Construction method of fair-faced concrete wall with turnup
By pouring more concrete on the upper side of the floor slab during clean water concrete wall construction, using wire mesh or quick-closing mesh, and spreading gravels and covering film on the top of the flange, the problem of poor flange forming quality is solved, and the density and Surface integrity.
Patent Information
- Application Number
- CN202411484144.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-23
- Publication Date
- 2024-12-03
AI Technical Summary
In the construction of clean water concrete walls, the molding quality of the flange is difficult to ensure, and poor surface texture, bubbles, cracks and peeling are prone to occur.
By pouring more concrete on the upper side of the floor, installing steel wire mesh or quick-closing mesh, spreading stones on the top and re-vibrating it, covering plastic film and material cloth to prevent the hanging mold from leaking slurry and direct sunlight.
Effectively prevent the flip-up hanging mold from leaking slurry, increase the density, avoid surface cracking and peeling, and ensure the quality of flip-up forming.
Smart Images

Figure CN119062028A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of clear water wall construction engineering, in particular to a construction method of a clear water concrete wall with flanges. Background Art
[0002] During the construction of exposed concrete walls, the layers are usually divided according to the building elevation, and open joints are set at the building elevation, so that the doors, windows and curtain walls of the exterior walls can be aligned to form through joints, meeting the desired effect of the architect. The exposed concrete walls are divided into sections according to the building elevation between layers, which are often 10cm higher than the interlayer structure. The exposed concrete walls are not as wide as the interlayer beams, and the 10cm part needs to be constructed with a hanging formwork.
[0003] In order to eliminate the difference between the two, a flange of about 10 cm is generally added to the inter-layer elevation, and often a flange is required between each layer. From the facade, it is difficult to distinguish the flange position. If the flange is not cast well, the effect of the entire facade will be very poor, affecting the appearance of the entire building, so the flange position must be cast successfully.
[0004] Because there are interlayer beams at the floor location, and the flanges of the horizontal parts set on the interlayer beams are generally constructed using hanging molds, the molding quality is difficult to guarantee, resulting in poor surface texture, bubbles, easy cracking and peeling on the surface, and the surface is not dense.
[0005] Therefore, the present invention provides a construction method of a plain concrete wall with flanged edges. Summary of the invention
[0006] The purpose of the present invention is to overcome the defects of the prior art and provide a construction method for a plain concrete wall with a flange, so as to solve the problems that the molding quality of the conventional plain concrete wall flange construction is difficult to ensure, and the surface texture is poor, bubbles are generated, the surface is easy to crack and peel.
[0007] The invention provides a construction method for a plain concrete wall with a flange, and the technical scheme is as follows: the specific construction steps are as follows: S1: a template is installed at the designed position of a wall and a structural beam, and the height of the template on the side of the structural beam away from the floor slab is consistent with the designed height of the flange, and then concrete is poured on the wall and the structural beam; S2: after the pouring of the wall and the structural beam is completed, a part of the floor slab inside the structural beam is poured; S3: a hanging template is installed on the side of the flange close to the floor slab, and concrete is poured on the flange, and at the same time, concrete is poured on the upper side of the floor slab to prevent leakage of slurry at the hanging template; S4: after the pouring of the flange is completed, stones are sprinkled on the top of the flange and re-vibration is performed; S5: after the re-vibration is completed, the surface of the flange is covered; S6: after the flange reaches the designed strength, the over-cast concrete on the upper side of the floor slab is chiseled off.
[0008] Furthermore, the steps for pouring the wall and the structural beam are as follows: before installing the formwork, laying out the steel bars at the designed position; dividing the wall and the structural beam into five layers from bottom to top according to the height, and pouring the concrete in five times.
[0009] Furthermore, before the structural beam is cast, the steel bars in the floor slab are extended into the structural beam and fixed to the steel bars in the structural beam.
[0010] Furthermore, before the structural beam is cast, a steel mesh is provided and fixed at the connection between the structural beam and the designed position of the floor slab.
[0011] Furthermore, a partition is provided, and after the wall and the structural beam are cast, the partition is vertically fixed on the floor slab so that the partition blocks part of the concrete cast on the floor slab.
[0012] Furthermore, after the pouring of the floor slab is completed, a cover plate is provided, and the cover plate is covered on the upper side of the floor slab and fixed.
[0013] Furthermore, before the floor slab is cast, at least two screw rods are provided, one end of the screw rod is vertically fixed on the steel bars in the floor slab, and the other end of the screw rod is higher than the designed height of the floor slab, and the screw rod is buried in the floor slab when casting the floor slab.
[0014] Furthermore, after the cover plate is fixed, the concrete poured on the upper side of the floor plate is poured onto the cover plate.
[0015] Furthermore, stones are sprinkled on the top of the flange, and the flange is re-vibrated after being left to stand for half an hour.
[0016] Furthermore, when covering the surface of the flange, a plastic film and a material cloth are provided, the plastic film is covered on the surface of the flange, and then the material cloth is covered on the surface of the plastic film.
[0017] Compared with the prior art, the present invention has the following beneficial effects:
[0018] While pouring the flange, pouring a certain thickness of concrete on the upper side of the floor slab can prevent leakage of slurry and liquid at the flange hanging formwork, thereby ensuring the quality of the flange forming.
[0019] Since there is more floating slurry on the top of the flange, sprinkling stones on the top of the flange and re-vibrating it after half an hour can effectively increase the density of the top of the flange.
[0020] By covering the top with film and material cloth, direct sunlight is avoided, thereby preventing the surface of the plain concrete from shrinking, cracking and peeling.
[0021] By installing wire mesh or quick-closing mesh, the loss of concrete can be blocked.
[0022] Pouring the floor slab within a partial range on one side of the hanging formwork can prevent the loss of concrete at the hanging formwork position.
[0023] By pouring concrete on the upper side of the floor slab, the molding quality of the flange can be ensured. After the flange is formed, the excess concrete is chiseled off. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 The present invention is a schematic structural diagram of a plain concrete wall with flanges.
[0025] Figure 2 The present invention is a structural cross-sectional view of a plain concrete wall with flanges.
[0026] Figure 3 to Figure 4 The present invention is a construction cross-sectional view of a flanging plain concrete wall.
[0027] Legend: 1. Wall; 2. Floor; 3. Flange; 4. Screw; 5. Partition; 6. Wire mesh; 7. Hanging formwork; 8. Structural beam; 9. Cover plate. DETAILED DESCRIPTION
[0028] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0029] See also Figure 1The invention provides a construction method of a plain concrete wall with a flange, which solves the problems that the molding quality of the existing plain concrete wall flange construction is difficult to ensure, and the surface texture is poor, bubbles are generated, the surface is easy to crack and peel. When pouring the flange, by pouring a certain thickness of concrete on the upper side of the floor slab, the leakage of slurry and liquid at the hanging mold of the flange can be prevented, thereby ensuring the quality of the flange molding. Since there is a lot of floating slurry on the top of the flange, by sprinkling stones on the top of the flange and re-vibrating it after half an hour, the density of the top of the flange can be effectively increased. By covering the top with a film and a material cloth, direct sunlight is avoided, thereby avoiding the shrinkage of the surface of the plain concrete, and the phenomenon of cracking and peeling easily occurring. By setting a wire mesh or a quick-closed net, the loss of concrete can be blocked. The floor slab within a part of the range on one side of the hanging mold is poured to prevent the loss of concrete at the hanging mold position. By pouring concrete on the upper side of the floor slab, the molding quality of the flange can be guaranteed. After the flange is formed, the over-cast concrete is chiseled off.
[0030] The construction method of a plain concrete wall with flanged edges of the present invention is described below in conjunction with the accompanying drawings.
[0031] See also Figure 1 , showing a schematic structural diagram of a plain concrete wall with flanges according to the present invention. Figure 2 , showing a structural cross-sectional view of a plain concrete wall with flanges according to the present invention. Figure 3 to Figure 4 This is a construction cross-sectional view of a plain concrete wall with flanges according to the present invention. Figure 1 and Figure 3 , a construction method of a plain concrete wall with flanged edges according to the present invention is described.
[0032] like Figures 1 to 4 As shown, a construction method for flanging of a plain concrete wall of the present invention has the following specific construction steps: installing a formwork at the designed position of the wall 1 and the structural beam 8, and the height of the formwork on the side of the structural beam 8 away from the floor 2 is consistent with the designed height of the flanging 3, and then pouring concrete on the wall 1 and the structural beam 8; S2: after the pouring of the wall 1 and the structural beam 8 is completed, pouring part of the floor 2 on the inner side of the structural beam 8; S3: installing a hanging formwork 7 on the side of the flanging 3 close to the floor 2, and pouring concrete on the flanging 3, and at the same time pouring concrete on the upper side of the floor 2 to prevent leakage of slurry from the hanging formwork 7; S4: after the pouring of the flanging 3 is completed, sprinkling stones on the top of the flanging 3 and re-vibrating; S5: after the re-vibration is completed, covering the surface of the flanging 3; S6: after the flanging 3 reaches the designed strength, chiseling out the excess concrete poured on the upper side of the floor 2.
[0033] In a specific embodiment, the height of the flange 3 is 10 cm.
[0034] In a specific embodiment, the steps for pouring the wall 1 and the structural beam 8 are as follows: before installing the formwork, the steel bars are arranged at the designed position; the wall 1 and the structural beam 8 are divided into five layers from bottom to top according to the height, and the concrete is poured in five times.
[0035] In a specific implementation, before the structural beam 8 is cast, the steel bars in the floor slab 2 are extended into the structural beam 8 and fixed to the steel bars in the structural beam 8 .
[0036] In a specific embodiment, before the structural beam 8 is cast, a steel mesh 6 is provided and fixed at the connection between the structural beam 8 and the designed position of the floor slab 2 .
[0037] In a preferred embodiment, the wire mesh 6 can be replaced by a quick-closing mesh.
[0038] In a specific embodiment, a partition 5 is provided. After the wall 1 and the structural beam 8 are cast, the partition 5 is vertically fixed on the floor slab 2 so that the partition 5 blocks part of the concrete cast on the floor slab 2.
[0039] In a specific embodiment, after the floor slab 2 is poured, a cover plate 9 is provided, and the cover plate 9 is covered on the upper side of the floor slab 2 and fixed.
[0040] In a specific embodiment, before the floor slab 2 is poured, at least two screw rods 4 are provided, one end of the screw rod 4 is vertically fixed on the steel bars in the floor slab 2, and the other end is higher than the design height of the floor slab 2, and the screw rod 4 is buried in the floor slab 2 when the floor slab 2 is poured.
[0041] More specifically, a nut and a nut washer are provided, the nut washer is sleeved on the corresponding screw rod 4, and then the nut is screwed onto the corresponding screw rod 4 to fix the cover plate 9. By fixing the cover plate 9, the cover plate 9 can be prevented from floating up during the flanging pouring and vibration process.
[0042] In a specific implementation, after the cover plate 9 is fixed, the extra concrete poured on the upper side of the floor slab 2 is poured onto the cover plate 9 .
[0043] In a preferred embodiment, the thickness of the poured concrete is 50-100 mm.
[0044] In a specific implementation, stones are sprinkled on the top of the flange 3 , and the flange 3 is re-vibrated after being left to stand for half an hour, so as to effectively ensure the molding quality of the flange 3 .
[0045] In a specific embodiment, when covering the surface of the flange 3, a plastic film and a material cloth are provided, the plastic film is covered on the surface of the flange 3, and then the material cloth is covered on the surface of the plastic film. The plastic film can maintain the flange 3 to prevent excessive water loss, and by further covering the material cloth, the flange 3 can be prevented from being directly exposed to the hot sun, thereby improving the molding quality of the flange 3.
[0046] The construction process of the fair-faced concrete wall with flanged edges of the present invention is described in detail below.
[0047] Reinforcement bars are arranged at the designed positions of the wall 1 and the structural beam 8 , and reinforcement bars are arranged at the designed position of the floor slab 2 . The reinforcement bars in the floor slab 2 extend to the designed position of the structural beam 8 and are welded to the reinforcement bars in the structural beam 8 .
[0048] Formwork is set up at the designed position of the wall 1 and the structural beam 8. Except that the height of the formwork at the floor slab 2 is consistent with the designed height of the flange 3, a wire mesh 6 is set at the connection between the floor slab 2 and the designed position of the structural beam 8. Then the wall 1 and the structural beam 8 are evenly divided into five layers from bottom to top according to the height, and then the wall 1 and the structural beam 8 are poured from bottom to top in five times.
[0049] At least two screw rods 4 are arranged at the designed position of the floor slab 2, and the upper ends of the screw rods 4 extend beyond the designed position of the floor slab 2. Then the formwork is supported, and then the floor slab 2 is poured with concrete.
[0050] After the concrete at the floor 2 reaches the designed strength, the cover plate 9 is installed on the upper side of the floor 2, so that the through holes on the cover plate 9 are sleeved on the corresponding screw rods 4, and then the nut gasket is sleeved on the screw rods 4, and the nut is screwed on the screw rods 4 to fix the cover plate 9.
[0051] The formwork and the hanging formwork 7 are installed at the designed position of the flange 3 and then concrete is poured on the flange 3. At the same time, concrete is poured on the upper side of the cover plate 9. After all the construction is completed, the concrete on the cover plate 9 is removed.
[0052] After the pouring of the flange 3 is completed, stones are sprinkled on the top of the flange 3, and re-vibration is performed after waiting for 30 minutes. After the re-vibration is completed, a plastic film is covered on the surface of the flange 3, and a material cloth is covered on the plastic film.
[0053] The present invention is described in detail above in conjunction with the embodiments of the accompanying drawings. A person skilled in the art can make various variations of the present invention according to the above description. Therefore, certain details in the embodiments should not constitute a limitation of the present invention, and the scope of protection of the present invention shall be defined by the scope of the attached claims.
Claims
1. A construction method for a plain concrete wall with flanges, Features: The specific construction steps are as follows: S1: installing formwork at the designed positions of the wall (1) and the structural beam (8), and the height of the formwork on the side of the structural beam (8) away from the floor slab (2) is consistent with the designed height of the flange (3), and then pouring concrete on the wall (1) and the structural beam (8); S2: After the wall (1) and the structural beam (8) are cast, a portion of the floor slab (2) inside the structural beam (8) is cast; S3: installing a hanging formwork (7) on the side of the flange (3) close to the floor slab (2), pouring concrete on the flange (3), and pouring concrete on the upper side of the floor slab (2) to prevent concrete leakage at the hanging formwork (7); S4: After the flange (3) is poured, stones are sprinkled on the top of the flange (3) and re-vibrated; S5: After the re-vibration is completed, the surface of the flange (3) is covered; S6: After the flange (3) reaches the designed strength, the excess concrete poured on the upper side of the floor slab (2) is chiseled off.
2. A construction method for a plain concrete wall with flanges according to claim 1, Features: The steps of casting the wall (1) and the structural beam (8) are as follows: Before installing the formwork, lay out the reinforcement at the designed location; The wall (1) and the structural beam (8) are divided into five layers from bottom to top according to height, and the concrete is poured in five times.
3. A construction method for a plain concrete wall with flanges according to claim 1, Features: Before the structural beam (8) is cast, the steel bars in the floor slab (2) are extended into the structural beam (8) and fixed to the steel bars in the structural beam (8).
4. A construction method for a plain concrete wall with flanges according to claim 1, Features: Before the structural beam (8) is cast, a steel mesh (6) is provided and the steel mesh (6) is fixed at the connection between the structural beam (8) and the floor slab (2) at the designed position.
5. A construction method for a plain concrete wall with flange according to claim 1, Features: A partition (5) is provided. After the wall (1) and the structural beam (8) are cast, the partition (5) is vertically fixed on the floor slab (2) so that the partition (5) blocks part of the concrete cast on the floor slab (2).
6. A construction method for a plain concrete wall with flanges according to claim 1, Features: After the pouring of the floor slab (2) is completed, a cover plate (9) is provided, and the cover plate (9) is covered on the upper side of the floor slab (2) and fixed.
7. A construction method for a plain concrete wall with flanges according to claim 6, Features: Before the floor slab (2) is cast, at least two screw rods (4) are provided, one end of the screw rod (4) is vertically fixed on the steel bars in the floor slab (2), and the other end is higher than the designed height of the floor slab (2), and when the floor slab (2) is cast, the screw rod (4) is buried in the floor slab (2).
8. A construction method for a plain concrete wall with flanges according to claim 7, Features: After the cover plate (9) is fixed, the extra concrete poured on the upper side of the floor slab (2) is poured onto the cover plate (9).
9. The construction method of a plain concrete wall with flange according to claim 1, Features: Stones are sprinkled on the top of the flange (3), and after being left to stand for half an hour, the flange (3) is re-vibrated.
10. The construction method of a plain concrete wall with flange according to claim 1, Features: When covering the surface of the flange (3), a plastic film and a material cloth are provided, the plastic film is covered on the surface of the flange (3), and then the material cloth is covered on the surface of the plastic film.