Frame structure existing building top-down multi-storey basement storey-adding method
The method addresses the challenge of adding multiple underground floors to existing buildings by using steel-cement-soil mixing piles and extended frame columns to minimize environmental impact and maintain structural integrity.
Patent Information
- Application Number
- CN202411199573.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-29
- Publication Date
- 2024-12-03
AI Technical Summary
Existing methods fail to efficiently add multiple underground floors to existing buildings with frame structures while minimizing impact on the surrounding environment and maintaining structural integrity.
A method involving foundation pit support, earth excavation, pouring slabs and force transfer belts, reinforcing foundation soil with pile foundations, dewatering, and reverse construction of underground structures using steel-cement-soil mixing piles and extended frame columns to transfer upper loads to the basement floor.
The method allows for the construction of multi-story basements with controlled settlement, reducing environmental impact and enabling normal use of upper floors during construction.
Smart Images

Figure CN119062140A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building engineering in civil engineering, and in particular to a method for adding floors to a multi-story basement in a reverse construction of an existing building with a frame structure. Background Art
[0002] Urban expansion is often restricted by limited land resources. The construction of underground parking lots has become one of the constraints on the healthy development of cities, especially when there are no basements and underground parking lots. The defects of existing buildings in terms of use functions are becoming increasingly apparent. The building density, population density, and vehicle density of old urban areas in large and megacities are very high. However, the buildings in old communities were built a long time ago, and most of them did not consider setting up underground parking lots, which caused serious conflicts with the increasing number of motor vehicles, resulting in parking difficulties, traffic jams, insufficient social public resources, and even social contradictions in cities, which seriously affected people's quality of life and work.
[0003] The application number is 201410690050.7, and the patent name is "Method for supporting underground floor increase of existing buildings by using supporting structure and underpinning structure", which proposes a method for adding one underground floor with independent foundation of frame structure, but fails to solve the problem of adding multiple underground floors, and the impact of deep development of underground space on the surrounding environment. The application number is 201110075492.7, and the patent name is "Method for adding basement floors of existing buildings with independent foundation of frame structure", which proposes a method for adding basements by extending the original frame columns and forming an integral new foundation with the basement floor, but fails to solve the problem of adding multiple basements and reduce the impact of construction on the surrounding environment. The application number is 201310390195.0, and the patent name is "Method for supporting underground floor increase of existing buildings by using existing pile foundation", which considers the method for adding underground floors of existing buildings with end-bearing pile foundation; for friction piles, press piles or supplementary bored piles are used, which are limited by the space in the existing building, and the support structure for retaining soil and stopping water is not considered to be set outside the new basement, and the support structure is not used to support the upper structure. Summary of the invention
[0004] Purpose of the invention: The purpose of the present invention is to provide a method for adding multi-story basements to existing buildings with frame structures. The method is easy to construct and can strictly control the settlement during the transfer of upper loads.
[0005] Technical solution: The present invention proposes a method for adding floors to a multi-story basement in an existing building with a frame structure, comprising the following steps:
[0006] S1 carries out foundation pit support construction and indoor earth excavation for existing buildings;
[0007] S2 pours the top slab and force transfer belt of the first underground floor;
[0008] S3 reinforces the foundation soil and presses in pile foundations;
[0009] S4 dewaters the foundation pit and excavates the downward soil in the room;
[0010] S5 conducts reverse construction of underground structures;
[0011] S6 repeats the above steps S1-S5 to complete the reverse construction of the newly added underground multi-layer structure.
[0012] Preferably, the foundation pit retaining construction in step (1) is specifically to construct a foundation pit retaining structure around the existing building to be added to, and the retaining structure adopts a steel-cement-soil mixing pile structure with a row of high-pressure rotary jet piles inserted with H-shaped steel.
[0013] Preferably, the indoor earth excavation in step (1) is specifically to excavate foundation soil starting from the indoor floor until the top surface of the original independent foundation.
[0014] Preferably, in step (2), casting the underground first floor top slab is specifically performed by drilling horizontal holes on the side of the original independent foundation and implanting steel bars, tying the underground first floor top slab steel bars, casting concrete to form the underground first floor top slab, and reserving an excavation opening.
[0015] Preferably, casting the force transfer belt in step (2) specifically involves casting the force transfer belt to the retaining structure.
[0016] Preferably, the reinforcement of the foundation soil in step (3) is specifically to vertically drill a hole on the top surface of the underground floor top plate, and pass the drill rod of the high-pressure jet grouting equipment downward through the drill hole to stir the foundation soil.
[0017] Preferably, in step (3), pressing the pile foundation is specifically to press the prefabricated steel barrel concrete pile into the stirred foundation soil from the vertical drill hole to the designed depth.
[0018] Preferably, the dewatering of the foundation pit in step (4) is specifically carried out by drilling well-point dewatering pipes inside the foundation pit supporting structure to carry out dewatering.
[0019] Preferably, in step (4), excavating the soil downward from the indoor space is specifically to continue to excavate the soil under the top plate of the underground first floor until the soil is excavated to the bottom surface elevation of the floor of the proposed basement, and the load of the existing building is transferred to the foundation soil under the floor by the pile foundation.
[0020] Preferably, the reverse construction of the underground structure in S5 comprises the following specific steps:
[0021] S51 Drill oblique holes on the top surface of the underground first floor roof, extend the frame columns of the building downward to the bottom of the foundation pit to form extended frame columns, and cast the bottom plate;
[0022] S52 cuts off the steel barrel concrete piles above the basement floor;
[0023] S53 The retaining structure formed by H-shaped steel also serves as the additional basement side wall.
[0024] Beneficial effects: After the construction of the method of the present invention is completed, the load of the upper building is transferred to the basement floor and the pile foundation under the floor through the extended frame columns, and is borne by the foundation soil under the floor. The support system of the underground first floor top plate also serves as the foundation pit retaining structure to resist the lateral pressure of the soil and reduce the impact of the construction on the surrounding environment. The deformation of the second floor caused by the construction of the basement floor can be effectively controlled, reducing the impact on the original building structure, and the normal use of the floors above the second floor of the original building will not be affected during the construction. Reverse construction can reduce the impact on the surrounding environment. This method can form a multi-story basement under the building. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a column grid diagram of an existing building of the frame structure of the present invention;
[0026] Figure 2 It is the plan layout of the foundation pit retaining structure, steel barrel concrete piles and excavation opening around the existing frame structure building;
[0027] Figure 3 It is the Ⅰ-Ⅰ section view of an existing frame structure building before adding an underground floor;
[0028] Figure 4 This is the Ⅰ-Ⅰ section view after the retaining structure is constructed;
[0029] Figure 5 It is the Ⅰ-Ⅰ cross-section diagram after the foundation soil is partially excavated to the top surface of the original independent foundation;
[0030] Figure 6 This is the Ⅰ-Ⅰ section view after the original independent foundation reinforcement is poured in reverse to build the underground top slab and reserve the excavation opening;
[0031] Figure 7 This is the Ⅰ-Ⅰ cross-section after vertical holes are drilled into the top slab of the underground floor and steel barrel concrete piles are pressed in;
[0032] Figure 8 This is the Ⅰ-Ⅰ cross-section after the earthwork is excavated from the underground first floor to the bottom of the pit;
[0033] Fig. 9 This is the Ⅰ-Ⅰ section view after the original frame columns were extended and the basement slab was poured;
[0034] Fig.10 This is the Ⅰ-Ⅰ section view after cutting off the steel barrel concrete piles above the bottom plate;
[0035] Fig.11 This is the Ⅰ-Ⅰ section view after pouring the concrete of the excavation opening to complete the construction of the underground floor top slab and backfilling the soil to the original ground surface;
[0036] Fig.12 This is the Ⅰ-Ⅰ cross-section diagram after step 10 is completed and the second underground floor is added.
[0037] Among them, 1. frame column, 2. frame beam, 3. original independent foundation, 4. foundation soil, 5. retaining structure, 51. H-shaped steel, 52. rotary jet pile, 6. independent foundation embedded reinforcement, 7. reverse construction of the first underground floor top plate, 8. excavation port, 9. force transmission belt, 10. vertical drilling, 11. steel barrel concrete pile, 12. grouting hole, 13. extended frame column, 14. first underground floor bottom plate, 15. second underground floor bottom plate. DETAILED DESCRIPTION
[0038] The following is combined with Figure 1-12 The present invention is further illustrated by the following embodiments.
[0039] The present invention discloses a method for adding a multi-story basement in a reverse construction of an existing building with a frame structure. The process uses the original independent foundation embedded reinforcement 52 to reversely form the top plate of the underground layer, and adopts steel barrel concrete piles that are pressed into the foundation soil after mixing with high-pressure rotary jet piles drilled from the top surface of the top plate to support the top plate of the underground layer and the upper load of the building, and then extends the frame column 1, and secretly digs rock and soil under the excavation opening 7 reserved for the top plate 6 of the reverse construction of the underground layer to form an underground space for the added underground layer; reserves an excavation opening for the bottom plate of the underground layer, and secretly digs downward to form multiple underground layers, including the following steps:
[0040] (1) Construction of a foundation pit retaining structure 5 around an existing building where an underground floor is to be added. The retaining structure 5 is composed of a row of high-pressure jet grouting piles 52 with H-shaped steel 51 inserted therein;
[0041] (2) Excavating foundation soil 4 from the indoor floor to the top surface of the original independent foundation 3;
[0042] (3) Drill horizontal holes on the side of the original independent foundation 3 and implant steel bars 6, tie the steel bars of the underground top plate, pour concrete to form the underground top plate 7, and reserve an excavation opening 8;
[0043] (4) simultaneously pouring the force transfer belt 9 to the retaining structure 5;
[0044] (5) Drill a hole 10 vertically on the top surface of the top plate 7 of the first underground floor, and insert the drill rod of the high-pressure jet grouting equipment downward through the hole; press the prefabricated steel barrel concrete pile 11 into the foundation soil 4 from the vertical hole 10 to the designed depth;
[0045] (6) Drill well-point drainage pipes on the inner side of the foundation pit support structure to carry out drainage;
[0046] (7) Continue to excavate the earth under the excavation opening 8 of the top plate 7 of the first underground floor to the bottom surface elevation of the floor plate of the proposed basement. The load of the existing building is transferred to the foundation soil under the floor plate through the pile foundation 11;
[0047] (8) Drill an inclined hole 12 on the top surface of the underground first floor top plate 7, extend the frame column 1 of the building downward and cast it to the bottom of the foundation pit to form an extended frame column 13, and cast the bottom plate 14 (with an excavation opening 8 reserved);
[0048] (9) Cut off the steel barrel concrete piles 11 above the basement floor 14;
[0049] (10) Repeat the above steps to form two (or more) underground layers.
[0050] After the construction of this method is completed, the upper structure load is transmitted to the original pile foundation under the bottom plate and the reinforced foundation soil 4 through the extended frame column 1, and is jointly borne by the original pile foundation under the bottom plate and the reinforced foundation soil 4, and the original structural frame beam 2 is not affected during the construction. The deformation of the second floor caused by the basement floor construction can be effectively controlled, reducing the impact on the original building, and the second floor and above floors can be used normally.
Claims
1. A method for adding multiple basements to an existing frame structure building, characterized in that: The following steps are involved: S1 carries out foundation pit support construction and indoor earth excavation for existing buildings; S2 pouring the top plate (7) and the force transmission belt (9) of the underground floor; S3 reinforces the foundation soil (4) and presses into the pile foundation; S4 dewaters the foundation pit and excavates the downward soil in the room; S5 conducts reverse construction of underground structures; S6 repeats the above steps S1-S5 to complete the reverse construction of the newly added underground multi-layer structure.
2. The method for adding floors to a multi-story basement in an existing frame structure according to claim 1, characterized in that: The foundation pit retaining construction in S1 specifically involves the construction of a foundation pit retaining structure around an existing building to be added to a new floor. The retaining structure adopts a steel-cement soil mixing pile structure with a row of high-pressure jet jet piles inserted into an H-shaped steel.
3. The method for adding floors to a multi-story basement in an existing frame structure according to claim 1, characterized in that: The indoor earth excavation in S1 specifically involves excavating foundation soil starting from the indoor floor until the top surface of the original independent foundation.
4. The method for adding floors to a multi-story basement in an existing frame structure according to claim 1, characterized in that: The pouring of the underground first floor top slab in S2 specifically includes drilling horizontal holes on the side of the original independent foundation and implanting steel bars, tying the underground first floor top slab steel bars, pouring concrete to form the underground first floor top slab, and reserving an excavation opening.
5. The method for adding floors to a multi-story basement in a frame structure existing building according to claim 2, characterized in that: The pouring of the force transfer belt in S2 specifically involves pouring the force transfer belt to the retaining structure.
6. The method for adding floors to a multi-story basement in a frame structure existing building according to claim 2, characterized in that: The reinforcement of the foundation soil in S3 specifically includes vertically drilling a hole on the top surface of the top plate of the first underground floor, and passing the drill rod of the high-pressure jet grouting equipment downward through the drill hole to stir the foundation soil.
7. The method for adding floors to a multi-story basement in a frame structure existing building according to claim 6, characterized in that: The pressing of the pile foundation in S3 is specifically to press the prefabricated steel barrel concrete pile into the mixed foundation soil from the vertical drilling hole to the designed depth.
8. The method for adding floors to a multi-story basement in a frame structure existing building according to claim 2, characterized in that: The dewatering of the foundation pit in S4 is specifically to install well point dewatering pipes inside the foundation pit supporting structure to carry out dewatering.
9. The method for adding floors to a multi-story basement in a frame structure existing building according to claim 1, characterized in that: The excavation of the soil downward from the indoor in S4 specifically involves continuing to secretly excavate the soil under the top plate excavation opening of the underground first floor, and excavating to the bottom surface elevation of the floor plate of the planned basement, and the load of the existing building is transferred to the foundation soil under the floor plate through the pile foundation.
10. The method for adding floors to a multi-story basement in a frame structure existing building according to claim 6, characterized in that: The reverse construction of the underground structure in S5 includes the following specific steps: S51 Drill oblique holes on the top surface of the underground first floor roof, extend the frame columns of the building downward to the bottom of the foundation pit to form extended frame columns, and cast the bottom plate; S52 cuts off the steel barrel concrete piles above the basement floor; S53 The retaining structure formed by the H-shaped steel (51) also serves as the additional basement side wall.
Citation Information
Patent Citations
Storey adding method for existing building basement with frame structure and independent foundation
CN102182325A
Method for supporting existing building underground added storey through original pile foundations
CN103437567B
Method for supporting underground layer increasing of existing building by supporting structure and underpinning structure
CN104453274A