Construction engineering cost on-site surveying and mapping device and surveying and mapping method

By designing surveying and mapping devices with support rods, ground rods and triangle brackets, the problem of insufficient stability of traditional devices on non-flat or soft ground is solved, and more accurate surveying and mapping data collection is achieved to ensure the quality and progress of the engineering project.

CN119062869AInactive Publication Date: 2024-12-03JIANGXI SHUANGJINGGONG IND CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411290976.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-14
Publication Date
2024-12-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Traditional construction project cost on-site surveying and mapping devices are difficult to maintain stability under non-flat or soft ground conditions, resulting in distortion of measurement data and affecting the quality and progress of the project.

Method used

A surveying and mapping device including support, support rod, support block, ground rod and triangle bracket is designed. The ground contact area is increased by supporting block, and the ground rod is increased stability. The triangle bracket is adjusted by using pressure sensor and electric push rod. The length, combined with the mounting assembly, limit the movement of the limit ring to ensure the stability of the device.

Benefits of technology

It improves the stability of the surveying and mapping device and the accuracy of data, ensures that the measurement data truly reflects the actual situation, reduces design and construction deviations, and improves the quality and progress of the project.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119062869A_ABST
    Figure CN119062869A_ABST
Patent Text Reader

Abstract

The invention relates to the field of building surveying and mapping, in particular to a building engineering cost field surveying and mapping device and method.The surveying and mapping device comprises a support, the support is used for installing a surveying and mapping instrument, a supporting rod is arranged at the bottom of the support, a supporting block is arranged at the bottom of the supporting rod, and a gradienter is installed on the supporting block; a round hole is formed in the middle of the supporting block, a ground inserting rod is slidably connected into the supporting rod and used for being inserted into the ground for stabilization, a triangular support is installed on the support, and a connecting assembly is arranged between the triangular support and the supporting rod. According to the surveying and mapping device, the supporting blocks, the ground inserting rods and the triangular supports are arranged, the contact area of the whole surveying and mapping device and the ground is increased through the supporting blocks, so that certain stability is kept, meanwhile, the contact surface with the unstable ground condition is extruded through the supporting legs, the ground is tamped, and it is ensured that the supporting legs are evenly stressed through pressure sensors; the stability of the triangular bracket is enhanced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of building surveying and mapping, and in particular to a construction engineering cost on-site surveying and mapping device and a surveying and mapping method. Background Art

[0002] With the continuous development of the construction industry, the demand for accurate management of engineering projects is increasing, among which the accurate assessment of construction project costs is one of the key factors for project success. In order to improve the accuracy of cost assessment, on-site surveying and mapping technology has been widely used. However, in actual operation, existing surveying and mapping devices often have some shortcomings, especially in terms of stability, which directly affects the accuracy and reliability of surveying and mapping data.

[0003] Traditional on-site surveying and mapping devices for construction project costs usually consist of measuring brackets, measuring instruments and other auxiliary equipment. The original intention of designing such devices is to quickly and accurately collect information about topography and landforms under on-site conditions, and to make cost estimates based on this information. However, due to the complex and changeable environment of construction sites and unstable ground conditions (such as soft soil, slopes, potholes and other terrain), traditional surveying and mapping devices often find it difficult to maintain sufficient stability. When the surveying and mapping device is placed on the land, if it encounters an uneven or soft surface, it may tilt or shift, resulting in distorted measurement data. In this case, the data collected not only fails to truly reflect the actual situation, but may also cause deviations in subsequent design and construction, thereby affecting the quality and progress of the entire project. Summary of the invention

[0004] The purpose of the present invention is to provide a construction engineering cost on-site surveying and mapping device and a surveying and mapping method to improve the problems existing in the prior art.

[0005] On the one hand, the present invention provides a construction project cost on-site surveying and mapping device, including a support, the support is used to install a surveying instrument, a support rod is provided at the bottom of the support, a support block is provided at the bottom of the support rod, a spirit level is installed on the support block, a circular hole is opened in the middle of the support block, a ground rod is slidably connected to the support rod, the ground rod is used to be inserted into the ground for stabilization, a tripod bracket is installed on the support, and a connecting assembly is provided between the tripod bracket and the support rod.

[0006] More preferably, the triangular bracket is composed of an outer rod, a center rod and an inner rod which are slidably connected in sequence, a first spring is connected between the outer rod and the center rod, an electric push rod is installed in the center rod, and the telescopic end of the electric push rod is connected to the inner rod.

[0007] More preferably, the bottom of the inner rod is rotatably connected to a support leg, a pressure sensor is provided at the bottom of the support leg, and the pressure sensor is electrically connected to the electric push rod.

[0008] More preferably, a limit block is provided on a side of the center rod close to the first spring, and a switch is provided on a side of the outer rod away from the first spring, the switch is used to control the start of the electric push rod, and the limit block contacts and cooperates with the switch.

[0009] More preferably, the connecting assembly includes a limit ring, a connecting block and a rocker arm, the limit ring is slidably connected to the upper side of the support rod, the limit ring and the outer rod are both provided with connecting blocks, the rocker arm is rotatably connected between the connecting block on the limit ring and the connecting block on the outer rod, the limit ring moves downward to drive the rocker arm to swing, thereby opening the triangular bracket.

[0010] More preferably, a circular hole is provided on a side of the outer rod close to the rocker rod, a top bead is provided on a side of the center rod close to the inner rod, an elastic member is connected between the top bead and the center rod, the top bead fits with the circular hole on the outer rod, and a circular arc-shaped inclined block is provided on the side of the rocker rod close to the circular hole on the outer rod, and the circular arc-shaped inclined block is used to push the top bead into the center rod.

[0011] More preferably, a locking assembly for limiting the limiting ring is also included, the locking assembly comprising a bevel rack, a tooth plate, a top column and a second spring, the bevel rack is arranged on the upper side of the support rod, the tooth plate is rotatably connected in the limiting ring, a torsion spring is connected between the tooth plate and the limiting ring, the top column is slidably connected in the limiting ring, the top column is in contact and cooperate with the tooth plate, the second spring is connected between the top column and the limiting ring, and the top column passes through the limiting ring.

[0012] More preferably, a sliding groove is provided on the upper side of the support rod, the ground-inserting rod is fixedly connected to the limiting ring via the sliding groove, and the ground-inserting rod is a compressible rod.

[0013] More preferably, a semicircular stopper is slidably connected to the bottom of the support block, the semicircular stopper is used to block the ground-inserting rod, a third spring is connected between the semicircular stopper and the support block, a pressure frame is slidably connected to the bottom of the support block, a fourth spring is connected between the pressure frame and the support block, a locking block is slidably connected inside the support block, the locking block is used to lock the semicircular stopper, and a fifth spring is connected between the locking block and the support block.

[0014] In another aspect, the present invention provides a method for on-site surveying and mapping of construction project costs, using any of the surveying and mapping devices described above, and operating as follows:

[0015] Place the support rod on the ground, and use the spirit level on the support block to adjust the surveying and mapping device to ensure that it is level. Then move the limit ring downward, and the limit ring drives the ground-inserting rod to be inserted into the ground to stabilize the surveying and mapping device. At the same time, the limit ring opens the tripod and supports it on the ground to stabilize the surveying and mapping device. Then install the surveying instrument on the support for surveying.

[0016] Compared with the prior art, the present invention has the following advantages:

[0017] The present invention is provided with a support block, a ground-inserting rod and a tripod bracket. The support block increases the contact area between the entire surveying and mapping device and the ground, thereby maintaining a certain stability. The ground-inserting rod is inserted into the ground, which increases the stability of the surveying and mapping device. At the same time, the final length of the tripod bracket is determined by the pressure value sensed by the pressure sensor. On the one hand, the support legs can be used to squeeze the contact surface with unstable ground conditions to compact the ground. On the other hand, the pressure sensor can ensure that the support feet are evenly stressed, thereby enhancing the stability of the tripod bracket. Secondly, the present invention uses a locking assembly to lock the locking tooth plate through an oblique rack, thereby limiting the movement of the limit ring. When the limit ring moves downward to open the tripod bracket, the limit ring is restricted to prevent the movement of the limit ring from causing instability of the tripod bracket, thereby enhancing the stability of the entire surveying and mapping device. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the three-dimensional structure of the present invention;

[0019] Figure 2 It is a three-dimensional structural schematic diagram of the supporting rod, supporting block and ground-inserting rod and other components of the present invention;

[0020] Figure 3 It is a schematic diagram of the three-dimensional structure of the tripod bracket of the present invention;

[0021] Figure 4 It is a three-dimensional structural schematic diagram of the center rod, electric push rod and other components of the present invention;

[0022] Figure 5 It is a three-dimensional structural schematic diagram of the outer rod, connecting block, limiting block and other components of the present invention;

[0023] Figure 6 It is a schematic diagram of the three-dimensional structure of the connection assembly of the present invention;

[0024] Figure 7 It is a schematic diagram of the three-dimensional structure of the swing rod of the present invention;

[0025] Figure 8 It is a schematic diagram of the three-dimensional structure of the clamping assembly of the present invention;

[0026] Fig. 9It is a three-dimensional structural schematic diagram of the semicircular stopper, the pressing frame and the positioning block and other components of the present invention;

[0027] Fig.10 It is a schematic diagram of the three-dimensional structure of the semicircular stopper of the present invention.

[0028] 1. Support; 2. Support rod; 3. Support block; 4. Ground rod; 5. Triangle bracket; 51. Outer rod; 52. Center rod; 53. Inner rod; 54. First spring; 55. Electric push rod; 56. Support leg; 57. Pressure sensor; 58. Limit block; 59. Switch; 6. Connecting assembly; 61. Limiting ring; 62. Connecting block; 63. Rocker; 7. Top bead; 8. Positioning assembly; 81. Bevel rack; 82. Positioning plate; 83. Top column; 84. Second spring; 9. Semicircular stop block; 10. Third spring; 11. Pressure frame; 12. Fourth spring; 13. Positioning block; 14. Fifth spring. DETAILED DESCRIPTION

[0029] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention. Unless otherwise defined, the technical terms or scientific terms used herein should be understood by people with general skills in the field to which the present invention belongs. "Including" and similar words used in this article mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects.

[0030] Embodiment 1:

[0031] The embodiment of the present invention provides a construction project cost on-site surveying and mapping device, such as Figure 1-Figure 7 As shown, it includes a support 1, which is used to install a surveying instrument. An opening and closing protection frame is installed on the support 1, and the surveying instrument is placed in the opening and closing protection frame. The opening and closing protection frame can slide up and down on the support 1 to adjust the up and down position of the surveying instrument. A support rod 2 is arranged at the bottom of the support 1, and a support block 3 is arranged at the bottom of the support rod 2. A spirit level is installed on the support block 3, and a round hole is opened in the middle of the support block 3. A ground rod 4 is slidably connected in the support rod 2, and the ground rod 4 is used to insert the round hole in the middle of the support block into the ground to stabilize the surveying and mapping device. A tripod bracket 5 is installed on the support 1, and a connecting component 6 is arranged between the tripod bracket 5 and the support rod 2.

[0032] Specifically, the triangular bracket 5 is composed of an outer rod 51, a center rod 52 and an inner rod 53 which are slidably connected in sequence. A first spring 54 is connected between the outer rod 51 and the center rod 52. An electric push rod 55 is installed in the center rod 52. The telescopic end of the electric push rod 55 is connected to the inner rod 53. The bottom of the inner rod 53 is rotatably connected to a support leg 56. A pressure sensor 57 is provided at the bottom of the support leg 56. The pressure sensor 57 is electrically connected to the electric push rod 55. A limit block 58 is provided on the side of the center rod 52 close to the first spring 54. A switch 59 is provided on the side of the outer rod 51 away from the first spring 54. The switch 59 is used to control the start of the electric push rod 55, and the limit block 58 contacts and cooperates with the switch 59.

[0033] Specifically, the connecting assembly 6 includes a limiting ring 61, a connecting block 62 and a rocker rod 63. The limiting ring 61 is slidably connected to the upper side of the support rod 2. The limiting ring 61 and the outer rod 51 are both provided with a connecting block 62. The rocker rod 63 is rotatably connected between the connecting block 62 on the limiting ring 61 and the connecting block 62 on the outer rod 51. The limiting ring 61 moves downward to drive the rocker rod 63 to swing, so as to open the triangular bracket 5. A circular hole is provided on the side of the outer rod 51 close to the rocker rod 63, and a top bead 7 is provided on the side of the center rod 52 close to the inner rod 53. An elastic member is connected between the top bead 7 and the center rod 52, and the top bead 7 fits with the circular hole on the outer rod 51. The side of the rocker rod 63 close to the circular hole on the outer rod 51 is an arc-shaped inclined block, which is used to push the top bead 7 into the center rod 52.

[0034] The working principle is as follows: place the support rod 2 on the ground, and adjust the level gauge on the support block 3 to ensure that the surveying and mapping device is level, then move the limit ring 61 downward, the limit ring 61 drives the ground-inserting rod 4 to be inserted into the ground, and stabilizes the surveying and mapping device. At the same time, the limit ring 61 pushes the triangular bracket 5 through the swing rod 63, and the arc-shaped inclined block of the swing rod 63 pushes the top bead 7 on the center rod 52, so that the top bead 7 is separated from the circular hole on the outer rod 51. Under the action of gravity and the reset action of the first spring 54, the center rod 52 slides downward in the outer rod 51 and extends. When it moves to the extreme position, the limit block 58 contacts the switch 59, thereby starting the electric push rod 55, so that the telescopic end of the electric push rod 55 drives the inner rod 53 to move downward and extend, and the inner rod 53 drives the supporting leg 56 and the pressure sensor 57 to move downward until they are in contact with the ground and squeeze the ground until the pressure value sensed by the pressure sensor 57 reaches a preset value, and the telescopic end of the electric push rod 55 is controlled to stop moving, thereby stabilizing the surveying and mapping device through the tripod bracket 5 and the support block 3, and ensuring the anti-collapse performance of the surveying and mapping device through the ground-inserting rod 4.

[0035] Embodiment 2:

[0036] On the basis of Example 1, Figure 8-Figure 10As shown, it also includes a locking assembly 8 for limiting the limiting ring 61, and the locking assembly 8 includes a beveled rack 81, a tooth plate 82, a top column 83 and a second spring 84. The beveled rack 81 is arranged on the upper side of the support rod 2, and the tooth plate 82 is rotatably connected in the limiting ring 61, and a torsion spring is connected between the tooth plate 82 and the limiting ring 61. A top column 83 is slidably connected in the limiting ring 61, and the top column 83 is in contact with the tooth plate 82. A second spring 84 is connected between the top column 83 and the limiting ring 61, and the top column 83 passes through the limiting ring 61.

[0037] When the limit ring 61 slides downward, the tooth plate 82 cooperates with the bevel rack 81, and the tooth plate 82 continuously cycles the process of flipping and resetting under the rental of the torsion spring. The bevel rack 81 prevents the tooth plate 82 from moving upward. When the surveying is completed and the tripod bracket 5 needs to be stored, the operator presses the top column 83 to deform the second spring 84, and the top column 83 pushes the tooth plate 82 to flip. At this time, the operator can move the limit ring 61 upward to the initial position.

[0038] Furthermore, a sliding groove is provided on the upper side of the support rod 2, and the ground-inserting rod 4 is fixedly connected to the limiting ring 61 through the sliding groove, and the tip of the ground-inserting rod 4 is retractable.

[0039] Furthermore, a semicircular stopper 9 is slidably connected to the bottom of the support block 3, and the semicircular stopper 9 is used to block the ground-inserting rod 4. A third spring 10 is connected between the semicircular stopper 9 and the support block 3, and the third spring 10 is used to drive the semicircular stopper 9 to reset. A pressure frame 11 is slidably connected to the bottom of the support block 3, and a convex rod is provided on the inner side of the pressure frame 11, which is used to be inserted into the semicircular stopper 9 to limit it. A fourth spring 12 is connected between the pressure frame 11 and the support block 3, and the fourth spring 12 is used to drive the pressure frame 11 to reset. A locking block 13 is slidably connected inside the support block 3, and the locking block 13 is used to lock the semicircular stopper 9. A fifth spring 14 is connected between the locking block 13 and the support block 3, and the fifth spring 14 is used to drive the locking block 13 to reset.

[0040] In order to prevent the operator from moving the limit ring 61 to extend the ground rod 4 when the support block 3 is not placed on the ground, thereby forming unnecessary safety hazards, when the support block 3 is not placed on the ground, the blocking block 13 will not be squeezed, and the semicircular stopper 9 will be limited by the pressure frame 11, so that the ground rod 4 cannot be extended. When the support block 3 is placed on the ground normally, the blocking block 13 is squeezed and moved upward, thereby driving the pressure frame 11 to move upward, so that the pressure frame 11 is separated from the semicircular stopper 9, thereby releasing the limit on the semicircular stopper 9. At this time, the operator moves the limit ring 61 to drive the ground rod 4 to move downward, and the ground rod 4 squeezes the semicircular stopper 9 to move outward, and the ground rod 4 is normally extended and inserted into the ground.

[0041] Embodiment 3:

[0042] On the basis of Example 2, the present invention further provides a method for on-site surveying and mapping of construction project costs, using the above-mentioned surveying and mapping device, and the surveying and mapping operation method includes:

[0043] Place the support rod 2 on the ground, and use the spirit level on the support block 3 to adjust the surveying and mapping device to ensure that it is level. Then move the limit ring 61 downward. The limit ring 61 drives the ground-inserting rod 4 to be inserted into the ground to stabilize the surveying and mapping device. At the same time, the limit ring 61 enables the tripod bracket 5 to open and support it on the ground to stabilize the surveying and mapping device. Then install the surveying instrument on the support 1 for surveying.

[0044] Although the embodiments of the present invention are described in detail above, it is obvious to those skilled in the art that various modifications and variations can be made to these embodiments. However, it should be understood that such modifications and variations are within the scope and spirit of the present invention as described in the claims. Moreover, the present invention described herein may have other embodiments and may be implemented or realized in a variety of ways.

Claims

1. A construction project cost on-site surveying and mapping device, characterized in that: The invention comprises a support (1), wherein the support (1) is used to install a surveying instrument, a support rod (2) is arranged at the bottom of the support (1), a support block (3) is arranged at the bottom of the support rod (2), a level is installed on the support block (3), a round hole is opened in the middle of the support block (3), a ground insertion rod (4) is slidably connected inside the support rod (2), and the ground insertion rod (4) is used to be inserted into the ground for stabilization, a triangular bracket (5) is installed on the support (1), and a connecting component (6) is arranged between the triangular bracket (5) and the support rod (2).

2. A construction engineering cost on-site surveying and mapping device according to claim 1, characterized in that: The triangular bracket (5) is composed of an outer rod (51), a center rod (52) and an inner rod (53) which are slidably connected in sequence. A first spring (54) is connected between the outer rod (51) and the center rod (52). An electric push rod (55) is installed in the center rod (52). The telescopic end of the electric push rod (55) is connected to the inner rod (53).

3. A construction engineering cost on-site surveying and mapping device according to claim 2, characterized in that: The bottom of the inner rod (53) is rotatably connected to a support leg (56), a pressure sensor (57) is provided at the bottom of the support leg (56), and the pressure sensor (57) is electrically connected to the electric push rod (55).

4. A construction engineering cost on-site surveying and mapping device according to claim 3, characterized in that: A limit block (58) is arranged on a side of the center rod (52) close to the first spring (54), and a switch (59) is arranged on a side of the outer rod (51) away from the first spring (54). The switch (59) is used to control the start of the electric push rod (55), and the limit block (58) is in contact with the switch (59).

5. A construction engineering cost on-site surveying and mapping device according to claim 4, characterized in that: The connection assembly (6) comprises a limiting ring (61), a connecting block (62) and a swing rod (63); the limiting ring (61) is slidably connected to the upper side of the support rod (2); the limiting ring (61) and the outer rod (51) are both provided with a connecting block (62); the swing rod (63) is rotatably connected between the connecting block (62) on the limiting ring (61) and the connecting block (62) on the outer rod (51); the limiting ring (61) moves downward to drive the swing rod (63) to swing, thereby opening the triangular bracket (5).

6. A construction engineering cost on-site surveying and mapping device according to claim 5, characterized in that: A circular hole is provided on a side of the outer rod (51) close to the swing rod (63); a top bead (7) is provided on a side of the center rod (52) close to the inner rod (53); an elastic member is connected between the top bead (7) and the center rod (52); the top bead (7) fits into the circular hole on the outer rod (51); and a circular arc-shaped inclined block is provided on a side of the swing rod (63) close to the circular hole on the outer rod (51); the circular arc-shaped inclined block is used to push the top bead (7) into the center rod (52).

7. A construction engineering cost on-site surveying and mapping device according to claim 6, characterized in that: The locking assembly (8) further comprises a locking assembly (8) for limiting the limiting ring (61), wherein the locking assembly (8) comprises an oblique rack (81), a latching tooth plate (82), a top column (83) and a second spring (84); the oblique rack (81) is arranged on the upper side of the support rod (2); the latching tooth plate (82) is rotatably connected inside the limiting ring (61); a torsion spring is connected between the latching tooth plate (82) and the limiting ring (61); the top column (83) is slidably connected inside the limiting ring (61); the top column (83) is in contact with and cooperates with the latching tooth plate (82); the second spring (84) is connected between the top column (83) and the limiting ring (61); and the top column (83) passes through the limiting ring (61).

8. A construction engineering cost on-site surveying and mapping device according to claim 7, characterized in that: A sliding groove is provided on the upper side of the support rod (2), and the ground-inserting rod (4) is fixedly connected to the limiting ring (61) via the sliding groove; the ground-inserting rod (4) is a compressible rod.

9. A construction engineering cost on-site surveying and mapping device according to claim 8, characterized in that: A semicircular stopper (9) is slidably connected to the bottom of the support block (3), and the semicircular stopper (9) is used to block the ground-inserting rod (4). A third spring (10) is connected between the semicircular stopper (9) and the support block (3). A pressing frame (11) is slidably connected to the bottom of the support block (3), and a fourth spring (12) is connected between the pressing frame (11) and the support block (3). A positioning block (13) is slidably connected inside the support block (3), and the positioning block (13) is used to position the semicircular stopper (9). A fifth spring (14) is connected between the positioning block (13) and the support block (3).

10. A construction project cost on-site surveying method, characterized in that: Using the surveying and mapping device according to any one of claims 1 to 9, the operations are as follows: The support rod (2) is placed on the ground, and the level gauge on the support block (3) is used to adjust the level of the surveying and mapping device. Then, the limit ring (61) is moved downward, and the limit ring (61) drives the ground-inserting rod (4) to be inserted into the ground to stabilize the surveying and mapping device. At the same time, the limit ring (61) causes the tripod support (5) to be opened and supported on the ground to stabilize the surveying and mapping device. Then, the surveying and mapping device is installed on the support (1) to perform surveying and mapping.