Test device for judging load effect of shield tunnel transverse channel heading machine

By designing a test device to simulate the load effect of the cross-channel boring machine, the problem that numerical simulation calculation cannot accurately evaluate the impact of the cross-channel boring machine reaction mode on the shield tunnel is solved, and the stress, deformation and joints on the shield tunnel are realized. Accurate analysis of the wrong platform improves the reliability of construction safety assessment.

CN119064048APending Publication Date: 2024-12-03BEIJING JIAOTONG UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411278443.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-12
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

The existing numerical simulation calculation methods cannot accurately calculate the impact of the reaction mode of the cross-channel boring machine on the shield tunnel, resulting in uncertain construction safety assessment.

Method used

A test device for judging the load function of the cross-channel boring machine in the shield tunnel is designed, including the shield tunnel model, hydraulic cylinder, laser displacement sensor and load force transmission assembly, which can simulate the back-pull and back-push load effects and monitor the hydraulic cylinder in real time. The elongation stroke and axial force change provide a reliable basis for judging construction safety.

Benefits of technology

This test device can effectively simulate and analyze the stress, deformation and joint misalignment response of the cross-channel boring machine load on the shield tunnel, provide accurate construction safety assessment, and improve the reliability of construction safety assessment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119064048A_ABST
    Figure CN119064048A_ABST
Patent Text Reader

Abstract

The invention discloses a test device for judging the load effect of a shield tunnel transverse channel heading machine, and particularly relates to the field of shield tunnel engineering. Comprising a shield tunnel model, a reserved opening is formed in a transverse channel of the shield tunnel model, a baffle is slidably connected to the reserved opening, an extension rod is in threaded connection with the baffle, a hydraulic oil cylinder located in the shield tunnel model is coaxially connected to the extension rod, an axial force meter is in threaded connection with the hydraulic oil cylinder, and a first cushion block is arranged at the bottom of the hydraulic oil cylinder; the bottom of the first cushion block is slidably connected with a second cushion block, the extension direction of a hydraulic rod on the hydraulic oil cylinder and the center of the reserved opening are located on the same straight line, and the hydraulic oil cylinder is provided with a load force transmission assembly used for keeping the relative position of the hydraulic oil cylinder unchanged. By the adoption of the technical scheme, the problem that an existing numerical simulation calculation method cannot accurately calculate the influence of the counter-force mode of the transverse channel heading machine on the shield tunnel is solved, and the safety of construction of the transverse channel of the shield tunnel is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of shield tunnel engineering, and in particular to a test device for judging the load effect of a shield tunnel cross channel boring machine. Background Art

[0002] As an important auxiliary structure between double-line shield tunnels, the cross passage is usually constructed by artificial mining method. However, the method of constructing the cross passage by mining method has the disadvantages of high construction risk, high cost of stratum reinforcement and long construction period. Therefore, some projects have tried to use small tunnel boring machines to construct the cross passage. When using tunnel boring machines to construct the cross passage, the tunnel boring machine needs to overcome the water and soil load of the heading face and the friction between the tunnel boring machine and the pipe segment and the stratum. The reaction force of the tunnel boring machine needs to be provided by the shield tunnel on the starting side of the tunnel boring machine. This reaction force load may have an adverse effect on the shield tunnel on the starting side, such as stress concentration of the pipe segment, misalignment of the joint opening, and excessive structural convergence deformation.

[0003] There are two reaction force modes of the tunnel boring machine: one is that the tunnel boring machine's propulsion reaction force directly acts on the lining on the opposite side of the main tunnel opening in the form of thrust. This mode has been applied in projects such as Ningbo and Wuxi subway tunnels, and relevant scholars have also conducted prototype tests (Zhu Yaohong, 2019; Liu Xian, 2020). This mode is back-push type, and the load is called back-push load; the other reaction force mode is to transmit the tunnel boring machine's propulsion reaction force to the same side of the opening through a force transmission mechanism, and act on the main tunnel in the form of a pulling force toward the inside of the tunnel. This mode has been applied in projects such as the Hong Kong Tuen Mun Tunnel. This mode is a reverse pull type, and the load is called a reverse pull load. However, the impact of this reverse pull load on the shield tunnel is still unclear. It is necessary to study and evaluate the effect of the reverse pull load of the cross channel tunnel boring machine on the shield tunnel in order to analyze the safety of this construction method.

[0004] At present, there are few studies on the effect of the reverse pull load of the cross-channel tunnel boring machine on the shield tunnel. Liu Minggao et al. (2021) used numerical simulation to analyze the stress and deformation response of the shield tunnel under different construction stages and different load magnitudes of the reverse pull construction load. There are relatively more studies on the effect of the back-push load of the cross-channel tunnel boring machine on the shield tunnel. Zhu Yaohong, Liu Xian et al. conducted prototype tests to explore the stress characteristics of the shield tunnel lining structure during the construction stage when the mechanical method was used for the construction of the connecting channel. The structural response of the shield main tunnel during the mechanical cutting process was experimentally analyzed. However, the numerical simulation calculation results are affected by many factors such as model simplification, mesh division, and calculation parameters, and the calculation results can often only be used as a basis for qualitative judgment. Summary of the invention

[0005] The present invention aims to provide a test device for evaluating the load effect of a cross-channel boring machine on a shield tunnel, thereby solving the problem that the existing numerical simulation calculation method cannot accurately calculate the influence of the reaction force mode of the cross-channel boring machine on the shield tunnel.

[0006] In order to achieve the above-mentioned purpose, the technical scheme of the present invention is as follows: a test device for judging the load effect of a tunnel boring machine on a cross channel of a shield tunnel, comprising a shield tunnel model, a reserved opening being provided on the cross channel of the shield tunnel model, a baffle being slidably connected to the reserved opening, the outer contour of the baffle being an arc shape, and the outer contour of the baffle being located on the same circle as the outer contour of the shield tunnel model when the baffle is not moved, an extension rod being threadedly connected to the baffle, a hydraulic cylinder located in the shield tunnel model being coaxially connected to the extension rod, an axial force meter being threadedly connected to the hydraulic cylinder, a first cushion block being provided at the bottom of the hydraulic cylinder, a second cushion block being slidably connected to the bottom of the shield tunnel model, the second cushion block being fixedly arranged at the bottom in the shield tunnel model, the extension direction of the hydraulic rod on the hydraulic cylinder being located on the same straight line as the center of the reserved opening, and a load transmission component for keeping the relative position of the hydraulic cylinder unchanged being provided on the hydraulic cylinder.

[0007] Furthermore, a laser displacement sensor is provided on the hydraulic rod of the hydraulic cylinder.

[0008] Through the above arrangement, the extension stroke of the hydraulic rod on the hydraulic cylinder can be monitored in real time with the aid of the laser displacement sensor.

[0009] Furthermore, the longitudinal dimension of the baffle satisfies the following formula:

[0010] l>t+Δl

[0011] Where l is the longitudinal length of the baffle, t is the thickness of the shield tunnel model, and Δl is the maximum design elongation of the hydraulic cylinder in the test.

[0012] The above settings ensure the stability and accuracy of the test.

[0013] Furthermore, the baffle is made of aluminum alloy material.

[0014] Through the above arrangement, the baffle has the functions of light weight, high strength, strong corrosion resistance, easy processing and installation, reusability and strong adaptability.

[0015] Furthermore, a weight-reducing groove is provided on the baffle plate on one side facing the central axis of the shield tunnel model.

[0016] Through the above arrangement, the weight of the baffle can be reduced with the help of the weight-reducing groove, so as to avoid the situation in which the hydraulic rod of the hydraulic cylinder is deflected downward in the extension direction due to the excessive weight of the baffle during the extension process, thereby improving the accuracy of the test results.

[0017] Furthermore, the load transmission component includes a back plate, which is abuttingly connected to the hydraulic cylinder, and the back plate is provided with a plurality of force transmission screws connected to the inner wall of the shield tunnel model.

[0018] Through the above arrangement, the reverse tensile load test can be realized with the help of the back plate, the force transmission screw and the hydraulic cylinder.

[0019] Furthermore, the load transmission component includes a transmission screw, one side of which is threadedly connected to a back plate, the back plate is abuttingly connected to the inner wall of the shield tunnel model, and the other side of the transmission screw is abuttingly connected to the hydraulic cylinder.

[0020] Through the above arrangement, the back-thrust load test can be realized with the help of the back plate, the force transmission screw and the hydraulic cylinder.

[0021] Compared with the prior art, this solution has the following beneficial effects:

[0022] 1. This scheme provides a test device for evaluating the load effect of the cross-channel tunnel boring machine of the shield tunnel. The test device can effectively simulate the stress, deformation, joint misalignment and other response results of the shield tunnel when the reverse pull and back push loads of different values ​​act on the shield tunnel, thereby providing a reliable basis for the evaluation of construction safety.

[0023] 2. This scheme can effectively restore the situation of the reverse pull and back push loads of the cross channel tunnel boring machine on the shield tunnel through this test device, and then accurately and effectively analyze the response of the shield tunnel under the reverse pull and back push loads, providing a basis for analyzing the safety of the shield tunnel structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 is a side view of the test device of Example 1;

[0025] Figure 2 is a graph showing the variation of soil pressure, hydraulic cylinder stroke, and hydraulic cylinder axial force with test time under the loading mode of Example 1;

[0026] Figure 3 is a diagram showing the variation of the main structure misalignment and the axial force of the hydraulic cylinder over time in the loading mode of Example 1;

[0027] Figure 4 is a side view of the test device of Example 2;

[0028] Figure 5 is a graph showing the variation of soil pressure, hydraulic cylinder stroke, and hydraulic cylinder axial force with test time under the loading mode of Example 2;

[0029] Figure 6is a diagram showing the variation of the main structure misalignment and the axial force of the hydraulic cylinder over time in the loading mode of Example 2;

[0030] Figure 7 It is the distribution diagram of monitoring points in the tests of Examples 1 and 2. DETAILED DESCRIPTION

[0031] The present invention is further described in detail below through specific embodiments:

[0032] The figure marks in the drawings of the specification include: shield tunnel model 1, reserved opening 2, baffle 3, extension rod 4, hydraulic cylinder 5, axial force meter 6, back plate 7, force transmission screw 8, first cushion block 9, and second cushion block 10.

[0033] Example 1

[0034] like Figure 1 As shown, a test device for judging the load effect of a tunnel boring machine on a cross channel of a shield tunnel comprises a shield tunnel model 1. A reserved opening 2 is provided on the cross channel of the shield tunnel model 1. In this embodiment, the reserved opening 2 is circular in shape. The diameter of the reserved opening 2 is 2 mm larger than the outer diameter of the baffle 3, which can meet the limitation of machining accuracy and ensure that the baffle 3 can move back and forth within the range of the reserved opening 2. A baffle 3 is slidably connected to the reserved opening 2. The baffle 3 is made of aluminum alloy material. The outer contour of the baffle 3 is an arc shape. When the baffle 3 is not moved, the outer contour is on the same circle as the outer contour of the shield tunnel model 1. The longitudinal dimension of the baffle 3 satisfies the following formula:

[0035] l>t+Δl

[0036] Where l is the longitudinal length of the baffle 3, t is the thickness of the shield tunnel model 1, and Δl is the maximum design elongation of the hydraulic cylinder 5 in the test, which is related to the maximum thrust of the test design, the nature of the formation, the size of the baffle 3 and other factors. In this example, t is 12.5 mm, Δl is 20 mm, and l is 35 mm. The size of the baffle 3 directly affects its support strength. A larger baffle 3 size usually means a stronger support capacity, which can better resist external loads and deformation, thereby improving the stability of the test device; the baffle 3 is the boundary condition of the test device, and its size will affect the significance of the boundary effect. A smaller baffle 3 size may aggravate the impact of boundary friction on the test results, because the friction at the boundary cannot be completely eliminated, while a larger baffle 3 size can relatively reduce this impact; the connection method and size of the baffle 3 and other parts of the test device will also affect the overall stiffness of the model. Reasonable baffle 3 size and connection method help to enhance the overall stiffness of the test device and improve the stability of the test device. At the same time, the size of the baffle 3 will affect the observation accuracy during the test. A larger baffle 3 size may provide more observation space and field of view, which is convenient for installing observation instruments and collecting data; as part of the model, changes in the size and shape of the baffle 3 may introduce additional variables and affect the accuracy of the test data. Therefore, when designing the size of the baffle 3, it is necessary to fully consider its impact on the accuracy of the data and take corresponding measures to reduce this impact; a reasonable design of the size of the baffle 3 helps to improve the repeatability of the test. When the size of the baffle 3 remains unchanged, it is easier to control the consistency of other test conditions, thereby reducing the discreteness of the test results and improving the reliability and repeatability of the test. A weight reduction groove is provided on the side of the baffle 3 facing the central axis of the shield tunnel model 1, so that the weight of the baffle 3 can be reduced by means of the weight reduction groove, avoiding the situation in which the hydraulic rod of the hydraulic cylinder 5 deflects downward in the extension direction due to the excessive weight of the baffle 3 during the extension process, thereby improving the accuracy of the test results. The baffle 3 is threadedly connected with an extension rod 4, and the extension rod 4 is coaxially connected with a hydraulic cylinder 5 located in the shield tunnel model 1. The hydraulic rod of the hydraulic cylinder 5 is threadedly connected with an axial force meter 6, and the end of the hydraulic rod of the hydraulic cylinder 5 is provided with a laser displacement sensor. The bottom of the hydraulic cylinder 5 is provided with a first cushion block 9, and the bottom of the first cushion block 9 is slidably connected with a second cushion block 10, and the second cushion block 10 is fixedly arranged at the bottom of the shield tunnel model 1. When the hydraulic cylinder 5 is driven or subjected to external impact, the first cushion block 9 serves as an interface between the hydraulic cylinder 5 and the second cushion block 10, and can absorb part of the impact energy. Since the first cushion block 9 and the second cushion block 10 are slidably connected, the relative movement between them can disperse and slow down the impact, thereby protecting the hydraulic cylinder 5 from damage caused by direct impact. In addition, the first cushion block 9 can disperse the impact energy to a wider area to avoid excessive concentration of stress at a certain point of the hydraulic cylinder 5, which helps to extend the service life of the hydraulic cylinder 5.The first pad 9 not only plays a buffering role, but also serves as a key component for positioning the specimen. By being fixedly connected to the hydraulic cylinder 5, the first pad 9 can ensure that the specimen is in the correct position and posture during the loading process. This design helps to ensure the accuracy and reliability of the test results. Finally, the second pad 10 can adapt to the slight movement or deformation of the specimen during the loading process to a certain extent, while the first pad 9 remains fixedly connected to the hydraulic cylinder 5, thereby ensuring the stability of the entire system. The elongation direction of the hydraulic rod on the hydraulic cylinder 5 is located on the same straight line as the center of the reserved opening 2, and the hydraulic cylinder 5 is provided with a load transmission component for maintaining the relative position of the hydraulic cylinder 5 unchanged. In this embodiment, the load transmission component includes a back plate 7, which is in contact with the left side wall of the hydraulic cylinder 5, and an array of four symmetrically arranged threaded holes is opened on the back plate 7, and a force transmission screw 8 is threadedly connected in each threaded hole, and the four force transmission screws 8 are connected to the right side wall of the shield tunnel model 1.

[0037] The test device of this embodiment is a reverse tensile load test device. The test device and the actual shield tunnel adopt a ratio of 1:50. The outer diameter of the actual shield tunnel is 15.5m, and the outer diameter of the shield tunnel model 1 is 310mm. The actual cross channel opening is circular, and the actual size of the cross channel opening is 4.3m. The size of the reserved opening 2 in this test device is 86mm. At the same time, the size of the hydraulic cylinder 5 in this example is 62mm (width) × 62mm (height) × 75mm (length), which can provide a maximum thrust of 6000N, and the corresponding actual thrust can reach F*50 / 2=6000N*50 / 2=15000kN.

[0038] In this embodiment, it is also necessary to calculate the direction of the combined force of gravity of the hydraulic cylinder 5, the extension rod 4, the baffle 3, the force transmission screw 8, the back plate 7 and the cushion block. By adjusting the length of the force transmission screw 8 and the extension rod 4, the direction of the combined force of gravity of the above components is made to pass through the axis of the shield tunnel model 1 to avoid the shield tunnel model 1 from rolling during the test, thereby ensuring the reliability of the test device.

[0039] The working process of this embodiment:

[0040] Before the test begins, different types of sensors, such as strain gauges, earth pressure gauges, misalignment monitoring modules, etc., are set in the shield tunnel model 1 and the soil layer outside the shield tunnel model 1.

[0041] During the test, the hydraulic cylinder 5 is first started. After the hydraulic cylinder 5 is started, the hydraulic rod on it is gradually extended. After the hydraulic rod of the hydraulic cylinder 5 is extended, it can drive the baffle 3 to slide from the reserved opening 2 and push into the formation. The soil layer in this embodiment is sandy soil, which is fine sand standard sand with an average particle size of d 50=0.17mm, the sand rain method was used in the test to prepare the sample, so that the soil in the moving direction of the baffle 3 produced passive earth pressure, thereby simulating the resistance encountered by the tunnel boring machine in actual engineering. In this process, in order to ensure the static balance and constant position of the hydraulic cylinder 5, the reaction load was transmitted to the model shield tunnel through the force transmission screw 8 and the back plate 7.

[0042] like Figure 2 The figure shows the changes of the axial force (F1), stroke (D1) of the hydraulic cylinder 5 and the soil pressure at three positions of the opening ring (arch P1, front of the opening P2, and opposite side of the opening P3) over time under the reverse pull construction load of the cross channel. It can be found that the test can be divided into five stages. The statistical test results of key time nodes are shown in Table 1 below.

[0043] Table 1 Statistics of key node test results of reverse tension loading mode

[0044]

[0045] It can be found that the soil pressure P5 in front of the baffle 3 increases with the loading process and eventually stabilizes. The soil pressure P6 on the opposite side of the opening remains almost unchanged during the loading process, indicating that the lining on the opposite side of the opening has almost no horizontal displacement and has not caused any change in the lateral soil pressure. For the measuring point P4 of the tunnel vault, it first increases and then stabilizes with the loading process, which indicates that the tunnel vault has an upward displacement and the vertical convergence of the overall structure is reduced.

[0046] For the reverse tension load mode, a misalignment monitoring point DL3 is arranged near the opening. Figure 7 The variation of misalignment and cylinder axial force over time is shown in a. Figure 3 As shown in the figure, it can be found that its change trend is very special. With the increase of load, its change trend is not monotonically changing. With the increase of the counter-tension force acting on the semi-open ring, the misalignment between the semi-open ring and the adjacent ring first decreases to 0, and then gradually increases. The initial misalignment is caused by the difference in stiffness between the two adjacent rings. Specifically, the initial misalignment direction is that the semi-open ring has a larger radial outward deformation relative to the adjacent ring. Since the load is an inward tensile force acting on the semi-open ring, the initial misalignment gradually decreases to 0 during the loading process. Then, as the counter-tension load increases, the absolute value of the misalignment between the rings continues to increase, indicating that the direction of the misalignment has changed. The absolute values ​​of the final misalignment and the initial misalignment are very close. It is worth noting that in the stage where the misalignment gradually increases, the construction load reaches the peak and basically remains unchanged, indicating that the change in the misalignment has a certain lag relative to the change in the cylinder axial force, and it is impossible to accurately judge the critical load value when the misalignment direction changes.

[0047] Example 2

[0048] like Figure 4 As shown, the difference between this embodiment and embodiment 1 is only that: in this embodiment, the load transmission component includes a force transmission screw 8, the left side of the force transmission screw 8 is threadedly connected to the back plate 7, the left side wall of the back plate 7 is in contact with the left side wall in the shield tunnel model 1, the left side wall of the back plate 7 adopts an arc surface that matches the left side wall in the shield tunnel model 1, and the right side of the force transmission screw 8 is in contact with the hydraulic cylinder 5, that is, the test device of this embodiment is a back-thrust load test device.

[0049] The working process of this embodiment is the same as that of embodiment 1.

[0050] The axial force (F1), stroke (D1) of the cross channel hydraulic cylinder 5 and the soil pressure at three positions of the opening ring (arch top P1, opening front P2, opening reverse side P3) are plotted as a function of the test time, as shown in Figure 2. Figure 5 As shown in Figure 2, the test can be divided into five stages: 1) centrifuge acceleration stage; 2) soil consolidation and data stabilization stage; 3) loading stage; 4) unloading stage; 5) centrifuge shutdown stage. This paper mainly focuses on the third stage: loading stage.

[0051] As can be seen from the figure, during the loading stage, the data of each soil pressure measuring point first approximately changes linearly, and then remains stable after reaching the peak value. The monitoring data of each key time node during the loading stage are sorted out as shown in Table 2 below. It can be seen that there is a deviation in the time when each measuring point reaches the peak value. Due to the inherent characteristics of the hydraulic servo system, the cylinder starts to push forward 20s after the loading command is issued. When the load reaches 1238s, the cylinder reaches the maximum axial force of 5203N that it can provide, but the cylinder stroke continues to increase until it reaches its peak value of 2.2mm at 1434s. The main reasons for this include two aspects: first, the cylinder continues to extend, and the reaction force of the cylinder causes the entire tunnel to move to the opposite side of the opening; second, during the jacking process of the baffle 3, the soil in front of it is passively damaged, and the yielded soil can continue to deform when the load no longer increases.

[0052] The earth pressure P1 of the main tunnel crown of the cross channel opening ring continued to decrease during the loading process. This is because with the increase of construction load, the tunnel underwent a transverse elliptical deformation. At the same time, the tunnel as a whole underwent a transverse displacement opposite to the direction of the tunnel boring machine, resulting in a soil arch effect on the overlying soil. The monitored earth pressure gradually decreased, and the final pressure value was 86.6% of the initial value. During the loading process, the earth pressure measuring point P2 in front of the baffle 3 at the cross channel opening first increased and then remained stable, with a peak value of 1109 kPa, which was 9.4 times the initial value.

[0053] Table 2 Statistics of key node test results of back-push loading mode

[0054]

[0055]

[0056] It is worth mentioning that when the axial force of the hydraulic cylinder 5 no longer increases to maintain stability, it means that the resultant force of the soil pressure in front of the baffle 3 is constant, but the soil pressure P2 at the central measuring point in front of the baffle 3 continues to increase to a certain extent as the stroke of the hydraulic cylinder 5 increases. This phenomenon shows that the soil pressure in front of the baffle 3 is not linearly distributed. Affected by the passive shear failure of the soil and the arc shape of the baffle 3, the stress at the center is greater than the stress at the edge of the baffle 3. For the soil pressure measuring point P3 at the arch waist on the opposite side of the opening, it first increases and then remains stable as the cylinder is loaded. The reason is that with the loading of the hydraulic cylinder 5, the tunnel has a transverse elliptical deformation trend, and the tunnel as a whole also has a displacement in the direction opposite to the advancement of the tunnel boring machine, resulting in passive soil pressure in the soil at P3. Although the increase of P3 and P2 is the effect of passive soil pressure, the overall deformation of the lining ring on the opposite side of the opening where P3 is located is relatively uniform, that is, the lining range that bears the passive soil pressure increment is larger than the size of the transverse channel baffle 3 where P2 is located, so its increase is much smaller than that of P2.

[0057] Monitor the influence of construction load on the misalignment between lining rings. For the back-push loading condition, a misalignment monitoring point (DL1 and DL2) is arranged on the same side and the opposite side of the opening. The monitoring method is as follows: There are 27 rings in the test, of which the back-push cross channel loading equipment is located at the 8th to 10th rings, and the reverse pull cross channel loading equipment is located at the 20th to 22nd rings. In order to explore the influence of excavation construction load on the main structure, this scheme mainly monitors the soil pressure near the opening ring, the misalignment of the pipe segment, and the stress of key parts. The specific method is as follows.

[0058] (1) Earth pressure. Three earth pressure sensors were arranged on the outside of the unclosed ring in the middle of the opening of the two transverse passages, respectively located at the top of the unclosed ring, in front of the baffle, and at the waist on the opposite side of the opening. The earth pressure box was attached to the outside of the tunnel with tape.

[0059] (2) Misalignment. Three misalignment measurement points were designed for this test, located at the opening side and the reverse side of the opening of the back-push type, and the opening side of the reverse-pull type.

[0060] (3) Structural stress. The measurement points of structural stress can be divided into three groups. The first group is located on the lining waist between the two transverse channel openings. The points are pasted both inside and outside the lining. This is mainly to explore the influence range of the two different transverse channel construction load modes on the stress inside and outside the lining ring. The second group is located on the outside of the lining on the opposite side of the back-push opening (there is a crescent plate inside, which makes it difficult to paste the sensor). This is mainly to explore the influence of the construction load transmitted by the crescent plate on the local stress. The third group is mainly located on the reverse pull opening side to explore the influence of the construction load transmitted by the opening and anchoring components on the main structural stress.

[0061] (4) Servo control and monitoring system

[0062] Real-time monitoring of the cylinder's axial force and stroke. A tension and compression sensor is used to monitor the cylinder's axial force. The sensor has a maximum range of 10kN and an accuracy of 10N. A laser displacement sensor is used to monitor the cylinder's stroke. The laser sensor is Panasonic's HG1050 sensor, with a range of 30mm and an accuracy of 30μm. The servo system is used to collect the cylinder's displacement and axial force in real time, and automatically adjust the oil pressure to ensure that the cylinder is pushed forward at the designed speed. The measurement points are arranged as follows: Figure 7 As shown in Fig. b. Since the opening of the transverse passage and the loading range of the construction load are concentrated in the range of the 3-ring lining, it can be inferred that there is a large misalignment deformation trend in the annular gap between the semi-open ring and the adjacent ring, that is, the annular gap between the 10th and 11th rings or the 7th and 8th rings in the test. Due to the symmetry of the structure and loading mode, this test only monitors the misalignment between the 10th and 11th rings.

[0063] The measuring point DL1 is located on the same side of the opening, and DL2 is located on the opposite side of the opening, both of which are located inside the tunnel lining. This test mainly focuses on the loading condition, so the changes of the two offset measuring points and the cylinder axial force over time during the loading stage (1080s~1523s) are plotted, as shown in Figure 2. Figure 6 As shown. The misalignment of measuring point DL1 before loading is about 6.62mm, which is mainly caused by the difference in structural stiffness between the semi-open ring and the adjacent ring. And the misalignment monitored by DL1 does not change much during the loading process (less than 8%). The initial value of the misalignment of DL2 is 5.39mm, and it is speculated that the cause is also the difference in structural stiffness between the semi-open ring and the adjacent ring. Since the back-push construction load is mainly the thrust load acting on the main lining structure through the crescent plate, the measuring point DL2 is close to the loading position. It can be clearly observed that the misalignment at this position continues to increase during the loading process. When the axial force increases to 4291N, the misalignment of DL2 exceeds that of DL1. When the axial force of the hydraulic cylinder 5 increases to the peak value, the misalignment reaches 6.76mm (an increase of 25% compared to the initial value); when the axial force no longer increases, the misalignment still increases, reaching a maximum of 8.49mm (an increase of 58% compared to the initial value).

[0064] The above are only embodiments of the present invention, and the common knowledge such as the known specific structures and / or characteristics in the scheme are not described in detail here. It should be pointed out that for those skilled in the art, several deformations and improvements can be made without departing from the structure of the present invention, which should also be regarded as the protection scope of the present invention, and these will not affect the effect of the implementation of the present invention and the practicality of the patent. The scope of protection required by this application shall be based on the content of its claims, and the specific implementation methods and other records in the specification can be used to interpret the content of the claims.

Claims

1. A test device for evaluating the load effect of a tunnel boring machine in a cross passage of a shield tunnel. Features: It comprises a shield tunnel model, wherein a reserved opening is provided on the transverse passage of the shield tunnel model, a baffle is slidably connected to the reserved opening, the outer contour of the baffle is an arc shape, and when the baffle is not moved, the outer contour and the outer contour of the shield tunnel model are located on the same circle, an extension rod is threadedly connected to the baffle, a hydraulic cylinder located in the shield tunnel model is coaxially connected to the extension rod, an axial force meter is threadedly connected to the hydraulic cylinder, a first cushion block is provided at the bottom of the hydraulic cylinder, the bottom of the first cushion block is slidably connected to a second cushion block, the second cushion block is fixedly arranged at the bottom in the shield tunnel model, the extension direction of the hydraulic rod on the hydraulic cylinder is located on the same straight line as the center of the reserved opening, and a load transmission component for keeping the relative position of the hydraulic cylinder unchanged is provided on the hydraulic cylinder.

2. A test device for evaluating the load effect of a shield tunnel cross-channel boring machine according to claim 1, Features: A laser displacement sensor is arranged on the hydraulic rod of the hydraulic cylinder.

3. A test device for evaluating the load effect of a shield tunnel cross-channel boring machine according to claim 1, Features: The longitudinal dimension of the baffle satisfies the following formula: l>t+Δl Where l is the longitudinal length of the baffle, t is the thickness of the shield tunnel model, and Δl is the maximum design elongation of the hydraulic cylinder in the test.

4. A test device for evaluating the load effect of a shield tunnel cross-channel boring machine according to claim 3, Features: The baffle is made of aluminum alloy material.

5. A test device for evaluating the load effect of a shield tunnel cross-channel boring machine according to claim 3, Features: A weight-reducing groove is provided on one side of the baffle plate facing the central axis of the shield tunnel model.

6. A test device for evaluating the load effect of a shield tunnel cross-channel boring machine according to any one of claims 1 to 5, Features: The load force transmission component comprises a back plate, which is in abutting connection with the hydraulic cylinder and is provided with a plurality of force transmission screws connected with the inner wall of the shield tunnel model.

7. A test device for evaluating the load effect of a cross-channel boring machine of a shield tunnel according to any one of claims 1 to 5, Features: The load force transmission component comprises a force transmission screw, one side of which is threadedly connected to a back plate, the back plate is abuttingly connected to the inner wall of the shield tunnel model, and the other side of the force transmission screw is abuttingly connected to the hydraulic cylinder.