High ground stress tunnel aseismic design method and system, electronic equipment and storage medium
Through finite element model and iterative optimization technology, combined with the coupling effect of high ground stress and seismic load, the problem of large design errors in the existing technology is solved, and the stability and safety design of high ground stress tunnels in high-intensity seismic areas are realized.
Patent Information
- Application Number
- CN202411286329.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-13
- Publication Date
- 2024-12-03
AI Technical Summary
The existing deep buried tunnel engineering design failed to effectively consider the coupling effect of high ground stress and seismic load, resulting in large design errors. Especially in high-intensity seismic areas and tunnels that pass through deep and large activity faults, the seismic effect is ignored. The calculation model The static dynamic boundary conversion process is not perfect enough.
The finite element "stratigraphic-structure" model is adopted to construct the stress field of the surrounding rock of the tunnel through engineering analogy and theoretical analysis, and iteratively optimize it in combination with seismic dynamic loads to form support parameters that meet high ground stress conditions to ensure the tunnel lining structure Stability and safety under earthquake action.
The safety and stability of the tunnel lining structure under high ground stress environment is achieved. Through in-depth nonlinear analysis and coupling calculation, more accurate structural internal forces are obtained. It is suitable for tunnel design in high-intensity seismic areas, improving the design accuracy. and security.
Smart Images

Figure CN119066753A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of deep buried tunnel engineering and deep underground space structure design, and in particular to a method, system, electronic equipment and storage medium for seismic design of high ground stress tunnels. Background Art
[0002] Extra-long tunnel projects are built in high-intensity earthquake zones, and some tunnels directly cross deep active fault zones. Most of these tunnels are characterized by extremely large burial depths and extremely high ground stresses. In this surrounding rock environment, the tunnel lining structure will face the continuous squeezing effect of high ground stresses. The lining structure is in a high-load state and has a high internal force level, requiring special strengthening design. At the same time, if an earthquake occurs, the structure will be subjected to the combined effects of high ground stress and seismic motion, and its stress will be even more unfavorable. This extremely unfavorable situation should be considered in the design of the lining structure.
[0003] In the existing deep-buried tunnel engineering design, the coupling effect of high ground stress and seismic load is usually not considered. The conventional practice is to consider high ground stress or seismic load separately, that is, for high ground stress tunnels, the structural internal force is usually calculated according to the structural or self-weight ground stress field, and then the structural design is carried out; seismic loads are usually not considered, or the structural seismic internal force is calculated separately according to the conventional seismic load, and then the two internal forces are simply superimposed, without considering the nonlinear characteristics of the structural force that may occur when the two loads act together and the coupling characteristics of the two loads.
[0004] For deep tunnels, the focus is usually only on the effect of high ground stress, while the seismic load of deep tunnels is often ignored; or only a simple linear superposition (arithmetic superposition of two separate calculations) is performed. However, for high-intensity earthquake zones, especially for tunnels crossing deep and large active faults, there are cases that prove that the displacement of the underground location of the tunnel is of the same order of magnitude as the corresponding surface, and there is no significant difference, so the seismic effect cannot be ignored.
[0005] For the static effect of high ground stress and the dynamic effect of earthquake, the coupling effect of the two is not considered deeply enough, which is mainly reflected in the separation of the two calculation models, which are used as separate problems to calculate the superposition of the structure after stress. Usually, a fixed boundary is used in the static stage, and the bottom boundary is cancelled and changed to acceleration or displacement input in the dynamic calculation stage, and the boundaries on both sides are changed to free field boundaries or viscoelastic boundaries, infinite element boundaries, etc. for energy absorption. Due to the imperfect processing of the static and dynamic boundary conversion of the calculation model, the calculation results cannot well reflect the actual situation. Summary of the invention
[0006] In order to solve the problem that the existing design does not take into account the coupling effect of high ground stress and seismic load, resulting in a large error between the tunnel design and the actual situation, the present invention provides a high ground stress tunnel seismic design method, system, electronic equipment and storage medium to ensure that the tunnel lining structure can maintain sufficient stability and safety under the action of earthquake in a high ground stress environment.
[0007] The present invention is achieved through the following technical solutions: A method for seismic design of a high geostress tunnel comprises the following steps: S1, according to the line design plan and engineering geological survey report, obtain the macroscopic geological and geographical information of the tunnel site and the basic information of the tunnel surrounding rock; S2, based on the information obtained in S1, use engineering analogy or theoretical analysis to preliminarily formulate the construction method and outline shape of the tunnel; According to the tunnel direction, the ground stress value and direction of the tunnel surrounding rock along the tunnel line are measured, and the ground stress field of the tunnel surrounding rock is constructed by combining the inversion method; S3, combining the information obtained in S1 as the basic modeling information and the tunnel surrounding rock in-situ stress field obtained in S2 to formulate tunnel support parameters A; S4, establish a stratum-structure finite element model for the stress analysis of the tunnel lining structure; use the tunnel surrounding rock in-situ stress field obtained in S2 as the calculation input condition to iteratively optimize the support parameter A to obtain the support parameter B that meets the safety factor requirements of the lining structure; S5, applying earthquake dynamic load to the stratum-structure finite element model, checking the safety factor and iteratively optimizing the support parameter B, and forming the support parameter C of the tunnel lining structure that meets the high ground stress condition; S6. Design a high geostress tunnel lining structure that meets the requirements based on support parameter C.
[0008] Preferably, in S1, the macroscopic geological and geographical information of the tunnel site includes the tunnel line direction, tunnel burial depth, and surface topography; the basic information of the tunnel surrounding rock includes rock lithology, rock strength, rock structure, and deformation modulus information.
[0009] Preferably, in S2, the construction method adopts the drilling and blasting method or the TBM method, and the outline shape of the tunnel is circular or horseshoe-shaped.
[0010] Preferably, in S3, the tunnel support parameter A is formulated by using the information obtained in S1 as the basic modeling information and the tunnel surrounding rock in-situ stress field obtained in S2 using an engineering analogy method or a theoretical analysis method.
[0011] Preferably, in S4, the stratum-structure finite element model is established based on the information obtained in S1 as basic modeling information, the in-situ stress of the tunnel surrounding rock obtained in S2, and the tunnel support parameters obtained in S3.
[0012] Preferably, in S4, the step of obtaining the support parameter B is specifically as follows: S41, establishing a stratum-structure finite element model based on the basic modeling information obtained by S1, the tunnel surrounding rock in-situ stress obtained by S2, and the tunnel support parameter A obtained by S3, and setting a static calculation boundary, and applying the tunnel surrounding rock in-situ stress field obtained by S2 as an input condition to the stratum-structure finite element model; S42, using the stratum-structure finite element model obtained in S41 to calculate the static force of the lining structure under high ground stress conditions, and using the obtained internal force of the lining structure to carry out reinforcement of the lining structure; S43, the safety factor of the reinforced lining structure is verified. If the verification does not meet the safety requirements, the calculation of S41 is repeated to iteratively optimize the support parameter A until the safety factor is met to form the support parameter B.
[0013] Preferably, in S5, the step of obtaining the support parameter C is specifically as follows: S51, based on the finite element model calculation structure obtained in S4, extract the reaction force on the side and bottom boundaries of the finite element model and each unit stress of the model; S52, cancel the fixed boundary of the stratum-structure finite element model and apply the extracted node reaction force and unit stress; S53, applying seismic loads to the stratum-structure finite element model of S52 to calculate the seismic dynamics and the internal forces of the lining structure under high ground stress conditions; S54, the lining structure is reinforced with the internal force of the lining structure obtained in S53, and then the safety factor of the reinforced lining structure is verified. If the verification does not meet the safety requirements, the steps of S53 are repeated to iteratively optimize the support parameter B until the structural safety factor meets the requirements to form the support parameter C.
[0014] A high-in-situ stress tunnel seismic design system comprises a data acquisition module, a data preprocessing system, a tunnel support parameter A acquisition module, a finite element model establishment module, a tunnel support parameter B acquisition module, a tunnel support parameter C acquisition module and a tunnel lining structure establishment module, wherein the data acquisition module is used to acquire macroscopic geological and geographical information of the tunnel site and basic information of the tunnel surrounding rock according to a line design plan and an engineering geological survey report; the data preprocessing system is used to preliminarily formulate a tunnel construction method and a tunnel contour shape by using an engineering analogy method or a theoretical analysis method and to construct a tunnel surrounding rock in-situ stress field by combining actual measurement and inversion; the tunnel support parameter A acquisition module is used to formulate a tunnel by combining information obtained by S1 as basic modeling information and tunnel surrounding rock in-situ stress field obtained by S2 Support parameter A; the finite element model establishment module is used to establish a stratum-structure finite element model for tunnel lining structure stress analysis based on the information obtained by S1 as the basic modeling information, the tunnel surrounding rock in-situ stress obtained by S2, and the tunnel support parameter A obtained by S3; the tunnel support parameter B acquisition module is used to iteratively optimize the support parameter A with the tunnel surrounding rock in-situ stress field obtained by S2 as the calculation input condition, and obtain the support parameter B that meets the safety factor requirements of the lining structure; the tunnel support parameter C acquisition module is used to check the safety factor of the support parameter B and iteratively optimize the parameters to form the support parameter C that meets the tunnel lining structure under high in-situ stress conditions; the tunnel lining structure establishment module is used to design a high in-situ stress tunnel lining structure that meets the requirements based on the support parameter C.
[0015] An electronic device comprises a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of the high ground stress tunnel seismic design method when executing the computer program.
[0016] A storage medium stores a computer program, which, when executed by a processor, implements the steps of the high ground stress tunnel seismic design method.
[0017] Compared with the prior art, the present invention has the following beneficial effects: The seismic design method of a high geostress tunnel of the present invention adopts a finite element "stratum-structure" model and proposes a proper processing method for the static-dynamic conversion of the calculation model boundary, thereby realizing the geostress-seismic dynamic coupling calculation of the tunnel seismic nonlinear analysis, obtaining the internal force of the deep tunnel structure, and then carrying out the design of the structure. The present invention takes into account the stress of the deep buried tunnel in the high geostress surrounding rock environment and the dynamic effect of the earthquake. The method is suitable for tunnel design in various high geostress areas, especially in seismically active areas, and provides a strong guarantee for the safety and durability of tunnel engineering. At the same time, the method and its system, electronic equipment and storage medium have broad application prospects in tunnel construction in the fields of transportation, water conservancy, mining, etc.
[0018] Furthermore, the static-dynamic boundary conversion processing method in the internal force calculation process of the tunnel lining structure can better fully and accurately apply the static-dynamic coupling effect to the calculation model, making the calculation results closer to the actual situation.
[0019] Furthermore, through multiple iterations of optimization and verification, it is ensured that the tunnel lining structure has sufficient safety under high ground stress and earthquake conditions.
[0020] The high geostress tunnel seismic design system of the present invention realizes the automated processing of the high geostress tunnel seismic design method through collaboration, decomposes the complex seismic design process into manageable parts, and improves the accuracy and efficiency of the design. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 is a flow chart of the seismic design method for high geostress tunnels of the present invention; Figure 2 It is a flow chart of obtaining support parameter B in a seismic design method for a high ground stress tunnel of the present invention; Figure 3 It is a schematic diagram of a stratum-structure finite element model in a seismic design method for a high ground stress tunnel of the present invention; Figure 4 It is a flow chart of obtaining support parameter C in a seismic design method for a high ground stress tunnel of the present invention; Figure 5 It is the peak acceleration at each depth of a tunnel under the vibration condition under the action of only dynamic and static-dynamic coupling in the present invention; Figure 6 It is the maximum relative displacement at each depth of a tunnel under the vibration condition under the action of only dynamic and static-dynamic coupling in the present invention; Figure 7 It is a schematic diagram of an electronic device for realizing the seismic design method of a geostress tunnel according to the present invention. DETAILED DESCRIPTION
[0022] The present invention is further described in detail below in conjunction with specific embodiments, which are intended to explain the present invention rather than to limit it.
[0023] The present invention discloses a method for seismic design of high ground stress tunnels. Figure 1 , including the following steps: S1. According to the line design plan and engineering geological survey report, obtain the macro geological and geographical information of the tunnel site and the basic information of the tunnel surrounding rock; the macro geological and geographical information of the tunnel site includes the tunnel line direction, tunnel burial depth, and surface topography; the basic information of the tunnel surrounding rock includes rock lithology, rock strength, rock structure, deformation modulus and other information.
[0024] S2, based on the information obtained in S1, adopts engineering analogy method or theoretical analysis method to preliminarily formulate the construction method and contour shape of the tunnel; wherein, the construction method adopts drilling and blasting method or TBM method, and the contour shape of the tunnel is circular or horseshoe-shaped.
[0025] The ground stress value and direction of the tunnel surrounding rock along the tunnel line are measured according to the tunnel direction, and the ground stress field of the tunnel surrounding rock is constructed by combining the inversion method.
[0026] S3, combining the information obtained in S1 as basic modeling information and the tunnel surrounding rock in-situ stress field obtained in S2, using engineering analogy method or theoretical analysis method to formulate tunnel support parameter A; S4, based on the basic modeling information obtained in S1, the tunnel surrounding rock in-situ stress obtained in S2, and the tunnel support parameters obtained in S3, a stratum-structure finite element model for the stress analysis of the tunnel lining structure is established. The support parameter A is iteratively optimized with the tunnel surrounding rock in-situ stress field obtained in S2 as the calculation input condition to obtain the support parameter B that meets the safety factor requirements of the lining structure. Figure 2 , the steps are as follows: S41, refer to Figure 3 , a stratum-structure finite element model is established based on the information obtained by S1 as the basic modeling information, the tunnel surrounding rock in-situ stress obtained by S2, and the tunnel support parameter A obtained by S3, and a static calculation boundary is set at the same time, and the tunnel surrounding rock in-situ stress field obtained by S2 is applied as an input condition to the stratum-structure finite element model; S42, using the stratum-structure finite element model obtained in S41 to calculate the static force of the lining structure under high ground stress conditions, and using the obtained internal force of the lining structure to carry out reinforcement of the lining structure; S43, the safety factor of the reinforced lining structure is verified. If the verification does not meet the safety requirements, the calculation of S41 is repeated to iteratively optimize the support parameter A until the safety factor is met to form the support parameter B.
[0027] S5, applying earthquake dynamic load to the stratum-structure finite element model, checking the safety factor and iteratively optimizing the support parameter B, to form the support parameter C of the tunnel lining structure that meets the high ground stress condition, refer to Figure 4 , the acquisition steps are as follows: S51, based on the finite element model calculation structure obtained in S4, extract the reaction force on the side and bottom boundaries of the finite element model and each unit stress of the model; S52, cancel the fixed boundary of the stratum-structure finite element model and apply the extracted node reaction force and unit stress; S53, applying seismic loads to the stratum-structure finite element model of S52 to calculate the seismic dynamics and the internal forces of the lining structure under high ground stress conditions; S54, the lining structure is reinforced with the internal force of the lining structure obtained in S53, and then the safety factor of the reinforced lining structure is verified. If the verification does not meet the safety requirements, the steps of S53 are repeated to iteratively optimize the support parameter B until the structural safety factor meets the requirements to form the support parameter C.
[0028] Among them, the support parameters C mainly include: 1. Type, length, spacing, prestressing force, etc. of anchor rods; 2. Model, spacing, construction location, etc. of the steel frame; 3. The grade, thickness, and application location of shotcrete; 4. Concrete grade, thickness, reinforcement parameters, etc. of the secondary lining.
[0029] S6. Design a high geostress tunnel lining structure that meets the requirements based on support parameter C.
[0030] The seismic design method of a high geostress tunnel of the present invention takes into account the structural stress characteristics of the deep buried tunnel under high geostress and seismic load, so that in the deep buried tunnel, especially in the high geostress environment, the seismic design of the tunnel lining structure is more comprehensive. In the geostress-seismic dynamic coupling calculation process, the fixed boundary is converted into an energy absorption boundary. The existing calculation technology usually does not consider the unbalanced force generated by the replacement of the boundary during the conversion process, which causes the change of the initial conditions of the dynamic calculation, resulting in inaccurate calculation. The technology proposed in the present invention extracts the boundary reaction force and unit stress after static equilibrium, applies them to the model, and can better handle the conversion of static and dynamic loads. At the same time, when calculating the structure of a deep buried tunnel or a deep underground space, the proposed stratum-structure model can also consider the multi-field coupling effect in the deep underground space. For example, in the S3 analysis, the complex effects such as the deep surrounding rock temperature field and the seepage field can be applied to the stratum-structure finite element model at the same time, and the coupling effect of more field bodies can be simulated.
[0031] Example Taking a high geostress tunnel as an example, the geostress-seismic dynamic coupling calculation of the tunnel seismic nonlinear analysis is as follows: (1) First, use the fixed boundary to calculate the reaction force generated by gravity on the unit stress and boundary nodes, and perform static equilibrium analysis. The horizontal reaction force on the side boundary during static equilibrium R fx a , bottom horizontal reaction force R fx b and R fy b , stress of each unit in the model σ .in, a represents the side boundary, bRepresents the bottom border.
[0032] (2) Then, the static and dynamic boundary conversion process is performed: first, the fixed boundary is cancelled, and then the boundary node reaction force and unit stress in step (1) are applied to the model. This step is an important step different from the traditional static and dynamic coupling calculation, because in the general static and dynamic calculation process, only the fixed boundary is cancelled and converted to the viscoelastic dynamic boundary.
[0033] (3) Implement earthquake dynamic calculations.
[0034] The accuracy of the static-dynamic coupling calculation method was verified. Based on the vibration conditions under the linear elastic free field (i.e., without tunnel structure) under the action of only dynamic and static-dynamic coupling, the peak acceleration and maximum relative displacement at each depth of the field were compared and analyzed (e.g. Figure 5 , 6 As shown in the figure, the maximum peak acceleration and the maximum relative displacement results are in good agreement, which proves that the geostress-seismic dynamic coupling calculation method proposed in the present invention has high accuracy.
[0035] The present invention also discloses a high-in-situ stress tunnel seismic design system, including a data acquisition module, a data preprocessing system, a tunnel support parameter A acquisition module, a finite element model establishment module, a tunnel support parameter B acquisition module, a tunnel support parameter C acquisition module and a tunnel lining structure establishment module, wherein the data acquisition module is used to acquire macroscopic geological and geographical information of the tunnel site and basic information of the tunnel surrounding rock according to the line design plan and the engineering geological survey report; the data preprocessing system is used to preliminarily formulate the construction method of the tunnel and the contour shape of the tunnel by using an engineering analogy method or a theoretical analysis method and to construct the tunnel surrounding rock in-situ stress field by combining actual measurement and inversion; the tunnel support parameter A acquisition module is used to combine the information acquired by S1 as the basic information for modeling and the tunnel surrounding rock in-situ stress field acquired by S2 The tunnel support parameter A is proposed; the finite element model establishment module is used to establish a stratum-structure finite element model for the stress analysis of the tunnel lining structure based on the information obtained by S1 as the basic modeling information, the tunnel surrounding rock in-situ stress obtained by S2, and the tunnel support parameter A obtained by S3; the tunnel support parameter B acquisition module is used to iteratively optimize the support parameter A with the tunnel surrounding rock in-situ stress field obtained by S2 as the calculation input condition, and obtain the support parameter B that meets the safety factor requirements of the lining structure; the tunnel support parameter C acquisition module is used to check the safety factor of the support parameter B and iteratively optimize the parameters to form the support parameter C that meets the tunnel lining structure under high in-situ stress conditions; the tunnel lining structure establishment module is used to design a high in-situ stress tunnel lining structure that meets the requirements based on the support parameter C.
[0036] As the starting point of the entire design process, the data acquisition module is not only based on the detailed line design plan, but also deeply analyzes the engineering geological survey report, accurately captures the macroscopic geological and geographical information of the tunnel site, such as topography, rock distribution, fracture structure, etc., and accurately extracts the basic physical and mechanical parameters of the tunnel surrounding rock, such as rock strength, elastic modulus, Poisson's ratio, etc. This information lays a solid data foundation for subsequent numerical simulation and analysis. The data preprocessing system uses engineering analogy and theoretical analysis methods. The system can preliminarily formulate construction methods and tunnel contour shapes suitable for the characteristics of tunnel engineering. By combining field measured data with inversion analysis technology, a high-precision tunnel surrounding rock geostress field model is further constructed to accurately reflect the initial stress state of the underground rock mass and provide a scientific basis for the reasonable setting of support parameters. The tunnel support parameter A acquisition module comprehensively considers the tunnel construction method, contour shape and surrounding rock geostress field characteristics. This module uses professional geotechnical engineering knowledge to preliminarily set the tunnel support parameter A, including the type, size, spacing and material properties of the support structure, in order to provide initial modeling conditions for the subsequent finite element model establishment. The finite element model building module relies on powerful numerical analysis software. This module constructs a fine stratum-structure finite element model based on the data collected and processed in the early stage. This model not only includes the complex geological structure of the tunnel surrounding rock, but also simulates the interaction between the support structure and the surrounding rock in detail, providing a high-precision calculation platform for subsequent force analysis and support parameter optimization. The tunnel support parameter B acquisition module takes the tunnel surrounding rock ground stress field as the calculation core. This module repeatedly adjusts and verifies the initially set support parameter A through an iterative optimization algorithm until the support parameter B that can meet the safety factor requirements of the lining structure is found. This process fully considers the stability and seismic performance of the tunnel structure and ensures the scientificity and rationality of the support design. In order to further improve the safety margin and adaptability of the tunnel lining structure, the tunnel support parameter C acquisition module further performs safety factor verification and parameter iterative optimization based on the support parameter B. By comprehensively considering various working conditions and boundary conditions, a set of economical and reliable support parameters C is finally formed, providing the optimal solution for the design of tunnel lining structures under high ground stress conditions. The tunnel lining structure establishment module is based on the finalized support parameter C. This module uses advanced engineering design software to design a tunnel lining structure that meets all safety requirements and functional requirements. This design result not only ensures the stability and durability of the tunnel under complex geological environments and potential earthquakes, but also takes into account practical needs such as construction convenience and cost control.
[0037] See also Figure 7As shown, the present invention also provides an electronic device 100 for implementing the seismic design method of a geostress tunnel; the electronic device 100 includes a memory 101, at least one processor 102, a computer program 103 stored in the memory 101 and executable on at least one processor 102, and at least one communication bus 104.
[0038] The memory 101 can be used to store the computer program 103. The processor 102 implements the steps of the multi-regional electric energy and ancillary service joint clearing method of embodiment 1 by running or executing the computer program stored in the memory 101 and calling the data stored in the memory 101. The memory 101 may mainly include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function (such as a sound playback function, an image playback function, etc.), etc.; the data storage area may store data (such as audio data) created according to the use of the electronic device 100, etc. In addition, the memory 101 may include a non-volatile memory, such as a hard disk, a memory, a plug-in hard disk, a smart memory card (SmartMedia Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), at least one disk storage device, a flash memory device, or other non-volatile solid-state storage devices.
[0039] The processor 102 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The processor 102 may be a microprocessor or any conventional processor, etc. The processor 102 is the control center of the electronic device 100, and uses various interfaces and lines to connect various parts of the entire electronic device 100.
[0040] The memory 101 in the electronic device 100 stores a plurality of instructions to implement a method for multimodal named entity recognition of electric power equipment, and the processor 102 can execute the plurality of instructions to implement the method.
[0041] If the module / unit integrated in the terminal device is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present invention implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. Computer-readable media may include: any entity or device that can carry the computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory and read-only memory (ROM, Read-Only Memory).
[0042] It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Furthermore, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0043] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0044] These computer program instructions may also be stored in a computer readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer readable memory produce an article of manufacture including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0045] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process in the computer or other programmable device. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0046] The above description is only a preferred embodiment of the present invention and is not intended to impose any limitation on the technical solution of the present invention. Those skilled in the art should understand that, without departing from the spirit and principles of the present invention, the technical solution can also be subjected to several simple modifications and substitutions, and these modifications and substitutions are also within the scope of protection covered by the claims.
Claims
1. A seismic design method for a high ground stress tunnel, characterized in that: The following steps are involved: S1, according to the line design plan and engineering geological survey report, obtain the macroscopic geological and geographical information of the tunnel site and the basic information of the tunnel surrounding rock; S2, based on the information obtained in S1, use engineering analogy or theoretical analysis to preliminarily formulate the construction method and contour shape of the tunnel; measure the ground stress value and direction of the tunnel surrounding rock along the tunnel line according to the direction of the tunnel, and construct the ground stress field of the tunnel surrounding rock by combining the inversion method; S3, combining the information obtained in S1 as the basic modeling information and the tunnel surrounding rock in-situ stress field obtained in S2 to formulate tunnel support parameters A; S4, establish a stratum-structure finite element model for the stress analysis of the tunnel lining structure; use the tunnel surrounding rock in-situ stress field obtained in S2 as the calculation input condition to iteratively optimize the support parameter A to obtain the support parameter B that meets the safety factor requirements of the lining structure; S5, applying earthquake dynamic load to the stratum-structure finite element model, checking the safety factor and iteratively optimizing the support parameter B, and forming the support parameter C of the tunnel lining structure that meets the high ground stress condition; S6. Design a high geostress tunnel lining structure that meets the requirements based on support parameter C.
2. The seismic design method for high geostress tunnel according to claim 1, characterized in that: In S1, the macroscopic geological and geographical information of the tunnel site includes the tunnel line direction, tunnel burial depth, and surface topography; the basic information of the tunnel surrounding rock includes rock lithology, rock strength, rock structure, and deformation modulus information.
3. The seismic design method for high geostress tunnel according to claim 1, characterized in that: In S2, the construction method is drill and blast or TBM, and the tunnel profile is circular or horseshoe-shaped.
4. The seismic design method for high geostress tunnel according to claim 1, characterized in that: In S3, the tunnel support parameter A is formulated by the engineering analogy method or theoretical analysis method based on the information obtained in S1 as the basic modeling information and the tunnel surrounding rock in-situ stress field obtained in S2.
5. The seismic design method for high geostress tunnel according to claim 1, characterized in that: In S4, the stratum-structure finite element model is established based on the information obtained in S1 as the basic information for modeling, the in-situ stress of the tunnel surrounding rock obtained in S2, and the tunnel support parameters obtained in S3.
6. The seismic design method for high geostress tunnel according to claim 5, characterized in that: In S4, the steps for obtaining the support parameter B are as follows: S41, establishing a stratum-structure finite element model based on the basic modeling information obtained by S1, the tunnel surrounding rock in-situ stress obtained by S2, and the tunnel support parameter A obtained by S3, and setting a static calculation boundary, and applying the tunnel surrounding rock in-situ stress field obtained by S2 as an input condition to the stratum-structure finite element model; S42, using the stratum-structure finite element model obtained in S41 to calculate the static force of the lining structure under high ground stress conditions, and using the obtained internal force of the lining structure to carry out reinforcement of the lining structure; S43, the safety factor of the reinforced lining structure is verified. If the verification does not meet the safety requirements, the calculation of S41 is repeated to iteratively optimize the support parameter A until the safety factor is met to form the support parameter B.
7. The seismic design method for high geostress tunnel according to claim 6, characterized in that: In S5, the steps for obtaining the support parameter C are as follows: S51, based on the finite element model calculation structure obtained in S4, extract the reaction force on the side and bottom boundaries of the finite element model and each unit stress of the model; S52, cancel the fixed boundary of the stratum-structure finite element model and apply the extracted node reaction force and unit stress; S53, applying seismic loads to the stratum-structure finite element model of S52 to calculate the seismic dynamics and the internal forces of the lining structure under high ground stress conditions; S54, the lining structure is reinforced with the internal force of the lining structure obtained in S53, and then the safety factor of the reinforced lining structure is verified. If the verification does not meet the safety requirements, the steps of S53 are repeated to iteratively optimize the support parameter B until the structural safety factor meets the requirements to form the support parameter C.
8. A high ground stress tunnel seismic design system, characterized in that: It includes a data acquisition module, a data preprocessing system, a tunnel support parameter A acquisition module, a finite element model establishment module, a tunnel support parameter B acquisition module, a tunnel support parameter C acquisition module and a tunnel lining structure establishment module. The data acquisition module is used to obtain macroscopic geological and geographical information of the tunnel site and basic information of the tunnel surrounding rock according to the line design plan and the engineering geological survey report; The data preprocessing system is used to preliminarily formulate the construction method of the tunnel and the outline shape of the tunnel by using the engineering analogy method or the theoretical analysis method, and to construct the tunnel surrounding rock ground stress field by combining the actual measurement and inversion; the tunnel support parameter A acquisition module is used to formulate the tunnel support parameter A by combining the information obtained by S1 as the basic modeling information and the tunnel surrounding rock ground stress field obtained by S2; The finite element model building module is used to establish a stratum-structure finite element model for the stress analysis of the tunnel lining structure based on the information obtained by S1 as the basic modeling information, the tunnel surrounding rock in-situ stress obtained by S2, and the tunnel support parameter A obtained by S3; the tunnel support parameter B acquisition module is used to iteratively optimize the support parameter A with the tunnel surrounding rock in-situ stress field obtained by S2 as the calculation input condition, and obtain the support parameter B that meets the safety factor requirements of the lining structure; The tunnel support parameter C acquisition module is used to check the safety factor and iteratively optimize the support parameter B to form the support parameter C of the tunnel lining structure that meets the high ground stress condition; The tunnel lining structure establishment module is used to design a high ground stress tunnel lining structure that meets the requirements according to the support parameter C.
9. An electronic device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the seismic design method for a high ground stress tunnel described in any one of claims 1 to 7 are implemented.
10. A storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the seismic design method for a high ground stress tunnel described in any one of claims 1 to 7 are implemented.
Citation Information
Cited By
Deeply-buried soft rock tunnel supporting structure design method based on energy regulation and control
CN120124173A