Channel state analysis and reconstruction method based on multi-source data fusion
Through multi-source data fusion analysis and design of the repair solutions of prefabricated sleeve linings and concrete sleeve linings, the problems of environmental disturbance and reduction of overcurrent cross-sectional area in old channels are solved, and the sustainable repair of channels is achieved and Extended service life.
Patent Information
- Application Number
- CN202411148359.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-04
- Publication Date
- 2024-12-03
AI Technical Summary
The existing technology is difficult to avoid excavation of soil during the maintenance of old channels, resulting in environmental disturbances, and there is a lack of feasible methods and refined calculation standards to determine whether the channels need to be repaired. After repair, the overcurrent cross-sectional area is reduced and it is difficult to achieve sustainable development. Sexual repair.
Using a channel state analysis method based on multi-source data fusion, we can determine whether repair is needed by obtaining working conditions parameters, and design the initial and iterative repair schemes, and use prefabricated sleeve linings and concrete sleeve linings for repair to avoid reducing overcurrent interception. Area, adjust the pressure balance of the side wall to achieve sustainable recycling.
It realizes channel maintenance without excavation and digging, avoids environmental disturbances, extends the service life of the channel, ensures that the overcurrent cross-sectional area does not decrease, and reflects a sustainable repair plan.
Smart Images

Figure CN119067304A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of water conservancy engineering, and in particular to a channel state analysis and reconstruction method based on multi-source data fusion. Background Art
[0002] With the development of cities, many water supply, sewage, flood and drainage channels and some irrigation channels are close to roads and railways and pass through the center of the city. The surrounding environment does not allow the demolition and reconstruction of old channels or excavation and repair from the outside, which makes the maintenance and reinforcement of old channels difficult. The construction conditions outside the channel are limited and it is impossible to demolish and rebuild. In addition, the disordered changes of groundwater outside the channel are also one of the factors affecting the lateral stability of the channel side wall; if the channel is repaired from the inside, the flow cross-sectional area will be reduced.
[0003] This technical field also lacks feasible methods to determine whether a channel needs to be repaired, and the design of repair plans also lacks refined calculation standards.
[0004] The existing repair methods make it difficult to repair the channel again after it has been repaired once, and their sustainability is poor. Summary of the invention
[0005] The technical problem to be solved by the present invention is how to avoid excavation and reduce disturbance to the surrounding environment during the maintenance of old channels. Through the refined collection and calculation of multi-source data, improper channel maintenance is avoided, the flow cross-sectional area is not reduced after reconstruction, and a technical route of sustainable recycling is embodied. The reconstructed channel can adjust the pressure balance on both sides.
[0006] In order to achieve the above object, the technical solution adopted by the present invention is: a channel status analysis and reconstruction method based on multi-source data fusion, the analysis method comprises the following steps:
[0007] S1. After the water in the old channel is drained, the operating parameters of the old channel are obtained;
[0008] S2, calculating and determining whether the old channel needs to be repaired based on the working condition parameters in step S1;
[0009] The channel reconstruction method based on the obtained X value includes the following steps:
[0010] S3. If the old channel needs to be repaired, the initial repair plan will be designed based on the working condition parameters;
[0011] S4, perform construction according to the initial repair plan of step S3 to obtain the initial renovation channel;
[0012] S5. During the operation of the first-generation refurbishment channel, the operation method of steps S1-S2 is performed again on the first-generation refurbishment channel;
[0013] S6. If the first-generation refurbishment channel needs repair, an iterative repair plan will be designed;
[0014] S7, perform construction according to the iterative repair plan of step S6 to obtain an iterative renovation channel;
[0015] S8. During the operation of the iterative renovation channel, the operation method of steps S5-S7 is executed again on the iterative renovation channel.
[0016] The operating parameters in step S1 include the operating years N1, the number N2 of cracks with a length exceeding L per unit area on the inner surface of the old channel, the proportion P of the area with calcification attached to the inner surface of the old channel, and the inclination angle θ of the side wall of the old channel.
[0017] Furthermore, L is 10 cm, and the calculation method in step S2 is:
[0018]
[0019] In formula (1), X is the repair coefficient;
[0020] The determination method in step S2 is that if the value of X is greater than or equal to 1, it is determined that repair is required, and if the value of X is less than 1, it is determined that repair is not required.
[0021] Furthermore, the initial repair solution in step S3 includes:
[0022] S3-1. Clean and smooth the inner surface of the old channel;
[0023] S3-2. Install the first-generation assembled lining layer on the inner surface of the old channel in sections, the first-generation assembled lining layer includes a first-generation base placed on the base of the old channel, two first-generation side walls installed on the inner side of the side wall of the old channel and connected to the first-generation base at the bottom through a hole column, and a plurality of support frames laterally connected between the two first-generation side walls, the first-generation side walls are higher than the side walls of the old channel and extend outward and then downward to form an n-shaped fastener that is buckled on the side wall, and there is a gap between the bottom of the groove of the n-shaped fastener and the top surface of the side wall; the support frame includes two support plates, the bottom ends of the two support plates are respectively placed in the grooves on the tops of the two first-generation side walls, the top ends of the two support plates are hinged to each other, and a counterweight is suspended below the hinge shaft through a connecting piece;
[0024] S3-3. A pressure relief drain pipe is installed through the side wall and the first generation prefabricated casing lining of the old channel to reduce the groundwater pressure outside the side wall.
[0025] Furthermore, in step S3-3, the outer end of the pressure relief drainage pipe is higher than the inner end, the inclination angle of the pressure relief drainage pipe is 15°-30°, and the outer end of the pressure relief drainage pipe is wrapped with a filter geotextile, and the specification of the filter geotextile is 100g / m 2The inner end of the pressure relief drain pipe is flush with the surface of the first-generation assembled sleeve lining.
[0026] Furthermore, in order to avoid reducing the flow cross-sectional area, the size requirements of the first generation assembled sleeve lining are:
[0027]
[0028] In formula (2), h2 is the height of the first-generation side wall above the old channel side wall, h1 is the height of the old channel inner section, w is the width of the old channel inner section, and d is the thickness of the first-generation prefabricated casing lining;
[0029] The value of d is proportional to the value of X.
[0030] Furthermore, both sides of the first-generation base protrude upward to form a low wall, and a linear array of connecting holes is provided on the low wall. The first-generation side wall is provided with a connecting column that passes through the bottom and cooperates with the connecting holes. A grouting hole connected to the bottom of the connecting hole is provided on the inner side of the low wall. After the first-generation side wall and the low wall of the first-generation base are installed through the connecting holes and the connecting columns, cement slurry is poured into the grouting hole until cement slurry seeps out from the joint between the first-generation side wall and the first-generation base.
[0031] Furthermore, the iterative repair scheme in step S6 is to first remove the first-generation assembled sleeve lining of the first-generation refurbished channel, and then install the iterative assembled sleeve lining according to the operating steps of step S3 to obtain the iterative refurbished channel.
[0032] Furthermore, the initial repair solution in step S3 is to pre-embed dowels with a plum blossom shape distribution on the inner surface of the old channel and cast an initial concrete casing lining. The initial concrete casing lining is arranged along the inner surface of the old channel. The two side walls of the initial concrete casing lining are higher than the side walls of the old channel and extend outward to form ears pressed on the side walls. The iterative repair solution in step S6 is to first remove the initial concrete casing lining of the initial renovation channel, and then cast the iterative concrete casing lining according to the operating steps of step S3. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0034] Figure 1 It is a work flow chart of the present invention.
[0035] Figure 2 It is a schematic diagram of the cross-sectional structure of the first generation renovation channel of the present invention.
[0036] Figure 3 It is a diagram showing the coordination relationship between the iterative concrete casing lining and the old channel in other embodiments of the present invention.
[0037] In the figure: 1, old channel 2, base 3, side wall 4, first-generation base 5, first-generation side wall 6, N-shaped fastener 7, pressure relief drain pipe 8, support plate 9, hinge shaft 10, connector 11, counterweight 12, groove 13, low wall 14, connecting column 15, grouting hole 16, dowel 17, support ear 18, first-generation concrete sleeve lining. DETAILED DESCRIPTION
[0038] See attached Figure 1 and 2 , the analysis method of the present invention comprises the following steps:
[0039] S1. After the water in the old channel 1 is drained, the operating parameters of the old channel 1 are obtained;
[0040] S2, calculating and determining whether the old channel 1 needs to be repaired based on the operating parameters in step S1;
[0041] The reengineering method includes the following steps:
[0042] S3. If the old channel 1 needs to be repaired, the initial repair plan will be designed based on the working condition parameters;
[0043] S4, perform construction according to the initial repair plan of step S3 to obtain the initial renovation channel;
[0044] S5. During the operation of the first-generation refurbishment channel, the operation method of steps S1-S2 is performed again on the first-generation refurbishment channel;
[0045] S6. If the first-generation refurbishment channel needs repair, an iterative repair plan will be designed;
[0046] S7, perform construction according to the iterative repair plan of step S6 to obtain an iterative renovation channel;
[0047] S8. During the operation of the iterative renovation channel, the operation method of steps S5-S7 is executed again on the iterative renovation channel.
[0048] Through the initial repair and multiple iterations of repair, the repair method can be used sustainably to extend the service life of the old channel 1.
[0049] The operating parameters in step S1 include the operating years N1, the number N2 of cracks with a length exceeding L per unit area on the inner surface of the old channel 1, the proportion P of the area with calcification attached to the inner surface of the old channel 1, and the inclination angle θ of the side wall 3 of the old channel 1. The above operating parameters can reflect the degree of aging of the channel from different angles.
[0050] The L is 10 cm, and the calculation method in step S2 is:
[0051]
[0052] In formula (1), X is the repair coefficient;
[0053] The determination method in step S2 is that if the value of X is greater than or equal to 1, it is determined that repair is required, and if the value of X is less than 1, it is determined that repair is not required.
[0054] The initial repair solution in step S3 includes:
[0055] S3-1. Clean and smooth the inner surface of the old channel 1 to avoid debris or unevenness that may affect the repair effect;
[0056] S3-2. Install the first-generation assembled lining layer on the inner surface of the old channel 1 in sections, the first-generation assembled lining layer includes a first-generation base 4 placed on the base 2 of the old channel 1, two first-generation side walls 5 installed on the inner side of the side wall 3 of the old channel 1 and connected to the first-generation base 4 at the bottom through holes and columns, and multiple support frames laterally connected between the two first-generation side walls. The first-generation side walls 5 are higher than the side walls 3 of the old channel 1 and extend outward and then downward to form an n-shaped fastener 6 that is buckled on the side wall 3. There is a gap between the bottom of the groove of the n-shaped fastener 6 and the top surface of the side wall 3; the support frame includes two support plates 8, the bottom ends of the two support plates 8 are respectively placed in the grooves 12 on the tops of the two first-generation side walls 5, the top ends of the two support plates 8 are hinged to each other, and a counterweight block 11 is suspended below the hinge shaft 9 through a connecting piece 10; adjusting the weight of the counterweight block 11 can be converted into adjusting the supporting force of the support frame on the first-generation side wall 5, and the adjustment principle is that the lower the water level, the heavier the weight of the counterweight block 11. The use of prefabricated technology for repairs not only allows for prefabrication in the factory and installation on site, thus avoiding construction around the channel, but also improves installation efficiency. In addition, there is no need for on-site crushing during the next renovation and demolition.
[0057] S3-3, the side wall 3 and the first generation assembled casing lining that penetrate the old channel 1 are provided with a pressure relief drainage pipe 7 for reducing the groundwater pressure outside the side wall 3. When the groundwater outside the side wall 3 increases, it can flow into the channel through the pressure relief drainage pipe 7, reducing the pressure outside the side wall 3 and improving the lateral stability of the side wall 3.
[0058] In step S3-3, the outer end of the pressure relief drainage pipe 7 is higher than the inner end, the inclination angle of the pressure relief drainage pipe 7 is 15°-30°, and the outer end of the pressure relief drainage pipe 7 is wrapped with a filter geotextile, and the specification of the filter geotextile is 100g / m 2 The inner end of the pressure relief drainage pipe 7 is flush with the surface of the first generation assembled casing lining. The anti-filter geotextile prevents soil and stone particles on the outside of the side wall 3 from flowing into the channel or blocking the pressure relief drainage pipe 7.
[0059] In order to avoid reducing the flow cross-sectional area, the size requirements of the first generation assembled sleeve lining are:
[0060]
[0061] In formula (2), h2 is the height of the first-generation side wall 5 above the side wall 3 of the old channel 1, h1 is the height of the inner section of the old channel 1, w is the width of the inner section of the old channel 1, and d is the thickness of the first-generation assembled casing lining;
[0062] The value of d is proportional to the value of X.
[0063] The two sides of the primary base 4 protrude upward to form a low wall 13, and the low wall 13 is provided with connection holes in a linear array. The primary side wall 5 is provided with a connection column 14 that passes through the bottom and cooperates with the connection hole. The inner side of the low wall 13 is provided with a grouting hole 15 connected to the bottom of the connection hole. After the primary side wall 5 and the low wall 13 of the primary base 4 are installed through the connection hole and the connection column 14, cement slurry is poured into the grouting hole 15 until the joint of the primary side wall 5 and the primary base 4 has cement slurry seeping out. Grouting seals to ensure that the joints of the primary prefabricated sleeve lining are water-proof. The joints between adjacent sections of the primary prefabricated sleeve lining are also grout-sealed.
[0064] The iterative repair scheme in step S6 is to first remove the first generation of assembled lining of the first generation of refurbished channel, and then install the iterative assembled lining according to the operation steps of step S3 to obtain the iterative refurbished channel. Such regular repairs increase the service life of the old channel.
[0065] See also Figure 3 In other embodiments, the first-generation repair scheme in step S3 is to pre-embed the dowels 16 distributed in a plum blossom shape on the inner surface of the old channel 1 and cast the first-generation concrete casing 18. The first-generation concrete casing 18 is arranged along the inner surface of the old channel 1. The two side walls of the first-generation concrete casing 18 are higher than the side walls of the old channel 1 and extend outward to form ears 17 pressed on the side walls; a pressure relief drainage pipe 7 is provided through the side walls of the old channel 1 and the first-generation concrete casing 18 to reduce the groundwater pressure outside the side wall. The dowels 16 are used to connect the first-generation concrete casing 18 and the old channel 1 so that the two are tightly combined. The iterative repair scheme in step S6 is to first remove the first-generation concrete casing 18 of the first-generation renovation channel, and then cast the iterative concrete casing according to the operating steps of step S3. Considering the characteristics of cast-in-place concrete that is difficult to remove but has a high degree of firmness, this embodiment is suitable for working conditions with a small number of iterations.
[0066] The above description is only proposed as an implementable technical solution of the present invention, and is not intended to be a single limitation on the technical solution itself.
Claims
1. A channel status analysis method based on multi-source data fusion, characterized by: The following steps are involved: S1. After the old channel is drained, the operating parameters of the old channel are obtained. The operating parameters include the operating years N1, the number of cracks N2 with a length exceeding L per unit area on the inner surface of the old channel, the proportion P of the area attached to the inner surface of the old channel, and the inclination angle θ of the side wall of the old channel; S2. Calculate and determine whether the old channel needs to be repaired based on the working condition parameters in step S1. The calculation method is: In formula (1), X is the repair coefficient; The judgment method is that if the value of X is greater than or equal to 1, it is judged that repair is needed, and if the value of X is less than 1, it is judged that repair is not needed.
2. The analysis method according to claim 1, characterized in that: The value of L in step S1 is 10 cm.
3. A channel reconstruction method based on the X value obtained by the analysis method of claim 1 or 2, characterized in that: The following steps are involved: When the value of S3 and X is greater than or equal to 1, the initial repair plan is designed based on the working condition parameters; S4, construct according to the initial repair plan of step S3 to obtain the initial renovation channel; S5. During the operation of the first-generation refurbishment channel, the operation method of steps S1-S2 is performed again on the first-generation refurbishment channel; S6. If the value of the first-generation refurbishment channel X is greater than or equal to 1, an iterative repair solution is designed; S7, construct according to the iterative repair plan of step S6 to obtain an iterative renovation channel; S8. During the operation of the iterative renovation channel, the operation method of steps S5-S7 is executed again on the iterative renovation channel.
4. The channel reconstruction method according to claim 3, characterized in that: The initial repair solution in step S3 is to pre-embed dowel bars distributed in a plum blossom shape on the inner surface of the old channel and cast the initial concrete casing lining. The initial concrete casing lining is arranged along the inner surface of the old channel. The two side walls of the initial concrete casing lining are higher than the side walls of the old channel and extend outward to form ears pressed on the side walls.
5. The channel reconstruction method according to claim 3, characterized in that: The iterative repair solution in step S6 is to first remove the initial concrete lining of the initial renovation channel, and then cast the iterative concrete lining in situ according to the operating steps of step S3.
6. The channel reconstruction method according to claim 3, characterized in that: The side wall and the first generation concrete lining layer of the old channel are equipped with a pressure relief drain pipe to reduce the groundwater pressure outside the side wall. The outer end of the pressure relief drain pipe is higher than the inner end. The inclination angle of the pressure relief drain pipe is 15°-30°. The outer end of the pressure relief drain pipe is wrapped with anti-filter geotextile. The specification of the anti-filter geotextile is 100g / m 2 The inner end of the pressure relief drainage pipe is flush with the surface of the primary concrete jacket lining.
7. The repair method according to claim 3, characterized in that: In order to avoid reducing the flow cross-sectional area, the size requirements of the first generation concrete lining are: In formula (2), h2 is the height of the side wall of the first-generation concrete casing above the side wall of the old channel, h1 is the height of the section inside the old channel, w is the width of the section inside the old channel, and d is the thickness of the first-generation concrete casing; The value of d is proportional to the value of X.