Automatic production scheduling method and device, medium and computer equipment
Through the automated production scheduling method, the production scheduling of bottleneck processes is optimized based on the production plan and the processing volume and duration of the bottleneck process, solving the problems of waste of production capacity and low operation efficiency caused by manual production scheduling, and achieving more efficient production line operations.
Patent Information
- Application Number
- CN202310637047.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-31
- Publication Date
- 2024-12-03
AI Technical Summary
In the prior art, manual production scheduling methods have wasted capacity in production line operations, making it difficult to quickly deal with product upgrades and production bottlenecks, resulting in low operational efficiency.
Through the automated production scheduling method, the product volume within each unit time period is calculated based on the production plan of the product model and the processing volume and duration of the bottleneck process, the production scheduling plan of the global bottleneck process is determined, and the utilization efficiency of the bottleneck process is optimized.
It realizes accurate production scheduling of bottleneck processes, improves utilization efficiency, reduces production capacity waste, and improves the operational efficiency of the production line.
Smart Images

Figure CN119067332A_ABST
Abstract
Description
Technical Field
[0001] Multiple embodiments of the present specification relate to the field of interface rendering technology, and more particularly to an automated production scheduling method, apparatus, medium, and computer equipment. Background Art
[0002] For factories that produce products, there are usually different production lines corresponding to different product models. Each production line consists of multiple processes, and the same process can be applied to multiple production lines.
[0003] In actual applications, a process can only be applied to one production line at a time. If the factory needs to maintain production on multiple production lines within the production cycle, production scheduling is required, that is, within the production cycle, each process needs to be applied on which production line at different time periods.
[0004] In the prior art, production scheduling is usually done manually based on experience. However, this manual scheduling method does not work well and wastes a lot of production capacity. Summary of the invention
[0005] According to a first aspect of multiple embodiments of this specification, an automated production scheduling method is proposed, comprising:
[0006] Obtaining a production plan within a production cycle; wherein the production plan includes: a planned cumulative output of product model Xi within each unit period of the production cycle; i=1, 2, ..., M, where M is the number of product models;
[0007] According to the production plan, determine the product quantity W to be processed at the bottleneck process j of product model Xi in each unit time period Xij ; For each bottleneck process, determine the time TIME required for the product model Xi to be processed at the bottleneck process j to reach the bottleneck process Xij ; Where j = 1, 2, ..., N, N is the number of bottleneck processes;
[0008] According to W in each unit period Xij and the time corresponding to each bottleneck process Xij , calculate the product quantity of product model Xi output by each bottleneck process in each unit time period;
[0009] The global bottleneck process production schedule is determined according to the product quantity of product model Xi output by each bottleneck process in each unit time period; wherein the global production schedule includes: the time period used by each bottleneck process in the production cycle to process product model Xi.
[0010] According to a second aspect of multiple embodiments of this specification, an automated production scheduling device is provided, comprising:
[0011] An acquisition module is used to acquire a production plan within a production cycle; wherein the production plan includes: a planned cumulative output of a product model Xi within each unit period of the production cycle; i=1, 2, ..., M, where M is the number of product models;
[0012] The determination module determines the product quantity W to be processed at the bottleneck process j of the product model Xi in each unit time period according to the production plan. Xij ; For each bottleneck process, determine the time TIME required for the product model Xi to be processed at the bottleneck process j to reach the bottleneck process Xij ; Where j = 1, 2, ..., N, N is the number of bottleneck processes;
[0013] The calculation module is based on W in each unit period. Xij and the time corresponding to each bottleneck process Xi j, calculate the product quantity of product model Xi output by each bottleneck process in each unit time period;
[0014] The production scheduling module determines the global bottleneck process production scheduling plan according to the product quantity of product model Xi output by each bottleneck process in each unit time period; wherein the global production scheduling plan includes: the time period used by each bottleneck process in the production cycle to process product model Xi.
[0015] According to a third aspect of multiple embodiments of the present specification, a computing device is proposed, including a memory and a processor; the memory is used to store computer instructions that can be executed on the processor, and the processor is used to implement the method described in the first aspect when executing the computer instructions.
[0016] According to a fourth aspect of multiple embodiments of the present specification, a computer-readable storage medium is provided, on which a computer program is stored, and when the program is executed by a processor, the method described in the first aspect is implemented.
[0017] In the technical solution provided by the present disclosure, automatic production scheduling is considered for key bottleneck processes, and the amount of products to be processed at each bottleneck process for each product model in each unit time period is determined according to the production plan of the production line of each product model (the planned cumulative output of each product model in each unit time period of a single production cycle). In addition, the time required for the products to be processed by each product model in each bottleneck process to reach another bottleneck process is also estimated. In this way, the amount of products of each product model output by each bottleneck process in each unit time period can be determined based on the amount of products to be processed by each product model in each bottleneck process in each unit time period and the time required for the products to be processed by each product model in each bottleneck process to reach another bottleneck process. With the amount of products of product model Xi output by each bottleneck process in each unit time period, the production scheduling plan of the global bottleneck process can be determined, that is, the time period for each bottleneck process to process different product models in a single production cycle can be determined.
[0018] Through the above technical solution, it is possible to achieve relatively accurate production scheduling of bottleneck processes, thereby improving the utilization efficiency of bottleneck processes and reducing production capacity waste. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 A flowchart of an automated production scheduling method is provided as an example.
[0020] Figure 2 It is a schematic diagram of a production plan within a production cycle provided by the present disclosure as an example.
[0021] Figure 3 An automated production scheduling initialization process is exemplified.
[0022] Figure 4 An example is provided to traverse the overall production scheduling process.
[0023] Figure 5 An example production scheduling process for a single machine is provided.
[0024] Figure 6 An exemplary logic diagram for calculating the priority weight of each alternative global bottleneck process scheduling plan is provided.
[0025] Figure 7 It is a structural schematic diagram of a computing device provided by the present disclosure.
[0026] In the drawings, the same or corresponding reference numerals represent the same or corresponding parts. The number of any element in the drawings is for example rather than limitation, and any naming is only for distinction and does not have any limiting meaning. DETAILED DESCRIPTION
[0027] In order to enable those skilled in the art to better understand the technical solutions in this specification, the technical solutions in the embodiments of this specification will be clearly and completely described below in conjunction with the drawings in the embodiments of this specification. Obviously, the described embodiments are only part of the embodiments of this specification, not all of the embodiments. Based on the embodiments in this specification, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of this specification.
[0028] It should be noted that: in other embodiments, the steps of the corresponding method are not necessarily performed in the order shown and described in this specification. In some other embodiments, the steps included in the method may be more or less than those described in this specification. In addition, a single step described in this specification may be decomposed into multiple steps for description in other embodiments; and multiple steps described in this specification may be combined into a single step for description in other embodiments.
[0029] Some concepts in the present disclosure are introduced here.
[0030] Production line: It is composed of multiple processes. The product materials are fed into the first process of the production line, and each process processes the product in turn until the last process of the production line outputs the finished product. Generally speaking, different product models need to be produced using different product lines. For example, LCD screens can have many different product models, and each product model has a dedicated production line for production.
[0031] Process: The link for product processing. For example, the processes involved in LCD screens may include coating, exposure, and development (Gate mask). Processes are usually executed by process execution equipment, and process execution equipment is limited, which means that a process can only be applied to one production line at the same time to produce products of the corresponding product model.
[0032] Bottleneck process: It is mainly defined based on the production process. We usually call the link with the slowest production rhythm in a process the "bottleneck". More broadly speaking, the bottleneck refers to the various factors that restrict output in the entire process, and the bottleneck process, as the name suggests, is the part of the work steps or process that restricts the output of the entire production line.
[0033] Non-bottleneck process: The process other than the bottleneck process is the non-bottleneck process.
[0034] Process execution equipment: also called process equipment or machine, is the equipment that executes the process. Process execution equipment can be divided into bottleneck process execution equipment and non-bottleneck process execution equipment. The same process execution equipment may have the ability to execute multiple processes, but a bottleneck process execution equipment can only execute one bottleneck process at the same time. If the bottleneck process needs to be changed, the bottleneck process execution equipment needs to switch the production conditions. A non-bottleneck process execution equipment can execute multiple non-bottleneck processes at the same time.
[0035] Scheduling: In a single production cycle, how to arrange each process to be applied to which product model in which time period is called scheduling. It is easy to understand that since the process execution equipment executes the process, the scheduling of the process is also the scheduling of the process execution equipment.
[0036] The following is a more detailed introduction to the background of the technical solution of the present disclosure.
[0037] In the operation scenario of the factory's product production line, the traditional production scheduling model based on manual experience is prevalent. For example, in the operation scenario of the TFT-LCD production line, the most difficult Array segment process still has a production scheduling model based on manual experience, which cannot quickly respond to the high requirements of product upgrades.
[0038] The product production line is oriented to the development needs of high Mask (many bottleneck processes), high WIP (large number of products to be processed at each process), and long TAT (long time each production line takes to complete the process), which leads to the reduction of the capacity difference of each process in Array, the existence of multiple production bottlenecks, and the increase of operational difficulty, mainly including the following aspects:
[0039] 1. Equipment and product status
[0040] (1) Many equipments: Array factory has a large number of main process equipments, all of which require personnel to make appointments to arrange production, which is a heavy workload.
[0041] (2) Many product types and processes: The average number of products in the WIP of the Array production line exceeds 30. Each product has an average of 27.2 main processes, of which the Oxide 8 Mask product has as many as 33 processes. The production is arranged by personnel, which is difficult.
[0042] (3) Many production restrictions: Production restrictions mainly include equipment restrictions, yield restrictions, logistics restrictions, etc. The judgment of various restrictions mainly depends on the experience management of operators. Although preventive measures have been taken on the equipment side, invalid transportation is inevitable when personnel changes occur.
[0043] 2. Operation status
[0044] (1) Offline interaction of operational data: Information about equipment status during Array operations needs to go through four processes: equipment status → technical department → manufacturing position → upstream position. The entire process mainly relies on offline communication by phone and text, and real-time interaction between data is impossible. In order to make the upstream supply reasonable, the switching within the process also requires real-time coordination, and personnel cannot respond to complex information changes in real time.
[0045] (2) Array equipment operation is determined by personnel experience: In the pull production model ③, input is determined by output demand, the intermediate processes are complex and diverse, the product scheduling combination rules are complex and the calculation amount is large, it is impossible to calculate the specific product quantity and complete the hourly scheduling, and personnel rely on experience to arrange production, and there are personnel differences. The supply differences in the upstream process lead to the switching back and forth of downstream products, resulting in capacity loss.
[0046] (3) Due to the complexity of the process flow, it is impossible to assess the capacity impact of subsequent processes, resulting in uneven distribution of WIP and resulting in capacity loss.
[0047] 3. Equipment Move Status
[0048] The PHT idle data of the bottleneck process determines the total monthly production capacity. Equipment idleness caused by personnel operation loss results in the loss of part of the equipment production capacity.
[0049] In summary, the existing manual production scheduling model is not very effective and will waste a lot of production capacity.
[0050] To this end, in one or more embodiments provided in the present disclosure, automatic production scheduling is considered for key bottleneck processes, and the amount of products to be processed at each bottleneck process for each product model in each unit time period is determined according to the production plan of the production line of each product model (the planned cumulative output of each product model in each unit time period of a single production cycle). In addition, the time required for the products to be processed by each product model in each bottleneck process to reach another bottleneck process is also estimated. In this way, the amount of products of each product model output by each bottleneck process in each unit time period can be determined based on the amount of products to be processed by each product model in each bottleneck process in each unit time period and the time required for the products to be processed by each product model in each bottleneck process to reach another bottleneck process. With the amount of products of product model Xi output by each bottleneck process in each unit time period, the production scheduling plan of the global bottleneck process can be determined, that is, the time period for each bottleneck process to process different product models in a single production cycle can be determined.
[0051] Through the above technical solution, it is possible to achieve relatively accurate production scheduling of bottleneck processes, thereby improving the utilization efficiency of bottleneck processes and reducing production capacity waste.
[0052] The technical solution provided by the present disclosure is described in detail below in conjunction with the accompanying drawings.
[0053] Figure 1 An exemplary process diagram of an automated production scheduling method is provided, comprising the following steps:
[0054] S100: Obtain the production plan within the production cycle.
[0055] The production plan may refer to the planned cumulative output of the product model Xi in each unit period of the production cycle, wherein i=1, 2, ..., M, and M is the number of product models.
[0056] Figure 2 Schematic diagram of the production plan within the production cycle provided by the present disclosure. Figure 2 As shown in the figure, the PRODUCT field indicates the product model, and the Total field indicates the planned cumulative output of each product model in a single production cycle. Each specific unit time period field indicates the planned cumulative output of each product model in that unit time period.
[0057] In some embodiments, the above-mentioned product model may specifically be a product model of an LCD screen, such as a product model of a TFT-LCD.
[0058] S102: According to the production plan, determine the product quantity W to be processed at the bottleneck process j of the product model Xi in each unit time period Xij ; For each bottleneck process, determine the time TIME required for the product model Xi to be processed at the bottleneck process j to reach the bottleneck process Xij .
[0059] Wherein, j=1, 2, ..., N, and N is the number of bottleneck processes.
[0060] In some embodiments, the time T required for the product corresponding to the product model Xi to be processed at the bottleneck process j can be determined. Xij ; and, for each bottleneck process, determine the time TAT required for the product model Xi output by the bottleneck process j to reach the bottleneck process Xij ; For each bottleneck process, T Xij and the TAT corresponding to the bottleneck process Xij Add them together to get the time TIME required for the product model Xi to be processed at the bottleneck process j to reach the bottleneck process Xij .
[0061] It is easy to understand that the above TAT XijIt can be determined based on historical operating data. These data follow a normal distribution. The Laida criterion (3σ) can be used to eliminate suspicious values from the TAT data within a historical production week to obtain a weighted average value of TAT.
[0062] S104: Based on W in each unit period Xij and the time corresponding to each bottleneck process Xij , calculate the product quantity of product model Xi output by each bottleneck process in each unit time period.
[0063] As a specific implementation method, according to the target value corresponding to WXij in each unit time period and TimeXij corresponding to each bottleneck process, the change of the product quantity WXij of product model Xi to be processed at the bottleneck process j in each other unit time period after the arrival of the unit time period is determined; wherein, the step of determining the target value corresponding to WXij includes: if WXij exceeds the performance threshold W of the process execution equipment of the bottleneck process, then W is used as the target value; if WXij does not exceed the performance threshold W of the process execution equipment of the bottleneck process, then WXij is used as the target value. Then, according to the change, the product quantity of product model Xi output by each bottleneck process in each unit time period can be calculated.
[0064] S106: Determine the global bottleneck process production schedule according to the product quantity of product model Xi output by each bottleneck process in each unit time period.
[0065] The global production scheduling plan may refer to the time period for each bottleneck process in the production cycle to process the product model Xi.
[0066] As a specific implementation method, the process execution equipment can be traversed to determine the single-device bottleneck process production schedule corresponding to a single process execution equipment based on the product quantity of product model Xi output by each bottleneck process in each unit time period and the availability of the process execution equipment; based on the single-device bottleneck process production schedule, the global bottleneck process production schedule is obtained.
[0067] The availability of the above-mentioned process execution equipment may include: the maintenance PM plan of the process execution equipment, the equipment reservation product status of the process execution equipment, the equipment verification product status of the process execution equipment, the tail lot product status of the process execution equipment, the MASK template distribution of the process execution equipment, the estimated Move quantity limit of the subsequent SPT equipment Cu product, etc.
[0068] There are two sources of automatic production scheduling data: data manually entered by personnel and production data automatically captured by the system.
[0069] Personnel manually input data: When the equipment needs to be shut down for debugging, cleaning, or when the equipment temporarily fails, the system cannot automatically estimate the length of time it will take, so personnel are required to manually upload the estimated downtime of the equipment, which will be executed with the highest priority during production scheduling. In this case, personnel need to import production input plans and equipment PM plans through WEB interaction, and set equipment product verification information and appointment information for special expedited production products that the equipment currently needs through the OIC client.
[0070] The system automatically captures data: The information automatically captured by the system is all real-time production information, which can ensure the feasibility of the production scheduling plan. Through the bottleneck process capacity prediction function in the first section, the system can automatically calculate the arrival rhythm of the process, and then obtain the distribution of the tail lot in the production line, the distribution of MASK, and the estimated Move quantity limit of the subsequent SPT equipment Cu product according to the real-time production situation of the equipment.
[0071] Figure 3 An example of an automated production scheduling initialization process is provided. Figure 3 As shown in the figure, initializing data is a prerequisite for ensuring the rationality of the plan. By confirming the equipment's current production products, tail lot distribution, and single-machine Release product status, the equipment's production scheduling direction and partial equipment scheduling can greatly reduce the equipment's production scheduling combinations and lay the foundation for subsequent recursive traversal and priority calculation.
[0072] After the production scheduling initialization process is completed, recursive traversal scheduling can be performed. The specific scheduling rules can be as follows (taking the Gate Mask process as an example):
[0073]
[0074]
[0075] Table 1
[0076] In some embodiments, multiple alternative global bottleneck process scheduling plans can be obtained based on the single equipment bottleneck process scheduling plan. According to the capacity utilization rate of the process execution equipment for each alternative global bottleneck process scheduling plan, the priority weight of each alternative global bottleneck process scheduling plan is determined; and the global bottleneck process scheduling plan with the highest priority weight is selected.
[0077] Figure 4 Provide an example of traversing the overall production scheduling process. Figure 5 This example provides a single machine production schedule. Figure 4 , Figure 5 The process is used to determine multiple alternative global bottleneck process production schedules.
[0078] Figure 6An exemplary schematic diagram of the calculation logic of the priority weight of each alternative global bottleneck process screening plan is provided. Figure 6 This is only an exemplary calculation logic, and those skilled in the art can easily conceive of other calculation logics to determine the priority weight of each candidate global bottleneck process.
[0079] pass Figure 1 The method flow shown can improve the matching rate of upstream and downstream processes. The upstream process can achieve "on-demand supply" based on the Mask production schedule and the WIP of the process to avoid PHT equipment Idle caused by invalid supply. The downstream process can clearly know the output plan of the Mask process and plan the equipment in advance. It can reduce logistics Idle (idle state without production). Due to the long-term high WIP operation of the Array factory and the high load of the storage warehouse, the products required by the equipment are not in the corresponding storage warehouse, resulting in idle logistics due to slow transportation. After the Gate Mask automatic production scheduling is introduced, the products required by each line in the corresponding time period are clarified, and the operating personnel can move the corresponding products to the storage warehouse in advance to reduce logistics Idle. It can also reduce the number of product switching and improve PHT production capacity.
[0080] In addition, in some embodiments, after executing the global bottleneck process production scheduling plan, the production scheduling of each non-bottleneck process can be operated according to the production scheduling of each bottleneck process. Specifically, for each non-bottleneck process, the amount of products of product model Xi to be processed at the downstream bottleneck process of the non-bottleneck process can be arranged according to the amount of products of product model Xi to be processed at the non-bottleneck process.
[0081] In order to ensure the production capacity of the bottleneck process Photo of Array, the non-bottleneck process needs to ensure the maximum supply of Photo. The traditional operation mode mostly adopts personnel to reserve the products that the equipment needs to produce, and the system only produces as the execution layer. However, the development direction of Array's product structure with high Mask, high WIP, and long TAT has brought great difficulties to personnel operation. Personnel cannot accurately match the bottleneck supply in real time, and there is a certain degree of loss. Therefore, this paper proposes an operation mode in which the system automatically makes decisions to match production. Based on real-time data drive, it connects to the DSP automatic scheduling and transportation system to release operation manpower, reduce the difficulty of personnel operation, improve the supply of bottleneck processes, reduce the idleness of non-bottleneck processes, and maximize the release of production capacity. According to the degree of correlation between the process and the bottleneck Photo process, it is mainly divided into two categories of process automatic operation modes: automatic operation of Photo direct supply process and automatic operation of Photo indirect supply process. The following distinguishes whether a non-bottleneck process has a bottleneck process directly downstream, and discusses them separately.
[0082] 1. The non-bottleneck process has a direct downstream bottleneck process.
[0083] The product continuity of the upstream direct supply process of Photo directly determines the switching frequency of Photo. Photo needs 380 seconds for a single switch. The more switches there are, the greater the loss of production capacity. In addition, due to product restrictions on Photo equipment, supply size conflicts will cause WIP accumulation on a single device, and other devices will have no WIP and become idle. Therefore, the automatic operation of Photo's direct supply process must be strongly related to Photo's production scheduling.
[0084] Currently, there are two types of equipment in the upstream direct supply process of Photo: Sputter and PECVD. Because the automatic operation schemes of the two types of equipment are similar, this section takes Sputter as an example to explain the operation scheme.
[0085] (1) Online device restrictions
[0086] In order to link the automatic handling system, the operating condition restrictions of the Sputter equipment are put online, and the personnel set the relevant status on the OIC.
[0087] For example, product prohibition run information.
[0088] Another example is the water content of equipment: water-containing equipment can only produce water-containing products, and water-free equipment cannot produce water-containing products. The water content of products can be identified through recipes, and the water content of equipment needs to be set by personnel. Only Metal Sputter has this rule, and ITO Sputter does not have this restriction.
[0089] Another example is the equipment production process: Sputter equipment needs to produce two processes, Gate and SD, and supply different process sections of Photo at the same time. Due to the adjustment of the delivery focus, personnel are required to set the current key production process.
[0090] (2) Production Priority
[0091] Each time a device port is requested to be put into operation, the system will automatically determine the highest priority lot that meets the production constraints. The priority order is:
[0092] Lot priority: Super Hot>Hot>Normal; the ratio of existing WIP to demand for downstream Photo demand production products.
[0093] The main difficulty of traditional operation methods is that they cannot dynamically match Photo demand. Automatic operation can start from Photo demand and adjust production in real time based on the ratio of Photo WIP to demand, giving priority to products with a small ratio of WIP to demand to ensure Photo demand supply, as shown in the following formula:
[0094] Demand = number of required devices × number of lots required for a single device;
[0095] Actual WIP = Photo INSTK WIP + WIP on SPT equipment + WIP in SPT Load port transfer;
[0096] The demand here refers to the demand of the downstream bottleneck process, SPT is a non-bottleneck device, INSTK WIP refers to each product model being processed by the downstream bottleneck process of the non-bottleneck process, the amount of products waiting to be produced is stored in the Stocker device, and the WIP in the SPT Load port transfer refers to the amount of products of each product model being output by the non-bottleneck process to the directly downstream bottleneck process.
[0097] When Photo has a tangent demand, it is necessary to prepare the WIP of the tangent product in advance. In this case, the number of Lots required by a single device for the products being produced and the tangent products is set to 5:1. This can improve the priority of the products being produced while ensuring the advance preparation of the WIP of the tangent products, so that the tangent products do not occupy the STK shed resources too early. The number of Lots required by a single device can be flexibly modified through registration. If the ratio of the products being produced and the tangent products is the same, the supply of the products being produced will be given priority. Transport location priority: The transport priority of the lot location is set through registration. Sputter upstream process Track Out time, the earlier the time, the higher the priority.
[0098] 2. The non-bottleneck process does not have a direct downstream bottleneck, but only an indirect downstream bottleneck.
[0099] The indirect supply process has the characteristics of large equipment capacity, a large number of sub-processes, and the machine can run multiple products at the same time. The capacity is much greater than the subsequent processes and is in a non-bottleneck state, such as Strip, Anneal, Wet Etch and other processes. However, since traditional operations use the method of personnel booking products and processes, it is easy to cause the accumulation of WIP in a single sub-process, and personnel are required to make a large number of product reservations, which results in a large amount of repetitive work and prone to misses, resulting in loss of capacity or utilization rate. Automatic operation focuses on releasing the capacity of non-bottleneck processes and increasing the Photo supply of bottleneck processes. It can achieve automatic balance of production line production. At the same time, the system retains the function of appointment priority and provides operators with a way to manually control production. Since the production restrictions of each process have their own characteristics, this article will explain them separately.
[0100] (1) Strip automatic operation
[0101] There are fewer restrictions on Strip equipment products. The production of products in this STK is mainly selected based on the equipment recipe and release products, which affects the production priority: Lot priority> appointment priority> upstream process Track Out time priority. At the same time, after the upstream equipment production is completed, according to the WIP in the STK where multiple Strip equipment that can produce the product are located, the product is automatically moved to the STK with low WIP. After the introduction of automatic operation, the Idle of the Strip process is significantly reduced.
[0102] (2)Anneal automatic operation
[0103] Because Anneal equipment with different PPIDs cannot be mixed, the system automatically selects all products under the PPID for mixed production when the personnel sets the current production PPID of the equipment in the system. If the personnel does not specify the PPID, the products in the default range (PPID 540-549 range) are produced. (PPID 540-549 range) represents normal products. When the personnel do not specify a special product to be produced, the default production is normal products.
[0104] Similar to Strip equipment, Anneal automatic operation mainly selects products in this STK for production based on the equipment PPID and release products, and the production priority is: Lot priority > appointment priority > upstream process Track Out time priority. At the same time, after the upstream equipment is finished producing, the product is automatically moved to the STK with low WIP based on the WIP in the STK where multiple Anneal equipment that can produce the product PPID is located. After the introduction of automatic operation, the Idle logistics of the Anneal process is converted into Idle WIP, providing greater production capacity space.
[0105] (3) Wet Etch automatic operation
[0106] WE equipment needs switching time to produce different recipe products. A single change takes 2 minutes. The JC of personnel operation accounts for about 4% of the whole month. Automatic operation prioritizes loading of similar recipe products, which reduces the number of JC. The detailed operation plan is as follows:
[0107] Equipment Inline mode switching: There are two types of equipment structures for WE production: Inline equipment and non-Inline equipment. The production processes of the two types of equipment are different. Inline equipment has two production units, Etch and Strip, and the production is divided into two modes: Etch+Strip and Strip Only; non-Inline equipment can only perform the Etch process. According to the change of equipment mode, the system will automatically switch the equipment state to match the recipe parameters in the corresponding state.
[0108] Cu Decap production arrangement: Due to the special production requirements of Cu Decap products, the liquid medicine used to produce Cu Decap products cannot be used for the production of other products. In addition, the production volume of Cu Decap products is not large. In order to make rational use of liquid medicine and not waste resources, Cu Decap products need to be arranged at the end of liquid medicine production. The system will automatically arrange continuous production of Cu Decap products at the end of liquid medicine production according to the length of liquid medicine production of the equipment. If there is no Cu Decap product, normal products will be produced until the liquid medicine is replaced.
[0109] Production priority: Lot priority > Priority for products with the same recipe currently being produced by the equipment > Priority for the equipment port and the product with less WIP quantity of the producible recipe being transported (when the product is switched, there will be two products with different recipes on the equipment) > Priority for the registered STK transport range > Priority for the upstream process with an earlier Track Out time (not in this STK, it can be automatically balanced to the producible STK through the balancing logic).
[0110] Through the technical solution provided in this article, we can import the bottleneck prediction model designed independently, provide effective production decisions with the capacity prediction results in hourly units, highlight key bottlenecks, help concentrate resources to make breakthroughs, and achieve early warning of production bottlenecks. We can also import the self-designed automatic production scheduling system, solidify and summarize the personnel production scheduling operation experience into the system, and automatically generate a visual Photo hourly production schedule, which reduces the difficulty of personnel scheduling and the fluctuation of operation capacity caused by differences in personnel experience, promotes the formation of a global operation rule database, and realizes the innovation of process data. We can also import the self-designed automatic operation system, the first in the TFT LCD industry to realize the operation mode that the main process can be produced without personnel scheduling, based on real-time data drive, truly realize end-to-end intelligent operation system, and maximize the release of production capacity.
[0111] The architecture of the technical solution provided by the present disclosure may include a bottleneck process capacity prediction module (mainly implementing steps S100-S104), a bottleneck process automatic production scheduling module (mainly implementing step S106), and a non-bottleneck process automatic operation module.
[0112] Among them, the bottleneck process capacity prediction module can realize capacity warning and assist in automatic production scheduling. The bottleneck process automatic production scheduling module can reduce logistics idleness, provide upstream and downstream process matching, and reduce MASK change. The non-bottleneck process automatic operation module can match the optimal supply of bottlenecks, minimize idleness, and reduce job changes.
[0113] The above solution architecture is supported by four major platforms, including the Oracle database platform for basic data collection and processing, the Java platform for building logical processing and judgment, the Web platform for user interaction and result display, and the MES and DSP platform for automatic production scheduling and control of production rhythm.
[0114] The present disclosure provides an automated production scheduling device, comprising:
[0115] An acquisition module is used to acquire a production plan within a production cycle; wherein the production plan includes: a planned cumulative output of a product model Xi within each unit period of the production cycle; i=1, 2, ..., M, where M is the number of product models;
[0116] The determination module determines the product quantity W to be processed at the bottleneck process j of the product model Xi in each unit time period according to the production plan. Xij ; For each bottleneck process, determine the time TIME required for the product model Xi to be processed at the bottleneck process j to reach the bottleneck process Xij ; Where j = 1, 2, ..., N, N is the number of bottleneck processes;
[0117] The calculation module is based on W in each unit period. Xij and the time corresponding to each bottleneck process Xij , calculate the product quantity of product model Xi output by each bottleneck process in each unit time period;
[0118] The production scheduling module determines the global bottleneck process production scheduling plan according to the product quantity of product model Xi output by each bottleneck process in each unit time period; wherein the global production scheduling plan includes: the time period used by each bottleneck process in the production cycle to process product model Xi.
[0119] The present disclosure also provides a computer program product, which executes the method of the embodiment of the present disclosure when running.
[0120] The present disclosure also provides a computer-readable storage medium having a computer program stored thereon, and the program, when executed by a processor, implements the method of the embodiment of the present disclosure.
[0121] The present disclosure also provides a computing device, including a memory and a processor; the memory is used to store computer instructions that can be executed on the processor, and the processor is used to implement the method of the embodiment of the present disclosure when executing the computer instructions.
[0122] Figure 7 It is a structural diagram of a computing device provided by the present disclosure. The computing device 15 may include but is not limited to: a processor 151, a memory 152, and a bus 153 connecting different system components (including the memory 152 and the processor 151).
[0123] The memory 152 stores computer instructions, which can be executed by the processor 151, so that the processor 151 can execute the method of any embodiment of the present disclosure. The memory 152 may include a random access memory unit RAM 1521, a cache memory unit 1522 and / or a read-only memory unit ROM 1523. The memory 152 may also include: a program tool 1525 having a set of program modules 1524, the program modules 1524 include but are not limited to: an operating system, one or more application programs, other program modules and program data, and one or more combinations of these program modules may include the implementation of a network environment.
[0124] The bus 153 may include, for example, a data bus, an address bus, and a control bus. The computing device 150 may also communicate with an external device 155 through an I / O interface 154, and the external device 155 may be, for example, a keyboard, a Bluetooth device, etc. The computing device 150 may also communicate with one or more networks through a network adapter 156, for example, the network may be a local area network, a wide area network, a public network, etc. As shown in the figure, the network adapter 156 may also communicate with other modules of the computing device 15 through the bus 153.
[0125] In addition, although the operations of the disclosed method are described in a specific order in the drawings, this does not require or imply that the operations must be performed in this specific order, or that all the operations shown must be performed to achieve the desired results. Additionally or alternatively, some steps may be omitted, multiple steps may be combined into one step, and / or one step may be decomposed into multiple steps.
[0126] Although the spirit and principle of the present disclosure have been described with reference to several specific embodiments, it should be understood that the present disclosure is not limited to the disclosed specific embodiments, and the division of various aspects does not mean that the features in these aspects cannot be combined to benefit, and such division is only for the convenience of expression. The present disclosure is intended to cover various modifications and equivalent arrangements included in the spirit and scope of the attached claims.
[0127] The methods described in the above embodiments can be implemented by a computer chip or entity, or by a product with a certain function. A typical implementation device is a computer. Specifically, the computer can be, for example, a personal computer, a laptop computer, a cellular phone, a camera phone, a smart phone, a personal digital assistant, a media player, a navigation device, an email device, a game console, a tablet computer, a wearable device, or a combination of any of these devices.
[0128] For the convenience of description, the above device is described by dividing it into various modules according to its functions. Of course, when implementing this specification, the functions of each module can be implemented in the same or multiple software and / or hardware.
[0129] It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as methods, devices, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0130] Computer-readable media include permanent and non-permanent, removable and non-removable media that can be used to store information by any method or technology. Information can be computer-readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disc read-only memory (CD-ROM), digital versatile disc (DVD) or other optical storage, magnetic cassettes, disk storage, quantum memory, graphene-based storage media or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer-readable media does not include temporary computer-readable media (transitory media), such as modulated data signals and carrier waves.
[0131] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.
[0132] The terms used in the multiple embodiments of this specification are only for the purpose of describing specific embodiments, and are not intended to limit the multiple embodiments of this specification. The singular forms of "a", "said" and "the" used in the multiple embodiments of this specification and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings. It should also be understood that the term "and / or" used herein refers to and includes any or all possible combinations of one or more associated listed items.
[0133] It should be understood that although the terms first, second, third, etc. may be used to describe various information in multiple embodiments of this specification, these information should not be limited to these terms. These terms are only used to distinguish the same type of information from each other. For example, without departing from the scope of multiple embodiments of this specification, the first information may also be referred to as the second information, and similarly, the second information may also be referred to as the first information. Depending on the context, the word "if" as used herein may be interpreted as "at the time of" or "when" or "in response to determining".
[0134] Each embodiment in this specification is described in a progressive manner, and the same and similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the method embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment. The method embodiment described above is merely illustrative, wherein the modules described as separate components may or may not be physically separated, and the functions of each module can be implemented in the same one or more software and / or hardware when implementing the embodiment scheme of this specification. It is also possible to select some or all of the modules according to actual needs to achieve the purpose of the embodiment scheme. A person of ordinary skill in the art can understand and implement it without paying creative labor.
[0135] The above description is only a preferred embodiment of the multiple embodiments of this specification and is not intended to limit the multiple embodiments of this specification. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the multiple embodiments of this specification should be included in the scope of protection of the multiple embodiments of this specification.
Claims
1. An automated production scheduling method, characterized in that: include: Obtaining a production plan within a production cycle; wherein the production plan includes: a planned cumulative output of product model Xi within each unit period of the production cycle; i=1, 2, ..., M, where M is the number of product models; According to the production plan, determine the product quantity W to be processed at the bottleneck process j of product model Xi in each unit time period Xij ; For each bottleneck process, determine the time TIME required for the product model Xi to be processed at the bottleneck process j to reach the bottleneck process Xij ; Where j = 1, 2, ..., N, N is the number of bottleneck processes; According to W in each unit period Xij and the time corresponding to each bottleneck process Xij , calculate the product quantity of product model Xi output by each bottleneck process in each unit time period; The global bottleneck process production schedule is determined according to the product quantity of product model Xi output by each bottleneck process in each unit time period; wherein the global production schedule includes: the time period used by each bottleneck process in the production cycle to process product model Xi.
2. The method according to claim 1, characterized in that: Product model Xi includes: Product model Xi of LCD screen.
3. The method according to claim 1, characterized in that: For each bottleneck process, the time TIME required for the product of product model Xi to be processed at bottleneck process j to reach the bottleneck process Xij ,include: Determine the time T required for the product corresponding to product model Xi to be processed at bottleneck process j Xij ; and, for each bottleneck process, determine the time TAT required for the product model Xi output by the bottleneck process j to reach the bottleneck process Xij ; For each bottleneck process, Xij and the TAT corresponding to the bottleneck process Xij Add them together to get the time TIME required for the product model Xi to be processed at the bottleneck process j to reach the bottleneck process Xij .
4. The method according to claim 1 or 3, characterized in that: According to W in each unit period Xij and the time corresponding to each bottleneck process Xij , calculate the product quantity of product model Xi output by each bottleneck process in each unit time period, including: According to W in each unit period Xij The corresponding target value and the time corresponding to each bottleneck process Xij , determine the product quantity W of product model Xi to be processed at bottleneck process j in each other unit period after the arrival of this unit period Xij The changes of W Xij The corresponding target value determination steps include: if W Xij If the performance threshold W of the process execution equipment that exceeds the bottleneck process is exceeded, W is used as the target value. Xij If the performance threshold W of the process execution equipment that does not exceed the bottleneck process is W, Xij as the target value; According to the changes, the product quantity of product model Xi output by each bottleneck process in each unit time period is calculated.
5. The method according to claim 1, characterized in that: According to the product quantity of product model Xi output by each bottleneck process in each unit period, determine the global bottleneck process production schedule, including: According to the product quantity of product model Xi output by each bottleneck process in each unit time period and the availability of process execution equipment, traverse the process execution equipment to determine the single equipment bottleneck process production schedule corresponding to a single process execution equipment; Based on the production schedule of the bottleneck process of a single device, the global bottleneck process production schedule is obtained.
6. The method according to claim 5, characterized in that The availability of process execution equipment includes at least one of the following: Maintenance PM plan for process execution equipment; Equipment reservation product status of process execution equipment; Equipment verification product status of process execution equipment; The status of the last lot of products of the equipment executing the process; The distribution of MASK templates of process execution equipment.
7. The method according to claim 5, characterized in that: Based on the production schedule of the bottleneck process of a single device, the global production schedule of the bottleneck process is obtained, including: Based on the production schedule of the bottleneck process of a single device, multiple alternative production schedules for the global bottleneck process are obtained; According to each alternative global bottleneck process scheduling plan and the capacity utilization rate of the process execution equipment, the priority weight of each alternative global bottleneck process screening plan is determined; Select the global bottleneck process production schedule with the highest priority weight.
8. The method according to claim 1, characterized in that: Also includes: Execute the global bottleneck process production scheduling plan; According to the production schedule of each bottleneck process, operate the production schedule of each non-bottleneck process.
9. The method according to claim 8, characterized in that According to the production schedule of each bottleneck process, operate the production schedule of each non-bottleneck process, including: For each non-bottleneck process, the amount of products of product model Xi to be processed at the non-bottleneck process is arranged according to the amount of products of product model Xi to be processed at the downstream bottleneck process of the non-bottleneck process.
10. An automated production scheduling device, characterized in that: include: An acquisition module is used to acquire a production plan within a production cycle; wherein the production plan includes: a planned cumulative output of a product model Xi within each unit period of the production cycle; i=1, 2, ..., M, where M is the number of product models; The determination module determines the product quantity W to be processed at the bottleneck process j of the product model Xi in each unit time period according to the production plan. Xij ; For each bottleneck process, determine the time TIME required for the product model Xi to be processed at the bottleneck process j to reach the bottleneck process Xij ; Where j = 1, 2, ..., N, N is the number of bottleneck processes; The calculation module is based on W in each unit period. Xij and the time corresponding to each bottleneck process Xij , calculate the product quantity of product model Xi output by each bottleneck process in each unit time period; The production scheduling module determines the global bottleneck process production scheduling plan according to the product quantity of product model Xi output by each bottleneck process in each unit time period; wherein the global production scheduling plan includes: the time period used by each bottleneck process in the production cycle to process product model Xi.
11. A computer-readable storage medium, characterized in that: The medium stores a computer program, and when the program is executed by a processor, the method according to any one of claims 1 to 9 is implemented.
12. A computing device, characterized in that: The method comprises a memory and a processor; the memory is used to store computer instructions executable on the processor, and the processor is used to implement the method described in any one of claims 1 to 9 when executing the computer instructions.