Method for supporting daily production scheduling operation of aircraft maintenance final assembly and MES system

By supporting daily production scheduling operations of aircraft maintenance, assembly and MES system, the problem of inconsistency between tasks and resources in traditional production management is solved, and the balance of the production process and resource coordination are achieved, and the production cycle is shortened.

CN119067352APending Publication Date: 2024-12-03WUHU STATE-OWNED FACTORY OF MACHINING
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411013812.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-26
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

The traditional production management method in the aircraft maintenance and assembly stage involves problems such as personnel failing to complete tasks on time, low degree of explicitness of the production process, unbalanced operations, incoordinated resources, and difficult to control the production cycle, resulting in low management efficiency and waste of resources.

Method used

Adopt a method and MES system to support daily production scheduling operations of aircraft maintenance and assembly. By forming maintenance plans and daily production scheduling templates, establishing calendars, adjusting dates, reasonably arranging process tasks, establishing material relationships, pushing warehousing systems, and realizing production The materials are distributed as planned, and the production process is executed, monitored and handled through the MES system.

Benefits of technology

It improves the precision of management, realizes the balance of production operations and resource coordination, reduces the production cycle, and solves the problems of low management efficiency, waste of resources and untimely handling of abnormal problems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119067352A_ABST
    Figure CN119067352A_ABST
Patent Text Reader

Abstract

The invention relates to a method for supporting daily production scheduling operation of aircraft maintenance final assembly and an MES system. The MES system comprises a personal workbench module, a basic data management module, a production preparation module, a task management module, a production process management module and a process execution module. And production management and maintenance data integration of a maintenance scheme and a production scheduling template are realized through the personal workbench module and the basic data management module. Compared with a traditional production scheduling and management mode, the method improves the management fineness in the final assembly operation production process, enables the production operation process to be more balanced and resources to be more coordinated by reasonably arranging daily operation tasks and continuously iterating and solidifying the operation process, achieves the purpose of shortening the production cycle, and improves the production efficiency. And meanwhile, the problems of low management efficiency, resource waste, untimely abnormal problem processing, unbalanced operation, non-fine management and the like in a traditional operation mode are solved by means of system management and control, a production process, resource dominance and the like.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of production scheduling and management in aircraft maintenance, and in particular to a method and an MES system for supporting daily production scheduling of aircraft maintenance and final assembly. Background Art

[0002] During aircraft maintenance, the final assembly phase is mainly responsible for the onboard assembly of repaired aircraft parts and accessories, including the assembly of large components such as power units and wings, as well as the installation of various aircraft systems and related equipment, such as landing gear systems, electrical systems, etc., and finally the debugging of all systems. During the assembly and debugging process, there are corresponding processes for the installation of each component and the debugging of the system, and the collection of various processes constitutes the maintenance plan for the aircraft maintenance final assembly phase. In the aircraft maintenance final assembly production management process, the traditional production management method is to assign the corresponding process sets to different operators according to the system and part, and the operators can freely arrange their time to complete the processes under their name and complete all processes before the final assembly delivery node.

[0003] The aircraft assembly stage is an important stage in the aircraft repair process. In the traditional production management mode, operators freely arrange the working time of each process. In this mode, it is easy for personnel in a certain system to fail to complete the task on time, which leads to the failure to complete the overall task of the assembly stage on time. Managers need to frequently intervene in the operation of operators and have strong management and scheduling experience to ensure the timely completion of the overall nodes. At the same time, the traditional operation mode often exposes the disadvantages of low degree of visibility of the production process, unbalanced operations, uncoordinated resources, uneven busyness of personnel, and difficult to control the production cycle.

[0004] In view of this, we propose a method and MES system to support daily production scheduling of aircraft maintenance and assembly to solve the above problems. Summary of the invention

[0005] In order to solve the above technical problems, the present invention proposes a method and MES system to support daily production scheduling of aircraft maintenance and assembly. The technical problem to be solved by the present invention is achieved by adopting the following technical solutions:

[0006] A method for supporting daily production scheduling of aircraft maintenance and assembly, the method comprising the following steps:

[0007] Step 1: Form a maintenance plan and daily production template based on the process set required in the aircraft assembly stage. The daily production template includes assembly, debugging tasks and node station task information;

[0008] Step 2: Create a calendar and divide the dates into common dates and single-flight overtime dates. Common dates are working days, and single-flight overtime dates are adjusted through ordinary rest days to ensure that there are enough working days for subtask scheduling and task cycles.

[0009] Step 3: Issue tasks and production cycles according to the maintenance plan, find the number of working days corresponding to the cycle, if not, add overtime dates for a single flight until the working days of the cycle meet the preset production cycle of the task, and form a working date list for a single flight with the adjusted calendar;

[0010] Step 4: According to the task plan of each station and the template sequence, traverse the planned start and completion time of all processes under the Quer task;

[0011] Step 5: Establish the relationship between various types of materials in the process, generate packing data according to the process and plan, push it to the warehousing system, and deliver it according to the plan.

[0012] As another improvement of the present invention, a MES system supporting daily production scheduling of aircraft maintenance and assembly is proposed, the system comprising a personal workbench module, a basic data management module, a production preparation module, a task management module, a production process management module and a process execution module;

[0013] The production management and maintenance data integration of maintenance plans and production scheduling templates are realized through the personal workbench module and basic data management module;

[0014] The production preparation module and task management module enable production material preparation, production task issuance and adjustment;

[0015] The execution, monitoring and problem handling of the production process are realized through the production process management module and the process execution module.

[0016] The beneficial effects of the present invention are as follows: compared with the traditional production scheduling and management mode, the present invention improves the precision of management in the production process of final assembly operations, and makes the production operation process more balanced and resources more coordinated by reasonably arranging daily operation tasks and continuously iterating and solidifying the operation process, thereby achieving the goal of shortening the production cycle. At the same time, the present invention solves the problems of low management efficiency, waste of resources, untimely handling of abnormal problems, unbalanced operations, and imprecise management in the traditional operation mode through system control, production process and resource explicitness. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0018] Figure 1 It is a schematic diagram of the method flow of the present invention;

[0019] Figure 2 It is a schematic diagram of the MES system structure of the present invention. DETAILED DESCRIPTION

[0020] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention will be explained more clearly and completely below in conjunction with the drawings in the embodiments. Of course, the described embodiments are only a part of the present invention but not all of it. Based on this embodiment, other embodiments obtained by those skilled in the art without creative labor are all within the protection scope of the present invention.

[0021] like Figure 1 to Figure 2 As shown, a method for supporting daily production scheduling of aircraft maintenance assembly includes the following steps:

[0022] Step 1: Form a maintenance plan and daily production template based on the process set required in the aircraft assembly stage. The daily production template includes assembly, debugging tasks and node station task information;

[0023] Step 2: Create a calendar table in the system database and divide the dates into public dates and single-flight overtime dates. Public dates are working days, and single-flight overtime dates are adjusted through ordinary rest days to ensure that subtask scheduling and task cycles have enough working days. Single-flight overtime dates are added based on actual conditions.

[0024] Step 3: Issue tasks and production cycles according to the maintenance plan, find the number of working days corresponding to the cycle, if not satisfied, add single flight overtime dates until the working days of the cycle meet the preset production cycle of the task, and form a list of working days for single flight aircraft with the adjusted calendar; tasks include assembly and debugging tasks, according to the planned start and completion time of assembly and debugging tasks and the preset production cycle of the task in the template; according to the planned start and completion time of the task, find the number of working days in the time interval, when the number of working days does not meet the preset cycle of the task in the template, it is necessary to add single flight overtime date data in the system to ensure that the number of working days in the above time interval (public working days + single flight overtime days) meets the preset cycle of the task;

[0025] Step 4: According to the task plan of each station and the template sequence, traverse the planned start and completion time of all processes under the Quer task;

[0026] Step 5: Establish the relationship between various types of materials in the process, generate packing data according to the process and plan, push it to the warehousing system, and deliver it according to the plan.

[0027] The station task information in the daily production scheduling template includes the working day cycle, the start date sequence of a single process, and the material packing template number.

[0028] The public dates mentioned above are assumed to be working days except weekends and statutory holidays.

[0029] The fourth step includes the following steps: Step 1: According to the preset work cycle of each station task, according to the station sequence and cycle, combined with the working date in the superior task, determine the planned start and completion time of each station task in turn;

[0030] Step 2: Issue work tasks in the system, and confirm the work plan according to the preset working day sequence in the daily production scheduling template and in combination with the production cycle.

[0031] The production cycle includes the working days of the task interval, and confirms the planned start and completion time of the process, where the planned start and completion time of the process is the first working day date of the task interval.

[0032] Step 6 includes the following steps:

[0033] Step 1: According to the final work plan, the packing template numbers of the work cards associated with each part are traversed to generate the packing numbers of the materials; the intelligent warehousing system traverses the fixed parts, accessories, and small parts resources included in the process according to the packing template numbers of the associated work cards to generate the packing numbers of the materials;

[0034] Step 2: The packing number in the first step is pushed to the intelligent warehousing system synchronously, guiding the intelligent warehousing system to pack the material resources and deliver the materials required for the process to the production site on time;

[0035] Step 3: If an abnormal situation occurs during the production operation, the planned start and completion time of a single process can be adjusted, and the distribution plan of the warehousing system can be modified simultaneously.

[0036] An MES system supporting daily production scheduling of aircraft maintenance and assembly, the system comprising a personal workbench module, a basic data management module, a production preparation module, a task management module, a production process management module and a process execution module;

[0037] The production management and maintenance data integration of maintenance plans and production scheduling templates are realized through the personal workbench module and basic data management module;

[0038] The production preparation module and task management module enable production material preparation, production task issuance and adjustment;

[0039] The execution, monitoring and problem handling of the production process are realized through the production process management module and the process execution module.

[0040] The personal workbench module is used to centrally process personal to-do items, maintenance work orders, system notifications, personal favorites, etc. on the system homepage;

[0041] The basic data management module maintains maintenance plans and production scheduling templates, manages production line section information, maintains work calendars, and manages process-related material packing and packaging templates.

[0042] Production preparation module, which realizes material packing data preparation before production, information synchronization intelligent warehousing system, instance maintenance project management, etc.;

[0043] The task management module is used to receive assembly and debugging production tasks, schedule the subtasks and processes of the tasks, assign work by profession, and adjust personnel and time, etc.

[0044] The production process management module is used to manage the business processes and data generated during the production process, including material monitoring, material completeness inventory, production progress monitoring, on-time completion statistics, abnormal problem process processing, internal retention process processing, internal fault handover process processing, etc.;

[0045] The process execution module is used for previewing, dispatching, canceling and transferring processes, operating, inspecting, executing technical processes, filling in and modifying processes during production operations.

[0046] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions only describe the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A method for supporting daily production scheduling of aircraft maintenance and assembly, characterized in that: The method comprises the following steps: Step 1: Form a maintenance plan and daily production template based on the process set required in the aircraft assembly stage. The daily production template includes assembly, debugging tasks and node station task information; Step 2: Create a calendar and divide the dates into public dates and single-flight overtime dates. Public dates are working days, and single-flight overtime dates are adjusted through ordinary rest days to ensure that there are enough working days for subtask scheduling and task cycles. Step 3: Issue tasks and production cycles according to the maintenance plan, find the number of working days corresponding to the cycle, if not, add overtime dates for a single flight until the working days of the cycle meet the preset production cycle of the task, and form a working date list for a single flight with the adjusted calendar; Step 4: According to the task plan of each station and the template sequence, traverse the planned start and completion time of all processes under the Quer task; Step 5: Establish the relationship between various types of materials in the process, generate packing data according to the process and plan, push it to the warehousing system, and deliver it according to the plan.

2. A method for supporting daily production scheduling of aircraft maintenance and assembly according to claim 1, characterized in that: The station task information in the daily production scheduling template includes the working day cycle, the start date sequence of a single process, and the material packing template number.

3. The method for supporting daily production scheduling of aircraft maintenance and assembly according to claim 1, characterized in that: The public dates mentioned above are assumed to be working days except weekends and statutory holidays.

4. The method for supporting daily production scheduling of aircraft maintenance and assembly according to claim 1, characterized in that: The fourth step includes the following steps: Step 1: According to the preset work cycle of each station task, according to the station order and cycle, combined with the working date in the superior task, determine the planned start and completion time of each station task in turn; Step 2: Issue work tasks, arrange station tasks according to the preset working day sequence in the daily production scheduling template and confirm the work plan in combination with the production cycle.

5. A method for supporting daily production scheduling of aircraft maintenance and assembly according to claim 4, characterized in that: The production cycle includes the working days of the task interval, and confirms the planned start and completion time of the process, where the planned start and completion time of the process is the first working day date of the task interval.

6. A method for supporting daily production scheduling of aircraft maintenance and assembly according to claim 1, characterized in that: Step 6 includes the following steps: Step 1: According to the final work plan, traverse the packing template number of each part-related work card to generate the packing number of the material; Step 2: The warehousing system packs the material resources and delivers the materials required for the process to the production site on time; Step 3: If an abnormal situation occurs during the production operation, the planned start and completion time of a single process can be adjusted, and the distribution plan of the warehousing system can be modified simultaneously.

7. An MES system using a method for supporting daily production scheduling of aircraft maintenance and assembly according to any one of claims 1 to 6, characterized in that: The system includes a personal workbench module, a basic data management module, a production preparation module, a task management module, a production process management module and a process execution module; The production management and maintenance data integration of maintenance plans and production scheduling templates are realized through the personal workbench module and basic data management module; The production preparation module and task management module enable production material preparation, production task issuance and adjustment; The execution, monitoring and problem handling of the production process are realized through the production process management module and the process execution module.