Power transmission line operation risk assessment method considering various external factors

Through Markov chain model and risk assessment ideas, combined with multiple external factors, a transmission line operation risk assessment model is established, which solves the problems of complexity and uncertainty in the existing technology, and improves the evaluation accuracy and operation and maintenance management. Effect.

CN119067433APending Publication Date: 2024-12-03STATE GRID HENAN ELECTRIC POWER CO XIANGCHENG COUNTY POWER SUPPLY CO
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410899037.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-05
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

The existing transmission line operation status analysis methods are complex and have strong uncertainty. They rely on a large amount of redundant data. The missing information will affect the accuracy of the assessment, making it difficult to accurately evaluate the operating risks of overhead transmission lines.

Method used

Using Markov chain model and risk assessment ideas, considering a variety of external factors, such as wind bias, ice covering, thunder damage, pollution flash, external force, etc., by obtaining historical data, predicting failure probability, quantifying impact indicators, and constructing comprehensive severity Indicators, establish a transmission line operation risk assessment model, and combine failure probability and severity assessment risk.

Benefits of technology

It improves the accuracy of the operation risk assessment of transmission lines, reduces the dependence on historical data, simplifies the evaluation process, and facilitates the operation and maintenance management of transmission lines and the safe and stable operation of the power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119067433A_ABST
    Figure CN119067433A_ABST
Patent Text Reader

Abstract

The invention discloses a power transmission line operation risk assessment method considering various external factors, and the method comprises the following steps: obtaining the historical data of an overhead power transmission line, and determining the external influence factors causing a line fault, the fault rate caused by the external influence factors of the line, the repair time, and the repair rate; evaluating and predicting the state of the power transmission line based on a Markov chain model; determining an influence index caused by the line fault, and constructing a comprehensive severity index; establishing a power transmission line operation risk assessment model; the method can effectively improve the risk assessment accuracy, facilitates the operation and maintenance management of a power transmission line, and promotes the safe and stable operation of a power grid.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of transmission line operation risk assessment, and in particular relates to a transmission line operation risk assessment method taking into account multiple external factors. Background Art

[0002] Transmission lines are an important part of the power system. Their failures not only affect the power transmission capacity of the power grid, but may also cause large-scale power outages in the power system, resulting in huge losses. Among them, overhead transmission lines are exposed to natural changes all year round. The environment they are in is complex and changeable, and there are relatively more factors related to the status of the equipment, which leads to a relatively complex mechanism of failure. Therefore, it is very important to accurately assess the operating risks and working conditions of overhead transmission lines, which is conducive to the operation and maintenance management of overhead transmission lines and promotes the safe and stable operation of the power grid.

[0003] Existing methods for analyzing the operating status of transmission lines usually require the collection of large volumes of multi-type, unstructured data. Before analysis, a large amount of redundant data collection, cleaning, and fusion must be performed. This is relatively complex and highly uncertain, which affects the accuracy of transmission line operation risk assessment at the source. In addition, it is highly dependent on historical data. Once certain information is missing, the accuracy of the assessment will be greatly affected.

[0004] Therefore, it is necessary to develop a transmission line operation risk assessment method that takes into account multiple external factors. Summary of the invention

[0005] The purpose of the present invention is to overcome the shortcomings of the prior art and to provide a transmission line operation risk assessment method taking into account multiple external factors, considering multiple external influencing factors that cause line failures, and assessing the transmission line operation risk based on the Markov chain model and risk assessment ideas, effectively providing assessment accuracy, facilitating the operation and maintenance management of transmission lines, and promoting the safe and stable operation of power grids.

[0006] The object of the present invention is achieved by: a method for assessing the operation risk of a power transmission line taking into account multiple external factors, comprising the following steps:

[0007] S1. Obtain historical data of overhead transmission lines, determine external factors that cause line failures, the failure rate caused by external factors of the line, and the repair time and repair rate;

[0008] S2. Evaluate and predict the state of the transmission line based on the Markov chain model to obtain the failure probability of the external influencing factors of each line; based on the above failure probability results, predict the initial failure probability of the line;

[0009] S3. Quantify the impact of the line fault; determine the impact index caused by the line fault, determine the weight of each impact index, and construct a comprehensive severity index to obtain quantitative data on the impact caused by the line fault;

[0010] S4. Establish a transmission line operation risk assessment model, input the line initial failure probability and the quantified comprehensive severity index into the risk assessment model, and obtain the transmission line operation risk value.

[0011] Furthermore, the external influencing factors in step S1 include six external factors, namely wind deflection, icing, lightning damage, pollution flashover, external force and others.

[0012] Furthermore, in step S1, the failure rate α is the ratio of the number of failures to the exposure time, and the repair rate β is the ratio of the number of repaired failures to the time, that is, the inverse of the average repair time t.

[0013] Furthermore, the failure probability prediction of each line external influencing factor in step S2 specifically includes: using α i and β i (i=1,2,…,N), respectively representing the line failure rate and repair rate caused by multiple external factors, and then the Markov state probability transfer matrix of the transmission line operation is obtained as follows:

[0014]

[0015] According to the approximation principle of Markov process, in the limit state:

[0016] PM=P ①

[0017] P = [p Z p1 … p N ] ②

[0018]

[0019] In formula ①, ②, ③: p Z is the probability of normal operation of the line, p1,...,p N are the failure probabilities caused by external factors of each line.

[0020] Furthermore, the line initial failure probability p in step S2 is C for:

[0021]

[0022] Furthermore, the influencing indicators in step S3 include power quality indicators, safety indicators and economic indicators.

[0023] Furthermore, in step S3, a comprehensive severity index S is constructed. I for:

[0024] S I =γ1S Q +γ2S S +γ3S E ⑤,

[0025] In formula ⑤, S Q S is the power quality impact severity index, S S is the safety impact severity index, E is the economic impact severity index, and γ1, γ2, and γ3 are their corresponding weights respectively.

[0026] Furthermore, the weight of each influencing indicator in step S3 is determined by using the superior-inferior solution distance method or the hierarchical analysis method.

[0027] Furthermore, the transmission line operation risk assessment model established in step S4 specifically adopts power system risk assessment to analyze and comprehensively measure the probability of occurrence of uncertainty time and the severity of consequences, and its expression is:

[0028] R isk =∑ i Pr(E i )·(∑ j Pr(X t,j |X t,f )S ev (E i , X t,j )) ⑥,

[0029] In formula ⑥: X t,f is the operation mode at time t, X t,j is the jth possible load level at time t, Pr(X t.j |X t.f ) is X t . f X appears in the run mode t,j The probability of load level; Pr(E i ) is the E i The probability of a disturbance occurring; S ev (E i , X t,j ) is X t,j Load level E i The severity of the system after a disturbance occurs. Therefore, the operation risk of the transmission line is defined as:

[0030]

[0031] In formula 7: R kis the operation risk value of line k, p k is the failure probability of line k, is the severity of the system caused by the line k failure.

[0032] Due to the adoption of the above technical scheme, the beneficial effects of the present invention are as follows: by considering multiple external influencing factors, the state of the transmission line is evaluated and predicted based on the Markov chain model, the failure probability of each line external influencing factor and the initial failure probability of the line are obtained, the impact index caused by the line failure is quantified and a comprehensive severity index is constructed, and at the same time, the failure probability and the severity index are combined by using the risk assessment idea to evaluate the operation risk of the transmission line, without processing a large amount of redundant historical data, reducing the dependence of the evaluation method on historical information, improving the accuracy of risk assessment, facilitating the operation and maintenance management of the transmission line and promoting the safe and stable operation of the power grid. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 It is a principle block diagram of the present invention. DETAILED DESCRIPTION

[0034] The technical solution of the present invention is further specifically described below through embodiments and in conjunction with the accompanying drawings.

[0035] like Figure 1 As shown, a transmission line operation risk assessment method taking into account multiple external factors includes the following steps:

[0036] S1. Obtain historical data of overhead transmission lines, determine the external factors that cause line failures, the failure rate caused by the external factors of the line, and the repair time and repair rate.

[0037] Among them, the external influencing factors in step S1 include six external factors, namely wind deviation, icing, lightning damage, pollution flash, external force and others; the failure rate α in step S1 is the ratio of the number of failures to the exposure time, and the repair rate β is the ratio of the number of repaired failures to the time, that is, the reciprocal of the average repair time t.

[0038] S2. Evaluate and predict the state of the transmission line based on the Markov chain model to obtain the failure probability of the external influencing factors of each line. Based on the above failure probability results, predict the initial failure probability of the line.

[0039] The failure probability prediction of each line external influencing factor in step S2 specifically includes: using α i and β i (i=1,2,...,N), respectively represent the line failure rate and repair rate caused by multiple external factors, and then the Markov state probability transfer matrix of the transmission line operation is obtained as follows:

[0040]

[0041] According to the approximation principle of Markov process, in the limit state:

[0042] PM=P ①

[0043] P = [p Z p1 … p N ] ②

[0044]

[0045] In formula ①, ②, ③: p Z is the probability of normal operation of the line, p1,...,p N are the failure probabilities caused by external factors of each line.

[0046] Among them, the initial failure probability of the line in step S2 is p C for:

[0047]

[0048] In specific implementation, according to the result obtained in step S1, there are 6 external factors affecting the line, so N=6 can be taken here.

[0049] S3. Quantify the impact of the line fault; determine the impact index caused by the line fault, determine the weight of each impact index, and construct a comprehensive severity index to obtain quantitative data on the impact caused by the line fault.

[0050] Specifically, the impact indicators in step S3 include power quality indicators, safety indicators and economic indicators, and the comprehensive severity index S is constructed. I for:

[0051] S I =γ1S Q +γ2S S +γ3S E ⑤,

[0052] In formula ⑤, S Q S is the power quality impact severity index, S S is the safety impact severity index, E is the economic impact severity index, γ1, γ2, and γ3 are their corresponding weights respectively. The weight of each impact index can be determined by the superior and inferior solution distance method or the hierarchical analysis method.

[0053] S4. Establish a transmission line operation risk assessment model, input the line initial failure probability and the quantified comprehensive severity index into the risk assessment model, and obtain the transmission line operation risk value.

[0054] The transmission line operation risk assessment model established in step S4 specifically adopts power system risk assessment to analyze and comprehensively measure the probability of occurrence of uncertainty time and the severity of consequences, and its expression is:

[0055] R isk =∑ i Pr(E i )·(∑ j Pr(X t,j |X t,f )S ev (E i , X t,j )) ⑥

[0056] In formula ⑥: X t,f is the operation mode at time t, X t,j is the jth possible load level at time t, Pr(X t,j |X t,f ) is X t,f X appears in the run mode t,j The probability of load level; Pr(E i ) is the E i The probability of a disturbance occurring; S ev (E i , X t,j ) is X t,j Load level E i The severity of the system after a disturbance occurs. Therefore, the operation risk of the transmission line is defined as:

[0057]

[0058] In formula 7: R k is the operation risk value of line k, p k is the failure probability of line k, is the severity of the system caused by the line k failure.

[0059] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art should understand that the specific implementation modes of the present invention can still be modified or replaced by equivalents, and any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be included in the scope of the claims of the present invention.

Claims

1. A transmission line operation risk assessment method taking into account multiple external factors, characterized in that: The following steps are involved: S1. Obtain historical data of overhead transmission lines, determine external factors that cause line failures, the failure rate caused by external factors of the line, and the repair time and repair rate; S2. Evaluate and predict the state of the transmission line based on the Markov chain model to obtain the failure probability of the external influencing factors of each line, and predict the initial failure probability of the line based on the above failure probability results; S3. Quantify the impact of the line fault; determine the impact index caused by the line fault, determine the weight of each impact index, and construct a comprehensive severity index to obtain quantitative data on the impact caused by the line fault; S4. Establish a transmission line operation risk assessment model, input the line initial failure probability and the quantified comprehensive severity index into the risk assessment model, and obtain the transmission line operation risk value.

2. A transmission line operation risk assessment method taking into account multiple external factors according to claim 1, characterized in that: The external influencing factors in step S1 include six external factors, namely wind deflection, icing, lightning damage, pollution flashover, external force and others.

3. A transmission line operation risk assessment method taking into account multiple external factors according to claim 1, characterized in that: In step S1, the failure rate α is the ratio of the number of failures to the exposure time, and the repair rate β is the ratio of the number of repaired failures to the time, that is, the reciprocal of the average repair time t.

4. A transmission line operation risk assessment method taking into account multiple external factors according to claim 1, characterized in that: The failure probability prediction of each line external influencing factor in step S2 specifically includes: Using α i and β i (i=1,2,…,N), respectively representing the line failure rate and repair rate caused by multiple external factors, and then the Markov state probability transfer matrix of the transmission line operation is obtained as follows: According to the approximation principle of Markov process, in the limit state: PM=P ① P=[p Z p1 … p N ] ② In formula ①, ②, ③: p Z is the probability of normal operation of the line, p1,…,p N are the failure probabilities caused by external factors of each line.

5. A transmission line operation risk assessment method taking into account multiple external factors according to claim 4, characterized in that: The initial line fault probability p in step S2 C for:

6. A transmission line operation risk assessment method taking into account multiple external factors according to claim 1, characterized in that: The influencing indicators in step S3 include power quality indicators, safety indicators and economic indicators.

7. A transmission line operation risk assessment method taking into account multiple external factors according to claim 6, characterized in that: In step S3, a comprehensive severity index S is constructed. I for: S I =γ1S Q +γ2S S +γ3S E ⑤, In formula ⑤, S Q S is the power quality impact severity index, S S is the safety impact severity index, E is the economic impact severity index, and γ1, γ2, and γ3 are their corresponding weights respectively.

8. A transmission line operation risk assessment method taking into account multiple external factors according to claim 6, characterized in that: The weight of each influencing index in step S3 is determined by using the superior-inferior solution distance method or the hierarchical analysis method.

9. A transmission line operation risk assessment method taking into account multiple external factors according to claim 1, characterized in that: The transmission line operation risk assessment model established in step S4 specifically adopts power system risk assessment to analyze and comprehensively measure the probability of occurrence of uncertainty time and the severity of consequences, and its expression is: R isk i Pr(E i )·( j Pr(X t,j |X t,f )S ev (E i ,X t,j )) ⑥​ In formula ⑥: X t,f is the operation mode at time t, X t,j is the jth possible load level at time t, Pr(X t,j |X t,f ) is X t,f X appears in the run mode t,j The probability of load level; Pr(E i ) is the E i The probability of a disturbance occurring; S ev (E i ,X t,j ) is X t,j Load level E i The severity of the system after a disturbance occurs. Therefore, the operation risk of the transmission line is defined as: In formula 7: R k is the operation risk value of line k, p k is the failure probability of line k, is the severity of the system caused by the line k failure.

Citation Information

Cited By

  • Safety management system for overhead transmission line

    CN119944960A