Power dispatching task distribution management and control system
Through the biomass resource data acquisition, power generation estimate and cost assessment module of the power dispatch task allocation and control system, the problems of insufficient utilization of biomass resource and insufficient cost assessment are solved, and the stability and economic improvement of power supply are achieved. Sustainable development.
Patent Information
- Application Number
- CN202411158971.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-22
- Publication Date
- 2024-12-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing technology lacks specialized biomass resource data acquisition and power generation estimate functions, resulting in insufficient utilization of biomass resources, which may lead to waste or insufficient energy, affect energy efficiency, and lack of cost assessment and comprehensive power cost analysis functions, resulting in power The cost of the scheduling plan is too high, affecting economic benefits and decision-making accuracy.
Provide a power scheduling task allocation and control system, including a biomass resource data acquisition module, a power generation estimate module, a cost evaluation coefficient acquisition module and a power scheduling scheme analysis module, which is used to obtain biomass resource data, estimate power generation, and evaluate and analyze the power scheduling plan, provide early warning prompts and plan analysis.
By accurately obtaining biomass resource data, optimizing resource utilization, ensuring the stability of power supply, reducing power costs, improving decision-making capabilities and system flexibility, promoting the effective use of renewable energy, supporting the sustainable development goals, and improving the economics of the power system and adaptability.
Smart Images

Figure CN119067475A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of electric power dispatching, and in particular to an electric power dispatching task allocation management and control system. Background Art
[0002] In the context of the global push for sustainable development and a low-carbon economy, the importance of biomass energy as a renewable resource has become increasingly prominent. With the gradual maturity of biomass power generation technology, the utilization of biomass resources in various regions has gradually become an important part of power dispatching. However, the acquisition and utilization of biomass resources face some challenges, so a power dispatching task allocation and control system is needed.
[0003] Prior art, such as an invention patent application with announcement number CN103761587A, discloses a method for power demand side resource planning based on intelligent power consumption technology, which includes the following steps: according to the requirements of power demand side resource planning in a certain region, a mathematical model reflecting the DSM resource planning of the region is established, and the mathematical model includes an objective function and constraints; using the historical load data and predicted load data obtained by the dispatching system and load forecasting system in the smart grid of a certain region, a comprehensive analysis is performed according to the national energy conservation and emission reduction indicators to obtain the target value of power saving and the target value of power saving required by the DSM project in a certain region; according to the planning requirements of a certain region, in the intelligent power consumption management system, user types and power consumption operation data are collected to calculate the annual utilization hours and the maximum possible power saving potential of a certain type of DSM project; the size of a certain type of DSM project of the objective function is calculated by using the steepest descent method or intelligent optimization algorithm. The present invention can be widely used in power demand side resource planning.
[0004] In view of the above scheme, the applicant of the present invention has found that the above technology has at least the following technical problems: 1. The existing technology lacks specialized biomass resource data acquisition and power generation estimation functions, which may lead to insufficient utilization of biomass resources. Improper resource allocation will lead to energy waste or shortage, affecting overall energy efficiency, and may lead to inaccurate judgments on whether biomass resources meet electricity demand. This will increase the risk of power shortages, especially during peak electricity consumption periods or when the supply of biomass resources is unstable, which may prevent the full tapping of the potential of renewable energy. Dependence on traditional fossil fuels may be too high, which is not conducive to environmental protection and sustainable development goals.
[0005] 2. Existing technologies lack the functions of obtaining cost assessment coefficients and comprehensive power cost analysis, and may ignore the combined impact of biomass resource costs and grid transmission costs. As a result, the cost of the selected power dispatching scheme may be too high, affecting economic benefits. There is a lack of modules for in-depth analysis of comprehensive power costs. Decision makers may not be able to fully understand the cost-effectiveness of different power dispatching schemes, and thus make inaccurate dispatching decisions, affecting the economy and efficiency of the power system, and failing to respond in a timely manner based on real-time resource conditions and changes in electricity demand. This inflexible system is prone to problems when resources fluctuate or demand changes. Summary of the invention
[0006] In view of the above-mentioned technical deficiencies, the purpose of the present invention is to provide a power dispatching task allocation management and control system.
[0007] To solve the above technical problems, the present invention adopts the following technical solution: The present invention provides a power dispatching task allocation and control system, including: a biomass resource data acquisition module: used to obtain the biomass resource data corresponding to the target area of the current cycle, and then analyze and obtain the biomass resource evaluation coefficient corresponding to the target area.
[0008] Power generation estimation module: used to estimate the power generation corresponding to the target area according to the biomass resource evaluation coefficient corresponding to the target area, and obtain the total power consumption corresponding to the target area in the same historical period, and then determine whether the biomass resources corresponding to the target area in the current period meet the power demand.
[0009] Cost assessment coefficient acquisition module: used when the biomass resources corresponding to the target area in the current cycle cannot meet the electricity demand, so as to obtain the biomass resource cost data and power grid transmission cost data corresponding to the target area, and then analyze and obtain the biomass resource cost assessment coefficient and power grid transmission cost assessment coefficient corresponding to the target area.
[0010] Power dispatching scheme analysis module: used to analyze the comprehensive power cost assessment coefficient corresponding to the target area according to the biomass resource cost assessment coefficient and the power grid transmission cost assessment coefficient corresponding to the target area, and then analyze the power dispatching scheme corresponding to the target area.
[0011] Early warning display module: used to issue early warning prompts when the biomass resources corresponding to the target area do not meet the electricity demand, and to display the early warning of the power dispatch corresponding to the target area.
[0012] Preferably, the estimated power generation corresponding to the target area is specifically analyzed as follows: the biomass resource assessment coefficient corresponding to the target area is compared with the biomass resource assessment coefficient corresponding to each power generation in the database; if the biomass resource assessment coefficient corresponding to the target area is the same as the biomass resource assessment coefficient corresponding to a certain power generation in the database, the power generation in the database is recorded as the power generation corresponding to the target area.
[0013] Preferably, the judgment of whether the biomass resources corresponding to the target area of the current cycle meet the electricity demand is specifically judged as follows: the total electricity consumption corresponding to the target area of the same historical cycle is obtained, and the total electricity consumption corresponding to the target area of the same historical cycle is compared with the power generation corresponding to the target area of the current cycle; if the total electricity consumption corresponding to the target area of the same historical cycle is greater than or equal to the power generation corresponding to the target area of the current cycle, it is judged that the biomass resources corresponding to the target area of the current cycle meet the electricity demand; if the total electricity consumption corresponding to the target area of the same historical cycle is less than the power generation corresponding to the target area of the current cycle, it is judged that the biomass resources corresponding to the target area of the current cycle cannot meet the electricity demand.
[0014] Preferably, the analysis of the power dispatching scheme corresponding to the target area specifically includes the following analysis process: comparing the comprehensive power cost assessment coefficient corresponding to the target area with the comprehensive power cost assessment coefficient interval corresponding to each power dispatching scheme in the database; if the comprehensive power cost assessment coefficient corresponding to the target area is within the comprehensive power cost assessment coefficient interval corresponding to a power dispatching scheme in the database, then the power dispatching scheme in the database will be used as the power dispatching scheme corresponding to the target area.
[0015] The beneficial effects of the present invention are as follows: 1. The present invention provides a power dispatching task allocation and control system, which can optimize resource utilization, ensure the stability of power supply, reduce power costs, and improve decision-making ability and system flexibility by accurately acquiring biomass resource data, estimating power generation, evaluating costs, and analyzing power dispatching plans. At the same time, it also promotes the effective use of renewable energy, supports sustainable development goals, and improves the economy, efficiency, and adaptability of the power system.
[0016] 2. In the embodiment of the present invention, through the acquisition of biomass resource data and the estimation of power generation, the system can accurately evaluate the resource situation in the target area, thereby optimizing the utilization of biomass resources, improving the overall efficiency of energy use, and being able to determine whether the biomass resources in the target area meet the electricity demand, and obtain other cost data to supplement when insufficient. This helps to ensure the stability of power supply and reduce the risk of power shortages due to insufficient resources. By focusing on the evaluation and optimization of biomass resources, the system helps to promote the use of renewable energy, support sustainable development goals, and reduce dependence on traditional fossil fuels.
[0017] 3. In the embodiment of the present invention, through the cost assessment coefficient acquisition module, the system can analyze the cost data of biomass resources and power grid transmission, help evaluate the comprehensive power costs of different power dispatching plans, so as to select the most economical plan and reduce the overall power cost. At the same time, the power dispatching plan analysis module can provide a dispatching plan based on comprehensive power cost evaluation, help decision makers make more scientific and reasonable dispatching decisions, improve the economy and operation efficiency of the power system, and dynamically adjust the power dispatching plan according to the changes in biomass resources, thereby improving the adaptability of the power system to different situations and enhancing flexibility and responsiveness. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0019] Figure 1 It is a schematic diagram of the connection of the system modules of the present invention. DETAILED DESCRIPTION
[0020] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0021] Embodiments of the present invention Figure 1 As shown, a power dispatching task allocation management and control system includes: a biomass resource data acquisition module, a power generation estimation module, a cost assessment coefficient acquisition module, a power dispatching plan analysis module, an early warning display module and a database.
[0022] The power generation estimation module is connected to the biomass resource data acquisition module and the cost assessment coefficient acquisition module respectively, the power dispatch plan analysis module is connected to the cost assessment coefficient acquisition module and the early warning display module respectively, the early warning display module is also connected to the power generation estimation module, and the database is connected to the power generation estimation module and the power dispatch plan analysis module respectively.
[0023] Biomass resource data acquisition module: used to obtain the biomass resource data corresponding to the target area of the current cycle, and then analyze and obtain the biomass resource assessment coefficient corresponding to the target area.
[0024] It should be noted that biomass resources include but are not limited to: plant biomass, wood: trees, wood chips, branches, sawdust, etc., animal biomass, animal manure: such as cow, chicken, pig and other animal manure can be used for fermentation to produce biogas. Animal fat: such as fat in animal slaughter by-products can be refined into biodiesel, and organic waste food waste: such as kitchen waste, residues from food processing. Gardening waste: such as pruned branches and leaves. Crop residues: such as corn stalks, wheat stalks, rice straw, sugarcane bagasse, etc. Energy crops: crops specifically grown for energy, such as sugarcane, sunflowers, rapeseed, etc.
[0025] In a specific embodiment, the biomass resource data includes the available amount, moisture content and ash content of each type of biomass.
[0026] It should be noted that satellite remote sensing and drone aerial photography are used to assess biomass distribution, and AI technology is used to analyze surface features to determine biomass type and availability. At the same time, in the target area, biomass samples are collected from areas with rich biomass resources through field surveys. Sample analysis: Sample analysis is performed in the laboratory to determine moisture content and ash content. The moisture content is usually determined by drying, while the ash content is usually determined by weighing the sample after burning it in a high-temperature furnace.
[0027] In another specific embodiment, the analysis obtains the biomass resource assessment coefficient corresponding to the target area. The specific analysis process is as follows: the available amount, moisture content and ash content corresponding to each type of biomass in the target area are respectively recorded as Z g , X g and C g , where g represents the number corresponding to each type of biomass, g = 1, 2...u, u is any integer greater than 2, substitute into the calculation formula The biomass resource assessment coefficient γ corresponding to the target area is obtained, where Z′, X′, and C′ are the standard available amount, standard moisture content, and standard ash content corresponding to the set type of biomass, respectively; ω1, ω2, and ω3 are the weight factors corresponding to the set type of biomass available amount, moisture content, and ash content, respectively.
[0028] It should be noted that ω1, ω2, and ω3 are all greater than 0 and less than 1.
[0029] It should also be noted that through the summary of a large amount of research data and experimental data, professional institutions and research institutions set the standard available amount, standard moisture content, and standard ash content corresponding to the type of biomass. At the same time, based on the professional knowledge and research basis of experts in the field, they discuss and confirm with industry organizations or professional institutions. Experts set the weight factors corresponding to the available amount of type biomass, the weight factors corresponding to the moisture content, and the weight factors corresponding to the ash content based on their own experience and knowledge.
[0030] Power generation estimation module: used to estimate the power generation corresponding to the target area according to the biomass resource evaluation coefficient corresponding to the target area, and obtain the total power consumption corresponding to the target area in the same historical period, and then determine whether the biomass resources corresponding to the target area in the current period meet the power demand.
[0031] In a specific embodiment, the estimated power generation corresponding to the target area is analyzed as follows: the biomass resource assessment coefficient corresponding to the target area is compared with the biomass resource assessment coefficient corresponding to each power generation in the database. If the biomass resource assessment coefficient corresponding to the target area is the same as the biomass resource assessment coefficient corresponding to a certain power generation in the database, the power generation in the database is recorded as the power generation corresponding to the target area.
[0032] In another specific embodiment, the determination of whether the biomass resources corresponding to the target area of the current cycle meet the electricity demand is performed as follows: the total electricity consumption corresponding to the target area of the same historical cycle is obtained, and the total electricity consumption corresponding to the target area of the same historical cycle is compared with the power generation corresponding to the target area of the current cycle. If the total electricity consumption corresponding to the target area of the same historical cycle is greater than or equal to the power generation corresponding to the target area of the current cycle, it is determined that the biomass resources corresponding to the target area of the current cycle meet the electricity demand; if the total electricity consumption corresponding to the target area of the same historical cycle is less than the power generation corresponding to the target area of the current cycle, it is determined that the biomass resources corresponding to the target area of the current cycle cannot meet the electricity demand.
[0033] It should be noted that to obtain the total electricity consumption of the target area in the same historical period, some data service companies and platforms (such as Statista, Bloomberg, etc.) will provide detailed electricity market data, including historical electricity consumption. Users can obtain this data through subscription or one-time purchase.
[0034] In the embodiment of the present invention, through the acquisition of biomass resource data and the estimation of power generation, the system can accurately evaluate the resource situation in the target area, thereby optimizing the utilization of biomass resources, improving the overall efficiency of energy use, and being able to determine whether the biomass resources in the target area meet the electricity demand, and obtain other cost data to supplement when insufficient. This helps to ensure the stability of power supply and reduce the risk of power shortages due to insufficient resources. By focusing on the evaluation and optimization of biomass resources, the system helps to promote the use of renewable energy, support sustainable development goals, and reduce dependence on traditional fossil fuels.
[0035] Cost assessment coefficient acquisition module: used when the biomass resources corresponding to the target area in the current cycle cannot meet the electricity demand, so as to obtain the biomass resource cost data and power grid transmission cost data corresponding to the target area, and then analyze and obtain the biomass resource cost assessment coefficient and power grid transmission cost assessment coefficient corresponding to the target area.
[0036] In a specific embodiment, the biomass resource cost data includes the purchase cost, transportation cost and storage cost corresponding to each type of biomass, and the power grid transmission cost data includes the power grid purchase cost, the cost corresponding to each auxiliary service and the operating cost corresponding to each equipment.
[0037] It should be noted that by investigating the market prices of various types of biomass on the market, we can understand the quotations of different suppliers. Contract data: Check the purchase contract signed with the supplier to obtain real-time or historical purchase price information, contact the logistics company, and inquire about the specific costs of transporting biomass, including different quotations for transportation distance and mode of transportation (road, rail, etc.). Regional characteristics: Consider factors such as traffic and seasonal impact during transportation to ensure that the transportation costs obtained can reflect the actual situation, and consult the storage service provider to obtain the standard costs of biomass storage, including rental fees and maintenance fees. Own facilities: If you use your own storage facilities, you need to conduct relevant operating cost analysis, including labor, equipment maintenance and other related expenses.
[0038] It is also necessary to check the electricity purchase price in the regional electricity market to understand the relevant market-based electricity prices. Contract price: The power supply contract signed with the power grid company usually includes the power grid purchase price and related terms. Contact the local power grid company to inquire about the charging standards for ancillary services (such as frequency regulation, backup power supply, etc.). Market quotation: In some areas, the market price of ancillary services may be made public. It is necessary to check the relevant market reports regularly and inquire about the maintenance, consumables and other operating costs of the equipment by asking the equipment manufacturer. Historical data analysis: If there is an operating record of similar equipment, historical data can be analyzed to estimate the operating costs of the equipment.
[0039] In another specific embodiment, the analysis obtains the biomass resource cost assessment coefficient corresponding to the target area. The specific analysis process is as follows: the purchase cost, transportation cost and storage cost corresponding to each type of biomass in the target area are respectively recorded as A g , B g and D g , where g represents the number corresponding to each type of biomass, g = 1, 2...u, u is any integer greater than 2, substitute into the calculation formula The biomass resource cost assessment coefficient α corresponding to the target area is obtained, where A′, B′, and D′ are the standard procurement cost, standard transportation cost, and standard storage cost corresponding to the set type of biomass, respectively; θ1, θ2, and θ3 are the weight factors corresponding to the set type of biomass procurement cost, transportation cost, and storage cost, respectively; ΔA, ΔB, and ΔD are the set permitted type of biomass procurement cost difference, permitted transportation cost difference, and permitted storage cost difference, respectively.
[0040] It should be noted that θ1, θ2, and θ3 are all greater than 0 and less than 1.
[0041] It should also be noted that through the summary of a large amount of research data and experimental data, the standard purchase cost, standard transportation cost, and standard storage cost corresponding to the type of biomass are set according to professional institutions and research institutions. At the same time, based on the professional knowledge and research basis of experts in the field, they are discussed and confirmed with industry organizations or professional institutions. Experts set the weight factors corresponding to the type of biomass purchase cost, the weight factors corresponding to the transportation cost, and the weight factors corresponding to the storage cost based on their own experience and knowledge, and set the permitted type of biomass purchase cost difference, permitted transportation cost difference, and permitted storage cost difference.
[0042] In another specific embodiment, the analysis obtains the grid transmission cost data corresponding to the target area. The specific analysis process is as follows: the grid procurement cost corresponding to the target area, the cost corresponding to each auxiliary service, and the operating cost corresponding to each device are recorded as Q, W, respectively. h and E k , where h represents the number corresponding to each auxiliary service, h = 1, 2...m, m is any integer greater than 2, k represents the number corresponding to each device, k = 1, 2...v, v is any integer greater than 2, substitute into the calculation formula The grid transmission cost data β corresponding to the target area is obtained, where Q′, W′, and E′ are the standard grid procurement cost, standard cost of ancillary services, and standard operating cost of equipment corresponding to the set area, respectively; ζ1, ζ2, and ζ3 are the weight factors corresponding to the grid procurement cost, ancillary service cost, and equipment operating cost of the set area, respectively; ΔQ, ΔW, and ΔE are the grid procurement cost difference, permitted ancillary service cost difference, and permitted equipment operating cost difference of the set permitted area, respectively.
[0043] It should be noted that ζ1, ζ2, and ζ3 are all greater than 0 and less than 1.
[0044] It should also be noted that through the summary of a large amount of research data and experimental data. According to professional institutions and research institutions, the standard grid procurement cost corresponding to the region, the standard cost corresponding to ancillary services, and the standard operating costs corresponding to the equipment are set. At the same time, based on the professional knowledge and research basis of experts in the field, they are discussed and confirmed with industry organizations or professional institutions. Experts set the weight factors corresponding to the regional grid procurement cost, the weight factors corresponding to the ancillary service cost, and the weight factors corresponding to the equipment operating cost based on their own experience and knowledge, and set the permitted regional grid procurement cost difference, permitted ancillary service cost difference, and permitted equipment operating cost difference.
[0045] Power dispatching scheme analysis module: used to analyze the comprehensive power cost assessment coefficient corresponding to the target area according to the biomass resource cost assessment coefficient and the power grid transmission cost assessment coefficient corresponding to the target area, and then analyze the power dispatching scheme corresponding to the target area.
[0046] In a specific embodiment, the analysis obtains the comprehensive electricity cost assessment coefficient corresponding to the target area. The specific analysis process is as follows: Substitute the biomass resource cost assessment coefficient and the power grid transmission cost assessment coefficient corresponding to the target area into the calculation formula The comprehensive electricity cost assessment coefficient η corresponding to the target area is obtained, where τ1 and τ2 are the weight factors corresponding to the set regional biomass resource cost assessment coefficient and the weight factors corresponding to the grid transmission cost assessment coefficient, respectively, and e represents a natural constant.
[0047] It should be noted that τ1 and τ2 are both greater than 0 and less than 1.
[0048] It should also be noted that, based on the expertise and research of experts in the field, and after discussion and confirmation with industry organizations or professional institutions, the experts set the weight factors corresponding to the regional biomass resource cost assessment coefficient and the weight factors corresponding to the power grid transmission cost assessment coefficient based on their own experience and knowledge.
[0049] In another specific embodiment, the power dispatching plan corresponding to the target area is analyzed, and the specific analysis process is as follows:
[0050] The comprehensive electricity cost assessment coefficient corresponding to the target area is compared with the comprehensive electricity cost assessment coefficient interval corresponding to each power dispatching scheme in the database. If the comprehensive electricity cost assessment coefficient corresponding to the target area is within the comprehensive electricity cost assessment coefficient interval corresponding to a power dispatching scheme in the database, the power dispatching scheme in the database will be used as the power dispatching scheme corresponding to the target area.
[0051] It should be noted that the power dispatch plan includes but is not limited to load regulation: during peak load periods, the balance of power supply is maintained by adjusting the load distribution of biomass power generation and traditional power sources; power purchasing strategy: when biomass resources cannot meet demand, formulate a power purchasing strategy to purchase electricity from the power grid or other energy suppliers to ensure the stability of power supply and time-period electricity price plan: according to the real-time price changes in the electricity market, formulate corresponding electricity price strategies to guide users to use electricity during low-price periods, thereby reducing pressure during peak periods, etc.
[0052] In the embodiment of the present invention, through the cost evaluation coefficient acquisition module, the system can analyze the cost data of biomass resources and power grid transmission, help evaluate the comprehensive power costs of different power dispatching plans, so as to select the most economical plan and reduce the overall power cost. At the same time, the power dispatching plan analysis module can provide a dispatching plan based on comprehensive power cost evaluation, help decision makers make more scientific and reasonable dispatching decisions, improve the economy and operation efficiency of the power system, and dynamically adjust the power dispatching plan according to the changes in biomass resources, thereby improving the adaptability of the power system to different situations and enhancing flexibility and responsiveness.
[0053] The present invention provides a power dispatching task allocation control system, which can optimize resource utilization, ensure the stability of power supply, reduce power costs, and improve decision-making ability and system flexibility by accurately acquiring biomass resource data, estimating power generation, evaluating costs and analyzing power dispatching plans. At the same time, it also promotes the effective use of renewable energy, supports sustainable development goals, and improves the economy, efficiency and adaptability of the power system.
[0054] The above contents are merely examples and explanations of the concept of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the concept of the invention or exceed the scope defined in this specification, they shall all fall within the protection scope of the present invention.
Claims
1. A power dispatching task allocation management and control system, characterized in that: include: Biomass resource data acquisition module: used to obtain the biomass resource data corresponding to the target area of the current cycle, and then analyze and obtain the biomass resource assessment coefficient corresponding to the target area; Power generation estimation module: used to estimate the power generation corresponding to the target area according to the biomass resource evaluation coefficient corresponding to the target area, and obtain the total power consumption corresponding to the target area in the same historical period, and then determine whether the biomass resources corresponding to the target area in the current period meet the power demand; Cost assessment coefficient acquisition module: used when the biomass resources corresponding to the target area in the current cycle cannot meet the electricity demand, so as to obtain the biomass resource cost data and power grid transmission cost data corresponding to the target area, and then analyze and obtain the biomass resource cost assessment coefficient and power grid transmission cost assessment coefficient corresponding to the target area; Power dispatching scheme analysis module: used to analyze the comprehensive power cost assessment coefficient corresponding to the target area according to the biomass resource cost assessment coefficient and the power grid transmission cost assessment coefficient corresponding to the target area, and then analyze the power dispatching scheme corresponding to the target area; Early warning display module: used to issue early warning prompts when the biomass resources corresponding to the target area do not meet the electricity demand, and to display the early warning of the power dispatch corresponding to the target area.
2. A power dispatching task allocation control system according to claim 1, characterized in that: The biomass resource data includes the available amount, moisture content and ash content of each type of biomass.
3. A power dispatching task allocation control system as claimed in claim 2, characterized in that: The analysis obtains the biomass resource assessment coefficient corresponding to the target area. The specific analysis process is as follows: The available amount, moisture content and ash content of each type of biomass in the target area are recorded as Z g , X g and C g , where g represents the number corresponding to each type of biomass, g = 1, 2...u, u is any integer greater than 2, substitute into the calculation formula The biomass resource assessment coefficient γ corresponding to the target area is obtained, where Z′, X′, and C′ are the standard available amount, standard moisture content, and standard ash content corresponding to the set type of biomass, respectively; ω1, ω2, and ω3 are the weight factors corresponding to the set type of biomass available amount, moisture content, and ash content, respectively.
4. A power dispatching task allocation control system as claimed in claim 3, characterized in that: The specific analysis process of the estimated power generation corresponding to the target area is as follows: The biomass resource assessment coefficient corresponding to the target area is compared with the biomass resource assessment coefficient corresponding to each power generation in the database. If the biomass resource assessment coefficient corresponding to the target area is the same as the biomass resource assessment coefficient corresponding to a certain power generation in the database, the power generation in the database will be recorded as the power generation corresponding to the target area.
5. A power dispatching task allocation control system as claimed in claim 4, characterized in that: The specific judgment process of judging whether the biomass resources corresponding to the target area in the current cycle meet the electricity demand is as follows: The total electricity consumption corresponding to the target area in the same historical period is obtained, and the total electricity consumption corresponding to the target area in the same historical period is compared with the power generation corresponding to the target area in the current period. If the total electricity consumption corresponding to the target area in the same historical period is greater than or equal to the power generation corresponding to the target area in the current period, it is determined that the biomass resources corresponding to the target area in the current period meet the electricity demand; if the total electricity consumption corresponding to the target area in the same historical period is less than the power generation corresponding to the target area in the current period, it is determined that the biomass resources corresponding to the target area in the current period cannot meet the electricity demand.
6. A power dispatching task allocation control system according to claim 1, characterized in that: The biomass resource cost data includes the purchase cost, transportation cost and storage cost corresponding to each type of biomass, and the power grid transmission cost data includes the power grid purchase cost, the cost corresponding to each auxiliary service and the operating cost corresponding to each equipment.
7. A power dispatching task allocation control system as claimed in claim 6, characterized in that: The analysis obtains the biomass resource cost assessment coefficient corresponding to the target area. The specific analysis process is as follows: The purchase cost, transportation cost and storage cost of each type of biomass in the target area are recorded as A g , B g and D g , where g represents the number corresponding to each type of biomass, g = 1, 2...u, u is any integer greater than 2, substitute into the calculation formula The biomass resource cost assessment coefficient α corresponding to the target area is obtained, where A′, B′, and D′ are the standard procurement cost, standard transportation cost, and standard storage cost corresponding to the set type of biomass, respectively; θ1, θ2, and θ3 are the weight factors corresponding to the set type of biomass procurement cost, transportation cost, and storage cost, respectively; ΔA, ΔB, and ΔD are the set permitted type of biomass procurement cost difference, permitted transportation cost difference, and permitted storage cost difference, respectively.
8. A power dispatching task allocation control system as claimed in claim 7, characterized in that: The analysis obtains the power transmission cost data of the power grid corresponding to the target area. The specific analysis process is as follows: The grid procurement cost corresponding to the target area, the cost corresponding to each ancillary service, and the operating cost corresponding to each device are recorded as Q and W respectively. h and E k , where h represents the number corresponding to each auxiliary service, h = 1, 2...m, m is any integer greater than 2, k represents the number corresponding to each device, k = 1, 2...v, v is any integer greater than 2, substitute into the calculation formula The grid transmission cost data β corresponding to the target area is obtained, where Q′, W′, and E′ are the standard grid procurement cost, standard cost of ancillary services, and standard operating cost of equipment corresponding to the set area, respectively; ζ1, ζ2, and ζ3 are the weight factors corresponding to the grid procurement cost, ancillary service cost, and equipment operating cost of the set area, respectively; ΔQ, ΔW, and ΔE are the grid procurement cost difference, permitted ancillary service cost difference, and permitted equipment operating cost difference of the set permitted area, respectively.
9. A power dispatching task allocation control system as claimed in claim 8, characterized in that: The above analysis obtains the comprehensive electricity cost assessment coefficient corresponding to the target area. The specific analysis process is as follows: Substitute the biomass resource cost assessment coefficient and power grid transmission cost assessment coefficient corresponding to the target area into the calculation formula The comprehensive electricity cost assessment coefficient η corresponding to the target area is obtained, where τ1 and τ2 are the weight factors corresponding to the set regional biomass resource cost assessment coefficient and the weight factors corresponding to the grid transmission cost assessment coefficient, respectively, and e represents a natural constant.
10. A power dispatching task allocation control system according to claim 9, characterized in that: The power dispatching plan corresponding to the target area is analyzed, and the specific analysis process is as follows: The comprehensive electricity cost assessment coefficient corresponding to the target area is compared with the comprehensive electricity cost assessment coefficient interval corresponding to each power dispatching scheme in the database. If the comprehensive electricity cost assessment coefficient corresponding to the target area is within the comprehensive electricity cost assessment coefficient interval corresponding to a power dispatching scheme in the database, the power dispatching scheme in the database will be used as the power dispatching scheme corresponding to the target area.
Citation Information
Patent Citations
Optimal scheduling method for wind power-waste incineration virtual power plant
CN110163768A
Integrated energy system optimization scheduling method considering demand response of a residential user
CN113537618A
Multi-energy biomass energy utilization system scheduling method and device
CN114595961A
Construction method of digital forestry big data system
CN117787576A
Multi-type energy storage system collaborative planning method based on power grid demand
CN117875675A
Cited By
New energy power generation prediction method based on weather data
CN120218636A