Through the new energy contract electricity decomposition method, the fairness and effectiveness of the electricity contract settlement mechanism in the spot power market was solved, the reasonable decomposition of electricity and market optimization allocation were achieved, and the benefits of new energy enterprises and the safe and economic operation of the power grid were improved.
Patent Information
- Application Number
- CN202410812098.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-21
- Publication Date
- 2024-12-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing technology has failed to effectively solve the settlement mechanism of power sub-valuation contracts and its fairness and effectiveness in the spot power market, resulting in an imbalance in market settlement funds, affecting the returns of new energy enterprises and the safe and economic operation of the power grid.
A new energy contract electricity decomposition method is proposed. Through the decomposition of the annual new energy contract electricity, combined with the actual requirements of the power market, the start-stop status of the power generation company and the distribution of new energy electricity are optimized, and the power distribution of new energy will be decomposed step by step to month, day, and each During the trading period, settlement rules are formulated and adjusted to achieve coordinated optimization of power decomposition.
It has achieved reasonable decomposition of electricity from year to month, day and time period, guaranteed market electricity demand, improved resource utilization, reduced risks of market entities, and promoted the healthy development of new energy.
Smart Images

Figure CN119070268A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of electric power dispatching, and in particular to a new energy contract electricity quantity decomposition method. Background Art
[0002] In recent years, my country has achieved remarkable results in the development of new energy represented by wind power and photovoltaic power generation. However, the intermittent and volatile characteristics of new energy output make it face greater operating risks in the power market. Under the construction of the power spot market, the spot prices of time and location are prone to price fluctuation risks, so it is necessary to design effective risk avoidance tools. The difference contract is a tool that can affect the distribution of social welfare without affecting market efficiency. Different types of difference contracts can be designed for different market entities to achieve different goals, thereby ensuring the benefits of new energy enterprises and smoothly integrating into the power market. However, the problem of power contract decomposition arises. Power decomposition plays a key role in the operation of power enterprises. If there is a lack of scientific and reasonable contract decomposition methods, it will cause a series of problems such as power deviation, execution difficulties, large completion rate deviation, and insufficient peak-shaving capacity. The deviation risk borne by the subject becomes larger, and the benefits of participating in the market are reduced, which seriously threatens the safe and economic operation of the power grid. Therefore, how to reasonably decompose the power from the annual multi-time scale to the month, day, and each trading period is an urgent problem to be solved in the power contract.
[0003] At present, most of the literature studies the decomposition method of the settlement curve of the power price difference contract, such as proposing a reasonable allocation model for the physical contract electricity and the competitive transaction electricity in the daily plan, but there are few existing literatures that conduct theoretical research on its settlement mechanism, and have not yet solved the settlement mechanism of the power price difference contract under the power spot market mechanism and its fairness and effectiveness problems, as well as the market settlement fund imbalance problem that may be caused. Therefore, the present invention proposes a new energy contract electricity decomposition method to solve the problems existing in the prior art. Summary of the invention
[0004] In view of the above problems, the purpose of the present invention is to propose a new energy contract electricity decomposition method to solve the problem that the existing contract electricity decomposition method cannot solve the settlement mechanism and its fairness and effectiveness of electricity price difference contracts under the electricity spot market mechanism, as well as the problem of market settlement fund imbalance that may be caused.
[0005] In order to achieve the purpose of the present invention, the present invention is implemented by the following technical scheme: a new energy contract power decomposition method, comprising the following steps:
[0006] Step 1: According to the annual renewable energy power contract quantity of each power generation company, determine the initial value of renewable energy monthly trading power distribution based on the actual requirements of the power market, and according to the annual renewable energy power contract quantity of each power generation company, decompose the annual contract total power of each power generation company according to the corresponding annual typical output curve, and obtain the ideal monthly decomposed power initial value of each type of power generation company without considering the maintenance plan, as the initial allocation value of monthly trading power;
[0007] Step 2: Take the initial allocation value of monthly transaction electricity obtained in step 1 as the parameter to be optimized, optimize the start and stop status of each unit of the power generation company and the new energy on a weekly basis and optimize the next cycle, then deduct the completed monthly transaction electricity from the annual total transaction electricity to obtain the remaining transaction electricity, and use this as the total transaction electricity for rolling optimization, so as to achieve coordinated optimization and decomposition of the monthly initial electricity;
[0008] Step 3: According to the monthly initial electricity coordination optimization decomposition result in step 2, the monthly electricity is decomposed into days, and then the electricity is decomposed into days to obtain the actual net load demand of the power system, and then the daily power generation plan of each unit is optimized and adjusted according to the actual net load demand;
[0009] Step 4: According to the optimized and adjusted daily power generation plan in step 3, the settlement rules are formulated. The actual execution curve and the planned curve are compared using the formulated settlement rules, and the deviation is calculated. Then, it is determined whether the calculated deviation is within an acceptable error range. Then, according to the deviation size and the formulated settlement rules, the electricity deviation fee to be paid is calculated. After that, the settlement results are evaluated, and the settlement rules are adjusted and optimized according to the evaluation results.
[0010] Further improvement is: in step 1, the specific step of decomposing the annual total power of each power generation company is: decomposing the total power of the difference contract signed by each power generation company into 12 months according to the revised annual load curve, and obtaining the total power of each month's power contract:
[0011]
[0012] In the formula, Q i,m is the total electricity contract quantity for month m, Q i is the annual electricity CFD volume of power generation company i, L m is the power generation in month m of the annual typical power generation curve of the power generating unit, where the superscript w1 represents a coal-fired unit, w2 represents a gas-fired unit, w3 represents a hydropower unit, and w4 represents a nuclear power unit.
[0013] Further improvements are as follows: the steps for obtaining the revised annual load curve are as follows: the power grid company combines historical load data and load forecasts to obtain the annual load forecast curve, and then deducts the non-bidding power supply part and the bilateral contract electricity from the load forecast curve to obtain the annual load forecast curve.
[0014] A further improvement is that in step 1, the calculation formula for the initial value of the ideal monthly decomposition power of each type of power generation company is:
[0015]
[0016] In the formula, is the power contract quantity of power generation company i in the mth month under ideal conditions, Q i The annual electricity CFD volume for power generation companies.
[0017] A further improvement is that in step 2, the coordinated optimization decomposition of the monthly initial electricity consumption specifically includes the following steps:
[0018] A1. Collect and summarize the market demand data, power plant data and power grid data of the power system through market transaction data, power plant operation data and power grid load data;
[0019] A2. Determine the time-series production simulation model of the power system based on the collected data;
[0020] A3. Set an objective function based on the optimization goal of the entire power system;
[0021] A4. Determine the monthly initial electricity and initial status of the power plant;
[0022] A5. Use the time series production simulation method to simulate the power system;
[0023] A6. Analyze the economy, reliability and sustainability of the power system based on the simulation results, and determine whether it is necessary to adjust the monthly initial electricity consumption by comparing and verifying the simulation results;
[0024] A7. Optimize the economic, reliability and sustainability issues in the simulation results by adjusting the monthly initial electricity consumption and power plant operation.
[0025] A further improvement is that in step 3, the objective function expression for optimization adjustment is as follows:
[0026]
[0027] In the formula, is the optimized daily power generation plan of unit i in period t, is the daily power generation plan of the optimized renewable energy power station j in period t, k is the penalty coefficient for wind and solar power abandonment, k>1.
[0028] A further improvement is that in step 3, optimizing and adjusting the daily power generation plan specifically includes the following steps:
[0029] B1. Obtain the total renewable energy power of the month based on statistical data, and calculate the renewable energy power of each day based on the number of days in the month, so that the monthly power consumption is decomposed to the day;
[0030] B2. Collect historical data on renewable energy power generation to obtain the total daily amount of renewable energy electricity. According to the characteristics of renewable energy power generation and the forecasting model, forecast the curve of renewable energy power generation within the day, decompose the total daily amount of renewable energy electricity according to the forecasted curve, and decompose the electricity into days.
[0031] B3. Adjust the daily power generation plan based on the actual situation of electricity consumption during the day.
[0032] A further improvement is that in step 4, when judging whether the calculated deviation is within an acceptable error range, if the deviation is within the acceptable range, it means that the plan is executed well and continues to be executed; if the deviation is not within the acceptable range, the plan is adjusted and corrected.
[0033] The beneficial effects of the present invention are as follows: based on the two major principles of ensuring fairness and realizing the risk hedging function of the price difference contract, the present invention considers the financial imbalance problem caused by the deviation of the planned electricity quantity, and proposes a new energy contract electricity quantity decomposition method. By formulating a more reasonable electricity quantity decomposition plan, the electricity quantity can be reasonably decomposed from the annual multi-time scale to the month, day, and each trading period, so as to meet the market electricity quantity demand of new energy, improve resource utilization on the basis of achieving safe supply, thereby realizing the overall optimization configuration of the market, playing an important role in the economic interests and market behavior of market entities, and thus promoting the healthy development of my country's new energy. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0035] Figure 1 It is a flow chart of the method for decomposing the electric power contract quantity of the present invention. DETAILED DESCRIPTION
[0036] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0037] Embodiment 1
[0038] See also Figure 1 This embodiment provides a new energy contract electricity decomposition method, including the following steps:
[0039] Step 1: Determine the initial value of the monthly trading electricity of renewable energy based on the electricity contract of each power generation company
[0040] According to the annual renewable energy power contract quantity of each power generation company, the initial value of renewable energy monthly trading power quantity is determined based on the actual requirements of the power market, and according to the annual renewable energy power contract quantity of each power generation company, the annual contract total power quantity of each power generation company is decomposed according to the corresponding annual typical output curve, and the ideal monthly decomposed power quantity initial value of each type of power generation company is obtained without considering the maintenance plan, which is used as the initial allocation value of monthly trading power quantity;
[0041] Specifically, at the beginning of the year, when the power price difference contract is signed, the power generation company reports the annual maintenance plan and the upper and lower limits of the power output of the generator set, the ramp rate, the start and stop time and other unit operating parameters to the power grid company. The power grid company combines historical load data and load forecasts to obtain the annual load forecast curve. The non-competitive power supply part and the bilateral contract power are deducted from the load forecast curve to obtain the revised annual load curve. The sum of the power price difference contracts signed by all power generation companies is decomposed into 12 months according to the revised annual load curve, and the total power contract power for each month is obtained as follows:
[0042]
[0043] In the formula, Q i,m is the total electricity contract quantity for month m, Q i is the annual electricity CFD volume of power generation company i, L m is the power generation of month m in the annual typical power generation curve of the power generating unit, where the superscript w1 represents a coal-fired unit, w2 represents a gas-fired unit, w3 represents a hydropower unit, and w4 represents a nuclear power unit;
[0044] The typical annual power generation curves of thermal power units, gas power units, hydropower units, and nuclear power units are obtained from the historical data of the past five years. The annual contract power of each power generation company is decomposed according to the corresponding typical annual power generation curve, and the ideal monthly decomposed power of each type of power generation company is obtained without considering the maintenance plan:
[0045]
[0046] In the formula, is the power contract quantity of power generation company i in the mth month under ideal conditions, Q i The annual electricity CFD volume of the power generation company;
[0047] Step 2: Use the time-series production simulation method to coordinate and optimize the monthly initial electricity consumption
[0048] Introduce weekly power optimization as a transition link between monthly power optimization and daily power balance, and set up system safety operation constraints in each time period. Take the initial allocation value of monthly trading power obtained in step 1 as the parameter to be optimized, optimize the start and stop status of each unit and new energy of the power generation company on a weekly basis, and optimize the next cycle. Through weekly rolling optimization, establish the connection between monthly trading power and the latest operating boundary, ensure that the monthly trading power meets the power balance in each time period, and ensure the safety of the monthly trading plan and its executability at the daily scheduling level;
[0049] Then, the completed monthly transaction electricity is deducted from the annual total transaction electricity to obtain the remaining transaction electricity, which is used as the total transaction electricity for rolling optimization. The monthly decomposition and execution of the annual electricity decomposition are completed through rolling calculations between months to ensure the smooth completion of the annual transaction electricity and achieve coordinated optimization and decomposition of the monthly initial electricity.
[0050] The specific steps include:
[0051] A1. Collect and summarize the market demand data, power plant data and power grid data of the power system through market transaction data, power plant operation data and power grid load data;
[0052] A2. Determine the time-series production simulation model of the power system based on the collected data. The model should include market demand, operation information of each power plant (such as minimum and maximum capacity limits, startup and shutdown cost limits, etc.) and grid constraints (such as transmission capacity, etc.);
[0053] A3. According to the optimization goal of the entire power system, an objective function is set. The objective function should take into account the economy, reliability and sustainability of the power system to achieve comprehensive optimization.
[0054] A4. Determine the monthly initial electricity volume and the initial status of the power plant. These initial quantities can be determined through previous market transaction data and data reported by power plants;
[0055] A5. Use the time-series production simulation method to simulate the power system. During the simulation process, the monthly initial electricity volume needs to be gradually adjusted to coordinate the supply and demand balance of the power grid;
[0056] A6. Analyze the economy, reliability and sustainability of the power system based on the simulation results, and determine whether it is necessary to adjust the monthly initial electricity consumption by comparing and verifying the simulation results;
[0057] A7. Optimize the economic, reliability and sustainability issues in the simulation results by adjusting the monthly initial electricity and power plant operation;
[0058] Step 3: Adjust the daily power generation plan according to actual conditions
[0059] In order to ensure the speed of regulation, it is assumed that the power generation plan is adjusted according to the principle of "equal proportion regulation" during the day, that is, when the actual net load demand of the power system is greater than the power generation plan of the system a day ago, the output is increased according to the size of the upward adjustment capacity of each unit; when the actual net load demand of the power system is less than the power generation plan of the system a day ago, the output is reduced according to the size of the downward adjustment capacity of each unit;
[0060] According to the monthly initial electricity coordination optimization decomposition results in step 2, the monthly electricity is decomposed into days, and then the electricity is decomposed into days to obtain the actual net load demand of the power system. Then, the daily power generation plan of each unit is optimized and adjusted according to the actual net load demand. The objective function expression is as follows:
[0061]
[0062] In the formula, is the optimized daily power generation plan of unit i in the tth period, is the optimized daily power generation plan of renewable energy power station j in period t, k is the penalty coefficient for wind and solar abandonment, k>1;
[0063] The specific steps include:
[0064] B1. Obtain the total renewable energy electricity of the month based on statistical data, and calculate the renewable energy electricity of each day based on the number of days in the month, so that the monthly electricity is decomposed to the day. For example, assuming that there are 30 days in the month, the daily electricity should be the total electricity divided by 30. Distribute the daily electricity to each hour, and determine how much electricity is consumed during the day and at night based on historical data or forecast data. Finally, decompose the hourly electricity to each minute, and determine the fluctuation of electricity consumption in different time periods based on historical data or forecast data. For example, the electricity distribution during peak hours and off-peak hours may be different.
[0065] B2. Collect historical data on renewable energy power generation, including power generation and time every hour or every half hour, add up the power generation every hour or every half hour to obtain the daily total amount of renewable energy power, predict the curve of renewable energy power generation within the day according to the characteristics of renewable energy power generation and the prediction model, decompose the daily total amount of renewable energy power according to the predicted curve to obtain the renewable energy power per hour or every half hour, and decompose the power into the day. If needed, the renewable energy power per hour or every half hour can be further decomposed into data per minute or per second;
[0066] B3. Adjust the daily power generation plan according to the actual situation of the daily power consumption, including the following steps:
[0067] S1. Determine why the power generation plan needs to be adjusted. Usually, the reasons for adjustment may include factors such as deviation in the forecast of renewable energy power generation, weather changes, and power generation equipment failure. By clarifying the reasons for adjustment, more targeted adjustments can be made;
[0068] S2. After determining the reason for the adjustment, make targeted adjustments to the power generation plan within the new energy power contract day, and adjust the operation mode, power generation capacity, and power generation time of the power generation facilities according to the specific situation to ensure that the overall power generation matches the market demand;
[0069] S3. After the adjustment is completed, the corresponding information will be synchronously updated to the supervision module of the power market to ensure that all participants in the market can get the information update in time;
[0070] S4. After the daily power generation plan is adjusted, the actual power generation of new energy facilities should be monitored at all times to ensure that it is consistent with the daily power generation plan and to adjust the market supply and demand balance in a timely manner;
[0071] S5. Evaluate and provide feedback on the adjustment effect based on the actual power generation situation. If the adjusted power generation plan can meet market demand, the power generation plan within the new energy power contract day needs to be adjusted and improved accordingly;
[0072] S6. After completing the adjustment, conduct an in-depth analysis of the reasons for the adjustment of the power generation plan in order to optimize the work and take measures to reduce the recurrence of similar problems;
[0073] Step 4: Settle the deviation between the actual execution and the planned curve
[0074] First, formulate settlement rules based on the optimized and adjusted intraday power generation plan in step 3. According to the actual execution and plan curve data, formulate settlement rules. The settlement rules should include the method of calculating deviations, the standard for determining whether the deviations are within the acceptable range, and the settlement method, etc.;
[0075] Then, the actual execution curve and the planned curve are compared using the established settlement rules, and the deviation is calculated. In this embodiment, the difference between the actual execution curve and the planned curve is compared by calculating the root mean square error (RMSE) and the mean absolute error (MAE);
[0076] Then determine whether the calculated deviation is within the acceptable error range. If the deviation is within the acceptable range, it means that the plan is well executed and will continue to be executed. If the deviation is not within the acceptable range, adjust and correct the plan.
[0077] Then, the electricity deviation fee to be paid is calculated based on the deviation size and the established settlement rules. If the deviation is large, adjustments need to be made to reduce the deviation;
[0078] The settlement results will then be evaluated to determine whether they meet market demand, policy requirements and economic benefits, and the settlement rules will be adjusted and optimized based on the evaluation results.
[0079] Embodiment 2
[0080] This embodiment selects the historical power generation curves of various power sources in the past year as a reference to decompose the settlement curves of the power price difference contracts of various power sources; the decomposition cycle is monthly, and the dispatching agency predicts the power consumption of non-market users in various time periods one month in advance; the settlement curves of different units of the same power source are decomposed in proportion according to the power contract power; finally, the unbalanced funds caused by the forecast deviation of non-market users in each time period are apportioned or returned by each generator unit according to the power price difference contract power ratio of the time period, and are completed within the same settlement cycle, as follows:
[0081] (1) The power grid company predicts the power consumption curve of non-market users in the next month based on the historical power consumption curve of non-market users one month in advance. And arrange the power price difference contracts for various types of units such as coal, gas, nuclear power, etc. for a period of time in the future. th,c , Q gas,c , Q nu,c , and requires that the predicted electricity consumption of non-market users is equal to the sum of the electricity difference contracts of various units;
[0082] (2) One month in advance, the power grid company shall decompose the power contract settlement curve in proportion based on the historical power generation curves of various power sources such as gas and nuclear power, as well as the maintenance plan. The decomposition formula for other types of units except coal-fired units is:
[0083]
[0084] The decomposition formula of the settlement curve of the coal-fired unit power price difference contract is:
[0085]
[0086] (3) For each generator unit of the same power source type, the settlement curve of its power difference contract is decomposed according to the ratio of its power difference contract quantity to the total power difference contract quantity of the power source type. For example, in a coal-fired power plant, for the i-th coal-fired generator unit, the formula for its planned quantity decomposition curve is:
[0087]
[0088] (4) The capital imbalance caused by the forecast deviation of non-market users in each period is apportioned or returned by each generator according to the proportion of electricity volume in the power price difference contract in that period. The apportionment or return formula for the i-th generator is:
[0089]
[0090] Where ΔC t Represents the total apportionment or refund cost for period t.
[0091] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A new energy contract electricity decomposition method, characterized in that: The following steps are involved: Step 1: According to the annual renewable energy power contract quantity of each power generation company, determine the initial value of renewable energy monthly trading power distribution based on the actual requirements of the power market, and according to the annual renewable energy power contract quantity of each power generation company, decompose the annual contract total power of each power generation company according to the corresponding annual typical output curve, and obtain the ideal monthly decomposed power initial value of each type of power generation company without considering the maintenance plan, as the initial allocation value of monthly trading power; Step 2: Take the initial allocation value of monthly transaction electricity obtained in step 1 as the parameter to be optimized, optimize the start and stop status of each unit of the power generation company and the new energy on a weekly basis and optimize the next cycle, then deduct the completed monthly transaction electricity from the annual total transaction electricity to obtain the remaining transaction electricity, and use this as the total transaction electricity for rolling optimization, so as to achieve coordinated optimization and decomposition of the monthly initial electricity; Step 3: According to the monthly initial electricity coordination optimization decomposition result in step 2, the monthly electricity is decomposed into days, and then the electricity is decomposed into days to obtain the actual net load demand of the power system, and then the daily power generation plan of each unit is optimized and adjusted according to the actual net load demand; Step 4: According to the optimized and adjusted daily power generation plan in step 3, the settlement rules are formulated. The actual execution curve and the planned curve are compared using the formulated settlement rules, and the deviation is calculated. Then, it is determined whether the calculated deviation is within an acceptable error range. Then, according to the deviation size and the formulated settlement rules, the electricity deviation fee to be paid is calculated. After that, the settlement results are evaluated, and the settlement rules are adjusted and optimized according to the evaluation results.
2. A new energy contract electricity decomposition method according to claim 1, characterized in that: In step 1, the specific steps for decomposing the annual total electricity contract of each power generation company are as follows: the total electricity of the difference contracts signed by each power generation company is decomposed into 12 months according to the revised annual load curve, and the total electricity contract of each month is obtained as follows: In the formula, Q i,m is the total electricity contract quantity for month m, Q i is the annual electricity CFD volume of power generation company i, L m is the power generation in month m of the annual typical power generation curve of the power generating unit, where the superscript w1 represents a coal-fired unit, w2 represents a gas-fired unit, w3 represents a hydropower unit, and w4 represents a nuclear power unit.
3. A new energy contract electricity decomposition method according to claim 2, characterized in that: The steps for obtaining the revised annual load curve are as follows: the power grid company combines historical load data and load forecasts to obtain the annual load forecast curve, and then deducts the non-bidding power supply part and bilateral contract electricity from the load forecast curve to obtain the annual load forecast curve.
4. A new energy contract electricity decomposition method according to claim 1, characterized in that: In step 1, the calculation formula for the initial value of the ideal monthly decomposition power of each type of power generation company is: In the formula, is the power contract quantity of power generation company i in the mth month under ideal conditions, Q i The annual electricity CFD volume for power generation companies.
5. A new energy contract electricity decomposition method according to claim 1, characterized in that: In the step 2, the coordinated optimization decomposition of the monthly initial electricity consumption specifically includes the following steps: A1. Collect and summarize the market demand data, power plant data and power grid data of the power system through market transaction data, power plant operation data and power grid load data; A2. Determine the time-series production simulation model of the power system based on the collected data; A3. Set an objective function based on the optimization goal of the entire power system; A4. Determine the monthly initial electricity and initial status of the power plant; A5. Use the time series production simulation method to simulate the power system; A6. Analyze the economy, reliability and sustainability of the power system based on the simulation results, and determine whether it is necessary to adjust the monthly initial electricity consumption by comparing and verifying the simulation results; A7. Optimize the economic, reliability and sustainability issues in the simulation results by adjusting the monthly initial electricity consumption and power plant operation.
6. A new energy contract electricity decomposition method according to claim 1, characterized in that: In step 3, the objective function expression for optimization adjustment is as follows: In the formula, is the optimized daily power generation plan of unit i in the tth period, is the daily power generation plan of the optimized renewable energy power station j in period t, k is the penalty coefficient for wind and solar power abandonment, k>
1.
7. A new energy contract electricity decomposition method according to claim 1, characterized in that: In step 3, optimizing and adjusting the daily power generation plan specifically includes the following steps: B1. Obtain the total renewable energy power of the month based on statistical data, and calculate the renewable energy power of each day based on the number of days in the month, so that the monthly power consumption is decomposed to the day; B2. Collect historical data on renewable energy power generation to obtain the total daily amount of renewable energy electricity. According to the characteristics of renewable energy power generation and the forecasting model, forecast the curve of renewable energy power generation within the day, decompose the total daily amount of renewable energy electricity according to the forecasted curve, and decompose the electricity into days. B3. Adjust the daily power generation plan based on the actual situation of electricity consumption during the day.
8. A new energy contract electricity decomposition method according to claim 1, characterized in that: In the step 4, it is determined whether the calculated deviation is within an acceptable error range. If the deviation is within the acceptable range, it means that the plan is executed well and continues to be executed. If the deviation is not within the acceptable range, the plan is adjusted and corrected.
Citation Information
Patent Citations
A power market price difference contract electric quantity decomposition technology and a decomposition result comprehensive evaluation method
CN109583951A
New energy annual transaction electric quantity optimization decomposition method and system
CN111047077A