Grid-connected control method and device of voltage conversion circuit and storage medium
By detecting and controlling the output bus voltage of the voltage conversion circuit, the output bus voltage is increased to equal to the peak voltage of the power grid by using the boost circuit technology, solving the problem of current shock when the inverter is connected to the grid, improving the adaptability of the grid and preventing it The device is damaged.
Patent Information
- Application Number
- CN202411546524.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-01
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2044-11-01
AI Technical Summary
When the inverter is incorporated into the power grid, the difference between the output bus voltage of the open-loop LLC circuit and the peak voltage of the power grid is too large, resulting in too large an instantaneous impact current in the grid connection, which easily damages the inverter, thereby reducing the adaptability of the grid connection.
By detecting whether the output bus voltage of the voltage conversion circuit is less than the peak voltage of the power grid, if it is less than, the primary full-bridge circuit and secondary full-bridge circuit are controlled to form a boost circuit, and the resonant circuit and energy storage components are used to charge and discharge, and the boost output is boosted. The bus voltage is equal to the peak voltage to avoid current impact during grid connection.
It effectively avoids the problem of excessive impact current in the grid connection caused by the large gap between the output bus voltage and the peak voltage of the power grid, and improves the grid connection adaptability of the voltage conversion circuit and prevents device damage.
Smart Images

Figure CN119070650A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of voltage conversion circuits, and in particular to a grid-connected control method, device and storage medium for a voltage conversion circuit. Background Art
[0002] At present, when an open-loop LLC circuit is used in an inverter, the output bus voltage gain of the open-loop LLC circuit is fixed. When the inverter is connected to the grid, components are easily damaged, resulting in poor grid-connection adaptability of the inverter. Summary of the invention
[0003] Based on this, it is necessary to provide a grid-connected control method, device and storage medium for a voltage conversion circuit that can improve the grid-connected adaptability of the voltage conversion circuit in order to address the above technical problems.
[0004] In a first aspect, the present application provides a grid-connected control method for a voltage conversion circuit, wherein the voltage conversion circuit includes an open-loop LLC circuit, wherein the open-loop LLC circuit includes a primary full-bridge circuit, a transformer, a resonant circuit, a secondary full-bridge circuit, and an output capacitor connected in sequence, and the method includes:
[0005] During the process of the voltage conversion circuit being connected to the power grid, detecting whether the output bus voltage of the voltage conversion circuit is less than the peak voltage of the power grid;
[0006] When the output bus voltage is less than the peak voltage, the switch tube included in the primary full-bridge circuit and the switch tube included in the secondary full-bridge circuit are controlled to a preset switching state, so that the primary full-bridge circuit, the transformer, the resonant circuit, the secondary full-bridge circuit and the output capacitor form a boost circuit, and the boost circuit is used to boost the output bus voltage to be equal to the peak voltage.
[0007] In one embodiment, controlling the switch tube included in the primary full-bridge circuit and the switch tube included in the secondary full-bridge circuit to a preset switch state includes:
[0008] Determine the phase difference of the primary and secondary switch tubes according to the peak voltage and the output bus voltage;
[0009] According to the phase difference between the primary and secondary side switches, the switch tube included in the primary side full bridge circuit and the switch tube included in the secondary side full bridge circuit are controlled to the preset switch state.
[0010] In one embodiment, determining the phase difference between the primary and secondary switches according to the peak voltage and the output bus voltage includes:
[0011] The output bus voltage is regulated by using a PI regulation algorithm to obtain the primary-secondary switch phase difference, wherein the reference voltage in the PI regulation algorithm is configured as the peak voltage.
[0012] In one embodiment, the primary full-bridge circuit includes a first switch tube, a second switch tube, a third switch tube and a fourth switch tube, and the secondary full-bridge circuit includes a fifth switch tube, a sixth switch tube, a seventh switch tube and an eighth switch tube, and according to the phase difference between the primary and secondary switch tubes, controlling the switch tubes included in the primary full-bridge circuit and the switch tubes included in the secondary full-bridge circuit to the preset switch state includes:
[0013] Controlling the fifth switch tube and the sixth switch tube to turn off;
[0014] According to the phase difference between the primary and secondary side switches, the first switch tube, the second switch tube, the third switch tube, the fourth switch tube, the seventh switch tube and the eighth switch tube are controlled to the preset switch state.
[0015] In one embodiment, controlling the first switch tube, the second switch tube, the third switch tube, the fourth switch tube, the seventh switch tube, and the eighth switch tube to the preset switch state according to the phase difference between the primary and secondary switches includes:
[0016] According to the phase difference between the primary and secondary switches, in a first time period, the first switch is turned off, the second switch is turned on, the third switch is turned on, the fourth switch is turned off, the seventh switch is turned off, and the eighth switch is turned on, so that the second switch, the third switch, the transformer, the resonant circuit, the sixth switch, and the eighth switch form a first energy storage circuit, and the first energy storage circuit is used to charge the energy storage element included in the resonant circuit;
[0017] According to the phase difference between the primary and secondary side switches, the first switch is controlled to be turned off, the second switch is turned on, the third switch is turned on, the fourth switch is turned off, the seventh switch is turned off, and the eighth switch is turned off in a second time period, so that the second switch, the third switch, the transformer, the resonant circuit, the sixth switch, the seventh switch, and the output capacitor form a first charging loop, wherein the first charging loop is used to charge the output capacitor through the energy storage element to boost the output bus voltage at both ends of the output capacitor, and the second time period is after the first time period in terms of timing.
[0018] In one embodiment, the controlling the first switch tube, the second switch tube, the third switch tube, the fourth switch tube, the seventh switch tube and the eighth switch tube to the preset switch state according to the phase difference between the primary and secondary switches further includes:
[0019] According to the phase difference between the primary and secondary switches, in a third time period, the first switch is turned on, the second switch is turned off, the third switch is turned off, the fourth switch is turned on, the seventh switch is turned on, and the eighth switch is turned off, so that the first switch, the fourth switch, the transformer, the resonant circuit, the fifth switch, and the seventh switch form a second energy storage circuit, and the second energy storage circuit is used to charge the energy storage element;
[0020] According to the phase difference between the primary and secondary side switches, the first switch is controlled to be turned on, the second switch is turned off, the third switch is turned off, the fourth switch is turned on, the seventh switch is turned off, and the eighth switch is turned off in a fourth time period, so that the first switch, the fourth switch, the transformer, the resonant circuit, the fifth switch, the eighth switch, and the output capacitor form a second charging loop, and the second charging loop is used to charge the output capacitor through the energy storage element to boost the output bus voltage at both ends of the output capacitor. The third time period is after the second time period in timing, and the fourth time period is after the third time period in timing.
[0021] In one embodiment, the voltage conversion circuit further includes an inverter circuit, and the inverter circuit is connected between the open-loop LLC circuit and the power grid. After the switch tube included in the primary full-bridge circuit and the switch tube included in the secondary full-bridge circuit are controlled to a preset switch state, the method further includes:
[0022] The switch tube included in the inverter circuit is controlled to be turned off so that the switch tube included in the inverter circuit forms a rectifier circuit.
[0023] In one embodiment, the method further comprises:
[0024] When the grid voltage is detected to pass through a zero point, the AC side relay included in the inverter circuit is controlled to close, and the switch tube included in the primary full-bridge circuit and the switch tube included in the secondary full-bridge circuit are controlled to a normal switching state.
[0025] In a second aspect, the present application provides a grid-connected control device for a voltage conversion circuit, wherein the voltage conversion circuit includes an open-loop LLC circuit, wherein the open-loop LLC circuit includes a primary full-bridge circuit, a transformer, a resonant circuit, a secondary full-bridge circuit, and an output capacitor connected in sequence, wherein the device includes:
[0026] A detection module, used for detecting whether the output bus voltage of the voltage conversion circuit is less than the peak voltage of the power grid during the process of the voltage conversion circuit being connected to the power grid;
[0027] A control module is used to control the switch tube included in the primary full-bridge circuit and the switch tube included in the secondary full-bridge circuit to a preset switching state when the output bus voltage is less than the peak voltage, so that the primary full-bridge circuit, the transformer, the resonant circuit, the secondary full-bridge circuit and the output capacitor form a boost circuit, and the boost circuit is used to boost the output bus voltage to be equal to the peak voltage.
[0028] In a third aspect, the present application provides a computer device, including a memory and a processor, wherein the memory stores a computer program, and when the processor executes the computer program, the steps of the method described in the first aspect are implemented.
[0029] In a fourth aspect, the present application provides a computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the steps of the method described in the first aspect above are implemented.
[0030] In a fifth aspect, the present application provides a computer program product, including a computer program, which, when executed by a processor, implements the steps of the method described in the first aspect above.
[0031] The grid-connected control method, device and storage medium of the above-mentioned voltage conversion circuit, the voltage conversion circuit includes an open-loop LLC circuit, the open-loop LLC circuit includes a primary full-bridge circuit, a transformer, a resonant circuit, a secondary full-bridge circuit and an output capacitor connected in sequence, in the process of the voltage conversion circuit being connected to the power grid, it is detected whether the output bus voltage of the voltage conversion circuit is less than the peak voltage of the power grid, and when the output bus voltage is less than the peak voltage, the switch tube included in the primary full-bridge circuit and the switch tube included in the secondary full-bridge circuit are controlled to a preset switch state, so that the primary full-bridge circuit, the transformer, the resonant circuit, the secondary full-bridge circuit and The output capacitor forms a boost circuit, and the boost circuit is used to boost the output bus voltage to be equal to the peak voltage. In this way, when the output bus voltage of the voltage conversion circuit is lower than the peak voltage of the power grid, the output bus voltage of the voltage conversion circuit is boosted by the boost circuit formed by the primary full-bridge circuit, the transformer, the resonant circuit, the secondary full-bridge circuit and the output capacitor, so as to avoid the situation where the instantaneous grid-connected impact current is too large due to the large gap between the output bus voltage and the peak voltage of the power grid when the voltage conversion circuit is connected to the grid, thereby avoiding damage to the components of the voltage conversion circuit and improving the grid-connected adaptability of the voltage conversion circuit. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] In order to more clearly illustrate the technical solutions in the embodiments of the present application or related technologies, the drawings required for use in the embodiments of the present application or related technical descriptions will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0033] Figure 1 An application environment diagram of a grid-connected control method for a voltage conversion circuit in one embodiment;
[0034] Figure 2 A schematic flow chart of a method for controlling a grid-connected voltage conversion circuit in one embodiment;
[0035] Figure 3 is a module schematic diagram of an open-loop LLC circuit in another embodiment;
[0036] Figure 4 It is a schematic diagram of a flow chart of a computer device controlling a switch tube included in a primary full-bridge circuit and a switch tube included in a secondary full-bridge circuit to a preset switch state in another embodiment;
[0037] Figure 5 is a circuit diagram of an open-loop LLC circuit in another embodiment;
[0038] Figure 6It is a schematic diagram of the wave generation mode of each switch tube in the open-loop LLC circuit in the related art;
[0039] Figure 7 is a flow chart of step 402 in another embodiment;
[0040] Figure 8 is a circuit diagram of an open-loop LLC circuit in another embodiment;
[0041] Fig. 9 A schematic diagram of a switch tube current waveform in an open-loop LLC circuit in another embodiment;
[0042] Fig.10 A schematic diagram of a voltage waveform of a switch tube in an open-loop LLC circuit in another embodiment;
[0043] Fig.11 is a circuit diagram of an open-loop LLC circuit in another embodiment;
[0044] Fig.12 is a circuit diagram of an open-loop LLC circuit in another embodiment;
[0045] Fig.13 is a circuit diagram of an open-loop LLC circuit in another embodiment;
[0046] Fig.14 It is a schematic diagram of the wave generation mode of each switch tube in an open-loop LLC circuit in another embodiment;
[0047] Fig.15 is a module schematic diagram of a voltage conversion circuit in another embodiment;
[0048] Fig.16 is a flow chart of a grid-connected control method of a voltage conversion circuit in another embodiment;
[0049] Fig.17 is a circuit diagram of an inverter circuit in another embodiment;
[0050] Fig.18 is a structural block diagram of a grid-connected control device for a voltage conversion circuit in one embodiment;
[0051] Fig.19 FIG. 4 is a diagram showing the internal structure of a computer device in one embodiment. DETAILED DESCRIPTION
[0052] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0053] When the open-loop LLC circuit is used in an inverter, the output bus voltage gain of the open-loop LLC circuit is fixed. When the input voltage on the primary side of the open-loop LLC circuit (i.e., the battery voltage) is too low, the output bus voltage of the open-loop LLC circuit will be much lower than the peak voltage of the grid. If the inverter is forcibly connected to the grid (or simply referred to as grid connection), the large gap between the output bus voltage and the peak voltage of the grid will cause excessive grid-connected instantaneous impact current, which may easily damage the inverter components and lead to poor grid-connected adaptability of the inverter. At this time, if the inverter is not connected to the grid, the adaptability of the inverter's grid-connected function will also be weakened, that is, the inverter's poor grid-connected adaptability will also exist.
[0054] In view of this, the embodiments of the present application provide a grid-connected control method, device and storage medium for a voltage conversion circuit, which can improve the grid-connected adaptability of the voltage conversion circuit.
[0055] The grid-connected control method of the voltage conversion circuit provided in the embodiment of the present application can be applied to Figure 1 In the application environment shown, the battery is connected to the voltage conversion circuit, the voltage conversion circuit is connected to the power grid, and the voltage conversion circuit is also connected to the computer device. The voltage conversion circuit can be set in an inverter to perform voltage conversion, such as converting direct current into alternating current.
[0056] The computer device may be a server, which may be an independent physical server, a server cluster or a distributed system composed of multiple physical servers, or a cloud server that provides cloud computing services.
[0057] In an exemplary embodiment, Figure 2 As shown, a grid-connected control method for a voltage conversion circuit is provided, and the method is applied to Figure 1 The computer device in the embodiment is used as an example to illustrate, including step 201 and step 202:
[0058] Step 201, during the process of the voltage conversion circuit being connected to the power grid, detecting whether the output bus voltage of the voltage conversion circuit is less than the peak voltage of the power grid.
[0059] In the embodiment of the present application, the voltage conversion circuit includes an open-loop LLC circuit, for example, see Figure 3 , Figure 3 It is a module schematic diagram of an open-loop LLC circuit, such as Figure 3 As shown, the open-loop LLC circuit includes a primary full-bridge circuit, a transformer, a resonant circuit, a secondary full-bridge circuit and an output capacitor connected in sequence. The primary full-bridge circuit is connected to a battery, and the voltage across the output capacitor is the output bus voltage of the voltage conversion circuit.
[0060] The output bus voltage of the voltage conversion circuit is affected by the input voltage (i.e., battery voltage) on the primary side of the open-loop LLC circuit. If the battery voltage is too low, the output bus voltage of the open-loop LLC circuit may be lower than the peak voltage of the grid, causing excessive instantaneous grid-connected surge current.
[0061] In the embodiment of the present application, the computer device can sample the output bus voltage of the voltage conversion circuit through the sampling circuit, and detect whether the output bus voltage of the voltage conversion circuit is less than the peak voltage of the power grid after sampling. If the output bus voltage of the voltage conversion circuit is greater than or equal to the peak voltage of the power grid, it indicates that the instantaneous impact current of the grid connection will not be too large, so the existing control strategy can be used to control the voltage conversion circuit to be connected to the power grid.
[0062] If the output bus voltage of the voltage conversion circuit is lower than the peak voltage of the power grid, continue to execute the following steps of the grid-connected control method of the voltage conversion circuit in the embodiment of the present application to avoid the situation where the instantaneous grid-connected impact current is too large due to the large gap between the output bus voltage and the peak voltage of the power grid when the voltage conversion circuit is connected to the grid.
[0063] Step 202, when the output bus voltage is less than the peak voltage, control the switch tube included in the primary full-bridge circuit and the switch tube included in the secondary full-bridge circuit to a preset switching state, so that the primary full-bridge circuit, the transformer, the resonant circuit, the secondary full-bridge circuit and the output capacitor form a boost circuit.
[0064] The boost circuit is used to boost the output bus voltage to be equal to the peak voltage.
[0065] The above-mentioned preset switch state is different from the conventional switch state of the switch tube included in the primary full-bridge circuit and the switch tube included in the secondary full-bridge circuit during the process of the traditional voltage conversion circuit being incorporated into the power grid. That is, in the embodiment of the present application, when the output bus voltage of the voltage conversion circuit is less than the peak voltage of the power grid, the computer device changes the conduction control logic of the switch tube included in the primary full-bridge circuit and the switch tube included in the secondary full-bridge circuit, and uses the primary full-bridge circuit, the transformer, the resonant circuit, the secondary full-bridge circuit and the output capacitor to form a boost circuit to increase the output bus voltage.
[0066] Exemplarily, the boost circuit may include an energy storage stage and a charging stage. In the energy storage stage, energy is stored by charging the energy storage element included in the resonant circuit. In the charging stage, the energy storage element included in the resonant circuit is discharged to charge the output capacitor, thereby increasing the voltage across the output capacitor, that is, increasing the output bus voltage of the voltage conversion circuit. The boost circuit is realized by charging and discharging the energy storage element included in the resonant circuit.
[0067] In the above-mentioned embodiment, when the output bus voltage of the voltage conversion circuit is lower than the peak voltage of the power grid, the output bus voltage of the voltage conversion circuit is boosted by a boost circuit formed by a primary full-bridge circuit, a transformer, a resonant circuit, a secondary full-bridge circuit and an output capacitor. That is, an improved design is made using existing circuit elements to avoid a situation in which the instantaneous grid-connected impact current is too large due to a large gap between the output bus voltage and the peak voltage of the power grid when the voltage conversion circuit is connected to the grid, thereby avoiding damage to the components of the voltage conversion circuit and improving the grid-connected adaptability of the voltage conversion circuit.
[0068] In one embodiment, based on Figure 2 The embodiment shown, see Figure 4 This embodiment exemplarily introduces an implementation method of controlling the switch tube included in the primary full-bridge circuit and the switch tube included in the secondary full-bridge circuit of the computer device to a preset switch state. Figure 4 As shown, the computer device can execute Figure 4 Step 401 and step 402 shown include:
[0069] Step 401, determining the phase difference between the primary and secondary switches according to the peak voltage and the output bus voltage.
[0070] See also Figure 5 , Figure 5 is a circuit diagram of an exemplary open-loop LLC circuit. Figure 5 In the open-loop LLC circuit shown in FIG. 1 , the primary full-bridge circuit includes a first switch tube MOS1, a second switch tube MOS2, a third switch tube MOS3 and a fourth switch tube MOS4, and the transformer is Figure 5 The resonant circuit shown in T1 consists of Figure 5 The resonant inductor Lr and the resonant capacitor Cr shown in the figure, the secondary full-bridge circuit includes a fifth switch tube MOS5, a sixth switch tube MOS6, a seventh switch tube MOS7 and an eighth switch tube MOS8, and the output capacitor is Figure 5 As shown in Cbus, R1 is the output dummy load of the open-loop LLC circuit, the resistance value of R1 is relatively large, and Vbus is the output bus voltage of the voltage conversion circuit.
[0071] In the related art, MOS1 / MOS4 and MOS5 / MOS8 are respectively used as the E group bridge arms of the original secondary side, and the wave generation mode is the same; MOS2 / MOS3 and MOS6 / MOS7 are respectively used as the F group bridge arms of the original secondary side, and the wave generation mode is the same. MOS1 / MOS2, MOS3 / MOS4, MOS5 / MOS6, MOS7 / MOS8 are 4 groups of complementary drives. The driving effective level (high level) and duty cycle of the E group bridge arm and the F group bridge arm are the same, and the phase difference is 180 degrees. After the open-loop LLC circuit is started, the output bus voltage Vbus reaches the maximum value. The wave generation mode of each switch tube in the open-loop LLC circuit is as follows: Figure 6 As shown, when all the switch tubes (MOS1, MOS4, MOS5, MOS8) included in the bridge arm of group E are turned on, all the switch tubes (MOS2, MOS3, MOS6, MOS7) included in the bridge arm of group F are turned off; when all the switch tubes included in the bridge arm of group F are turned on, all the switch tubes included in the bridge arm of group E are turned off.
[0072] In the related art, due to (Vbus is the output bus voltage, Vbat is the battery voltage, Ns is the primary turns ratio of the transformer in the open-loop LLC circuit, and Np is the secondary turns ratio of the transformer in the open-loop LLC circuit). When the battery voltage Vbat decreases as the battery power decreases, Vbus also decreases accordingly. (Vgridpeak is the peak voltage of the grid). When Vbus < Vgridpeak, ,and (Ic is the instantaneous impact current of grid connection, Cbus is the capacitance of output capacitor, is the instantaneous time of grid connection), The larger it is, the greater the instantaneous grid-connected impact current Ic will be. When it exceeds the rated current threshold of the device, the device will be damaged.
[0073] In the embodiment of the present application, the computer device determines the phase difference between the primary and secondary switch tubes according to the peak voltage of the power grid and the output bus voltage of the voltage conversion circuit. Figure 5 The phase difference Angle of the original secondary switch tube may refer to the phase difference between the first switch tube MOS1 and the eighth switch tube MOS8, and the phase difference between the second switch tube MOS2 and the seventh switch tube MOS7. The larger the value is, the larger the phase difference Angle of the primary and secondary switch tubes is. The size of is positively correlated with the size of the phase difference Angle of the primary and secondary switching tubes. The larger the phase difference Angle of the primary and secondary switching tubes, the greater the boost amplitude of the boost circuit formed by the primary full-bridge circuit, transformer, resonant circuit, secondary full-bridge circuit and output capacitor.
[0074] As an implementation method, the computer device can use a P (Proportional) I (Integral) regulation algorithm to regulate the output bus voltage, that is, perform PI regulation on the output bus voltage, and set the primary and secondary switch phase difference Angle. The reference voltage (Vref) in the PI regulation algorithm is set to the peak voltage of the power grid. Based on the PI regulation algorithm, a high-precision primary and secondary switch phase difference can be obtained.
[0075] Step 402, according to the phase difference between the primary and secondary switches, control the switch tubes included in the primary full-bridge circuit and the switch tubes included in the secondary full-bridge circuit to a preset switch state.
[0076] After the computer device obtains the phase difference Angle between the primary and secondary switches, the computer device controls the switches included in the primary full-bridge circuit and the switches included in the secondary full-bridge circuit to a preset switching state according to the phase difference Angle between the primary and secondary switches.
[0077] In a possible implementation of step 402, see Figure 7 , step 402 may include Figure 7 Step 701 and step 702 shown:
[0078] Step 701, controlling the fifth switch tube and the sixth switch tube to be turned off.
[0079] The computer device controls the fifth switch tube MOS5 and the sixth switch tube MOS6 to turn off. After the fifth switch tube MOS5 and the sixth switch tube MOS6 are turned off, the fifth switch tube MOS5 and the sixth switch tube MOS6 are equivalent to the diode D in the open-loop LLC circuit by utilizing the unidirectional conduction characteristics of the internal diodes of the fifth switch tube MOS5 and the sixth switch tube MOS6.
[0080] Step 702 , controlling the first switch tube, the second switch tube, the third switch tube, the fourth switch tube, the seventh switch tube and the eighth switch tube to a preset switch state according to the phase difference between the primary and secondary switches.
[0081] After the computer device controls the fifth switch tube MOS5 and the sixth switch tube MOS6 to turn off, the other switch tubes in the open-loop LLC circuit can be turned on and controlled normally. Therefore, the computer device controls the remaining first switch tube MOS1, second switch tube MOS2, third switch tube MOS3, fourth switch tube MOS4, seventh switch tube MOS7 and eighth switch tube MOS8 in the open-loop LLC circuit to the preset switching state according to the phase difference of the original secondary side switch tube.
[0082] The above-mentioned embodiment does not require the addition of additional hardware circuits. Based on the existing switch tubes and energy storage elements in the existing open-loop LLC circuit topology, the phase difference between the original and secondary side switch tubes is obtained through PI adjustment. Based on the original and secondary side switch tube phase difference, the grid-connected control method of the embodiment of the present application can be executed, so that the output bus voltage of the voltage conversion circuit is stabilized at the peak voltage of the power grid. The implementation method is simple and easy to implement, and is conducive to cost control.
[0083] Below, with Figure 5 Taking the open-loop LLC circuit shown in FIG. 1 as an example, the implementation of step 702 is exemplarily introduced.
[0084] In the first time period, the computer device controls the first switch tube MOS1 to turn off, the second switch tube MOS2 to turn on, the third switch tube MOS3 to turn on, the fourth switch tube MOS4 to turn off, the seventh switch tube MOS7 to turn off, and the eighth switch tube MOS8 to turn on according to the phase difference between the primary and secondary side switches.
[0085] See also Figure 8 , the computer device controls the conduction time of the second switch tube MOS2 and the eighth switch tube MOS8 to overlap according to the phase difference Angle of the primary and secondary side switches, that is, in the first time period, the second switch tube MOS2 and the eighth switch tube MOS8 are both in the conduction state. At this time, the second switch tube MOS2 on the primary side of the transformer, the third switch tube MOS3, the transformer and the resonant circuit on the secondary side of the transformer, and the sixth switch tube MOS6 (i.e. Figure 8 The diode D6 shown in the figure) and the eighth switch tube MOS8 form a first energy storage circuit, which is used to charge the energy storage elements (ie, Lr and Cr) included in the resonant circuit. The current in the first energy storage circuit flows as shown in the figure. Figure 8 In the direction indicated by the red dotted arrow, the output capacitor discharges a small amount in the first time period, and the output capacitor and R1 form a current loop.
[0086] See also Fig. 9 and Fig.10 After the computer device turns off the fifth switch tube MOS5 and the sixth switch tube MOS6, as the phase difference Angle of the primary and secondary switch tubes changes, the current waveform of the switch tube in the open-loop LLC circuit is as follows: Fig. 9 As shown, the voltage waveform of the switch tube in the open-loop LLC circuit is as follows: Fig.10 As shown, Fig. 9 and Fig.10 The time period t1-t2 shown may be the first time period mentioned above in this embodiment.
[0087] Among them, I (Moss6) / I (Moss7) / I (Moss8) are the currents of the sixth switch tube MOS6 / the seventh switch tube MOS7 / the eighth switch tube MOS8 respectively (the direction from the D pole to the S pole is the positive direction of the current), I (CR) / V (CR) is the current / voltage of the resonant capacitor Cr (the same name end is the positive direction), I (LR) / V (LR) is the current / voltage of the resonant inductor Lr (the same name end is the positive direction), Vs is the secondary voltage of the transformer, and Vs1 is the voltage of the secondary side of the transformer, the resonant capacitor Cr, and the resonant inductor Lr.
[0088] Under the action of Vs, the energy storage elements (ie, Lr and Cr) included in the resonant circuit begin to be charged and store energy in the first time period (t1-t2).
[0089] In the second time period, the computer device controls the first switch tube MOS1 to turn off, the second switch tube MOS2 to turn on, the third switch tube MOS3 to turn on, the fourth switch tube MOS4 to turn off, the seventh switch tube MOS7 to turn off, and the eighth switch tube MOS8 to turn off according to the phase difference between the original and secondary side switches.
[0090] See also Fig.11 The computer device controls the seventh switch tube MOS7 to turn off according to the phase difference Angle of the original secondary switch tube. At this time, the seventh switch tube MOS7 is equivalent to a diode (i.e. Fig.11 As shown in D7, the second switch tube MOS2, the third switch tube MOS3, the transformer, the resonant circuit, the sixth switch tube MOS6, the seventh switch tube MOS7 and the output capacitor form a first charging loop, and the current in the first charging loop flows as shown in Fig.11 In the direction indicated by the red dotted arrow, the first charging loop is used to charge the output capacitor through the energy storage element. The loop current flows to the output capacitor periodically through the diode inside the seventh switch tube MOS7 to charge the output capacitor, thereby boosting the output bus voltage at both ends of the output capacitor.
[0091] In the embodiment of the present application, the second time period is after the first time period in terms of timing. Fig. 9 and Fig.10 , Fig. 9 and Fig.10 The time period t2-t3 shown may be the second time period mentioned above in this embodiment.
[0092] Assume that the boost voltage of the output bus voltage at both ends of the output capacitor by the first charging circuit is Indicates that .
[0093] In the third time period, the computer device controls the first switch tube MOS1 to be turned on, the second switch tube MOS2 to be turned off, the third switch tube MOS3 to be turned off, the fourth switch tube MOS4 to be turned on, the seventh switch tube MOS7 to be turned on, and the eighth switch tube MOS8 to be turned off according to the phase difference between the original and secondary side switches.
[0094] See also Fig.12 , the computer device controls the on-time of the first switch tube MOS1 and the seventh switch tube MOS7 to overlap according to the phase difference Angle of the original secondary switch tube, that is, in the third time period, the first switch tube MOS1 and the seventh switch tube MOS7 are both in the on state. At this time, the first switch tube MOS1, the fourth switch tube MOS4, the transformer, the resonant circuit, the fifth switch tube MOS5 (i.e. Fig.12 The diode D5) and the seventh switch tube MOS7 form a second energy storage circuit, which is used to charge the energy storage element (ie, Lr and Cr). The current in the second energy storage circuit flows as follows: Fig.12 In the direction indicated by the red dotted arrow, the output capacitor is discharged a small amount during the third time period, and the output capacitor and R1 form a current loop.
[0095] Please continue to see Fig. 9 and Fig.10 , Fig. 9 and Fig.10 The time period t4-t5 shown may be the third time period mentioned above in this embodiment, and the third time period is after the second time period in terms of timing.
[0096] In the fourth time period, the computer device controls the first switch tube MOS1 to be turned on, the second switch tube MOS2 to be turned off, the third switch tube MOS3 to be turned off, the fourth switch tube MOS4 to be turned on, the seventh switch tube MOS7 to be turned off, and the eighth switch tube MOS8 to be turned off according to the phase difference between the original and secondary side switches.
[0097] See also Fig.13 The computer device controls the eighth switch tube MOS8 to turn off according to the phase difference Angle of the original secondary switch tube. At this time, the eighth switch tube MOS8 is equivalent to a diode (i.e. Fig.13 As shown in D8, the first switch tube MOS1, the fourth switch tube MOS4, the transformer, the resonant circuit, the fifth switch tube MOS5, the eighth switch tube MOS8 and the output capacitor form a second charging loop, and the current in the second charging loop flows as follows: Fig.13 In the direction indicated by the red dotted arrow, the second charging loop is used to charge the output capacitor through the energy storage element. The loop current flows to the output capacitor periodically through the diode inside the eighth switch tube MOS8 to charge the output capacitor, thereby boosting the output bus voltage at both ends of the output capacitor.
[0098] In the embodiment of the present application, the fourth time period is after the third time period in terms of timing. Fig. 9 and Fig.10 , Fig. 9 and Fig.10 The time period t5-t6 shown may be the fourth time period mentioned above in this embodiment.
[0099] Assume that the boost voltage of the output bus voltage at both ends of the output capacitor by the second charging circuit is Indicates that .
[0100] See also Fig.14 The wave generation mode of each switch tube in the open-loop LLC circuit in the embodiment of the present application is as follows: Fig.14 The fifth switch tube MOS5 and the sixth switch tube MOS6 are controlled to be turned off (these two switch tubes are equivalent to two diodes in the circuit), and the control waveforms of the first switch tube MOS1-the fourth switch tube MOS4 and the seventh switch tube MOS7 and the eighth switch tube MOS8 are adjusted by the change of the phase difference of the primary and secondary switch tubes, so that the first switch tube MOS1 and the seventh switch tube MOS7, the second switch tube MOS2 and the eighth switch tube MOS8 will have a simultaneous conduction period. When the second switch tube MOS2 and the eighth switch tube MOS8 are simultaneously turned on, the first energy storage circuit performs The energy storage element is charged, so that the energy storage element can be discharged after being charged, so as to charge the output capacitor, thereby boosting the output bus voltage at both ends of the output capacitor; when the first switch tube MOS1 and the seventh switch tube MOS7 are turned on at the same time, the second energy storage loop charges the energy storage element included in the resonant circuit, so that the energy storage element can be discharged after being charged, so as to charge the output capacitor, thereby boosting the output bus voltage at both ends of the output capacitor. In this way, a boost circuit is formed based on the existing switch tubes and energy storage elements in the open-loop LLC circuit topology to boost the output bus voltage, thereby achieving the effect of increasing the output bus voltage.
[0101] In one embodiment, based on any of the above embodiments, Figure 3 For example, see the embodiment shown in Fig.15 The voltage conversion circuit of the embodiment of the present application also includes an inverter circuit, and the inverter circuit is connected between the open-loop LLC circuit and the power grid.
[0102] See also Fig.16 After the computer device of this embodiment controls the switch tube included in the primary full-bridge circuit and the switch tube included in the secondary full-bridge circuit to a preset switch state, the grid-connected control method of the voltage conversion circuit also includes: Fig.16 Step 1601 shown:
[0103] Step 1601, controlling the switch tube included in the inverter circuit to turn off, so that the switch tube included in the inverter circuit forms a rectifier circuit.
[0104] For example, see Fig.17 , Fig.17 is a circuit diagram of an exemplary inverter circuit. The switch tube included in the inverter circuit may include Fig.17 The ninth switch tube MOS9, the tenth switch tube MOS10, the eleventh switch tube MOS11, and the twelfth switch tube MOS12 are shown.
[0105] When the output bus voltage of the open-loop LLC circuit is less than the peak voltage, the computer device controls the switch tube included in the primary full-bridge circuit and the switch tube included in the secondary full-bridge circuit to a preset switch state to form a boost circuit to boost the output bus voltage to be equal to the peak voltage. At this time, the switch tube included in the inverter circuit is closed to phase-lock the power grid. Fig.17 The four switching tubes shown are equivalent to four diodes in the circuit, forming a rectifier circuit to rectify the grid input.
[0106] Please continue to see Fig.16 The grid-connected control method of the voltage conversion circuit also includes Fig.16 Step 1602 is shown:
[0107] Step 1602, when the grid voltage is detected to be zero-crossing, the AC side relay included in the inverter circuit is controlled to be closed, and the switch tube included in the primary full-bridge circuit and the switch tube included in the secondary full-bridge circuit are controlled to be in a normal switching state.
[0108] When the grid voltage passes through zero, relay S11 is turned on. At this time, since there is no voltage difference between the output bus voltage and the grid peak voltage, the grid-connected impact current can be ignored. At the same time, the grid-connected control of the switch tubes included in the primary full-bridge circuit and the switch tubes included in the secondary full-bridge circuit is canceled, and the normal wave generation mode of each switch tube is restored. The bus capacitor is charged after rectification by the uncontrolled rectification characteristics of the inverter circuit. At this time, the battery charging current is the smallest and the battery voltage gradually increases. When the charging current at the battery end is small, the full-bridge drive of the inverter circuit is turned on to perform PFC (Power Factor Correction) boost regulation charging.
[0109] It should be understood that, although the various steps in the flowcharts involved in the above-mentioned embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above-mentioned embodiments can include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily to be carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.
[0110] Based on the same inventive concept, the embodiment of the present application also provides a voltage conversion circuit grid-connected control device for implementing the voltage conversion circuit grid-connected control method involved above. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme recorded in the above method, so the specific limitations in the embodiments of the grid-connected control device for one or more voltage conversion circuits provided below can refer to the limitations of the voltage conversion circuit grid-connected control method above, and will not be repeated here.
[0111] In an exemplary embodiment, Fig.18 As shown, a grid-connected control device for a voltage conversion circuit is provided, wherein the voltage conversion circuit includes an open-loop LLC circuit, wherein the open-loop LLC circuit includes a primary full-bridge circuit, a transformer, a resonant circuit, a secondary full-bridge circuit, and an output capacitor connected in sequence, and the device includes:
[0112] The detection module 1801 is used to detect whether the output bus voltage of the voltage conversion circuit is less than the peak voltage of the power grid during the process of the voltage conversion circuit being connected to the power grid;
[0113] The control module 1802 is used to control the switch tube included in the primary full-bridge circuit and the switch tube included in the secondary full-bridge circuit to a preset switching state when the output bus voltage is less than the peak voltage, so that the primary full-bridge circuit, the transformer, the resonant circuit, the secondary full-bridge circuit and the output capacitor form a boost circuit, and the boost circuit is used to boost the output bus voltage to be equal to the peak voltage.
[0114] In one embodiment, the control module 1802 includes:
[0115] A determination unit, used to determine a phase difference between the primary and secondary switching tubes according to the peak voltage and the output bus voltage;
[0116] A control unit is used to control the switch tube included in the primary full-bridge circuit and the switch tube included in the secondary full-bridge circuit to the preset switch state according to the phase difference between the primary and secondary switches.
[0117] In one of the embodiments, the determination unit is specifically used to adjust the output bus voltage using a PI regulation algorithm to obtain the primary-secondary side switch phase difference, wherein the reference voltage in the PI regulation algorithm is configured as the peak voltage.
[0118] In one embodiment, the primary full-bridge circuit includes a first switch tube, a second switch tube, a third switch tube and a fourth switch tube, and the secondary full-bridge circuit includes a fifth switch tube, a sixth switch tube, a seventh switch tube and an eighth switch tube. The control unit is specifically used to control the fifth switch tube and the sixth switch tube to be turned off; according to the phase difference between the primary and secondary switch tubes, the first switch tube, the second switch tube, the third switch tube, the fourth switch tube, the seventh switch tube and the eighth switch tube are controlled to the preset switch state.
[0119] In one embodiment, the control unit is specifically used to control the first switch tube to turn off, the second switch tube to turn on, the third switch tube to turn on, the fourth switch tube to turn off, the seventh switch tube to turn on, and the eighth switch tube to turn on in a first time period according to the phase difference between the primary and secondary switches, so that the second switch tube, the third switch tube, the transformer, the resonant circuit, the sixth switch tube, and the eighth switch tube form a first energy storage circuit, and the first energy storage circuit is used to charge the energy storage element included in the resonant circuit; according to the phase difference between the primary and secondary switches, in a second time period, control the first switch tube to turn off, the second switch tube to turn on, the third switch tube to turn on, the fourth switch tube to turn off, the seventh switch tube to turn off, and the eighth switch tube to turn off, so that the second switch tube, the third switch tube, the transformer, the resonant circuit, the sixth switch tube, the seventh switch tube, and the output capacitor form a first charging circuit, and the first charging circuit is used to charge the output capacitor through the energy storage element to boost the output bus voltage at both ends of the output capacitor, and the second time period is after the first time period in terms of timing.
[0120] In one embodiment, the control unit is specifically used to control the first switch tube to be turned on, the second switch tube to be turned off, the third switch tube to be turned off, the fourth switch tube to be turned on, the seventh switch tube to be turned on, and the eighth switch tube to be turned off within a third time period according to the phase difference between the primary and secondary switches, so that the first switch tube, the fourth switch tube, the transformer, the resonant circuit, the fifth switch tube, and the seventh switch tube form a second energy storage circuit, and the second energy storage circuit is used to charge the energy storage element; according to the phase difference between the primary and secondary switches, the first switch tube is controlled to be turned on within a fourth time period. , the second switch tube is turned off, the third switch tube is turned off, the fourth switch tube is turned on, the seventh switch tube is turned off, and the eighth switch tube is turned off, so that the first switch tube, the fourth switch tube, the transformer, the resonant circuit, the fifth switch tube, the eighth switch tube and the output capacitor form a second charging loop, the second charging loop is used to charge the output capacitor through the energy storage element to boost the output bus voltage across the output capacitor, the third time period is after the second time period in timing, and the fourth time period is after the third time period in timing.
[0121] In one embodiment, the voltage conversion circuit also includes an inverter circuit, which is connected between the open-loop LLC circuit and the power grid. The control module 1802 is also used to control the switch tube included in the inverter circuit to turn off so that the switch tube included in the inverter circuit forms a rectifier circuit.
[0122] In one embodiment, the control module 1802 is also used to control the AC side relay included in the inverter circuit to close, and control the switch tube included in the primary full-bridge circuit and the switch tube included in the secondary full-bridge circuit to a normal switching state when the grid voltage is detected to pass through a zero point.
[0123] Each module in the above-mentioned grid-connected control device of the voltage conversion circuit can be implemented in whole or in part by software, hardware and a combination thereof. Each of the above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory in the computer device in the form of software, so that the processor can call and execute the corresponding operations of each of the above modules.
[0124] In an exemplary embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as shown in FIG. Fig.19As shown. The computer device includes a processor, a memory, an input / output interface (Input / Output, referred to as I / O) and a communication interface. The processor, the memory and the input / output interface are connected through a system bus, and the communication interface is connected to the system bus through the input / output interface. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store the grid-connected control data of the voltage conversion circuit. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a grid-connected control method of a voltage conversion circuit is implemented.
[0125] Those skilled in the art will understand that Fig.19 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.
[0126] In an exemplary embodiment, a computer device is provided, including a memory and a processor, wherein a computer program is stored in the memory, and when the processor executes the computer program, the following steps are implemented:
[0127] During the process of the voltage conversion circuit being connected to the power grid, detecting whether the output bus voltage of the voltage conversion circuit is less than the peak voltage of the power grid;
[0128] When the output bus voltage is less than the peak voltage, the switch tube included in the primary full-bridge circuit and the switch tube included in the secondary full-bridge circuit are controlled to a preset switching state, so that the primary full-bridge circuit, the transformer, the resonant circuit, the secondary full-bridge circuit and the output capacitor form a boost circuit, and the boost circuit is used to boost the output bus voltage to be equal to the peak voltage.
[0129] In one embodiment, when the processor executes the computer program, the following steps are specifically implemented:
[0130] Determine the phase difference of the primary and secondary switch tubes according to the peak voltage and the output bus voltage;
[0131] According to the phase difference between the primary and secondary side switches, the switch tube included in the primary side full bridge circuit and the switch tube included in the secondary side full bridge circuit are controlled to the preset switch state.
[0132] In one embodiment, when the processor executes the computer program, the following steps are specifically implemented:
[0133] The output bus voltage is regulated by using a PI regulation algorithm to obtain the primary-secondary switch phase difference, wherein the reference voltage in the PI regulation algorithm is configured as the peak voltage.
[0134] In one embodiment, the primary full-bridge circuit includes a first switch tube, a second switch tube, a third switch tube, and a fourth switch tube, and the secondary full-bridge circuit includes a fifth switch tube, a sixth switch tube, a seventh switch tube, and an eighth switch tube. When the processor executes the computer program, the following steps are specifically implemented:
[0135] Controlling the fifth switch tube and the sixth switch tube to turn off;
[0136] According to the phase difference between the primary and secondary side switches, the first switch tube, the second switch tube, the third switch tube, the fourth switch tube, the seventh switch tube and the eighth switch tube are controlled to the preset switch state.
[0137] In one embodiment, when the processor executes the computer program, the following steps are specifically implemented:
[0138] According to the phase difference between the primary and secondary switches, in a first time period, the first switch is turned off, the second switch is turned on, the third switch is turned on, the fourth switch is turned off, the seventh switch is turned off, and the eighth switch is turned on, so that the second switch, the third switch, the transformer, the resonant circuit, the sixth switch, and the eighth switch form a first energy storage circuit, and the first energy storage circuit is used to charge the energy storage element included in the resonant circuit;
[0139] According to the phase difference between the primary and secondary side switches, the first switch is controlled to be turned off, the second switch is turned on, the third switch is turned on, the fourth switch is turned off, the seventh switch is turned off, and the eighth switch is turned off in a second time period, so that the second switch, the third switch, the transformer, the resonant circuit, the sixth switch, the seventh switch, and the output capacitor form a first charging loop, wherein the first charging loop is used to charge the output capacitor through the energy storage element to boost the output bus voltage at both ends of the output capacitor, and the second time period is after the first time period in terms of timing.
[0140] In one embodiment, when the processor executes the computer program, the following steps are specifically implemented:
[0141] According to the phase difference between the primary and secondary switches, in a third time period, the first switch is turned on, the second switch is turned off, the third switch is turned off, the fourth switch is turned on, the seventh switch is turned on, and the eighth switch is turned off, so that the first switch, the fourth switch, the transformer, the resonant circuit, the fifth switch, and the seventh switch form a second energy storage circuit, and the second energy storage circuit is used to charge the energy storage element;
[0142] According to the phase difference between the primary and secondary side switches, the first switch is controlled to be turned on, the second switch is turned off, the third switch is turned off, the fourth switch is turned on, the seventh switch is turned off, and the eighth switch is turned off in a fourth time period, so that the first switch, the fourth switch, the transformer, the resonant circuit, the fifth switch, the eighth switch, and the output capacitor form a second charging loop, and the second charging loop is used to charge the output capacitor through the energy storage element to boost the output bus voltage at both ends of the output capacitor. The third time period is after the second time period in timing, and the fourth time period is after the third time period in timing.
[0143] In one embodiment, when the processor executes the computer program, the processor further implements the following steps:
[0144] The switch tube included in the inverter circuit is controlled to be turned off so that the switch tube included in the inverter circuit forms a rectifier circuit.
[0145] In one embodiment, when the processor executes the computer program, the processor further implements the following steps:
[0146] When the grid voltage is detected to pass through a zero point, the AC side relay included in the inverter circuit is controlled to close, and the switch tube included in the primary full-bridge circuit and the switch tube included in the secondary full-bridge circuit are controlled to a normal switching state.
[0147] In one embodiment, a computer readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the following steps are implemented:
[0148] During the process of the voltage conversion circuit being connected to the power grid, detecting whether the output bus voltage of the voltage conversion circuit is less than the peak voltage of the power grid;
[0149] When the output bus voltage is less than the peak voltage, the switch tube included in the primary full-bridge circuit and the switch tube included in the secondary full-bridge circuit are controlled to a preset switching state, so that the primary full-bridge circuit, the transformer, the resonant circuit, the secondary full-bridge circuit and the output capacitor form a boost circuit, and the boost circuit is used to boost the output bus voltage to be equal to the peak voltage.
[0150] In one embodiment, when the computer program is executed by a processor, the following steps are specifically implemented:
[0151] Determine the phase difference of the primary and secondary switch tubes according to the peak voltage and the output bus voltage;
[0152] According to the phase difference between the primary and secondary side switches, the switch tube included in the primary side full bridge circuit and the switch tube included in the secondary side full bridge circuit are controlled to the preset switch state.
[0153] In one embodiment, when the computer program is executed by a processor, the following steps are specifically implemented:
[0154] The output bus voltage is regulated by using a PI regulation algorithm to obtain the primary-secondary switch phase difference, wherein the reference voltage in the PI regulation algorithm is configured as the peak voltage.
[0155] In one embodiment, the primary full-bridge circuit includes a first switch tube, a second switch tube, a third switch tube and a fourth switch tube, and the secondary full-bridge circuit includes a fifth switch tube, a sixth switch tube, a seventh switch tube and an eighth switch tube. When the computer program is executed by the processor, the following steps are specifically implemented:
[0156] Controlling the fifth switch tube and the sixth switch tube to turn off;
[0157] According to the phase difference between the primary and secondary side switches, the first switch tube, the second switch tube, the third switch tube, the fourth switch tube, the seventh switch tube and the eighth switch tube are controlled to the preset switch state.
[0158] In one embodiment, when the computer program is executed by a processor, the following steps are specifically implemented:
[0159] According to the phase difference between the primary and secondary switches, in a first time period, the first switch is turned off, the second switch is turned on, the third switch is turned on, the fourth switch is turned off, the seventh switch is turned off, and the eighth switch is turned on, so that the second switch, the third switch, the transformer, the resonant circuit, the sixth switch, and the eighth switch form a first energy storage circuit, and the first energy storage circuit is used to charge the energy storage element included in the resonant circuit;
[0160] According to the phase difference between the primary and secondary side switches, the first switch is controlled to be turned off, the second switch is turned on, the third switch is turned on, the fourth switch is turned off, the seventh switch is turned off, and the eighth switch is turned off in a second time period, so that the second switch, the third switch, the transformer, the resonant circuit, the sixth switch, the seventh switch, and the output capacitor form a first charging loop, wherein the first charging loop is used to charge the output capacitor through the energy storage element to boost the output bus voltage at both ends of the output capacitor, and the second time period is after the first time period in terms of timing.
[0161] In one embodiment, when the computer program is executed by a processor, the following steps are specifically implemented:
[0162] According to the phase difference between the primary and secondary switches, in a third time period, the first switch is turned on, the second switch is turned off, the third switch is turned off, the fourth switch is turned on, the seventh switch is turned on, and the eighth switch is turned off, so that the first switch, the fourth switch, the transformer, the resonant circuit, the fifth switch, and the seventh switch form a second energy storage circuit, and the second energy storage circuit is used to charge the energy storage element;
[0163] According to the phase difference between the primary and secondary side switches, the first switch is controlled to be turned on, the second switch is turned off, the third switch is turned off, the fourth switch is turned on, the seventh switch is turned off, and the eighth switch is turned off in a fourth time period, so that the first switch, the fourth switch, the transformer, the resonant circuit, the fifth switch, the eighth switch, and the output capacitor form a second charging loop, and the second charging loop is used to charge the output capacitor through the energy storage element to boost the output bus voltage at both ends of the output capacitor. The third time period is after the second time period in timing, and the fourth time period is after the third time period in timing.
[0164] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0165] The switch tube included in the inverter circuit is controlled to be turned off so that the switch tube included in the inverter circuit forms a rectifier circuit.
[0166] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0167] When the grid voltage is detected to pass through a zero point, the AC side relay included in the inverter circuit is controlled to close, and the switch tube included in the primary full-bridge circuit and the switch tube included in the secondary full-bridge circuit are controlled to a normal switching state.
[0168] In one embodiment, a computer program product is provided, comprising a computer program, which, when executed by a processor, implements the following steps:
[0169] During the process of the voltage conversion circuit being connected to the power grid, detecting whether the output bus voltage of the voltage conversion circuit is less than the peak voltage of the power grid;
[0170] When the output bus voltage is less than the peak voltage, the switch tube included in the primary full-bridge circuit and the switch tube included in the secondary full-bridge circuit are controlled to a preset switching state, so that the primary full-bridge circuit, the transformer, the resonant circuit, the secondary full-bridge circuit and the output capacitor form a boost circuit, and the boost circuit is used to boost the output bus voltage to be equal to the peak voltage.
[0171] In one embodiment, when the computer program is executed by a processor, the following steps are specifically implemented:
[0172] Determine the phase difference of the primary and secondary switch tubes according to the peak voltage and the output bus voltage;
[0173] According to the phase difference between the primary and secondary side switches, the switch tube included in the primary side full bridge circuit and the switch tube included in the secondary side full bridge circuit are controlled to the preset switch state.
[0174] In one embodiment, when the computer program is executed by a processor, the following steps are specifically implemented:
[0175] The output bus voltage is regulated by using a PI regulation algorithm to obtain the primary-secondary switch phase difference, wherein the reference voltage in the PI regulation algorithm is configured as the peak voltage.
[0176] In one embodiment, the primary full-bridge circuit includes a first switch tube, a second switch tube, a third switch tube and a fourth switch tube, and the secondary full-bridge circuit includes a fifth switch tube, a sixth switch tube, a seventh switch tube and an eighth switch tube. When the computer program is executed by the processor, the following steps are specifically implemented:
[0177] Controlling the fifth switch tube and the sixth switch tube to turn off;
[0178] According to the phase difference between the primary and secondary side switches, the first switch tube, the second switch tube, the third switch tube, the fourth switch tube, the seventh switch tube and the eighth switch tube are controlled to the preset switch state.
[0179] In one embodiment, when the computer program is executed by a processor, the following steps are specifically implemented:
[0180] According to the phase difference between the primary and secondary switches, in a first time period, the first switch is turned off, the second switch is turned on, the third switch is turned on, the fourth switch is turned off, the seventh switch is turned off, and the eighth switch is turned on, so that the second switch, the third switch, the transformer, the resonant circuit, the sixth switch, and the eighth switch form a first energy storage circuit, and the first energy storage circuit is used to charge the energy storage element included in the resonant circuit;
[0181] According to the phase difference between the primary and secondary side switches, the first switch is controlled to be turned off, the second switch is turned on, the third switch is turned on, the fourth switch is turned off, the seventh switch is turned off, and the eighth switch is turned off in a second time period, so that the second switch, the third switch, the transformer, the resonant circuit, the sixth switch, the seventh switch, and the output capacitor form a first charging loop, wherein the first charging loop is used to charge the output capacitor through the energy storage element to boost the output bus voltage at both ends of the output capacitor, and the second time period is after the first time period in terms of timing.
[0182] In one embodiment, when the computer program is executed by a processor, the following steps are specifically implemented:
[0183] According to the phase difference between the primary and secondary switches, in a third time period, the first switch is turned on, the second switch is turned off, the third switch is turned off, the fourth switch is turned on, the seventh switch is turned on, and the eighth switch is turned off, so that the first switch, the fourth switch, the transformer, the resonant circuit, the fifth switch, and the seventh switch form a second energy storage circuit, and the second energy storage circuit is used to charge the energy storage element;
[0184] According to the phase difference between the primary and secondary side switches, the first switch is controlled to be turned on, the second switch is turned off, the third switch is turned off, the fourth switch is turned on, the seventh switch is turned off, and the eighth switch is turned off in a fourth time period, so that the first switch, the fourth switch, the transformer, the resonant circuit, the fifth switch, the eighth switch, and the output capacitor form a second charging loop, and the second charging loop is used to charge the output capacitor through the energy storage element to boost the output bus voltage at both ends of the output capacitor. The third time period is after the second time period in timing, and the fourth time period is after the third time period in timing.
[0185] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0186] The switch tube included in the inverter circuit is controlled to be turned off so that the switch tube included in the inverter circuit forms a rectifier circuit.
[0187] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0188] When the grid voltage is detected to pass through a zero point, the AC side relay included in the inverter circuit is controlled to close, and the switch tube included in the primary full-bridge circuit and the switch tube included in the secondary full-bridge circuit are controlled to a normal switching state.
[0189] A person of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment method can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile memory and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, an artificial intelligence (AI) processor, etc., but are not limited to this.
[0190] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this application.
[0191] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.
Claims
1. A grid-connected control method for a voltage conversion circuit, characterized in that: The voltage conversion circuit includes an open-loop LLC circuit, and the open-loop LLC circuit includes a primary full-bridge circuit, a transformer, a resonant circuit, a secondary full-bridge circuit, and an output capacitor connected in sequence. The method includes: During the process of the voltage conversion circuit being connected to the power grid, detecting whether the output bus voltage of the voltage conversion circuit is less than the peak voltage of the power grid; When the output bus voltage is less than the peak voltage, the switch tube included in the primary full-bridge circuit and the switch tube included in the secondary full-bridge circuit are controlled to a preset switching state, so that the primary full-bridge circuit, the transformer, the resonant circuit, the secondary full-bridge circuit and the output capacitor form a boost circuit, and the boost circuit is used to boost the output bus voltage to be equal to the peak voltage.
2. The method according to claim 1, characterized in that The controlling the switch tube included in the primary full-bridge circuit and the switch tube included in the secondary full-bridge circuit to a preset switch state includes: Determine the phase difference of the primary and secondary switch tubes according to the peak voltage and the output bus voltage; According to the phase difference between the primary and secondary side switches, the switch tube included in the primary side full bridge circuit and the switch tube included in the secondary side full bridge circuit are controlled to the preset switch state.
3. The method according to claim 2, characterized in that The determining the phase difference between the primary and secondary switches according to the peak voltage and the output bus voltage includes: The output bus voltage is regulated by using a PI regulation algorithm to obtain the primary-secondary switch phase difference, wherein the reference voltage in the PI regulation algorithm is configured as the peak voltage.
4. The method according to claim 2, characterized in that: The primary full-bridge circuit includes a first switch tube, a second switch tube, a third switch tube and a fourth switch tube, and the secondary full-bridge circuit includes a fifth switch tube, a sixth switch tube, a seventh switch tube and an eighth switch tube. According to the phase difference between the primary and secondary switch tubes, controlling the switch tubes included in the primary full-bridge circuit and the switch tubes included in the secondary full-bridge circuit to the preset switch state includes: Controlling the fifth switch tube and the sixth switch tube to turn off; According to the phase difference between the primary and secondary side switches, the first switch tube, the second switch tube, the third switch tube, the fourth switch tube, the seventh switch tube and the eighth switch tube are controlled to the preset switch state.
5. The method according to claim 4, characterized in that The controlling the first switch tube, the second switch tube, the third switch tube, the fourth switch tube, the seventh switch tube, and the eighth switch tube to the preset switch state according to the phase difference between the primary and secondary switches includes: According to the phase difference between the primary and secondary switches, in a first time period, the first switch is turned off, the second switch is turned on, the third switch is turned on, the fourth switch is turned off, the seventh switch is turned off, and the eighth switch is turned on, so that the second switch, the third switch, the transformer, the resonant circuit, the sixth switch, and the eighth switch form a first energy storage circuit, and the first energy storage circuit is used to charge the energy storage element included in the resonant circuit; According to the phase difference between the primary and secondary side switches, the first switch is controlled to be turned off, the second switch is turned on, the third switch is turned on, the fourth switch is turned off, the seventh switch is turned off, and the eighth switch is turned off in a second time period, so that the second switch, the third switch, the transformer, the resonant circuit, the sixth switch, the seventh switch, and the output capacitor form a first charging loop, wherein the first charging loop is used to charge the output capacitor through the energy storage element to boost the output bus voltage at both ends of the output capacitor, and the second time period is after the first time period in terms of timing.
6. The method according to claim 5, characterized in that The controlling the first switch tube, the second switch tube, the third switch tube, the fourth switch tube, the seventh switch tube and the eighth switch tube to the preset switch state according to the phase difference between the primary and secondary switches also includes: According to the phase difference between the primary and secondary switches, in a third time period, the first switch is turned on, the second switch is turned off, the third switch is turned off, the fourth switch is turned on, the seventh switch is turned on, and the eighth switch is turned off, so that the first switch, the fourth switch, the transformer, the resonant circuit, the fifth switch, and the seventh switch form a second energy storage circuit, and the second energy storage circuit is used to charge the energy storage element; According to the phase difference between the primary and secondary side switches, the first switch is controlled to be turned on, the second switch is turned off, the third switch is turned off, the fourth switch is turned on, the seventh switch is turned off, and the eighth switch is turned off in a fourth time period, so that the first switch, the fourth switch, the transformer, the resonant circuit, the fifth switch, the eighth switch, and the output capacitor form a second charging loop, and the second charging loop is used to charge the output capacitor through the energy storage element to boost the output bus voltage at both ends of the output capacitor. The third time period is after the second time period in timing, and the fourth time period is after the third time period in timing.
7. The method according to any one of claims 1 to 6, characterized in that: The voltage conversion circuit further includes an inverter circuit, and the inverter circuit is connected between the open-loop LLC circuit and the power grid. After the switch tube included in the primary full-bridge circuit and the switch tube included in the secondary full-bridge circuit are controlled to a preset switch state, the method further includes: The switch tube included in the inverter circuit is controlled to be turned off so that the switch tube included in the inverter circuit forms a rectifier circuit.
8. The method according to claim 7, characterized in that The method further comprises: When the grid voltage is detected to pass through a zero point, the AC side relay included in the inverter circuit is controlled to close, and the switch tube included in the primary full-bridge circuit and the switch tube included in the secondary full-bridge circuit are controlled to a normal switching state.
9. A grid-connected control device for a voltage conversion circuit, characterized in that: The voltage conversion circuit includes an open-loop LLC circuit, and the open-loop LLC circuit includes a primary full-bridge circuit, a transformer, a resonant circuit, a secondary full-bridge circuit, and an output capacitor connected in sequence. The device includes: A detection module, used for detecting whether the output bus voltage of the voltage conversion circuit is less than the peak voltage of the power grid during the process of the voltage conversion circuit being connected to the power grid; A control module is used to control the switch tube included in the primary full-bridge circuit and the switch tube included in the secondary full-bridge circuit to a preset switching state when the output bus voltage is less than the peak voltage, so that the primary full-bridge circuit, the transformer, the resonant circuit, the secondary full-bridge circuit and the output capacitor form a boost circuit, and the boost circuit is used to boost the output bus voltage to be equal to the peak voltage.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 8 are implemented.
Citation Information
Patent Citations
Grid-connected startup method for photovoltaic grid-connected inverter
CN102891503A
Inverter and adjusting method for direct current bus voltage of inverter
CN104426402A
High-efficiency high-frequency isolated bidirectional DC / DC converter and modulation method thereof
CN109560711A
High-frequency isolation bidirectional direct-current converter based on phase-shifted full bridge and grid-connected energy storage system
CN110957923A
Inverter power supply and open-loop DC boosting and closed-loop AC output control method thereof
CN114094863A
Cited By
Charging method and device for battery in energy storage system and storage medium
CN120749968A
Battery charging method and device in energy storage system and storage medium
CN120749968B
Grid connection control method and apparatus for voltage conversion circuit, and storage medium
EP4783445A1
Grid connection control method and apparatus for voltage conversion circuit, and storage medium
WO2026091711A1