Environment-friendly low-energy-consumption sand making production line and control method thereof

By sorting the raw materials in size and determining the precise crushing object, the crushing process of the machined sand production line is optimized, and the problems of long-term high load and unsatisfactory crushing are solved, thus achieving low energy consumption and high-efficiency sand making Production.

CN119076164AInactive Publication Date: 2024-12-06湖北品啸建材有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411039762.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-12-06
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the crushing process, the existing machine sand production line causes the jaw crusher to be in a high load state for a long time, resulting in serious energy loss and high equipment failure rate, and unsatisfactory crushing effect and efficiency, and high rework rate.

Method used

By sorting the size of the raw materials delivered to the silo, a pile of raw materials of different volumes is obtained, and the crushing object and crushing parameters are determined based on the difference between the initial finished sand prediction and the production order demand, and the jaw crusher and backlash are optimized. The working method of the crusher achieves accurate crushing and uniform transportation.

Benefits of technology

It reduces energy loss during crushing, reduces equipment wear and unnecessary energy consumption, improves crushing efficiency and the quality of finished sand, extends the service life of the equipment, reduces production costs, and reduces rework rate and downtime.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119076164A_ABST
    Figure CN119076164A_ABST
Patent Text Reader

Abstract

The invention relates to an environment-friendly low-energy-consumption sand making production line and a control method thereof. The method comprises the steps that raw materials conveyed to a stock bin are classified according to the size; judging whether the initial finished product sand predicted quantity of the third raw material pile meets the demand quantity of the current production order or not; if yes, controlling a first conveying device to convey the third raw material pile to a counter-impact crusher for crushing; and if not, determining a current crushing object of the jaw crusher from the first raw material pile and the second raw material pile based on a difference value between the initial finished product sand predicted quantity of the third raw material pile and the demand quantity of the current production order, and controlling the jaw crusher to execute crushing parameters corresponding to the current crushing object, the third raw material pile and crushed materials discharged from a discharge port of the jaw crusher are conveyed to a counter-impact crusher through a first conveying device to be crushed; and conveying the crushed material crushed by the counter-impact crusher to a subsequent processing procedure to obtain finished sand. And the working energy efficiency of the sand making production line is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of energy-saving production control technology, and in particular to an environmentally friendly low-energy consumption sand making production line and a control method thereof. Background Art

[0002] Since the amount of aggregate used in construction is quite huge, the use and promotion of artificial sand has been greatly promoted, and the artificial sand production line has also developed rapidly.

[0003] However, at present, the machine-made sand production line usually transports the materials directly to the feeder by truck after mining to feed the jaw crusher for primary crushing. After the primary crushing, the crushed materials are transported to the next crusher by the next conveyor belt for secondary crushing, and the crushed materials after the secondary crushing are screened to transport the crushed materials that meet the size standard of the next processing step for processing, and those that do not meet the standard are transported back to the jaw crusher by the conveyor belt for primary crushing.

[0004] After analysis, it was found that during the crushing work, different sizes of stones are directly transported to the jaw crusher for crushing. In order to ensure stable production, the jaw crusher usually has to operate under high load to better meet the stone crushing needs, resulting in serious energy loss and high equipment failure rate. At the same time, during the stone crushing process, since the jaw crusher needs to process stones with large differences in size at the same time, its working parameters cannot be adjusted accurately and targetedly, which can easily result in unsatisfactory stone crushing effect and efficiency, resulting in a high rework rate, which further aggravates the energy loss problem. Summary of the invention

[0005] In order to solve the above technical problems, the present application provides an environmentally friendly, low-energy consumption sand making production line and a control method thereof.

[0006] In the first aspect, the above-mentioned invention objective of the present application is achieved through the following technical solutions:

[0007] A control method for an environmentally friendly and low-energy consumption sand production line is applied to the sand production line. The sand production line comprises a silo, a jaw crusher, a first conveying device and a back-impact crusher. The silo is located at the input end of the first conveying device, the back-impact crusher is located at the output end of the first conveying device, and the discharge port of the crusher is located above the conveying section between the input end and the output end of the first conveying device. The control method comprises the following steps:

[0008] The raw materials transported to the silo are classified by size to obtain a first raw material pile, a second raw material pile and a third raw material pile; wherein the first raw material pile and the second raw material pile are crushing objects corresponding to the jaw crusher, the third raw material pile is a crushing object corresponding to the reverse impact crusher, the volume of each raw material in the first raw material pile is larger than the volume of each raw material in the second raw material pile, and the volume of each raw material in the second raw material pile is larger than the volume of each raw material in the third raw material pile;

[0009] Determining whether the initial predicted quantity of finished sand of the third raw material pile meets the demand of the current production order;

[0010] If so, controlling the first conveying device to convey the third raw material pile to the reverse impact crusher for crushing;

[0011] If not, based on the difference between the initial predicted amount of finished sand of the third raw material pile and the demand of the current production order, determine the current crushing object of the jaw crusher from the first raw material pile and the second raw material pile, control the jaw crusher to execute the crushing parameters corresponding to the current crushing object, and convey the third raw material pile and the crushed materials discharged from the discharge port of the jaw crusher to the counter-impact crusher for crushing through the first conveying device;

[0012] The crushed materials after being crushed by the reverse impact crusher are transported to a subsequent processing step to obtain finished sand.

[0013] In a preferred example, the present application may be further configured as follows: the third raw material pile and the crushed materials discharged from the discharge port of the jaw crusher are conveyed to the counter-impact crusher for crushing by the first conveying device, including:

[0014] Obtaining the current feed amount of the jaw crusher;

[0015] Based on the current feed amount, predicting the discharge amount of the jaw crusher to obtain a predicted discharge amount;

[0016] Based on the predicted discharge amount, determining the current value of the first conveying device when it is working, to obtain a predicted current value;

[0017] determining a next conveying speed of the first conveying device based on the predicted current value;

[0018] Determining a target flow direction of crushed material discharged by the jaw crusher according to the predicted current value, the next conveying speed of the first conveying device, and the current working parameters of the counter-impact crusher; wherein the target flow direction includes a first flow direction and a second flow direction, and the first flow direction is opposite to the second flow direction;

[0019] When the target flow direction is the first flow direction, the crushed materials discharged from the jaw crusher are returned to the third raw material pile in the silo through a reflux device;

[0020] When the target flow direction is the second flow direction, the crushed materials discharged from the jaw crusher are transported to the counter-impact crusher through the first conveying device.

[0021] In a preferred example, the present application can be further configured to: determine the target flow direction of the crushed material discharged by the jaw crusher according to the predicted current value, the next conveying speed of the first conveying device and the current working parameters of the back-impact crusher, including:

[0022] Determining whether at least one of the predicted current value, the next conveying speed of the first conveying device, and the current operating parameter of the counter-impact crusher satisfies a preset condition;

[0023] If the condition is satisfied, the target flow direction of the crushed materials discharged by the jaw crusher is determined to be the first flow direction;

[0024] If not satisfied, the target flow direction of the crushed material discharged from the jaw crusher is determined to be the second flow direction.

[0025] In a preferred example, the present application can be further configured as follows: the preset conditions include:

[0026] When the next conveying speed is less than the minimum preset value;

[0027] The predicted current value is greater than the preset target value;

[0028] The working parameters of the anti-impact crushing have reached the maximum preset values.

[0029] In a preferred example, the present application can be further configured to: classify the raw materials delivered to the silo by size according to the working parameters of the jaw crusher and the back-impact crusher, including:

[0030] Determining a crushing range of the jaw crusher based on the working parameters of the jaw crusher;

[0031] The crushing range of the jaw crusher is divided into a first volume range and a second volume range according to a preset rule; wherein the volume of each crushed object in the first volume range is greater than the volume of each crushed object in the second volume range;

[0032] Determine a third volume range according to the working parameters of the counter-impact crusher and the size of the discharge port of the jaw crusher; wherein the volume of each crushed object within the third volume range is smaller than the volume of each crushed object within the second volume range;

[0033] The raw materials delivered to the silo are classified by size according to the first volume range, the second volume range and the third volume range to obtain a first raw material pile corresponding to the first volume range, a second raw material pile corresponding to the second volume range and a third raw material pile corresponding to the third volume range.

[0034] In a preferred example, the present application may be further configured as follows: based on the difference between the initial predicted amount of finished sand of the third raw material pile and the required amount of the current production order, determining the current crushing object of the jaw crusher from the first raw material pile and the second raw material pile, including:

[0035] Get the required quantity of the current production order;

[0036] Respectively obtaining the predicted initial finished sand quantities corresponding to the first raw material pile, the second raw material pile, and the third raw material pile;

[0037] Obtaining the difference according to the predicted initial quantity of finished sand of the third raw material pile and the required quantity of the current production order;

[0038] Compensating the difference to obtain a compensation value; wherein the compensation value is greater than the difference;

[0039] The compensation value is matched with the initial finished sand prediction of the first raw material pile and / or the second raw material pile respectively, and the current crushing object of the jaw crusher is determined based on the matching result.

[0040] In a preferred example, the present application can be further configured to: respectively obtain the initial predicted amount of finished sand corresponding to the first raw material pile, the second raw material pile, and the third raw material pile, including:

[0041] acquiring images of the first raw material pile, the second raw material pile, and the third raw material pile;

[0042] Preprocessing the image and performing feature extraction to obtain target features; wherein the target features include the shape, volume and stacking density features of the raw material pile in the image;

[0043] The target features of the first raw material pile, the second raw material pile and the third raw material pile are respectively input into the pre-trained prediction model to obtain the corresponding initial predicted amount of finished sand.

[0044] In a preferred example, the present application can be further configured to: match the compensation value with the initial finished sand prediction of the first raw material pile and / or the second raw material pile respectively, and determine the current crushing object of the jaw crusher based on the matching result, including:

[0045] Determine whether at least one of the predicted initial finished sand quantities corresponding to the first raw material pile and the second raw material pile is greater than the compensation value;

[0046] If yes, the current crushing object of the jaw crusher is determined according to the number of the initial predicted amount of finished sand greater than the compensation value; wherein, when the number is 1, the raw material pile corresponding to the initial predicted amount of finished sand greater than the compensation value is determined as the current crushing object of the jaw crusher; when the number is 2, the second raw material pile is determined as the current crushing object of the jaw crusher;

[0047] If not, the current crushing object of the jaw crusher is determined according to the predicted initial finished sand quantity corresponding to the first raw material pile and the second raw material pile and the preset threshold; wherein the preset threshold is less than the compensation value, and the preset threshold is the time that the jaw crusher runs under the current working parameters is greater than the preset standard time.

[0048] In a preferred example, the present application can be further configured as follows: determining the current crushing object of the jaw crusher according to the initial finished sand prediction amount corresponding to the first raw material pile and the second raw material pile and a preset threshold, including:

[0049] Determine whether at least one of the predicted initial finished sand quantities corresponding to the first raw material pile and the second raw material pile is greater than the preset threshold;

[0050] If yes, the current crushing object of the jaw crusher is determined according to the number of the initial predicted amount of finished sand greater than the compensation value; wherein, when the number is 1, the raw material pile corresponding to the initial predicted amount of finished sand greater than the preset threshold is determined as the current crushing object of the jaw crusher; when the number is 2, the second raw material pile is determined as the current crushing object of the jaw crusher;

[0051] If not, the jaw crusher does not work.

[0052] In the second aspect, the above invention objective of the present application is achieved through the following technical solutions:

[0053] An environmentally friendly low-energy consumption sand production line, using the environmentally friendly low-energy consumption sand production line control method as described in any one of the above, the production line comprises:

[0054] A silo is used to store the raw materials transported to the silo so as to obtain a first raw material pile, a second raw material pile and a third raw material pile after size classification; wherein the first raw material pile and the second raw material pile are crushing objects corresponding to the jaw crusher, the third raw material pile is a crushing object corresponding to the counter-impact crusher, the volume of each raw material in the first raw material pile is greater than the volume of each raw material in the second raw material pile, and the volume of each raw material in the second raw material pile is greater than the volume of each raw material in the third raw material pile;

[0055] A jaw crusher, used for crushing the first raw material pile and the second raw material pile;

[0056] A first conveying device is used to convey the third raw material pile and the crushed materials after being crushed by the jaw crusher to the reverse impact crusher for crushing;

[0057] A back-impact crusher is used to crush the third raw material pile and the crushed materials after being crushed by the jaw crusher, so as to transport the crushed materials after being crushed by the back-impact crusher to a subsequent processing step to obtain finished sand;

[0058] Wherein, the silo is located at the input end of the first conveying device, the back-impact crusher is located at the output end of the first conveying device, and the discharge port of the crusher is located above the conveying section between the input end and the output end of the first conveying device.

[0059] In summary, the environmentally friendly, low-energy consumption sand production line and control method thereof provided in this application include at least one of the following beneficial technical effects:

[0060] 1. The present application classifies the raw materials transported to the silo by size, and classifies the raw materials into a first raw material pile and a second raw material pile corresponding to the jaw crusher, and a third raw material pile corresponding to the back-impact crusher, so as to perform corresponding transportation and crushing work according to the classified volumes. The crusher can be fed evenly during crushing, and energy loss in crushing work can be reduced. It is avoided that different raw materials with large volume differences enter the crusher at the same time, causing the jaw crusher to operate under high load for a long time. At the same time, by classifying the raw materials, it is helpful to reduce the wear of the crusher and unnecessary energy consumption.

[0061] 2. By judging whether the predicted amount of initial finished sand of the third raw material pile meets the demand of the current production order, the production method of the raw materials is determined. When the predicted amount of initial finished sand of the third raw material pile meets the demand of the current production order, the third raw material pile is directly transported to the counter-impact crusher for crushing through the first conveying device, without starting the jaw crusher, thereby optimizing the production process, reducing energy loss and improving work energy efficiency. If it is not satisfied, the current crushing object of the jaw crusher is determined from the first raw material pile and the second raw material pile, and the jaw crusher is controlled to execute the crushing parameters corresponding to the current crushing object, and the crushed materials discharged from the third raw material pile and the discharge port of the jaw crusher are transported to the counter-impact crusher for crushing through the first conveying device to realize refined production. Controlling the jaw crusher to execute the corresponding crushing parameters according to the current crushing object can ensure more accurate crushing of the raw materials and more refined parameter regulation effects, thereby greatly improving the energy efficiency of the crushing work and reducing energy loss.

[0062] 3. The crushed materials after the impact crusher are transported to the subsequent processing procedures for processing to obtain finished sand. The crushed materials are further processed through the subsequent processing procedures to effectively ensure the quality of the finished sand.

[0063] By classifying the sizes of different stones so that the corresponding conveying and crushing work can be performed according to the classified volumes, the crusher can be fed evenly during crushing, reducing energy loss in crushing work, and avoiding different raw materials with large volume differences entering the crusher at the same time, causing the jaw crusher to operate under high load for a long time. In addition, by classifying the raw materials, it helps to reduce the wear of the crusher and unnecessary energy consumption, extend the service life of the equipment, improve the crushing efficiency, and reduce production costs. At the same time, it is convenient to accurately adjust and control the working parameters of the crusher, so as to accurately control the stone crushing effect and efficiency, avoid high rework rate due to unsatisfactory discharging effect, thereby further aggravating the energy loss problem, and improve the safety of the production process, reduce downtime and the occurrence of accidents. BRIEF DESCRIPTION OF THE DRAWINGS

[0064] Figure 1 This is a flow chart of an implementation method of an environmentally friendly, low-energy sand production line control method provided in this embodiment.

[0065] Figure 2 This is a working principle diagram of an environmentally friendly, low-energy sand making production line provided in this embodiment.

[0066] Figure 3 This is another working principle diagram of an environmentally friendly, low-energy sand making production line provided in this embodiment.

[0067] Figure numbers: 1. silo, 2. feeder, 3. jaw crusher, 4. first conveying device, 5. counter-impact crusher, 6. return material device, 7. second conveying device, 8. vibrating screen, 9. return material conveying device, 10. third conveying device, 11. sand making machine. DETAILED DESCRIPTION

[0068] The present application is further described in detail below in conjunction with the accompanying drawings.

[0069] In one embodiment, if Figure 1-3 As shown, an environmentally friendly low-energy consumption sand production line control method is applied to the sand production line, the sand production line includes a silo 1, a jaw crusher 3, a first conveying device 4 and a back-impact crusher 5, the silo 1 is located at the input end of the first conveying device 4, the back-impact crusher 5 is located at the output end of the first conveying device 4, and the discharge port of the crusher is located above the conveying section between the input end and the output end of the first conveying device 4. The control method includes the following steps:

[0070] S10, classifying the raw materials transported to the silo 1 by size to obtain a first raw material pile, a second raw material pile and a third raw material pile; wherein the first raw material pile and the second raw material pile are crushing objects corresponding to the jaw crusher 3, the third raw material pile is a crushing object corresponding to the counter-impact crusher 5, the volume of each raw material in the first raw material pile is larger than the volume of each raw material in the second raw material pile, and the volume of each raw material in the second raw material pile is larger than the volume of each raw material in the third raw material pile;

[0071] It should be noted that, in the prior art, after the stone is mined, it is directly transported to the feeder 2 to feed the jaw crusher 3 so that the jaw crusher 3 can crush the stone. However, since the stones after mining often have different sizes, the jaw crusher 3 usually has to operate under a high load state to better meet the stone crushing demand. At the same time, during the stone crushing process, since the jaw crusher 3 needs to process stones with large differences in size at the same time, it is easy to be unable to accurately control the stone crushing effect and efficiency, resulting in unsatisfactory discharging effect, serious rework rate, and aggravated equipment loss problem. In the present embodiment, the raw materials transported to the silo 1 are classified by size to obtain a first raw material pile, a second raw material pile and a third raw material pile; wherein, the first raw material pile and the second raw material pile are the crushing objects corresponding to the jaw crusher 3, and the third raw material pile is the crushing object corresponding to the back-impact crusher 5. The volume of each raw material in the first raw material pile is larger than the volume of each raw material in the second raw material pile, and the volume of each raw material in the second raw material pile is larger than the volume of each raw material in the third raw material pile. After classification, the above-mentioned problem can be effectively solved, and accurate transportation and processing of stone can be achieved, so that the working parameters of each equipment can be accurately controlled according to the volume of the stone currently transported and processed, so as to meet the best processing effect of the current stone and improve the discharging effect and efficiency.

[0072] Among them, by classifying and processing the volume sizes of different stones, so as to perform corresponding conveying and crushing work according to the classified volumes, the crusher can be fed evenly during crushing, reducing energy loss in crushing work, and avoiding different raw materials with large volume differences from entering the crusher at the same time, causing the jaw crusher 3 to operate in a high-load state for a long time. In addition, by classifying the raw materials, it helps to reduce the wear and tear of the crusher and unnecessary energy consumption, extend the service life of the equipment, improve the crushing efficiency, and reduce production costs. At the same time, after classification, it is convenient to accurately adjust and control the working parameters of the crusher, so as to accurately control the stone crushing effect and efficiency, avoid the situation where the discharging effect is not ideal and the rework rate is high, thereby further aggravating energy loss. In addition, after classification, it can effectively avoid and control the large pieces of stone that often appear in the crushing work of stones with large volume differences for a long time, which may get stuck in the crusher or cause equipment failure, thereby improving the safety of the production process and reducing downtime and the occurrence of accidents.

[0073] As needed, also include:

[0074] The silo 1 is provided with a first atomizing spray device corresponding to the first raw material pile, a second atomizing spray device corresponding to the second raw material pile, and a third atomizing spray device corresponding to the third raw material pile;

[0075] According to the changes of the first raw material pile, the second raw material pile and the third raw material pile, the corresponding atomizing spray device is controlled to execute the corresponding working mode; wherein the working mode includes a first spray mode and a second spray mode, the spray amount of the first spray mode is configured to decrease with the increase of time, the spray amount of the second spray mode is configured to increase with the increase of time, and the initial spray amount of the first spray mode is less than the initial spray amount of the second spray mode;

[0076] When the working mode is the first spray mode, the raw material pile corresponding to the atomizing spray device remains unchanged (that is, the number of the raw material pile does not increase or decrease, the raw material pile remains stationary, and the dust concentration gradually decreases);

[0077] When the working mode is the second spray mode, the raw material pile corresponding to the atomizing spray device changes (that is, the number of raw material piles is gradually increasing or decreasing, at which time the raw material pile maintains a dynamic state and the dust concentration gradually increases).

[0078] By setting up the corresponding atomizing spray device, the degree of dust pollution to the environment can be effectively reduced at the source, and through the atomizing dispersion effect, the dust control and dust reduction effects can be greatly achieved, and the raw material pile can be prevented from being too wet or too dry, which is not conducive to subsequent processing and avoids serious dust pollution in the subsequent processing process.

[0079] In a preferred example, the present application can be further configured to: classify the raw materials delivered to the silo 1 by size according to the working parameters of the jaw crusher 3 and the back impact crusher 5, including:

[0080] S110, determining a crushing range of the jaw crusher 3 based on the working parameters of the jaw crusher 3;

[0081] S120, dividing the crushing range of the jaw crusher 3 into a first volume range and a second volume range; wherein the volume of each crushed object in the first volume range is greater than the volume of each crushed object in the second volume range;

[0082] S130, determining a third volume range according to the working parameters of the counter-impact crusher 5 and the size of the discharge port of the jaw crusher 3; wherein the volume of each crushed object within the third volume range is smaller than the volume of each crushed object within the second volume range;

[0083] S140. Classify the raw materials delivered to the silo 1 by size according to the first volume range, the second volume range, and the third volume range to obtain a first raw material pile corresponding to the first volume range, a second raw material pile corresponding to the second volume range, and a third raw material pile corresponding to the third volume range.

[0084] As needed, the raw materials delivered to the silo 1 are classified by screening equipment; wherein the screening range of the screening equipment is set accordingly according to the first volume range, the second volume range and the third volume range to obtain a first raw material pile corresponding to the first volume range, a second raw material pile corresponding to the second volume range and a third raw material pile corresponding to the third volume range.

[0085] S20, determining whether the initial predicted quantity of finished sand in the third raw material pile meets the demand of the current production order;

[0086] S30: If yes, control the first conveying device 4 to convey the third raw material pile to the reverse impact crusher 5 for crushing;

[0087] S40, if not, based on the difference between the initial predicted amount of finished sand of the third raw material pile and the demand of the current production order, determine the current crushing object of the jaw crusher 3 from the first raw material pile and the second raw material pile, control the jaw crusher 3 to execute the crushing parameters corresponding to the current crushing object, and convey the third raw material pile and the crushed materials discharged from the discharge port of the jaw crusher 3 to the counter-impact crusher 5 for crushing through the first conveying device 4;

[0088] In a preferred example, the present application can be further configured as follows: based on the difference between the initial predicted amount of finished sand of the third raw material pile and the required amount of the current production order, determining the current crushing object of the jaw crusher 3 from the first raw material pile and the second raw material pile, including:

[0089] S41, respectively obtaining the predicted amount of initial finished sand corresponding to the first raw material pile, the second raw material pile and the third raw material pile;

[0090] In a preferred example, the present application can be further configured to: respectively obtain the initial predicted amount of finished sand corresponding to the first raw material pile, the second raw material pile, and the third raw material pile, including:

[0091] S411, acquiring images of the first raw material pile, the second raw material pile, and the third raw material pile;

[0092] In this embodiment, a camera or a drone may be used to collect images of the first raw material pile, the second raw material pile, and the third raw material pile to facilitate subsequent prediction processing.

[0093] S412, preprocessing the image and performing feature extraction to obtain target features; wherein the target features include shape features, volume features and stacking density features of the raw material pile in the image;

[0094] In this embodiment, the accuracy and efficiency can be further predicted by preprocessing the image, and the preprocessing includes graying, denoising, edge detection and other operations. The shape features, volume features and stacking density features of the raw material pile are extracted to obtain the target features and improve the prediction accuracy.

[0095] Among them, S412-1, raw material pile shape feature extraction includes the following steps:

[0096] S412-11, using the Canny edge detection algorithm to detect the edge of the stone pile from the image;

[0097]

[0098] In the formula, E(x, y) represents the edge image, G(x, y) represents the gradient amplitude, and T high and T low Indicates high and low thresholds;

[0099] S412-12, use a contour detection algorithm (such as the findContours function in OpenCV) to extract the contour of the stone pile;

[0100]

[0101] In the formula, A represents the contour area, n represents the number of contour points, (x i y i ) represents the coordinates of contour points;

[0102] S412-13. Calculate geometric features of shapes, including area, perimeter, and convex hull;

[0103]

[0104] Where P represents the contour area and n represents the number of contour points.

[0105] S412-2, raw material pile volume feature extraction includes the following steps:

[0106] S412-21, using a depth camera to obtain depth information of the stone pile, or obtaining depth information by multi-view image reconstruction;

[0107] S412-22, calculating the volume of the stone pile according to the depth information;

[0108]

[0109] In the formula, V represents the volume of the raw material pile, N represents the number of voxels, and ΔV i The volume of the i-th voxel.

[0110] Wherein, using the depth camera to obtain the depth information of the raw material pile in step S412-21 includes the following steps:

[0111] Use a depth camera (such as Microsoft Kinect or Intel RealSense) to capture a depth image of the raw material pile;

[0112] Perform pre-processing operations such as filtering and noise reduction on the depth image to improve the accuracy of the depth data;

[0113] The depth image is converted into a three-dimensional point cloud to obtain the three-dimensional shape of the raw material pile; wherein the depth image is converted into a three-dimensional point cloud including:

[0114]

[0115] Where (X, Y, Z) represents the coordinates of the three-dimensional point, (u, v) represents the pixel coordinates on the depth image, and d(u, v) represents the depth value at the pixel (u, v); (c x , c y ) represents the coordinates of the camera optical center, f x , f y Indicates the focal length of the camera.

[0116] Wherein, obtaining depth information through multi-view image reconstruction in step S412-21 includes the following steps:

[0117] Use camera equipment to capture images of the rock pile from multiple angles.

[0118] Register multi-view images and find corresponding image feature points.

[0119] Use parallax or structured light methods to estimate depth information and reconstruct 3D shapes.

[0120]

[0121] d represents the depth value, f represents the focal length of the camera, B represents the baseline distance (the distance between the two cameras), x l , x r Indicates the horizontal coordinates of corresponding points in the left and right views;

[0122] The estimated depth information is converted into a three-dimensional point cloud to obtain a three-dimensional shape of the stone pile; wherein the estimated depth information is converted into a three-dimensional point cloud including:

[0123]

[0124] In the formula, (X, Y, Z) represents the coordinates of the three-dimensional point, (u, v) represents the image coordinates, and d represents the depth value; (c x , c y) represents the coordinates of the camera optical center, f x , f y Indicates the focal length of the camera.

[0125] S412-3, raw material pile density feature extraction includes the following steps:

[0126] The weight of each raw material pile (the first raw material pile, the second raw material pile and the third raw material pile) is measured by a weighing device; specifically, a weighing device such as a floor scale can be set at the location where the raw material piles are stored or stacked to obtain the weight data of each raw material pile;

[0127] Calculating the corresponding stacking density of the raw material pile according to the volume and weight of the raw material pile;

[0128]

[0129] Wherein, ρ represents the bulk density, W represents the weight of the raw material pile, and V represents the volume of the raw material pile.

[0130] S413, respectively inputting the target features of the first raw material pile, the second raw material pile and the third raw material pile into the pre-trained prediction model to obtain the corresponding initial predicted amount of finished sand.

[0131] In this embodiment, the pre-trained model is constructed by using a regression model (such as linear regression, random forest regression) or a neural network model (such as LSTM, GRU), and the constructed model is trained using labeled data, and parameters are adjusted to improve model accuracy, thereby obtaining a pre-trained prediction model. Through this prediction model, it is possible to accurately predict the amount of finished sand in the first raw material pile, the second raw material pile, and the third raw material pile.

[0132] S42, obtaining the difference according to the predicted amount of the initial finished sand of the third raw material pile and the required amount of the current production order;

[0133] S43, compensating the difference to obtain a compensation value; wherein the compensation value is greater than the difference;

[0134] It should be noted that since the difference is calculated based on the predicted initial amount of finished sand in the third raw material pile and the required amount of the current production order, in order to avoid unexpected situations during the production process, the difference is compensated to ensure stable production to meet the required amount of the current production order.

[0135] S44, matching the compensation value with the initial finished sand prediction of the first raw material pile and / or the second raw material pile, and determining the current crushing object of the jaw crusher 3 based on the matching result. Specifically, the steps include:

[0136] S441, determining whether at least one of the predicted initial finished sand quantities corresponding to the first raw material pile and the second raw material pile is greater than the compensation value;

[0137] S442, if yes, determine the current crushing object of the jaw crusher 3 according to the number of the initial finished sand predicted quantity greater than the compensation value; wherein, when the number is 1, the raw material pile corresponding to the initial finished sand predicted quantity greater than the compensation value is determined as the current crushing object of the jaw crusher 3; when the number is 2, the second raw material pile is determined as the current crushing object of the jaw crusher 3;

[0138] S443. If not, determine the current crushing object of the jaw crusher 3 based on the predicted initial finished sand quantity corresponding to the first raw material pile and the second raw material pile and the preset threshold; wherein the preset threshold is less than the compensation value, and the preset threshold is the time that the jaw crusher 3 runs under the current working parameters is greater than the preset standard time.

[0139] It should be noted that, by judging whether there is at least one predicted amount of initial finished sand corresponding to the first raw material pile and the second raw material pile that is greater than the compensation value, it is possible to accurately ensure that the amount of sand produced meets the order quantity and avoid inventory accumulation. At the same time, it is possible to minimize the number of types of raw material piles to ensure that the same type and size of raw materials are used to meet the needs of current production orders, reduce the frequency of changes in equipment working parameters, and extend the service life of equipment.

[0140] In a preferred example, the present application can be further configured as follows: according to the initial finished sand prediction amount corresponding to the first raw material pile and the second raw material pile and the preset threshold, determining the current crushing object of the jaw crusher 3 includes:

[0141] S443-1, determining whether at least one of the predicted initial finished sand quantities corresponding to the first raw material pile and the second raw material pile is greater than the preset threshold;

[0142] S443-2, if yes, determine the current crushing object of the jaw crusher 3 according to the number of the initial finished sand prediction quantity greater than the compensation value; wherein, when the number is 1, the raw material pile corresponding to the initial finished sand prediction quantity greater than the preset threshold is determined as the current crushing object of the jaw crusher 3; when the number is 2, the second raw material pile is determined as the current crushing object of the jaw crusher 3;

[0143] S443-3: If not, the jaw crusher 3 does not work.

[0144] It should be noted that, by judging whether there is at least one predicted amount of initial finished sand corresponding to the first raw material pile and the second raw material pile that is greater than a preset threshold, it can accurately ensure that the amount of sand produced meets the order quantity. If it is greater than the preset threshold, it means that the time taken by the jaw crusher 3 to process the current raw material under the current working parameters reaches the preset standard time, thereby avoiding the working time of the jaw crusher 3 not reaching the preset standard time, reducing the frequency of changes in the working parameters of the equipment, and extending the service life of the equipment.

[0145] After determining the current crushing object of the jaw crusher 3, the determined current crushing object of the jaw crusher 3 is transported to the jaw crusher 3 through the feeder 2 for crushing, and the jaw crusher 3 is controlled to execute the crushing parameters corresponding to the current crushing object, thereby realizing refined production and crushing of raw materials and improving sand making effect and energy efficiency.

[0146] Wherein, controlling the jaw crusher 3 to execute the crushing parameters corresponding to the current crushing object includes:

[0147] Determining the opening size of the jaw crusher 3 based on the volume range corresponding to the current crushing object of the jaw crusher 3;

[0148] Based on the opening size, determining the distance between the movable jaw plate and the fixed jaw plate of the jaw crusher 3;

[0149] It should be noted that the opening size is determined based on the maximum size within the volume range corresponding to the current crushing object, so as to facilitate the crushing of the raw materials; specifically, it can be the maximum size within the volume range corresponding to the current crushing object, or calculated based on the maximum size and the compensation coefficient, wherein the compensation coefficient ranges from 1 to 1.5.

[0150] According to the distance between the movable jaw plate and the fixed jaw plate of the jaw crusher 3 and the size of the discharge port of the jaw crusher 3, the eccentric shaft speed of the jaw crusher 3 is determined; specifically, it includes:

[0151]

[0152] Wherein, V is the swing speed of the jaw plate (m / s), L is the distance between the movable jaw plate and the fixed jaw plate (m), and S is the size of the discharge opening (m). The size of the discharge opening of the jaw crusher 3 is set according to production needs or according to the working parameters of the impact crusher 5 to avoid material return.

[0153] The current crushing object is crushed based on the eccentric shaft rotation speed of the jaw crusher 3.

[0154] In a preferred example, the present application may be further configured as follows: the first conveying device 4 conveys the third raw material pile and the crushed materials discharged from the discharge port of the jaw crusher 3 to the counter-impact crusher 5 for crushing, including:

[0155] S45, obtaining the priority of the return material conveying device 9 and the jaw crusher 3; wherein the priority of the return material conveying device 9 is higher than the priority of the jaw crusher 3;

[0156] S46, based on the priority, according to the predicted discharge amount of the return material conveying device 9 and the jaw crusher 3, determining the target flow direction of the crushed material discharged by the jaw crusher 3;

[0157] S461. Based on the conveying speed and predicted discharge volume of the return material conveying device 9, determine the next conveying speed and predicted current value of the corresponding first conveying device 4; it should be noted that the next conveying speed and predicted current value of the corresponding first conveying device 4 are the first prediction results obtained by the conveying speed and predicted discharge volume of the first conveying device 4 corresponding to the return material conveying device 9.

[0158] S462, judging whether the conveying speed of the return material conveying device 9, the next conveying speed of the corresponding first conveying device 4 and the predicted current value all meet the preset conveying conditions; wherein the preset conveying conditions include: the conveying speed of the return material conveying device 9 is greater than the minimum conveying speed, the next conveying speed of the corresponding first conveying device 4 is within the preset interval, and the predicted current value of the corresponding first conveying device 4 is less than the preset target value;

[0159] S463, if at least one of the conditions is not satisfied, determining that the target flow direction of the crushed material discharged by the jaw crusher 3 is the first flow direction;

[0160] S463, if all conditions are met, determine the next conveying speed and predicted current value of the first conveying device 4 based on the current feed amount and crushing efficiency of the jaw crusher 3; specifically, including:

[0161] S463-1, obtaining the current feed amount of the jaw crusher 3;

[0162] Specifically, a camera is used to capture an image of the crusher feed port; the feed amount is identified and measured through an image processing algorithm (such as a convolutional neural network CNN) to obtain the current feed amount Q in ;

[0163] The method includes identifying and measuring the feed amount by an image processing algorithm (such as a convolutional neural network (CNN)), and comprising the following steps:

[0164] The camera is used to capture images of the feed port of the jaw crusher 3 in real time to obtain a continuous image data stream.

[0165] The acquired image is preprocessed, including grayscale, normalization, and resizing. Grayscale: converts color images to grayscale images. Normalization: scales pixel values ​​to the [0, 1] interval. Resizing: adjusts the image size to match the CNN model input size.

[0166] A convolutional neural network model is established; wherein, the input layer: an image of size (256\times 256); the convolution layer: multiple convolution layers extract features; the pooling layer: the maximum pooling or average pooling layer reduces the size of the feature map; the fully connected layer: maps the features to the output space; the output layer: outputs the feed amount prediction result.

[0167] The model training process uses loss function, optimizer and training data to train and obtain a trained output quantity prediction model; the loss function includes mean square error, the optimizer is Adam, and the training data includes an image data set containing feed quantity annotations;

[0168] Use the trained output prediction model to predict the real-time image and get the current feed amount Q in .

[0169] S463-2, predicting the discharge amount of the jaw crusher 3 based on the current feed amount to obtain a predicted discharge amount;

[0170] Among them, the predicted discharge volume Q is calculated based on the current feed volume and crushing efficiency out ; Specifically, including: Q out =η*Q in Where Q in represents the current feed amount obtained through image processing, and η represents the crushing efficiency.

[0171] S463-3, based on the predicted discharge amount, determining the current value of the first conveying device 4 when it is working, and obtaining the predicted current value;

[0172] Among them, based on the predicted discharge volume Q out , predict the current value of the first conveying device 4, specifically, including: I = k * Q out +I t , I t =k*Q cur +I0,Q cur =Q1+Q2; where I represents the predicted current value, k represents the coefficient of current and transmission amount, Q out Indicates the predicted discharge volume, Q cur represents the current predicted conveying volume, Q1 represents the current actual conveying volume, Q2 represents the predicted discharge volume of the return conveying device 9, and I t Indicates the current value, I0 indicates the current value when no-load;

[0173] S463-4, based on the predicted current value, determining the next conveying speed of the first conveying device 4; specifically, including: In the formula, v represents the next conveying speed of the first conveying device 4, A represents the cross-sectional area of ​​the conveyor belt, and ρ represents the material density.

[0174] It should be noted that the next conveying speed and predicted current value of the first conveying device 4 are the second prediction results obtained by the first conveying device 4 corresponding to the conveying speed and predicted discharge volume of the return conveying device 9. The steps for obtaining the first prediction results are set correspondingly to the steps for obtaining the second prediction results, and the second prediction results are obtained based on the first prediction results, which will not be repeated here.

[0175] S463-5, determining a target flow direction of the crushed material discharged by the jaw crusher 3 according to the predicted current value, the next conveying speed of the first conveying device 4, and the current working parameters of the counter-impact crusher 5; wherein the target flow direction includes a first flow direction and a second flow direction, and the first flow direction is opposite to the second flow direction;

[0176] In this embodiment, the discharge amount is predicted according to the current feed amount of the jaw crusher 3, and the working current value of the first conveying device 4 when receiving the predicted discharge amount is determined according to the predicted discharge amount, the predicted current value is obtained, and the next conveying speed of the first conveying device 4 is determined according to the predicted current value, and the current working states of the first conveying device 4 and the counter-impact crusher 5 are determined according to the predicted current value, the next conveying speed and the current working parameters of the counter-impact crusher 5, so that the target flow direction of the crushed materials discharged by the jaw crusher 3 is determined according to the current working states of the first conveying device 4 and the counter-impact crusher 5, and refined control of the crushed materials discharged by the jaw crusher 3 is achieved, so as to avoid excessive or insufficient crushed materials conveyed by the first conveying device 4 and crushed by the counter-impact crusher 5, thereby affecting the stability and processing effect of subsequent processing steps and delaying the service life of the equipment.

[0177] In a preferred example, the present application can be further configured to: determine the target flow direction of the crushed material discharged by the jaw crusher 3 according to the predicted current value, the next conveying speed of the first conveying device 4 and the current working parameters of the back-impact crusher 5, including:

[0178] S463-51, judging whether at least one of the predicted current value, the next conveying speed of the first conveying device 4, and the current working parameter of the counter-impact crusher 5 satisfies a preset condition;

[0179] In a preferred example, the present application can be further configured as follows: the preset conditions include:

[0180] The next conveying speed is less than a minimum preset value;

[0181] The predicted current value is greater than the preset target value;

[0182] The working parameters of the anti-impact crushing have reached the maximum preset values.

[0183] It should be noted that the minimum preset value is the minimum speed of the first conveying device 4. When the next conveying speed is less than the minimum preset value, it means that the next conveying speed does not match the conveying speed of the first conveying device 4. In order to avoid frequent shutdowns (such as the jaw crusher 3 or the first conveying device 4) and to ensure stable operation, it is necessary to return the crushed materials discharged by the jaw crusher 3 to the silo 1 through the return device 6, so as to ensure the stable progress of subsequent processing.

[0184] Among them, the preset target value is the maximum working current value of the first conveying device 4. When the predicted current value is greater than the preset target value, it means that the predicted current value is at the maximum working current value, that is, when the predicted discharge amount is output to the first conveying device 4, the load of the first conveying device 4 will reach the maximum value or the conveying speed will reach the maximum value. In order to avoid the equipment from operating in a serious high-load state, it is necessary to return the crushed material discharged by the jaw crusher 3 to the silo 1 through the return device 6, so as to ensure the stable progress of subsequent processing.

[0185] The working parameters of reverse impact crushing include one or more of rotor speed, crushing ratio, feed amount, feed speed and motor power. Among them, the hardness, humidity, particle size and density of the stone will affect the feed amount. The feed amount of stones with high hardness should be appropriately reduced. Stones with high humidity are easy to adhere, which affects the smooth feeding. Similarly, different crushing finenesses require corresponding rotor speeds. Higher rotor speeds can improve the crushing fineness, but will also increase equipment wear and energy consumption. Materials with high hardness require lower rotor speeds to avoid excessive wear. Softer materials can use higher rotor speeds to improve crushing efficiency. The feed amount and rotor speed need to be balanced and matched. Too much feed amount and too low rotor speed will cause the crusher to be blocked. Too little feed amount and too high rotor speed may cause energy waste and equipment idling. Appropriate feed amount and rotor speed can improve crushing efficiency and product quality. For example, when processing materials with higher hardness, appropriately reducing the feed amount and rotor speed can reduce equipment wear and energy consumption. Therefore, by setting the maximum preset value, precise control of the production line can be achieved to avoid affecting the performance of the equipment and causing excessive waste of resources. When the back-impact crushing working parameters reach the maximum preset value, the crushed materials discharged by the jaw crusher 3 are returned to the silo 1 through the return device 6, thereby effectively improving the working energy efficiency of the equipment and ensuring the stability of subsequent processing.

[0186] See also Figure 2, wherein the dotted line indicates that the crushed materials discharged by the jaw crusher 3 are not output to the first conveying device 4, but are output to the reflux device, so as to flow back to the silo 1 or the third raw material pile of the silo 1 through the reflux device; specifically: S463-52, if satisfied, determine that the target flow direction of the crushed materials discharged by the jaw crusher 3 is the first flow direction;

[0187] When the target flow direction is the first flow direction, the crushed materials discharged from the jaw crusher 3 are returned to the third raw material pile of the silo 1 through a reflux device;

[0188] It should be noted that the reflux device can be a telescopic conveyor, one end of which is arranged in the silo 1. When the target flow direction is the first flow direction, the extension end of the telescopic conveyor is controlled to extend below the discharge port of the jaw crusher 3 to return the crushed materials discharged by the jaw crusher 3 to the third raw material pile in the silo 1. At this time, the extension end is above the first conveying device 4.

[0189] The reflux device may further include a plurality of conveyors, through which the silo 1 and the discharge port of the jaw crusher 3 are connected, so that the crushed materials discharged from the jaw crusher 3 can be refluxed into the third raw material pile of the silo 1 . Specifically, the output end of the conveyor near the silo 1 is arranged in the silo 1 or above the third raw material pile, and the input end is below the output end of the adjacent conveyor, and they are arranged in this order, so that the silo 1 and the discharge port of the jaw crusher 3 are connected. The conveyor near the discharge port of the jaw crusher 3 can be a telescopic conveyor, or connected with a moving mechanism. Through the moving mechanism, when the target flow direction is the second flow direction, the conveyor near the discharge port of the jaw crusher 3 can be moved away from the discharge port of the jaw crusher 3, so that the crushed materials discharged by the jaw crusher 3 are transported to the counter-impact crusher 5 through the first conveying device 4; or when the target flow direction is the first flow direction, it is moved below the discharge port of the jaw crusher 3, so that the crushed materials discharged by the jaw crusher 3 are returned to the third raw material pile of the silo 1. Refined control of the crushed materials discharged by the jaw crusher 3 is achieved to avoid affecting the stability and processing effect of subsequent processing procedures and delaying the service life of the equipment.

[0190] See also Figure 3 , wherein the dotted line indicates that the crushed materials discharged by the jaw crusher 3 are not output to the reflux device, but are output to the first conveying device 4, so that the crushed materials discharged by the jaw crusher 3 are conveyed to the counter-impact crusher 5 through the first conveying device 4; specifically: S463-53, if not satisfied, then determine that the target flow direction of the crushed materials discharged by the jaw crusher 3 is the second flow direction.

[0191] When the target flow direction is the second flow direction, the crushed materials discharged from the jaw crusher 3 are transported to the counter-impact crusher 5 through the first conveying device 4 .

[0192] S47, when the target flow direction is the second flow direction, and the first difference between the next conveying speed of the first conveying device 4 and the minimum preset value is greater than the preset threshold, and the second difference between the predicted current value of the first conveying device 4 and the preset target value is greater than the second preset threshold, determine the minimum difference from the first difference and the second difference, and determine the amount to be conveyed of the first conveying device 4 according to the determined minimum difference;

[0193] S48, determining a feeding speed of the third raw material pile based on the amount to be transported;

[0194] S49. Based on the feeding speed of the third raw material pile, control the feeding speed of the feeder 2 of the third raw material pile, so that the feeder 2 of the third raw material pile conveys the raw materials of the third raw material pile to the first conveying device 4 according to the feeding speed.

[0195] It should be noted that the feeder 2 of the third raw material pile also includes a feeding inverter for controlling the feeding motor, and PID operation is performed on the difference. The target feeding frequency of the feeding motor is calculated according to the PID operation result and the initial feeding frequency of the feeding motor, and the target feeding frequency is sent to the feeding inverter. The feeding inverter controls the operation of the feeding motor based on the target feeding frequency to achieve the function of controlling the feeding speed of the feeding motor.

[0196] S50, conveying the crushed materials after being crushed by the back-impact crusher 5 to a subsequent processing step to obtain finished sand.

[0197] In one embodiment, the crushed material after being crushed by the back-impact crusher 5 is conveyed to a subsequent processing step, including:

[0198] The crushed material after being crushed by the counter-impact crusher 5 is conveyed to the vibrating screen 8 by the second conveying device 7;

[0199] Screening is performed on a vibrating screen 8 to obtain qualified sand-making materials and unqualified sand-making materials, wherein the particle size of the qualified sand-making materials is smaller than the particle size of the unqualified sand-making materials;

[0200] The unqualified sand-making materials are conveyed to the first conveying device 4 through the return conveying device 9, so that the first conveying device 4 can uniformly convey the broken materials to be crushed by the back-impact crusher 5; the materials to be processed can be uniformly conveyed, the production process can be optimized, the materials can be uniformly processed, and the production effect can be finely controlled.

[0201] The qualified sand making material is conveyed to the sand making machine 11 through the third conveying device 10, and the finished sand is obtained after being processed by the sand making machine 11.

[0202] In a second aspect, the present application further provides an environmentally friendly, low-energy consumption sand production line, using the environmentally friendly, low-energy consumption sand production line control method as described in any one of the above, the production line comprising:

[0203] A silo 1 is used to store the raw materials transported to the silo 1 so as to obtain a first raw material pile, a second raw material pile and a third raw material pile after size classification; wherein the first raw material pile and the second raw material pile are crushing objects corresponding to the jaw crusher 3, the third raw material pile is a crushing object corresponding to the counter-impact crusher 5, the volume of each raw material in the first raw material pile is greater than the volume of each raw material in the second raw material pile, and the volume of each raw material in the second raw material pile is greater than the volume of each raw material in the third raw material pile;

[0204] A jaw crusher 3, used for crushing the first raw material pile and the second raw material pile;

[0205] A first conveying device 4 is used to convey the third raw material pile and the crushed materials after being crushed by the jaw crusher 3 to the reverse impact crusher 5 for crushing;

[0206] The back impact crusher 5 is used to crush the third raw material pile and the crushed materials after the jaw crusher 3, so as to transport the crushed materials after the back impact crusher 5 to the subsequent processing steps to obtain finished sand;

[0207] The silo 1 is located at the input end of the first conveying device 4 , the back-impact crusher 5 is located at the output end of the first conveying device 4 , and the discharge port of the crusher is located above the conveying section between the input end and the output end of the first conveying device 4 .

[0208] For the specific definition of the system, please refer to the definition of the method above, which will not be repeated here. Each module in the above system can be implemented in whole or in part by software, hardware and a combination thereof. The above modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory in the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules.

[0209] In one embodiment, a computer device is provided, which may be a server. The computer device includes a processor, a memory, a network interface, and a database connected via a system bus. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program, and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store electromagnetic induction control data during wireless charging. The network interface of the computer device is used to communicate with an external terminal via a network connection. The computer program is executed by the processor to implement the method.

[0210] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the steps of the above-mentioned environmentally friendly and low-energy sand making production line control method are implemented.

[0211] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include non-volatile and / or volatile memory. Non-volatile memory can include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory can include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).

[0212] Those skilled in the art will clearly understand that for the sake of convenience and brevity of description, only the division of the above-mentioned functional units and modules is used as an example. In actual applications, the above-mentioned functions can be distributed and completed by different functional units and modules as needed, that is, the internal structure of the system can be divided into different functional units or modules to complete all or part of the functions described above.

[0213] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.

Claims

1. An environmentally friendly and low-energy consumption sand production line control method, characterized in that: Applied to a sand production line, the sand production line includes a silo, a jaw crusher, a first conveying device and a counter-impact crusher, the silo is located at the input end of the first conveying device, the counter-impact crusher is located at the output end of the first conveying device, and the discharge port of the crusher is located above the conveying section between the input end and the output end of the first conveying device. The control method includes the following steps: The raw materials transported to the silo are classified by size to obtain a first raw material pile, a second raw material pile and a third raw material pile; wherein the first raw material pile and the second raw material pile are crushing objects corresponding to the jaw crusher, the third raw material pile is a crushing object corresponding to the reverse impact crusher, the volume of each raw material in the first raw material pile is larger than the volume of each raw material in the second raw material pile, and the volume of each raw material in the second raw material pile is larger than the volume of each raw material in the third raw material pile; Determining whether the initial predicted quantity of finished sand of the third raw material pile meets the demand of the current production order; If so, controlling the first conveying device to convey the third raw material pile to the reverse impact crusher for crushing; If not, based on the difference between the initial predicted amount of finished sand of the third raw material pile and the demand of the current production order, determine the current crushing object of the jaw crusher from the first raw material pile and the second raw material pile, control the jaw crusher to execute the crushing parameters corresponding to the current crushing object, and convey the third raw material pile and the crushed materials discharged from the discharge port of the jaw crusher to the counter-impact crusher for crushing through the first conveying device; The crushed materials after being crushed by the reverse impact crusher are transported to a subsequent processing step to obtain finished sand.

2. The environmentally friendly and low-energy consumption sand production line control method according to claim 1 is characterized in that: The method further comprises: conveying the third raw material pile and the crushed materials discharged from the discharge port of the jaw crusher to the counter-impact crusher for crushing by the first conveying device, comprising: Obtaining the current feed amount of the jaw crusher; Based on the current feed amount, predicting the discharge amount of the jaw crusher to obtain a predicted discharge amount; Based on the predicted discharge amount, determining the current value of the first conveying device when it is working, to obtain a predicted current value; determining a next conveying speed of the first conveying device based on the predicted current value; Determining a target flow direction of crushed material discharged by the jaw crusher according to the predicted current value, the next conveying speed of the first conveying device, and the current working parameters of the counter-impact crusher; wherein the target flow direction includes a first flow direction and a second flow direction, and the first flow direction is opposite to the second flow direction; When the target flow direction is the first flow direction, the crushed materials discharged from the jaw crusher are returned to the third raw material pile in the silo through a reflux device; When the target flow direction is the second flow direction, the crushed materials discharged from the jaw crusher are transported to the counter-impact crusher through the first conveying device.

3. The control method of an environmentally friendly and low-energy sand production line according to claim 2 is characterized in that: Determining a target flow direction of crushed materials discharged from the jaw crusher according to the predicted current value, the next conveying speed of the first conveying device, and the current working parameters of the counter-impact crusher includes: Determining whether at least one of the predicted current value, the next conveying speed of the first conveying device, and the current operating parameter of the counter-impact crusher satisfies a preset condition; If the condition is satisfied, the target flow direction of the crushed materials discharged by the jaw crusher is determined to be the first flow direction; If not satisfied, the target flow direction of the crushed material discharged from the jaw crusher is determined to be the second flow direction.

4. The control method of an environmentally friendly and low-energy consumption sand production line according to claim 3 is characterized in that: The preset conditions include: When the next conveying speed is less than the minimum preset value; The predicted current value is greater than the preset target value; The working parameters of the anti-impact crushing have reached the maximum preset values.

5. The environmentally friendly and low-energy consumption sand production line control method according to claim 1 is characterized in that: The raw materials delivered to the silo are classified by size according to the working parameters of the jaw crusher and the impact crusher, including: Determining a crushing range of the jaw crusher based on the working parameters of the jaw crusher; The crushing range of the jaw crusher is divided into a first volume range and a second volume range; wherein the volume of each crushed object in the first volume range is greater than the volume of each crushed object in the second volume range; Determine a third volume range according to the working parameters of the counter-impact crusher and the size of the discharge port of the jaw crusher; wherein the volume of each crushed object within the third volume range is smaller than the volume of each crushed object within the second volume range; The raw materials delivered to the silo are classified by size according to the first volume range, the second volume range and the third volume range to obtain a first raw material pile corresponding to the first volume range, a second raw material pile corresponding to the second volume range and a third raw material pile corresponding to the third volume range.

6. The environmentally friendly and low-energy consumption sand production line control method according to claim 1 is characterized in that: Based on the difference between the initial predicted quantity of finished sand of the third raw material pile and the demand of the current production order, determining the current crushing object of the jaw crusher from the first raw material pile and the second raw material pile comprises: Respectively obtaining the predicted initial finished sand quantities corresponding to the first raw material pile, the second raw material pile, and the third raw material pile; Obtaining the difference according to the predicted initial quantity of finished sand of the third raw material pile and the required quantity of the current production order; Compensating the difference to obtain a compensation value; wherein the compensation value is greater than the difference; The compensation value is matched with the initial finished sand prediction of the first raw material pile and / or the second raw material pile respectively, and the current crushing object of the jaw crusher is determined based on the matching result.

7. The control method of an environmentally friendly and low-energy consumption sand production line according to claim 6 is characterized in that: Respectively obtaining the predicted initial finished sand quantities corresponding to the first raw material pile, the second raw material pile, and the third raw material pile, including: acquiring images of the first raw material pile, the second raw material pile, and the third raw material pile; Preprocessing the image and performing feature extraction to obtain target features; wherein the target features include the shape, volume and stacking density features of the raw material pile in the image; The target features of the first raw material pile, the second raw material pile and the third raw material pile are respectively input into the pre-trained prediction model to obtain the corresponding initial predicted amount of finished sand.

8. The environmentally friendly and low-energy consumption sand production line control method according to claim 6 is characterized in that: Matching the compensation value with the initial finished sand prediction of the first raw material pile and / or the second raw material pile respectively, and determining the current crushing object of the jaw crusher based on the matching result, comprising: Determine whether at least one of the predicted initial finished sand quantities corresponding to the first raw material pile and the second raw material pile is greater than the compensation value; If yes, the current crushing object of the jaw crusher is determined according to the number of the initial predicted amount of finished sand greater than the compensation value; wherein, when the number is 1, the raw material pile corresponding to the initial predicted amount of finished sand greater than the compensation value is determined as the current crushing object of the jaw crusher; when the number is 2, the second raw material pile is determined as the current crushing object of the jaw crusher; If not, the current crushing object of the jaw crusher is determined according to the predicted initial finished sand quantity corresponding to the first raw material pile and the second raw material pile and the preset threshold; wherein the preset threshold is less than the compensation value, and the preset threshold is the time that the jaw crusher runs under the current working parameters is greater than the preset standard time.

9. The environmentally friendly and low-energy consumption sand production line control method according to claim 8 is characterized in that: Determining a current crushing object of the jaw crusher according to the initial finished sand prediction amount corresponding to the first raw material pile and the second raw material pile and a preset threshold value, including: Determine whether at least one of the predicted initial finished sand quantities corresponding to the first raw material pile and the second raw material pile is greater than the preset threshold; If yes, the current crushing object of the jaw crusher is determined according to the number of the initial predicted amount of finished sand greater than the compensation value; wherein, when the number is 1, the raw material pile corresponding to the initial predicted amount of finished sand greater than the preset threshold is determined as the current crushing object of the jaw crusher; when the number is 2, the second raw material pile is determined as the current crushing object of the jaw crusher; If not, the jaw crusher does not work.

10. An environmentally friendly, low-energy consumption sand production line, characterized in that: Using the environmentally friendly low-energy consumption sand production line control method as described in any one of claims 1 to 9 above, the production line comprises: A silo is used to store the raw materials transported to the silo so as to obtain a first raw material pile, a second raw material pile and a third raw material pile after size classification; wherein the first raw material pile and the second raw material pile are crushing objects corresponding to the jaw crusher, the third raw material pile is a crushing object corresponding to the counter-impact crusher, the volume of each raw material in the first raw material pile is greater than the volume of each raw material in the second raw material pile, and the volume of each raw material in the second raw material pile is greater than the volume of each raw material in the third raw material pile; A jaw crusher, used for crushing the first raw material pile and the second raw material pile; A first conveying device is used to convey the third raw material pile and the crushed materials after being crushed by the jaw crusher to the reverse impact crusher for crushing; A back-impact crusher is used to crush the third raw material pile and the crushed materials after being crushed by the jaw crusher, so as to transport the crushed materials after being crushed by the back-impact crusher to a subsequent processing step to obtain finished sand; Wherein, the silo is located at the input end of the first conveying device, the back-impact crusher is located at the output end of the first conveying device, and the discharge port of the crusher is located above the conveying section between the input end and the output end of the first conveying device.