Manufacturing method of composite core pile
By performing outsourcing body forming and prestressing treatment on existing piles, the composite core piles are formed, which solves the problems of excessive mechanical properties and waste of resources, improves the load-bearing capacity and crack resistance, and ensures the stability and economicality of the building .
Patent Information
- Application Number
- CN202411458688.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-18
- Publication Date
- 2024-12-06
AI Technical Summary
The design of existing prefabricated piles leads to excessive mechanical properties, waste of resources and damage to foundation soil, affecting the stability of the building.
The existing piles are used as core piles, and the molded outsourcing body is formed on the outside through the mold to form a composite core pile, reducing resource waste, improving load-bearing capacity, and improving bending and crack resistance through prestressed ribs and maintenance.
Effectively utilize existing pile resources, reduce manufacturing costs, meet actual load-bearing needs, avoid stress concentration, and improve the overall performance of composite core piles.
Smart Images

Figure CN119077940A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of prefabricated components, in particular to a method for manufacturing a composite core pile. Background Art
[0002] At present, most of the designs of existing precast pile products enable the foundation piles to meet the bearing capacity requirements under certain special working conditions by changing their cross-sectional shape and structural reinforcement. In order to cope with engineering projects with large local shear and bending moments, precast pile products with good mechanical properties and high bearing capacity are usually used. Although this approach can ensure the stability and safety of the building, it also brings some problems. The use of precast piles with good mechanical properties and high bearing capacity will lead to excess mechanical properties. This means that in actual engineering, the bearing capacity of the piles far exceeds the actual demand. This not only wastes resources, but also increases construction costs. In addition, due to the excessive bearing capacity of the piles, it may cause damage to the foundation soil, thereby affecting the stability of the entire building. Therefore, it is necessary to improve the existing manufacturing method of precast piles. Summary of the invention
[0003] The present invention provides a method for manufacturing a composite core pile, which can utilize existing piles to manufacture the composite core pile, thereby reducing the manufacturing cost and ensuring the bearing capacity of the entire composite core pile.
[0004] To solve the above problems, the present invention adopts the following technical solutions:
[0005] According to a first aspect of the present invention, an embodiment of the present invention provides a method for manufacturing a composite core pile, comprising the following steps:
[0006] (1) Select qualified precast concrete piles as core piles;
[0007] (2) fixing plates are installed at both ends of the core pile, and a screw is connected to the side of the fixing plate away from the core pile;
[0008] (3) The core pile is hoisted into the prefabricated mold, the screw rod passes through the preset fixing grooves at both ends of the mold, and the core pile is fixed in the center inside the mold. The fixing plates at both ends of the core pile and the mold are enclosed to form a molding cavity;
[0009] (4) pouring the material into the molding cavity for the second time. After the pouring is completed, the mold is hoisted onto a vibration table for vibration or an inserted vibrating rod is used for vibration and compaction;
[0010] (5) The mold is hoisted as a whole to the steam curing tank for steam curing. After the curing is completed, the mold is demolded and then naturally cured to the designed strength or placed in an autoclave for pressure steam curing to the designed strength.
[0011] In some embodiments, an end plate is fixed to the end surface of the core pile, a threaded hole is provided on the end plate, and a through hole is provided on the fixing plate to be connected with the threaded hole; the step of installing the fixing plates at both ends of the core pile specifically includes: abutting the two fixing plates against the two end plates respectively, and connecting the through holes on the fixing plates with the threaded holes on the end plates, and using screws to pass through the through holes and fix them in the threaded holes;
[0012] Alternatively, a sleeve is anchored on the end face of the core pile, the sleeve is provided with a threaded hole, and the fixing plate is provided with a through hole that is docked with the threaded hole; the step of installing the fixing plates at both ends of the core pile specifically includes: respectively abutting the two fixing plates against the end faces at both ends of the core pile, and docking the through holes on the fixing plates with the threaded holes on the sleeve, and using screws to pass through the through holes and fix them in the threaded holes.
[0013] In some embodiments, grooves or anchors are provided on the surface of the core pile.
[0014] According to a second aspect of the present invention, an embodiment of the present invention provides a method for manufacturing a composite core pile, comprising the following steps:
[0015] (1) Select qualified precast concrete piles as core piles;
[0016] (2) fixing plates are installed at both ends of the core pile, and a screw is connected to the side of the fixing plate away from the core pile;
[0017] (3) Insert the unbonded prestressed tendons or corrugated tubes into the through holes reserved on the fixing plates at both ends of the core pile, and initially straighten and clamp the unbonded prestressed tendons or corrugated tubes;
[0018] (4) The core pile is hoisted into the prefabricated mold, the screw rod passes through the preset fixing grooves at both ends of the mold, and the core pile is fixed in the center inside the mold. The fixing plates at both ends of the core pile and the mold are enclosed to form a molding cavity;
[0019] (5) pouring the material into the molding cavity for the second time. After the pouring is completed, the mold is hoisted onto a vibration table for vibration or an inserted vibrating rod is used for vibration and compaction;
[0020] (6) The mold is hoisted as a whole to a steam curing tank for steam curing. After curing, the mold is demoulded and then naturally cured to the designed strength or placed in an autoclave for pressure steam curing to the designed strength;
[0021] (7) The unbonded prestressed tendons are tensioned, grouting is then performed in the holes formed by the tensioning, and the composite core piles are cured. After the curing, the tensioning of the unbonded prestressed tendons is relaxed, and the ends of the unbonded prestressed tendons are sealed and anchored.
[0022] In some embodiments, an end plate is fixed to the end surface of the core pile, a threaded hole is provided on the end plate, and a through hole is provided on the fixing plate to be connected with the threaded hole; the step of installing the fixing plates at both ends of the core pile specifically includes: abutting the two fixing plates against the two end plates respectively, and connecting the through holes on the fixing plates with the threaded holes on the end plates, and using screws to pass through the through holes and fix them in the threaded holes;
[0023] Alternatively, a sleeve is anchored on the end face of the core pile, the sleeve is provided with a threaded hole, and the fixing plate is provided with a through hole that is docked with the threaded hole; the step of installing the fixing plates at both ends of the core pile specifically includes: respectively abutting the two fixing plates against the end faces at both ends of the core pile, and docking the through holes on the fixing plates with the threaded holes on the sleeve, and using screws to pass through the through holes and fix them in the threaded holes.
[0024] In some embodiments, grooves or anchors are provided on the surface of the core pile.
[0025] According to a third aspect of the present invention, an embodiment of the present invention provides a method for manufacturing a composite core pile, comprising the following steps:
[0026] (1) Select qualified precast concrete piles as core piles;
[0027] (2) fixing plates are installed at both ends of the core pile, and a screw is connected to the side of the fixing plate away from the core pile;
[0028] (3) Arrange several unbonded prestressed tendons in a spiral shape around the core pile and along the axis of the core pile, insert the unbonded prestressed tendons into the through holes reserved on the fixing plates at both ends of the core pile, and initially straighten and clamp the unbonded prestressed tendons;
[0029] (4) The core pile is hoisted into the prefabricated mold, the screw rod passes through the preset fixing grooves at both ends of the mold, and the core pile is fixed in the center inside the mold. The fixing plates at both ends of the core pile and the mold are enclosed to form a molding cavity;
[0030] (5) pouring the material into the molding cavity for the second time. After the pouring is completed, the mold is hoisted onto a vibration table for vibration or an inserted vibrating rod is used for vibration and compaction;
[0031] (6) The mold is hoisted as a whole to a steam curing tank for steam curing. After curing, the mold is demoulded and then naturally cured to the designed strength or placed in an autoclave for pressure steam curing to the designed strength;
[0032] (7) The unbonded prestressed tendons are tensioned, grouting is then performed in the holes formed by the tensioning, and the composite core piles are cured. After the curing, the tensioning of the unbonded prestressed tendons is relaxed, and the ends of the unbonded prestressed tendons are sealed and anchored.
[0033] In some embodiments, an end plate is fixed to the end surface of the core pile, a threaded hole is provided on the end plate, and a through hole is provided on the fixing plate to be connected with the threaded hole; the step of installing the fixing plates at both ends of the core pile specifically includes: abutting the two fixing plates against the two end plates respectively, and connecting the through holes on the fixing plates with the threaded holes on the end plates, and using screws to pass through the through holes and fix them in the threaded holes;
[0034] Alternatively, a sleeve is anchored on the end face of the core pile, the sleeve is provided with a threaded hole, and the fixing plate is provided with a through hole that is docked with the threaded hole; the step of installing the fixing plates at both ends of the core pile specifically includes: respectively abutting the two fixing plates against the end faces at both ends of the core pile, and docking the through holes on the fixing plates with the threaded holes on the sleeve, and using screws to pass through the through holes and fix them in the threaded holes.
[0035] In some embodiments, grooves or anchors are provided on the surface of the core pile.
[0036] According to a fourth aspect of the present invention, an embodiment of the present invention provides a method for manufacturing a composite core pile, comprising the following steps:
[0037] (1) Select qualified precast concrete piles as core piles;
[0038] (2) fixing plates are installed at both ends of the core pile, and a screw is connected to the side of the fixing plate away from the core pile; a fixing device for fixing the non-prestressed tendons is installed on the fixing plate;
[0039] (3) Arrange several non-prestressed tendons around the core pile and longitudinally along the axis of the core pile, and insert the non-prestressed tendons into the fixtures reserved on the fixing plates at both ends of the core pile for fixing;
[0040] (4) The core pile is hoisted into the prefabricated mold, the screw rod passes through the preset fixing grooves at both ends of the mold, and the core pile is fixed in the center inside the mold. The fixing plates at both ends of the core pile and the mold are enclosed to form a molding cavity;
[0041] (5) pouring the material into the molding cavity for the second time. After the pouring is completed, the mold is hoisted onto a vibration table for vibration or an inserted vibrating rod is used for vibration and compaction;
[0042] (6) The mold is hoisted as a whole to the steam curing tank for steam curing. After the curing is completed, the mold is demolded and then naturally cured to the designed strength or placed in an autoclave for pressure steam curing to the designed strength.
[0043] In some embodiments, an end plate is fixed to the end surface of the core pile, a threaded hole is provided on the end plate, and a through hole is provided on the fixing plate to be connected with the threaded hole; the step of installing the fixing plates at both ends of the core pile specifically includes: abutting the two fixing plates against the two end plates respectively, and connecting the through holes on the fixing plates with the threaded holes on the end plates, and using screws to pass through the through holes and fix them in the threaded holes;
[0044] Alternatively, a sleeve is anchored on the end face of the core pile, the sleeve is provided with a threaded hole, and the fixing plate is provided with a through hole that is docked with the threaded hole; the step of installing the fixing plates at both ends of the core pile specifically includes: respectively abutting the two fixing plates against the end faces at both ends of the core pile, and docking the through holes on the fixing plates with the threaded holes on the sleeve, and using screws to pass through the through holes and fix them in the threaded holes.
[0045] In some embodiments, grooves or anchors are provided on the surface of the core pile.
[0046] According to a fifth aspect of the present invention, an embodiment of the present invention provides a method for manufacturing a composite core pile, comprising the following steps:
[0047] (1) Select qualified precast concrete piles as core piles;
[0048] (2) fixing plates are installed at both ends of the core pile, and a screw is connected to the side of the fixing plate away from the core pile;
[0049] (3) Anchor holes are set on the fixing plate, and the prestressed tendons are inserted into the anchor holes and then anchored with a clamp anchor;
[0050] (4) The core pile is hoisted into the prefabricated mold, the screw rod passes through the preset fixing grooves at both ends of the mold, and the core pile is fixed in the center inside the mold. The fixing plates at both ends of the core pile and the mold are enclosed to form a molding cavity;
[0051] (5) pouring the material into the forming cavity for the second time, and then tensioning the prestressed tendons to control the stress;
[0052] (6) After the tensioning is completed, the mold is hoisted onto a vibration table for vibration or other safe and reliable methods are used to vibrate and compact the mold;
[0053] (7) The mold is hoisted as a whole to the steam curing tank for steam curing. After the curing is completed, the prestressed tendons are relaxed and then demoulding is performed;
[0054] (8) After demoulding, the composite core pile is placed in an autoclave for pressure steam curing to the designed strength.
[0055] In some embodiments, an end plate is fixed to the end surface of the core pile, a threaded hole is provided on the end plate, and a through hole is provided on the fixing plate to be connected with the threaded hole; the step of installing the fixing plates at both ends of the core pile specifically includes: abutting the two fixing plates against the two end plates respectively, and connecting the through holes on the fixing plates with the threaded holes on the end plates, and using screws to pass through the through holes and fix them in the threaded holes;
[0056] Alternatively, a sleeve is anchored on the end face of the core pile, the sleeve is provided with a threaded hole, and the fixing plate is provided with a through hole that is docked with the threaded hole; the step of installing the fixing plates at both ends of the core pile specifically includes: respectively abutting the two fixing plates against the end faces at both ends of the core pile, and docking the through holes on the fixing plates with the threaded holes on the sleeve, and using screws to pass through the through holes and fix them in the threaded holes.
[0057] In some embodiments, grooves or anchors are provided on the surface of the core pile.
[0058] The present invention has at least the following beneficial effects: the present invention adopts the existing precast concrete pile as the core pile, and casts the outer body on the outside of the core pile through a mold for a second time. The outer body and the core pile together form a composite core pile, which effectively utilizes the existing pile resources, reduces resource waste, and reduces manufacturing costs. At the same time, the bearing capacity of the entire composite core pile can meet actual needs.
[0059] Furthermore, the core piles were cured together with the secondary poured concrete outer body. The secondary curing of the core piles can further improve and stabilize the strength of the concrete of the core pile body, thus ensuring the strength of the core piles.
[0060] If the outer casing is reinforced and prestressed, the bearing capacity of the composite core pile can be further improved, and its bending and crack resistance can be significantly improved;
[0061] In addition, the outer casing and the core pile are formed separately, and the interface between the two is not prone to stress concentration under the action of external construction loads, thereby avoiding ring cracks at the junction. BRIEF DESCRIPTION OF THE DRAWINGS
[0062] Figure 1 A schematic diagram of the structure of a composite core pile according to an embodiment of the present invention;
[0063] Figure 2 is a cross-sectional schematic diagram of a composite core pile according to Example 1 of the present invention;
[0064] Figure 3 is a cross-sectional schematic diagram of a composite core pile according to Example 2 of the present invention;
[0065] Figure 4 is a cross-sectional schematic diagram of a composite core pile according to Example 3 of the present invention;
[0066] Figure 5 A schematic structural diagram of a mold according to an embodiment of the present invention;
[0067] Figure 6 This is a schematic structural diagram of a mold after secondary pouring according to an embodiment of the present invention.
[0068] Wherein, the accompanying drawings are marked as follows:
[0069] Core pile 100, center hole 101, steel bar 110;
[0070] Outer enclosure 200, prestressed tendons 210;
[0071] End plate 300;
[0072] A fixing plate 410 and a screw rod 420;
[0073] Mold 500 , molding cavity 501 , fixing groove 502 . DETAILED DESCRIPTION
[0074] The present invention provides the following description with reference to the accompanying drawings to assist in a comprehensive understanding of various embodiments of the present invention as defined by the claims and their equivalents. The description includes various specific details to assist in understanding, but these details should be considered as exemplary only. Therefore, those skilled in the art will recognize that various changes and modifications can be made to the various embodiments described herein without departing from the scope and spirit of the present invention.
[0075] In the description of the present invention, descriptions of orientations, such as up, down, front, back, left, right, etc., and orientations or positional relationships indicated are based on the orientations or positional relationships shown in the drawings and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0076] It will be understood that when one element (eg, a first element) is “connected” to another element (eg, a second element), the element may be directly connected to the other element or an intervening element (eg, a third element) may be present between the element and the other element.
[0077] Before describing in detail the method for manufacturing the composite core pile of the present invention, it is necessary to describe the structure of the composite core pile to be manufactured by the present invention.
[0078] like Figure 1As shown, the composite core pile includes a core pile 100 and an outer package 200, the outer package 200 is sleeved on the outside of the core pile 100 and wraps at least a part of the outer peripheral surface of the core pile 100, and the outer package 200 is cast and formed on the outside of the core pile 100. Specifically, the core pile 100 can be placed in a prefabricated mold, and concrete can be filled into the mold, and the concrete is coated on the outside of the core pile 100 to form the outer package 200. Therefore, this embodiment utilizes the existing core pile 100, and the core pile 100 and the outer package 200 form a composite core pile, which effectively utilizes the existing pile resources, reduces resource waste, and reduces construction costs. At the same time, the cross-sectional area of the composite core pile is significantly increased, and the end face bearing capacity and horizontal resistance are significantly improved, which can fully utilize the advantages of the high compressive strength of concrete, and the bearing capacity of the entire composite core pile can meet actual needs. In addition, the outer package 200 and the core pile 100 are formed separately, which avoids stress concentration at the interface between the outer package 200 and the core pile 100 during construction when the outer package 200 and the core pile 100 are formed in one piece, thereby reducing the risk of ring crack damage in the interface transition section.
[0079] Regarding whether reinforcement is required in the outer enclosure 200, the following embodiments are provided below.
[0080] Example 1: Figure 2 As shown, the outer body 200 has no embedded steel bars, which can reduce the molding process of the outer body 200 and facilitate the rapid molding of the outer body 200.
[0081] Example 2: Figure 3 As shown, prestressed tendons 210 are embedded in the outer body 200, and the presence of the prestressed tendons 210 can enhance the structural strength of the outer body 200. The prestressed tendons 210 extend along the length direction of the core pile 100, which has the advantages of simple structure and easy operation.
[0082] Example 3: Figure 4 As shown, prestressed tendons 210 are embedded in the outer body 200, and the prestressed tendons 210 are arranged in a spiral shape around the core pile 100. This can provide radial restraint to the outer body 200 and the core pile 100, improve the crack resistance and shear resistance of the composite core pile, and at the same time, the amount of steel used in the cross section is greatly reduced, the cost increase is not large, and the performance is significantly improved.
[0083] In the above embodiments, the prestressed tendons 210 include but are not limited to prestressed steel bars and steel strands.
[0084] In another embodiment, non-prestressed tendons are embedded in the outer body 200, which can also enhance the structural strength of the outer body 200, while eliminating the step of prestressed stretching and simplifying the forming process. The non-prestressed tendons can be hot-rolled ribbed steel bars.
[0085] Regarding the form in which the outer enclosure 200 covers the outer circumference of the core pile 100 , the following embodiments are provided below.
[0086] In one embodiment, the outer enclosure is provided and wraps a portion of the outer circumference of the core pile, so that the outer enclosure is concentrated in a certain area of the core pile, so as to be suitable for use scenarios with higher requirements on local bearing capacity.
[0087] In another embodiment, an outer enclosure is provided and is arranged along the length direction of the core pile to wrap the entire outer circumference of the core pile, thereby enhancing the bearing capacity of the entire outer circumference of the composite core pile.
[0088] In another embodiment, a plurality of outer enclosures are provided and spaced apart along the length direction of the core pile, forming a structure similar to a variable cross-section pile, so that the bearing capacity of the entire composite core pile is higher when subjected to pull-out and compression conditions.
[0089] Regarding the shape of the core pile 100 , several embodiments are provided below.
[0090] In one embodiment, the cross-sectional shape of the core pile 100 is circular.
[0091] In another embodiment, the cross-section of the core pile 100 is square.
[0092] Of course, according to actual needs, the cross-sectional shape of the core pile 100 can also be a special shape or other shapes.
[0093] Regarding the shape of the outer package 200, several embodiments are provided below.
[0094] In one embodiment, the outer contour of the cross section of the outer enclosure 200 is circular.
[0095] In another embodiment, the outer contour of the cross section of the outer enclosure 200 is a square.
[0096] Of course, according to actual needs, the outer contour of the cross section of the outer enclosure 200 can also be a special shape or other shapes.
[0097] Regarding whether reinforcement is required in the core pile 100, the following embodiments are provided.
[0098] In one embodiment, no steel bars are embedded in the core pile.
[0099] In another embodiment, if Figure 2-4 As shown, a steel bar 110 is embedded in the core pile 100 . The steel bar 110 may include a prestressed bar or a non-prestressed bar. The prestressed bar includes but is not limited to a prestressed steel rod and a steel strand.
[0100] Furthermore, the steel bars 110 embedded in the core pile 100 can form a steel cage, including main bars and stirrups wound around the main bars. The main bars extend along the length direction of the core pile 100. The main bars can be prestressed bars or non-prestressed bars. The stirrups can be spirally wound around the main bars.
[0101] Regarding whether the core pile 100 is a solid structure, the following embodiments are provided.
[0102] In one embodiment, if Figure 1 As shown, the core pile 100 has no center hole at its center and is a solid pile structure.
[0103] In another embodiment, the core pile 100 is provided with a center hole running through it along its length direction. Under the premise of ensuring that the mechanical properties meet the construction requirements, the existence of the center hole can reduce the material used for the core pile 100, thereby saving manufacturing costs and facilitating pile construction and pile connection.
[0104] Regarding the structure of the end surface of the core pile 100, several embodiments are provided below.
[0105] In one embodiment, if Figure 1 As shown, the end surface of the core pile 100 may not be fixed with an end plate.
[0106] In another embodiment, if Figure 4 As shown, an end plate 300 is fixed to the end surface of the core pile 100 to protect the end surface of the core pile 100 .
[0107] The embodiments of the present invention also provide embodiments of the molds required for the manufacturing method of the composite core pile, such as Figure 5 As shown, the overall shape of the mold 500 is similar to a box body, and its cross-sectional shape is adapted to the cross-sectional shape of the composite core pile. When the cross-sectional shape of the composite core pile is circular, the cross-sectional shape of the mold 500 is also circular. In order to form a more regular circle, the mold 500 may include an upper mold and a lower mold. After the upper mold and the lower mold are molded together, the cross-sectional shape of the entire mold 500 is circular. When the cross-sectional shape of the composite core pile is square, the cross-sectional shape of the mold 500 is also square. When the cross-sectional shape of the composite core pile is irregular, the cross-sectional shape of the mold 500 is also irregular. The end plates at both ends of the length direction of the mold 500 are provided with through fixing grooves 502 for the screw rod 420 to pass through, so as to fix the core pile 100.
[0108] An embodiment of the present invention provides a method for manufacturing a composite core pile, comprising the following steps:
[0109] (1) Select qualified precast concrete piles as core piles.
[0110] Precast concrete piles can be prefabricated or idle. Precast concrete piles can be tested and qualified precast concrete piles can be used as core piles to ensure the quality of the core piles.
[0111] (2) Fixing plates are installed at both ends of the core pile, and a screw is connected to the side of the fixing plate away from the core pile.
[0112] The fixing plate is used to form the molding cavity, and the screw rod is used to position and support the core pile. The screw rod can be integrally formed with the fixing plate, or can be fixedly connected to the fixing plate by welding, threaded connection, or other methods.
[0113] (3) The core pile is hoisted into the prefabricated mold, the screw rod passes through the preset fixing grooves at both ends of the mold, and the core pile is fixed in the center inside the mold. The fixing plates at both ends of the core pile and the mold are enclosed to form a molding cavity;
[0114] like Figure 5 As shown, a lifting device can be used to lift the core pile 100 installed with a fixing plate 410 into the mold 500, and the screws 420 at both ends of the core pile 100 are respectively inserted into the fixing grooves 502 at both ends of the mold 500, and the core pile 100 is centrally fixed on the inner side of the mold 500; the width of the fixing plate 410 is adapted to the width of the inner cavity of the mold 500 to reduce the gap between the fixing plate 410 and the inner wall of the mold 500 and reduce concrete leakage; the fixing plates 410 at both ends of the core pile 100 and the mold 500 enclose a molding cavity 501, and the molding cavity 501 is used to mold the outer package.
[0115] (4) A second pouring of material is performed into the molding cavity. After the pouring is completed, the mold is hoisted onto a vibration table for vibration or an inserted vibrating rod is used for vibration and compaction.
[0116] The secondary pouring of concrete into the forming cavity will fill the forming cavity and then wrap the outer surface of the core pile to form a Figure 6 The outer enclosure 200 shown is vibrated to make the concrete densely filled, avoid bubbles and cavities, and ensure the molding quality of the outer enclosure.
[0117] (5) The mold is hoisted as a whole to the steam curing tank for steam curing. After the curing is completed, the mold is demolded and then naturally cured to the designed strength or placed in an autoclave for pressure steam curing to the designed strength.
[0118] Therefore, the composite core pile can be manufactured in this embodiment. The structure of the composite core pile can refer to the composite core pile shown in Example 1.
[0119] In some embodiments, an end plate is fixed to the end face of the core pile, a threaded hole is provided on the end plate, and a through hole is provided on the fixing plate to be connected with the threaded hole; in step (2), the step of installing the fixing plate at both ends of the core pile specifically includes: two fixing plates are respectively abutted against the two end plates, and the through holes on the fixing plates are connected with the threaded holes on the end plates, and screws are passed through the through holes and fixed in the threaded holes. Thus, the fixing plate and the end plate of the core pile are fixed together by screws. This method is easy to install and easy to disassemble.
[0120] In other embodiments, the end face of the core pile is anchored with a sleeve, and a part of the sleeve can be buried in the core pile when the core pile is formed. The sleeve is provided with a threaded hole, and the fixing plate is provided with a through hole that is connected to the threaded hole; in step (2), the step of installing the fixing plate at both ends of the core pile specifically includes: the two fixing plates are respectively abutted against the end faces of the two ends of the core pile, and the through holes on the fixing plates are connected to the threaded holes on the sleeve, and screws are passed through the through holes and fixed in the threaded holes. This method is suitable for the use scenario where the core pile does not need an end plate, and the fixing plate can also be fixed to the end plate of the core pile by screws.
[0121] In some embodiments, a groove is provided on the surface of the core pile. During the secondary pouring, a portion of the concrete of the outer body is embedded in the groove, thereby increasing the contact area between the core pile and the outer body, increasing the adhesion force, and enhancing the connection strength between the core pile and the outer body.
[0122] Furthermore, the groove can be arranged around the core pile to form an annular groove, and a plurality of grooves can be arranged, so that the core pile forms a structure similar to a variable cross-section pile, which can further enhance the connection strength between the core pile and the outer body.
[0123] In another embodiment, anchors are provided on the surface of the core pile, and during the secondary pouring of the outer body, the anchors are embedded in the outer body to be anchored to the outer body, thereby enhancing the connection strength between the core pile and the outer body.
[0124] A part of the anchor piece can be directly embedded in the core pile, and the other part is located outside the core pile. Alternatively, an embedded part is embedded in the core pile, and the anchor piece is fixedly connected to the embedded part. Specifically, the anchor piece can be fixedly connected to the embedded part by welding, mechanical connection or other methods.
[0125] Anchors include but are not limited to anchor bars and anchor plates. Embedded parts include but are not limited to embedded steel bars and embedded steel plates.
[0126] An embodiment of the present invention further provides a method for manufacturing a composite core pile, comprising the following steps:
[0127] (1) Select qualified precast concrete piles as core piles.
[0128] Precast concrete piles can be prefabricated or idle. Precast concrete piles can be tested and qualified precast concrete piles can be used as core piles to ensure the quality of the core piles.
[0129] (2) Fixing plates are installed at both ends of the core pile, and a screw is connected to the side of the fixing plate away from the core pile.
[0130] The fixing plate is used to form the molding cavity, and the screw rod is used to position and support the core pile. The screw rod can be integrally formed with the fixing plate, or can be fixedly connected to the fixing plate by welding, threaded connection, or other methods.
[0131] (3) Insert the unbonded prestressed tendons or corrugated tubes into the reserved through holes on the fixing plates at both ends of the core pile, and initially straighten and clamp the unbonded prestressed tendons or corrugated tubes.
[0132] Through holes are reserved on both fixing plates, and the through holes on the two fixing plates correspond to each other. The two ends of the unbonded prestressed tendons or corrugated tubes are respectively inserted into the two corresponding through holes on the two fixing plates to fix the unbonded prestressed tendons or corrugated tubes. The unbonded prestressed tendons or corrugated tubes extend along the length direction of the core pile and are distributed around the core pile. It should be noted that the corrugated tube is a reserved channel for the unbonded prestressed tendons to facilitate the subsequent tensioning of the tendons so that the prestressed tendons do not form a bond with the outer concrete. It is a way to lay unbonded prestressed tendons. After fixing the corrugated tube, the prestressed tendons need to be inserted into the corrugated tube.
[0133] (4) The core pile is hoisted into the prefabricated mold, the screw rod passes through the preset fixing grooves at both ends of the mold, and the core pile is fixed in the center inside the mold. The fixing plates at both ends of the core pile and the mold are enclosed to form a molding cavity.
[0134] The core pile with the fixed plate installed can be hoisted into the mold by using a lifting device. The screws at both ends of the core pile are respectively inserted into the fixed grooves at both ends of the mold, and the core pile is fixed in the center on the inner side of the mold. The width of the fixed plate is matched with the width of the inner cavity of the mold to reduce the gap between the fixed plate and the inner wall of the mold and reduce concrete leakage. The fixed plates at both ends of the core pile and the mold enclose a molding cavity, which is used to form the outer package.
[0135] (5) A secondary pouring of material is performed into the molding cavity. After the pouring is completed, the mold is hoisted onto a vibration table for vibration or an inserted vibrating rod is used for vibration and compaction.
[0136] The concrete is poured into the forming cavity for the second time, and the concrete will fill the forming cavity and then wrap the outer surface of the core pile to form an outer body; the purpose of vibration is to make the concrete filling dense, avoid the formation of bubbles and cavities, and ensure the forming quality of the outer body.
[0137] (6) The mold is hoisted as a whole to the steam curing tank for steam curing. After the curing is completed, the mold is demolded and then naturally cured to the designed strength or placed in an autoclave for pressure steam curing to the designed strength.
[0138] (7) The unbonded prestressed tendons are tensioned, grouting is then performed in the holes formed by the tensioning, and the composite core piles are cured. After the curing, the tensioning of the unbonded prestressed tendons is relaxed, and the ends of the unbonded prestressed tendons or corrugated pipes are sealed and anchored.
[0139] Therefore, the composite core pile can be manufactured in this embodiment. The structure of the composite core pile can refer to the composite core pile shown in Example 2. The prestressed tendons are arranged around the core pile and extend along the length direction of the core pile.
[0140] In some embodiments, an end plate is fixed to the end face of the core pile, a threaded hole is provided on the end plate, and a through hole is provided on the fixing plate to be connected with the threaded hole; in step (2), the step of installing the fixing plate at both ends of the core pile specifically includes: two fixing plates are respectively abutted against the two end plates, and the through holes on the fixing plates are connected with the threaded holes on the end plates, and screws are passed through the through holes and fixed in the threaded holes. Thus, the fixing plate and the end plate of the core pile are fixed together by screws. This method is easy to install and easy to disassemble.
[0141] In other embodiments, the end face of the core pile is anchored with a sleeve, and a part of the sleeve can be buried in the core pile when the core pile is formed. The sleeve is provided with a threaded hole, and the fixing plate is provided with a through hole that is connected to the threaded hole; in step (2), the step of installing the fixing plate at both ends of the core pile specifically includes: the two fixing plates are respectively abutted against the end faces of the two ends of the core pile, and the through holes on the fixing plates are connected to the threaded holes on the sleeve, and screws are passed through the through holes and fixed in the threaded holes. This method is suitable for the use scenario where the core pile does not need an end plate, and the fixing plate can also be fixed to the end plate of the core pile by screws.
[0142] In some embodiments, a groove is provided on the surface of the core pile. During the secondary pouring, a portion of the concrete of the outer body is embedded in the groove, thereby increasing the contact area between the core pile and the outer body, increasing the adhesion force, and enhancing the connection strength between the core pile and the outer body.
[0143] Furthermore, the groove can be arranged around the core pile to form an annular groove, and a plurality of grooves can be arranged, so that the core pile forms a structure similar to a variable cross-section pile, which can further enhance the connection strength between the core pile and the outer body.
[0144] In another embodiment, anchors are provided on the surface of the core pile, and during the secondary pouring of the outer body, the anchors are embedded in the outer body to be anchored to the outer body, thereby enhancing the connection strength between the core pile and the outer body.
[0145] A part of the anchor piece can be directly embedded in the core pile, and the other part is located outside the core pile. Alternatively, an embedded part is embedded in the core pile, and the anchor piece is fixedly connected to the embedded part. Specifically, the anchor piece can be fixedly connected to the embedded part by welding, mechanical connection or other methods.
[0146] Anchors include but are not limited to anchor bars and anchor plates. Embedded parts include but are not limited to embedded steel bars and embedded steel plates.
[0147] An embodiment of the present invention further provides a method for manufacturing a composite core pile, comprising the following steps:
[0148] (1) Select qualified precast concrete piles as core piles.
[0149] Precast concrete piles can be prefabricated or idle. Precast concrete piles can be tested and qualified precast concrete piles can be used as core piles to ensure the quality of the core piles.
[0150] (2) Fixing plates are installed at both ends of the core pile, and a screw is connected to the side of the fixing plate away from the core pile.
[0151] The fixing plate is used to form the molding cavity, and the screw rod is used to position and support the core pile. The screw rod can be integrally formed with the fixing plate, or can be fixedly connected to the fixing plate by welding, threaded connection, or other methods.
[0152] (3) Arrange several unbonded prestressed tendons in a spiral shape around the core pile and along the axis of the core pile. Pass the unbonded prestressed tendons through the through holes reserved on the fixing plates at both ends of the core pile, and initially straighten and clamp the unbonded prestressed tendons.
[0153] Through holes are reserved on both fixing plates, and the through holes on the two fixing plates correspond to each other. The two ends of the unbonded prestressed tendons are respectively inserted into the two corresponding through holes on the two fixing plates to fix the unbonded prestressed tendons. The unbonded prestressed tendons are arranged around the core pile and extend in a spiral shape along the length direction of the core pile.
[0154] (4) The core pile is hoisted into the prefabricated mold, the screw rod passes through the preset fixing grooves at both ends of the mold, and the core pile is fixed in the center inside the mold. The fixing plates at both ends of the core pile and the mold are enclosed to form a molding cavity.
[0155] The core pile with the fixed plate installed can be hoisted into the mold by using a lifting device. The screws at both ends of the core pile are respectively inserted into the fixed grooves at both ends of the mold, and the core pile is fixed in the center on the inner side of the mold. The width of the fixed plate is matched with the width of the inner cavity of the mold to reduce the gap between the fixed plate and the inner wall of the mold and reduce concrete leakage. The fixed plates at both ends of the core pile and the mold enclose a molding cavity, which is used to form the outer package.
[0156] (5) A secondary pouring of material is performed into the molding cavity. After the pouring is completed, the mold is hoisted onto a vibration table for vibration or an inserted vibrating rod is used for vibration and compaction.
[0157] The concrete is poured into the forming cavity for the second time, and the concrete will fill the forming cavity and then wrap the outer surface of the core pile to form an outer body; the purpose of vibration is to make the concrete filling dense, avoid the formation of bubbles and cavities, and ensure the forming quality of the outer body.
[0158] (6) The mold is hoisted as a whole to the steam curing tank for steam curing. After the curing is completed, the mold is demolded and then naturally cured to the designed strength or placed in an autoclave for pressure steam curing to the designed strength.
[0159] (7) The unbonded prestressed tendons are tensioned, grouting is then performed in the holes formed by the tensioning, and the composite core piles are cured. After the curing, the tensioning of the unbonded prestressed tendons is relaxed, and the ends of the unbonded prestressed tendons are sealed and anchored.
[0160] Therefore, the composite core pile can be manufactured in this embodiment. The structure of the composite core pile can refer to the composite core pile shown in Example 3. The prestressed tendons are arranged around the core pile and extend in a spiral shape along the length direction of the core pile.
[0161] In some embodiments, an end plate is fixed to the end face of the core pile, a threaded hole is provided on the end plate, and a through hole is provided on the fixing plate to be connected with the threaded hole; in step (2), the step of installing the fixing plate at both ends of the core pile specifically includes: two fixing plates are respectively abutted against the two end plates, and the through holes on the fixing plates are connected with the threaded holes on the end plates, and screws are passed through the through holes and fixed in the threaded holes. Thus, the fixing plate and the end plate of the core pile are fixed together by screws. This method is easy to install and easy to disassemble.
[0162] In other embodiments, the end face of the core pile is anchored with a sleeve, and a part of the sleeve can be buried in the core pile when the core pile is formed. The sleeve is provided with a threaded hole, and the fixing plate is provided with a through hole that is connected to the threaded hole; in step (2), the step of installing the fixing plate at both ends of the core pile specifically includes: the two fixing plates are respectively abutted against the end faces of the two ends of the core pile, and the through holes on the fixing plates are connected to the threaded holes on the sleeve, and screws are passed through the through holes and fixed in the threaded holes. This method is suitable for the use scenario where the core pile does not need an end plate, and the fixing plate can also be fixed to the end plate of the core pile by screws.
[0163] In some embodiments, a groove is provided on the surface of the core pile. During the secondary pouring, a portion of the concrete of the outer body is embedded in the groove, thereby increasing the contact area between the core pile and the outer body, increasing the adhesion force, and enhancing the connection strength between the core pile and the outer body.
[0164] Furthermore, the groove can be arranged around the core pile to form an annular groove, and a plurality of grooves can be arranged, so that the core pile forms a structure similar to a variable cross-section pile, which can further enhance the connection strength between the core pile and the outer body.
[0165] In another embodiment, anchors are provided on the surface of the core pile, and during the secondary pouring of the outer body, the anchors are embedded in the outer body to be anchored to the outer body, thereby enhancing the connection strength between the core pile and the outer body.
[0166] A part of the anchor piece can be directly embedded in the core pile, and the other part is located outside the core pile. Alternatively, an embedded part is embedded in the core pile, and the anchor piece is fixedly connected to the embedded part. Specifically, the anchor piece can be fixedly connected to the embedded part by welding, mechanical connection or other methods.
[0167] Anchors include but are not limited to anchor bars and anchor plates. Embedded parts include but are not limited to embedded steel bars and embedded steel plates.
[0168] An embodiment of the present invention further provides a method for manufacturing a composite core pile, comprising the following steps:
[0169] (1) Select qualified precast concrete piles as core piles;
[0170] Precast concrete piles can be prefabricated or idle. Precast concrete piles can be tested and qualified precast concrete piles can be used as core piles to ensure the quality of the core piles.
[0171] (2) fixing plates are installed at both ends of the core pile, and a screw is connected to the side of the fixing plate away from the core pile; a fixing device for fixing the non-prestressed tendons is installed on the fixing plate;
[0172] A circle of through holes can be set on the periphery of the fixing plate, and the fixers can be installed in the through holes to create conditions for the subsequent installation of non-prestressed tendons.
[0173] (3) Arrange several non-prestressed tendons around the core pile and longitudinally along the axis of the core pile, and insert the non-prestressed tendons into the fixtures reserved on the fixing plates at both ends of the core pile for fixing;
[0174] (4) The core pile is hoisted into the prefabricated mold, the screw rod passes through the preset fixing grooves at both ends of the mold, and the core pile is fixed in the center inside the mold. The fixing plates at both ends of the core pile and the mold are enclosed to form a molding cavity;
[0175] The core pile with the fixed plate installed can be hoisted into the mold by using a lifting device. The screws at both ends of the core pile are respectively inserted into the fixed grooves at both ends of the mold, and the core pile is fixed in the center on the inner side of the mold. The width of the fixed plate is matched with the width of the inner cavity of the mold to reduce the gap between the fixed plate and the inner wall of the mold and reduce concrete leakage. The fixed plates at both ends of the core pile and the mold enclose a molding cavity, which is used to form the outer package.
[0176] (5) pouring the material into the molding cavity for the second time. After the pouring is completed, the mold is hoisted onto a vibration table for vibration or an inserted vibrating rod is used for vibration and compaction;
[0177] The concrete is poured into the forming cavity for the second time, and the concrete will fill the forming cavity and then wrap the outer surface of the core pile to form an outer body; the purpose of vibration is to make the concrete filling dense, avoid the formation of bubbles and cavities, and ensure the forming quality of the outer body.
[0178] (6) The mold is hoisted as a whole to the steam curing tank for steam curing. After the curing is completed, the mold is demolded and then naturally cured to the designed strength or placed in an autoclave for pressure steam curing to the designed strength.
[0179] Therefore, the composite core pile can be manufactured in this embodiment. Non-prestressed tendons are arranged in the outer body of the composite core pile, and the non-prestressed tendons can extend along the length direction of the core pile.
[0180] In some embodiments, an end plate is fixed to the end face of the core pile, a threaded hole is provided on the end plate, and a through hole is provided on the fixing plate to be connected with the threaded hole; in step (2), the step of installing the fixing plate at both ends of the core pile specifically includes: two fixing plates are respectively abutted against the two end plates, and the through holes on the fixing plates are connected with the threaded holes on the end plates, and screws are passed through the through holes and fixed in the threaded holes. Thus, the fixing plate and the end plate of the core pile are fixed together by screws. This method is easy to install and easy to disassemble.
[0181] In other embodiments, the end face of the core pile is anchored with a sleeve, and a part of the sleeve can be buried in the core pile when the core pile is formed. The sleeve is provided with a threaded hole, and the fixing plate is provided with a through hole that is connected to the threaded hole; in step (2), the step of installing the fixing plate at both ends of the core pile specifically includes: the two fixing plates are respectively abutted against the end faces of the two ends of the core pile, and the through holes on the fixing plates are connected to the threaded holes on the sleeve, and screws are passed through the through holes and fixed in the threaded holes. This method is suitable for the use scenario where the core pile does not need an end plate, and the fixing plate can also be fixed to the end plate of the core pile by screws.
[0182] In some embodiments, a groove is provided on the surface of the core pile. During the secondary pouring, a portion of the concrete of the outer body is embedded in the groove, thereby increasing the contact area between the core pile and the outer body, increasing the adhesion force, and enhancing the connection strength between the core pile and the outer body.
[0183] Furthermore, the groove can be arranged around the core pile to form an annular groove, and a plurality of grooves can be arranged, so that the core pile forms a structure similar to a variable cross-section pile, which can further enhance the connection strength between the core pile and the outer body.
[0184] In another embodiment, anchors are provided on the surface of the core pile, and during the secondary pouring of the outer body, the anchors are embedded in the outer body to be anchored to the outer body, thereby enhancing the connection strength between the core pile and the outer body.
[0185] A part of the anchor piece can be directly embedded in the core pile, and the other part is located outside the core pile. Alternatively, an embedded part is embedded in the core pile, and the anchor piece is fixedly connected to the embedded part. Specifically, the anchor piece can be fixedly connected to the embedded part by welding, mechanical connection or other methods.
[0186] Anchors include but are not limited to anchor bars and anchor plates. Embedded parts include but are not limited to embedded steel bars and embedded steel plates.
[0187] An embodiment of the present invention further provides a method for manufacturing a composite core pile, comprising the following steps:
[0188] (1) Select qualified precast concrete piles as core piles;
[0189] Precast concrete piles can be prefabricated or idle. Precast concrete piles can be tested and qualified precast concrete piles can be used as core piles to ensure the quality of the core piles.
[0190] (2) fixing plates are installed at both ends of the core pile, and a screw is connected to the side of the fixing plate away from the core pile;
[0191] The fixing plate is used to form the molding cavity, and the screw rod is used to position and support the core pile. The screw rod can be integrally formed with the fixing plate, or can be fixedly connected to the fixing plate by welding, threaded connection, or other methods.
[0192] (3) Anchor holes are set on the fixing plate, and the prestressed tendons are inserted into the anchor holes and then anchored with a clamp anchor;
[0193] Both ends of the prestressed tendon are respectively inserted into the anchor holes on the two fixing plates, and both ends of the prestressed tendon are anchored by the clamp anchors, so that the prestressed tendon is fixed on the fixing plates.
[0194] (4) The core pile is hoisted into the prefabricated mold, the screw rod passes through the preset fixing grooves at both ends of the mold, and the core pile is fixed in the center inside the mold. The fixing plates at both ends of the core pile and the mold are enclosed to form a molding cavity;
[0195] The core pile with the fixed plate installed can be hoisted into the mold by using a lifting device. The screws at both ends of the core pile are respectively inserted into the fixed grooves at both ends of the mold, and the core pile is fixed in the center on the inner side of the mold. The width of the fixed plate is matched with the width of the inner cavity of the mold to reduce the gap between the fixed plate and the inner wall of the mold and reduce concrete leakage. The fixed plates at both ends of the core pile and the mold enclose a molding cavity, which is used to form the outer package.
[0196] (5) pouring the material into the forming cavity for the second time, and then tensioning the prestressed tendons to control the stress;
[0197] In this embodiment, the prestressed tendons are tensioned first. Specifically, the clamp anchor can be pulled by tensioning equipment, thereby driving the prestressed tendons to tension the prestressed tendons.
[0198] (6) After the tensioning is completed, the mold is hoisted onto a vibration table for vibration or other safe and reliable methods are used to vibrate and compact the mold;
[0199] The concrete will fill the molding cavity and then wrap around the outer surface of the core pile to form an outer body; the purpose of vibration is to make the concrete filling dense, avoid the formation of bubbles and cavities, and ensure the molding quality of the outer body.
[0200] (7) The mold is hoisted as a whole to the steam curing tank for steam curing. After the curing is completed, the prestressed tendons are relaxed and then demoulding is performed;
[0201] (8) After demoulding, the composite core pile is placed in an autoclave for pressure steam curing to the designed strength.
[0202] Therefore, in this embodiment, the composite core pile can be manufactured by the pre-tensioning method.
[0203] In some embodiments, an end plate is fixed to the end face of the core pile, a threaded hole is provided on the end plate, and a through hole is provided on the fixing plate to be connected with the threaded hole; in step (2), the step of installing the fixing plate at both ends of the core pile specifically includes: two fixing plates are respectively abutted against the two end plates, and the through holes on the fixing plates are connected with the threaded holes on the end plates, and screws are passed through the through holes and fixed in the threaded holes. Thus, the fixing plate and the end plate of the core pile are fixed together by screws. This method is easy to install and easy to disassemble.
[0204] In other embodiments, the end face of the core pile is anchored with a sleeve, and a part of the sleeve can be buried in the core pile when the core pile is formed. The sleeve is provided with a threaded hole, and the fixing plate is provided with a through hole that is connected to the threaded hole; in step (2), the step of installing the fixing plate at both ends of the core pile specifically includes: the two fixing plates are respectively abutted against the end faces of the two ends of the core pile, and the through holes on the fixing plates are connected to the threaded holes on the sleeve, and screws are passed through the through holes and fixed in the threaded holes. This method is suitable for the use scenario where the core pile does not need an end plate, and the fixing plate can also be fixed to the end plate of the core pile by screws.
[0205] In some embodiments, a groove is provided on the surface of the core pile. During the secondary pouring, a portion of the concrete of the outer body is embedded in the groove, thereby increasing the contact area between the core pile and the outer body, increasing the adhesion force, and enhancing the connection strength between the core pile and the outer body.
[0206] Furthermore, the groove can be arranged around the core pile to form an annular groove, and a plurality of grooves can be arranged, so that the core pile forms a structure similar to a variable cross-section pile, which can further enhance the connection strength between the core pile and the outer body.
[0207] In another embodiment, anchors are provided on the surface of the core pile, and during the secondary pouring of the outer body, the anchors are embedded in the outer body to be anchored to the outer body, thereby enhancing the connection strength between the core pile and the outer body.
[0208] A part of the anchor piece can be directly embedded in the core pile, and the other part is located outside the core pile. Alternatively, an embedded part is embedded in the core pile, and the anchor piece is fixedly connected to the embedded part. Specifically, the anchor piece can be fixedly connected to the embedded part by welding, mechanical connection or other methods.
[0209] Anchors include but are not limited to anchor bars and anchor plates. Embedded parts include but are not limited to embedded steel bars and embedded steel plates.
[0210] The terms and words used in the above description and claims are not limited to the literal meanings, but are only used by the applicant to enable a clear and consistent understanding of the present invention. Therefore, it should be clear to those skilled in the art that the above description of various embodiments of the present invention is provided only for illustration, and not for limiting the present invention as defined by the attached claims and their equivalents.
Claims
1. A method for manufacturing a composite core pile, It is characterized in that The steps include: (1) Select qualified precast concrete piles as core piles; (2) fixing plates are installed at both ends of the core pile, and a screw is connected to the side of the fixing plate away from the core pile; (3) The core pile is hoisted into the prefabricated mold, the screw rod passes through the preset fixing grooves at both ends of the mold, and the core pile is fixed in the center inside the mold. The fixing plates at both ends of the core pile and the mold are enclosed to form a molding cavity; (4) pouring the material into the molding cavity for the second time. After the pouring is completed, the mold is hoisted onto a vibration table for vibration or an inserted vibrating rod is used for vibration and compaction; (5) The mold is hoisted as a whole to the steam curing tank for steam curing. After the curing is completed, the mold is demolded and then naturally cured to the designed strength or placed in an autoclave for pressure steam curing to the designed strength.
2. The method for manufacturing a composite core pile according to claim 1, It is characterized in that The end surface of the core pile is fixed with an end plate, the end plate is provided with a threaded hole, and the fixing plate is provided with a through hole that is butted with the threaded hole; the step of installing the fixing plates at both ends of the core pile specifically includes: abutting the two fixing plates against the two end plates respectively, and making the through holes on the fixing plates butt with the threaded holes on the end plates, and using screws to pass through the through holes and fix them in the threaded holes; Alternatively, a sleeve is anchored on the end face of the core pile, the sleeve is provided with a threaded hole, and the fixing plate is provided with a through hole that is docked with the threaded hole; the step of installing the fixing plates at both ends of the core pile specifically includes: respectively abutting the two fixing plates against the end faces at both ends of the core pile, and docking the through holes on the fixing plates with the threaded holes on the sleeve, and using screws to pass through the through holes and fix them in the threaded holes.
3. A method for manufacturing a composite core pile, It is characterized in that The steps include: (1) Select qualified precast concrete piles as core piles; (2) fixing plates are installed at both ends of the core pile, and a screw is connected to the side of the fixing plate away from the core pile; (3) Insert the unbonded prestressed tendons or corrugated tubes into the through holes reserved on the fixing plates at both ends of the core pile, and initially straighten and clamp the unbonded prestressed tendons or corrugated tubes; (4) The core pile is hoisted into the prefabricated mold, the screw rod passes through the preset fixing grooves at both ends of the mold, and the core pile is fixed in the center inside the mold. The fixing plates at both ends of the core pile and the mold are enclosed to form a molding cavity; (5) pouring the material into the molding cavity for the second time. After the pouring is completed, the mold is hoisted onto a vibration table for vibration or an inserted vibrating rod is used for vibration and compaction; (6) The mold is hoisted as a whole to a steam curing tank for steam curing. After curing, the mold is demoulded and then naturally cured to the designed strength or placed in an autoclave for pressure steam curing to the designed strength; (7) The unbonded prestressed tendons are tensioned, grouting is then performed in the holes formed by the tensioning, and the composite core piles are cured. After the curing, the tensioning of the unbonded prestressed tendons is relaxed, and the ends of the unbonded prestressed tendons are sealed and anchored.
4. The method for manufacturing a composite core pile according to claim 3, It is characterized in that The end surface of the core pile is fixed with an end plate, the end plate is provided with a threaded hole, and the fixing plate is provided with a through hole that is butted with the threaded hole; the step of installing the fixing plates at both ends of the core pile specifically includes: abutting the two fixing plates against the two end plates respectively, and making the through holes on the fixing plates butt with the threaded holes on the end plates, and using screws to pass through the through holes and fix them in the threaded holes; Alternatively, a sleeve is anchored on the end face of the core pile, the sleeve is provided with a threaded hole, and the fixing plate is provided with a through hole that is docked with the threaded hole; the step of installing the fixing plates at both ends of the core pile specifically includes: respectively abutting the two fixing plates against the end faces at both ends of the core pile, and docking the through holes on the fixing plates with the threaded holes on the sleeve, and using screws to pass through the through holes and fix them in the threaded holes.
5. A method for manufacturing a composite core pile, It is characterized in that The steps include: (1) Select qualified precast concrete piles as core piles; (2) fixing plates are installed at both ends of the core pile, and a screw is connected to the side of the fixing plate away from the core pile; (3) Arrange several unbonded prestressed tendons in a spiral shape around the core pile and along the axis of the core pile, insert the unbonded prestressed tendons into the through holes reserved on the fixing plates at both ends of the core pile, and initially straighten and clamp the unbonded prestressed tendons; (4) The core pile is hoisted into the prefabricated mold, the screw rod passes through the preset fixing grooves at both ends of the mold, and the core pile is fixed in the center inside the mold. The fixing plates at both ends of the core pile and the mold are enclosed to form a molding cavity; (5) pouring the material into the molding cavity for the second time. After the pouring is completed, the mold is hoisted onto a vibration table for vibration or an inserted vibrating rod is used for vibration and compaction; (6) The mold is hoisted as a whole to a steam curing tank for steam curing. After curing, the mold is demoulded and then naturally cured to the designed strength or placed in an autoclave for pressure steam curing to the designed strength; (7) The unbonded prestressed tendons are tensioned, grouting is then performed in the holes formed by the tensioning, and the composite core piles are cured. After the curing, the tensioning of the unbonded prestressed tendons is relaxed, and the ends of the unbonded prestressed tendons are sealed and anchored.
6. The method for manufacturing a composite core pile according to claim 5, It is characterized in that The end surface of the core pile is fixed with an end plate, the end plate is provided with a threaded hole, and the fixing plate is provided with a through hole that is butted with the threaded hole; the step of installing the fixing plates at both ends of the core pile specifically includes: abutting the two fixing plates against the two end plates respectively, and making the through holes on the fixing plates butt with the threaded holes on the end plates, and using screws to pass through the through holes and fix them in the threaded holes; Alternatively, a sleeve is anchored on the end face of the core pile, the sleeve is provided with a threaded hole, and the fixing plate is provided with a through hole that is docked with the threaded hole; the step of installing the fixing plates at both ends of the core pile specifically includes: respectively abutting the two fixing plates against the end faces at both ends of the core pile, and docking the through holes on the fixing plates with the threaded holes on the sleeve, and using screws to pass through the through holes and fix them in the threaded holes.
7. A method for manufacturing a composite core pile, It is characterized in that The steps include: (1) Select qualified precast concrete piles as core piles; (2) fixing plates are installed at both ends of the core pile, and a screw is connected to the side of the fixing plate away from the core pile; a fixing device for fixing the non-prestressed tendons is installed on the fixing plate; (3) Arrange several non-prestressed tendons around the core pile and longitudinally along the axis of the core pile, and insert the non-prestressed tendons into the fixtures reserved on the fixing plates at both ends of the core pile for fixing; (4) The core pile is hoisted into the prefabricated mold, the screw rod passes through the preset fixing grooves at both ends of the mold, and the core pile is fixed in the center inside the mold. The fixing plates at both ends of the core pile and the mold are enclosed to form a molding cavity; (5) pouring the material into the molding cavity for the second time. After the pouring is completed, the mold is hoisted onto a vibration table for vibration or an inserted vibrating rod is used for vibration and compaction; (6) The mold is hoisted as a whole to the steam curing tank for steam curing. After the curing is completed, the mold is demolded and then naturally cured to the designed strength or placed in an autoclave for pressure steam curing to the designed strength.
8. The method for manufacturing a composite core pile according to claim 7, It is characterized in that The end surface of the core pile is fixed with an end plate, the end plate is provided with a threaded hole, and the fixing plate is provided with a through hole that is butted with the threaded hole; the step of installing the fixing plates at both ends of the core pile specifically includes: abutting the two fixing plates against the two end plates respectively, and making the through holes on the fixing plates butt with the threaded holes on the end plates, and using screws to pass through the through holes and fix them in the threaded holes; Alternatively, a sleeve is anchored on the end face of the core pile, the sleeve is provided with a threaded hole, and the fixing plate is provided with a through hole that is docked with the threaded hole; the step of installing the fixing plates at both ends of the core pile specifically includes: respectively abutting the two fixing plates against the end faces at both ends of the core pile, and docking the through holes on the fixing plates with the threaded holes on the sleeve, and using screws to pass through the through holes and fix them in the threaded holes.
9. A method for manufacturing a composite core pile, It is characterized in that The steps include: (1) Select qualified precast concrete piles as core piles; (2) fixing plates are installed at both ends of the core pile, and a screw is connected to the side of the fixing plate away from the core pile; (3) Anchor holes are set on the fixing plate, and the prestressed tendons are inserted into the anchor holes and then anchored with a clamp anchor; (4) The core pile is hoisted into the prefabricated mold, the screw rod passes through the preset fixing grooves at both ends of the mold, and the core pile is fixed in the center inside the mold. The fixing plates at both ends of the core pile and the mold are enclosed to form a molding cavity; (5) pouring the material into the forming cavity for the second time, and then tensioning the prestressed tendons to control the stress; (6) After the tensioning is completed, the mold is hoisted onto a vibration table for vibration or other safe and reliable methods are used to vibrate and compact the mold; (7) The mold is hoisted as a whole to the steam curing tank for steam curing. After the curing is completed, the prestressed tendons are relaxed and then demoulding is performed; (8) After demoulding, the composite core pile is placed in an autoclave for pressure steam curing to the designed strength.
10. The method for manufacturing a composite core pile according to claim 9, It is characterized in that The end surface of the core pile is fixed with an end plate, the end plate is provided with a threaded hole, and the fixing plate is provided with a through hole that is butted with the threaded hole; the step of installing the fixing plates at both ends of the core pile specifically includes: abutting the two fixing plates against the two end plates respectively, and making the through holes on the fixing plates butt with the threaded holes on the end plates, and using screws to pass through the through holes and fix them in the threaded holes; Alternatively, a sleeve is anchored on the end face of the core pile, the sleeve is provided with a threaded hole, and the fixing plate is provided with a through hole that is docked with the threaded hole; the step of installing the fixing plates at both ends of the core pile specifically includes: respectively abutting the two fixing plates against the end faces at both ends of the core pile, and docking the through holes on the fixing plates with the threaded holes on the sleeve, and using screws to pass through the through holes and fix them in the threaded holes.
11. A method for manufacturing a composite core pile according to any one of claims 1 to 10, Features: The surface of the core pile may be provided with grooves or anchors.