Marine transportation and piling integrated wind power installation ship and wind power single pile hoisting method
By improving the position and lifting method of auxiliary cranes and combining with the main crane to carry out pile cranes, the problem of low single pile lifting efficiency in offshore wind power installation ships under heavy wind and waves is solved, and efficient single pile lifting and pile turning is achieved. Reduced construction costs and expanded deck loading area.
Patent Information
- Application Number
- CN202411493541.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-24
- Publication Date
- 2024-12-06
AI Technical Summary
Existing offshore wind power installation ships cannot effectively lift and flip single piles under heavy wind and waves, resulting in low construction efficiency and high cost.
The position of the auxiliary crane has been improved, and it has been changed from the same side of the main crane to be next to the main crane. The main crane is used for pile lifting, expanding the deck loading area, and the single pile is jointly lifted by setting up multiple lifting points. Realize vertical and horizontal placement and pile turning.
It improves construction efficiency, reduces costs, expands the deck loading area, and enhances the loading capacity and balance of the ship.
Smart Images

Figure CN119079028A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of wind power installation equipment, and in particular relates to an offshore transport and piling integrated wind power installation vessel and a wind power single pile lifting method. Background Art
[0002] With the acceleration of global climate change and global green transformation, wind energy has begun to play a role in the energy transformation process, especially offshore wind power resources are abundant, do not occupy land, do not consume water resources, and are suitable for large-scale development. As offshore wind power gradually advances into deep sea areas, the power generation and economic advantages of intelligent ultra-large capacity units will be further highlighted, so it is urgent to install large-scale wind turbines at sea.
[0003] The self-elevating wind turbine installation vessel is the core equipment for offshore wind power construction. It can be used for both wind turbine installation and single pile foundation construction. The domestic wind turbine installation vessel piling adopts the mode of transport and piling separation, that is, the single pile is directly transported to the wind power construction site by a large transport ship, and then the wind turbine installation vessel that is lifted up performs the single pile construction. This mode can still be used in calm waters near the coast. In areas with strong winds and waves in the open sea, due to the poor wind and wave adaptability and large swaying of auxiliary ships such as transport ships, the effective operation window time is short, the construction efficiency is low, and even construction is impossible.
[0004] In the case of strong winds and waves, a more advanced mode is to integrate transportation and piling, that is, to hoist the single pile on the deck of the wind turbine installation ship at a temporary dock near the wind farm in calm waters, and then use the self-elevating wind turbine installation ship to sail to the construction site, use four legs to lift the hull out of the water, and then carry out piling construction. However, two problems must be solved: one is to hoist the single pile on the deck of the wind turbine ship, and the other is to use the lifting facilities on the wind turbine ship to turn over and lift the pile. The current problems are: First, the main crane on the wind turbine cannot lift a single pile from a transport ship or dock to the deck of the wind turbine and place it vertically or horizontally as required. Even if the main crane uses double hooks to lift, the pile can only be in a direction perpendicular to the projection of the crane arm on the water surface, and it cannot be symmetrically swung horizontally or vertically.
[0005] Second, the pile turning method is unscientific (pile turning is to cooperate with the main crane to turn the wind power piles placed flat on the deck upside down) The pile can be hoisted onto the deck using external forces, and then only the problem of turning the pile on the deck needs to be solved. There are many ways to turn the pile: a special crane is specially designed at the stern of the deck to cooperate with the turning of the pile, and a special pile turner is also used. Such a structure is unreasonable, unsafe, and costly. Summary of the invention
[0006] In order to solve the above problems, the present invention discloses an integrated offshore transport and piling wind power installation vessel and a method for lifting a single wind power pile, which improves the position of the auxiliary crane, and changes the auxiliary crane originally arranged on the same side of the main crane to a pile-circling crane arranged next to the main crane (the other side), thereby expanding the effective loading area of the deck, and can also cooperate with the main crane to turn the pile, thereby improving the performance of the ship and reducing the construction cost.
[0007] To achieve the above object, the technical solution of the present invention is as follows: An offshore transport and piling integrated wind power installation vessel, including a hull, a superstructure (a building on the upper deck, including a driving cabin, an operating table, etc.), internal equipment, four pile legs, a main crane and an auxiliary crane. The main crane is arranged on the right pile leg at the stern of the ship in the form of a pile-circling crane, and a main hook and an auxiliary hook are arranged on the top of the main crane arm. The auxiliary crane is arranged on the left pile leg at the stern of the ship in the form of a pile-circling crane, and a small hook is arranged on the top of the auxiliary crane arm.
[0008] As a supplement to the present invention, the hull is a steel box-shaped structure, and four pile legs are arranged at four corners of the deck.
[0009] As a supplement to the present invention, the four pile legs are triangular truss structures, with gear rack transmission, and pile shoes are arranged at the bottom of the pile legs.
[0010] As a supplement to the present invention, the capacity of the auxiliary hook is one third of that of the main hook.
[0011] As a supplement to the present invention, the hook capacity of the auxiliary crane is one seventh of the main hook capacity of the main crane.
[0012] The steps of wind power single pile lifting method are as follows: (1) There are three lifting points 1, 2 and 3 on the pile, which are the main hook lifting point of the main crane, the auxiliary hook lifting point of the main crane and the pile turning lifting point of the auxiliary crane. The distance between the main hook lifting point and the center of gravity of the pile is L1, the distance between the auxiliary hook lifting point and the center of gravity of the pile is L2, the main hook lifting point and the auxiliary hook lifting point are set on both sides of the center of gravity of the pile, and the distance between the pile turning lifting point and the center of gravity of the pile is L3. The calculation method of the hook position and hook capacity is as follows:
[0013]
[0014] (2) At the temporary construction wharf, first lift the monopile from the transport ship and place it on the deck of the wind turbine ship. The monopile transport barge is moored next to the wind turbine installation ship. The main crane uses the main hook and auxiliary hook to lift the monopile at lifting points 1 and 2 respectively. The monopile is lifted and turned over in the air, while keeping the monopile in an inclined state. The crane is rotated to move the monopile above the deck close to the auxiliary crane. At this time, the auxiliary crane is used to lift it to lifting point 3. The auxiliary hook at lifting point 2 is loosened, and the main hook and auxiliary crane are used to lift the monopile and place it on the deck. It can be placed vertically or horizontally.
[0015] (3) After the pile is firmly tied on the deck, the wind turbine installation vessel sails to the offshore construction site, and after positioning, the pile legs are lifted up. The main crane's main hook lifts the pile to lifting point No. 1, and the auxiliary crane lifts to lifting point No. 3. The main and auxiliary cranes lift the pile and turn it over until the pile is fully upright. The auxiliary crane hook can then be loosened, and the main hook will then lift the pile to the location where it needs to be driven for positioning and driving.
[0016] The beneficial effects of the present invention are: (1) The position of the auxiliary crane was improved. By using scientific methods, it was able to cooperate with the main crane to have the ability to turn over piles on the deck, thereby improving work efficiency, saving costs and expanding functions.
[0017] (2) After the position of the auxiliary crane is changed, the auxiliary crane does not occupy the deck area, which can significantly increase the deck loading area.
[0018] (3) Placing the auxiliary crane on the other side of the main crane at the stern is equivalent to increasing the loading capacity of the stern and reducing the ballast balance water. More wind turbine components can be loaded at the original auxiliary crane position, thus increasing the deck loading capacity of the entire ship.
[0019] (4) The auxiliary crane is arranged on the other side leg of the main crane. Its effective lifting range just covers most of the blind spots of the main crane. The auxiliary crane can be used to install small components of the wind turbine. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is a longitudinal monopile + a set of wind turbine layout diagram of the present invention; Figure 2 It is a schematic diagram of the arrangement of the single pile suspension points of the present invention; Figure 3 This is a layout diagram of two longitudinal monopiles of the present invention.
[0021] List of Figure Symbols: 1. Hull, 2. Superstructure, 3. Legs, 4. Main crane, 5. Auxiliary crane, 6. Piles, 7. Blades, 8. Nacelle, 9. Tower. DETAILED DESCRIPTION
[0022] The present invention will be further explained below in conjunction with the accompanying drawings and specific embodiments. It should be understood that the following specific embodiments are only used to illustrate the present invention and are not used to limit the scope of the present invention.
[0023] like Figure 1-3 As shown, the large-scale self-elevating wind power installation ship integrated with offshore transportation and installation described in the present invention comprises a hull 1, a superstructure 2 (a building on the upper deck, including a driving cabin, an operating console, a command tower, etc.), internal equipment, four pile legs 3, a main crane 4 and an auxiliary crane 5; wherein, The hull 1 is a steel box-shaped structure, and the inside of the hull is equipped with propellers, motors and other equipment to ensure the normal operation of the ship, ensuring a speed of more than 10 knots and DP2 dynamic positioning capability.
[0024] The four pile legs 3 on the deck are triangular truss structures, with gear rack transmission, and large-area pile shoes are arranged at the lower part of the pile legs.
[0025] The main crane 4 is located on the column leg at the right stern of the ship, and is in the form of a pile-circling crane. A main hook and an auxiliary hook are arranged on the top of the boom of the main crane 4. The capacity of the main hook meets the requirements of single pile construction, and the capacity of the auxiliary hook is about one-third of the main hook; the auxiliary crane 5 is located on the left pile leg at the stern of the ship, and is in the form of a pile-circling crane. A small hook is arranged on the top of the boom of the auxiliary crane 5. The capacity of the small hook meets the requirements of wind turbine installation, and the hook capacity of the small hook is about one-seventh of the main hook capacity of the main crane.
[0026] The present invention has two main innovative points.
[0027] 1. Change the auxiliary crane 5 originally arranged on the same side of the main crane to a pile-circling crane next to the main crane (on the other side), such as Figure 1 and 3 As shown, This change has the following benefits: 1) It is beneficial to the balance of the ship and increases the effective loading capacity.
[0028] The original main and auxiliary cranes were on the same side of the ship, and the bow was loaded more, while the blind area of the main crane was loaded less, so the front was heavy and the rear was light. To ensure the balance of the ship, the stern must be ballasted with water, which will reduce the loading capacity. Placing the auxiliary crane on the other side of the stern main crane is equivalent to increasing the loading capacity of the stern and reducing the ballast balance water. More wind turbine components can be loaded at the original auxiliary crane position, thus increasing the loading capacity of the entire ship.
[0029] 2) The auxiliary crane does not occupy the deck area, and the auxiliary crane boom does not occupy the available space on the deck when it is in a shelved state. The auxiliary crane's pile-circling boom can be placed next to the main crane in the loaded state, which can significantly increase the deck's loading area.
[0030] 3) The auxiliary crane can properly load the blind area of the deck of the main crane and make full use of the deck area. As the lifting height of the main crane is getting higher and higher, the minimum working radius of the main crane is also getting larger and larger, and the blind area that cannot be loaded is also very large, wasting the deck loading area. The auxiliary crane is arranged on the other side pile leg of the main crane, and its effective lifting range just covers most of the blind area of the main crane. The auxiliary crane can be used to place small components, accessories, tools, etc. for installing wind turbines in the blind area of the main crane. This is more conducive to ensuring the balance of the ship, increasing the effective loading area of the deck, and increasing the ability to load cargo.
[0031] 4) Speed up the loading speed at the temporary wharf on the construction site; according to the integrated mode of transportation and installation, the components must be loaded onto the ship at the temporary wharf. According to the original auxiliary crane arrangement plan, the components of the wind turbine, including the tower, nacelle, hub and three blades, must be hoisted by a main crane, and the auxiliary crane cannot be used. With this plan, the three blades, small components, accessories and tools can all be hoisted by the auxiliary crane, which shortens the loading time and speeds up the loading speed.
[0032] 5) The auxiliary crane can cooperate with the main crane to directly lift the single pile on the transport barge and turn the pile in the air.
[0033] 2. Offshore wind power single pile lifting method like Figure 2 As shown, three lifting points 1, 2 and 3 are arranged on the single pile, which are respectively the main hook lifting point of the main crane, the auxiliary hook lifting point of the main crane and the pile turning lifting point of the auxiliary crane.
[0034] The distance between the main hook lifting point and the single pile gravity center is L1, the distance between the auxiliary hook lifting point and the single pile gravity center is L2, the main hook lifting point and the auxiliary hook lifting point are respectively set on both sides of the single pile gravity center, the distance between the pile turning lifting point and the single pile gravity center is L3, the calculation method of the hook position and hook capacity is as follows:
[0035]
[0036] The self-elevating wind turbine installation vessel must lift the monopile from the transport ship and place it on the deck of the wind turbine ship at the temporary construction dock near the construction site. The monopile transport barge docks next to the self-elevating wind turbine installation vessel. The main crane uses the main hook and auxiliary hook to lift the monopile at lifting points 1 and 2 respectively. The monopile is lifted and turned over in the air while keeping it tilted. The crane is rotated to move the monopile above the deck close to the auxiliary crane. At this time, the auxiliary crane is allowed to lift it to lifting point No. 3, the auxiliary hook at lifting point No. 2 is loosened, and the monopile is lifted by the main hook and auxiliary crane to be placed on the deck. It can be placed vertically or horizontally.
[0037] After the monopile is firmly tied on the deck, the self-elevating wind turbine installation vessel sails to the construction site, lifts the pile legs after positioning, and the main crane's main hook lifts the monopile to lifting point No. 1, and the auxiliary crane lifts to lifting point No. 3. The main and auxiliary cranes lift the monopile and turn the pile until the pile is fully upright. Then the auxiliary crane hook can be loosened, and then the main hook lifts the monopile to the position where piling is required for positioning and piling.
[0038] It should be noted that the above content only illustrates the technical idea of the present invention and cannot be used to limit the protection scope of the present invention. For ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications all fall within the protection scope of the claims of the present invention.
Claims
1. A wind power installation ship integrated with offshore transport and piling, characterized by: Including the hull, superstructure, internal equipment, four pile legs, main crane and auxiliary crane, The main crane is arranged on the right pile leg at the stern of the ship in the form of a pile-circling crane, and a main hook and an auxiliary hook are arranged on the top of the main crane arm. The auxiliary crane is arranged on the left pile leg at the stern of the ship in the form of a pile-circling crane, and a small hook is arranged on the top of the auxiliary crane arm.
2. The offshore transport and piling integrated wind power installation vessel according to claim 1, characterized in that: The hull is a steel box-shaped structure, and four pile legs are arranged at the four corners of the deck.
3. The offshore transport and piling integrated wind power installation vessel according to claim 1, characterized in that: The four pile legs are triangular truss structures, with gear rack transmission, and pile shoes are arranged at the bottom of the pile legs.
4. The offshore transport and piling integrated wind power installation vessel according to claim 1, characterized in that: The auxiliary hook capacity is one third of the main hook capacity.
5. The offshore transport and piling integrated wind power installation vessel according to claim 1, characterized in that: The hook capacity of the auxiliary crane is one seventh of the main hook capacity of the main crane.
6. A method for lifting a single wind power pile using the offshore transport and piling integrated wind power installation vessel of claim 1, characterized in that: Here are the steps: (1) There are three lifting points 1, 2 and 3 on the pile, which are the main hook lifting point of the main crane, the auxiliary hook lifting point of the main crane and the pile turning lifting point of the auxiliary crane. The distance between the main hook lifting point and the center of gravity of the pile is L1, the distance between the auxiliary hook lifting point and the center of gravity of the pile is L2, the main hook lifting point and the auxiliary hook lifting point are set on both sides of the center of gravity of the pile, and the distance between the pile turning lifting point and the center of gravity of the pile is L3. The calculation method of the hook position and hook capacity is as follows: , , (2) At the temporary construction wharf, first lift the monopile from the transport ship and place it on the deck of the wind turbine ship. The monopile transport barge is docked next to the wind turbine installation ship. The main crane uses the main hook and auxiliary hook to lift the monopile at lifting points 1 and 2 respectively. The monopile is lifted and turned over in the air, while keeping the monopile in an inclined state. The crane is rotated to make the monopile above the deck close to the auxiliary crane. At this time, the auxiliary crane is used to lift the monopile to lifting point 3. The auxiliary hook of lifting point 2 is loosened. The main hook and auxiliary crane are used to lift the monopile and place it on the deck. It can be placed vertically or horizontally. (3) After the pile is firmly tied on the deck, the wind turbine installation vessel sails to the offshore construction site, and after positioning, the pile legs are lifted up. The main crane's main hook lifts the pile to lifting point No. 1, and the auxiliary crane lifts to lifting point No.
3. The main and auxiliary cranes lift the pile and turn it over until the pile is fully upright. The auxiliary crane hook can then be loosened, and the main hook will then lift the pile to the location where it needs to be driven for positioning and driving.