Two-deck construction technology

The single-layer hatch cover plate made by box type, lifting and retorting method combined with small current welding and sequential assembly method solves the problems of cumbersome assembly steps and large welding deformation in the prior art, and achieves high efficiency, Accurate hatch assembly and stable structure.

CN119079056APending Publication Date: 2024-12-06NANTONG COSCO HEAVY IND
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411351317.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-26
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The assembly steps of existing bulk carrier hatch covers for marine transportation are complicated, the welding deformation is large, and the structural accuracy and stability need to be improved, resulting in high costs and increased safety risks.

Method used

A single-layer hatch cover plate with box-type and hanging-off structure is made by the counter-making method, using stacking seats, lifting seats and other accessories, combined with assembly lines and markings, small current welding and sequential assembly method are used to ensure dimensional accuracy. and stable structure.

Benefits of technology

It improves assembly efficiency, saves time, ensures assembly dimensional accuracy and structural stability, reduces welding deformation and offset, and improves the standardization and stability of the overall structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119079056A_ABST
    Figure CN119079056A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of deck construction, and discloses a two-deck construction process which comprises the following steps: feeding materials into a site, inspecting, nesting and blanking; assembling long and short beams and end side plates; splicing and welding the top plate; top plate stiffeners are assembled and welded, long and short beams are assembled, and end side plates are assembled; performing inspection before welding, and assembling and welding; inspecting after welding, welding a turnover top plate, mounting a stacking seat and a lifting seat, and turning over to seal a bottom plate; correcting the bottom plate by fire work, turning over and fire work before final assembly, and positioning the final assembly; and carrying out a flexibility test, a stacking test and a device airtightness test, and finally, carrying out sand blasting, repairing, grinding and painting, installing anti-collision rubber and stacking finished products. In the assembling process, the hatch cover is manufactured through a reverse manufacturing method, the equipment efficiency is higher, time is saved, the assembling size accuracy is higher, and the device structure is more stable. During assembly and welding of components, the components are installed according to assembly lines and mark numbers, after welding, the structural accuracy is high, and welding deformation can be effectively reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of deck construction, and in particular to a second deck construction process. Background Art

[0002] At present, the hatch covers of bulk carriers used for ocean transportation are basically opened and closed by cranes on the ship or at the dock. The structural design is special, the structure is complex, the assembly steps are cumbersome, the welding deformation is large, and the cost of replacement and maintenance of accessories is also high.

[0003] The patent application with publication number CN110802340A discloses a manufacturing process for closing the hatch cover of a cargo ship. It comprehensively applies methods such as vertical division, plumb line hanging, and steel wire stretching to determine the closing and assembly positioning reference line, and through reasonable planning of the assembly sequence of each component group, intermediate group, and final assembly, it can avoid overhead welding, simplify the closing of the hatch cover from the intermediate group to the final assembly, and then turn over only once for completion inspection, and ensure that the product meets the requirements of higher closing matching accuracy such as straightness and flatness, avoid the welding difficulty of overhead welding, reduce the safety risk of turning over the hatch cover, and reduce manufacturing costs.

[0004] The prior art has complicated assembly steps, large welding deformation, and the structural accuracy and stability need to be improved.

[0005] Therefore, a new technical solution is needed to solve the above technical problems. Summary of the invention

[0006] The purpose of the present invention is to provide a second deck construction process, and to provide a single-layer hatch cover with a box-type and lift-off structure. The device has only one cover type, and a stacking seat and a lifting seat are installed on the hatch cover top plate, and accessories such as anti-collision blocks and anti-jump devices are installed on the side plates. The hatch cover is made by the reverse manufacturing method, which has higher equipment efficiency, saves time, and has higher assembly size accuracy and a more stable device structure.

[0007] The technical solution adopted by the present invention is: A second deck construction process, the process flow comprises the following steps: A) Material delivery and inspection, nesting and unloading; B) Small assembly of long and short beams and end and side panels: end panel assembly, small beam assembly, side panel assembly, anti-collision block base assembly; C) Top plate assembly and welding: Mark the top plate according to the top plate marking diagram, mark the CVP and CL center lines, grind the welds where the components pass through the top plate, use the arc-starting and extinguishing plates in accordance with the specifications, overlap the top plate and the end plate and side plate, lock the top plate with a locking device, and do not add margins around the edges. Check the roughness of the assembly; D) Assembly and welding of top plate stiffeners, assembly of long and short beams, and assembly of end and side plates: The top plate bulb flat steel must be spliced, welded, and corrected before being assembled to the top plate. The assembly adopts the sequential assembly method, first installing the small beam, then the end beam, and finally the side plate. The web of the end plate is overlapped and welded with the top plate. Before drawing the line, the straightness of the top plate must be checked, and then the line is drawn on the top plate to ensure the straightness of the line. When installing the end plate, the inner side of the web must be close to the drawn line to ensure the size. The minimum overlap weld must not be less than 6mm. Before assembly and welding, the middle of the top plate should be raised and arched 3~5mm toward the bottom plate. After welding, turn it over and perform pyrotechnics once. The pyrotechnics must be 0~5mm sagging toward the bottom plate. E) Inspection before welding and assembly welding; F) Inspection after welding, welding of top plate, installation of stacking seat and lifting seat, and bottom plate of turning over; G) pyrotechnic correction of base plate, pyrotechnic turning before final assembly, final assembly positioning; H) Conduct flexibility test by adjusting the height of the jack, simulate the actual support state to conduct stacking test, conduct airtight test of the device, and finally sandblast, repair and paint the device, install anti-collision rubber, and stack the finished products.

[0008] By adopting the above process, the hatch cover is assembled using the reverse manufacturing method, which has higher equipment efficiency, saves time, and has higher assembly dimensional accuracy and a more stable device structure.

[0009] Preferably, the end plate assembly in step B comprises the following steps: S-B11: After the web plate and the face plate are butt-welded, they are assembled on a flat frame; S-B12: Draw the center line of the web CL according to the small assembly drawing as the assembly reference. Check the straightness of the panel before drawing the line, and draw the triangle plate assembly line according to the CL line; S-B13: The face plate and web of the end plate are overlapped and welded. When installing the web, the inner side of the web should be close to the marking line, and the minimum overlap weld should not be less than 6mm; S-B14: Use a square to check the verticality of the web and panel assembly, and ensure that the size tolerance from the center line to the stacking seat hole is ±1mm.

[0010] By adopting the above process, the components are installed according to the assembly line, and after welding, the structural accuracy is high, the overall structure of the device is more standardized, and the structure is more stable.

[0011] Preferably, when the small beam is assembled in step B, the web assembly line is drawn on the panel according to the small assembly drawing and used as an assembly reference for installation.

[0012] Preferably, the side panel assembly in step B includes the following steps: S-B21: The side panel assembly is based on the CVP centerline, and the CVP centerline is marked with a sample punch; S-B22: After the web plate and the face plate are butt-welded, they are assembled on a flat frame; S-B23: Weld the corresponding rib position marks on the side panels; S-B24: Use templates to assemble the side panel runners to ensure the opening is within positive tolerance and to check the flatness of the side panel runner panels.

[0013] By adopting the above process, the components are installed according to the assembly line and the marking numbers, and after welding, the structural accuracy is high, the overall structure of the device is more standardized, and the structure is more stable.

[0014] Preferably, the assembly of the anti-collision block base in step B includes the following steps: S-B31: According to the small assembly drawing, the assembly line around the bumper base is marked on the belly plate as the assembly reference; S-B32: Drill bolt holes on the web first, then fix the template with ø10mm pins and assemble the limit stops around it; S-B33: The welding foot at the joint of the limit block is 7V, which is ground flat after welding; S-B34: To avoid the weld foot being too large and the inner side being unable to be polished into place, the weld foot of the limit block and the web is 4V, and a template is used for inspection after welding.

[0015] By adopting the above process, the parts are installed according to the assembly line, and after welding, the structure is highly accurate, and after welding, it is inspected and the structure is more stable.

[0016] Preferably, the assembly welding in step E) comprises the following steps: S-E1: Temporary lifting lug installation: Temporary lifting lugs are welded to the end plate; S-E2: Side plate sealing installation: S-E21: The outer periphery of the side plates are all sealed. When assembling the sealed plates, pay attention to the overlap with the top and bottom plates. Check the straightness of the top plate before drawing the line, and then draw the line on the thickness of the sealed plate to ensure the straightness of the line. When installing the end plate, the inner side of the web plate should be close to the drawn line to ensure the size. The minimum overlap weld should not be less than 6mm; S-E22: When welding the sealing plate, first weld the fillet welds with the triangle plates on both sides, and finally weld the fillet welds with the panel, and weld several times with low current to reduce welding deformation; S-E23: If the combined thickness of the sealing plate and the plate to be welded is greater than 60mm, it must be preheated to 150° before welding; S-E24: Use template to check the opening and flatness of the slide.

[0017] By adopting the above process, the components are installed according to the assembly line, and several small current weldings are used respectively, which effectively reduces welding deformation.

[0018] Preferably, the stacking seat and the lifting seat in step F are installed after the hatch cover is turned over once.

[0019] Preferably, turning over and sealing the bottom plate in step F comprises the following steps: S-F1: The four corners of the front hatch cover of the bottom plate are fixed and leveled, and steel plates of corresponding thickness are placed at the hard stops of each small beam to ensure the camber; S-F2: Check the straightness of the beam before sealing the bottom plate; S-F3: The bottom plate and top plate stiffeners are assembled according to the small assembly drawing and welded as required. The local deformation is corrected before closing the plate to release the stress. The bottom plate is welded with pads all around to ensure the welding gap. SF 4: After the base plate welding is completed, pyrotechnic correction is performed.

[0020] Preferably, the final assembly positioning in step G includes the following steps: S-G1: The CL center of the end plate is used as the reference, and the CVP line of the side plate is used as the reference. The lids are punched and positioned by knocking and punching. The final assembly is divided into two groups. The first group has 5 lids, and the 5th lid is used as the reference lid. The second group has 4 lids, and the 5th lid of the first group is used as the reference lid. The step difference between multiple cover plates is ≤10mm; S-G2: Single cover completion inspection: The single cover completion camber is 0~+5mm for the side plate edge and 0~+5mm for the end plate; S-G3: Check the dimensions of the stowage seat and the opening dimensions of the transverse bulkhead chute.

[0021] By adopting the above process, the components are assembled based on the assembly line, which reduces the deviation during assembly, improves the assembly accuracy and the qualified rate.

[0022] Compared with the prior art, the present invention has the following beneficial effects: 1. In the assembly process of the present invention, the hatch cover is manufactured by the reverse manufacturing method, which has higher equipment efficiency, saves time, and has higher assembly dimension accuracy and more stable device structure.

[0023] 2. In the assembly process of the present invention, when the components are assembled and welded, the components are installed according to the assembly line and the marking number. After welding, the structural accuracy is high, the overall structure of the device is more standardized, and the structure is more stable.

[0024] 3. In the assembly process of the present invention, assembly lines are used when assembling various components, which reduces the deviation during assembly and improves the assembly accuracy. In addition, low-current welding is used during assembly, which can effectively reduce welding deformation. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a structural schematic diagram of the present invention; Figure 2 For the present invention Figure 1 The structural diagram at a in the middle; Figure 3 For the present invention Figure 1 The structural diagram at b in the middle; Figure 4 It is a schematic diagram of the state after turning over of the present invention.

[0026] Among them: 1. Stacking seat; 2. Lifting seat; 3. Top plate; 4. Locking device; 5. Top plate reinforcement; 6. Bottom plate; 7. End plate; 8. Side plate; 9. Anti-collision block base; 10. Stop pin; 11. Side plate slide. DETAILED DESCRIPTION

[0027] like Figure 1-4 As shown, a second deck construction process includes the following steps: A) Material delivery and inspection, nesting and unloading; B) Assembly of long and short beams and end and side plates: assembly of end plate 7, assembly of small beams, assembly of side plates 7, assembly of anti-collision block base 9; C) Top plate 3 paneling and welding: Mark the top plate 3 according to the top plate marking diagram, mark the CVP and CL center lines, grind the weld where the component passes through the top plate 3 weld, use the arc-initiating and extinguishing plates in accordance with the specifications, the top plate 3 and the end plate 7 and the side plate 8 are all overlapped, the top plate 3 is locked by the locking device 4, no margin is added around, and the panel surface is checked; during assembly, the top plate gap is controlled to 0~1mm; the plate thickness difference direction is consistent with the panel Figure 1 The marking datum meets the requirements of the drawing; the dimension tolerance from the center line of CL to the center of the stacking seat hole is ±2mm; (there are 16 stacking seats in total, 8 for the top plate and 8 for the bottom plate); the dimension tolerance from the center line of CVP to the center of the stacking seat hole is ±1mm; the diagonal of the stacking seat hole (|D1-D2|﹤6mm); all top plates need to be leveled by a leveling machine and marked with a roller; ensure the quality of submerged arc welding of the top plate and minimize the number of rework.

[0028] D) Assembly and welding of top plate stiffener 5, assembly of long and short beams, and assembly of end and side plates: The top plate bulb flat steel must be spliced, welded, and corrected before being assembled on the top plate 3. The assembly adopts the sequential assembly method, first installing the small beam, then the end beam, and finally the side plate 8. The web of the end plate 7 is overlapped and welded with the top plate 3. Before drawing the line, check the straightness of the top plate 3, and then draw the line on the top plate 3 to ensure the straightness of the line. When installing the end plate 7, the inner side of the web must be close to the drawn line to ensure the size. The minimum overlap weld must not be less than 6mm. Before assembly and welding, the middle of the top plate should be raised and arched 3~5mm to the side of the bottom plate 6. After welding, turn it over and perform pyrotechnics once. The pyrotechnics must be 0~5mm drooping to the bottom plate 6. E) Inspection before welding and assembly welding; F) Inspection after welding, welding of top plate, installation of stacking seat 1 and lifting seat 2, and bottom plate 6; G) pyrotechnic correction of the base plate 6, pyrotechnic turning before final assembly, final assembly positioning; H) Conduct flexibility test by adjusting the height of the jack, simulate the actual support state to conduct stacking test, conduct airtight test of the device, and finally sandblast, repair, paint, install anti-collision rubber, and stack the finished products. During the flexibility test, keep the upper surfaces of the four supports flush, the hatch cover is supported at four points, and one support point is lowered or raised at will, the lowering amount or raising amount is 5mm, and the fourth support point is required to still be in contact with the hatch cover, record the test results, and make a report; during the stacking test, follow the stacking instructions shown in the figure to simulate the stacking conditions in the second deck cabin, and measure the height difference between the fourth, fifth, and sixth cover anti-jump latches from the bottom layer and the upper surface of the base, and record the test results.

[0029] The assembly of the end plate 7 in step B includes the following steps: S-B11: After the web plate and the face plate are butt-welded, they are assembled on a flat frame; S-B12: Draw the center line of the web CL according to the small assembly drawing as the assembly reference. Check the straightness of the panel before drawing the line. Draw the triangle plate assembly line according to the CL line. S-B13: The face plate and web of end plate 7 are overlapped and welded. When installing the web, the inner side of the web should be close to the marking line, and the minimum overlap weld should not be less than 6mm; S-B14: Use a square to check the verticality of the web and panel assembly, and ensure that the size tolerance from the center line to the stacking seat hole is ±1mm.

[0030] During assembly, control the length dimension to ±2mm and the height dimension to ±1mm; the panel and web of the end plate 7 are overlapped and welded. Before drawing the line, check the straightness of the panel, and then draw the line on the panel to ensure the straightness of the line. When installing the web, the inner side of the web should be close to the drawn line to ensure the size; the minimum lap weld shall not be less than 6mm; the size tolerance from the center line to the stacking seat hole is ±1mm; the direction of the plate thickness difference is consistent with the drawing; the arc-extinguishing plate is used correctly; the camber requirement: no camber is allowed in the small assembly stage; after completion, if the size deviation is large, it shall be repaired or welded, and the process shall be fed back in time to adjust the relevant assembly data of the previous process.

[0031] When assembling the small beam in step B, draw the web assembly line on the panel according to the small assembly drawing and use it as the assembly reference for installation.

[0032] During assembly, control the length dimension to 0 / -1mm and the height dimension to ±1mm; after the panel is installed, the distance between the panel and the upper end of the small beam is the same as the height at both ends of the web. This panel is used for bottom plate plug welding; pay attention to the accuracy of the holes for the stiffeners at the upper and lower ends of the small beam.

[0033] The assembly of the side panel 8 in step B includes the following steps: S-B21: The side panel 8 is assembled based on the CVP centerline, which is marked with a sample punch; S-B22: After the web plate and the face plate are butt-welded, they are assembled on a flat frame; S-B23: Weld the corresponding rib position number marks on the side plate 8; S-B24: When assembling the side panel slide 11, use a template to ensure that the opening is a positive tolerance and check the flatness of the side panel slide 11 panel.

[0034] During assembly, the height of the control side panel must be within ±1mm, and the length must be within ±2mm; the total length of the web and panel must be checked; the panel level and flatness must be ≤2mm; the slot opening must be 0 / +2; pay attention to ensuring the straightness and verticality of the stop pin 10 latch sleeve.

[0035] The assembly of the anti-collision block base 9 in step B includes the following steps: S-B31: According to the small assembly drawing, an assembly line for limiting the surroundings of the anti-collision block base 9 is drawn on the web as an assembly reference; S-B32: Drill bolt holes in the web first, then fix the template with ø10mm pins and assemble the limit stops around it; S-B33: The welding foot at the joint of the limit block is 7V, which is ground flat after welding; S-B34: To prevent the weld foot from being too large and the inner side from being unable to be polished properly, the weld foot of the limit block and the web is 4V. Use template inspection after welding.

[0036] During assembly, the control limits on all sides are assembled using templates, and the thickness of the template is greater than 12mm; the opening inside the limit is 152 (+0.5~+1); the weld on the inside of the limit is polished and smooth and then inspected with a template.

[0037] The assembly welding in step E) comprises the following steps: S-E1: Temporary lifting lug installation: The temporary lifting lug is welded to the end plate 7; S-E2: Side panel 8 sealing plate installation: S-E21: The outer periphery of the side plate 8 is a sealing plate. When assembling the sealing plate, pay attention to the overlap with the top plate 3 and the bottom plate 6. Check the straightness of the top plate before drawing the line, and then draw a line on the thickness of the sealing plate to ensure the straightness of the line. When installing the end plate 7, the inner side of the web should be close to the drawn line to ensure the size. The minimum overlap weld should not be less than 6mm; S-E22: When welding the sealing plate, first weld the fillet welds with the triangle plates on both sides, and finally weld the fillet welds with the panel, and weld several times with low current to reduce welding deformation; S-E23: If the combined thickness of the sealing plate and the plate to be welded is greater than 60mm, it must be preheated to 150° before welding; S-E24: Use template to check the opening and flatness of the slide.

[0038] During assembly, select the corresponding lifting lugs and lifting tools according to the tonnage; before using the lifting lugs, check the appearance of the welds and the size of the weld feet to ensure that there are no defects in the appearance; check on the tire frame, focusing on the levelness and flatness of the panel, the overall flatness is less than 1mm, and 2mm is allowed locally; after the sealing plate is welded, ensure the opening of the transverse bulkhead slide (0~+2mm), and the distance from the center of the slide to the top plate is H±2mm; In step F, the stacking seat 1 and the lifting seat 2 are installed after the hatch cover is turned over once.

[0039] During assembly, the control cover stacking seat is installed according to the tolerance, the length direction is L±4mm, the length from the center line CL to the stacking seat 1 is assembled according to L±2mm, the width direction is assembled according to L±2mm, and the diagonal difference of the stacking seat 1 |D1-D2|﹤6mm; the stacking seat 1 on the transverse bulkhead of the end plate 7 is installed according to the tolerance, the length direction is L±4mm, the length from the center line CL to the stacking seat is assembled according to L±2mm, and the distance from the center of the stacking seat 1 to the top plate is H+2mm; the top of the stacking seat 1 and the lashing ring is flush with the top plate, and the weld on the top plate surface is ground flat after welding.

[0040] Turning over and sealing the bottom plate 6 in step F includes the following steps: S-F1: The four corners of the front hatch cover of the bottom plate 6 are fixed and leveled, and steel plates of corresponding thickness are placed at the hard stops of each small beam to ensure the camber; S-F2: Check the straightness of the beam before sealing the bottom plate 6; S-F3: The bottom plate 6 and the top plate stiffener 5 are assembled according to the small assembly drawing and welded as required. The local deformation is corrected before closing the plate to release the stress. The bottom plate 6 is welded with pads all around to ensure the welding gap; SF 4: After the base plate welding is completed, pyrotechnic correction is performed.

[0041] During assembly, according to the requirements of the front reverse deformation of the bottom plate: the end plate 7 is arched 0-5mm toward the bottom plate 6, the side plate 8 is flattened, and then welded; ensure that the gasket welding gap is 4mm.

[0042] The final assembly positioning in step G includes the following steps: S-G1: The CL center of the end plate 7 is used as the reference, and the CVP line of the side plate 8 is used as the reference. The lids are punched and positioned by punching. The final assembly is divided into two groups. The first group has 5 lids, and the 5th lid is used as the reference lid. The second group has 4 lids, and the 5th lid of the first group is used as the reference lid. The step difference between multiple cover plates is ≤10mm; S-G2: Single cover completion inspection: The single cover completion camber is 0~+5mm for the side plate edge and 0~+5mm for the end plate; S-G3: Check the dimensions of the stacking seat 1 and the opening dimensions of the chute on the transverse bulkhead.

[0043] During assembly, the diagonal is measured and the length dimension is controlled within the tolerance range based on inspection.

[0044] In the assembly process of the present invention, the hatch cover is made by the reverse manufacturing method, which has higher equipment efficiency, saves time, and has higher assembly dimension accuracy and more stable device structure. When the components are assembled and welded, the components are installed according to the assembly line and the marking number. After welding, the structure is highly accurate, the overall structure of the device is more standardized, and the structure is more stable. In addition, the assembly adopts low current welding, which can effectively reduce welding deformation.

[0045] The embodiments described above are merely descriptions of preferred implementations of the present invention and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by those skilled in the art should be included in the protection scope determined by the claims of the present invention.

Claims

1. A second deck construction process, characterized by: The process comprises the following steps: A) Material delivery and inspection, nesting and unloading; B) Small assembly of long and short beams and end and side panels: end panel assembly, small beam assembly, side panel assembly, and anti-collision block base assembly; C) Top plate assembly and welding: Mark the top plate according to the top plate marking diagram, mark the CVP and CL center lines, grind the welds where the components pass through the top plate, use the arc-starting and extinguishing plates in accordance with the specifications, overlap the top plate and the end plate and side plate, lock the top plate with a locking device, and do not add margins around the edges. Check the roughness of the assembly; D) Assembly and welding of top plate stiffeners, assembly of long and short beams, and assembly of end and side plates: The top plate bulb flat steel must be spliced, welded, and corrected before being assembled to the top plate. The assembly adopts the sequential assembly method, first installing the small beam, then the end beam, and finally the side plate. The web of the end plate is overlapped and welded with the top plate. Before drawing the line, the straightness of the top plate must be checked, and then the line is drawn on the top plate to ensure the straightness of the line. When installing the end plate, the inner side of the web must be close to the drawn line to ensure the size. The minimum overlap weld must not be less than 6mm. Before assembly and welding, the middle of the top plate should be raised and arched 3~5mm toward the bottom plate. After welding, turn it over and perform pyrotechnics once. The pyrotechnics must be 0~5mm sagging toward the bottom plate. E) Inspection before welding and assembly welding; F) Inspection after welding, welding of top plate, installation of stacking seat and lifting seat, and bottom plate of turning over; G) pyrotechnic correction of base plate, pyrotechnic turning before final assembly, final assembly positioning; H) Conduct flexibility test by adjusting the height of the jack, simulate the actual support state to conduct stacking test, conduct airtight test of the device, and finally sandblast, repair grind, paint, install anti-collision rubber, and stack the finished products.

2. A second deck construction process according to claim 1, characterized in that: The end plate assembly in step B includes the following steps: S-B11: After the web plate and the face plate are butt-welded, they are assembled on a flat frame; S-B12: Draw the center line of the web CL according to the small assembly drawing as the assembly reference. Check the straightness of the panel before drawing the line, and draw the triangle plate assembly line according to the CL line; S-B13: The face plate and web of the end plate are overlapped and welded. When installing the web, the inner side of the web should be close to the marking line, and the minimum overlap weld should not be less than 6mm; S-B14: Use a square to check the verticality of the web and panel assembly, and ensure that the size tolerance from the center line to the stacking seat hole is ±1mm.

3. A second deck construction process according to claim 1, characterized in that: When assembling the small beam in step B, draw the web assembly line on the panel according to the small assembly drawing and use it as the assembly reference for installation.

4. A second deck construction process according to claim 1, characterized in that: The side panel assembly in step B includes the following steps: S-B21: The side panel assembly is based on the CVP centerline, and the CVP centerline is marked with a sample punch; S-B22: After the web plate and the face plate are butt-welded, they are assembled on a flat frame; S-B23: Weld the corresponding rib position marks on the side panels; S-B24: Use templates to assemble the side panel runners to ensure the opening is within positive tolerance and to check the flatness of the side panel runner panels.

5. A second deck construction process according to claim 1, characterized in that: The assembly of the anti-collision block base in step B includes the following steps: S-B31: According to the small assembly drawing, the assembly line around the bumper base is marked on the belly plate as the assembly reference; S-B32: Drill bolt holes on the web first, then fix the template with ø10mm pins and assemble the limit stops around it; S-B33: The welding foot at the joint of the limit block is 7V, which is ground flat after welding; S-B34: To avoid the weld foot being too large and the inner side being unable to be polished into place, the weld foot of the limit block and the web is 4V, and a template is used for inspection after welding.

6. A second deck construction process according to claim 1, characterized in that: The assembly welding in step E) comprises the following steps: S-E1: Temporary lifting lug installation: Temporary lifting lugs are welded to the end plate; S-E2: Side plate sealing installation: S-E21: The outer periphery of the side plates are all sealed. When assembling the sealed plates, pay attention to the overlap with the top and bottom plates. Check the straightness of the top plate before drawing the line, and then draw the line on the thickness of the sealed plate to ensure the straightness of the line. When installing the end plate, the inner side of the web plate should be close to the drawn line to ensure the size. The minimum overlap weld should not be less than 6mm; S-E22: When welding the sealing plate, first weld the fillet welds with the triangle plates on both sides, and finally weld the fillet welds with the panel, and weld several times with low current to reduce welding deformation; S-E23: If the combined thickness of the sealing plate and the plate to be welded is greater than 60mm, it must be preheated to 150° before welding; S-E24: Use template to check the opening and flatness of the slide.

7. A second deck construction process according to claim 1, characterized in that: The stacking seat and the lifting seat in step F are installed after the hatch cover is turned over once.

8. A second deck construction process according to claim 1, characterized in that: Turning over and sealing the bottom plate in step F comprises the following steps: S-F1: The four corners of the front hatch cover of the bottom plate are fixed and leveled, and steel plates of corresponding thickness are placed at the hard stops of each small beam to ensure the camber; S-F2: Check the straightness of the beam before sealing the bottom plate; S-F3: The bottom plate and top plate stiffeners are assembled according to the small assembly drawing and welded as required. The local deformation is corrected before closing the plate to release the stress. The bottom plate is welded with pads all around to ensure the welding gap. SF 4: After the base plate welding is completed, pyrotechnic correction is performed.

9. A second deck construction process according to claim 1, characterized in that: The final assembly positioning in step G includes the following steps: S-G1: The CL center of the end plate is used as the reference, and the CVP line of the side plate is used as the reference. The lids are punched and positioned by knocking and punching. The final assembly is divided into two groups. The first group has 5 lids, and the 5th lid is used as the reference lid. The second group has 4 lids, and the 5th lid of the first group is used as the reference lid. The step difference between multiple cover plates is ≤10mm; S-G2: Single cover completion inspection: The single cover completion camber is 0~+5mm for the side plate edge and 0~+5mm for the end plate; S-G3: Check the dimensions of the stowage seat and the opening dimensions of the transverse bulkhead chute.