Method for installing bow springboard

By pre-installing the articulated seats on the bow springboard and articulating them on the hull, the problem of low installation efficiency of the bow springboard is solved, and a more efficient and safe installation process is achieved, the boring processing steps are simplified, and the installation quality is improved.

CN119079064APending Publication Date: 2024-12-06WUCHANG SHIPBUILDING INDUSTRY GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411370715.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-29
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The installation efficiency of ship bow springboard is low, mainly due to the high requirements of hinge installation accuracy and coaxiality. The existing process requires the boring machine to perform secondary processing on the ship platform, which is very labor-intensive and has low production efficiency.

Method used

The articulated seat is pre-installed on the bow springboard, and is articulated with the articulated seat through the articulated seat to be fixed to the hull to avoid boring processing on the boat platform. It is equipped with hand-pulled hoists and screw buckles to ensure the correctness of articulation and sealing of the articulation. sex.

Benefits of technology

It improves installation efficiency, reduces operating risks in complex environments of the ship, increases operating space, simplifies the installation process, and improves installation quality and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119079064A_ABST
    Figure CN119079064A_ABST
Patent Text Reader

Abstract

The invention discloses a bow springboard mounting method, and relates to the technical field of ship springboard mounting, the mounting method comprises the following steps: mounting hinge seats on two sides of one end of a bow springboard; the bow springboard is positioned, and the bow springboard is rotatably connected with the ship body; hinging a hinging piece with the hinging seat, and then fixing the hinging piece in a fixed area of a ship body so as to realize the hinging of the bow springboard and the ship body; and the bow springboard is sealed, so that installation of the bow springboard is completed. The hinge seat is installed on the bow springboard firstly, then the bow springboard is transported to the ship body to be installed, secondary boring on a boring machine on a slipway after installation is not needed, the situation that workers disassemble and assemble machining equipment and machine machining operation in the complex slipway environment is avoided, the machining operation space is increased, the installation efficiency is improved, and the installation risk is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of ship gangway installation, and specifically relates to a method for installing a bow gangway. Background Art

[0002] The bow ramp of a ship has a wide range of applications. It is needed on various types of roll-on / roll-off ships, roll-on / roll-off passenger ships, the sides of large ships and amphibious ships to meet various usage requirements.

[0003] As a key passage equipment, the bow ramp carries an important mission and has very high requirements for installation quality. The installation difficulties of the ramp include the installation accuracy and the sealing after installation. The installation accuracy of the ramp mainly depends on the installation accuracy and coaxiality of the ramp hinge. For the installation of the ramp hinge, the hinge welding is completed on the slipway first, and then a boring machine is used to perform secondary boring on the slipway to ensure the coaxiality of the hinge. This process requires the boring machine to be put on the slipway to perform secondary boring after the eye plate is installed. The labor intensity is high, and multiple corrections are required after installation, and the production efficiency is low. Summary of the invention

[0004] The purpose of the present application is to provide a method for installing a bow springboard, aiming to solve the technical problem of low installation efficiency of the bow springboard at least to a certain extent.

[0005] In order to solve the above technical problems, this application adopts the following technical solutions:

[0006] A first aspect of an embodiment of the present application provides a method for installing a bow ramp, the method comprising the following steps:

[0007] Install hinged seats on both sides of one end of the bow ramp;

[0008] Positioning the bow gangplank and rotatably connecting the bow gangplank to the hull;

[0009] Hinging the hinged member with the hinged seat, and then fixing the hinged member to a fixed area of ​​the hull, so as to realize the hinged connection between the bow ramp and the hull;

[0010] Seal the bow springboard to complete the installation of the bow springboard.

[0011] In some embodiments, the step of installing hinged seats on both sides of one end of the bow springboard includes:

[0012] Before the hinge seat is hinged to the hinge component, the hinge seat is bored to form a first hinge hole, wherein the first hinge hole is used to cooperate with the second hinge hole on the hinge component to install the expansion mandrel.

[0013] In some embodiments, positioning the bow ramp includes:

[0014] Folding and hoisting the bow gangplank to a transfer platform, wherein the transfer platform is located in front of the bow door of the hull;

[0015] Adjust the height of the transfer platform so that the hinged seat is flush with the fixing area.

[0016] In some embodiments, the rotatably connecting the bow ramp to the hull comprises:

[0017] Use a hand chain hoist to pull the bow gangplank to the front wall of the bow sealing plate of the hull, and dock it with the vehicle clamping plate of the hull;

[0018] Turnbuckles are respectively arranged on the port side and the starboard side of the vehicle deck, and the vehicle clamping plate is connected with the bow ramp through the turnbuckles to realize the hinged connection between the bow ramp and the hull.

[0019] In some embodiments, the hinge seat includes a bottom plate and two support plates spaced apart from each other on the bottom plate, and the hinge member is hingedly connected to the hinge seat including:

[0020] Making a template, placing the template between the two support plates, and trimming the template so that the template and the two support plates are gap-matched;

[0021] Process hinges according to sample size and shape;

[0022] One end of the hinge is fitted with the fixed area on the bow sealing plate of the hull, and the other end of the hinge is extended into the hinge seat. An expansion mandrel is driven into the hinge seat and the hinge to hinge the hinge seat and the hinge.

[0023] In some embodiments, the fixing area of ​​the hinge to the hull includes:

[0024] The hinge and the bow seal plate are spot welded, and a reinforcing bracket is welded on the hinge.

[0025] In some embodiments, before welding the reinforcing bracket on the hinge, the method further comprises:

[0026] A tooling bracket is welded on the hinged part. 24 hours after the welding is completed, the tooling bracket is removed and the welding position is polished and smoothed.

[0027] In some embodiments, before sealing the bow ramp, the process further includes performing an opening and closing inspection on the bow ramp, and the specific steps are as follows:

[0028] Use the tooling hand hoist to check the opening and closing of the bow gangway to ensure the correctness of the articulation.

[0029] In some embodiments, sealing the bow ramp includes:

[0030] A sealing seat with a groove is welded on the bow sealing plate of the hull, and then a sealing member is installed in the sealing groove. When the bow springboard is fully retracted, the sealing surface of the bow springboard is tightly fitted and pressed against the sealing member, thereby achieving sealing of the bow springboard.

[0031] In some embodiments, before the first step, the bow ramp needs to be processed in the factory, and the specific steps are:

[0032] The bow springboard body is processed by a plasma CNC machine tool. During processing, a margin must be left in the length direction of the bow springboard body to facilitate error correction during installation on the slipway. Then the center position of the second hinge hole of the hinge is marked on the bow springboard body, and then the corresponding shaft hole is processed on a milling machine.

[0033] It can be seen from the above technical solution that the present application has at least the following advantages and positive effects:

[0034] A method for installing a bow springboard in the present application first installs a hinged seat on the bow springboard, and then transports the bow springboard to the hull for installation. There is no need to put a boring machine on the slipway to perform secondary boring after installation, which avoids the need for workers to disassemble and assemble processing equipment and perform machining operations in the complex environment of the slipway, increases the processing operation space, improves installation efficiency, and reduces installation risks. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0036] Figure 1 It is a process flow chart of a method for installing a bow ramp in an embodiment of the present application;

[0037] Figure 2 It is a schematic diagram of the installation of a bow springboard in a method for installing a bow springboard in an embodiment of the present application;

[0038] Figure 3 It is a schematic diagram of positioning and transporting the bow ramp in the embodiment of the present application;

[0039] Figure 4 It is a schematic diagram of the opening and closing inspection of the bow ramp in the embodiment of the present application.

[0040] The accompanying drawings are described as follows: 1. hull; 2. bow ramp; 3. hinged seat; 4. hinged part; 5. transfer platform; 6. hand winch; 7. vehicle splint; 8. bow sealing plate. DETAILED DESCRIPTION

[0041] In order to make the technical personnel in the technical field to which the present application belongs to understand the present application more clearly, the technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.

[0042] Figure 1 is a process flow chart of a method for installing a bow ramp in an embodiment of the present application, Figure 2 : is a schematic diagram of the installation of a bow springboard in a method for installing a bow springboard in an embodiment of the present application, such as Figure 1 and Figure 2 As shown, the installation method comprises the following steps:

[0043] S1: Processing the bow springboard 2 in the factory;

[0044] Specifically, a plasma CNC machine tool is used to process the bow springboard 2 body. During processing, a margin must be left in the length direction of the bow springboard 2 body to facilitate error correction during installation on the slipway. Then the center position of the second hinge hole of the hinge 4 is marked on the bow springboard 2 body, and then the corresponding shaft hole is processed on a milling machine.

[0045] Since the bow springboard 2 is a heavy equipment, it is installed before the ship shaft system is constructed. Before the bow springboard 2 is installed, the welding of the bow section of the hull 1 needs to be completed. The bow springboard 2 is embedded, and a transfer platform 5 needs to be made to smoothly transport the springboard into the hull 1 for installation. In order to ensure the watertightness of the bow springboard 2 after installation, the flatness of the hull 1 surface that the springboard contacts when the springboard is folded is required to meet the design index of the ship during processing. In addition, the center line of the hull 1 is engraved on the bow hull 1 panel and a foreign mark is made, and the center line is engraved on the front and back of the springboard and a foreign mark is made.

[0046] S2: Install hinged seats 3 on both sides of one end of the bow springboard 2;

[0047] Specifically, after the hinge seat 3 is installed on both sides of one end of the bow springboard 2, the hinge seat 3 is bored in the factory to form a first hinge hole, which is used to cooperate with the second hinge hole on the hinge 4 to install the expansion mandrel. It is not necessary to put the boring machine on the slipway for secondary boring after installation.

[0048] S3: Positioning the bow ramp 2 and rotatably connecting the bow ramp 2 to the hull 1;

[0049] like Figure 3 As shown, Figure 3 It is a schematic diagram of positioning and transportation of the bow ramp 2 in the embodiment of the present application.

[0050] Specifically, the positioning of the bow springboard 2 includes: folding the bow springboard 2 and hoisting it to the transfer platform 5, wherein the transfer platform 5 is located in front of the bow door of the hull 1; and adjusting the height of the transfer platform 5 so that the articulated seat 3 is flush with the fixed area.

[0051] Specifically, the rotatable connection of the bow gangplank 2 to the hull 1 includes: using a hand winch 6 to pull the bow gangplank 2 to the front wall of the bow sealing plate 8 of the hull 1, and docking with the vehicle clamping plate 7 of the hull 1; spiral buckles are respectively provided on the port and starboard sides of the vehicle deck, and the vehicle clamping plate 7 is connected to the bow gangplank 2 through the spiral buckles to realize the hinge connection between the bow gangplank 2 and the hull 1. When connecting, loosen the spiral buckle to the maximum and then connect the vehicle deck and the bow gangplank 2 respectively, tighten the spiral buckle, and adjust the distance between the hinge center line at the end of the bow gangplank 2 and the front wall of the bow sealing plate to meet the requirements. The positioning size is set as a review size, and the review size should be consistent with the positioning size

[0052] S4: hinge the hinge 4 to the hinge seat 3, and then fix the hinge 4 to the fixed area of ​​the hull 1 to realize the hinge connection between the bow ramp 2 and the hull 1;

[0053] Specifically, the articulated seat 3 includes a bottom plate and two support plates spaced apart on the bottom plate, and the articulation of the hinge 4 with the articulated seat 3 includes: making a template, placing the template between the two support plates, trimming the template so that the template and the two support plates are gap-matched; processing the articulated member 4 according to the size and shape of the template; fitting one end of the articulated member 4 with the fixed area on the bow seal plate 8 of the hull 1, and extending the other end of the articulated member 4 into the articulated seat 3, driving an expansion mandrel into the articulated seat 3 and the articulated member 4, so that the articulated seat 3 is articulated with the articulated member 4 to provide a fulcrum for the rotation of the bow springboard 2 on the hull 1. A process gasket is installed between the articulated member 4 and the articulated seat 3 to eliminate the axial gap, and a springboard hinge process expansion mandrel is passed through the hinge hole to expand and tighten to eliminate the radial gap.

[0054] Specifically, the fixing area of ​​the hinge 4 to the hull 1 includes:

[0055] Spot weld the hinge 4 and the bow seal 8, weld the tooling elbow plate on the hinge 4, remove the tooling elbow plate 24 hours after welding, polish and smooth the welding position, weld a reinforcing elbow plate after each tooling elbow plate is removed, until all the tooling elbow plates are replaced. The thickness of the reinforcing elbow plate shall not be less than 24mm, and the reinforcing elbow plate and the single-eye plate shall be intermittently welded. Observe the welding deformation during welding, measure the weld temperature after welding a weld, and weld the next weld only when the temperature is below 60° until the welding work is completed. The welding of the single-eye plate of the hull 1 can be constructed at the same time. During welding, it is necessary to check in real time whether the weld of the back support is cracked, and use a triangular caliper to monitor the vertical angle of the welded single-eye plate in real time. If the vertical angle changes, the welding construction must be stopped immediately, and the weld must be welded on the reverse side after the weld cools down. After correction, the tooling support is strengthened, and then the welding operation can be carried out.

[0056] S5: Check the opening and closing of the bow ramp 2;

[0057] See also Figure 4 , Figure 4 It is a schematic diagram of the opening and closing inspection of the bow ramp 2 in the embodiment of the present application.

[0058] Specifically, the bow ramp 2 is pulled to the front wall position of the bow sealing plate 8 of the hull 1 by using the hand chain hoist 6, and docked with the vehicle clamping plate 7 of the hull 1.

[0059] S5: The bow springboard 2 is sealed to complete the installation of the bow springboard 2.

[0060] It can be seen from the above technical solution that the present application has at least the following advantages and positive effects:

[0061] A method for installing a bow springboard in the present application first installs a hinged seat on the bow springboard, and then transports the bow springboard to the hull for installation. There is no need to put a boring machine on the slipway to perform secondary boring after installation, which avoids the need for workers to disassemble and assemble processing equipment and perform machining operations in the complex environment of the slipway, increases the processing operation space, improves installation efficiency, and reduces installation risks.

[0062] Unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include the first and second features being in direct contact, or may include the first and second features not being in direct contact but being in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes the first feature being directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes the first feature being directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.

[0063] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise" and "counterclockwise" indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0064] In this application, unless otherwise clearly specified and limited, the terms "connection", "fixation", etc. should be understood in a broad sense. For example, "fixation" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0065] In addition, the descriptions of "first", "second", etc. in this application are only for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" or "second" may explicitly or implicitly include one or more features. In the description of this application, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0066] Although the embodiments of the present application have been shown and described, those skilled in the art will appreciate that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present application, and that the scope of the present application is defined by the claims and their equivalents.

Claims

1. A method for installing a bow ramp, characterized in that: The installation method comprises the following steps: Install hinged seats on both sides of one end of the bow ramp; Positioning the bow gangplank and rotatably connecting the bow gangplank to the hull; Hinging the hinged member with the hinged seat, and then fixing the hinged member to a fixed area of ​​the hull, so as to realize the hinged connection between the bow ramp and the hull; Seal the bow springboard to complete the installation of the bow springboard.

2. The method for installing a bow ramp according to claim 1, characterized in that: The hinged seats are installed on both sides of one end of the bow springboard, including: Before the hinge seat is hinged to the hinge component, the hinge seat is bored to form a first hinge hole, wherein the first hinge hole is used to cooperate with the second hinge hole on the hinge component to install the expansion mandrel.

3. The method for installing a bow ramp according to claim 1, characterized in that: Positioning the bow springboard comprises: Folding and hoisting the bow gangplank to a transfer platform, wherein the transfer platform is located in front of the bow door of the hull; Adjust the height of the transfer platform so that the hinged seat is flush with the fixing area.

4. The method for installing a bow ramp according to claim 1, characterized in that: The method of rotatably connecting the bow ramp to the hull comprises: Use a hand chain hoist to pull the bow gangplank to the front wall of the bow sealing plate of the hull, and dock it with the vehicle clamping plate of the hull; Turnbuckles are respectively arranged on the port side and the starboard side of the vehicle deck, and the vehicle clamping plate is connected with the bow ramp through the turnbuckles to realize the hinged connection between the bow ramp and the hull.

5. The method for installing a bow ramp according to claim 1, characterized in that: The hinge seat comprises a bottom plate and two support plates spaced apart on the bottom plate, and the hinge member is hinged to the hinge seat comprising: Making a template, placing the template between the two support plates, and trimming the template so that the template and the two support plates are gap-matched; Process hinges according to sample size and shape; One end of the hinge is fitted with the fixed area on the bow sealing plate of the hull, and the other end of the hinge is extended into the hinge seat. An expansion mandrel is driven into the hinge seat and the hinge to hinge the hinge seat and the hinge.

6. The method for installing a bow ramp according to claim 5, characterized in that: The fixing area for fixing the hinge to the hull includes: The hinge and the bow seal plate are spot welded, and a reinforcing bracket is welded on the hinge.

7. The method for installing a bow ramp according to claim 6, characterized in that: Before welding the reinforcing bracket on the hinged part, the method further comprises: A tooling bracket is welded on the hinged part. 24 hours after the welding is completed, the tooling bracket is removed and the welding position is polished and smoothed.

8. The method for installing a bow ramp according to claim 1, characterized in that: Before sealing the bow ramp, the bow ramp is also inspected for opening and closing, and the specific steps are as follows: Use the tooling hand hoist to check the opening and closing of the bow gangway to ensure the correctness of the articulation.

9. The method for installing a bow ramp according to claim 1, characterized in that: The method of sealing the bow springboard comprises: A sealing seat with a groove is welded on the bow sealing plate of the hull, and then a sealing member is installed in the sealing groove. When the bow springboard is fully retracted, the sealing surface of the bow springboard is tightly fitted and pressed against the sealing member, thereby achieving sealing of the bow springboard.

10. The method for installing a bow ramp according to claim 1, characterized in that: Before the first step, the bow springboard needs to be processed in the factory. The specific steps are as follows: The bow springboard body is processed by a plasma CNC machine tool. During processing, a margin must be left in the length direction of the bow springboard body to facilitate error correction during installation on the slipway. Then the center position of the second hinge hole of the hinge is marked on the bow springboard body, and then the corresponding shaft hole is processed on a milling machine.