Automatic feeding control system for puffed food raw material processing

By real-time analysis and regulation of material separation and conveying parameters in the puffed food raw material processing system, the problem of inconsistent raw material transmission in traditional systems is solved, production efficiency and product quality are improved, and efficient and stable production of puffed food is ensured.

CN119079476AActive Publication Date: 2024-12-06QUANZHOU RUIMAI FOOD CO LTD

Patent Information

Application Number
CN202411276983.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-12
Publication Date
2024-12-06
Estimated Expiration
2044-09-12

AI Technical Summary

Technical Problem

The traditional puffed food raw material processing and feeding control system cannot effectively analyze and adjust the correlation between the weight deviation of the packaged raw material and the conveying device, resulting in reduced production efficiency and inconsistent product quality.

Method used

An automatic loading control system including monitoring period division, material separation abnormality analysis, single-line conveying analysis, multi-line conveying analysis and operating parameter regulation was designed. The conveyor belt status image is collected in real time through a high-definition camera to identify spacing deviations and abnormal splashing conditions. , analyze and regulate the material distribution and conveying parameters in real time to ensure the consistency of parameters between each production line.

Benefits of technology

Accurate control of the processing process of puffed food raw materials, improve production efficiency and product consistency, predict potential failures, avoid resource waste, and ensure the stability and efficiency of the production line.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119079476A_ABST
    Figure CN119079476A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of food processing control, and discloses an automatic feeding control system for puffed food raw material processing, which comprises a monitoring time division module, a material distribution abnormity analysis module, a single-line conveying analysis module, a multi-line conveying analysis module, a conveying abnormity analysis module and an operation parameter regulation and control module. According to the method, the abnormal material distribution conditions of all the monitoring periods of all the production lines are analyzed during material distribution procedure control, then whether material distribution parameter regulation and control need to be conducted or not is judged, and correction can be conducted according to the raw material conveying device under different conditions. Meanwhile, the conveying parameter abnormal conditions of all the production lines are obtained based on the distance deviation conditions and the abnormal splashing conditions of all the production lines during conveying procedure control, whether conveying parameter regulation and control need to be conducted or not is judged in combination with the conveying parameter deviation between all the production lines, and the change of the state of the production lines can be found and responded in time; and conveying parameters can be adjusted accurately and specifically.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of food processing control and relates to an automatic feeding control system for processing puffed food raw materials. Background Art

[0002] Puffed food refers to a type of food that uses a series of processing technologies to make originally compact ingredients become fluffy and light. The production of puffed food usually includes processes such as raw material preparation, transportation, processing, and baking. Among them, the transportation process for raw material processing is an important process to ensure efficient and stable production of puffed food. The lack of precise control over the feeding process of puffed food raw material processing may result in inconsistent or abnormal raw material transportation parameters of each production line during each monitoring period, which in turn leads to reduced production quality or efficiency. Therefore, automatic feeding control of puffed food raw material processing is of great significance.

[0003] The feeding control of puffed food raw material processing mainly includes the analysis and control of material distribution and transportation.

[0004] Traditionally, the analysis of material distribution in the processing and feeding of puffed food raw materials is usually to analyze the weight deviation of each packaged raw material and then adjust the weight of each packaged raw material, but ignores the correlation between the weight deviation of the packaged raw materials and the raw material conveying device, resulting in the inability to make targeted adjustments to the packaging parameters of the raw material conveying device based on the existing weight deviation of the packaged raw materials. When cumulative errors occur in the system, the weight of the packaged raw materials needs to be continuously adjusted, which reduces production efficiency, makes the system unable to perform adaptive adjustments, and increases unnecessary waste of resources.

[0005] The traditional conveying process of puffed food raw material processing and loading is usually regulated by the conveying parameters of a single production line. This analysis method ignores the adaptability analysis of the conveying parameters of each production line in each monitoring period. This control method of conveying parameters may not ensure the consistency of conveying parameters between production lines, which may cause the raw materials of each production line to be unable to be accurately compounded, resulting in abnormal product ingredients and affecting product quality. Summary of the invention

[0006] In view of this, in order to solve the problems raised in the above background technology, an automatic feeding control system for processing puffed food raw materials is now proposed.

[0007] The purpose of the present invention can be achieved through the following technical solutions: An automatic feeding control system for puffed food raw material processing, including: a monitoring period division module, which is used to divide the production period of raw material processing into several monitoring periods based on equal intervals.

[0008] The material distribution abnormality analysis module is used to use the raw material conveying device to transport various types of raw materials in each raw material warehouse to the conveyor belt of the corresponding production line in each monitoring period on each production line. Different production lines correspond to different raw materials. Based on the pre-set material distribution parameters, intermittent discharging operations are performed on each raw material to obtain the corresponding packaged raw materials. The weight of each packaged raw material of each production line in each monitoring period is detected by the weight detection device, and the material distribution abnormality of each production line in each monitoring period is analyzed, so as to determine whether the material distribution parameters need to be adjusted.

[0009] The single-line conveying analysis module is used to convey the packaged raw materials based on the pre-set conveying parameters, and use a high-definition camera to collect real-time status images of the packaged raw materials on the conveyor belt corresponding to each production line in each monitoring period, and then identify abnormal conveying conditions. The abnormal conveying condition identification includes spacing deviation condition identification and abnormal splash condition identification, and then analyze the abnormal conveying parameter conditions of each production line in each monitoring period.

[0010] The multi-line conveying analysis module is used to obtain the conveying parameters corresponding to each production line in each monitoring period in real time, and then analyze the conveying parameter deviation of each production line in each monitoring period.

[0011] The conveying anomaly analysis module is used to determine whether conveying parameter regulation is needed based on the conveying parameter anomalies and conveying parameter deviations of each production line in each monitoring period.

[0012] The operation parameter control module is used to obtain the specific control direction when it is determined that operation parameter control is needed. If the control direction is abnormal material distribution control, the material distribution parameter demand analysis is performed; if the control direction is abnormal conveying parameter control, the conveying parameter demand analysis is performed.

[0013] In a preferred embodiment of the present invention, the analysis of abnormal material distribution of each production line in each monitoring period is specifically as follows: the weight of the unit packaging raw materials corresponding to each type of raw materials is obtained from the product specification information of the puffed food, and recorded as the standard packaging raw material weight.

[0014] The weight of each packaging raw material for each production line in each monitoring period detected by the weight detection device is extracted, and then the weight of each packaging raw material is calculated by difference with the corresponding standard packaging raw material weight to obtain the packaging raw material deviation of each production line in each monitoring period, and then the absolute value of the packaging raw material deviation of each production line in each monitoring period is calculated by ratio with the corresponding standard packaging raw material weight to obtain the packaging raw material weight deviation degree of each production line in each monitoring period.

[0015] The weight deviation of each packaged raw material of each production line in each monitoring period is averaged and calculated to obtain the material distribution abnormality index of each production line in each monitoring period.

[0016] In a preferred embodiment of the present invention, the judgment on whether the material distribution parameters need to be adjusted is specifically as follows: the material distribution abnormality index of each production line in each monitoring period obtained by analysis is compared with the preset material distribution abnormality index threshold to obtain a judgment result on whether the material distribution parameters need to be adjusted.

[0017] In a preferred embodiment of the present invention, the identification of the spacing deviation is specifically analyzed as follows: extract the state image of the packaged raw materials in each monitoring period on each conveyor belt collected in real time by a high-definition camera, and then use image processing software to obtain the contour of each packaged raw material in each monitoring period on each conveyor belt, and then obtain the minimum distance between the contours of each adjacent packaged raw material as the corresponding monitoring spacing.

[0018] The average monitoring spacing is calculated by averaging the monitoring spacing within each monitoring period of each conveyor belt, and then the difference between each monitoring spacing and the average monitoring spacing is calculated to obtain the monitoring spacing deviation, and then the absolute value of the monitoring spacing deviation is calculated by ratio with the average monitoring spacing to obtain the deviation degree of each monitoring spacing.

[0019] The mean of each monitoring interval deviation is calculated to obtain the interval deviation index of each conveyor belt in each monitoring period.

[0020] In a preferred embodiment of the present invention, the abnormal splashing situation identification is specifically analyzed as follows: extract the status image of the packaged raw materials in each monitoring period on each conveyor belt collected in real time by a high-definition camera, locate the packaged raw material area in the status image and the splashing raw material area within a preset collection distance around the packaged raw materials, and then use image processing software to obtain the contour of each packaged raw material and the contour of each splashing raw material, and obtain the contour area of ​​each packaged raw material and the contour area of ​​each splashing raw material.

[0021] The contour areas of the splashing raw materials corresponding to each packaged raw material are cumulatively calculated to obtain the splashing raw material areas corresponding to each packaged raw material, the areas of each packaged raw material and the corresponding splashing raw material areas are summed up to obtain the reference area, and then the ratio of each splashing raw material area to the reference area is calculated to obtain the abnormal splashing area ratio of each packaged raw material.

[0022] The abnormal splash area ratio of each packaged raw material in each monitoring period of each conveyor belt is averaged to obtain the abnormal splash index corresponding to each conveyor belt in each monitoring period.

[0023] In a preferred embodiment of the present invention, the analysis of abnormal conveying parameters of each production line in each monitoring period is specifically as follows: the spacing deviation index and abnormal splash index of each production line in each monitoring period corresponding to each monitoring period are accumulated and calculated according to the weights to obtain the conveying abnormality index of each production line in each monitoring period.

[0024] In a preferred embodiment of the present invention, the analysis of the conveying parameter deviation of each production line in each monitoring period is specifically as follows: extracting the conveying parameters corresponding to each production line in each monitoring period obtained in real time, and then comparing the conveying parameters, selecting any conveyor belt as a reference conveyor belt, and then recording the conveying parameters of the reference conveyor belt as reference conveying parameters, calculating the difference between the conveying parameters of each conveyor belt and the reference conveying parameters to obtain a conveying parameter deviation value, and then calculating the ratio of each conveying parameter deviation value to the reference conveying parameter to obtain a corresponding conveying parameter deviation index.

[0025] The conveying parameter deviation indexes are compared, and the maximum conveying parameter deviation index is selected as the conveying parameter deviation index of the corresponding production line in the monitoring period.

[0026] In a preferred embodiment of the present invention, the judgment on whether it is necessary to adjust the transport parameters is specifically as follows: the transport abnormality index and the transport parameter deviation index of each production line in each monitoring period are compared with the preset transport abnormality index threshold and the transport parameter deviation index threshold to obtain a judgment result on whether it is necessary to adjust the transport parameters.

[0027] In a preferred embodiment of the present invention, the material distribution parameter demand analysis is specifically as follows: the material distribution parameters of the raw material conveying device corresponding to each production line in each monitoring period are obtained, and then the target material distribution parameters are obtained by average calculation.

[0028] The weight of the corresponding packaging raw materials of each production line in each monitoring period is averaged and calculated to obtain the average packaging raw material weight of each production line in each monitoring period. The average packaging raw material weight of each production line in each monitoring period is then differentially calculated with the corresponding standard packaging raw material weight to obtain the corresponding packaging raw material weight deviation of each production line in each monitoring period. The ratio is then calculated with the corresponding standard packaging raw material weight to obtain the material distribution parameter correction degree of each production line in each monitoring period.

[0029] The material distribution parameter correction amount of each production line in each monitoring period is calculated by multiplying the correction degree of the material distribution parameter of each production line in each monitoring period with the corresponding target material distribution parameter, and then the material distribution parameter correction amount of each production line in each monitoring period is calculated by summing the corresponding target material distribution parameter to obtain the material distribution parameter adjustment target amount of each production line in each monitoring period.

[0030] In a preferred embodiment of the present invention, the transportation parameter demand analysis is specifically as follows: extracting the transportation parameters corresponding to each production line in each monitoring period obtained in real time, and recording them as actual transportation parameters;

[0031] The transport abnormality index of each production line in each monitoring period is multiplied by the actual transport parameter to obtain the transport parameter adjustment amount, and then the target transport parameter of each production line in each monitoring period is obtained by summing it with the corresponding actual transport parameter;

[0032] Compare the target conveying parameters of each production line in each monitoring period to determine whether further adjustment is needed. If necessary, select any target conveying parameter as the reference target conveying parameter, and record the corresponding production line as the reference production line. Then, perform difference calculation between the target conveying parameter of each conveyor belt and the reference target conveying parameter to obtain the reference conveying parameter demand deviation, and then perform ratio calculation with the corresponding reference target conveying parameter to obtain the conveying parameter demand correction degree of the corresponding production line. Then, perform mean calculation on the conveying parameter demand correction degree of each production line in each monitoring period to obtain the conveying parameter demand correction degree of the reference production line.

[0033] The conveying parameter demand correction degrees obtained by taking each production line as the reference production line are compared, and the target conveying parameter of the reference production line corresponding to the minimum conveying parameter demand correction degree is selected as the conveying parameter adjustment target amount of each conveyor belt.

[0034] Compared with the prior art, the beneficial effects of the present invention are as follows: (1) When controlling the material distribution process, the present invention analyzes the material distribution abnormalities of each production line in each monitoring period, and then determines whether it is necessary to adjust the material distribution parameters. This analysis method analyzes the weight deviation of the packaged raw materials in each monitoring period in real time, and then can carry out targeted and adaptive material distribution parameter adjustment of the raw material conveying device. At the same time, continuous material distribution abnormality analysis can predict potential failures or performance degradations of the raw material conveying device, and can carry out targeted corrections and optimizations on the raw material conveying device under different situations, thereby improving the material distribution efficiency and avoiding unnecessary waste of resources.

[0035] (2) When controlling the conveying process, the present invention obtains the abnormal conveying parameter conditions of each production line in each monitoring period based on the spacing deviation and abnormal splashing conditions of each production line in each monitoring period, and at the same time determines whether conveying parameter adjustment is needed in combination with the conveying parameter deviation of each production line between each monitoring period. This analysis method can instantly detect and respond to changes in the status of the production line, and then accurately and specifically adjust the conveying parameters to ensure the stability and efficiency of the production process, while also improving the consistency of the finished product and avoiding energy waste caused by unnecessary speed adjustment.

[0036] (3) The present invention also provides a judgment result on whether each production line meets the production requirements in each monitoring period based on the analysis of the abnormal conditions of the material distribution parameters of each production line in each monitoring period. This analysis method can monitor the abnormal operation of each production line in each monitoring period in real time, and provide a continuous optimization solution. When the production line has continuous production parameter abnormalities, the conveying device can be repaired and checked in time, thereby improving the work efficiency and production stability of the production line. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0038] Figure 1 It is a schematic diagram of the connection of each module of the system of the present invention.

[0039] Figure 2 It is a schematic diagram of a feeding device of the present invention.

[0040] Figure numerals: 1 - raw material bin, 2 - raw material conveying device, 3 - conveyor belt. DETAILED DESCRIPTION

[0041] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0042] See also Figure 1 As shown, the present invention provides an automatic feeding control system for processing puffed food raw materials, the system includes a monitoring period division module, a material distribution abnormality analysis module, a single-line conveying analysis module, a multi-line conveying analysis module, a conveying abnormality analysis module and an operating parameter control module, wherein the monitoring period division module is respectively connected to the material distribution abnormality analysis module, the single-line conveying analysis module and the multi-line conveying analysis module, the single-line conveying analysis module and the multi-line conveying analysis module are both connected to the conveying abnormality analysis module, and the material distribution abnormality analysis module and the conveying abnormality analysis module are both connected to the operating parameter control module.

[0043] The monitoring period division module is used to divide the production period of raw material processing into several monitoring periods based on equal intervals.

[0044] Exemplarily, the interval duration is 15 minutes.

[0045] It should be noted that the reasons for dividing the production period into several monitoring periods for analysis are: 1. By dividing the production process into multiple monitoring periods, the feeding of raw materials can be monitored in real time, and any deviations can be discovered and corrected in a timely manner. This helps to maintain the stability of the production process and the consistency of product quality. 2. By subdividing the time periods, the production process can be managed in a refined manner. The monitoring data of each monitoring period can be used to optimize the feeding speed or modify the production parameters to adapt to changes in raw material characteristics and production needs.

[0046] The material distribution abnormality analysis module is used to use the raw material conveying device to convey various types of raw materials in each raw material warehouse to the conveyor belt of the corresponding production line during each monitoring period of each production line. Please refer to Figure 2 A schematic diagram of a feeding device is shown, in which different production lines correspond to different raw materials. Based on the pre-set material distribution parameters, intermittent discharging operations are performed on each raw material to obtain the corresponding packaged raw materials. A weight detection device is used to detect the weight of each packaged raw material of each production line in each monitoring period, and the abnormal material distribution of each production line in each monitoring period is analyzed to determine whether it is necessary to adjust the material distribution parameters.

[0047] Exemplarily, the puffed food may be potato chips, French fries and rice crackers. Taking potato chips as an example, the corresponding raw materials are corn starch, fruit and vegetable powder and seasoning powder.

[0048] Exemplarily, the raw material conveying device may be a screw conveyor, and the material distribution parameter may be the rotation speed of the screw conveyor.

[0049] Preferably, the analysis of the abnormal distribution of materials in each production line during each monitoring period is specifically as follows: the weight of the unit packaging raw materials corresponding to each type of raw materials is obtained from the product specification information of the puffed food, and recorded as the standard packaging raw material weight.

[0050] It should be noted that the weight of the raw materials per unit package refers to the weight of the corresponding raw materials required for a bag of puffed food.

[0051] The weight of each packaging raw material for each production line in each monitoring period detected by the weight detection device is extracted, and then the weight of each packaging raw material is calculated by difference with the corresponding standard packaging raw material weight to obtain the packaging raw material deviation of each production line in each monitoring period, and then the absolute value of the packaging raw material deviation of each production line in each monitoring period is calculated by ratio with the corresponding standard packaging raw material weight to obtain the packaging raw material weight deviation degree of each production line in each monitoring period.

[0052] The weight deviation of each packaged raw material of each production line in each monitoring period is averaged and calculated to obtain the material distribution abnormality index of each production line in each monitoring period.

[0053] Preferably, the determination of whether the material distribution parameters need to be regulated is specifically as follows: the material distribution anomaly index of each production line in each monitoring period obtained by analysis is compared with a preset material distribution anomaly index threshold to obtain a determination result of whether the material distribution parameters need to be regulated.

[0054] Exemplarily, the material distribution abnormality index threshold is 0.05.

[0055] It should be added that if the material distribution abnormality index of a production line in a certain monitoring period is greater than the material distribution abnormality index threshold, it is judged that material distribution parameter adjustment is required; if the material distribution abnormality index of a production line in a certain monitoring period is less than or equal to the material distribution abnormality index threshold, it is judged that material distribution parameter adjustment is not required.

[0056] It should be noted that the present invention analyzes the abnormal material distribution conditions of each production line in each monitoring period when controlling the material distribution process, and then determines whether it is necessary to adjust the material distribution parameters. This analysis method analyzes the weight deviation of the packaged raw materials in each monitoring period in real time, and then can perform targeted and adaptive material distribution parameter adjustment. At the same time, continuous material distribution abnormality analysis can predict potential failures or performance degradation of equipment, and can perform targeted corrections and optimizations on the raw material conveying device under different situations, thereby improving the material distribution efficiency and avoiding unnecessary waste of resources.

[0057] The single-line conveying analysis module is used to convey the packaged raw materials based on pre-set conveying parameters, and uses a high-definition camera to collect real-time status images of the packaged raw materials on the conveyor belt corresponding to each production line in each monitoring period, and then identify abnormal conveying conditions. The abnormal conveying condition identification includes spacing deviation condition identification and abnormal splash condition identification, and then analyzes the abnormal conveying parameter conditions of each production line in each monitoring period.

[0058] Exemplarily, the conveying parameter may be a conveying speed.

[0059] It should be noted that the reasons for selecting spacing deviation and abnormal splash as the basis for judging abnormal conveying parameters are: taking conveying speed as an example, spacing deviation reflects the uniformity of material distribution during the conveying process. If the spacing deviation is large, it means that the material is unevenly distributed, which may affect the quality and consistency of the final product. Splashing usually means that the material is thrown out during the conveying process, which not only causes material waste, but also increases the cost of cleaning, especially when handling expensive or sensitive raw materials. Both spacing deviation and abnormal splashing can directly or indirectly affect production efficiency. The former may cause a pause or adjustment in the production line, while the latter may require additional time and resources for cleaning.

[0060] Preferably, the identification of the spacing deviation is specifically analyzed as follows: extract the state image of the packaged raw materials in each monitoring period on each conveyor belt collected in real time by a high-definition camera, and then use image processing software to obtain the contour of each packaged raw material in each monitoring period on each conveyor belt, and then obtain the minimum distance between the contours of each adjacent packaged raw material as the corresponding monitoring spacing.

[0061] The average monitoring spacing is calculated by averaging the monitoring spacing within each monitoring period of each conveyor belt, and then the difference between each monitoring spacing and the average monitoring spacing is calculated to obtain the monitoring spacing deviation, and then the absolute value of the monitoring spacing deviation is calculated by ratio with the average monitoring spacing to obtain the deviation degree of each monitoring spacing.

[0062] The mean of each monitoring interval deviation is calculated to obtain the interval deviation index of each conveyor belt in each monitoring period.

[0063] Preferably, the abnormal splashing situation identification is specifically analyzed as follows: extract the status image of the packaged raw materials in each monitoring period on each conveyor belt collected in real time by a high-definition camera, locate the packaged raw material area in the status image and the splashing raw material area within a preset collection distance around the packaged raw materials, and then use image processing software to obtain the contour of each packaged raw material and the contour of each splashing raw material, and obtain the contour area of ​​each packaged raw material and the contour area of ​​each splashing raw material.

[0064] Exemplarily, the collection distance is 10 cm.

[0065] It should be noted that the reason for setting the collection distance is that the raw materials are conveyed to the delivery belt through the raw material conveying device. The speed of the conveyor belt may cause the raw materials to splash, but this behavior should be within a controllable range. The splashed raw materials that exceed the collection distance should not be used as the basis for analyzing the raw material splashing situation.

[0066] The contour areas of the splashing raw materials corresponding to each packaged raw material are cumulatively calculated to obtain the splashing raw material areas corresponding to each packaged raw material, the areas of each packaged raw material and the corresponding splashing raw material areas are summed up to obtain the reference area, and then the ratio of each splashing raw material area to the reference area is calculated to obtain the abnormal splashing area ratio of each packaged raw material.

[0067] The abnormal splash area ratio of each packaged raw material in each monitoring period of each conveyor belt is averaged to obtain the abnormal splash index corresponding to each conveyor belt in each monitoring period.

[0068] Preferably, the analysis of abnormal conveying parameters of each production line in each monitoring period is specifically as follows: the spacing deviation index and abnormal splash index of each production line in each monitoring period corresponding to each monitoring period are accumulated according to the weights to obtain the conveying abnormality index of each production line in each monitoring period.

[0069] Exemplarily, the weights of the spacing deviation index and the abnormal splash index are 0.6 and 0.4.

[0070] The multi-line conveying analysis module is used to obtain the conveying parameters corresponding to each production line in each monitoring period in real time, and then analyze the conveying parameter deviation of each production line in each monitoring period.

[0071] Preferably, the analysis of the conveying parameter deviation of each production line in each monitoring period is specifically as follows: extract the conveying parameters corresponding to each production line in each monitoring period obtained in real time, and then compare the conveying parameters, select any conveyor belt as a reference conveyor belt, and then record the conveying parameters of the reference conveyor belt as reference conveying parameters, calculate the difference between the conveying parameters of each conveyor belt and the reference conveying parameters to obtain the conveying parameter deviation value, and then calculate the ratio of each conveying parameter deviation value to the reference conveying parameter to obtain the corresponding conveying parameter deviation index.

[0072] The conveying parameter deviation indexes are compared, and the maximum conveying parameter deviation index is selected as the conveying parameter deviation index of the corresponding production line in the monitoring period.

[0073] It should be noted that the reason for selecting the maximum conveying parameter deviation index as the conveying parameter deviation index of the corresponding production line in the monitoring period is: in practice, if the maximum conveying parameter deviation index is within the allowable range, it is judged that there is no need to perform speed adaptability adjustment between multiple production lines; if the maximum conveying parameter deviation index exceeds the allowable range, speed adaptability adjustment should be performed between multiple production lines.

[0074] It should be noted that in practice, it is necessary to ensure the synchronization of the conveying parameters of each production line in each monitoring period, because in actual production it is necessary to ensure that each packaged raw material arrives at the mixing area at the same time, so as to ensure the quality of the mixed product. When there is a deviation in the conveying parameters, it may cause different packaged raw materials to arrive at different times, which in turn will cause deviations in the mixed weight or abnormalities in the proportions of each raw material.

[0075] The conveying anomaly analysis module is used to determine whether conveying parameter regulation is required based on the conveying parameter anomalies and conveying parameter deviations of each production line in each monitoring period.

[0076] Preferably, the judgment on whether transport parameter regulation is needed is specifically as follows: the transport anomaly index and transport parameter deviation index of each production line in each monitoring period are compared with the preset transport anomaly index threshold and transport parameter deviation index threshold respectively to obtain the judgment result on whether transport parameter regulation is needed.

[0077] Exemplarily, the delivery anomaly index threshold is 0.25, and the delivery parameter deviation index threshold is 0.2.

[0078] It should be added that if the transportation abnormality index of a certain production line in a certain monitoring period is greater than the transportation abnormality index threshold, it is judged that transportation parameter adjustment is required; if the transportation abnormality index of a certain production line in a certain monitoring period is less than or equal to the transportation abnormality index threshold, it is judged that transportation parameter adjustment is not required.

[0079] It should be noted that, when controlling the conveying process, the present invention obtains the abnormal conditions of the conveying parameters of each production line in each monitoring period based on the spacing deviation and abnormal splashing of each production line in each monitoring period, and at the same time determines whether it is necessary to adjust the conveying parameters in combination with the conveying parameter deviations of each production line between each monitoring period. This analysis method can instantly discover and respond to changes in the status of the production line, and then accurately and specifically adjust the conveying parameters to ensure the stability and efficiency of the production process, while also improving the consistency of the finished product and avoiding energy waste caused by unnecessary speed adjustment.

[0080] The operating parameter control module is used to obtain specific control directions when it is determined that operating parameter control is required. If the control direction is abnormal material distribution control, a material distribution parameter demand analysis is performed; if the control direction is abnormal conveying parameter control, a conveying parameter demand analysis is performed.

[0081] Preferably, the material distribution parameter demand analysis is specifically as follows: obtaining the material distribution parameters of the raw material conveying device corresponding to each production line in each monitoring period, and then performing mean calculation to obtain the target material distribution parameters.

[0082] The weight of the corresponding packaging raw materials of each production line in each monitoring period is averaged and calculated to obtain the average packaging raw material weight of each production line in each monitoring period. The average packaging raw material weight of each production line in each monitoring period is then differentially calculated with the corresponding standard packaging raw material weight to obtain the corresponding packaging raw material weight deviation of each production line in each monitoring period. The ratio is then calculated with the corresponding standard packaging raw material weight to obtain the material distribution parameter correction degree of each production line in each monitoring period.

[0083] The material distribution parameter correction amount of each production line in each monitoring period is calculated by multiplying the correction degree of the material distribution parameter of each production line in each monitoring period with the corresponding target material distribution parameter, and then the material distribution parameter correction amount of each production line in each monitoring period is calculated by summing the corresponding target material distribution parameter to obtain the material distribution parameter adjustment target amount of each production line in each monitoring period.

[0084] It needs to be explained that when the correction sign of the material distribution parameter of a production line is positive, the weight of the packaged raw materials of the production line is greater than the standard weight of the packaged raw materials, and the material distribution parameter of the production line needs to be reduced. When the correction sign of the material distribution parameter of a production line is negative, the weight of the packaged raw materials of the production line is less than the standard weight of the packaged raw materials, and the material distribution parameter of the production line needs to be increased.

[0085] Preferably, the transportation parameter demand analysis is specifically as follows: extracting the transportation parameters corresponding to each production line in each monitoring period obtained in real time and recording them as actual transportation parameters.

[0086] The transport abnormality index of each production line in each monitoring period is multiplied by the actual transport parameter to obtain the transport parameter adjustment amount, which is then summed with the corresponding actual transport parameter to obtain the target transport parameter of each production line in each monitoring period.

[0087] The target conveying parameters of each production line in each monitoring period are compared to determine whether further adjustment is needed. If necessary, any target conveying parameter is selected as the reference target conveying parameter, and the corresponding production line is recorded as the reference production line. Then, the target conveying parameter of each conveyor belt is calculated by difference with the reference target conveying parameter to obtain the reference conveying parameter demand deviation, and then the ratio is calculated with the corresponding reference target conveying parameter to obtain the conveying parameter demand correction degree of the corresponding production line. Then, the conveying parameter demand correction degree of each production line in each monitoring period is averaged to obtain the conveying parameter demand correction degree of the reference production line.

[0088] The conveying parameter demand correction degrees obtained by taking each production line as the reference production line are compared, and the target conveying parameter of the reference production line corresponding to the minimum conveying parameter demand correction degree is selected as the conveying parameter adjustment target amount of each conveyor belt.

[0089] It should be noted that the reason for selecting the target conveying parameters of the reference production line corresponding to the minimum conveying parameter demand correction as the target amount of conveying parameter adjustment for each conveyor belt is that selecting the minimum correction means the smallest adjustment, which usually brings the lowest adjustment cost. The adjustment cost includes the additional energy consumption, raw material waste, equipment wear and possible production downtime caused by the adjustment. At the same time, a smaller correction means that the changes in production parameters will not be too large, which helps to maintain the stability and continuity of production and reduce production fluctuations and uncertainties caused by large changes in parameters.

[0090] It should be added that the present invention also provides a function for determining whether each production line meets the production requirements in each monitoring period, specifically as follows: obtaining the material distribution parameters of the raw material conveying device in each monitoring period in real time, and then drawing a material distribution parameter change curve with time as the horizontal coordinate and the material distribution parameter as the vertical coordinate, and then evenly arranging a number of collection points on the change curve, and calculating the mean of the vertical coordinate of each collection point to obtain the monitoring material distribution parameters in the monitoring period.

[0091] The corrected material distribution parameter X and the monitoring material distribution parameter X 0 Substitute into the analysis formula Obtain the abnormal index λ of the material distribution parameters of each production line in each monitoring period 分料 , where e represents a natural constant.

[0092] The abnormal index of the material distribution parameters of each production line in each monitoring period is compared with the preset abnormal index threshold of the material distribution parameters, so as to obtain the judgment result of whether each production line meets the production requirements in each monitoring period.

[0093] It should be added that if the material distribution parameter abnormality index of a production line is greater than the material distribution parameter abnormality index threshold, it is judged that it does not meet the production requirements; if the material distribution parameter abnormality index of a production line is less than or equal to the material distribution parameter abnormality index threshold, it is judged that it meets the production requirements.

[0094] It should be noted that the present invention also provides a judgment result on whether each production line meets the production requirements in each monitoring period based on the analysis of the abnormal conditions of the material distribution parameters of each production line in each monitoring period. This analysis method can monitor the operating abnormalities of each production line in each monitoring period in real time, and provide a continuous optimization solution. When the production line has continuous production parameter abnormalities, the conveying device can be inspected and checked in time, thereby improving the work efficiency and production stability of the production line.

[0095] The above contents are merely examples and explanations of the concept of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the concept of the invention or exceed the scope defined by the present invention, they shall all fall within the protection scope of the present invention.

Claims

1. An automatic feeding control system for processing puffed food raw materials, characterized in that: include: A monitoring period division module is used to divide the production period of raw material processing into several monitoring periods based on equal intervals; The material distribution abnormality analysis module is used to use the raw material conveying device to transport various types of raw materials in each raw material warehouse to the conveyor belt of the corresponding production line during each monitoring period of each production line. Different production lines correspond to different raw materials. Based on the pre-set material distribution parameters, intermittent discharging operations are performed on each raw material to obtain corresponding packaged raw materials. The weight of each packaged raw material of each production line during each monitoring period is detected by the weight detection device, and the material distribution abnormality of each production line during each monitoring period is analyzed, so as to determine whether the material distribution parameters need to be adjusted; The single-line conveying analysis module is used to convey the packaging raw materials based on the preset conveying parameters, and use the high-definition camera to collect the state images of the packaging raw materials on the conveyor belt corresponding to each production line in each monitoring period in real time, and then identify the abnormal conveying situation, which includes the identification of spacing deviation and abnormal splashing, and then analyze the abnormal conveying parameters of each production line in each monitoring period; The multi-line conveying analysis module is used to obtain the conveying parameters corresponding to each production line in each monitoring period in real time, and then analyze the conveying parameter deviation of each production line in each monitoring period; The conveying abnormality analysis module is used to determine whether conveying parameter regulation is needed based on the conveying parameter abnormalities and conveying parameter deviations of each production line in each monitoring period; The operation parameter control module is used to obtain the specific control direction when it is determined that operation parameter control is needed. If the control direction is abnormal material distribution control, the material distribution parameter demand analysis is performed; if the control direction is abnormal conveying parameter control, the conveying parameter demand analysis is performed.

2. The automatic feeding control system for processing puffed food raw materials according to claim 1, characterized in that: The analysis of the abnormal material distribution of each production line in each monitoring period is as follows: Obtain the weight of the corresponding unit packaging raw materials of various raw materials from the product specification information of the puffed food, and record it as the standard packaging raw material weight; Extract the weight of each packaging raw material of each production line in each monitoring period detected by the weight detection device, and then calculate the difference between the weight of each packaging raw material and the corresponding standard packaging raw material weight to obtain the packaging raw material deviation of each production line in each monitoring period, and then calculate the absolute value of the packaging raw material deviation of each production line in each monitoring period and the corresponding standard packaging raw material weight to obtain the packaging raw material weight deviation of each production line in each monitoring period; The weight deviation of each packaged raw material of each production line in each monitoring period is averaged and calculated to obtain the material distribution abnormality index of each production line in each monitoring period.

3. The automatic feeding control system for processing puffed food raw materials according to claim 2, characterized in that: The determination of whether the material distribution parameters need to be regulated is as follows: The analyzed material distribution abnormality index of each production line in each monitoring period is compared with the preset material distribution abnormality index threshold to obtain a judgment result on whether material distribution parameter adjustment is needed.

4. The automatic feeding control system for processing puffed food raw materials according to claim 1, characterized in that: The specific analysis of the spacing deviation identification is as follows: Extract the state images of the packaged raw materials in each monitoring period on each conveyor belt collected in real time by a high-definition camera, and then use image processing software to obtain the contours of each packaged raw material in each monitoring period on each conveyor belt, and then obtain the minimum distance between the contours of each adjacent packaged raw material as the corresponding monitoring interval; The average monitoring spacing of each conveyor belt in each monitoring period is calculated to obtain the average monitoring spacing, and then the difference between each monitoring spacing and the average monitoring spacing is calculated to obtain the monitoring spacing deviation, and then the absolute value of the monitoring spacing deviation is calculated to obtain the ratio of the average monitoring spacing to obtain the deviation degree of each monitoring spacing; The mean of each monitoring interval deviation is calculated to obtain the interval deviation index of each conveyor belt in each monitoring period.

5. The automatic feeding control system for processing puffed food raw materials according to claim 4, characterized in that: The specific analysis of abnormal splashing situation identification is as follows: Extract the state image of the packaged raw materials in each monitoring period on each conveyor belt collected in real time by a high-definition camera, locate the packaged raw material area in the state image and the splashed raw material area within a preset collection distance around the packaged raw materials, and then use image processing software to obtain the contour of each packaged raw material and the contour of each splashed raw material, and obtain the contour area of ​​each packaged raw material and the contour area of ​​each splashed raw material; The splashing raw material contour areas corresponding to each sub-packaged raw material are cumulatively calculated to obtain the splashing raw material areas corresponding to each sub-packaged raw material, the areas of each sub-packaged raw material and the corresponding splashing raw material areas are summed to obtain the reference area, and then the ratio of each splashing raw material area to the reference area is calculated to obtain the abnormal splashing area ratio of each sub-packaged raw material; The abnormal splash area ratio of each packaged raw material in each monitoring period of each conveyor belt is averaged to obtain the abnormal splash index corresponding to each conveyor belt in each monitoring period.

6. The automatic feeding control system for processing puffed food raw materials according to claim 5, characterized in that: The analysis of abnormal conveying parameters of each production line in each monitoring period is as follows: The spacing deviation index and abnormal splash index of each production line in each monitoring period corresponding to each monitoring period are accumulated and calculated according to the weight to obtain the conveying abnormality index of each production line in each monitoring period.

7. The automatic feeding control system for processing puffed food raw materials according to claim 6, characterized in that: The analysis of the conveying parameter deviation of each production line in each monitoring period is as follows: Extract the corresponding conveying parameters of each production line in each monitoring period obtained in real time, and then compare the conveying parameters, select any conveyor belt as the reference conveyor belt, and then record the conveying parameters of the reference conveyor belt as the reference conveying parameters, calculate the difference between the conveying parameters of each conveyor belt and the reference conveying parameters to obtain the conveying parameter deviation value, and then calculate the ratio of each conveying parameter deviation value to the reference conveying parameter to obtain the corresponding conveying parameter deviation index; The conveying parameter deviation indexes are compared, and the maximum conveying parameter deviation index is selected as the conveying parameter deviation index of the corresponding production line in the monitoring period.

8. The automatic feeding control system for processing puffed food raw materials according to claim 7, characterized in that: The determination of whether the transport parameter needs to be regulated is as follows: The conveying abnormality index and conveying parameter deviation index of each production line in each monitoring period are compared with the preset conveying abnormality index threshold and conveying parameter deviation index threshold to obtain a judgment result on whether conveying parameter regulation is needed.

9. The automatic feeding control system for processing puffed food raw materials according to claim 1, characterized in that: The material distribution parameter requirement analysis is as follows: Obtain the material distribution parameters of the raw material conveying device corresponding to each production line in each monitoring period, and then perform mean calculation to obtain the target material distribution parameters; The weight of the corresponding packaging raw materials of each production line in each monitoring period is averaged and calculated to obtain the average packaging raw material weight of each production line in each monitoring period, and then the average packaging raw material weight of each production line in each monitoring period is calculated to be different from the corresponding standard packaging raw material weight to obtain the packaging raw material weight deviation of each production line in each monitoring period, and then the ratio is calculated with the corresponding standard packaging raw material weight to obtain the material distribution parameter correction degree of each production line in each monitoring period; The material distribution parameter correction amount of each production line in each monitoring period is calculated by multiplying the correction degree of the material distribution parameter of each production line in each monitoring period with the corresponding target material distribution parameter, and then the material distribution parameter correction amount of each production line in each monitoring period is calculated by summing the corresponding target material distribution parameter to obtain the material distribution parameter adjustment target amount of each production line in each monitoring period.

10. An automatic feeding control system for processing puffed food raw materials as claimed in claim 9, characterized in that: The transportation parameter requirement analysis is as follows: Extract the corresponding conveying parameters of each production line in each monitoring period obtained in real time and record them as actual conveying parameters; The transport abnormality index of each production line in each monitoring period is multiplied by the actual transport parameter to obtain the transport parameter adjustment amount, and then the target transport parameter of each production line in each monitoring period is obtained by summing it with the corresponding actual transport parameter; Compare the target conveying parameters of each production line in each monitoring period to determine whether further adjustment is needed. If necessary, select any target conveying parameter as the reference target conveying parameter, and record the corresponding production line as the reference production line. Then, perform difference calculation between the target conveying parameter of each conveyor belt and the reference target conveying parameter to obtain the reference conveying parameter demand deviation, and then perform ratio calculation with the corresponding reference target conveying parameter to obtain the conveying parameter demand correction degree of the corresponding production line. Then, perform mean calculation on the conveying parameter demand correction degree of each production line in each monitoring period to obtain the conveying parameter demand correction degree of the reference production line. The conveying parameter demand correction degrees obtained by taking each production line as the reference production line are compared, and the target conveying parameter of the reference production line corresponding to the minimum conveying parameter demand correction degree is selected as the conveying parameter adjustment target amount of each conveyor belt.

Citation Information

Patent Citations

  • Food processing system and food processing method

    CN110944514A

  • Processing position constant speed control method and system and storage medium

    CN116924000A

  • Puffed food production line real-time monitoring management system based on big data

    CN118428885A

  • Apparatus and method for substantially continuous delivery of a substantially constant weight of material per unit of time from a bulk storage location and for weighing, blending, and mixing conveyable materials

    US20050283273A1

Cited By

  • Automatic raw material feeding control system for carbonless copy paper production

    CN119644964A

  • An automatic feeding control system for raw materials used in the production of carbonless copy paper

    CN119644964B

  • Full-automatic material arranging control system

    CN120964319A

  • Inspection system, inspection method, and program

    JP2026160097A

  • Inspection system, inspection method, and program

    JP7870102B1