Fixed flat arch track crane equipment and operation method thereof
By using fixed flat arch rail crane equipment in canyon-type large-volume concrete construction, multi-point hoisting is achieved using multiple flat roof beams and multiple parallel tracks of crane trolleys, which solves the low pouring efficiency and long construction period in the existing technology. The problem of lifting capacity and lifting flexibility is improved, and is suitable for complex construction areas.
Patent Information
- Application Number
- CN202411317939.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-20
- Publication Date
- 2024-12-06
AI Technical Summary
Canyon-type large-volume concrete pouring is limited by existing cable machines or gate tower machines, resulting in low pouring efficiency and extended construction period, complex installation and control, and limited load bearing.
Fixed flat arch rail crane equipment is adopted, including multiple flat roof beams and lifting trolleys. Multi-point lifting is achieved through multiple parallel tracks. The lifting trolleys can be transferred between different flat roof beams, enhancing lifting capacity and lifting flexibility.
It improves the pouring efficiency of large-volume concrete pouring, shortens the construction period, enhances lifting capacity, and meets the diversified lifting needs of complex construction areas.
Smart Images

Figure CN119079804A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of large-volume concrete construction equipment, and in particular to a fixed flat-arch rail crane device and an operating method thereof. Background Art
[0002] The pouring of large-volume concrete in canyon-type areas has always been a difficult problem in construction. How to efficiently pour concrete while ensuring safety is of great significance to engineering construction. At present, large-volume concrete pouring in canyon-type areas is generally carried out by cable cranes or gantry cranes. However, a cable crane has only one hook, which limits the efficiency of concrete pouring and thus prolongs the construction period of large-volume concrete pouring. For pouring areas on different cross-sections, it is currently necessary to install multiple cable cranes along the canyon direction. The installation and control process of the cable crane system is complex and difficult, and has limited load-bearing capacity. The gantry crane is arranged in or near the pouring position area, which has a great impact on the position and low construction efficiency. In combination with the actual project, a fixed flat arch rail crane equipment and an operation method thereof are proposed. Summary of the invention
[0003] In order to solve the current technical problems, the main purpose of the present invention is to provide a fixed flat arch rail crane equipment and an operating method thereof, so as to improve the pouring efficiency of large-volume concrete pouring and shorten the construction period of large-volume concrete pouring.
[0004] The technical solution adopted by the present invention is: a fixed flat arch rail crane equipment, including at least two flat top beams installed to span the working space, each of the flat top beams is parallel to each other, a first track is installed on the flat top beam, at least one lifting trolley is installed on the first track on two adjacent flat top beams, a plurality of second tracks are installed at one end or both ends of the flat top beam, each second track is aligned with the first track on the flat top beam, and an inclined track is correspondingly arranged between two adjacent second tracks.
[0005] The flat top beam comprises a main beam and an arch beam, and the arch beam is connected to the lower side of the main beam through a vertical support.
[0006] Basic platforms are respectively arranged on both sides of the working space, the two ends of the main beam are respectively installed on the upper side surfaces of the basic platforms on both sides, and the two ends of the arch beam are respectively installed on the side surfaces on the opposite side of the basic platforms on both sides.
[0007] Support columns are respectively installed at both ends of the main beam, and a base plate is installed at the bottom of the support column. The base plate is installed, connected and fixed to the base platform.
[0008] A gravity sensor is installed at the bottom of the base plate.
[0009] Stress gauges are installed on the main beams, arch beams and vertical supports, and the stress gauges are used to detect the deformation of the main beams, arch beams and vertical supports.
[0010] Main platforms are respectively arranged on both sides of the working space and at both ends of the flat top beam, and the second track is installed on the main platforms.
[0011] A material feeding platform is arranged on one side or both sides of the working space, and the material feeding platform is located below the flat top beam.
[0012] The material feeding platform is connected with the main platform through a road.
[0013] The lifting trolley includes a traveling body, and two roller wheels are respectively installed at the bottom of the traveling body at positions corresponding to the first tracks on two adjacent flat-top beams. The traveling body moves on the first track driven by the roller wheels. A winch system is installed inside the traveling body. The steel wire rope of the winch system extends downward from between two adjacent flat-top beams, and a hook is installed at the lower end of the steel wire rope through a movable pulley.
[0014] A plurality of lifting trolleys are installed on the first tracks of the two adjacent flat-top beams, and avoidance sensors are respectively installed on both sides of the traveling bodies of the adjacent lifting trolleys.
[0015] The operation method of the fixed flat arch rail crane equipment comprises the following steps: A plurality of flat top beams are installed on the working space, and a lifting trolley is installed on two adjacent flat top beams; Transport equipment and materials or concrete to the feeding platform, and the lifting trolley will lift the equipment and materials or concrete into the construction area by using the corresponding lifting equipment; When there are multiple construction areas in the same cross section of the working space, multiple lifting trolleys are installed on two adjacent flat top beams, and the multiple construction areas are hoisted by the multiple lifting trolleys respectively; When the construction area is transferred, that is, from the area under one group of flat top beams to the area under another group of flat top beams, the lifting trolley moves from one group of flat top beams to another group of flat top beams via the inclined rails on the second track.
[0016] The present invention has the following beneficial effects: 1. The present invention installs multiple flat-top beams on the working space, and installs a lifting trolley on two adjacent flat-top beams; the vehicle transports equipment, materials or concrete to the feeding platform, and the lifting trolley lifts the equipment, materials or concrete into the construction area by using corresponding lifting equipment; when there are multiple construction areas in the same cross-section of the working space, multiple lifting trolleys are installed on two adjacent flat-top beams, and the multiple construction areas are lifted by the multiple lifting trolleys respectively. When the construction area is transferred, that is, from the area under one group of flat-top beams to the area under another group of flat-top beams, the lifting trolley moves from one group of flat-top beams to another group of flat-top beams through the inclined rail on the second track, thereby widening the use scope of the lifting trolley. Through the above method, the pouring efficiency of large-volume concrete pouring in the working space is improved, and the construction period of large-volume concrete pouring is shortened; 2. Large lifting capacity: Compared with the commonly used cable cranes and gantry cranes, this patent adopts a flat-top arch beam form, which greatly increases the load-bearing capacity and the lifting capacity of the crane, effectively improving the construction efficiency; 3. Various lifting forms: This patent sets up multiple parallel tracks, and multiple cranes can be installed on any two adjacent flat-top arch beams. Multiple cranes can perform lifting operations separately, and lifting operations can also be performed between cranes on the same track or non-same track. This meets the diverse lifting requirements such as multiple storage points and large lifting weights, and can well meet the operating requirements of the construction area, and is particularly suitable for large and complex construction areas. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0018] Figure 1 It is a schematic diagram of the main structure of the present invention.
[0019] Figure 2 It is a schematic diagram of the top structure of the present invention.
[0020] In the figure: Working space 10, basic platform 11, material feeding platform 12, road 13; Main platform 20, second track 21, inclined track 22; Flat top beam 100, main beam 101, arch beam 102, vertical support 103, support column 104, base plate 105, first track 110; Lifting trolley 200, traveling vehicle body 201, wire rope 202, movable pulley 203, hook 204. DETAILED DESCRIPTION
[0021] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0022] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0023] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0024] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0025] Embodiment 1: See also Figure 1-2 As shown, a fixed flat arch rail crane device includes at least two flat top beams 100 installed to span a working space 10, the flat top beams 100 are parallel to each other, a first track 110 is installed on the flat top beams 100, at least one lifting trolley 200 is installed on the first track 110 on two adjacent flat top beams 100, a plurality of second tracks 21 are installed at one end or both ends of the flat top beams 100, each second track 21 is aligned with the first track 110 on the flat top beams 100, and an inclined track 22 is correspondingly arranged between two adjacent second tracks 21.
[0026] Every two flat top beams 100 form a group, and the lifting trolley 200 is installed on a group of flat top beams 100, see Figure 2 , four flat-top beams 100 are shown in the figure, that is, three groups.
[0027] The lifting trolley 200 adopts a structure similar to the lifting trolley on a bridge crane and is used for lifting equipment, materials and concrete through a sling.
[0028] The working space 10 includes V-shaped valleys such as canyons, valleys, and river valleys. Multiple second rails 21 are installed at one end or both ends of the flat-top beam 100, so that it is convenient for the lifting trolley 200 to enter the flat-top beam 100 through the second rails 21 for lifting operations. One or more lifting trolleys 200 can be configured on a group of flat-top beams 100 according to needs and load conditions. The lifting trolley 200 can enter from one group of flat-top beams 100 to another group of flat-top beams 100 through the inclined rails 22 to switch the construction area. The inclined rails 22 adopt a structure similar to or a train ramp.
[0029] Specifically, the flat top beam 100 includes a main beam 101 and an arch beam 102, and the arch beam 102 is connected to the lower side of the main beam 101 through a vertical support 103. The structural strength of the flat top beam 100 is ensured by the combined installation of the main beam 101, the arch beam 102 and the vertical support 103.
[0030] For further information, see Figure 1 A basic platform 11 is respectively provided on both sides of the working space 10, and the two ends of the main beam 101 are respectively installed on the upper side surfaces of the basic platforms 11 on both sides, so as to facilitate installation and fixation; the two ends of the arch beam 102 are respectively installed on the side surfaces of the opposite sides of the basic platforms 11 on both sides. When the arch beam 102 is under pressure, since the two ends are rigidly connected, the deformation of the arch beam 102 can be reduced, so that the flat top beam 100 has a greater load capacity.
[0031] Furthermore, support columns 104 are respectively installed at both ends of the main beam 101, and a base plate 105 is installed at the bottom of the support column 104. The base plate 105 is installed, connected and fixed to the base platform 11, which facilitates the installation and fixation of the main beam 101.
[0032] Furthermore, a gravity sensor is installed at the bottom of the base plate 105. The actual load condition of the flat top beam 100 can be known to maximize the load-bearing capacity of the equipment.
[0033] Furthermore, stress gauges are installed on the main beam 101 , the arch beam 102 and the vertical brace 103 , and the stress gauges are used to detect the deformation of the main beam 101 , the arch beam 102 and the vertical brace 103 , thereby improving the safety of the flat top beam 100 .
[0034] In this embodiment, main platforms 20 are respectively provided on both sides of the working space 10 and at both ends of the flat top beam 100 , and the second rails 21 are installed on the main platforms 20 .
[0035] In this embodiment, a feeding platform 12 is provided on one or both sides of the working space 10, and the feeding platform 12 is located below the flat top beam 100. The feeding platform 12 facilitates the transportation of equipment materials or concrete to the lifting trolley 200 or the lifting trolley 200.
[0036] Furthermore, the material feeding platform 12 is connected to the main platform 20 via the road 13, so that construction vehicles, equipment or materials can travel or be transported to the material feeding platform via the road.
[0037] Specifically, the lifting trolley 200 includes a traveling body 201, and two roller wheels are respectively installed at the bottom of the traveling body 201 at the positions corresponding to the first track 110 on two adjacent flat-top beams 100. The traveling body 201 travels on the first track 110 driven by the roller wheels. A winch system is installed inside the traveling body 201. The wire rope 202 of the winch system extends downward from between the two adjacent flat-top beams 100, and the lower end of the wire rope 202 is installed with a hook 204 through a movable pulley 203.
[0038] Furthermore, a plurality of trolleys 200 are installed on the first rails 110 of the two adjacent flat top beams 100, and avoidance sensors are installed on both sides of the traveling bodies 201 of the adjacent trolleys 200. This makes it easier to prevent collision when multiple trolleys 200 approach each other on the common rail.
[0039] Embodiment 2: The operation method of the fixed flat arch rail crane equipment comprises the following steps: A plurality of flat top beams 100 are installed on the working space 10, and a lifting trolley 200 is installed on two adjacent flat top beams 100; The equipment materials or concrete are transported to the material delivery platform 12, and the lifting vehicle 200 hoists the equipment materials or concrete into the construction area by using corresponding lifting equipment.
[0040] When there are multiple construction areas in the same cross section of the working space, multiple lifting trolleys 200 are installed on two adjacent flat top beams 100, and the multiple lifting trolleys 200 are used to perform lifting operations on the multiple construction areas respectively.
[0041] When the construction area is transferred, that is, from the area under one group of flat-top beams 100 to the area under another group of flat-top beams 100, the lifting trolley 200 moves from one group of flat-top beams 100 to another group of flat-top beams 100 via the inclined rail 22 on the second track 21.
[0042] Embodiment three: This patent adopts a flat-top arch beam structure, specifically, multiple sets of flat-top beams 100 are fixedly installed in parallel on the basic platform 11 set in advance on both sides of the working space 10. In principle, the flat-top beams 100 fully cover the casting area of the working space 10 below.
[0043] The main beam 101 of the flat top beam 100 is securely mounted on the basic platform 11 through the base plate 105 and bolts. Of course, an embedded plate can also be embedded on the basic platform 11, and then the base plate 105 and the embedded plate are welded and securely connected.
[0044] In order to enhance the strength and bearing capacity of the main beam 101, an arch beam 102 and a vertical support 103 are provided under the main beam 101. The two ends of the arch beam 102 can reliably abut against the outer vertical surface of the foundation platform 11. Of course, the two ends of the arch beam can also be directly abutted against the vertical surface of the foundation platform, buried plate welding, bolt connection, etc. In order to facilitate installation and improve bearing capacity, the above steel structure can adopt a steel structure with a higher strength grade, such as 800MPa or 1000MPa grade, and the structure of I-beam is preferred.
[0045] A first track 110 is arranged above the main beam 101, and multiple sets of second tracks 21 and inclined tracks 22 are arranged on the main platforms 20 on both sides of the working space in alignment with the first track 110 and at the same elevation, so that it is convenient for the hoisting trolley 200 to enter the main beam 101 from the main platform 20 through the second track 21 for lifting operations. One or more hoisting trolleys 200 can be configured on a set of flat top beams 100 according to needs and load conditions. The hoisting trolley 200 consists of a traveling body 201 and traveling wheels to form a traveling mechanism. A hoisting winch system is installed in the trolley. The steel wire rope 202 wound on the hoisting winch system is connected to the hook 204 through a movable pulley 203 at the bottom to carry out lifting or pouring operations.
[0046] Through the inclined rails 22, the lifting trolley 200 can move from one group of flat top beams 100 to another group of flat top beams 100 to switch the construction area.
[0047] A material feeding platform 12 is arranged below the main platform 20. The material feeding platform 12 is used for vehicles or equipment to transport construction materials or concrete loaded in hanging tanks to this platform, and then the materials are hoisted into the construction position by the hook of the trolley. The material feeding platform 12 is connected to the main platform 20 through a road 13 arranged on the main platform 20, so that construction vehicles, equipment or materials can travel or be transported to the material feeding platform 12 through the road.
[0048] Gravity sensors are installed under the base plate 105 of the support column 104, and stress gauges are also installed on the main beam 101, arch beam 102 and vertical support 103. Through the real-time detection of gravity sensors and strain gauges by the system, the matching situation of actual load and bearing capacity of this patent can be known, so as to maximize the use of the bearing capacity of the equipment. When the load is close to the bearing capacity, timely alarm or shutdown can be carried out to ensure safe operation.
[0049] Avoidance sensors are provided on both sides of the traveling body 201 of the lifting trolley 200, so that when multiple lifting trolleys 200 are close to each other on the common rail, they will not collide. When the two trolleys are relatively close, the avoidance sensor will sense and alarm, and transmit the relevant information to the master control system. After analysis and judgment, the master control system will promptly issue instructions to let the trolley automatically or by human operation to drive away, avoid, stop, etc., to ensure the safe operation of each vehicle.
[0050] The control of the patented device can adopt wired or wireless power supply, or both methods can be used but as backup, which can improve the reliability of signal transmission. In principle, the power supply adopts the method of laying the line along the main beam and then passing the cable drum onto the trolley to ensure reliable power supply.
[0051] The crane can be operated automatically under the control of the control system, that is, the program automatically performs logical calculations based on the input storage area work content, and reasonably and automatically distributes work to each crane. Each crane can automatically perform corresponding operations according to the settings of the master control program to ensure the optimization of overall efficiency and avoid collisions.
[0052] In addition to single-machine lifting or concrete pouring, multi-machine lifting can also be achieved. The lifting can be carried out by multiple cranes on the same track or by cranes on different tracks. Depending on the needs of the storage area, a lifting beam can be selected or not used to perform the corresponding operation. Obviously, the above embodiments are only examples for clear explanation and are not limitations on the implementation methods. For ordinary technicians in the field, other different forms of changes or modifications can be made on the basis of the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived from this are still within the scope of protection of the invention.
Claims
1. A fixed flat arch rail crane device, characterized in that: The invention comprises at least two flat-top beams (100) installed to span across a working space (10), wherein the flat-top beams (100) are parallel to each other, a first track (110) is installed on the flat-top beams (100), at least one lifting trolley (200) is installed on the first track (110) on two adjacent flat-top beams (100), a plurality of second tracks (21) are installed on one end or both ends of the flat-top beams (100), each second track (21) is aligned with a first track (110) on the flat-top beams (100), and an inclined track (22) is correspondingly arranged between two adjacent second tracks (21).
2. A fixed flat arch rail crane device according to claim 1, characterized in that: The flat top beam (100) comprises a main beam (101) and an arch beam (102), wherein the arch beam (102) is connected to the lower side of the main beam (101) via a vertical support (103).
3. A fixed flat arch rail crane device according to claim 2, characterized in that: Basic platforms (11) are respectively arranged on both sides of the working space (10), the two ends of the main beam (101) are respectively mounted on the upper side surfaces of the basic platforms (11) on both sides, and the two ends of the arch beam (102) are respectively mounted on the side surfaces of the basic platforms (11) on the two sides on the opposite side.
4. A fixed flat arch rail crane device according to claim 3, characterized in that: Support columns (104) are respectively installed at both ends of the main beam (101), a base plate (105) is installed at the bottom of the support column (104), and the base plate (105) is installed, connected and fixed to the base platform (11).
5. A fixed flat arch rail crane device according to claim 4, characterized in that: A gravity sensor is installed at the bottom of the base plate (105).
6. A fixed flat arch rail crane device according to claim 5, characterized in that: Stress gauges are installed on the main beam (101), the arch beam (102) and the vertical brace (103), and the stress gauges are used to detect deformation conditions of the main beam (101), the arch beam (102) and the vertical brace (103).
7. The fixed flat arch rail crane equipment according to claim 1, characterized in that: Main platforms (20) are respectively arranged on both sides of the working space (10) and at both ends of the flat top beam (100), and the second track (21) is installed on the main platform (20).
8. The fixed flat arch rail crane equipment according to claim 1, characterized in that: A material feeding platform (12) is provided on one side or both sides of the working space (10), and the material feeding platform (12) is located below the flat top beam (100).
9. The fixed flat arch rail crane equipment according to claim 8, characterized in that: The feeding platform (12) is connected to the main platform (20) via a road (13).
10. The fixed flat arch rail crane equipment according to claim 1, characterized in that: The lifting trolley (200) comprises a traveling body (201), two roller wheels are respectively installed at the bottom of the traveling body (201) at positions corresponding to the first tracks (110) on two adjacent flat-top beams (100), the traveling body (201) travels on the first tracks (110) driven by the roller wheels, a winch system is installed inside the traveling body (201), a steel wire rope (202) of the winch system extends downward from between the two adjacent flat-top beams (100), and a hook (204) is installed at the lower end of the steel wire rope (202) via a movable pulley (203).
11. The fixed flat arch rail crane equipment according to claim 10, characterized in that: A plurality of lifting trolleys (200) are installed on the first rails (110) of the two adjacent flat-top beams (100), and avoidance sensors are respectively installed on both sides of the traveling bodies (201) of the adjacent lifting trolleys (200).
12. An operating method for a fixed flat arch rail crane device according to any one of claims 1 to 11, the operating method comprising the following steps: A plurality of flat-top beams (100) are installed on the working space (10), and a lifting trolley (200) is installed on two adjacent flat-top beams (100); The equipment and materials or concrete are transported to the material feeding platform (12), and the lifting trolley (200) hoists the equipment and materials or concrete into the construction area by using corresponding lifting equipment; When there are multiple construction areas in the same cross section of the working space, multiple lifting trolleys (200) are installed on two adjacent flat top beams (100), and the multiple lifting trolleys (200) are used to perform lifting operations on the multiple construction areas respectively; When the construction area is transferred, that is, from the area below one group of flat-top beams (100) to the area below another group of flat-top beams (100), the lifting trolley (200) moves from one group of flat-top beams (100) to another group of flat-top beams (100) via the inclined rail (22) on the second track (21).