Integrated deslagging and filtering device
Through the integrated slag removal filter device, automated maintenance and metal impurity filtration of large-scale filter equipment are realized, solving the problems of cumbersome maintenance of existing equipment and the inability to filter metal impurities, and improving the functional perfection and operating efficiency of the equipment.
Patent Information
- Application Number
- CN202411568205.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-05
- Publication Date
- 2024-12-06
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing large-scale filtration equipment needs to be manually removed and maintained after long-term use, and it is impossible to clean the filter element and discharge wastewater, and it is impossible to effectively filter metal impurities in the liquid.
An integrated slag removal filter device is designed, including installation platform, water scale, primary and secondary slag removal equipment and liquid discharge balancer, equipped with scraping components and magnetic filtration devices, which are realized by driving motors and worms. Automatic filter element replacement, cleaning and sewage discharge, and use magnetic filter devices to adsorb and filter metal impurities.
It improves maintenance efficiency, realizes automatic replacement and cleaning of filter elements, ensures effective filtration of metal impurities, and reduces the risk of manual operation.
Smart Images

Figure CN119080111A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of water treatment equipment, and in particular to an integrated slag removal and filtering device. Background Art
[0002] Humans have been treating water for many years. Physical methods include using filter elements with different pore sizes in filtering equipment to remove impurities from the water by adsorption or barrier methods. After long-term use, the filter elements of existing large-scale filtering equipment need to be replaced with new ones, which requires manual dismantling and the maintenance process is extremely cumbersome. In addition, large-scale filtering equipment is relatively high, which poses a great operational risk. In addition, existing filter elements cannot be cleaned or wastewater discharged internally, and cannot effectively filter out metal materials in the liquid. Summary of the invention
[0003] In view of the above problems, the present invention proposes an integrated slag removal and filtering device, which adds the functions of filter element replacement, internal cleaning, internal sewage discharge and metal filtering of the filtering equipment, so that the overall function of the filtering equipment is more complete and the operating efficiency is more efficient.
[0004] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: an integrated slag removal and filtering device, comprising a mounting platform, on which a water inlet balancer, a primary filtering device, a secondary filtering device, a slag removal device and a liquid outlet balancer are symmetrically arranged, and a scraping assembly is respectively installed on the primary filtering device and the secondary filtering device, and the scraping assembly comprises a driving device, a mounting bracket and a plurality of cleaning scrapers, and the cleaning scrapers are connected and arranged on the mounting bracket, and one end of the mounting bracket is connected to the driving device and is arranged in the primary filtering device and the secondary filtering device, and a filter plate and a magnetic filtering device are arranged on the slag removal device, and the magnetic filtering device is positioned and installed in the slag removal device, and the filter plate is sleeved on the outer peripheral surface of the magnetic filtering device and is located at one side of the bottom of the slag removal device, and an adjusting device for controlling the scraping assembly and the magnetic filtering device to perform lifting operations is arranged on the mounting platform, and the adjusting device comprises a plurality of connecting components, a driving motor and a worm, and the plurality of connecting components are respectively locked at one end of the scraping assembly and the magnetic filtering device, and control the magnetic filtering device to perform lifting operations, and the driving motor drives the worm to drive the connecting components to form a linkage link, and a sewage discharge channel is arranged at the bottom of the mounting platform.
[0005] Preferably, a driving rod is provided on the driving motor, a first bevel gear is connected to one side of the driving rod, a matching second bevel gear is provided on the worm gear perpendicular to the first bevel gear, a mounting shell for mounting the worm gear, the first bevel gear and the second bevel gear is provided on the mounting platform, a slider is threadedly connected to the worm gear, a positioning foot is provided on one side of the slider, a sliding groove for the positioning foot to slide up and down is provided on the mounting shell, positioning holes are provided on both sides of the positioning foot, and a positioning column adapted to the positioning hole is fixedly connected to the mounting shell.
[0006] Preferably, the slag removal equipment is equipped with a fixed bracket for supporting the filter plate and the magnetic filtering device, and the connecting assembly includes a plurality of connecting arms respectively hinged to the mounting bracket and the fixed bracket, one end of the connecting arm is connected to the worm gear, and the other end extends toward and is connected to one side of the fixed bracket or the mounting bracket, and the fixed bracket and the mounting bracket are respectively provided with hinged columns hinged to the connecting arms.
[0007] Preferably, a first positioning plate and a second positioning plate spaced a certain distance apart are provided on the fixed bracket, the magnetic filtering device includes magnetic columns arranged in a ring array between the first positioning plate and the second positioning plate, one end of the magnetic column is plugged into the first positioning plate, the filter plate is plugged into the second positioning plate and extends to the middle position of the magnetic column, the slag removal equipment is provided with a partition assembly for partitioning the interior into a water inlet chamber and a water outlet chamber, a supporting boss for supporting the partition assembly is provided between the water inlet chamber and the water outlet chamber, and one end of the partition assembly is pressed against the filter plate and the supporting boss respectively.
[0008] Preferably, the partition assembly includes a fixed column, a fixed sleeve and a plurality of elastic members in a circular array, the fixed column circular array is arranged on one side of the outer periphery of the magnetic column, the fixed sleeve is sleeved on the outer peripheral surface of the magnetic column and one side is abutted against the fixed column, and the other side is plugged into the filter plate and the support boss, the elastic member is sleeved on the fixed column, one end of the elastic member is pressed against the fixed sleeve, and the other end is pressed against the slag removal equipment.
[0009] Preferably, a pressure-bearing bracket is provided on the fixed bracket, a plurality of sleeves are provided on the pressure-bearing bracket, the magnetic column is inserted in the sleeve, and a plurality of through holes connected to the magnetic column are opened on the sleeve.
[0010] Preferably, the sewage discharge channel includes a first sewage discharge chamber, a second sewage discharge chamber and a third sewage discharge chamber which are connected in sequence through pipelines, a first sewage discharge valve is installed on the pipeline between the first sewage discharge chamber and the second sewage discharge chamber, a second sewage discharge valve is installed on the pipeline between the second sewage discharge chamber and the third sewage discharge chamber, and a third sewage discharge valve is installed on the side of the third sewage discharge chamber facing the liquid outlet balancer.
[0011] Compared with the prior art, the beneficial effects of the present invention are as follows: the scraping assembly and the magnetic filtering device are respectively installed and fixed by using an installation bracket and a fixing bracket, and are respectively connected and fixed with the installation bracket and the fixing bracket by a plurality of connecting arms on the worm gear, the worm gear is driven to rotate by using a driving rod arranged on the driving motor, and at the same time, the sliding block drives the installation bracket and the fixing bracket on the connecting arm to perform an ascending or descending operation, thereby avoiding manual disassembly and replacement one by one, and improving the efficiency of maintenance operations, and after the installation is completed, the connecting arm can be removed, and at the same time, the driving device of the scraping assembly is installed, so that the inside of the primary filtering device and the secondary filtering device can be cleaned, and sewage can be discharged through the first sewage discharge chamber, the second sewage discharge chamber and the third sewage discharge chamber at the bottom, and when the sewage flows from the secondary filtering device into the slag removal device, it first flows into the water inlet chamber at the upper end of the magnetic suction column, and after magnetically absorbing the metal impurities in the medium, it flows into the water outlet chamber at the lower end and passes through the filter plate for secondary filtration, and finally the liquid is discharged by the liquid outlet balancer. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 It is a structural cross-sectional view of the secondary filtering device and the slag removal device of the present invention; Figure 3 It is a schematic diagram of the structure of the adjusting device, the fixing bracket and the mounting bracket of the present invention; Figure 4 It is a schematic diagram of a top view of the overall structure of the present invention.
[0013] In the figure: 1. Installation platform; 2. Water inlet balancer; 3. Primary filtering device; 4. Secondary filtering device; 5. Deslagging device; 8. Liquid outlet balancer; 9. Scraping assembly; 10. Driving device; 11. Mounting bracket; 12. Cleaning scraper; 13. Filter plate; 14. Magnetic filtering device; 15. Adjusting device; 16. Connecting assembly; 17. Driving motor; 18. Worm; 19. Drain channel; 20. Driving rod; 21. First bevel gear; 23. Second bevel gear; 24. Mounting housing; 25. Sliding block; 26. Positioning foot; 27. Sliding block Groove; 28. Positioning hole; 29. Positioning column; 30. Fixed bracket; 31. Connecting arm; 32. Articulated column; 33. First positioning plate; 34. Second positioning plate; 35. Magnetic column; 36. Water inlet chamber; 37. Water outlet chamber; 38. Partition assembly; 39. Support boss; 40. Fixed column; 41. Fixed sleeve; 42. Elastic member; 43. Pressure bracket; 44. Sleeve; 45. Through hole; 46. First sewage chamber; 47. Second sewage chamber; 48. Third sewage chamber; 49. First sewage valve; 50. Second sewage valve; 51. Third sewage valve. DETAILED DESCRIPTION
[0014] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0015] Example: As attached Figures 1 to 4An integrated slag removal and filtering device shown in the figure comprises an installation platform 1, on which a water inlet balancer 2, a primary filtering device 3, and a secondary filtering device 4 are symmetrically arranged (the primary filtering device 3 and the secondary filtering device 4 both adopt backwashing filter elements, and the purified water (purified gas) of the filter is backwashed to restore the purification function of the filter, remove the filter blockage, and reduce the pressure difference at both ends of the filter. During operation, water flows through the bottom drainage system in the reverse direction through the filter tank to wash away the blocking materials in the filter material and reduce the factors causing the head loss. Different types of filter tanks have different backwashing strengths and backwashing times. For the fast filter tank, the backwashing strength is 36~54m / h, the backwashing time is 5~10min, and the expansion rate of the filter layer is 40%~50%.In addition, when the ion exchange method is used to treat water or wastewater, and before the resin regeneration operation, backwashing is also required to be performed in advance, the purpose of which is to loosen the resin layer and remove impurities, broken particles, etc. in the resin layer), a slag removal device 5 and a liquid balancer 8, the first-level filtering device 3 and the second-level filtering device 4 are respectively installed with a scraping component 9 (the first-level filtering device 3 uses a scraping component 9 with the same structure), the scraping component 9 includes a driving device 10 (specifically a rotating motor), a mounting bracket 11 and a plurality of cleaning scrapers 12 (made of rubber), the cleaning scraper 12 is connected to the mounting bracket 11, and one end of the mounting bracket 11 is connected to the driving device The device 10 is arranged in the primary filtering device 3 and the secondary filtering device 4. The slag removal device 5 is provided with a filter plate 13 and a magnetic filtering device 14. The magnetic filtering device 14 is positioned and installed in the slag removal device 5. The filter plate 13 is sleeved on the outer peripheral surface of the magnetic filtering device 14 and is located at one side of the bottom of the slag removal device 5. The mounting platform 1 is provided with an adjusting device 15 for controlling the scraping component 9 and the magnetic filtering device 14 to perform lifting operations. The adjusting device 15 includes a plurality of connecting components 16, a driving motor 17 and a worm 18. The plurality of connecting components 16 are respectively locked to one end of the scraping component 9 and the magnetic filtering device 14. The drive motor 17 drives the worm 18 to drive the connecting assembly 16 to form a linkage link, and controls the magnetic filtering device 14 to perform lifting operations. A sewage discharge channel 19 is provided at the bottom of the installation platform 1. The scraping assembly 9 and the magnetic filtering device 14 are installed and fixed respectively by using the installation bracket 11 and the fixing bracket 30, and are connected and fixed with the installation bracket 11 and the fixing bracket 30 respectively through a plurality of connecting arms 31 on the worm 18. The drive rod 20 provided on the drive motor 17 drives the worm 18 to rotate, and at the same time, the slider 25 drives the installation bracket 11 and the fixing bracket 30 on the connecting arm 31 to perform lifting or lowering operations, thereby avoiding It eliminates the need for manual disassembly and replacement one by one, thereby improving the efficiency of maintenance operations. After the installation is completed, the connecting arm 31 can be removed, and the drive device 10 of the scraper assembly 9 can be installed at the same time. The interior of the primary filter device 3 and the secondary filter device 4 can be cleaned, and sewage is discharged through the first sewage discharge chamber 46, the second sewage discharge chamber 47 and the third sewage discharge chamber 48 at the bottom. When the sewage flows from the secondary filter device 4 into the slag removal device 5, it first flows into the water inlet chamber 36 at the upper end of the magnetic suction column 35, and after magnetically absorbing metal impurities in the medium, it flows into the water outlet chamber 37 at the lower end and then passes through the filter plate 13 for secondary filtration, and finally the liquid is discharged by the liquid balancer 8.
[0016] As attached Figure 3As shown, a driving rod 20 is provided on the driving motor 17, and a first bevel gear 21 is connected to one side of the driving rod 20. A matching second bevel gear 23 is provided on the worm 18 perpendicular to the first bevel gear 21. A mounting shell 24 for mounting the worm 18, the first bevel gear 21 and the second bevel gear 23 is provided on the mounting platform 1. A slider 25 is threadedly connected to the worm 18, and a positioning foot 26 is provided on one side of the slider 25. A slide groove 27 for the positioning foot 26 to slide up and down is provided on the mounting shell 24. Positioning holes 28 are provided on both sides of the positioning foot 26. Positioning columns 29 adapted to the positioning holes 28 are fixedly connected to the mounting shell 24.
[0017] As attached Figure 2 As shown, the slag removal equipment 5 is equipped with a fixed bracket 30 for supporting the filter plate 13 and the magnetic filter device 14, and the connecting assembly 16 includes a plurality of connecting arms 31 respectively hinged to the mounting bracket 11 and the fixed bracket 30, one end of the connecting arm 31 is connected to the worm 18 (tightened and fixed by bolts), and the other end extends toward and is connected to one side of the fixed bracket 30 or the mounting bracket 11, and the fixed bracket 30 and the mounting bracket 11 are respectively provided with hinged columns 32 (tightened and fixed by bolts) which are hinged to the connecting arms 31.
[0018] As attached Figure 2 As shown, a first positioning plate 33 and a second positioning plate 34 spaced a certain distance apart are provided on the fixed bracket 30, the magnetic filtering device 14 includes magnetic suction columns 35 arranged in a ring array between the first positioning plate 33 and the second positioning plate 34, one end of the magnetic suction column 35 is plugged into the first positioning plate 33, the filter plate 13 is plugged into the second positioning plate 34 and extends to the middle position of the magnetic suction column 35, the slag removal device 5 is provided with a partition assembly 38 for partitioning the interior into a water inlet chamber 36 and a water outlet chamber 37, a supporting boss 39 for supporting the partition assembly 38 is provided between the water inlet chamber 36 and the water outlet chamber 37, one end of the partition assembly 38 is pressed against the filter plate 13 and the supporting boss 39 respectively, the magnetic suction column 35 is used to first adsorb the metal particles in the medium, and then a secondary filtration is performed through the filter plate 13 at the bottom.
[0019] As attached Figure 2As shown, the partition assembly 38 includes a fixing column 40, a fixing sleeve 41 and a plurality of elastic members 42 in a circular array. The fixing column 40 is arranged in a circular array on one side of the outer periphery of the magnetic column 35. The fixing sleeve 41 is sleeved on the outer peripheral surface of the magnetic column 35 and one side is abutted against the fixing column 40, and the other side is plugged into the filter plate 13 and the support boss 39. The elastic member 42 is sleeved on the fixing column 40. One end of the elastic member 42 is pressed against the fixing sleeve 41, and the other end is abutted against the slag removal device 5, thereby increasing the elastic pressing effect on the fixing sleeve 41 and preventing a gap from being generated between the fixing sleeve 41 and the filter plate 13 and the support boss 39 bracket.
[0020] As attached Figure 3 As shown, a pressure-bearing bracket 43 (an integrated structure) is provided on the fixed bracket 30, and a plurality of sleeves 44 are provided on the pressure-bearing bracket 43. The magnetic column 35 is inserted in the sleeve 44, and a plurality of through holes 45 connected to the magnetic column 35 are provided on the sleeve 44, which support the middle part of the magnetic column 35 to avoid breakage caused by excessive medium pressure.
[0021] As attached Figure 1 As shown, the sewage channel 19 includes a first sewage chamber 46, a second sewage chamber 47 and a third sewage chamber 48 which are connected in sequence by pipelines. A first sewage valve 49 is installed on the pipeline between the first sewage chamber 46 and the second sewage chamber 47, a second sewage valve 50 is installed on the pipeline between the second sewage chamber 47 and the third sewage chamber 48, and a third sewage valve 51 is installed on the side of the third sewage chamber 48 facing the liquid outlet balancer 8, so as to discharge impurities after cleaning and dirt after precipitation.
[0022] In the present invention, terms such as "upper", "lower", "left", "right", "front", "back", "vertical", "horizontal", "side", "bottom", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings. They are relational words determined only for the convenience of describing the structural relationships of the various parts or elements of the present invention, and do not specifically refer to any part or element in the present invention and should not be understood as limitations on the present invention.
Claims
1. An integrated slag removal and filtering device, comprising a mounting platform (1), characterized in that: The installation platform (1) is symmetrically provided with a water inlet balancer (2), a primary filter device (3), a secondary filter device (4), a slag removal device (5) and a liquid outlet balancer (8); the primary filter device (3) and the secondary filter device (4) are respectively provided with a scraping assembly (9); the scraping assembly (9) comprises a driving device (10), a mounting bracket (11) and a plurality of cleaning scrapers (12); the cleaning scrapers (12) are connected to the mounting bracket (11); one end of the mounting bracket (11) is connected to the driving device (10) and is provided in the primary filter device (3) and the secondary filter device (4); the slag removal device (5) is provided with a filter plate (13) and a magnetic filter device (14); the magnetic filter device (14) is positioned and installed In the slag removal device (5), the filter plate (13) is sleeved on the outer peripheral surface of the magnetic filtering device (14) and is located at one side of the bottom of the slag removal device (5). The mounting platform (1) is provided with an adjustment device (15) for controlling the scraping component (9) and the magnetic filtering device (14) to perform lifting operations. The adjustment device (15) comprises a plurality of connecting components (16), a drive motor (17) and a worm (18). The plurality of connecting components (16) are respectively locked to one end of the scraping component (9) and the magnetic filtering device (14). The drive motor (17) drives the worm (18) to drive the connecting components (16) to form a linkage link and control the magnetic filtering device (14) to perform lifting operations. A sewage discharge channel (19) is provided at the bottom of the mounting platform (1).
2. The integrated slag removal and filtering device according to claim 1, characterized in that: The driving motor (17) is provided with a driving rod (20), one side of which is connected to a first bevel gear (21), and a second bevel gear (23) matching with the first bevel gear (21) is provided on the worm (18) at a side perpendicular to the first bevel gear (21), and a mounting shell (24) for mounting the worm (18), the first bevel gear (21) and the second bevel gear (23) is provided on the mounting platform (1), a slider (25) is threadedly connected to the worm (18), one side of which is provided with a positioning foot (26), a sliding groove (27) for the positioning foot (26) to slide up and down is provided on the mounting shell (24), positioning holes (28) are provided on both sides of the positioning foot (26), and a positioning column (29) matched with the positioning hole (28) is fixedly connected to the mounting shell (24).
3. The integrated slag removal and filtering device according to claim 2, characterized in that: The slag removal device (5) is provided with a fixed bracket (30) for supporting the filter plate (13) and the magnetic filtering device (14); the connecting assembly (16) comprises a plurality of connecting arms (31) respectively hinged to the mounting bracket (11) and the fixed bracket (30); one end of the connecting arm (31) is connected to the worm (18); the other end extends toward and is connected to one side of the fixed bracket (30) or the mounting bracket (11); and the fixed bracket (30) and the mounting bracket (11) are respectively provided with hinged columns (32) hinged to the connecting arms (31).
4. The integrated slag removal and filtering device according to claim 3 is characterized in that: A first positioning plate (33) and a second positioning plate (34) spaced a certain distance apart are arranged on the fixed bracket (30); the magnetic filtering device (14) comprises magnetic columns (35) arranged in a ring array between the first positioning plate (33) and the second positioning plate (34); one end of the magnetic columns (35) is plugged into the first positioning plate (33); the filter plate (13) is plugged into the second positioning plate (34) and extends to the middle of the magnetic columns (35); a partition assembly (38) is arranged on the slag removal device (5) for partitioning the interior into a water inlet chamber (36) and a water outlet chamber (37); a supporting boss (39) for supporting the partition assembly (38) is arranged between the water inlet chamber (36) and the water outlet chamber (37); one end of the partition assembly (38) is pressed against the filter plate (13) and the supporting boss (39), respectively.
5. The integrated slag removal and filtering device according to claim 4, characterized in that: The partition assembly (38) comprises a fixing column (40), a fixing sleeve (41) and a plurality of elastic members (42) in an annular array. The fixing columns (40) are arranged in an annular array on one side of the outer periphery of the magnetic column (35). The fixing sleeve (41) is sleeved on the outer periphery of the magnetic column (35) and one side of the fixing sleeve is in contact with the fixing column (40), and the other side is plugged into the filter plate (13) and the support boss (39). The elastic member (42) is sleeved on the fixing column (40), one end of the elastic member (42) is pressed against the fixing sleeve (41), and the other end is pressed against the slag removal device (5).
6. The integrated slag removal and filtering device according to claim 5, characterized in that: The fixed bracket (30) is provided with a pressure-bearing bracket (43), the pressure-bearing bracket (43) is provided with a plurality of sleeves (44), the magnetic column (35) is inserted in the sleeve (44), and the sleeve (44) is provided with a plurality of through holes (45) connected to the magnetic column (35).
7. The integrated slag removal and filtering device according to claim 6, characterized in that: The sewage discharge passage (19) comprises a first sewage discharge chamber (46), a second sewage discharge chamber (47) and a third sewage discharge chamber (48) which are connected in sequence through pipelines; a first sewage discharge valve (49) is installed on the pipeline between the first sewage discharge chamber (46) and the second sewage discharge chamber (47); a second sewage discharge valve (50) is installed on the pipeline between the second sewage discharge chamber (47) and the third sewage discharge chamber (48); and a third sewage discharge valve (51) is installed on the side of the third sewage discharge chamber (48) facing the liquid outlet balancer (8).
Citation Information
Patent Citations
Metal oxide anode matrix pretreatment equipment
CN117721476A
Movable high-precision filtering device
CN212068006U
Convenient-to-clean stirring device for food production
CN212328009U
Sewage filtering device
CN213803318U
Magnetic filter for oil liquid of converter tilting speed reducer
CN217431930U
Cited By
Treating agent spraying device for high-COD (Chemical Oxygen Demand) sewage treatment
CN119972433A
