Cold region bridge cast-in-place anti-collision wall reinforcing formwork and construction method thereof
By setting up anti-slope stretching eye openings in the cast-in-place anti-collision wall of the bridge in the northern cold zone and covering the asphalt concrete, the problems of water seepage and freezing of the tension eye are solved, extending the service life of the bridge and reducing maintenance costs.
Patent Information
- Application Number
- CN202411505005.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-28
- Publication Date
- 2024-12-06
AI Technical Summary
The water seepage problem of tension eye in cast-in-place anti-collision walls of bridges in cold areas in the northern region seriously affects the durability and safety of the bridge. The existing sealing methods cannot fundamentally solve the water seepage problem and are highly maintained.
A cast-in-place anti-collision wall reinforcement template is adopted, which includes setting a tension eye opening above the bottom edge of the inner formwork of the anti-collision wall, and fixing one end of the tension in the opening and the other end to the outer formwork of the anti-collision wall On top, a 2-4% reverse slope is formed, covering the asphalt concrete to hide the tension eye and avoid leakage caused by water accumulation and freeze-thaw cycles.
It effectively avoids the water seepage and freezing of the tension eye, extends the service life of the bridge anti-collision wall, reduces maintenance costs, and avoids corrosion of the sealing materials and freeze-thaw cycle damage.
Smart Images

Figure CN119083331A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of bridge construction, and in particular to the technical field of bridge crash wall construction in cold regions. Background Art
[0002] With the rapid development of new materials and technologies for municipal and highway bridges in my country, bridge construction has entered a stage of high-quality development. However, for the special environment of the northern cold regions of Inner Mongolia, Heilongjiang, Jilin and Liaoning, some existing construction methods still need to be improved.
[0003] In recent years, with the development of the industry, the technical development of cold-region bridge crash barriers has emerged in various forms. The traditional process adopts the cast-in-place mode, and steel crash walls and prefabricated crash walls have appeared later. Due to the large amount of on-site welding and anti-corrosion problems in operation, steel crash walls are rarely used in northern cold regions and cannot be promoted for the time being. Prefabricated crash walls are more suitable for small longitudinal slopes and straight sections, so they are not suitable for use in projects such as urban viaducts, interchanges and highway bridges. Therefore, cast-in-place crash walls are still the most widely used in municipal bridges, interchanges and highway bridges in northern cold regions. The existing cast-in-place crash wall process uses steel formwork and tie bars for fixing, which is also a mature process at present. However, during the operation stage of the crash wall, most of the tie rod eyes will leak water and freeze, which seriously affects the durability and safety of the crash wall.
[0004] At present, for the water seepage problem of tie rod eye of municipal bridges, interchanges and highway bridges in the northern cold regions, see Figure 1 As shown in the figure, the red circle position is the actual situation of water seepage in the tie rod eye. Long-term water seepage in the tie rod eye will lead to concrete degradation and corrosion. The concrete degradation refers to the insufficient hydration reaction of the concrete, thereby reducing its strength and durability, which will seriously affect the safety and life of the bridge. The corrosion refers to the corrosion of the internal steel bars caused by the infiltration of water, which in turn affects the overall stability and safety of the structure. In winter in cold areas, due to the temperature, freeze-thaw damage will also occur, that is, the infiltrated water freezes and expands at low temperatures, causing expansion inside the concrete, which may eventually cause cracks and peeling of the crash barrier. This situation will not only cause great safety hazards to pedestrians and vehicles passing under the bridge, but also affect the strength of the bridge crash barrier.
[0005] The existing technical means to solve the water seepage of the tie rod eye generally adopts the means of plugging, such as: various methods such as foam sealant plus plugging agent, but when the snow melting agent is used in cold areas in winter and the freeze-thaw cycle is repeated, the corrosion of the plugging material, the damage of the freeze-thaw cycle, and repeated maintenance will occur. The corrosion of the plugging material refers to the fact that the snow melting agent used in winter contains corrosive chemical components, which will destroy the structure of the plugging material under long-term action and reduce its waterproof performance; the damage of the freeze-thaw cycle refers to the repeated rise and fall of the ambient temperature, which causes the plugging material to expand and contract, and is prone to denaturation, cracks or falling off, and ultimately leads to the loss of the plugging effect; repeated maintenance refers to the need for frequent inspection and maintenance due to the above situation, so as to timely discover the failure of the plugging effect and take effective re-repair measures in time, which increases the maintenance cost and operation complexity. That is, the existing plugging means cannot fundamentally solve the problem of water seepage.
[0006] The water seepage problem of the tie rod eyes of the cast-in-place crash barriers of bridges in northern cold regions has seriously affected the quality and service life of the bridges. It is a problem that technical personnel in this field have always been eager to solve, but no effective technical means have been found. Summary of the invention
[0007] In order to solve the problem of water seepage in the tie rod eyes of the cast-in-place anti-collision wall of bridges in northern cold regions, this application proposes the following solutions:
[0008] A cast-in-place anti-collision wall reinforcement template, the cast-in-place anti-collision wall reinforcement template comprising tie rod eye openings, tie rods, an inner template of the anti-collision wall, an outer template of the anti-collision wall and a top edge of the anti-collision wall,
[0009] The tie rod eyelet opening is 30-50mm above the bottom edge of the inner template of the crash wall;
[0010] One end of the tie bar is fixed in the tie bar eye opening, and the other end is fixed on the outer template of the crash wall, and has a reverse slope of 2-4%;
[0011] The top edge 7 of the anti-collision wall is installed on the top of the inner template of the anti-collision wall and the outer template of the anti-collision wall.
[0012] Furthermore, the inner diameter of the tie rod eyelet opening is 20-24 mm.
[0013] Furthermore, the outer diameter of the tie rod is 18-22 mm.
[0014] Furthermore, the distance between the tie rod eyelet opening and the bottom edge of the inner template of the crash wall is 50 mm.
[0015] Furthermore, the reverse slope of the reinforcement is 3%.
[0016] Furthermore, the top surfaces of the inner template of the anti-collision wall and the outer template of the anti-collision wall are in the same horizontal plane.
[0017] A construction method for a cast-in-place crash barrier for a bridge in a cold region, the construction method using any one of the cast-in-place crash barrier reinforcement formworks described in the present application, the method for making the cast-in-place crash barrier reinforcement formworks in the construction method comprising: installing the reinforcement formworks on both sides of the bridge, wherein the inner formwork of the crash barrier is installed on the inner side of the bridge beam and above the bridge deck pavement, and the outer formwork of the crash barrier is installed on the outer side of the beam, the tie rod eye opening of the inner formwork of the crash barrier is 30-50mm higher than the bridge deck pavement, one end of the tie rod is passed through the tie rod eye opening and fixed, and the other end is lifted vertically upward until the entire tie rod forms a reverse slope of 2-4%, and then the other end of the tie rod is fixedly connected to the outer formwork of the crash barrier.
[0018] Furthermore, the construction method further comprises: laying a layer of asphalt concrete on the surface layer of the bridge deck pavement, wherein the thickness of the asphalt concrete 2 is ensured to cover the openings of the tie rod eyelets.
[0019] Furthermore, the thickness of the asphalt concrete is 100 mm.
[0020] Beneficial Effects
[0021] (1) The cast-in-place anti-collision wall reinforcement formwork described in the present invention adopts simple technical means, effectively solves the technical problems that have been long desired to be solved in the field, does not increase costs, and is easy to implement.
[0022] (2) The cast-in-place crash barrier reinforcement formwork of the present invention has the inner formwork reinforcement eye openings positioned 30-50 mm higher than the bridge deck pavement, thereby preventing water from entering the inner formwork reinforcement eye openings.
[0023] (3) The cast-in-place crash barrier reinforcement formwork described in the present invention hides the eyelets of the reinforcement bars by covering them with asphalt concrete, thereby preventing debris from entering the eyelets, such as small animals, insects, leaves, etc. mixed with rainwater, which ferment in the eyelets and cause internal corrosion, while also maintaining the appearance after the bridge deck is paved.
[0024] (4) The cast-in-place anti-collision wall reinforcement formwork described in the present invention is provided with a tie rod with an inclination of 2-4%, which avoids the problem of internal condensation water seeping through the tie rod eye openings of the outer formwork due to repeated freeze-thaw cycles in cold regions, thereby fundamentally solving the problem of water leakage and freezing on the outer side of the anti-collision wall.
[0025] (5) The cast-in-place crash barrier reinforcement formwork described in the present invention fundamentally avoids the problem of water seepage in the tie rod eyes, no longer relies on traditional sealing materials, and does not cause corrosion problems of sealing materials or damage caused by freeze-thaw cycles. It effectively improves the durability of the crash barrier and extends the service life of the bridge crash barrier.
[0026] (6) The cast-in-place crash barrier reinforcement formwork and construction method described in the present invention can fundamentally avoid the problem of water seepage in the tie rod eyes and the problem of frequent maintenance of the bridge crash barrier caused by this problem, thereby greatly reducing the maintenance cost of the bridge. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 This is a photo of the water seepage in the tie rod holes on the bridge after the construction of the cold zone crash wall was completed.
[0028] Figure 2 It is a flow chart of a construction method for waterproofing the reinforcement eyes of a cast-in-place anti-collision wall in cold regions as described in Implementation Method 3.
[0029] Figure 3 It is a structural cross-sectional view of a method for manufacturing a cast-in-place anti-collision wall reinforcement formwork according to the first embodiment. Figure numerals: tie rod eye opening 1, asphalt concrete 2, bridge deck pavement 3, tie rod 4, anti-collision wall inner formwork 5, anti-collision wall outer formwork 6, anti-collision wall top edge 7, beam body 8. DETAILED DESCRIPTION
[0030] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0031] Implementation Method 1
[0032] Combined with Figure 3 To illustrate the present embodiment, a cast-in-place anti-collision wall reinforcement formwork, the cast-in-place anti-collision wall reinforcement formwork comprises a tie rod eye opening 1, a tie rod 4, an inner formwork 5 of the anti-collision wall, an outer formwork 6 of the anti-collision wall and a top edge 7 of the anti-collision wall, wherein the tie rod eye opening 1 is 30-50 mm above the bottom edge of the inner formwork 5 of the anti-collision wall; one end of the tie rod 4 is fixed in the tie rod eye opening 1, and the other end is fixed on the outer formwork 6 of the anti-collision wall, and has a reverse slope of 2-4%; the top edge 7 of the anti-collision wall is installed at the top of the inner formwork 5 of the anti-collision wall and the outer formwork 6 of the anti-collision wall.
[0033] The tie rod eye opening 1 is 30-50 mm above the bottom edge of the inner formwork 5 of the crash barrier, which makes it convenient to hide the tie rod eye opening 1 by covering it with asphalt concrete. After the bridge deck is paved, it remains beautiful and helps the tie rod to better fix the inner and outer formworks, increase the stability of the overall structure, and prevent the formworks from shifting during the concrete pouring process.
[0034] One end of the tie rod 4 is fixed in the tie rod eye opening 1, and the other end is fixed on the outer template 6 of the crash barrier, and has a reverse slope of 2-4%, which avoids the problem of internal condensation water seeping from the tie rod eye opening of the outer template due to repeated freeze-thaw cycles in cold areas, and fundamentally solves the problem of water leakage and freezing on the outer side of the crash barrier.
[0035] The top edge 7 of the anti-collision wall is installed on the top of the inner and outer templates 5 and 6 of the anti-collision wall, which plays a role of connection and reinforcement, making the inner and outer templates more stable and not easy to shift or deform during the concrete pouring process.
[0036] In this embodiment, the inner diameter of the tie rod eyelet opening 1 is preferably 20-24 mm.
[0037] In this embodiment, the outer diameter of the tie rod 4 is preferably 18-22 mm.
[0038] In this embodiment, the distance between the tie rod eyelet opening 1 and the bottom edge of the inner template 5 of the crash barrier is preferably 50 mm.
[0039] In this embodiment, the reverse slope of the tie rod 4 is preferably 3%.
[0040] Implementation Method 2
[0041] This embodiment is a further example of the first embodiment. In this embodiment, the top surfaces of the inner side template 5 of the anti-collision wall and the outer side template 6 of the anti-collision wall are in the same horizontal plane.
[0042] The present embodiment stipulates that the tops of the inner template 5 and the outer template 6 of the anti-collision wall are flush, ensuring that the tops of the inner and outer templates are at the same horizontal height, thereby ensuring that the top surface of the anti-collision wall is flat and consistent, helping to reduce construction errors caused by inconsistent template heights and improving construction accuracy.
[0043] Implementation Method 3
[0044] Combined with Figure 2 The present embodiment is described, a construction method of a cast-in-place crash barrier for a bridge in a cold region, the construction method uses a cast-in-place crash barrier reinforcement formwork described in the first or second embodiment, the manufacturing method of the cast-in-place crash barrier reinforcement formwork in the construction method is: the reinforcement formwork is installed on both sides of the bridge, wherein the inner formwork 5 of the crash barrier is installed on the inner side of the beam body 8 of the bridge and is located above the bridge deck pavement 3, the outer formwork 6 of the crash barrier is installed on the outer side of the beam body 8, the tie rod eye opening 1 of the inner formwork 5 of the crash barrier is 30-50mm higher than the bridge deck pavement, one end of the tie rod 4 passes through the tie rod eye opening 1 and is fixed, and then the other end is lifted vertically upward until the entire tie rod forms a reverse slope of 2-4%, and then the other end of the tie rod 4 is fixedly connected to the outer formwork 6 of the crash barrier.
[0045] The reinforcement eye opening 1 of the inner template 5 of the crash barrier is 30-50 mm higher than the bridge deck pavement, thus avoiding the problem of water pouring into the reinforcement eye opening of the inner template.
[0046] After one end of the tie rod 4 passes through the tie rod eye opening 1 and is fixed, the other end is lifted vertically upward until the entire tie rod forms a reverse slope of 2-4%. Then, the other end of the tie rod 4 is fixedly connected to the outer formwork 6 of the crash barrier, thereby avoiding the problem of internal condensed water seeping through the tie rod eye opening of the outer formwork due to repeated freeze-thaw cycles in cold areas, and fundamentally solving the problem of water leakage and freezing on the outer side of the crash barrier.
[0047] Implementation Method 4
[0048] This embodiment is a further example of the third embodiment. In this embodiment, the construction method further includes: laying a layer of asphalt concrete 2 on the surface of the bridge deck pavement 3, and the thickness of the asphalt concrete 2 is guaranteed to cover the tie rod eye opening 1.
[0049] The present embodiment stipulates that the asphalt concrete 2 must cover the eyelet opening 1 to prevent debris from entering the eyelet, such as small animals, insects, leaves, etc. mixed with rainwater, which ferment in the eyelet and cause internal corrosion, while also maintaining the appearance after the bridge deck is paved.
[0050] In this embodiment, the thickness of the asphalt concrete 2 is preferably 100 mm.
[0051] Implementation Method 5
[0052] This embodiment is a further illustration of the third embodiment. In this embodiment, the tie rod 4 is inserted through a special sleeve and extended by 50 mm on both sides of the inner formwork 5 and the outer formwork 6 of the crash wall. The purpose is to prevent the tie rod from penetrating into the concrete slurry during use and ensure smooth removal of the formwork.
[0053] Implementation Method 6
[0054] This embodiment is illustrated by way of example in conjunction with a specific application scenario. A construction method for a cast-in-place anti-collision wall for a bridge in a cold region includes the following steps:
[0055] S1. Construction preparation
[0056] S11. Preparation before construction. Determine the composition of the construction team, including technicians, workers and managers; formulate safety rules and regulations for the construction site, clean up the construction site, set up construction signs and safety areas, check the status of all construction equipment and tools to ensure they are intact and reliable, and put construction materials in place.
[0057] S12, template production. The top edge 7 of the crash wall must be kept flush, and then the position of the eyelet of the inner template 5 of the crash wall is optimized to ensure that the eyelet opening 1 of the inner template 5 of the crash wall is 30-50mm higher than the bridge deck pavement. After one end of the tie bar 4 is passed through the eyelet opening 1 of the inner template 5 of the crash wall and fixed, the other end is lifted vertically upward, and the inclination of the tie bar 4 is determined by using tools such as a level ruler and a distance meter, until it stops at 2-4%, and finally the position of the eyelet opening of the outer template 6 of the crash wall is determined.
[0058] S2. Construction layout
[0059] S21, using the double-row point technology, after placing the points, the surveyor uses an angle grinder to grind the marked points into a flat surface on the box beam, cleans the surface dust, and draws the marks with red paint;
[0060] S22, the lead-out point array is used for construction support formwork. The plane position is checked for accuracy by measuring the point array and measuring the distance with a steel tape measure. The interval between two rows of points is 30cm, which is convenient for checking after the formwork is installed;
[0061] S23. When laying out, the entire crash barrier must be considered in its entirety. All bridge deck elevations must be measured and set in advance, with a stakeout point every 10m for straight sections, every 4m for curved sections, and every 2m for sections with large longitudinal slopes and small radius curves, to control the overall line shape of the crash barrier.
[0062] S3. Steel bar processing and installation
[0063] S31. The steel bars are cut and manufactured strictly in accordance with the process required by the design documents and prefabricated in advance. The models, specifications and structural dimensions meet the requirements of the design documents;
[0064] S32. Mark the elevation on the steel bars at intervals of 10m / section, hang wires for control, and weld the steel bars according to the designed elevation;
[0065] S33. After the anti-collision wall reinforcement is installed, check its elevation and line shape to ensure that the elevation meets the requirements of the design documents and the line shape is straight.
[0066] S4. Install template
[0067] S41. The reinforced formwork of the cast-in-place crash wall adopts a standard steel formwork, and double-sided tape is clamped at the template seams to make the seams tight. The new formwork must be pre-assembled and inspected before use;
[0068] S42. Use leveling and plumb ball method to check the plane position and top elevation of the formwork, and check the node connection and longitudinal and lateral stability between the formworks;
[0069] S43. Keep the inner surface of the steel mold clean. Before each mold installation, use an angle grinder to remove rust from the steel mold. After rust removal, wipe it clean with a cloth and apply a release agent to keep the inner surface of the steel mold free of any debris or stains.
[0070] S5. Overall adjustment template
[0071] S51. According to the elevation of the hanging line, first determine the elevation of the outer template, and then install the inner template. The insufficient part of the inner template is supported by square wood, etc. to ensure that the outer and inner templates of the anti-collision wall are on the same horizontal line;
[0072] S52. Use a spirit level to check each template joint. If it fails, use a guide chain to adjust it to ensure that the top surface is level and that each reinforcement eye of the cast-in-place crash wall reinforcement template has a reverse slope of 3±1%.
[0073] S6. Concrete pouring
[0074] S61. The concrete of the crash wall is poured in three layers: the first layer is poured to the root of the chamfer of the crash wall, the second layer is poured to half the height of the straight section, and the third layer is poured to the top. During vibration, ensure that it is sufficient and there is no over-vibration;
[0075] S62. Concrete should be vibrated and compacted, without any leakage or over-vibration. The concrete should not sink, no bubbles should appear, and the surface should be smooth.
[0076] S63. After the concrete is vibrated, use a spatula to finish the surface for the first time to ensure that the top surface of the anti-collision wall is flat; use a level ruler to check and install the embedded parts of the street light pole and the surrounding area of the embedded parts, and strictly level the concrete surface to ensure that the base of the street light pole is level;
[0077] S64. After the slurry is set before the initial setting, use a spatula to carry out the second finishing. It is strictly forbidden to add water artificially during the finishing process.
[0078] S7, demoulding and curing
[0079] S71. The time of demoulding should be correctly determined according to the test results of the test block to prevent premature demoulding from causing concrete to stick to the formwork and cause roughness, honeycombs or missing edges and corners;
[0080] S72. Do not use excessive force or haste when removing the mold, and pay attention to protecting the edges and corners;
[0081] S73. When hoisting, it is strictly forbidden to collide the template with the edges and corners. If the template is deformed, it should be repaired and tried out immediately, and it can be put into use only after passing the inspection;
[0082] S74. After the formwork is removed, the concrete should be covered and watered promptly for curing, and the curing time should be no less than 7 days.
[0083] The focus of layout is to control the line shape of the cast-in-place crash barrier, especially the large longitudinal slope and small radius curve section. The layout points should be increased to ensure the smooth line shape of the final crash barrier.
[0084] The measurement is adjusted according to the elevation of the top surface of the crash barrier. Since the beam will inevitably face many elevation problems during the implementation process, space for adjustment is given.
[0085] The pouring of concrete must be controlled in layers and divided into three layers according to the pouring needs. The purpose is to reduce bubbles and ensure the appearance quality of the crash barrier.
[0086] The technical solution provided by the present invention is further described in detail through the above specific implementation modes in order to highlight the advantages and benefits of the technical solution provided by the present invention. However, the above specific implementation modes are not intended to limit the present invention. Any reasonable modification and improvement of the present invention, combination of implementation modes and equivalent substitution within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A cast-in-place anti-collision wall reinforcement formwork, the cast-in-place anti-collision wall reinforcement formwork comprising tie rod eye openings (1), tie rods (4), an inner side formwork of the anti-collision wall (5), an outer side formwork of the anti-collision wall (6) and a top edge of the anti-collision wall (7), characterized in that: The tie rod eyelet opening (1) is 30-50 mm above the bottom edge of the inner side template (5) of the anti-collision wall; One end of the tie bar (4) is fixed in the tie bar eye opening (1), and the other end is fixed on the outer side template (6) of the anti-collision wall, and has a reverse slope of 2-4%; The top edge (7) of the anti-collision wall is installed on the top ends of the inner template (5) of the anti-collision wall and the outer template (6) of the anti-collision wall.
2. A cast-in-place anti-collision wall reinforcement formwork according to claim 1, characterized in that: The inner diameter of the tie rod eyelet opening (1) is 20-24 mm.
3. The cast-in-place anti-collision wall reinforcement formwork according to claim 1, characterized in that: The outer diameter of the tie rod (4) is 18-22 mm.
4. The cast-in-place anti-collision wall reinforcement formwork according to claim 1, characterized in that: The distance between the tie rod eye opening (1) and the bottom edge of the inner side template (5) of the anti-collision wall is 50 mm.
5. The cast-in-place anti-collision wall reinforcement formwork according to claim 1, characterized in that: The reverse slope of the tension reinforcement (4) is 3%.
6. The cast-in-place anti-collision wall reinforcement formwork according to claim 1, characterized in that: The top surfaces of the inner side template (5) of the anti-collision wall and the outer side template (6) of the anti-collision wall are in the same horizontal plane.
7. A construction method for a cast-in-place crash barrier for a bridge in a cold region, the construction method using a cast-in-place crash barrier reinforcement formwork according to any one of claims 1 to 6, the method for making the cast-in-place crash barrier reinforcement formwork in the construction method comprising: installing the reinforcement formwork on both sides of the bridge, wherein the inner formwork (5) of the crash barrier is installed on the inner side of the bridge beam (8) and is located above the bridge deck pavement (3), and the outer formwork (6) of the crash barrier is installed on the outer side of the beam (8), characterized in that: The eyelet opening (1) of the inner template (5) of the crash wall is 30-50 mm higher than the bridge deck pavement (3). After one end of the tie bar (4) passes through the eyelet opening (1) and is fixed, the other end is lifted vertically upward until the entire tie bar forms a reverse slope of 2-4%. Then, the other end of the tie bar (4) is fixedly connected to the outer template (6) of the crash wall.
8. The construction method of a cast-in-situ crash barrier for a cold region bridge according to claim 7, characterized in that: The construction method further comprises: laying a layer of asphalt concrete (2) on the surface layer of the bridge deck pavement (3), wherein the thickness of the asphalt concrete (2) is ensured to cover the tie rod eye opening (1).
9. The construction method of a cast-in-situ crash barrier for a cold region bridge according to claim 7, characterized in that: The thickness of the asphalt concrete (2) is 100 mm.
10. The construction method of a cast-in-situ crash barrier for a cold region bridge according to claim 7, characterized in that: The tie rod (4) is inserted into a special sleeve and is extended by 50 mm on both sides of the inner side template (5) and the outer side template (6) of the crash wall.