Silt-resistant disaster-prevention high-pile wharf structure for port engineering
By adopting steel plate energy-consuming devices and prestressed steel sleeve systems in the high pile dock structure, it absorbs seismic energy and prevents continuous collapse, and solves the problems of existing high pile docks that are damaged after earthquake and have poor anti-silt effect, and achieves the Rapid recovery of structure and improved security.
Patent Information
- Application Number
- CN202411370041.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-29
- Publication Date
- 2024-12-06
AI Technical Summary
The existing high pile dock structure is prone to damage after earthquakes and is difficult to repair, and has poor anti-silt effect, insufficient resistance, difficult to quickly restore functions, and there is a risk of continuous collapse.
Using a structure including concrete piles, precast concrete beams and steel pipe pile caps, the steel plate energy consumption is used as the first line of defense to absorb seismic energy, and the prestressed steel sleeve system is used as the second line of defense. Lines of defense prevent continuous collapse, ensuring structure safety and resilience.
The recovery of the functions of the high pile dock during siltation and post-seismic functions is achieved, reducing losses, improving the economic and safety of the structure, having good anti-continuous collapse performance, and enhancing the earthquake resistance.
Smart Images

Figure CN119083366A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of preventing siltation disasters at ports and docks, and in particular to an anti-siltation and disaster-preventing high-pile dock structure used in port engineering. Background Art
[0003] With the development of social economy, the state requires that the port structure can quickly recover after an earthquake. With the summary of experience from many earthquake disasters and the continuous improvement of the understanding of port seismic design, the high-pile wharf structure is required to have the ability to resist progressive collapse. In addition, after an earthquake, the pile-beam joints in the structure are most likely to be damaged and yielded, and are difficult to repair.
[0004] For example, the Chinese utility model patent with authorization announcement number CN 219951804 U discloses an anti-siltation system behind and below the dock in the field of dredging engineering technology, including a movable plate, an upper fixed body, a movable winding body, and a lower support body; the upper fixed body is connected to the lower support body, the lower support body is located at the lower end of the upper fixed body, and the lower support body is inserted into the bottom of the harbor; the movable plate is connected to the upper fixed body through the movable winding body. The anti-siltation system automatically controls the opening and closing of the anti-siltation system through the impact of water flow, and can fundamentally solve the problem of siltation behind and below the dock according to the principles of fluid mechanics. However, the anti-siltation system only has the first line of defense, the anti-siltation effect is not good, and the resistance under the action of seismic load is weak.
[0005] Another example is the Chinese invention patent application with publication number CN 118048939 A, which discloses a seismic isolation structure suitable for high-pile docks in strong earthquake zones, which includes: a pile foundation, which is a pair or more pairs of symmetrically arranged inclined piles arranged in the vertical direction; a pile cap, which is arranged on the top of the pile foundation; one or more seismic isolation devices, which are symmetrically arranged on the top of the pile cap, connecting the pile cap and the crossbeam of the beam-slab type high-pile dock, or connecting the pile cap and the panel of the beamless slab type high-pile dock. The invention also claims to protect the seismic isolation high-pile dock structure design method of the seismic isolation structure, which has the beneficial effects of extending the natural vibration period of the structure and increasing the damping to consume seismic energy and reduce the seismic response of the structure. However, in the seismic isolation structure, the pile cap is directly fixedly connected to the pile foundation, and the horizontal load and the bending moment at both ends will be borne by the pile cap, causing damage to the pile cap. Summary of the invention
[0006] In order to solve the above-mentioned technical defects existing in the prior art, the purpose of the present invention is to provide a high-pile wharf structure for port engineering that is silted up and prevents disasters, which can realize that the high-pile wharf can prevent siltation loads and be earthquake-resistant, and the structural function can be restored, thereby reducing the losses caused by siltation or earthquakes, accelerating the recovery speed of strong siltation or earthquakes, and at the same time having good anti-continuous collapse performance, thereby greatly improving the economy and safety of the high-pile wharf structure.
[0007] Whether the high-pile wharf is affected by siltation or encounters an accidental event such as an earthquake (other accidental events include ship collisions, bomb attacks, etc.), the key to the design of the structural system is: first, when the destructive load occurs, this part of the energy is absorbed by the replaceable energy-absorbing components to prevent the beam-column joints from being damaged and failing; second, when extreme loads occur, the energy-absorbing components fail or even the local structure fails. The pre-tensioned steel bar system is set up to prevent continuous collapse, thereby ensuring the safety of the entire structural system.
[0008] In order to solve the above technical problems, the solution adopted by the present invention is as follows:
[0009] The present invention provides an anti-siltation and disaster prevention high-pile wharf structure for port engineering, comprising concrete piles, precast concrete beams and steel pipe pile caps, wherein the steel pipe pile caps are sleeved on the top of the concrete piles, the precast concrete beams are placed on the top of the steel pipe pile caps, the steel pipe pile caps comprise lower steel pipes of the steel pipe pile caps and upper supporting plates of the steel pipe pile caps connected together by welding, and a plurality of steel plate energy absorbers are arranged between the lower steel pipes of the steel pipe pile caps and the upper supporting plates of the steel pipe pile caps. In actual work, the concrete piles are first driven to the designed elevation, and then the steel pipe pile caps are sleeved on the top of the concrete piles.
[0010] The anti-silting and disaster-preventing high-pile wharf structure of the present invention can enable the wharf to resist silting loads and earthquakes, and the structural functions can be restored, thereby reducing the losses caused by silting or earthquakes, accelerating the recovery speed of strong siltation or earthquakes, and having good anti-progressive collapse performance, thereby greatly improving the economy and safety of the high-pile wharf structure.
[0011] Preferably, concrete is poured in the middle of the node formed by the concrete pile, the precast concrete beam and the steel pipe pile cap to form pile head core concrete, thereby consolidating the components.
[0012] In the present invention, the upper end of the steel pipe pile cap is a horizontal support plate supporting the horizontal longitudinal and transverse beams; the steel plate energy absorber is respectively connected to the steel pipe concrete pile and the horizontal beam; the prestressed steel sleeve reinforcement system is pre-buried at the end of the concrete prefabricated beam, and the prestressed steel bars are installed during construction; the node formed by the concrete pile, steel pile cap and transverse beam is connected as a whole through the pile head core concrete.
[0013] In any of the above schemes, it is preferred that the steel plate energy absorber includes an upper wing plate and a side wing plate with reserved bolt holes, the upper wing plate of the energy absorber is connected to the upper support plate of the cap and the precast concrete beam through the beam embedded bolt sleeve at the lower end of the precast concrete beam; the side wing plate of the energy absorber is connected to the lower steel pipe of the steel pipe pile cap through bolts; the hole diameter of the reserved bolt hole is 2 mm larger than the nominal diameter of the bolt. When installing the steel plate energy absorber and the steel pipe pile cap, first use bolts to pass through the upper wing plate and the bolt slot of the energy absorber, then screw them into the beam embedded bolt sleeve under the end of the precast concrete beam, and finally use bolts to connect the side wing plate of the steel plate energy absorber to the steel pipe part of the steel pipe pile cap.
[0014] In any of the above schemes, it is preferred that the inner diameter of the steel pipe at the bottom of the steel pipe pile cap is the same as the outer diameter of the concrete pile; and a bolt groove is provided on the upper support plate of the steel pipe pile cap. When sedimentation load, earthquake load and other accidental loads occur, the precast concrete beam can slide along the bolt groove of the steel pipe pile cap, so the horizontal load and the bending moment at both ends will not be borne by the steel pipe pile cap, but will be transmitted to the steel plate energy absorber through the pre-embedded bolt sleeve of the crossbeam. As the first line of defense, the steel plate energy absorber will yield first under the action of earthquake loads and consume earthquake energy. In order to ensure that the steel plate energy absorber has a strong energy absorption capacity, its bending bearing capacity must exceed half of the bending capacity of the pile foundation.
[0015] In any of the above schemes, it is preferred that the width of the bolt groove is 2 mm larger than the nominal diameter of the pre-embedded bolt sleeve of the beam; the length of the bolt groove is 20 mm longer than the arrangement range of the pre-embedded bolt sleeve of the beam at both ends; the pre-embedded bolt sleeve of the beam is fixedly connected through the bolt groove on the steel pipe pile cap support plate and the reserved bolt hole on the upper wing plate of the energy absorber on the steel plate energy absorber.
[0016] In any of the above solutions, preferably, the upper wing plate and the side wing plate of the energy absorber are formed by cold bending of steel plates. In order to ensure that the energy absorber can withstand cyclic reciprocating loads, the upper wing plate and the side wing plate of the energy absorber are formed by cold bending of steel plates and cannot be welded.
[0017] In any of the above schemes, preferably, the ends of the precast concrete beams are provided with embedded steel sleeves, and during construction, prestressed steel bars are screwed into the embedded steel sleeves in the precast concrete beams on both sides, and a tensioner is installed at the joint of the two prestressed steel bars. During operation, the coaxial horizontal beams are screwed in with prestressed steel bars, and the embedded steel sleeves are connected and pre-tensioned through the tensioner.
[0018] The prestressed steel sleeve system connecting the horizontal beams, embedded steel sleeves, prestressed steel bars and tensioners, build a second line of defense to prevent the continuous collapse of the structure. When an extreme situation occurs, the steel plate energy absorber fails first, followed by the failure of the head of the concrete pile and the bending failure of the end of the precast concrete beam; at this time, the embedded steel sleeves, prestressed steel bars and tensioners of the prestressed steel sleeve system provide tensioning force, which prevents the wharf structure from further chain failure reactions, thereby avoiding the overall collapse of the structure.
[0019] In summary, the anti-siltation and disaster prevention high-pile wharf structure for port engineering of the present invention has the following advantages: the precast concrete beam is fixedly connected with a plurality of steel plate energy absorbers by bolts through the upper support plate of the steel pipe pile cap. The steel plate energy absorber, as the first line of defense, yields first under the action of earthquake loads and the like, and consumes earthquake energy; the embedded steel sleeves, prestressed steel bars and tensioners constitute the second line of defense to prevent continuous collapse of the structure; when extreme conditions occur, the steel plate energy absorber fails first, followed by failure of the head of the concrete pile and failure of the bending resistance of the end of the precast concrete beam; at this time, the prestressed steel sleeve system, the embedded steel sleeves, prestressed steel bars and tensioners provide tensioning force, which prevents the wharf structure from further chain failure reaction, thereby avoiding the overall collapse of the structure.
[0020] Description of Figure Numbers
[0021] Concrete pile 1, precast concrete beam 2, embedded steel sleeve 21, prestressed steel bar 22, tensioner 23, beam embedded bolt sleeve 24, steel pipe pile cap 3, steel pipe pile cap lower steel pipe 31, steel pipe pile cap upper supporting plate 32, bolt slide 33, steel plate energy absorber 4, energy absorber upper wing plate 41, energy absorber side wing plate 42, reserved bolt hole 43, bolt 44, pile head core concrete 5. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a schematic diagram of a high-pile wharf structure for resisting siltation and preventing disasters for port engineering according to the present invention.
[0023] Figure 2 The invention provides a high pile wharf structure for preventing siltation and disasters in port engineering. Figure 1 A schematic structural diagram of a steel pipe pile cap in a preferred embodiment is shown.
[0024] Figure 3 The invention provides a high pile wharf structure for preventing siltation and disasters in port engineering. Figure 1 The schematic diagram of the structure of the steel plate energy absorber in the preferred embodiment is shown.
[0025] Figure 4 The invention provides a high pile wharf structure for preventing siltation and disasters in port engineering. Figure 3 A schematic diagram of the installation position of the preferred embodiment is shown. DETAILED DESCRIPTION
[0026] The following description is merely exemplary in nature and is not intended to limit the disclosure, application or use. The specific implementation of the anti-silting and disaster prevention high-pile wharf structure for port engineering of the present invention is further described below in conjunction with the accompanying drawings.
[0027] like Figure 1 As shown, it is a schematic diagram of the anti-silting and disaster-preventing high-pile wharf structure for port engineering according to the present invention.
[0028] The anti-siltation and disaster prevention high-pile wharf structure for port engineering of the present invention comprises a concrete pile 1, a precast concrete beam 2 and a steel pipe pile cap 3, the steel pipe pile cap 3 is sleeved on the top of the concrete pile 1, the precast concrete beam 2 is placed on the top of the steel pipe pile cap 3 (specifically: the precast concrete beam 2 is placed on the steel pipe pile cap supporting plate 32), the steel pipe pile cap 3 comprises a steel pipe pile cap lower steel pipe 31 and a steel pipe pile cap upper supporting plate 32 connected together by welding, and a plurality of steel plate energy absorbers 4 (combined with Figure 4 In actual work, the concrete pile 1 is first driven to the designed elevation, and then the steel pipe pile cap 3 is inserted into the top of the concrete pile 1.
[0029] The anti-silting and disaster-preventing high-pile wharf structure of the present invention is suitable for ports with strong silting and also for strong earthquake areas. It can achieve functional recovery under strong silting loads or strong earthquake loads and other accidental loads, and has the performance of preventing progressive collapse.
[0030] In this embodiment, concrete is poured in the middle of the node formed by the concrete pile 1, the precast concrete beam 2 and the steel pipe pile cap 3 to form the pile head core concrete 5, so as to consolidate the components.
[0031] In this embodiment, the steel plate energy absorber 4 includes an upper wing plate 41 and a side wing plate 42 of the energy absorber with reserved bolt holes 43. The upper wing plate 41 of the energy absorber is connected to the upper support plate 32 of the cap and the precast concrete beam 2 through the beam embedded bolt sleeve 24 at the lower end of the precast concrete beam 2; the side wing plate 42 of the energy absorber is connected to the lower steel pipe 31 of the steel pipe pile cap through bolts 44; the hole diameter of the reserved bolt hole 43 is 2 mm larger than the nominal diameter of the bolt 44. When the steel plate energy absorber 4 is installed with the steel pipe pile cap 3, the bolt 44 is first passed through the upper wing plate 41 of the energy absorber and the bolt groove 33, and then screwed into the beam embedded bolt sleeve 24 under the end of the precast concrete beam 2, and finally the side wing plate 42 of the energy absorber 4 is connected to the steel pipe 31 of the steel pipe pile cap with bolts 44.
[0032] It should be noted that the shape of the steel plate energy absorber 4 is only one embodiment of the present invention, but the present invention includes but is not limited to this, as long as the steel plate energy absorber 4 can meet the above requirements.
[0033] In this embodiment, the energy absorber upper wing plate 41 and the energy absorber side wing plate 42 are formed by cold bending of steel plates (see Figure 3 In order to ensure that the energy absorber 4 can withstand the cyclic reciprocating load, the energy absorber upper wing plate 41 and the energy absorber side wing plate 42 of the steel plate energy absorber 4 are formed by cold bending of steel plates and cannot be welded.
[0034] In this embodiment, the end of the precast concrete beam 2 is provided with an embedded steel sleeve 21. During construction, the embedded steel sleeves 21 in the precast concrete beams 2 on both sides are screwed with prestressed steel bars 22, and a tensioner 23 is installed at the joint of the two prestressed steel bars 22. During operation, the coaxial horizontal beam is screwed with the prestressed steel bars 22, and the embedded steel sleeves 21 are connected and pre-tensioned through the tensioner 23.
[0035] See also Figure 2 As shown, according to the anti-silting disaster prevention high-pile wharf structure for port engineering of the present invention, Figure 1 A schematic structural diagram of a steel pipe pile cap in a preferred embodiment is shown.
[0036] In this embodiment, the inner diameter of the lower steel pipe 31 of the steel pipe pile cap is the same as the outer diameter of the concrete pile 1; and a bolt sliding groove 33 is provided on the upper supporting plate 32 of the steel pipe pile cap.
[0037] In this embodiment, the width of the bolt slot 33 is 2 mm larger than the nominal diameter of the beam pre-embedded bolt sleeve 24; the length of the bolt slot 33 is 20 mm longer than the two ends of the arrangement range of the beam pre-embedded bolt sleeve 24; the beam pre-embedded bolt sleeve 24 is fixedly connected through the bolt slot 33 on the steel pipe pile cap support plate 32 and the reserved bolt hole 43 of the energy absorber upper wing plate 41 on the steel plate energy absorber 4. When sedimentation load, earthquake load and other accidental loads occur, since the precast concrete beam 2 can slide along the bolt slot 33 of the steel pipe pile cap 3, the horizontal load and the bending moment at both ends will not be borne by the steel pipe pile cap 3, but will be transmitted to the steel plate energy absorber 4 through the beam pre-embedded bolt sleeve 24. The steel plate energy absorber 4, as the first line of defense, will yield first under the action of earthquake loads and the like, consuming earthquake energy. In order to ensure that the steel plate energy absorber 4 has a strong energy absorption capacity, its bending bearing capacity must exceed half of the bending capacity of the pile foundation.
[0038] The prestressed steel sleeve system, which connects the horizontal beams, has embedded steel sleeves 21, prestressed steel bars 22 and tensioners 23, which form the second line of defense to prevent the continuous collapse of the structure. When an extreme situation occurs, the steel plate energy absorber 4 fails first, followed by the failure of the head of the concrete pile 1 and the bending failure of the end of the precast concrete beam 2; at this time, the prestressed steel sleeve system, which has embedded steel sleeves 21, prestressed steel bars 22 and tensioners 23, provides tensioning force, which prevents the wharf structure from further chain failure, thereby avoiding the overall collapse of the structure.
[0039] The method for determining the prestressing force of the embedded steel sleeve 21, prestressed steel bar 22 and tensioner 23 of the prestressed steel sleeve system is as follows: simplify the hinged system of the local failure node, release all the loads of the concrete pile 1 and the end bending moment of the precast concrete beam 2; calculate the steel bar tension F at this time under extreme working conditions; when setting the prestressing force, divide the calculated F by the number of prestressed steel bars 22 to obtain the prestressing force.
[0040] It is not difficult for those skilled in the art to understand that the anti-silting and disaster prevention high-pile dock structure for port engineering of the present invention includes any combination of the various parts in this specification. Due to space limitations and to make the specification concise, these combinations are not introduced in detail one by one here, but after reading this specification, the scope of the present invention consisting of any combination of the various parts constituting this specification is self-evident.
Claims
1. A high-pile wharf structure for anti-silting and disaster prevention in port engineering, comprising a concrete pile (1), a precast concrete beam (2) and a steel pipe pile cap (3), wherein the steel pipe pile cap (3) is sleeved on the top of the concrete pile (1), and the precast concrete beam (2) is placed on the top of the steel pipe pile cap (3), characterized in that: The steel pipe pile cap (3) comprises a steel pipe pile cap lower steel pipe (31) and a steel pipe pile cap upper supporting plate (32) connected together by welding, and a plurality of steel plate energy absorbers (4) are arranged between the steel pipe pile cap lower steel pipe (31) and the steel pipe pile cap upper supporting plate (32).
2. The high-pile wharf structure for anti-silting and disaster prevention for port engineering according to claim 1, characterized in that: Concrete is poured in the middle of the node formed by the concrete pile (1), the precast concrete beam (2) and the steel pipe pile cap (3) to form the pile head core concrete (5).
3. The high-pile wharf structure for anti-silting and disaster prevention for port engineering according to claim 1, characterized in that: The steel plate energy absorber (4) comprises an upper wing plate (41) and a side wing plate (42) of the energy absorber with reserved bolt holes (43). The upper wing plate (41) of the energy absorber is connected to the upper support plate (32) of the cap and the precast concrete beam (2) through a beam pre-embedded bolt sleeve (24) at the lower end of the precast concrete beam (2); the side wing plate (42) of the energy absorber is connected to the lower steel pipe (31) of the steel pipe pile cap through bolts (44); the hole diameter of the reserved bolt hole (43) is 2 mm larger than the nominal diameter of the bolt (44).
4. The anti-silting and disaster prevention high-pile wharf structure for port engineering according to claim 1, characterized in that: The inner diameter of the steel pipe (31) at the bottom of the steel pipe pile cap is the same as the outer diameter of the concrete pile (1); and a bolt slide groove (33) is provided on the upper supporting plate (32) of the steel pipe pile cap.
5. The anti-silting and disaster prevention high-pile wharf structure for port engineering according to claim 4, characterized in that: The width of the bolt chute (33) is 2 mm larger than the nominal diameter of the beam pre-embedded bolt sleeve (24); the length of the bolt chute (33) is 20 mm longer than the arrangement range of the beam pre-embedded bolt sleeve (24) at both ends; the beam pre-embedded bolt sleeve (24) is fixedly connected through the bolt chute (33) on the steel pipe pile cap support plate (32) and the reserved bolt hole (43) of the energy absorber upper wing plate (41) on the steel plate energy absorber (4).
6. The anti-silting and disaster prevention high-pile wharf structure for port engineering according to claim 3, characterized in that: The energy dissipator upper wing plate (41) and the energy dissipator side wing plate (42) are both formed by cold bending of steel plates.
7. The high-pile wharf structure for preventing siltation and disasters for port engineering according to claim 1 or 2, characterized in that: The end of the precast concrete beam (2) is provided with a pre-buried steel sleeve (21). During construction, pre-buried steel sleeves (21) in the precast concrete beams (2) on the left and right sides are screwed into the pre-buried steel sleeves (21), and a tensioner (23) is installed at the joint of the two pre-buried steel bars (22).
