Prefabricated support type secondary pouring surface uniform joint bar system and construction method thereof

Through the prefabricated bracket-type secondary casting surface uniform insertion system, the prefabricated bracket and the crane are used to hoist the reinforcement bracket as a whole, and combined with the detachable locking structure and the sleeve auxiliary loading and unloading unit, the initial settling time of the secondary casting surface insertion is solved. The difficulty in controlling the safety hazards of suspended insert construction and the cumbersome adjustment of steel bars have been achieved to improve the support strength and positioning accuracy of steel bars.

CN119083733AActive Publication Date: 2024-12-06CHINA FIRST METALLURGICAL GROUP
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411302422.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-18
Publication Date
2024-12-06
Estimated Expiration
2044-09-18

AI Technical Summary

Technical Problem

In the prior art, the secondary casting surface insertion method has problems such as the settlement of steel bars that does not meet the requirements, the initial settling time is difficult to control, safety hazards in the construction of suspended steel bars, and the complicated adjustment of the position of steel bars.

Method used

The prefabricated bracket-type secondary casting surface uniform insertion system is adopted. The steel bar bracket is hoisted through the prefabricated bracket and the crane as a whole, and combined with the detachable locking structure and the sleeve auxiliary loading and unloading unit, the flexibility and accuracy of the steel bar layout are achieved.

Benefits of technology

It solves the difficulty in controlling the initial settling time and the safety risks of suspended insert construction, improves the support strength of the bracket and the positioning accuracy of the steel column foundation embedded parts, simplifies the steel bar position adjustment process, and reduces the construction complexity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119083733A_ABST
    Figure CN119083733A_ABST
Patent Text Reader

Abstract

The invention discloses a prefabricated support type secondary pouring surface uniform steel joint system and a construction method thereof. The device comprises a steel bar preassembling support formed by hinging a side beam, a transverse frame beam and a vertical frame beam, steel bar locking units installed on the vertical frame beam at equal intervals, and a support supporting unit arranged at the bottom of the side beam and used for enabling the whole support to be overhead. The arrangement of the reinforcing steel bar parts is realized by presetting the bracket, and finally, the bracket on which the reinforcing steel bars are fixed is integrally hoisted to a secondary pouring surface through the crane, so that the technical problem that the initial setting time of first-time pouring concrete is difficult to control in the construction process due to the adoption of a manual reinforcing steel bar inserting method for paving a riding track is solved; meanwhile, the risk that safety accidents are likely to occur due to manual construction of erecting riding tracks through suspended joint bars is avoided; in addition, the center of the hoisted support is in lap joint with the embedded column steel bar, so that the supporting strength of the support is improved, the embedded column steel bar is prevented from toppling in the pouring process, and the positioning accuracy of the steel column foundation embedded part can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of secondary casting surface reinforcing bar insertion, and more specifically, relates to a prefabricated bracket type secondary casting surface uniform reinforcing bar insertion system and a construction method thereof. Background Art

[0002] Under the constraints of some specific processes or methods, concrete components need to be poured twice. The purpose of inserting vertical steel bars into the secondary pouring surface is to enhance the shear strength of the horizontal construction joint of the twice poured concrete. When the component is subjected to horizontal force, it restrains the sliding of the secondary pouring surface to ensure the safety and use function of the structure.

[0003] At present, the horizontal construction joint rebar implantation method commonly used on construction sites requires the laying of a horseway suspended above the casting surface in advance for construction workers to walk on, so as to achieve manual rebar insertion. In addition, patent CN106759280A discloses a method for positioning and constructing super-long foundation pile foundation rebars, which belongs to the field of foundation pile rebar construction in construction projects, including determining the length and number of rebars → making a rebar fixing bracket → installing a rebar fixing bracket → fixing a rebar fixing bracket → measuring and positioning the center line of the rebar column → rebar construction → rebar elevation control → rebar fixing → rebar re-measurement. This construction method adds the production, installation and fixing work of the fixed bracket and the surrounding fixed bracket, which plays a role in positioning construction in actual operations, and has a significant positioning effect, which improves the quality, efficiency and safety of the construction process. In addition, patent CN207268047U discloses a vertical steel bar fixing device inserted into a thick plate. The thick plate includes an upper steel bar and a lower steel bar, and the vertical steel bar fixing device includes a leg, a frame, a plurality of steel bars and a positioning stirrup. The leg is located at the bottom of the thick plate, the leg is connected to the lower steel bar, the frame is located above the leg and connected to the leg, a plurality of steel bars are vertically arranged on the frame and arranged along the frame, the steel bar is connected to the frame or the upper steel bar, the positioning steel bar is arranged along the periphery of the plurality of steel bars and connected to the steel bar, and the positioning stirrup is connected to the upper steel bar. Since each steel bar is connected to both the frame or the upper steel bar and the positioning stirrup, that is, each steel bar has two fixing points, which ensures that the steel bar is firmly fixed. In addition, the length of the steel bar entering the thick plate is the height of the thick plate minus the height of the leg, that is, the length saved by each steel bar is approximately the height of the leg, so the amount of steel bars used is reduced, which is conducive to reducing construction costs.

[0004] The above patent method achieves accurate insertion of steel bars to a certain extent, but there are still the following technical problems or areas for improvement: (1) The manual reinforcement insertion method for laying horseways requires strict control of the initial setting time of the first pouring of concrete. If the reinforcement is inserted too early, the reinforcement will sink, resulting in the exposed length not meeting the requirements; conversely, if it is too late, it will be difficult to insert the reinforcement and the insertion depth will not meet the requirements; in addition, the manual construction of the horseway with suspended reinforcement is prone to safety accidents; therefore, it can be considered to use a crane-assisted suspended reinforcement insertion method after the pre-layout and positioning of the reinforcement; (2) Since the density of the reinforcement layout varies under different construction conditions, on the basis of the improvement direction mentioned in (1), consideration should be given to improving the flexibility and convenience of adjusting the pre-installed position of the reinforcement; (3) Due to the large number of reinforcements to be installed, if the prefabricated bracket method is used to determine the position of the reinforcement, the position adjustment process of the reinforcement installation tooling is extremely cumbersome, so auxiliary tools can be appropriately added to facilitate the disassembly and installation of the tooling. Summary of the invention

[0005] In view of the above defects or improvement needs of the prior art, the present invention provides a prefabricated bracket type secondary casting surface uniform reinforcement system and a construction method thereof, which realizes the arrangement of steel bars by pre-setting the bracket, and finally hoists the bracket with the steel bars fixed thereon as a whole onto the secondary casting surface by a crane, thereby solving the technical problem of the difficulty in controlling the initial setting time of the first pouring of concrete during the construction process due to the manual reinforcement insertion method for laying the horseway, and at the same time avoids the risk of safety accidents caused by the manual construction of the horseway with suspended reinforcement insertion; in addition, the center of the bracket after hoisting is overlapped with the hidden column steel bars, thereby improving the support strength of the bracket, and preventing the hidden column steel bars from tipping over during the pouring process, and can improve the positioning accuracy of the embedded parts of the steel column foundation.

[0006] In order to achieve the above object, according to a first aspect of the present invention, a prefabricated support type secondary casting surface uniform reinforcing bar system comprises:

[0007] A steel bar pre-installed bracket formed by hinged side beams, transverse frame beams and vertical frame beams, a steel bar locking unit equidistantly installed on the vertical frame beams, and a bracket support unit provided at the bottom of the side beams for the bracket to be suspended as a whole; the bottom of the bracket support unit is fixedly connected to the poured cushion layer outside the secondary casting surface, and the steel bars to be inserted are fixedly installed in the steel bar locking unit; the vertical frame beam located at the center of the steel bar pre-installed bracket is erected on the hidden column steel bars around the steel column;

[0008] The steel bar locking unit comprises a steel bar locking sleeve fixed to the transverse frame beam, a non-slip rubber pad arranged on the inner wall of the steel bar locking sleeve to prevent the steel bar from sliding out, a threaded hole opened on the side wall of the steel bar locking sleeve and a first tightening screw rotatably connected to the threaded hole.

[0009] Preferably, the bracket support unit comprises:

[0010] A vertical support column with an upper end fixedly connected to the bottom of the side beam, a flange connection plate fixedly connected to the bottom of the vertical support column, and anchor bolts that fixedly connect the flange connection plate to the cast cushion layer.

[0011] Preferably, the bracket support unit further includes:

[0012] A support brace installed diagonally on a diagonal vertical support column.

[0013] Preferably, the connection between the reinforcement locking sleeve and the transverse frame beam is welding.

[0014] Preferably, the reinforcement locking sleeve and the transverse frame beam are detachably connected.

[0015] Preferably, the steel bar locking sleeve and the transverse frame beam are detachably connected through a sleeve disassembly assembly, and the sleeve disassembly assembly includes a side connecting block fixed to the side wall of the steel bar locking sleeve, an insertion hole opened in the side connecting block, a concave locking buckle with one end inserted into the insertion hole, a threaded hole opened in the other end of the concave locking buckle and a second tightening screw rotatably connected to the threaded hole, and a locking push block fixed to the front end of the second tightening screw for abutting the transverse frame beam.

[0016] Preferably, it also includes a sleeve auxiliary loading and unloading unit, which includes:

[0017] A main shell with an opening at the bottom, a handle installed on the top of the main shell, a beam-mounting opening penetrating through the side of the main shell, a strong magnet installed on the inner surface of the main shell and used to temporarily absorb the concave locking buckle and the steel bar locking sleeve to prevent them from falling, and a screw forward driving unit that controls the second tightening screw to make a forward push movement.

[0018] Preferably, the screw forward driving unit comprises:

[0019] A rear-stage transmission gear coaxially fixedly connected to the rear end of the second tightening screw, a sliding transmission gear meshing with both sides of the rear-stage transmission gear, an intermediate transmission gear coaxially fixedly connected to the sliding transmission gear, a front-stage transmission gear arranged between a pair of the intermediate transmission gears and meshing with them, and a forward drive motor coaxially fixedly connected to the front-stage transmission gear; the forward drive motor is fixedly connected to the main housing.

[0020] According to a second aspect of the present invention, a construction method of a prefabricated support type secondary casting surface uniform reinforcing bar system comprises the following steps:

[0021] S100: Measure and lay out the area where reinforcement is required according to the construction drawings, expand it by 100mm to 200mm, and lay out the positioning line and control line of the poured cushion layer;

[0022] S200: Install the side beams, adjust the horizontality of the side beams by leveling, install the vertical beams, and level the vertical beams; install the transverse beams, and level the transverse beams, and complete the assembly of the pre-installed steel bar brackets;

[0023] S300: Fix the bracket support unit to the bottom of the steel bar pre-installed bracket, and use diagonal braces to connect the vertical support columns in the same plane;

[0024] S400: With the help of the sleeve auxiliary loading and unloading unit, the sleeve disassembly assembly is connected to the transverse frame beam according to the spacing of the inserted steel bars, and the steel bars to be inserted are inserted and fixed into the steel bar locking sleeve;

[0025] S500: hoist the support with the steel bars fixed thereon to the secondary casting surface as a whole by means of a crane, and fix the support unit of the support to the cast cushion layer by means of anchor bolts;

[0026] S600: Pour concrete and vibrate it. After the concrete reaches final setting, loosen the first tightening screw to release the steel bars to be inserted. Use vertical transportation machinery to directly hang the bracket to the next area where the same type of steel bars are inserted for rotation.

[0027] Preferably, the S400 further includes the following steps:

[0028] S401: Holding the handle, first put the concave locking buckle equipped with the second tightening screw into the inner cavity of the main shell, and then put the steel bar locking sleeve into it, and at the same time ensure that the insertion hole is inserted into one end of the concave locking buckle, and under the action of the strong magnet, ensure that the two will not fall off;

[0029] S402: At the predetermined installation position, the transverse frame beam is inserted into the frame beam clamping entrance, and then the device is started. Under the action of the forward driving motor, the front-stage transmission gear, the intermediate transmission gear, the sliding transmission gear, and the rear-stage transmission gear are driven, and finally the second tightening screw is rotated in a directional manner, so that the locking push block in front of it squeezes and top-connects the transverse frame beam, so as to complete the fixed connection between the transverse frame beam and the steel bar locking unit;

[0030] S403: The installation operation is completed by removing the sleeve auxiliary loading and unloading unit, and vice versa for the disassembly operation.

[0031] In general, the above technical solutions conceived by the present invention can achieve the following beneficial effects compared with the prior art:

[0032] 1. A prefabricated bracket-type secondary casting surface uniform reinforcement system of the present invention realizes the arrangement of steel bars by presetting the bracket, and finally hoists the bracket with fixed steel bars as a whole onto the secondary casting surface by a crane, thereby solving the technical problem of the difficulty in controlling the initial setting time of the first pouring of concrete during the construction process when using the manual reinforcement insertion method for laying the horseway, and at the same time avoids the risk of safety accidents caused by the manual construction of the horseway with suspended reinforcement. In addition, the center of the bracket after hoisting is overlapped with the hidden column steel bars, thereby improving the support strength of the bracket, preventing the hidden column steel bars from tipping over during the pouring process, and improving the positioning accuracy of the embedded parts of the steel column foundation.

[0033] 2. A prefabricated bracket type secondary casting surface uniform rebar insertion system of the present invention realizes a detachable connection between the steel bar locking sleeve and the transverse frame beam through a clever combination of a concave locking buckle and a threaded tight top structure, thereby effectively realizing the flexible adjustment of the steel bar layout position on the prefabricated bracket and meeting the customized application requirements of different steel bar layout densities under different construction conditions.

[0034] 3. The prefabricated bracket type secondary casting surface uniform rebar insertion system of the present invention, by designing a sleeve auxiliary loading and unloading unit, effectively solves the technical problem that due to the large number of steel bars to be installed, if the prefabricated bracket method is used to determine the position of the steel bars, the position adjustment process of the steel bar installation tooling is extremely cumbersome, and realizes the convenient disassembly and installation of the sleeve tooling.

[0035] 4. The prefabricated support type secondary casting surface uniform reinforcement system of the present invention effectively prevents the adhesion of concrete to the prefabricated support by separately adding a support support unit under the prefabricated support, thereby ensuring the subsequent multiple reuse value of the support; in addition, on the basis of the original support structure, supporting pillars and diagonal braces are added, and the supporting strength of the supporting unit is improved as a whole by utilizing the triangular structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 This is a schematic diagram of the overall structure of a prefabricated support type secondary casting surface uniform reinforcement insertion system according to an embodiment of the present invention;

[0037] Figure 2 This is a front cross-sectional view of a construction state diagram of a prefabricated support type secondary casting surface uniform reinforcement insertion system according to an embodiment of the present invention;

[0038] Figure 3 A top view of a construction state of a prefabricated support type secondary casting surface uniform reinforcement insertion system according to an embodiment of the present invention;

[0039] Figure 4 This is a steel column structure diagram of a prefabricated bracket type secondary casting surface uniform reinforcement system according to an embodiment of the present invention;

[0040] Figure 5This is a second embodiment of a support support unit of a prefabricated support type secondary casting surface uniform reinforcement insertion system according to an embodiment of the present invention;

[0041] Figure 6 This is a second embodiment of a support support unit of a prefabricated support type secondary casting surface uniform reinforcement insertion system according to an embodiment of the present invention;

[0042] Figure 7 This is a schematic structural diagram of a reinforcement locking unit of a prefabricated support type secondary casting surface uniform reinforcement insertion system according to an embodiment of the present invention;

[0043] Figure 8 It is a schematic diagram of a top view of the structure of a sleeve disassembly assembly of a prefabricated support type secondary casting surface uniform reinforcement insertion system according to an embodiment of the present invention;

[0044] Fig. 9 It is a side structural schematic diagram of a sleeve disassembly assembly of a prefabricated support type secondary casting surface uniform reinforcement insertion system according to an embodiment of the present invention;

[0045] Fig.10 A schematic diagram of the three-dimensional structure of a sleeve auxiliary loading and unloading unit of a prefabricated bracket-type secondary casting surface uniform reinforcement insertion system according to an embodiment of the present invention;

[0046] Fig.11 This is a schematic diagram of the internal structure of a sleeve auxiliary loading and unloading unit of a prefabricated bracket type secondary casting surface uniform reinforcement insertion system according to an embodiment of the present invention;

[0047] Fig.12 This is a structural schematic diagram of a screw forward driving unit of a prefabricated support type secondary casting surface uniform reinforcement insertion system according to an embodiment of the present invention;

[0048] Fig.13 This is a flow chart of a construction method of a prefabricated support type secondary casting surface uniform reinforcement insertion system according to an embodiment of the present invention;

[0049] In all the drawings, the same reference numerals represent the same technical features, specifically: 1-cast cushion layer, 2-pre-installed steel bar bracket, 201-side beam, 202-transverse frame beam, 203-vertical frame beam, 3-bracket support unit, 301-vertical support column, 302-flange connecting plate, 303-anchor bolt, 304-pillar diagonal brace, 4-steel locking unit, 401-steel locking sleeve, 402-anti-slip rubber pad, 403-first tightening screw, 410-sleeve disassembly assembly, 411-side connecting block, 412-insertion Hole, 413-concave locking buckle, 414-locking push block, 415-second tightening screw, 5-sleeve auxiliary loading and unloading unit, 500-main shell, 501-beam card entrance, 502-handle, 510-strong magnet, 520-screw forward driving unit, 521-rear stage transmission gear, 522-sliding transmission gear, 523-intermediate transmission gear, 524-front stage transmission gear, 525-forward driving motor, 6-rebar to be inserted, 7-steel column, 701-horizontal reinforcement, 702-hidden column reinforcement, 8-concrete secondary pouring surface. DETAILED DESCRIPTION

[0050] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0051] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0052] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0053] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0054] like Figures 1 to 12 As shown, in an embodiment of the present invention, the prefabricated support type secondary casting surface uniform reinforcement system comprises:

[0055] A steel bar pre-installed bracket 2 formed by hingedly connecting the side beam 201, the horizontal frame beam 202 and the vertical frame beam 203, a steel bar locking unit 4 equidistantly installed on the vertical frame beam 203, and a bracket support unit 3 provided at the bottom of the side beam 201 for the bracket to be suspended as a whole; the bottom of the bracket support unit 3 is fixedly connected to the poured cushion layer 1 on the periphery of the secondary casting surface, and the steel bar 6 to be inserted is fixedly installed in the steel bar locking unit 4; the vertical frame beam 203 located at the center of the steel bar pre-installed bracket 2 is laid on the hidden column steel bars 702 around the steel column 7;

[0056] The steel bar locking unit 4 includes a steel bar locking sleeve 401 fixed to the transverse frame beam 202, an anti-skid rubber pad 402 arranged on the inner wall of the steel bar locking sleeve 401 to prevent the steel bar from sliding out, a threaded hole opened on the side wall of the steel bar locking sleeve 401 and a first tightening screw 403 rotatably connected to the threaded hole.

[0057] In the embodiment of the present invention, a bracket is preset to realize the arrangement of steel bars, and finally the bracket with fixed steel bars is hoisted as a whole onto the secondary pouring surface by a crane, thereby solving the technical problem of the difficulty in controlling the initial setting time of the first pouring of concrete during the construction process by the method of manually inserting steel bars when laying the horseway, and avoiding the risk of safety accidents caused by the manual construction of the horseway with suspended steel bars. In addition, the center of the bracket after hoisting is overlapped with the hidden column steel bars, thereby improving the supporting strength of the bracket, preventing the hidden column steel bars from tipping over during the pouring process, and improving the positioning accuracy of the embedded parts of the steel column foundation.

[0058] like Figure 1 , Figure 2 and Figure 5 As shown, in this embodiment of the present invention, the bracket support unit 3 includes:

[0059] A vertical support column 301 whose upper end is fixedly connected to the bottom of the side beam 201, a flange connection plate 302 fixedly connected to the bottom of the vertical support column 301, and anchor bolts 303 that fix the flange connection plate 302 to the cast cushion layer 1.

[0060] like Figure 6 As shown, in this embodiment of the present invention, the bracket support unit 3 includes:

[0061] The support diagonal brace 304 is obliquely installed on the diagonal vertical support column 301.

[0062] In the embodiment of the present invention, a bracket support unit is separately added under the prefabricated bracket, thereby effectively preventing the concrete from sticking to the prefabricated bracket, thereby ensuring the subsequent multiple reuse value of the bracket; in addition, on the basis of the original supporting structure, a supporting column diagonal brace rod 304 is added, and the supporting strength of the supporting unit is improved by utilizing the triangular structure as a whole.

[0063] like Figure 1 , Figure 3 As shown, in the embodiment of the present invention, the connection between the reinforcement locking sleeve 401 and the transverse frame beam 202 is welding.

[0064] like Figure 1 , Figure 3 As shown, in the embodiment of the present invention, the reinforcement locking sleeve 401 and the transverse frame beam 202 are detachably connected.

[0065] like Figure 3 , Figure 8 , Fig. 9 As shown, in the embodiment of the present invention, the reinforcement locking sleeve 401 and the transverse frame beam 202 are detachably connected through a sleeve disassembly assembly 410, and the sleeve disassembly assembly 410 includes:

[0066] A side connecting block 411 fixed to the side wall of the steel bar locking sleeve 401, an insertion hole 412 opened in the side connecting block 411, a concave locking buckle 413 with one end inserted into the insertion hole 412, a threaded hole opened at the other end of the concave locking buckle 413 and a second tightening screw 415 rotatably connected to the threaded hole, and a locking push block 414 fixed to the front end of the second tightening screw 415 for abutting against the transverse frame beam 202.

[0067] In the embodiment of the present invention, through the ingenious combination of the concave locking buckle 413 and the threaded tightening top structure, a detachable connection between the steel bar locking sleeve 401 and the transverse frame beam 202 is achieved, thereby effectively realizing the flexible adjustment of the steel bar layout position on the prefabricated bracket, and meeting the customized application requirements of different steel bar layout densities under different construction conditions.

[0068] like Figure 10 to Figure 12 As shown, in the embodiment of the present invention, the prefabricated support type secondary casting surface uniform reinforcement insertion system further includes a sleeve auxiliary loading and unloading unit 5, which includes:

[0069] A main housing 500 with an opening at the bottom, a handle 502 installed on the top of the main housing 500, a beam-mounting entrance 501 penetrating through the side of the main housing 500, a strong magnet 510 installed on the inner surface of the main housing 500 and used to temporarily absorb the concave locking buckle 413 and the steel bar locking sleeve 401 to prevent them from falling, and a screw forward driving unit 520 for controlling the second tightening screw 415 to move forward;

[0070] like Fig.11 and Fig.12 As shown, in this embodiment of the present invention, the screw forward driving unit 520 includes:

[0071] A rear-stage transmission gear 521 coaxially fixedly connected to the rear end of the second tightening screw 415, a sliding transmission gear 522 that maintains meshing transmission with both sides of the rear-stage transmission gear 521, an intermediate transmission gear 523 that is coaxially fixedly connected to the sliding transmission gear 522, a front-stage transmission gear 524 that is arranged between a pair of the intermediate transmission gears 523 and maintains meshing transmission with them, and a forward push drive motor 525 that is coaxially fixedly connected to the front-stage transmission gear 524; the forward push drive motor 525 is fixedly connected to the main shell 500.

[0072] In an embodiment of the present invention, by designing a sleeve auxiliary loading and unloading unit, the technical problem that the position adjustment process of the steel bar installation tooling is extremely cumbersome if the prefabricated bracket method is used to determine the position of the steel bars due to the large number of steel bars to be installed is effectively solved, thereby achieving convenient disassembly and installation of the sleeve tooling.

[0073] In an embodiment of the present invention, the construction method of a prefabricated support type secondary casting surface uniform reinforcing bar system comprises:

[0074] S100: Measure and lay out the area where reinforcement is required according to the construction drawings, expand it by 100 mm to 200 mm, and lay out the positioning line and control line of the poured cushion layer 1;

[0075] S200: Install the side beam 201, adjust the horizontality of the side beam by leveling, install the vertical beam 203, and level the vertical beam 203; install the horizontal beam 202, and level the horizontal beam 202, and complete the assembly of the steel bar pre-installed bracket 2;

[0076] S300: Fix the support unit 3 to the bottom of the pre-installed steel bar support 2, and connect the vertical support columns 301 in the same plane using diagonal braces;

[0077] S400: With the help of the sleeve auxiliary loading and unloading unit 5, the sleeve disassembly assembly 410 is connected to the transverse frame beam 202 according to the inserted reinforcement spacing, and the steel bar 6 to be inserted is inserted and fixed into the steel bar locking sleeve 401;

[0078] S500: hoisting the support with the steel bars fixed thereon to the secondary casting surface as a whole by means of a crane, and fixing the support unit 3 of the support to the cast cushion layer 1 by means of anchor bolts;

[0079] S600: pour concrete and vibrate it. After the concrete reaches final setting, loosen the first tightening screw 403 to release the steel bar 6 to be inserted. Use a vertical transport machine to directly hang the bracket to the next reinforcement insertion area of ​​the same type for rotation.

[0080] In the embodiment of the present invention, the S400 further includes the following steps:

[0081] S401: Holding the handle 502, firstly put the concave locking buckle 413 equipped with the second tightening screw 415 into the inner cavity of the main housing 500, and then put the steel bar locking sleeve 401 into it, and at the same time ensure that the insertion hole 412 is inserted into one end of the concave locking buckle 413, and under the action of the strong magnet 510, ensure that the two will not fall off;

[0082] S402: At the predetermined installation position, the transverse frame beam 202 is inserted into the frame beam clamping entrance 501, and then the device is started. Under the action of the forward driving motor 525, the front-stage transmission gear 524, the intermediate transmission gear 523, the sliding transmission gear 522, and the rear-stage transmission gear 521 are driven, and finally the second tightening screw 415 is rotated in a directional manner, so that the locking push block 414 in front of it squeezes and top-connects the transverse frame beam 202, so as to complete the fixed connection between the transverse frame beam 202 and the steel bar locking unit 4;

[0083] S403: The installation operation is completed by removing the sleeve auxiliary assembly and disassembly unit 5, and vice versa for the disassembly operation.

[0084] The above are only preferred embodiments of the present application and are not intended to limit the present application. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present application shall be included in the protection scope of the present application. The above are only preferred implementations of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and variations can be made without departing from the technical principles of the present application, and these improvements and variations should also be regarded as the protection scope of the present application.

Claims

1. A prefabricated support type secondary casting surface uniform reinforcement system, characterized in that: include: A steel bar pre-installed bracket (2) formed by hinged connection of a side beam (201), a transverse frame beam (202) and a vertical frame beam (203), a steel bar locking unit (4) equidistantly installed on the vertical frame beam (203), and a bracket support unit (3) arranged at the bottom of the side beam (201) for suspending the entire bracket; the bottom of the bracket support unit (3) is fixedly connected to the poured cushion layer (1) outside the secondary pouring surface, and the steel bar (6) to be inserted is fixedly installed in the steel bar locking unit (4); the vertical frame beam (203) located at the center of the steel bar pre-installed bracket (2) is laid on the hidden column steel bars (702) around the steel column (7); The steel bar locking unit (4) comprises a steel bar locking sleeve (401) fixed to the transverse frame beam (202), an anti-skid rubber pad (402) arranged on the inner wall of the steel bar locking sleeve (401) to prevent the steel bar from sliding out, a threaded hole opened on the side wall of the steel bar locking sleeve (401), and a first tightening screw (403) rotatably connected to the threaded hole.

2. A prefabricated support type secondary casting surface uniform reinforcing bar system according to claim 1, characterized in that: The bracket support unit (3) comprises: A vertical support column (301) whose upper end is fixedly connected to the bottom of the side beam (201), a flange connection plate (302) fixedly connected to the bottom of the vertical support column (301), and anchor bolts (303) that fixedly connect the flange connection plate (302) to the cast cushion layer (1).

3. A prefabricated support type secondary casting surface uniform reinforcing bar system according to claim 2, characterized in that: The bracket support unit (3) further comprises: A support diagonal brace (304) is obliquely mounted on the diagonal vertical support column (301).

4. A prefabricated support type secondary casting surface uniform reinforcing bar system according to claim 1, characterized in that: The connection between the reinforcement locking sleeve (401) and the transverse frame beam (202) is by welding.

5. The prefabricated support type secondary casting surface uniform reinforcing bar system according to claim 1, characterized in that: The reinforcement locking sleeve (401) and the transverse frame beam (202) are detachably connected.

6. A prefabricated support type secondary casting surface uniform reinforcement system according to claim 5, characterized in that: The steel bar locking sleeve (401) and the transverse frame beam (202) are detachably connected via a sleeve disassembly assembly (410), and the sleeve disassembly assembly (410) comprises a side connection block (411) fixed to the side wall of the steel bar locking sleeve (401), an insertion hole (412) provided in the side connection block (411), a concave locking buckle (413) with one end inserted into the insertion hole (412), a threaded hole provided at the other end of the concave locking buckle (413) and a second tightening screw (415) rotatably connected to the threaded hole, and a locking push block (414) fixed to the front end of the second tightening screw (415) for abutting against the transverse frame beam (202).

7. A prefabricated support type secondary casting surface uniform reinforcement system according to claim 6, characterized in that: It also includes a sleeve auxiliary loading and unloading unit (5), which includes: A main shell (500) with an opening at the bottom, a handle (502) installed on the top of the main shell (500), a beam-mounting opening (501) penetrating through the side of the main shell (500), a strong magnet (510) installed on the inner surface of the main shell (500) and used for temporarily adsorbing a concave locking buckle (413) and a steel bar locking sleeve (401) to prevent them from falling, and a screw forward driving unit (520) for controlling a second tightening screw (415) to make a forward push movement.

8. A prefabricated support type secondary casting surface uniform reinforcing bar system according to claim 7, characterized in that: The screw forward driving unit (520) comprises: A rear-stage transmission gear (521) coaxially fixedly connected to the rear end of the second tightening screw (415), a sliding transmission gear (522) meshing with both sides of the rear-stage transmission gear (521), an intermediate transmission gear (523) coaxially fixedly connected to the sliding transmission gear (522), a front-stage transmission gear (524) arranged between a pair of the intermediate transmission gears (523) and meshing with them, and a forward driving motor (525) coaxially fixedly connected to the front-stage transmission gear (524); the forward driving motor (525) is fixedly connected to the main housing (500).

9. A construction method for a prefabricated support type secondary casting surface uniform reinforcement system, characterized in that: The steps include: S100: Measure and lay out the area where reinforcement is required according to the construction drawings, expand it by 100 mm to 200 mm, and lay out the positioning line and control line of the poured cushion layer 1; S200: installing the side beams (201), adjusting the horizontality of the side beams by leveling, installing the vertical beams (203), and leveling the vertical beams (203); installing the transverse beams (202), and leveling the transverse beams (202), and completing the assembly of the steel bar pre-installed bracket (2); S300: Fixing the support unit (3) to the bottom of the pre-installed steel bar support (2), and connecting the vertical support columns (301) in the same plane using diagonal braces; S400: With the help of the sleeve auxiliary loading and unloading unit (5), the sleeve disassembly assembly (410) is connected to the transverse frame beam (202) according to the spacing of the inserted steel bars, and the steel bars to be inserted (6) are inserted and fixed into the steel bar locking sleeve (401); S500: hoisting the support with the steel bars fixed thereon as a whole onto the secondary casting surface by means of a crane, and fixing the support unit (3) of the support to the cast cushion layer (1) by means of anchor bolts; S600: pouring concrete and vibrating it, waiting for the concrete to reach final setting, loosening the first tightening screw (403), releasing the steel bar to be inserted (6), and using a vertical transport machine to directly hang the bracket to the next steel bar insertion area of ​​the same type for turnover use.

10. The construction method of a prefabricated support type secondary casting surface uniform reinforcing bar system according to claim 9, characterized in that: The S400 further includes the following steps: S401: Holding the handle (502), firstly put the concave locking buckle (413) equipped with the second tightening screw (415) into the inner cavity of the main housing (500), and then put the steel bar locking sleeve (401) therein, and at the same time ensure that the insertion hole (412) is inserted into one end of the concave locking buckle (413), and under the action of the strong magnet (510), ensure that the two will not fall off; S402: At the predetermined installation position, the transverse frame beam (202) is inserted into the frame beam insertion port (501), and then the device is started. Under the action of the forward driving motor (525), the front-stage transmission gear (524), the intermediate transmission gear (523), the sliding transmission gear (522), and the rear-stage transmission gear (521) are driven, and finally the second tightening screw (415) is rotated in a directional manner, so that the locking push block (414) in front of it squeezes and top-connects the transverse frame beam (202), so as to complete the fixed connection between the transverse frame beam (202) and the steel bar locking unit (4); S403: The installation operation is completed by removing the sleeve auxiliary assembly and disassembly unit (5), and vice versa for the disassembly operation.

Citation Information

Patent Citations

  • Positioning construction method for foundation joint bars of super long foundation pile

    CN106759280A

  • Insert vertical steel bar fixing device in thick plate

    CN207268047U

  • Precise positioning frame for large steel columns and equipment foundation fixing bolts and construction method of precise positioning frame

    CN102561712A

  • Method and implement for connecting joint bar

    JP2004190368A