Roof radial truss displacement adjusting device and roof construction method
By using a combination device of guide rails, sliders and hydraulic crawlers in the roof system, the radial truss deformation problem caused by cable structure tension is solved, and the position correction and stability improvement of the roof system is achieved, and the truss is not subjected to stress destroy.
Patent Information
- Application Number
- CN202411260244.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-10
- Publication Date
- 2024-12-06
AI Technical Summary
During the roof system construction of large venue buildings, cable structure tension causes deformation or displacement of radial trusses, resulting in actual position deviation and affecting the load bearing of the roof system.
A roof radial truss displacement adjustment device is designed, including guide rails, sliders, support and hydraulic crawlers. By hydraulically driving the support movement, the locking member unlocking support moves along the guide rail to correct the position of the truss and avoid stress damage.
Correct the radial truss position after the cable structure is tensed to avoid sub-bending moments, ensure the safety and stability of the roof system, and prevent the radial truss from being damaged by force by non-rigid connection.
Smart Images

Figure CN119083736A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to steel structure construction, and in particular to a roof radial truss displacement adjustment device and a roof system construction method. Background Art
[0002] Trusses have excellent tensile properties, light structure, and convenient splicing and installation. Most large venues such as stadiums and exhibition halls use a roof system composed of "support + cable structure + truss". During the construction of such large venues, it is particularly important to control the deformation of the radial trusses of the roof. Different lifting equipment needs to be selected at different construction stages to fully present the structural shape. However, the tensioning process of the cable structure will cause the truss to deform or shift, resulting in deviations in the actual position of the truss and changes in the stress state, which is not conducive to the load bearing of the roof system. Summary of the invention
[0003] The object of the present invention is to provide a roof radial truss displacement adjustment device and a roof system construction method based on the device, which can correct the position of the radial truss after the cable structure is tensioned and avoid the radial truss from being damaged by force during the tensioning process of the cable structure.
[0004] The technical solution adopted by the present invention is: A roof radial truss displacement adjustment device is installed on a temporary support of the radial truss, comprising a guide rail and a slide plate arranged on the top of the temporary support, a support and a hydraulic crawler slidably matched on the guide rail, and a bolt plate; the support adopts a left-right split combined structure, the bolt plate is simultaneously installed on the front and rear sides of the two half-side supports and the two half-side supports are combined and connected by bolts, the top opposite sides of the two half-side supports are provided with embedded grooves, the bottom opposite sides are provided with slide grooves, the bottom surfaces are supported on the slide plate, the lower part of the radial truss is matched and embedded in the embedded grooves on both sides, and the slide grooves on both sides are matched on the guide rail; the hydraulic crawler is used to drive the support to move through hydraulic drive, and the hydraulic crawler body is provided with an actuator detachably connected to the support, a locking member used to lock on the guide rail, and a manipulation member used to manipulate the extension and retraction of the actuator.
[0005] Furthermore, an anti-slip coating is provided in the embedding groove.
[0006] Furthermore, the operating member is arranged on the side of the hydraulic crawler body and adopts a pressure rod structure. Each time the pressure rod is pressed down, the operating member can be driven to extend a stroke.
[0007] Furthermore, a travel limiting structure is provided on the guide rail.
[0008] A roof system construction method comprises the following steps: firstly constructing a main structure and permanent supports of a roof system, and then constructing temporary supports of the roof system; and then installing the above-mentioned roof radial truss displacement adjustment device on the selected temporary supports: before installation, firstly determining the stress state of the radial truss during the tensioning process of the cable structure, and then analyzing and obtaining the offset direction and distance of the radial truss, and selecting a hydraulic crawler according to the offset distance and required power of the radial truss; during installation, firstly installing and arranging guide rails and slide plates according to the offset direction and distance of the radial truss, and then placing a support and a hydraulic crawler, accurately locating the position of the support, and combining and connecting two half-side supports, and locking the position of the hydraulic crawler and the support by using a locking piece; and then hoisting the radial truss and the annular truss in sections, so that the radial truss falls into the embedding groove of the corresponding support. After each batch is hoisted, check whether the truss position is offset from the designed position. If there is an offset, unlock the hydraulic crawler and the support and adjust the truss until all the splicing is completed; then, after the unloading in the middle area is completed, remove the temporary support in the middle area, retain the temporary support of the outer and inner rings, release the radial constraint on the top of the support, and maintain the annular constraint; then install, lift and tension the cable structure in sequence. During tensioning, the locking parts are unlocked, and the support can move along the guide rail and support on the slide; then adjust the radial truss displacement: first lock the hydraulic crawler with the locking parts, and then operate the actuator with the operating parts, and the actuator drives the support and radial truss to move until the radial truss is adjusted to the designed position; finally, remove the roof radial truss displacement adjustment device and temporary support.
[0009] Furthermore, the temporary support includes a base, a lattice frame and a top operating platform which are arranged in sequence from bottom to top, and the lattice frame is composed of a plurality of lattice standard sections.
[0010] Furthermore, the stress state of the radial truss during the tensioning process of the cable structure is affected by the combined influence of the annular truss, cable structure and permanent support. A finite element analysis is performed on the stress state of the radial truss under the combined influence of the annular truss, cable structure and permanent support, and the offset direction and distance of the radial truss are obtained.
[0011] Furthermore, when the radial trusses and the annular trusses are hoisted in sections, the landing points are first measured and marked on site to ensure accurate landing, and then the radial trusses and the annular trusses are hoisted in sections according to the performance and layout of the lifting equipment: first install the radial trusses in the middle area, and then install the annular trusses connected on both sides, the radial trusses connected at both ends, the annular trusses on the second outer sides, and the annular trusses on the outer sides in sequence; after the radial trusses and the annular trusses are accurately positioned, at the closing line, all the steel structure rods are disconnected, temporarily overlapped with connecting plates, and cooperated with the ear plates with waist holes on the annular trusses to ensure that the closing mouth can be freely extended and retracted.
[0012] Furthermore, the cable structure includes radial cables and ring cables. The radial cables and ring cables are first assembled on the ground, and then a hoist is installed to connect the traction strands of the traction equipment at the end of the truss to the cable structure. The cable structure is then lifted to a corresponding position by the hoist, and then the cable structure is tensioned by the traction equipment.
[0013] Furthermore, the hydraulic crawler is installed on an open side near the support, and drives the support and the radial truss to move in the opposite direction according to the offset direction of the radial truss.
[0014] The beneficial effects of the present invention are: The device can correct the position of the radial truss after the cable structure is tensioned, avoiding secondary bending moments of the radial truss and ensuring the safety and stability of the roof system. Moreover, during the tensioning of the cable structure, the locking parts are unlocked and the supports can move along the guide rails and be supported on the slide. This non-rigid connection method can avoid stress damage to the radial truss. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0016] Figure 1 It is a working schematic diagram of the roof radial truss displacement adjustment device in the present invention.
[0017] Figure 2 yes Figure 1 A partial enlarged view of .
[0018] Figure 3 yes Figure 1 Top view of the .
[0019] Figure 4 yes Figure 1 Side view of.
[0020] Figure 5 It is a schematic diagram of the stress state of the cable structure in different stages of the finite element analysis of the present invention.
[0021] Figure 6 It is a top view of a part of the roof system of the present invention.
[0022] In the figure: 1-base; 2-radial truss; 3-spherical node; 4-permanent support; 5-cross steel; 6-C40 concrete; 7-bolt plate; 8-top operating platform; 9-actuator; 10-circular truss; 11-hydraulic crawler; 12-guide rail; 13-support; 14-slide plate; 15-lattice tire frame; 16-pressure rod; 17-travel limit structure. DETAILED DESCRIPTION
[0023] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. The components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various different configurations.
[0024] Therefore, the following detailed description of the embodiments of the present application provided in the accompanying drawings is not intended to limit the scope of the present application for which protection is sought, but merely represents selected embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.
[0025] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0026] In the description of this application, it should also be noted that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0027] The features and performance of the present application are further described in detail below in conjunction with the embodiments.
[0028] Embodiment 1 This embodiment discloses a displacement adjustment device for a roof radial truss 2, such as Figures 1 to 4 As shown, it is installed on the temporary support of the radial truss 2, including a guide rail 12, a slide plate 14, a support 13, a bolt plate 7 and a hydraulic crawler 11; and: the guide rail 12 is arranged on the top of the temporary support, see Figures 1 to 4 ; Slide plate 14 is provided at the top of the temporary support, see Figures 1 to 4The support 13 is slidably fitted on the guide rail 12. The support 13 adopts a combined structure of left and right split parts. The top opposite sides of the two half supports 13 are provided with embedded grooves, the bottom opposite sides are provided with slide grooves, and the bottom surface is supported on the slide plate 14. The lower part of the radial truss 2 is embedded in the embedded grooves on both sides, and the slide grooves on both sides are fitted on the guide rail 12. Figures 1 to 4 Bolt plate 7 is installed on the front and rear sides of the two half supports 13 and the two half supports 13 are connected by bolts. Figure 1 and Figure 2 The hydraulic crawler 11 is slidably fitted on the guide rail 12 and is used to drive the support 13 to move through hydraulic drive. The main body of the hydraulic crawler 11 is provided with an actuator 9 detachably connected to the support 13, a locking member for locking on the guide rail 12, and an operating member for operating the extension and retraction of the actuator 9.
[0029] In order to ensure the coordinated movement of the radial truss 2 and the support 13 , in this embodiment, preferably, an anti-slip coating is provided in the embedding groove to increase the friction coefficient between the radial truss 2 and the support 13 .
[0030] In order to precisely control the extension and contraction amount of the actuator 9 and facilitate operation, in this embodiment, preferably: Figure 1 and Figure 3 As shown, the operating member is arranged on the side of the main body of the hydraulic crawler 11, and adopts a pressure rod 16 structure. Each time the pressure rod 16 is pressed down, it can drive the actuator 9 to extend a stroke, similar to a jack.
[0031] In order to prevent the support 13 and the hydraulic crawler 11 from going out of range when sliding on the guide rail 12, in this embodiment, preferably: Figure 2 As shown, a travel limiting structure 17 is provided on the guide rail 12 .
[0032] In this embodiment, preferably: the slide plate 14 is made of polytetrafluoroethylene plate; the actuator 9 is detachably connected to the support 13 through a pin; the guide rail 12 is welded on a temporary support; and the guide rail 12 is made of steel.
[0033] Embodiment 2 This embodiment discloses a roof system construction method, comprising the following steps: S1. Preparation before construction: Before the construction of the roof system, analyze and determine the truss specifications and the form of temporary support based on the design calculations and on-site construction requirements.
[0034] S2. Construction of support system: First construct the permanent support 4 of the main structure and roof system, and then construct the temporary support of the roof system.
[0035] like Figure 1 and Figure 4As shown, in this embodiment: the permanent support 4 adopts a cross-shaped steel concrete column, adopts C40 concrete 6, and a cross-shaped steel 5 is arranged inside; the temporary support includes a base 1, a lattice frame 15 and a top operating platform 8 which are arranged in sequence from bottom to top. The lattice frame 15 is composed of a number of lattice standard sections. The base 1 adopts HW300×300, the lattice standard section adopts 2m×2m, the main vertical pole section is φ219×10, the horizontal tie rod section is φ76×5, and the oblique tie rod section is φ89×5. The top operating platform 8 adopts HN450×200, and the bearing capacity of a single temporary support can reach 90t.
[0036] S3. Install the displacement adjustment device of the roof radial truss 2 in the first embodiment on the selected temporary support: Before installation, the stress state of the radial truss 2 during the tensioning of the cable structure is first determined, and then the offset direction and distance of the radial truss 2 are analyzed, and the hydraulic crawler 11 is selected according to the offset distance of the radial truss 2 and the required power; the stress state of the radial truss 2 during the tensioning of the cable structure is affected by the annular truss 10, the cable structure and the permanent support 4. The stress state of the radial truss 2 under the comprehensive influence of the annular truss 10, the cable structure and the permanent support 4 is subjected to finite element analysis to obtain the offset direction and distance of the radial truss 2. The finite element software such as Midas / Gen can be used for analysis and calculation to analyze the stress state of the cable structure at different stages, such as Figure 5 As shown, in this embodiment, it is calculated that the maximum deformation of the Z axis is -15mm, the maximum deformation of the Y axis is -2 to 2mm, and the maximum deformation of the X axis is -4 to 4mm when the cable structure is lifted, and then it is calculated that the maximum displacement of the radial truss 2 after the cable structure is tensioned is no more than 100mm.
[0037] During installation, first install and arrange the guide rail 12 and the slide plate 14 according to the offset direction and distance of the radial truss 2, then place the support 13 and the hydraulic crawler 11, accurately locate the position of the support 13 and combine and connect the two half supports, and use the locking piece to lock the position of the hydraulic crawler 11 and the support 13.
[0038] S4, then hoist the radial truss 2 and the annular truss 10 in sections, so that the radial truss 2 falls into the corresponding groove of the support 13. After each batch of hoisting is completed, check whether the truss position is offset from the designed position. If there is an offset, unlock the hydraulic crawler 11 and the support 13 and adjust the truss until all the splicing is completed: like Figure 6As shown, when the radial truss 2 and the annular truss 10 are hoisted in sections, the site is first measured and the landing points are marked to ensure accurate landing. Then, the radial truss 2 and the annular truss 10 are hoisted in sections according to the performance and layout of the lifting equipment: the radial truss 2 in the middle area is installed first, and then the annular trusses 10 connected on both sides, the radial trusses 2 connected at both ends, the annular trusses 10 on the secondary periphery on both sides, and the annular trusses 10 on the periphery on both sides are installed in sequence; after the radial truss 2 and the annular truss 10 are accurately positioned, at the closing line, all the rods of the steel structure are disconnected, and the connecting plates are temporarily overlapped, and the ear plates with waist holes on the annular truss 10 are used to ensure that the closing mouth can be freely extended and retracted. Taking the installation of a single-span truss as an example, the radial truss 2 is divided into three or four sections for batch hoisting, and is installed after being accurately positioned by the tower crane. The annular truss 10 can be divided into three situations: hoisting with a tower crane as a whole, hoisting with a tower crane in two pieces, and hoisting with a crawler crane as a whole.
[0039] S5. After the unloading of the middle area is completed, the temporary support of the middle area is removed, and the temporary support of the outer ring and the inner ring is retained. The radial constraint on the top of the support 13 is released, and the annular constraint is maintained.
[0040] S6. Install, lift and tension the cable structure in sequence. When tensioning, the locking part is unlocked, and the support 13 can move along the guide rail 12 and be supported on the slide 14: the cable structure includes radial cables and ring cables. First, assemble the radial cables and ring cables on the ground, and then install the lifter to connect the traction strands of the traction equipment at the end of the truss to the cable structure, and then lift the cable structure to the corresponding position through the lifter, and then tension the cable structure through the traction equipment.
[0041] S7. Adjust the displacement of the radial truss 2: first lock the hydraulic crawler 11 through the locking member, and then operate the actuator 9 through the operating member, and the actuator 9 drives the support 13 and the radial truss 2 to move until the radial truss 2 is adjusted to the designed position; the hydraulic crawler 11 is installed on the empty side near the support 13, and drives the support 13 and the radial truss 2 to move in the opposite direction according to the offset direction of the radial truss 2.
[0042] S8. Remove the displacement adjustment device and temporary support of the roof radial truss 2.
[0043] The device can correct the position of the radial truss 2 after the cable structure is tensioned, avoiding secondary bending moment of the radial truss 2, and ensuring the safety and stability of the roof system. In addition, during the tensioning process of the cable structure, the locking piece is unlocked, and the support 13 can move along the guide rail 12 and be supported on the slide 14. This non-rigid connection method can avoid stress damage to the radial truss 2.
[0044] The embodiments described above are part of the embodiments of the present application, rather than all of the embodiments. The detailed description of the embodiments of the present application is not intended to limit the scope of the present application for protection, but merely represents the selected embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present application.
Claims
1. A roof radial truss displacement adjustment device, characterized in that: It is installed on the temporary support of the radial truss, including a guide rail and a slide plate arranged on the top of the temporary support, a support and a hydraulic crawler that slide on the guide rail, and a bolt plate; the support adopts a left-right split combined structure, the bolt plate is installed on the front and rear sides of the two half-side supports at the same time and the two half-side supports are combined and connected by bolts, the top opposite sides of the two half-side supports are provided with embedded grooves, the bottom opposite sides are provided with slide grooves, the bottom surface is supported on the slide plate, the lower part of the radial truss is embedded in the embedded grooves on both sides, and the slide grooves on both sides are matched on the guide rail; the hydraulic crawler is used to drive the support to move through hydraulic drive, and the main body of the hydraulic crawler is provided with an actuator detachably connected to the support, a locking member for locking on the guide rail, and an operating member for operating the extension and retraction of the actuator.
2. The roof radial truss displacement adjustment device according to claim 1, characterized in that: The groove is provided with an anti-slip coating.
3. The roof radial truss displacement adjustment device according to claim 1, characterized in that: The operating part is arranged on the side of the main body of the hydraulic crawler and adopts a pressure rod structure. Each time the pressure rod is pressed down, the operating part can be driven to extend a stroke.
4. The roof radial truss displacement adjustment device according to claim 1, characterized in that: A travel limiting structure is provided on the guide rail.
5. A roof system construction method, characterized in that: First, permanent supports for the main structure and roof system are constructed, and then temporary supports for the roof system are constructed; then, the roof radial truss displacement adjustment device as described in any one of claims 1 to 4 is installed on the selected temporary supports: before installation, the stress state of the radial truss during the tensioning of the cable structure is first determined, and then the offset direction and distance of the radial truss are analyzed, and the hydraulic crawler is selected according to the offset distance and required power of the radial truss; during installation, the guide rails and slide plates are first installed and arranged according to the offset direction and distance of the radial truss, and then the support and hydraulic crawler are placed, the position of the support is accurately located and the two half-side supports are combined and connected, and the position of the hydraulic crawler and the support is locked by using a locking piece; then the radial truss and the annular truss are hoisted in sections so that the radial truss falls into the corresponding support groove. After each batch is hoisted, check whether the truss position is offset from the designed position. If there is an offset, unlock the hydraulic crawler and the support and adjust the truss until all the splicing is completed; then, after the unloading in the middle area is completed, remove the temporary support in the middle area, retain the temporary support of the outer and inner rings, release the radial constraint on the top of the support, and maintain the annular constraint; then install, lift and tension the cable structure in sequence. During tensioning, the locking parts are unlocked, and the support can move along the guide rail and support on the slide; then adjust the radial truss displacement: first lock the hydraulic crawler with the locking parts, and then operate the actuator with the operating parts, and the actuator drives the support and radial truss to move until the radial truss is adjusted to the designed position; finally, remove the roof radial truss displacement adjustment device and temporary support.
6. The roof system construction method according to claim 5, characterized in that: The temporary support includes a base, a lattice frame and a top operating platform which are arranged in sequence from bottom to top. The lattice frame is composed of a number of lattice standard sections.
7. The roof system construction method according to claim 5, characterized in that: During the tensioning process of the cable structure, the stress state of the radial truss is affected by the combined influence of the annular truss, cable structure and permanent support. Finite element analysis is carried out on the stress state of the radial truss under the combined influence of the annular truss, cable structure and permanent support, and the offset direction and distance of the radial truss are obtained.
8. The roof system construction method according to claim 5, characterized in that: When lifting radial trusses and annular trusses in sections, first measure and mark the landing points on site to ensure accurate landing, and then lift the radial trusses and annular trusses in sections according to the performance and layout of the lifting equipment: first install the radial trusses in the middle area, and then install the annular trusses connected on both sides, the radial trusses connected at both ends, the annular trusses on the second outer sides, and the annular trusses on the outer sides in turn; after the radial trusses and annular trusses are accurately positioned, all the steel structure rods are disconnected at the closing line, and temporarily overlapped with connecting plates, and cooperate with the ear plates with waist holes on the annular trusses to ensure that the closing mouth can be freely extended and retracted.
9. The roof system construction method according to claim 5, characterized in that: The cable structure includes radial cables and ring cables. The radial cables and ring cables are first assembled on the ground, and then the hoist is installed. The traction strands of the traction equipment at the end of the truss are connected to the cable structure. The cable structure is then lifted to the corresponding position by the hoist, and then the cable structure is tensioned by the traction equipment.
10. The roof system construction method according to claim 5, characterized in that: The hydraulic crawler is installed on an empty side near the support, and drives the support and radial truss to move in the opposite direction according to the offset direction of the radial truss.