Temporary supporting structure of energy-saving steel bar truss floor support plate and using method of temporary supporting structure
The modular support structure with adjustable electromagnets and pneumatic suction cups, along with real-time monitoring, addresses inefficiencies and safety risks in steel truss floor decks by optimizing installation, monitoring, and detecting abnormalities, thereby improving construction efficiency and safety.
Patent Information
- Application Number
- CN202411239220.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-05
- Publication Date
- 2024-12-06
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing temporary support structures for steel truss floor decks lack adjustability, are inconvenient to install and disassemble, and fail to monitor abnormal conditions in real-time, leading to inefficiencies and safety risks.
A modular support structure with adjustable electromagnets and pneumatic suction cups, combined with real-time monitoring and comprehensive evaluation modules to detect and respond to abnormalities, optimizing support positioning and ensuring safety.
Enhances construction efficiency, safety, and adaptability by allowing quick installation, real-time monitoring, and timely risk detection, reducing manual labor and operational errors.
Smart Images

Figure CN119083744A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of building construction, and more specifically, to an energy-saving steel truss floor deck temporary support structure and a method of using the same. Background Art
[0002] Steel truss floor decks have insufficient rigidity in long-span structures and require support from brackets. Temporary support structures provide the necessary stability and safety for the floor decks during construction to prevent structural instability or collapse due to excessive spans and ensure the safety of construction workers. For floor decks with spans exceeding design limits, temporary support can ensure the integrity of the structure during construction and avoid deformation or damage caused by self-weight or other construction loads. Temporary support helps control the deformation of the floor deck during construction and ensures that the structure meets design requirements and quality standards, thereby ensuring the long-term performance and durability of the building.
[0003] The document with the prior art publication number CN217420649U provides a temporary support structure for a steel truss floor slab with an over-limit span, which is used for supporting the construction of the floor slab between two steel frame beams. The temporary support structure includes: longitudinal supports, which are provided with two groups, and each of the steel frame beams is provided with a group of longitudinal supports. Each group of longitudinal supports includes a vertically arranged longitudinal plate, a support portion provided at one end of the longitudinal plate, and a clamping portion provided at the other end of the longitudinal plate, which abuts against the side of the wing plate close to the floor slab toward the other wing plate, and the clamping portion clamps the two opposite surfaces of the wing plate away from the floor slab to fix the longitudinal support to the steel frame beam; and transverse supports, which are connected between the two groups of longitudinal supports to support the floor slab in the vertical direction. The temporary support structure provided by the technical solution of the invention can save installation and disassembly procedures and adapt to different types of steel frame beams.
[0004] Although the above-mentioned prior art solutions can achieve relevant beneficial effects through the structure of the prior art, they still have the following defects: 1. The position of the support point cannot be adjusted as needed. 2. It is not convenient to install and disassemble, and the work efficiency is low. 3. It is impossible to monitor the abnormal conditions and potential risks of the steel truss floor deck in time.
[0005] In view of this, we propose an energy-saving steel truss floor deck temporary support structure and a use method thereof. Summary of the invention
[0006] 1. Technical issues to be solved
[0007] The purpose of the present application is to provide an energy-saving temporary support structure and method for steel truss floor decking, which solves the technical problems raised in the above-mentioned background technology, realizes two or more combined fixing methods of electromagnets and pneumatic suction cups, and can be flexibly selected according to steel truss floor decking of different materials and structures. The comprehensive evaluation module combines abnormality identification and stress deformation monitoring to comprehensively evaluate the status of the steel truss floor decking, timely discover potential risks and issue alarms; the position of the support point can be quickly adjusted as needed, which is convenient for disassembly and installation, and has the technical effect of improving work efficiency.
[0008] 2. Technical solution
[0009] The technical solution of this application provides an energy-saving steel truss floor deck temporary support structure, including:
[0010] Main base, main support frame, auxiliary base A, auxiliary support frame A, auxiliary base B, auxiliary support frame B, auxiliary base C, auxiliary support frame C and monitoring mechanism;
[0011] A main support frame is provided on the main base so as to be able to slide up and down;
[0012] Two auxiliary bases A are symmetrically and slidably arranged on the main base; two auxiliary support frames A are symmetrically and slidably arranged on the main support frame; the auxiliary bases A and the corresponding auxiliary support frames A are slidably arranged;
[0013] Auxiliary base B is slidably provided on auxiliary base A; auxiliary support frame B is slidably provided on auxiliary support frame A; auxiliary base B and corresponding auxiliary support frame B are slidably provided;
[0014] Auxiliary base C is slidably provided on auxiliary base B; auxiliary support frame C is slidably provided on auxiliary support frame B; auxiliary base C and corresponding auxiliary support frame C are slidably provided;
[0015] A monitoring mechanism is fixed on the main base. During use, the monitoring mechanism monitors the condition of the steel truss floor deck in real time and detects abnormal conditions in time. The monitoring mechanism can monitor the stress state, deformation, abnormal vibration and other key parameters of the steel truss floor deck in real time, and provide timely and accurate monitoring data for construction personnel. Once an abnormal situation is found, measures can be taken immediately to ensure construction safety and quality.
[0016] Laser rangefinders are fixedly arranged on the main base, auxiliary base A, auxiliary base B and auxiliary base C.
[0017] Through the above technical solution, the long-span steel truss floor deck is supported by the main support frame, auxiliary support frame A, auxiliary support frame B and auxiliary support frame C; the distance between the main base, auxiliary base A, auxiliary base B and auxiliary base C can be adjusted as needed, so that the distance between the main support frame, auxiliary support frame A, auxiliary support frame B and auxiliary support frame C can be adjusted to adjust the position of the support point of the steel truss floor deck. The height of the main support frame, auxiliary support frame A, auxiliary support frame B and auxiliary support frame C can be adjusted as needed. The monitoring agency monitors the condition of the steel truss floor deck in real time and detects abnormal conditions in time.
[0018] As an optional solution of the present invention, the main base includes a main bottom plate, a main support column, a main electric telescopic rod, a mobile positioning assembly and a main top plate;
[0019] Main support columns are fixedly arranged at the four corners above the main bottom plate; the main top plate is fixedly arranged between the four main support columns; two main electric telescopic rods are fixedly arranged on both sides of the main bottom plate; the movable rods of the main electric telescopic rods are fixedly connected to the main support frame;
[0020] A number of slides are provided on the main bottom plate;
[0021] The four corners of the main bottom plate are fixedly provided with mobile positioning components; the mobile positioning components include a fixed shell, a hydraulic rod and an electric control caster; the fixed shell is fixedly provided with a hydraulic rod, and the lower end of the movable rod of the hydraulic rod is fixedly provided with an electric control caster.
[0022] An adjustment mechanism is symmetrically fixed on the main bottom plate, and the adjustment mechanism includes a motor and a gear;
[0023] Two motors are symmetrically fixedly arranged on the main bottom plate, and gears are coaxially fixedly arranged on output ends of the motors.
[0024] Through the above technical solution, the height and position of the main support frame can be adjusted by controlling the extension and retraction of the electric telescopic rod. The height of the electric control caster can be adjusted by controlling the extension and retraction of the hydraulic rod, so as to adapt to different ground conditions or achieve fine-tuning positioning. The design of the electric control caster allows the entire main base to be easily moved to the desired position.
[0025] As an optional solution of the present invention, the main support frame includes a main support plate, a guide rod, an electromagnet and a pneumatic suction cup;
[0026] Guide rods are fixedly arranged at the four corners below the main support plate;
[0027] The guide rod is slidably matched with the main support column;
[0028] The main support plate is fixedly connected to the movable rod of the main electric telescopic rod;
[0029] The main support plate is provided with a plurality of electromagnets and pneumatic suckers, and the exposed heights of the electromagnets and pneumatic suckers on the main support plate can be set as required.
[0030] A plurality of guide grooves are arranged on the main supporting plate.
[0031] Through the above technical solution, the steel truss floor deck is supported by the main support plate, and the steel truss floor deck is adsorbed and fixed by the electromagnet 3 and the pneumatic suction cup. The combined use of the electromagnet and the pneumatic suction cup can flexibly cope with steel truss floor decks of different materials, thicknesses and shapes to meet diverse construction needs. The rapid adsorption and fixing function of the electromagnet and the pneumatic suction cup greatly shortens the construction time and improves the construction efficiency. The entire support system can be flexibly adjusted and optimized according to the specific conditions of the construction site to adapt to different construction environments and conditions.
[0032] As an optional solution of the present invention, the auxiliary base A includes a moving frame, a tooth plate A and a slide plate A;
[0033] The mobile frame includes an auxiliary bottom plate, an auxiliary support column, an auxiliary top plate and an auxiliary electric telescopic rod;
[0034] Four auxiliary support columns are fixedly arranged between the auxiliary bottom plate and the auxiliary top plate; a plurality of slide grooves are arranged on the auxiliary bottom plate and the auxiliary top plate;
[0035] The two ends of the auxiliary bottom plate are fixedly provided with movable positioning components.
[0036] Two auxiliary electric telescopic rods are fixedly arranged on the auxiliary bottom plate;
[0037] An adjustment mechanism is fixedly arranged on the auxiliary bottom plate;
[0038] The auxiliary base plate is fixedly provided with a tooth plate A and a slide plate A; the tooth plate A and the slide plate A are both slidably matched with the slide groove on the main base, and the tooth plate A is meshed and transmission-connected with the gear on the main base.
[0039] Two slide plates A are fixedly arranged on the auxiliary top plate;
[0040] Through the above technical solution, the adjustment mechanism on the main base is activated to drive the tooth plate A to move, thereby driving the auxiliary base A to move and adjust the position of the auxiliary base A. The design of the adjustment mechanism and the mobile positioning assembly makes the position adjustment of the auxiliary base A simple and quick, thereby improving the construction efficiency.
[0041] As an optional solution of the present invention, the auxiliary support frame A includes an auxiliary support plate, a plug plate A, a guide rod, an electromagnet and a pneumatic suction cup;
[0042] Guide rods are fixedly arranged below both ends of the auxiliary support plate; the guide rods are slidably matched with the auxiliary support columns;
[0043] Insertion plates A are fixedly arranged at both ends of the auxiliary support plate; the insertion plates A are slidably matched with the guide grooves on the main support plate.
[0044] A plurality of electromagnets and pneumatic suction cups are fixedly arranged on the auxiliary support plate.
[0045] Through the above technical solution, the auxiliary support frame A can be used to provide auxiliary support for the steel truss floor deck.
[0046] As an optional solution of the present invention, the auxiliary base B includes a moving frame, a tooth plate B and a slide plate B;
[0047] Two slide plates B are fixedly arranged on the upper end of the mobile frame;
[0048] A tooth plate B and a slide plate B are fixedly arranged at the upper and lower ends of the movable frame; the tooth plate B and the slide plate B are both arranged to cooperate with the auxiliary base A in a sliding manner.
[0049] The tooth plate B and the adjusting mechanism on the auxiliary base A are meshed and transmission connected.
[0050] The auxiliary support frame C includes an auxiliary support plate, a plug plate B, a guide rod, an electromagnet and a pneumatic suction cup;
[0051] Guide rods are fixedly arranged below both ends of the support plate; the guide rods are slidably matched with the auxiliary base B;
[0052] Insertion plates B are fixedly arranged at both ends of the auxiliary support plate, and the insertion plates B are slidably matched with the auxiliary support frame A. The insertion plates B are slidably matched with the main support frame.
[0053] A plurality of electromagnets and pneumatic suction cups are fixedly arranged on the auxiliary support plate.
[0054] As an optional solution of the present invention, the auxiliary base C includes a moving frame, a tooth plate C and a slide plate C;
[0055] Two slide plates C are fixedly arranged on the upper end of the mobile frame;
[0056] The upper and lower ends of the mobile frame are fixedly provided with tooth plates C and slide plates C; the tooth plates C and slide plates C are both slidably matched with the auxiliary base B. The tooth plates C and slide plates C are both slidably matched with the main base and the auxiliary base A. The tooth plates C are meshed and transmission-connected with the adjustment mechanism on the auxiliary base B.
[0057] The auxiliary support frame C includes a support plate, a plug plate C, a guide rod, an electromagnet and a pneumatic suction cup;
[0058] Guide rods are fixedly arranged below both ends of the support plate; the guide rods are slidably matched with the auxiliary base C;
[0059] Insertion plates C are fixedly arranged at both ends of the auxiliary support plate; the insertion plates C are arranged in sliding cooperation with the auxiliary support frame B. The insertion plates B are arranged in sliding cooperation with the main support frame and the auxiliary support frame A.
[0060] A plurality of electromagnets and pneumatic suction cups are fixedly arranged on the auxiliary support plate.
[0061] As an optional solution of the present invention, the monitoring mechanism monitors the condition of the steel truss floor deck in real time during use to detect abnormal conditions in a timely manner. It includes:
[0062] Support spacing calculation module: collect the design drawings of the steel truss floor deck, and give the support position of the steel truss floor deck according to the design size and weight of the steel truss floor deck. That is, calculate the most appropriate distance between the main support frame, auxiliary support frame A, auxiliary support frame B and auxiliary support frame C. According to the design drawings, design size and weight of the steel truss floor deck, use mechanical analysis and engineering calculations to determine the optimal support spacing between the main support frame and the auxiliary support frame. This helps to optimize the layout of the support structure, ensure that the floor deck is evenly stressed during the support process, and reduce the risk of deformation and damage.
[0063] Stress deformation monitoring module: including stress strain sensors, displacement sensors, vibration sensors and temperature sensors; stress strain sensors, displacement sensors, vibration sensors and temperature sensors are installed on the top of the main support frame, auxiliary support frame A, auxiliary support frame B and auxiliary support frame C; during use, the stress, deformation, vibration and temperature of the steel truss floor deck are monitored; these sensors should be installed at key positions of the main support frame, auxiliary support frame and floor deck, such as the stress concentration point, mid-span, near the support point, etc. Real-time monitoring of the stress state, deformation, vibration characteristics and temperature changes of the floor deck provides data support for evaluating the safety and stability of the floor deck.
[0064] Image acquisition module: including high-definition camera and LED light, to collect high-definition images of steel truss floor deck;
[0065] Image preprocessing module: preprocess the collected images, including filtering, denoising, grayscale and normalization;
[0066] Feature extraction module: extracts features from the preprocessed image. The extracted features include color, texture and shape.
[0067] Abnormal identification module: Identify the image after feature extraction and promptly identify abnormal conditions of the steel truss floor deck (including deformation, damage, collapse, etc.);
[0068] Comprehensive assessment module: Integrates the monitoring results of the abnormal identification module and the stress-deformation monitoring module (abnormal monitoring results, stress conditions, deformation conditions, vibration and temperature) to conduct a comprehensive assessment of the steel truss floor deck and identify potential risks in a timely manner.
[0069] Alarm module: including alarm, which will send out alarm in time when abnormal situation is detected;
[0070] Control center: connected to the support spacing calculation module, stress deformation monitoring module, image acquisition module, image preprocessing module, feature extraction module, abnormality recognition module and alarm module network; the control center is connected to the motor, electromagnet, pneumatic suction cup, auxiliary electric telescopic rod, hydraulic rod and electric control caster network.
[0071] Through the above technical solution, the monitoring agency has achieved comprehensive and real-time monitoring of the steel truss floor decking and its supporting structure by comprehensively using a variety of sensors and image processing technologies, providing a strong guarantee for construction safety and quality.
[0072] As an optional solution of the present invention, the support spacing calculation module provides the support position of the steel truss floor deck according to the design size and weight of the steel truss floor deck, including the following steps:
[0073] 1. Collect design information: Obtain detailed design drawings of the steel truss floor deck, including size, shape, material specifications, load requirements, etc. Record key dimensions of the floor deck, such as length, width, thickness, and span.
[0074] Determine the total weight and weight per unit area of the floor decking according to the design drawings or material list.
[0075] 2. Load analysis:
[0076] Determine the load: According to the design requirements, determine the load that the floor deck needs to bear, including static loads (such as dead weight, weight of fixed equipment, etc.) and live loads (such as personnel, mobile equipment, wind loads, etc.).
[0077] Load combination: According to the building code, various loads are combined to obtain the most unfavorable load condition; Z =P 静 +P 动 *K, where P Z It is the most unfavorable load condition calculated according to the building code, that is, the combination that has the greatest impact on the structure among all possible load combinations. 静 It is a static load, also called a permanent load, which refers to the weight of the structure itself and the load that is fixed on it and will not change. 动 is the live load, which refers to the load that changes on the structure, such as personnel, furniture, equipment, etc. k is the load combination factor, which is a factor determined according to the building code and is used to adjust the live load when calculating the most unfavorable load situation.
[0078] 3. Mechanical analysis: Simplify the complex steel truss floor deck into a beam or plate model to facilitate mechanical analysis.
[0079] Calculation of bending moment and shear force: Based on the load conditions and simplified model, the bending moment and shear force distribution at different locations of the floor deck are calculated.
[0080] Consider the influence of support: analyze the impact of the support structure on the stress state of the floor deck, including the reaction force of the support point, support stiffness, etc.
[0081] 4. Calculation of support spacing: Based on the size, weight and load of the floor decking, combined with the length of the main support frame, estimate the distance between the main support frame, auxiliary support frame A, auxiliary support frame B and auxiliary support frame C.
[0082] L 间 =(LL 0 ) / 6; where L 间 is the distance between the main support frame, auxiliary support frame A, auxiliary support frame B and auxiliary support frame C; L is the length of the steel truss floor deck; L 0 The length of the main support frame;
[0083] 5. Optimize support layout: Try to make the support layout symmetrical to reduce the torsion and lateral displacement of the floor deck. The support position should be easy to install and disassemble, while considering safety factors during construction. Consider mechanical properties, construction convenience, cost and other factors to determine the final support position and spacing.
[0084] As an optional solution of the present invention, the comprehensive evaluation module integrates the monitoring results of the abnormal identification module and the stress deformation monitoring module (abnormal monitoring results, stress conditions, deformation conditions, vibration and temperature) to conduct a comprehensive evaluation of the steel truss floor deck and timely discover potential risks. It includes the following steps:
[0085] 1. Data preprocessing: Collect monitoring data from the anomaly identification module, including but not limited to abnormal signals detected by sensors, abnormal types (such as cracks, corrosion, desoldering, etc.), abnormal locations and timestamps. Perform preliminary screening and classification of abnormal data to remove noise and invalid data. Collect real-time monitoring data from the stress deformation monitoring module, such as stress distribution, deformation, vibration frequency, amplitude and temperature of steel truss floor decking. Calibrate and standardize the data to ensure data consistency and accuracy.
[0086] 2. Data fusion processing:
[0087] Time synchronization: The data of the anomaly identification module and the stress deformation monitoring module are synchronized to ensure that both are analyzed within the same time frame.
[0088] Correlation analysis: Correlation analysis is performed between abnormal data and stress-deformation data to find changes in stress-deformation data before and after the abnormality occurs. Analyze the causal relationship between the abnormality and stress-deformation, such as whether a specific stress-deformation pattern may cause or aggravate the abnormal phenomenon.
[0089] Multi-source data fusion: Use data fusion technology (such as weighted average method) to comprehensively process multi-source data such as abnormal data, stress conditions, deformation conditions, vibration and temperature. Perform data fusion processing according to the following formula:
[0090] In the formula, I 综合 Represents the comprehensive status indicator after fusion. 1 、w 2 、w 3 、w 4 、w 5 and w 6 They represent the weights of different data sources (abnormal signals, stress, deformation, vibration frequency, amplitude and temperature), which are determined according to the importance or reliability of each data source. 滤波 Indicates the abnormal signal after filtering. 标准 Indicates the stress value after normalization. 标准 represents the normalized deformation value. f represents the vibration frequency. A represents the amplitude. θ represents the temperature.
[0091] 3. Construct a comprehensive evaluation model to quantitatively evaluate the overall status of the steel truss floor deck. 综合 =β 0 +β 1 *X 1 +β 2 *X 2 +…+β n *X n +∈; where I 综合 Indicates the comprehensive status index of the floor deck. 0 , β 1 , β 2 ,...,β n Respectively represent the intercept term and the coefficient of the independent variable in the multiple linear regression model. These coefficients are determined through regression analysis and are used to describe the relationship between the independent variable and the dependent variable. 1 , X 2 ,...,X n Represents the independent variable in the model. ∈ represents the error term in the regression model, which includes the impact of other factors on the dependent variable except the independent variable.
[0092] 4. Risk identification: Based on the integrated data, identify potential risks that may exist in the steel truss floor deck, such as structural damage, reduced bearing capacity, stability issues, etc.
[0093] Risk assessment: Quantitatively evaluate the identified risks to determine the severity of the risks, the scope of impact, and the possible consequences.
[0094] Assess the development trends and evolution patterns of risks, and predict possible future changes in risks.
[0095] 5. Early warning: Based on the risk assessment results, early warning information is issued to relevant departments and personnel to remind them to pay attention to the safety status of the steel truss floor deck. Decision support information is provided, such as recommended maintenance measures, reinforcement plans or emergency treatment measures.
[0096] 6. Feedback and optimization: Evaluate the implementation effect of the comprehensive evaluation module, including the accuracy and timeliness of early warning and its guiding role in actual work. Based on the evaluation results and actual application, continuously optimize the algorithm and parameter settings of the comprehensive evaluation model.
[0097] The present invention provides a method for using an energy-saving steel bar truss floor deck temporary support structure, comprising the following steps:
[0098] S1. Move the main base to the middle position below the steel truss floor deck;
[0099] S2. The support spacing calculation module of the monitoring mechanism calculates the appropriate distances between the main support frame, the auxiliary support frame A, the auxiliary support frame B and the auxiliary support frame C;
[0100] S3, start each adjustment mechanism to adjust the distance between the main support frame, the auxiliary support frame A, the auxiliary support frame B and the auxiliary support frame C;
[0101] S4, making each main electric telescopic rod and auxiliary electric telescopic rod work synchronously, driving the main support frame, auxiliary support frame A, auxiliary support frame B and auxiliary support frame C to rise to a suitable height and contact with the lower surface of the steel truss floor deck; starting the hydraulic rod on the mobile positioning assembly to make the electric control caster rise and leave the ground;
[0102] S5. Start the electromagnet or pneumatic suction cup to adsorb and fix the steel truss floor deck. The electromagnet or pneumatic suction cup can be selected according to the material of the steel truss floor deck, or the electromagnet and pneumatic suction cup can be used in combination.
[0103] S6. The monitoring mechanism monitors the condition of the steel truss floor deck in real time; the stress and deformation monitoring module monitors the stress, deformation, vibration and temperature of the steel truss floor deck;
[0104] S7, the comprehensive assessment module integrates the monitoring results of the abnormal identification module and the stress deformation monitoring module (abnormal monitoring results, stress conditions, deformation conditions, vibration and temperature), conducts a comprehensive assessment of the steel truss floor deck, and promptly discovers potential risks;
[0105] S8. When the stress, deformation and vibration of the steel truss floor deck are monitored to exceed the threshold; when the steel truss floor deck is monitored to have abnormal conditions or potential risks, the alarm module will issue an alarm in time.
[0106] 3. Beneficial effects
[0107] One or more technical solutions provided in the technical solution of this application have at least the following technical effects or advantages:
[0108] 1. The present invention can improve construction efficiency: through automated and precisely controlled support structure adjustment, it can be quickly and accurately installed at the designated location, reducing the time for manual adjustment and calibration, and significantly improving construction efficiency.
[0109] 2. The present invention can enhance construction safety: the supporting structure has a real-time monitoring function, which can timely detect the stress, deformation, vibration and temperature anomalies of the steel truss floor deck, effectively prevent safety accidents caused by insufficient support or structural changes, and improve the safety of the construction site.
[0110] 3. The present invention has strong adaptability: it provides two or more combined fixing methods of electromagnets and pneumatic suction cups, and can be flexibly selected according to steel truss floor decks of different materials and structures, thereby enhancing the adaptability and practicality of the supporting structure.
[0111] 4. The comprehensive assessment module of the present invention combines abnormality identification with stress and deformation monitoring, which can comprehensively assess the status of the steel truss floor deck, timely discover potential risks and issue alarms, provide timely early warning information for construction personnel, and reduce losses caused by untimely processing.
[0112] 5. The present invention can reduce manual dependence: the highly automated design reduces the construction's dependence on manual labor, reduces labor intensity, and also reduces the possibility of human operational errors, thereby improving construction efficiency and accuracy.
[0113] 6. The present invention can quickly adjust the position and move quickly by moving the positioning component, thereby improving work efficiency;
[0114] 7. After use, the auxiliary base A, auxiliary support frame A, auxiliary base B, auxiliary support frame B, auxiliary base C and auxiliary support frame C can be stored to save space and facilitate transportation. BRIEF DESCRIPTION OF THE DRAWINGS
[0115] Figure 1This is an overall schematic diagram of an energy-saving steel truss floor deck temporary support structure disclosed in a preferred embodiment of the present application;
[0116] Figure 2 A schematic diagram of the main base and main support frame of an energy-saving steel truss floor deck temporary support structure disclosed in a preferred embodiment of the present application;
[0117] Figure 3 A schematic diagram of an auxiliary base A and an auxiliary support frame A of an energy-saving steel truss floor deck temporary support structure disclosed in a preferred embodiment of the present application;
[0118] Figure 4 A schematic diagram of an auxiliary base B and an auxiliary support frame B of an energy-saving steel truss floor deck temporary support structure disclosed in a preferred embodiment of the present application;
[0119] Figure 5 A schematic diagram of an auxiliary base C and an auxiliary support frame C of an energy-saving steel truss floor deck temporary support structure disclosed in a preferred embodiment of the present application.
[0120] Reference numerals:
[0121] 1. Main base; 2. Main support frame; 3. Auxiliary base A; 4. Auxiliary support frame A; 5. Auxiliary base B; 6. Auxiliary support frame B; 7. Auxiliary base C; 8. Auxiliary support frame C; 11. Main bottom plate; 12. Main support column; 13. Main electric telescopic rod; 14. Mobile positioning assembly; 15. Main top plate; 16. Motor; 17. Gear; 21. Main support plate; 22. Guide rod; 23. Electromagnet; 24. Pneumatic suction cup; 31. Auxiliary bottom plate; 32. Auxiliary support column; 33. Auxiliary top plate; 34. Auxiliary electric telescopic rod; 35. Tooth plate A; 36. Slide plate A; 41. Auxiliary support plate; 42. Insert plate A; 51. Tooth plate B; 52. Slide plate B; 61. Insert plate B; 71. Tooth plate C; 72. Slide plate C; 81. Insert plate C. DETAILED DESCRIPTION
[0122] The present application is further described in detail below in conjunction with the accompanying drawings.
[0123] Reference Figure 1 , the embodiment of the present application provides an energy-saving steel truss floor deck temporary support structure, including: a main base 1, a main support frame 2, an auxiliary base A3, an auxiliary support frame A4, an auxiliary base B5, an auxiliary support frame B6, an auxiliary base C7, an auxiliary support frame C8 and a monitoring mechanism;
[0124] A main support frame 2 is provided on the main base 1 so as to be able to slide up and down;
[0125] Two auxiliary bases A3 are symmetrically and slidably arranged on the main base 1; two auxiliary support frames A4 are symmetrically and slidably arranged on the main support frame 2; the auxiliary bases A3 and the corresponding auxiliary support frames A4 are slidably arranged;
[0126] Auxiliary base B5 is slidably provided on the auxiliary base A3; auxiliary support frame B6 is slidably provided on the auxiliary support frame A4; the auxiliary base B5 and the corresponding auxiliary support frame B6 are slidably provided;
[0127] Auxiliary bases C7 are slidably provided on the auxiliary bases B5; auxiliary support frames C8 are slidably provided on the auxiliary support frames B6; the auxiliary bases C7 and the corresponding auxiliary support frames C8 are slidably provided;
[0128] A monitoring mechanism is fixedly arranged on the main base 1. During use, the monitoring mechanism monitors the condition of the steel truss floor deck in real time and detects abnormal conditions in time. The monitoring mechanism can monitor the stress state, deformation, abnormal vibration and other key parameters of the steel truss floor deck in real time, and provide timely and accurate monitoring data for construction personnel. Once an abnormal condition is found, measures can be taken immediately to ensure construction safety and quality.
[0129] Laser rangefinders are fixedly arranged on the main base 1, the auxiliary base A3, the auxiliary base B5 and the auxiliary base C7.
[0130] In this technical solution, the long-span steel truss floor deck is supported by the main support frame 2, the auxiliary support frame A4, the auxiliary support frame B6 and the auxiliary support frame C8; the distance between the main base 1, the auxiliary base A3, the auxiliary base B5 and the auxiliary base C7 can be adjusted as needed, so that the distance between the main support frame 2, the auxiliary support frame A4, the auxiliary support frame B6 and the auxiliary support frame C8 can be adjusted to adjust the position of the support point of the steel truss floor deck. The height of the main support frame 2, the auxiliary support frame A4, the auxiliary support frame B6 and the auxiliary support frame C8 can be adjusted as needed. Thus, the position of the support point can be flexibly arranged. This design enables the support structure to adapt to steel truss floor decks of different shapes and sizes, improving construction efficiency and quality. The monitoring agency monitors the condition of the steel truss floor deck in real time and detects abnormal conditions in a timely manner.
[0131] Reference Figure 2 , the main base 1 includes a main bottom plate 11, a main support column 12, a main electric telescopic rod 13, a mobile positioning assembly 14 and a main top plate 15;
[0132] Main support columns 12 are fixedly arranged at the four corners above the main bottom plate 11; the main top plate 15 is fixedly arranged between the four main support columns 12; two main electric telescopic rods 13 are fixedly arranged on both sides of the main bottom plate 11; the movable rods of the main electric telescopic rods 13 are fixedly connected to the main support frame 2;
[0133] A plurality of slide grooves are provided on the main bottom plate 11;
[0134] The four corners of the main base plate 11 are fixedly provided with a mobile positioning assembly 14; the mobile positioning assembly 14 includes a fixed shell, a hydraulic rod and an electric control caster; the fixed shell is fixedly provided with a hydraulic rod, and the lower end of the movable rod of the hydraulic rod is fixedly provided with an electric control caster.
[0135] An adjustment mechanism is symmetrically fixed on the main bottom plate 11, and the adjustment mechanism includes a motor 16 and a gear 17;
[0136] Two motors 16 are symmetrically fixedly disposed on the main base plate 11 , and a gear 17 is coaxially fixedly disposed on the output end of the motor 16 .
[0137] In this technical solution, the height and position of the main support frame 2 can be adjusted by controlling the extension and retraction of the electric telescopic rod 13. The height of the electric control casters can be adjusted by controlling the extension and retraction of the hydraulic rod, so as to adapt to different ground conditions or achieve fine-tuning positioning. The design of the electric control casters allows the entire main base to be easily moved to a desired position.
[0138] The main support frame 2 includes a main support plate 21, a guide rod 22, an electromagnet 23 and a pneumatic suction cup 24;
[0139] Guide rods 22 are fixedly provided at the four corners below the main support plate 21;
[0140] The guide rod 22 is slidably matched with the main support column 12;
[0141] The main support plate 21 is fixedly connected to the movable rod of the main electric telescopic rod 13;
[0142] A plurality of electromagnets 23 and pneumatic suckers 24 are provided on the main support plate 21. The exposed heights of the electromagnets 23 and pneumatic suckers 24 on the main support plate 21 can be set as required.
[0143] A plurality of guide grooves are arranged on the main support plate 21 .
[0144] In this technical solution, the steel truss floor deck is supported by the main support plate 21, and the steel truss floor deck is adsorbed and fixed by the electromagnet 23 and the pneumatic suction cup 24. The combined use of electromagnets and pneumatic suction cups can flexibly cope with steel truss floor decks of different materials, thicknesses and shapes to meet diverse construction needs. The rapid adsorption and fixing function of the electromagnet and pneumatic suction cup greatly shortens the construction time and improves the construction efficiency. The sliding cooperation between the guide rod and the main support column and the dual fixing mechanism of the electromagnet and the pneumatic suction cup ensure stability and safety during the construction process. The entire support system can be flexibly adjusted and optimized according to the specific conditions of the construction site to adapt to different construction environments and conditions.
[0145] Reference Figure 3 , the auxiliary base A3 includes a moving frame, a tooth plate A35 and a slide plate A36;
[0146] The mobile frame includes an auxiliary bottom plate 31, an auxiliary support column 32, an auxiliary top plate 33 and an auxiliary electric telescopic rod 34;
[0147] Four auxiliary support columns 32 are fixedly arranged between the auxiliary bottom plate 31 and the auxiliary top plate 33; a plurality of slide grooves are arranged on the auxiliary bottom plate 31 and the auxiliary top plate 33;
[0148] The two ends of the auxiliary bottom plate 31 are fixedly provided with movable positioning components 14 .
[0149] Two auxiliary electric telescopic rods 34 are fixedly arranged on the auxiliary bottom plate 31;
[0150] An adjustment mechanism is fixedly provided on the auxiliary bottom plate 31;
[0151] A tooth plate A35 and a slide plate A36 are fixedly arranged on the auxiliary base plate 31; the tooth plate A35 and the slide plate A36 are slidably matched with the slide groove on the main base 1. The tooth plate A35 is meshed and transmission-connected with the gear 17 on the main base 1.
[0152] Two slide plates A36 are fixedly arranged on the auxiliary top plate 33;
[0153] In this technical solution, the adjustment mechanism on the main base 1 is activated to drive the tooth plate A35 to move, thereby driving the auxiliary base A3 to move and adjust the position of the auxiliary base A3. The design of the adjustment mechanism and the mobile positioning assembly 14 makes the position adjustment of the auxiliary base A3 simple and fast, thereby improving the construction efficiency.
[0154] The auxiliary support frame A4 includes an auxiliary support plate 41, an insert plate A42, a guide rod 22, an electromagnet 23 and a pneumatic suction cup 24;
[0155] Guide rods 22 are fixedly disposed below both ends of the auxiliary support plate 41; the guide rods 22 are slidably matched with the auxiliary support columns 32;
[0156] Insertion plates A42 are fixedly provided at both ends of the auxiliary support plate 41 ; the insertion plates A42 are slidably matched with the guide grooves on the main support plate 21 .
[0157] A plurality of electromagnets 23 and pneumatic suction cups 24 are fixedly mounted on the auxiliary support plate 41 .
[0158] In this technical solution, the steel truss floor deck can be auxiliary supported by the auxiliary support frame A4.
[0159] Reference Figure 4 , the auxiliary base B5 includes a moving frame, a tooth plate B51 and a slide plate B52;
[0160] Two slide plates B52 are fixedly arranged on the upper end of the mobile frame;
[0161] A tooth plate B51 and a slide plate B52 are fixedly arranged at the upper and lower ends of the movable frame; the tooth plate B51 and the slide plate B52 are both slidably matched with the auxiliary base A3.
[0162] The tooth plate B51 is meshed and transmission-connected with the adjusting mechanism on the auxiliary base A3.
[0163] The auxiliary support frame C6 includes an auxiliary support plate 41, a plug plate B61, a guide rod 22, an electromagnet 23 and a pneumatic suction cup 24;
[0164] Guide rods 22 are fixedly arranged below both ends of the support plate 41; the guide rods 22 are slidably matched with the auxiliary base B5;
[0165] The two ends of the auxiliary support plate 41 are fixedly provided with plug plates B61, and the plug plates B61 are slidably matched with the auxiliary support frame A4 and the plug plates B61 are slidably matched with the main support frame 2.
[0166] A plurality of electromagnets 23 and pneumatic suction cups 24 are fixedly mounted on the auxiliary support plate 41 .
[0167] Reference Figure 5 , the auxiliary base C7 includes a moving frame, a tooth plate C71 and a slide plate C72;
[0168] Two slide plates C72 are fixedly arranged on the upper end of the mobile frame;
[0169] The upper and lower ends of the mobile frame are fixedly provided with tooth plates C71 and slide plates C72; the tooth plates C71 and slide plates C72 are both slidably matched with the auxiliary base B5. The tooth plates C71 and slide plates C72 are both slidably matched with the main base 1 and the auxiliary base A3. The tooth plates C71 are meshed and transmission-connected with the adjustment mechanism on the auxiliary base B5.
[0170] The auxiliary support frame C8 includes a support plate 41, an insert plate C81, a guide rod 22, an electromagnet 23 and a pneumatic suction cup 24;
[0171] Guide rods 22 are fixedly arranged below both ends of the support plate 41; the guide rods 22 are slidably matched with the auxiliary base C7;
[0172] Insertion plates C81 are fixedly arranged at both ends of the auxiliary support plate 41; the insertion plates C81 are slidably matched with the auxiliary support frame B6. The insertion plates B61 are slidably matched with the main support frame 2 and the auxiliary support frame A4.
[0173] A plurality of electromagnets 23 and pneumatic suction cups 24 are fixedly mounted on the auxiliary support plate 41 .
[0174] Furthermore, a monitoring mechanism is fixedly provided on the main base 1. During use, the monitoring mechanism monitors the condition of the steel truss floor deck in real time and detects abnormal conditions in time. The monitoring mechanism can monitor the key parameters such as the stress state, deformation and abnormal vibration of the steel truss floor deck in real time, and provide timely and accurate monitoring data for construction personnel. Once an abnormal situation is found, measures can be taken immediately to ensure construction safety and quality. The monitoring mechanism can give the support position of the steel truss floor deck according to the design size and weight of the steel truss floor deck. Including:
[0175] Support spacing calculation module: collect the design drawings of the steel truss floor deck, and give the support position of the steel truss floor deck according to the design size and weight of the steel truss floor deck. That is, calculate the most appropriate distance between the main support frame 2, auxiliary support frame A4, auxiliary support frame B6 and auxiliary support frame C8. According to the design drawings, design size and weight of the steel truss floor deck, use mechanical analysis and engineering calculations to determine the optimal support spacing between the main support frame and the auxiliary support frame. This helps to optimize the layout of the support structure, ensure that the floor deck is evenly stressed during the support process, and reduce the risk of deformation and damage.
[0176] Stress deformation monitoring module: including stress strain sensors, displacement sensors, vibration sensors and temperature sensors; stress strain sensors, displacement sensors, vibration sensors and temperature sensors are installed on the top of the main support frame 2, auxiliary support frame A4, auxiliary support frame B6 and auxiliary support frame C8; during use, the stress, deformation, vibration and temperature of the steel truss floor deck are monitored; these sensors should be installed at key positions of the main support frame, auxiliary support frame and floor deck, such as the stress concentration point, mid-span, near the support point, etc. Real-time monitoring of the stress state, deformation, vibration characteristics and temperature changes of the floor deck provides data support for evaluating the safety and stability of the floor deck.
[0177] Image acquisition module: including high-definition camera and LED light, to collect high-definition images of steel truss floor deck;
[0178] Image preprocessing module: preprocess the collected images, including filtering, denoising, grayscale and normalization;
[0179] Feature extraction module: extracts features from the preprocessed image. The extracted features include color, texture and shape.
[0180] Abnormal identification module: Identify the image after feature extraction and promptly identify abnormal conditions of the steel truss floor deck (including deformation, damage, collapse, etc.);
[0181] Comprehensive assessment module: Integrates the monitoring results of the abnormal identification module and the stress-deformation monitoring module (abnormal monitoring results, stress conditions, deformation conditions, vibration and temperature) to conduct a comprehensive assessment of the steel truss floor deck and identify potential risks in a timely manner.
[0182] Alarm module: including alarm, which will send out alarm in time when abnormal situation is detected;
[0183] Control center: connected to the support spacing calculation module, stress deformation monitoring module, image acquisition module, image preprocessing module, feature extraction module, abnormality recognition module and alarm module network; the control center is connected to the motor 16, electromagnet 23, pneumatic suction cup 24, auxiliary electric telescopic rod 34, hydraulic rod and electric control caster network.
[0184] In this technical solution, the monitoring agency uses a combination of multiple sensors and image processing technologies to achieve comprehensive and real-time monitoring of steel truss floor decking and its supporting structure, providing strong guarantees for construction safety and quality.
[0185] Furthermore, the support spacing calculation module provides the support position of the steel truss floor deck according to the design size and weight of the steel truss floor deck, including the following steps:
[0186] 1. Collect design information: Obtain detailed design drawings of the steel truss floor deck, including size, shape, material specifications, load requirements, etc. Record key dimensions of the floor deck, such as length, width, thickness, and span.
[0187] Determine the total weight and weight per unit area of the floor decking according to the design drawings or material list.
[0188] 2. Load analysis:
[0189] Determine the load: According to the design requirements, determine the load that the floor deck needs to bear, including static loads (such as dead weight, weight of fixed equipment, etc.) and live loads (such as personnel, mobile equipment, wind loads, etc.).
[0190] Load combination: According to the building code, various loads are combined to obtain the most unfavorable load condition; Z =P 静 +P 动 *K, where P Z It is the most unfavorable load condition calculated according to the building code, that is, the combination that has the greatest impact on the structure among all possible load combinations. 静 Static load, also called permanent load, refers to the weight of the structure itself and the loads fixed on it that will not change, such as the weight of structural members, fixed equipment, decorative surface layers, etc. 动Live loads, also called variable loads, are loads that can move on a structure, such as people, furniture, equipment, etc. Live loads are usually temporary, and their magnitude and location may change over time. k is the load combination factor, a factor determined according to building regulations that is used to adjust live loads when calculating the most unfavorable load situation. This factor takes into account the possibility of multiple loads acting simultaneously and the load safety reserve that may need to be increased in specific circumstances.
[0191] 3. Mechanical analysis: Simplify the complex steel truss floor deck into a beam or plate model to facilitate mechanical analysis.
[0192] Calculation of bending moment and shear force: Based on the load conditions and simplified model, the bending moment and shear force distribution at different locations of the floor deck are calculated.
[0193] Consider the influence of support: analyze the impact of the support structure on the stress state of the floor deck, including the reaction force of the support point, support stiffness, etc.
[0194] 4. Calculation of support spacing: Based on the size, weight and load of the floor decking, combined with the length of the main support frame 2, estimate the distance between the main support frame 2, auxiliary support frame A4, auxiliary support frame B6 and auxiliary support frame C8.
[0195] L 间 =(LL 0 ) / 6; where L 间 is the distance between the main support frame 2, auxiliary support frame A4, auxiliary support frame B6 and auxiliary support frame C8; L is the length of the steel truss floor deck; L 0 is the length of the main support frame 2;
[0196] 5. Optimize support layout: Try to make the support layout symmetrical to reduce the torsion and lateral displacement of the floor deck. The support position should be easy to install and disassemble, while considering safety factors during construction. Consider mechanical properties, construction convenience, cost and other factors to determine the final support position and spacing.
[0197] Furthermore, the comprehensive assessment module integrates the monitoring results of the abnormal identification module and the stress deformation monitoring module (abnormal monitoring results, stress conditions, deformation conditions, vibration and temperature) to conduct a comprehensive assessment of the steel truss floor deck and discover potential risks in a timely manner. The following steps are included:
[0198] 1. Data preprocessing: Collect monitoring data from the anomaly identification module, including but not limited to abnormal signals detected by sensors, abnormal types (such as cracks, corrosion, desoldering, etc.), abnormal locations and timestamps. Perform preliminary screening and classification of abnormal data to remove noise and invalid data. Collect real-time monitoring data from the stress deformation monitoring module, such as stress distribution, deformation, vibration frequency, amplitude and temperature of steel truss floor decking. Calibrate and standardize the data to ensure data consistency and accuracy.
[0199] 2. Data fusion processing:
[0200] Time synchronization: The data of the anomaly identification module and the stress deformation monitoring module are synchronized to ensure that both are analyzed within the same time frame.
[0201] Correlation analysis: Correlation analysis is performed between abnormal data and stress-deformation data to find changes in stress-deformation data before and after the abnormality occurs. Analyze the causal relationship between the abnormality and stress-deformation, such as whether a specific stress-deformation pattern may cause or aggravate the abnormal phenomenon.
[0202] Multi-source data fusion: Use data fusion technology (such as weighted average method) to comprehensively process multi-source data such as abnormal data, stress conditions, deformation conditions, vibration and temperature. Perform data fusion processing according to the following formula:
[0203] In the formula, I 综合 Represents the comprehensive status indicator after fusion. 1 、w 2 、w 3 、w 4 、w 5 and w 6 They represent the weights of different data sources (abnormal signals, stress, deformation, vibration frequency, amplitude and temperature), which are determined according to the importance or reliability of each data source. 滤波 Indicates the abnormal signal after filtering. 标准 Indicates the stress value after normalization. 标准 represents the normalized deformation value. f represents the vibration frequency. A represents the amplitude. θ represents the temperature.
[0204] 3. Construct a comprehensive evaluation model to quantitatively evaluate the overall status of the steel truss floor deck. 综合 =β 0 +β 1 *X 1 +β 2 *X 2 +…+β n *X n +∈; where I 综合Indicates the comprehensive status index of the floor deck. 0 , β 1 , β 2 ,...,β n Respectively represent the intercept term and the coefficient of the independent variable in the multiple linear regression model. These coefficients are determined through regression analysis and are used to describe the relationship between the independent variable and the dependent variable. 1 , X 2 ,...,X n Represents the independent variables in the model, i.e., the factors that affect the comprehensive state of the floor deck (such as stress, deformation, temperature, etc.). ∈ represents the error term in the regression model, which includes the influence of other factors on the dependent variable in addition to the independent variables. These symbols and formulas need to be appropriately adjusted and interpreted according to the specific data and analysis objectives. The determination of weights may need to be achieved through expert consultation, historical data analysis, or machine learning algorithms.
[0205] 4. Risk identification: Based on the integrated data, identify potential risks that may exist in the steel truss floor deck, such as structural damage, reduced bearing capacity, stability issues, etc.
[0206] Risk assessment: Quantitatively evaluate the identified risks to determine the severity of the risks, the scope of impact, and the possible consequences.
[0207] Assess the development trends and evolution patterns of risks, and predict possible future changes in risks.
[0208] 5. Early warning: Based on the risk assessment results, early warning information is issued to relevant departments and personnel to remind them to pay attention to the safety status of the steel truss floor deck. Decision support information is provided, such as recommended maintenance measures, reinforcement plans or emergency treatment measures.
[0209] 6. Feedback and optimization: Evaluate the implementation effect of the comprehensive evaluation module, including the accuracy and timeliness of early warning and its guiding role in actual work. Based on the evaluation results and actual application, continuously optimize the algorithm and parameter settings of the comprehensive evaluation model.
[0210] The present invention provides a method for using an energy-saving steel bar truss floor deck temporary support structure, comprising the following steps:
[0211] S1, move the main base 1 to the middle position below the steel truss floor deck;
[0212] S2, the support spacing calculation module of the monitoring mechanism calculates the appropriate distance between the main support frame 2, the auxiliary support frame A4, the auxiliary support frame B6 and the auxiliary support frame C8;
[0213] S3, start each adjustment mechanism to adjust the distance between the main support frame 2, the auxiliary support frame A4, the auxiliary support frame B6 and the auxiliary support frame C8;
[0214] S4, make each main electric telescopic rod 13 and auxiliary electric telescopic rod 34 work synchronously, drive the main support frame 2, auxiliary support frame A4, auxiliary support frame B6 and auxiliary support frame C8 to rise to a suitable height, and contact with the lower surface of the steel truss floor deck; start the hydraulic rod on the mobile positioning assembly 14 to make the electric control casters rise and leave the ground;
[0215] S5, start the electromagnet 23 or the pneumatic suction cup 24 to adsorb and fix the steel truss floor deck; the electromagnet 23 or the pneumatic suction cup 24 can be selected according to the material of the steel truss floor deck, or the electromagnet 23 and the pneumatic suction cup 24 can be used in combination;
[0216] S6. The monitoring mechanism monitors the condition of the steel truss floor deck in real time; the stress and deformation monitoring module monitors the stress, deformation, vibration and temperature of the steel truss floor deck;
[0217] S7, the comprehensive assessment module integrates the monitoring results of the abnormal identification module and the stress deformation monitoring module (abnormal monitoring results, stress conditions, deformation conditions, vibration and temperature), conducts a comprehensive assessment of the steel truss floor deck, and promptly discovers potential risks;
[0218] S8. When the stress, deformation and vibration of the steel truss floor deck are monitored to exceed the threshold; when the steel truss floor deck is monitored to have abnormal conditions or potential risks, the alarm module will issue an alarm in time.
[0219] In this technical solution, the long-span steel truss floor deck is supported by the main support frame 2, the auxiliary support frame A4, the auxiliary support frame B6 and the auxiliary support frame C8; the distance between the main base 1, the auxiliary base A3, the auxiliary base B5 and the auxiliary base C7 can be adjusted as needed, so that the distance between the main support frame 2, the auxiliary support frame A4, the auxiliary support frame B6 and the auxiliary support frame C8 can be adjusted to adjust the position of the support point of the steel truss floor deck. The height of the main support frame 2, the auxiliary support frame A4, the auxiliary support frame B6 and the auxiliary support frame C8 can be adjusted as needed. Thus, the position of the support point can be flexibly arranged. This design enables the support structure to adapt to steel truss floor decks of different shapes and sizes, improving construction efficiency and quality. The monitoring agency monitors the condition of the steel truss floor deck in real time and detects abnormal conditions in a timely manner.
[0220] The working principle of the energy-saving steel truss floor deck temporary support structure of the present invention is as follows: the main base 1 is moved to the middle position below the steel truss floor deck; the support spacing calculation module of the monitoring mechanism calculates the appropriate distance between the main support frame 2, the auxiliary support frame A4, the auxiliary support frame B6 and the auxiliary support frame C8; each adjustment mechanism is started to adjust the distance between the main support frame 2, the auxiliary support frame A4, the auxiliary support frame B6 and the auxiliary support frame C8; each main electric telescopic rod 13 and the auxiliary electric telescopic rod 34 are made to work synchronously to drive the main support frame 2, the auxiliary support frame A4, the auxiliary support frame B6 and the auxiliary support frame C8 to rise to a suitable height and contact with the lower surface of the steel truss floor deck; the electromagnet 23 or the pneumatic suction cup 24 is started to suck the steel The steel truss floor deck is adsorbed and fixed; according to the material of the steel truss floor deck, the electromagnet 23 or the pneumatic suction cup 24 can be selected, or the electromagnet 23 and the pneumatic suction cup 24 can be used in combination; the monitoring mechanism monitors the condition of the steel truss floor deck in real time; the stress and deformation monitoring module monitors the stress, deformation, vibration and temperature of the steel truss floor deck; the comprehensive evaluation module integrates the monitoring results of the abnormality recognition module and the stress and deformation monitoring module, conducts a comprehensive evaluation of the steel truss floor deck, and promptly discovers potential risks; when it is monitored that the stress, deformation and vibration of the steel truss floor deck exceed the threshold; when it is monitored that the steel truss floor deck has an abnormal condition or potential risk, the alarm module promptly issues an alarm.
[0221] The present invention can be installed quickly and accurately at the designated location through automated and precisely controlled support structure adjustment, reducing the time for manual adjustment and calibration, and significantly improving construction efficiency. It has a real-time monitoring function, and can promptly detect stress, deformation, vibration, and temperature anomalies of the steel truss floor deck, effectively preventing safety accidents caused by insufficient support or structural changes, and improving the safety of the construction site. It provides two or more combined fixing methods of electromagnets and pneumatic suction cups, which can be flexibly selected according to steel truss floor decks of different materials and structures, thereby enhancing the adaptability and practicality of the support structure. The comprehensive evaluation module combines abnormality identification with stress and deformation monitoring, and can comprehensively evaluate the status of the steel truss floor deck, promptly detect potential risks and issue alarms, provide timely early warning information for construction personnel, and reduce losses caused by untimely processing.
[0222] As described above, the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features thereof may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for using an energy-saving steel truss floor deck temporary support structure, characterized in that: The following steps are involved: S1. Move the main base to the middle position below the steel truss floor deck; S2. The support spacing calculation module of the monitoring mechanism calculates the appropriate distances between the main support frame, the auxiliary support frame A, the auxiliary support frame B and the auxiliary support frame C; S3, start each adjustment mechanism to adjust the distance between the main base, the auxiliary base A, the auxiliary base B and the auxiliary base C; that is, adjust the distance between the main support frame, the auxiliary support frame A, the auxiliary support frame B and the auxiliary support frame C; S4, making each main electric telescopic rod and auxiliary electric telescopic rod work synchronously, driving the main support frame, auxiliary support frame A, auxiliary support frame B and auxiliary support frame C to rise to a suitable height and contact with the lower surface of the steel truss floor deck; starting the hydraulic rod on the mobile positioning assembly to make the electric control caster rise and leave the ground; S5, start the electromagnet or pneumatic suction cup to absorb and fix the steel truss floor deck; S6. The monitoring mechanism monitors the condition of the steel truss floor deck in real time; the stress and deformation monitoring module monitors the stress, deformation, vibration and temperature of the steel truss floor deck; S7, the comprehensive assessment module integrates the monitoring results of the abnormal identification module and the stress deformation monitoring module, conducts a comprehensive assessment of the steel truss floor deck, and discovers potential risks in a timely manner; S8. When the stress, deformation and vibration of the steel truss floor deck are monitored to exceed the threshold; or when the steel truss floor deck is monitored to have abnormal conditions or potential risks, the alarm module will issue an alarm in time.
2. The method for using the energy-saving steel bar truss floor deck temporary support structure according to claim 1 is characterized by: Step S2 includes the following steps: S21. Collect design information: obtain detailed design drawings of the steel truss floor deck, including size, shape, material specifications and load requirements; S22. Load analysis: According to the design requirements, determine the loads that the floor deck needs to bear, including static loads and live loads; according to the building specifications, combine various loads to obtain the most unfavorable load condition; Z =P 静 +P 动 *K, where P Z is the most unfavorable load condition calculated according to the building code; P 静 is the static load; P 动 It refers to the load that will change on the structure; k is the load combination factor; S23, Mechanical analysis: Simplify the complex steel truss floor deck into a beam or plate model to facilitate mechanical analysis; calculate the bending moment and shear force distribution of the floor deck at different positions based on the load conditions and simplified models; analyze the influence of the supporting structure on the stress state of the floor deck, including the reaction force and support stiffness of the support point; S24. Calculation of support spacing: Based on the size, weight and load of the floor deck, combined with the length of the main support frame, estimate the distance between the main support frame, auxiliary support frame A, auxiliary support frame B and auxiliary support frame C; L 间 =(L-L0) / 6; where L 间 The distance between the main support frame, auxiliary support frame A, auxiliary support frame B and auxiliary support frame C; L is the length of the steel truss floor deck; L0 is the length of the main support frame; S25. Optimize support layout: Make the support layout symmetrical to reduce the torsion and lateral displacement of the floor deck.
3. The method for using the energy-saving steel bar truss floor deck temporary support structure according to claim 1 is characterized by: Step S7 includes the following steps: S71, data preprocessing: collect monitoring data from the abnormality identification module, preliminarily screen and classify the abnormal data, and remove noise and invalid data; collect real-time monitoring data from the stress deformation monitoring module, calibrate and standardize the data to ensure the consistency and accuracy of the data; S72, data fusion processing: including time synchronization, correlation analysis and multi-source data fusion; S73. Construct a comprehensive evaluation model to quantitatively evaluate the overall status of the steel truss floor deck; I 综合 =β0+β1*X1+β2*X2+…+β n *X n +∈; where I 综合 Indicates the comprehensive status index of the floor deck; β0, β1, β2, ..., β n Respectively represent the intercept term and the coefficient of the independent variable in the multiple linear regression model; X1, X2, ..., X n represents the independent variable in the model;∈ represents the error term in the regression model; S74, Risk Identification: Based on the fused data, identify the potential risks of the steel truss floor deck, including structural damage, reduced bearing capacity and stability issues; Conduct quantitative assessment of identified risks to determine the severity, scope of impact and possible consequences of the risks; S75, Early Warning: Based on the risk assessment results, early warning information is issued to relevant departments and personnel to remind them to pay attention to the safety status of the steel truss floor deck; S76. Feedback and optimization: Evaluate the implementation effect of the comprehensive evaluation module, and continuously optimize the algorithm and parameter settings of the comprehensive evaluation model based on the evaluation results and actual application conditions.
4. The method for using the energy-saving steel bar truss floor deck temporary support structure according to claim 3 is characterized by: Step S72 includes the following steps: S721, time synchronization: synchronize the data of the abnormality identification module and the stress deformation monitoring module to ensure that the two are analyzed within the same time frame; S7221. Correlation analysis: Correlation analysis is performed on the abnormal data and the stress deformation data to find the changes in the stress deformation data before and after the abnormality occurs; and the causal relationship between the abnormality and the stress deformation is analyzed; S723, multi-source data fusion: using the weighted average method, the abnormal data, stress conditions, deformation conditions, vibration and temperature data are comprehensively processed; the data fusion processing is performed according to the following formula: In the formula, I 综合 represents the comprehensive status index after fusion; w1, w2, w3, w4, w5 and w6 represent the weights of abnormal signal, stress, deformation, vibration frequency, amplitude and temperature respectively; S 滤波 Represents the abnormal signal after filtering; σ 标准 represents the stress value after standardization; δ 标准 represents the deformation value after standardized processing; f represents the vibration frequency; A represents the amplitude; θ represents the temperature.
5. The method for using the energy-saving steel bar truss floor deck temporary support structure according to claim 1 is characterized by: The main base comprises a main bottom plate, a main support column, a main electric telescopic rod, a mobile positioning assembly and a main top plate; Main support columns are fixedly arranged at the four corners above the main bottom plate; the main top plate is fixedly arranged between the four main support columns; two main electric telescopic rods are fixedly arranged on both sides of the main bottom plate; the movable rods of the main electric telescopic rods are fixedly connected to the main support frame; A number of slide grooves are provided on the main base plate; mobile positioning components are fixedly arranged on the outer sides of the four corners of the main base plate; the mobile positioning components include a fixed shell, a hydraulic rod and an electric control caster; a hydraulic rod is fixedly arranged in the fixed shell, and an electric control caster is fixedly arranged at the lower end of the movable rod of the hydraulic rod; an adjustment mechanism is symmetrically fixedly arranged on the main base plate, and the adjustment mechanism includes a motor and a gear; two motors are symmetrically fixedly arranged on the main base plate, and a gear is coaxially fixedly arranged at the output end of the motor.
6. The method for using the energy-saving steel bar truss floor deck temporary support structure according to claim 5 is characterized in that: The main support frame includes a main support plate, a guide rod, an electromagnet and a pneumatic suction cup; Guide rods are fixedly arranged at the four corners below the main support plate; the guide rods are slidably matched with the main support column; the main support plate is fixedly connected with the movable rod of the main electric telescopic rod; A plurality of electromagnets and pneumatic suction cups are arranged on the main support plate; the exposed heights of the electromagnets and pneumatic suction cups on the main support plate can be set as required; and a plurality of guide grooves are arranged on the main support plate.
7. The method for using the energy-saving steel bar truss floor deck temporary support structure according to claim 6 is characterized by: The auxiliary base A includes a moving frame, a tooth plate A and a slide plate A; The mobile frame includes an auxiliary bottom plate, an auxiliary support column, an auxiliary top plate and an auxiliary electric telescopic rod; four auxiliary support columns are fixedly arranged between the auxiliary bottom plate and the auxiliary top plate; a plurality of slide grooves are arranged on the auxiliary bottom plate and the auxiliary top plate; mobile positioning components are fixedly arranged at both ends of the auxiliary bottom plate; two auxiliary electric telescopic rods are fixedly arranged on the auxiliary bottom plate; an adjustment mechanism is fixedly arranged on the auxiliary bottom plate; a tooth plate A and a slide plate A are fixedly arranged on the auxiliary bottom plate; both the tooth plate A and the slide plate A are slidably matched with the slide grooves on the main base; the tooth plate A is meshed and driven with the gears on the main base; two slide plates A are fixedly arranged on the auxiliary top plate; The auxiliary support frame A comprises an auxiliary support plate, a plug plate A, a guide rod, an electromagnet and a pneumatic suction cup; Guide rods are fixedly arranged below both ends of the auxiliary support plate; the guide rods are slidably matched with the auxiliary support columns; plug plates A are fixedly arranged at both ends of the auxiliary support plate; the plug plates A are slidably matched with the guide grooves on the main support plate; and a number of electromagnets and pneumatic suction cups are fixedly arranged on the auxiliary support plate.
8. The method for using the energy-saving steel bar truss floor deck temporary support structure according to claim 7 is characterized in that: The auxiliary base B and the auxiliary support frame C differ from the auxiliary support frame A in that the positions of the tooth plate A and the slide plate A are different; the auxiliary support frame B and the auxiliary support frame C differ from the auxiliary support frame A in that the positions of the plug plate A and the guide rod are different.
9. The method for using the energy-saving steel bar truss floor deck temporary support structure according to claim 1 is characterized by: Monitoring agencies include: Support spacing calculation module: collect the design drawings of the steel truss floor deck, and calculate the most appropriate distance between the main support frame, auxiliary support frame A, auxiliary support frame B and auxiliary support frame C according to the design size and weight of the steel truss floor deck; Stress deformation monitoring module: including stress strain sensors, displacement sensors, vibration sensors and temperature sensors; stress strain sensors, displacement sensors, vibration sensors and temperature sensors are installed on the top of the main support frame, auxiliary support frame A, auxiliary support frame B and auxiliary support frame C; the stress, deformation, vibration and temperature of the steel truss floor deck are monitored; Image acquisition module: including high-definition camera and LED light, to collect high-definition images of steel truss floor deck; Image preprocessing module: preprocess the collected images, including filtering, denoising, grayscale and normalization; Feature extraction module: extracts features from the preprocessed image. The extracted features include color, texture and shape. Abnormal identification module: recognizes the image after feature extraction and promptly identifies abnormal conditions of the steel truss floor deck; Comprehensive assessment module: Integrate the monitoring results of the abnormal identification module and the stress deformation monitoring module to conduct a comprehensive assessment of the steel truss floor deck and discover potential risks in a timely manner; Alarm module: including alarm, which will send out alarm in time when abnormal situation is detected; Control center: connected to the support spacing calculation module, stress deformation monitoring module, image acquisition module, image preprocessing module, feature extraction module, abnormality recognition module and alarm module network; the control center is connected to the motor, electromagnet, pneumatic suction cup, auxiliary electric telescopic rod, hydraulic rod and electric control caster network.
10. An energy-saving steel truss floor deck temporary support structure, comprising: Main base, main support frame, auxiliary base A, auxiliary support frame A, auxiliary base B, auxiliary support frame B, auxiliary base C, auxiliary support frame C and monitoring mechanism; characterized in that: A main support frame is slidably arranged on the main base; two auxiliary bases A are symmetrically slidably arranged on the main base; two auxiliary support frames A are symmetrically slidably arranged on the main support frame; the auxiliary base A and the corresponding auxiliary support frame A are slidably arranged; Auxiliary base B is slidably provided on auxiliary base A; auxiliary support frame B is slidably provided on auxiliary support frame A; auxiliary base B and corresponding auxiliary support frame B are slidably provided; Auxiliary base C is slidably provided on auxiliary base B; auxiliary support frame C is slidably provided on auxiliary support frame B; auxiliary base C and corresponding auxiliary support frame C are slidably provided; A monitoring mechanism is fixedly installed on the main base. During use, the monitoring mechanism monitors the condition of the steel truss floor deck in real time and detects abnormal conditions in time.