Inclined shaft sealing method for preventing water gushing and air leakage of coal mine and sealed inclined shaft
By laying water pipes and burying U-shaped water storage pipes in coal mine shafts, and combining the filling of closed walls and mineral gangue sand, the problem of poor sand and gravel sealing effect is solved, and more efficient water inrush and air leakage prevention and control is achieved, and the The sealing properties of the wellbore and the energy utilization efficiency.
Patent Information
- Application Number
- CN202411032060.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2024-12-06
AI Technical Summary
In the prior art, sand and gravel are used to seal coal mine shafts, which have high chances of water inflow and air leakage, resulting in safety hazards and environmental pollution.
By laying water pipes and burying U-shaped water storage pipes in the inclined shaft, filling them with water, and building multiple closed walls at the bottom and wellheads and filling them with ore sand. Combining rapid sealing materials spraying and filling, a multi-layer sealing structure is formed. Improve sealing effect.
It effectively reduces the incidence of water influx and air leakage, improves the sealing and sealing of coal mine shafts, reduces energy consumption and resource waste, and promotes environmental protection and sustainable development.
Smart Images

Figure CN119084070A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of coal mine shafts, in particular to an inclined shaft sealing method and a closed inclined shaft for preventing water gushing and air leakage in coal mines. Background Art
[0002] A coal mine shaft refers to a vertical or inclined engineering structure that is dug to connect the ground with the underground mining area during the coal mining process. It is not only the main entrance and exit of the mine to the ground, but also a key project for lifting and transporting coal (or gangue), transporting personnel, materials and equipment, as well as ventilation and drainage during mine production. According to the different ways of mine development, shafts can be mainly divided into three types: vertical shafts, inclined shafts and horizontal tunnels; inclined projects are called inclined shafts, and their wellhead structures, shaft structures and bottom structures vary depending on their uses. Inclined shafts can be divided into main inclined shafts, auxiliary inclined shafts, inclined ventilation shafts, drainage inclined shafts, sand injection inclined shafts, etc. according to their uses.
[0003] Coal mine shafts are also the main ventilation and drainage channels of mines, which can ensure the safe entry and exit of miners and the normal operation of mines. Closing coal mine shafts can prevent unauthorized personnel from illegally entering the mines and reduce the chance of accidents. Closing coal mine shafts is an important measure for mine safety management, which can improve the safety of miners and the sustainable development of mines. my country has clear and strict regulations and standards for shaft closure.
[0004] When the geological and climatic environment of the mine changes, cracks in the shaft seal develop, forming air and water leakage channels of varying degrees, which can easily lead to water inrush accidents. At the same time, it will also cause air to enter the goaf, increasing the risk of spontaneous combustion of coal in the goaf. Harmful gases in the working face will also leak, causing pollution to the surrounding environment, which is not conducive to environmental protection and sustainable development. At present, the commonly used inclined shaft sealing materials are mainly sand and gravel, which have insufficient sealing effect, resulting in a high probability of water inrush and air leakage. Summary of the invention
[0005] In order to solve the problem of high probability of water gushing and air leakage in the prior art using sand and gravel for plugging, the present invention provides an inclined shaft for preventing water gushing in coal mines and a sealing method thereof.
[0006] On the one hand, the present invention is achieved through the following technical solutions:
[0007] A method for closing an inclined shaft to prevent water inrush and air leakage in a coal mine comprises the following steps:
[0008] S1. Lay a water pipe extending into the interior of the inclined shaft along the drainage ditch of the inclined shaft;
[0009] S2, both ends of the water delivery pipe are connected to the U-shaped water storage pipe buried at the bottom of the well;
[0010] S3, fill the U-shaped water storage pipe with water;
[0011] S4. Construct a second closed wall at the bottom of the inclined shaft;
[0012] S5, filling a section of ore gangue sand from the second closed wall along the inclined shaft outward;
[0013] S6. Construct a third closed wall at a distance from the external exit of the inclined shaft;
[0014] S7. Fill a section of mine gangue from the third closed wall along the inclined shaft outwards.
[0015] After being filled with water, the U-shaped water storage pipe helps to form a seal inside the pipe, and the gushing water is pumped out through the pipe; the two sections of mineral gangue filled at both ends of the inclined shaft can improve the sealing of both ends and prevent air leakage in the inclined shaft.
[0016] A further improvement of the present invention further includes step 5.1, before filling the quick sealing material in step S5, spraying the quick sealing material onto the inner wall of the inclined well. The sprayed quick sealing material forms an anti-leakage surface layer.
[0017] A further improvement of the present invention also includes step 5.2, before filling the gangue, constructing a first closed wall and reserving a gap, and closing the first closed wall after the gangue is filled. The added first closed wall cooperates with the second closed wall to improve the plugging and sealing effect of the bottom section of the inclined shaft.
[0018] A further improvement of the present invention further comprises step 7.1, before filling the quick sealing material in step S7, spraying the quick sealing material onto the inner wall of the inclined shaft.
[0019] A further improvement of the present invention also includes step 7.2, before filling the gangue, constructing a fourth closed wall and reserving a gap, and closing the fourth closed wall after the gangue is filled. The added fourth closed wall cooperates with the third closed wall to improve the plugging and sealing effect of the inclined shaft wellhead section.
[0020] Another aspect of the present invention is achieved through the following technical solutions:
[0021] A closed inclined shaft for preventing water gushing and air leakage in coal mines, comprising an inclined shaft and a drainage ditch along the inclined shaft, a water pipe is laid in the drainage ditch, and U-shaped water storage pipes buried downward are respectively arranged at both ends of the water pipe; a first plugging section and a second plugging section are respectively arranged at the bottom and the wellhead of the inclined shaft, and the first plugging section and the second plugging section correspond to the two ends of the water pipe respectively. The first plugging section and the second plugging section are arranged at both ends of the inclined shaft to enhance the sealing effect of the inclined shaft, and to inhibit air leakage and the aggravation of the rupture of the shaft wall caused by air leakage; the water pipe extends along the drainage ditch to the outside of the two plugging sections, and can discharge the water leaking from the bottom of the inclined shaft to the outside with the cooperation of the U-shaped water storage pipe pre-filled with water.
[0022] A further improvement of the present invention is that the first blocking section includes a first closed wall and a second closed wall, the second closed wall is arranged near the bottom of the inclined shaft; the first closed wall and the second closed wall enclose a first cavity in the inclined shaft, and a quick sealing material and ore gangue are arranged in the first cavity, the quick sealing material is applied on the inner wall of the inclined shaft, and the ore gangue is filled inside the quick sealing material. The quick sealing material forms an anti-leakage treatment on the inner wall of the first cavity, and the filled ore gangue is confined in the first cavity, thereby enhancing and giving full play to the barrier and sealing effect on the gushing water.
[0023] A further improvement of the present invention is that the second plugging section includes a third sealed wall and a fourth sealed wall, the fourth sealed wall is arranged near the wellhead of the inclined shaft; the third sealed wall and the fourth sealed wall enclose a second cavity in the inclined shaft, and a quick sealing material and ore gangue are arranged in the second cavity, the quick sealing material is applied on the inner wall of the inclined shaft, and the ore gangue is filled inside the quick sealing material. The quick sealing material forms an anti-leakage treatment on the inner wall of the second cavity, and the filled ore gangue is confined in the second cavity, thereby enhancing and giving full play to the barrier and sealing effect on the gushing water.
[0024] A further improvement of the present invention is that the thickness of the first closed wall, the second closed wall, the third closed wall and the fourth closed wall are all 2m.
[0025] A further improvement of the present invention is that the lengths of the first cavity and the second cavity are both 20 m.
[0026] It can be seen from the above technical scheme that the beneficial effects of the present invention are: the U-shaped water storage pipe after being filled with water is helpful to form a seal inside the pipeline, and the gushing water is pumped out through the pipeline; the two sections of mineral gangue filled at the two ends of the inclined shaft can improve the sealing of the two ends and prevent the air leakage problem of the inclined shaft. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] In order to more clearly illustrate the technical solution of the present invention, the accompanying drawings required for use in the description will be briefly introduced below. Obviously, the accompanying drawings in the following description are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0028] Figure 1 It is a structural schematic diagram of a specific implementation mode of the present invention.
[0029] In the attached figure: 1. Inclined shaft; 2. Water pipe; 3. U-shaped water storage pipe; 4. First closed wall; 5. Second closed wall; 6. Third closed wall; 7. Fourth closed wall; 8. Quick-sealing material; 9. Gangue. DETAILED DESCRIPTION
[0030] In order to make the purpose, features and advantages of the present invention more obvious and easy to understand, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings in this specific embodiment. Obviously, the embodiments described below are only part of the embodiments of the present invention, not all of them. Based on the embodiments in this patent, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this patent.
[0031] As attached Figure 1 As shown, a method for closing an inclined shaft to prevent water inrush and air leakage in a coal mine comprises the following steps:
[0032] S1, laying a water pipe 2 extending to the interior of the inclined shaft 1 along the drainage ditch of the inclined shaft 1;
[0033] S2, both ends of the water delivery pipe 2 are connected to the U-shaped water storage pipe 3 buried at the bottom of the well;
[0034] S3, filling the U-shaped water storage pipe 3 with water;
[0035] S4, construct a second closed wall 5 at the bottom of the inclined shaft 1;
[0036] S5, filling a section of ore gangue 9 from the second closed wall 5 along the inclined shaft 1 outward;
[0037] S6, construct a third closed wall 6 at a distance from the external exit of the inclined shaft 1;
[0038] S7. Fill a section of ore gangue 9 from the third closed wall 6 along the inclined shaft 1 outward.
[0039] After being filled with water, the U-shaped water storage pipe 3 helps to form a seal inside the pipeline, and the gushing water is pumped out through the pipeline; the two sections of mineral gangue 9 filled at the two ends of the inclined shaft 1 can improve the sealing of the two ends and prevent the air leakage problem of the inclined shaft 1.
[0040] The method further comprises step 5.1, in which, before filling the quick sealing material 8 in step S5, the quick sealing material 8 is sprayed onto the inner wall of the inclined well 1. The sprayed quick sealing material 8 forms an anti-leakage surface layer.
[0041] The method further includes step 5.2, before filling the gangue 9, constructing the first closed wall 4 and reserving a gap, and closing the first closed wall 4 after the gangue 9 is filled. The additional first closed wall 4 cooperates with the second closed wall 5 to improve the plugging and sealing effect of the bottom section of the inclined shaft 1.
[0042] The method further comprises step 7.1, wherein the quick sealing material 8 is sprayed onto the inner wall of the inclined well 1 before filling the quick sealing material 8 in step S7.
[0043] The method further includes step 7.2, before filling the gangue 9, constructing a fourth closed wall 7 and reserving a gap, and closing the fourth closed wall 7 after the gangue 9 is filled. The added fourth closed wall 7 cooperates with the third closed wall 6 to improve the plugging and sealing effect of the wellhead section of the inclined shaft 1.
[0044] A closed inclined shaft for preventing water gushing and air leakage in coal mines comprises an inclined shaft 1 and a drainage ditch along the inclined shaft 1, a water pipe 2 with a diameter of ф195 mm and made of corrosion-resistant steel pipe is laid in the drainage ditch, U-shaped water storage pipes 3 buried downwards are respectively provided at both ends of the water pipe 2, and the U-shaped water storage pipes 3 are pre-filled with water; the U-shaped water storage pipe 3 near the wellhead of the inclined shaft 1 is connected to a water pump.
[0045] The bottom and the wellhead of the inclined well 1 are respectively provided with a first plugging section and a second plugging section, and the first plugging section and the second plugging section correspond to the two ends of the water delivery pipe 2 respectively.
[0046] The first plugging section includes a first sealing wall 4 and a second sealing wall 5, wherein the second sealing wall 5 is arranged near the bottom of the inclined shaft 1; the first sealing wall 4 and the second sealing wall 5 enclose a first cavity in the inclined shaft 1, wherein a quick sealing material 8 and ore gangue 9 are arranged in the first cavity, wherein the quick sealing material 8 is applied on the inner wall of the inclined shaft 1, and the ore gangue 9 is filled inside the quick sealing material 8. The quick sealing material 8 forms an anti-leakage treatment on the inner wall of the first cavity, and the filled ore gangue 9 is confined in the first cavity, thereby enhancing and giving full play to the blocking and sealing effect on the gushing water.
[0047] The second plugging section includes a third sealed wall 6 and a fourth sealed wall 7, wherein the fourth sealed wall 7 is arranged near the wellhead of the inclined shaft 1; the third sealed wall 6 and the fourth sealed wall 7 enclose a second cavity in the inclined shaft 1, wherein a quick sealing material 8 and ore gangue 9 are arranged in the second cavity, wherein the quick sealing material 8 is applied on the inner wall of the inclined shaft 1, and the ore gangue 9 is filled inside the quick sealing material 8. The quick sealing material 8 forms an anti-leakage treatment on the inner wall of the second cavity, and the filled ore gangue 9 is confined in the second cavity, thereby enhancing and giving full play to the blocking and sealing effect on the gushing water.
[0048] The rapid sealing material 8 is a SPA foam type rapid sealing material 8 .
[0049] The gangue 9 is a mixture of yellow mud and gangue.
[0050] The thickness of the first closed wall 4, the second closed wall 5, the third closed wall 6 and the fourth closed wall 7 are all 2m.
[0051] The lengths of the first cavity and the second cavity are both 20 m.
[0052] The invention discloses a method for closing an inclined shaft for preventing water gushing and air leakage in a coal mine and a closed inclined shaft. After the U-shaped water storage pipe is filled with water, it is helpful to form a seal in the pipeline, and the gushing water is pumped out through the pipeline. The two sections of mineral gangue filled at the two ends of the inclined shaft can improve the sealing of the two ends, thereby preventing and controlling the air leakage problem of the inclined shaft.
[0053] The construction is convenient, rapid and short in cycle; the overall investment is 30% to 40% lower than that of shotcrete mortar; the polymer material used is plastic and has a certain adaptability to the deformation of the tunnel, which effectively prevents water gushing and air leakage after the inclined shaft is closed;
[0054] Good sealing of coal mine inclined shafts can reduce the mine's energy consumption and resource waste. Sealed shafts can effectively utilize the hydraulic and air pressure inside the mine, improve energy efficiency, and reduce energy consumption; reduce the generation and emission of mine waste, which is beneficial to environmental protection and sustainable development.
[0055] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same and similar parts between the various embodiments can be referenced to each other.
[0056] The terms "upper", "lower", "outer side", "inner side", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish the relative relationship in position if they exist, and do not need to be qualitative. It should be understood that the numbers used in this way can be interchanged where appropriate, so that the embodiments of the present invention described here can be implemented in an order other than those illustrated or described here. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions.
[0057] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A method for closing an inclined shaft to prevent water inrush and air leakage in a coal mine, characterized in that: The following steps are involved: S1, laying a water pipe (2) extending into the interior of the inclined well (1) along the drainage ditch of the inclined well (1); S2, both ends of the water delivery pipe (2) are connected to a U-shaped water storage pipe (3) buried at the bottom of the well; S3, filling the U-shaped water storage pipe (3) with water; S4, constructing a second closed wall (5) at the bottom of the inclined shaft (1); S5, filling a section of ore gangue (9) from the second closed wall (5) along the inclined shaft (1); S6. Construct a third closed wall (6) at a distance from the inclined shaft (1) near the external exit; S7, filling a section of ore gangue (9) from the third closed wall (6) along the inclined shaft (1) outwards.
2. A method for sealing an inclined shaft for preventing water inrush and air leakage in a coal mine according to claim 1, characterized in that: The method further comprises step 5.1, in which the quick sealing material (8) is sprayed onto the inner wall of the inclined well (1) before the quick sealing material (8) is filled in step S5.
3. A method for sealing an inclined shaft for preventing water inrush and air leakage in a coal mine according to claim 2, characterized in that: The method further comprises step 5.2, before filling the gangue (9), constructing a first closed wall (4) and reserving gaps, and closing the first closed wall (4) after the gangue (9) is filled.
4. A method for sealing an inclined shaft for preventing water inrush and air leakage in a coal mine according to claim 3, characterized in that: The method further comprises step 7.1, wherein before the quick sealing material (8) is filled in step S7, the quick sealing material (8) is first sprayed onto the inner wall of the inclined well (1).
5. A method for sealing an inclined shaft for preventing water inrush and air leakage in a coal mine according to claim 4, characterized in that: The method further comprises step 7.2, before filling the gangue (9), constructing a fourth closed wall (7) and reserving gaps, and closing the fourth closed wall (7) after the gangue (9) is filled.
6. A closed inclined shaft realized by using the inclined shaft sealing method for preventing water inrush and air leakage in coal mines as claimed in claim 5, comprising an inclined shaft (1) and a drainage ditch along the inclined shaft (1), characterized in that: A water pipe (2) is laid in the drainage ditch, and downwardly buried U-shaped water storage pipes (3) are respectively provided at both ends of the water pipe (2); a first blocking section and a second blocking section are respectively provided at the bottom and the wellhead of the inclined well (1), and the first blocking section and the second blocking section correspond to the two ends of the water pipe (2).
7. A closed inclined shaft for preventing water inrush and air leakage in coal mines according to claim 6, characterized in that: The first blocking section comprises a first sealed wall (4) and a second sealed wall (5), wherein the second sealed wall (5) is arranged close to the bottom of the inclined shaft (1); the first sealed wall (4) and the second sealed wall (5) enclose a first cavity in the inclined shaft (1), wherein a quick sealing material (8) and mineral gangue (9) are arranged in the first cavity, wherein the quick sealing material (8) is applied on the inner wall of the inclined shaft (1), and the mineral gangue (9) is filled inside the quick sealing material (8).
8. A closed inclined shaft for preventing water inrush and air leakage in coal mines according to claim 7, characterized in that: The second plugging section comprises a third sealed wall (6) and a fourth sealed wall (7), wherein the fourth sealed wall (7) is arranged close to the wellhead of the inclined shaft (1); the third sealed wall (6) and the fourth sealed wall (7) enclose a second cavity in the inclined shaft (1), wherein a quick sealing material (8) and mineral gangue (9) are arranged in the second cavity, wherein the quick sealing material (8) is applied on the inner wall of the inclined shaft (1), and the mineral gangue (9) is filled inside the quick sealing material (8).
9. A closed inclined shaft for preventing water inrush and air leakage in coal mines according to claim 8, characterized in that: The thickness of the first sealed wall (4), the second sealed wall (5), the third sealed wall (6) and the fourth sealed wall (7) are all 2 m.
10. A closed inclined shaft for preventing water inrush and air leakage in coal mines according to claim 8, characterized in that: The lengths of the first cavity and the second cavity are both 20 m.