Combined steam supply system for oil extraction and control method thereof

The combined steam supply system with solar and biomass integration addresses solar energy instability, ensuring stable steam production for heavy oil extraction with reduced costs and environmental impact.

CN119084934APending Publication Date: 2024-12-06SEPCOIII ELECTRIC POWER CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411186672.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The instability and intermittency of solar energy supply pose challenges for continuous and stable production of high-temperature superheated steam needed for heavy oil extraction, leading to high investment costs and environmental pollution from fossil fuels.

Method used

A combined steam supply system integrating a concentrating solar collector and a biomass boiler, controlled by a DCS system with optical power prediction, ensures stable steam supply by adjusting steam flow and power sources to compensate for solar fluctuations.

Benefits of technology

The system provides stable steam supply without heat storage, reducing investment and operational complexity while using renewable energy effectively.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119084934A_ABST
    Figure CN119084934A_ABST
Patent Text Reader

Abstract

The invention discloses a combined steam supply system for oil extraction and a control method thereof.The system comprises a deaerator, a circulating water tank, a light condensation and heat collection device, a biomass boiler, a first steam-water separator, a second steam-water separator and an electric heater, a water inlet of the deaerator is connected with external feed water, and a water outlet of the deaerator is connected with the circulating water tank; the outlet water of the circulating water tank is connected with the light-gathering and heat-collecting device and the biomass boiler; a gas outlet of the light condensation and heat collection device is connected with a steam-water separator I, and a gas outlet of the steam-water separator I is connected with a mixing valve; one gas outlet path of the biomass boiler is connected with a steam-water separator II, and the other gas outlet path is connected with a deaerator; a gas outlet of the steam-water separator II is connected with a mixing valve; an air outlet of the mixing valve is connected with an electric heater, an outlet of the electric heater discharges superheated steam, the heat collection water pump and the boiler water pump are both electrically connected with a DCS, and the DCS is further electrically connected with an optical power prediction system. According to the system and the control method thereof, the steam supply stability can be improved, and the investment cost can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a combined steam supply system, in particular to a combined steam supply system for oil production and a control method thereof. Background Art

[0002] In the field of oil production, for heavy oil with high viscosity coefficient, superheated steam at about 300℃ is generally used to heat the underground oil layer to reduce the viscosity coefficient and facilitate extraction. At present, thermal recovery of heavy oil mainly uses natural gas as fuel, which faces the problems of high carbon emissions and serious environmental pollution. In order to reduce dependence on fossil fuels and reduce environmental pollution, oil production companies are carrying out clean energy substitution projects and vigorously developing renewable clean energy, especially solar energy.

[0003] Solar energy has the advantages of wide distribution, renewable, clean and pollution-free, and high safety. However, the energy density of sunlight is low, and the use of solar energy requires a large amount of land. It is also greatly affected by weather and geographical location, and has problems of intermittency and instability. Industrial heat and power generation usually require stable energy input. How to overcome the instability of solar energy in energy supply faces great technical challenges. In the field of solar thermal power generation, the common practice is to configure heat storage devices or integrate ISCC combined cycle systems with natural gas to achieve continuous operation. However, the investment in heat storage is large, and it cannot meet the requirements of continuous operation on consecutive rainy days. In order to achieve a main steam temperature of 540°C, the ISCC combined cycle system has harsh construction conditions and a complex heat exchange system. Applying it to the field of heavy oil thermal recovery to produce 300°C superheated steam will result in a huge waste of energy grade and no economic advantage.

[0004] Direct solar thermal steam generation (DSG) technology reduces the intermediate heat exchange link, has higher photothermal conversion efficiency, and also has the advantages of cleanliness, no pollution, and low investment. For the three technical routes that can realize large-scale solar thermal power generation, such as tower, trough and linear Fresnel, the tower concentrating collector is point-focused, with a high concentration ratio and compact absorber arrangement, which can directly produce high-temperature and high-pressure superheated steam, but has high-precision requirements for superheated tube screen energy flow delivery, and is difficult to control. The trough and linear Fresnel concentrating collectors are line-focused, with a low concentration ratio and a long heat absorption pipeline. The superheated steam temperature response has obvious inertia and nonlinearity. Due to the intermittent and random fluctuations of solar radiation, the DSG system often experiences large changes in operating conditions during operation, resulting in a very complex problem of controlling the superheated steam temperature at the outlet of the collector system. At the same time, no matter which technical route is adopted, direct solar thermal steam generation faces the problem of heat storage difficulties, is greatly affected by DNI fluctuations, and cannot continuously and stably output steam. Summary of the invention

[0005] In order to solve the above technical problems, the present invention provides a combined steam supply system for oil production and a control method thereof, so as to achieve the purpose of improving steam supply stability and reducing investment costs.

[0006] To achieve the above object, the technical solution of the present invention is as follows:

[0007] A combined steam supply system for oil production, comprising a deaerator, a circulating water tank, a concentrating heat collecting device, a biomass boiler, a steam-water separator 1, a steam-water separator 2 and an electric heater, wherein the water inlet of the deaerator is connected to external water supply, and the water outlet is connected to the circulating water tank, one water outlet of the circulating water tank is connected to the concentrating heat collecting device through a heat collecting water pump, and the other water outlet is connected to the biomass boiler through a boiler water pump; the air outlet of the concentrating heat collecting device is connected to the steam-water separator 1, and the air outlet of the steam-water separator 1 is connected to a mixing valve One air inlet of the biomass boiler is connected to the circulating water tank through its outlet; one air outlet of the biomass boiler is connected to the second steam-water separator, and the other air outlet is connected to the deaerator; the air outlet of the second steam-water separator is connected to another air inlet of the mixing valve, and the water outlet is connected to the circulating water tank; the air outlet of the mixing valve is connected to the electric heater, and the outlet of the electric heater discharges superheated steam through the steam supply mother pipe for oil production. The heat collecting water pump and the boiler water pump are both electrically connected to the DCS system, and the DCS system is also electrically connected to the optical power prediction system.

[0008] In the above scheme, steam flow, temperature and pressure sensors are respectively arranged on the pipelines of the two air inlets of the mixing valve, and the steam flow, temperature and pressure sensors are electrically connected to the DCS system.

[0009] In the above scheme, the electric heater is powered by photovoltaic power during the day, and is equipped with a battery to smooth the photovoltaic output. In rainy weather or at night, the electric heater is powered by the power grid.

[0010] In the above scheme, the concentrating heat collection system can be a tower type, linear Fresnel type or trough type heat collection system.

[0011] A control method for a combined steam supply system for oil production includes the following process:

[0012] (1) Basic diagnosis: During normal daytime, the solar collector and the biomass boiler are running simultaneously, with the solar collector as the main steam supply and the biomass boiler as the auxiliary steam supply. In this state, basic diagnosis of the steam supply flow rate is performed. If the flow rate does not meet the requirements, the system will alarm and shut down;

[0013] (2) Cloud cover activation test: During operation, the optical power prediction system predicts possible cloud cover in the future. When cloud cover is predicted to occur in the future, the steam supply flow of the biomass boiler is gradually increased by adjusting the boiler water pump. When cloud cover occurs, the biomass boiler is the main steam supply, and the concentrated solar collector is the auxiliary steam supply.

[0014] (3) Cloud cover release test: When the DCS system determines that the cloud cover has completely ended based on the predicted value given by the optical power prediction system, the steam supply flow of the biomass boiler is gradually reduced by adjusting the boiler water pump, and the steam supply flow of the concentrating solar collector is simultaneously increased until the normal production mode is restored, with the concentrating solar collector as the main steam supply and the biomass boiler as the auxiliary steam supply;

[0015] (4) Coupling test in production mode: In normal production mode, by monitoring the steam flow rate changes of the concentrated solar collector system, the boiler water pump is adjusted to adjust the steam flow rate of the biomass boiler, so that the total steam flow rate of the concentrated solar collector system and the steam flow rate of the biomass boiler remain stable, thereby achieving coupled linkage control;

[0016] (5) Night mode test: When the optical power prediction system detects that the solar altitude angle is less than the set value, it is judged to be night time. At this time, the coupling linkage control is stopped and all steam is supplied by the biomass boiler. In the morning, when the solar altitude angle is greater than the set value, it is judged to be daytime and the coupling linkage control starts to work.

[0017] In the above scheme, in step (1), at time t, the steam flow rate of the steam supply main pipe needs to meet the following conditions:

[0018]

[0019] Among them, v Π is the steam flow demand of the steam supply main pipe, is the actual steam flow rate of the steam supply main at time t, δ Π It is the allowable fluctuation value of the steam supply main pipe.

[0020] In the above scheme, in step (2), the DCS system's warning time for cloud cover must be greater than the adjustment time of the biomass boiler from minimum to maximum output, and less than the maximum prediction time of the optical power prediction system;

[0021] At time t, the optical power prediction system can predict t+Δt cloud The steam flow rate of the concentrating solar collector at the time is The wavy line above the variable indicates the predicted value, and the following formula is used to determine whether the cloud cover mode is activated:

[0022]

[0023]

[0024] Among them, dv1 represents the reduction in steam flow rate of the concentrating solar collector. represents the actual steam flow rate of the solar collector at time t, v active_cloudis the threshold for activating the cloud cover mode. When the optical power prediction system predicts that cloud During the time period, when the reduction in the solar thermal steam flow rate dv1 is greater than the threshold, the cloud cover mode is activated and the system enters the cloud cover mode;

[0025] At this time, the biomass boiler The regulation rate increases the flow rate, and its value is:

[0026]

[0027] After the cloud cover mode is turned on, the DCS system's coupling interlock Γ lock Locking, for a duration of Δt cloud The set adjustment parameters will no longer be changed.

[0028] In the above scheme, in step (3), under the cloud cover mode, predict [t+1,t+Δt cloud ]Minimum steam flow rate of the concentrated solar collector within the time period Determine whether the cloud cover release mode needs to be activated;

[0029]

[0030] in, represents the predicted steam production flow of the concentrated solar collector at t+1, and so on; v deactive_cloud represents the threshold for cloud cover removal, when [t+1,t+Δt cloud ]Minimum steam production flow rate of solar thermal energy within the time period When the difference with the current solar thermal steam production is greater than the threshold, the cloud cover release mode is activated;

[0031] After the mirror field activates the cloud cover release mode, the steam output flow rate of the concentrating solar collector is η CSP The flow rate is increased by the adjustment rate, and the biomass boiler increases at η GB The speed of the reduction flow, the two variables are given by the following formula:

[0032]

[0033] in, is the maximum load adjustment rate of the concentrated solar collector, is the maximum load adjustment rate of the biomass boiler;

[0034] The duration of the coupled linkage when the mirror field exits the cloud cover Δt coulple It is given by the following formula:

[0035]

[0036] in, The steam flow rate of the solar collector in the cloud cover release mode is at t+Δt cloud The expected value that can be achieved at any time, The steam supply flow for the current concentrating solar collector device;

[0037] During the cloud cover release duration Δt coulple Internal, control system coupling interlock Γ lock Lock and continuously monitor [t+n,t+Δt cloud ]Minimum steam flow rate of the concentrating solar collector during the time period Where n is Δt coulple At the nth moment in the time period, if Update And update the adjustment parameters of the biomass boiler according to the cloud cover release mode.

[0038] In the above scheme, in step (4), in the normal production mode, except for the cloud cover and cloud cover release mode, the coupling activation threshold v is set tolerate , its value range is:

[0039]

[0040] in, Indicates the maximum load adjustment rate of the concentrated solar collector. Indicates the maximum load adjustment rate of the biomass boiler, δ Π Indicates the allowable fluctuation value of the steam supply main pipe;

[0041] when and The difference exceeds the threshold v tolerate , coupled linkage switch Γ active_couple is activated, otherwise the steam flow of the concentrated solar collector and the biomass boiler remains unchanged, as shown below:

[0042]

[0043]

[0044] in, represents the steam flow rate of the concentrated solar collector predicted at time t+1, represents the actual steam flow at time t;

[0045] When the coupling linkage switch Γ active_couple If activated, the steam load adjustment rate of the concentrated solar collector and biomass boiler is calculated:

[0046]

[0047] Among them, η CSPrepresents the load adjustment rate of the concentrated solar collector, η GB Indicates the load adjustment rate of the biomass boiler, Indicates the maximum load adjustment rate of the concentrated solar collector. Indicates the maximum load adjustment rate of the biomass boiler, The sign of the regulation used for a given steam flow rate;

[0048] The coupling duration is:

[0049]

[0050] During the duration, the coupling interlock Γ lock Lock and no longer change the set adjustment parameters.

[0051] In the above scheme, the output power of the electric heater at time t is determined by the following formula:

[0052]

[0053] in, is the enthalpy of superheated steam when the pressure is P and the superheat is ΔT, is the enthalpy of dry saturated steam at pressure P, is the steam flow rate of the steam supply main at time t.

[0054] Through the above technical solution, the present invention provides a combined steam supply system for oil production and a control method thereof having the following characteristics:

[0055] Beneficial effects:

[0056] 1. The method of the present invention can, without configuring heat storage, use a light power prediction system to allow the biomass boiler to increase or decrease the load in advance according to the light and heat power prediction value, thereby ensuring the stability of steam supply.

[0057] 2. Compared with the ISCC combined cycle system, the present invention has low system complexity and is relatively simple to operate and maintain.

[0058] 3. The photothermal system of the present invention adopts DSG technology, which reduces heat exchange losses and reduces investment compared with the thermal oil + molten salt heat storage solution. BRIEF DESCRIPTION OF THE DRAWINGS

[0059] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art are briefly introduced below.

[0060] Figure 1 This is a schematic diagram of a combined steam supply system for oil production disclosed in an embodiment of the present invention.

[0061] Figure 2 The present invention is a flowchart of a control method for a combined steam supply system for oil production disclosed in an embodiment of the present invention. DETAILED DESCRIPTION

[0062] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0063] The present invention provides a combined steam supply system for oil production, such as Figure 1 As shown, it includes a deaerator, a circulating water tank, a concentrating and collecting device, a biomass boiler, a steam-water separator 1, a steam-water separator 2 and an electric heater. The water inlet of the deaerator is connected to the external water supply, and the water outlet is connected to the circulating water tank. One water outlet of the circulating water tank is connected to the concentrating and collecting device through a heat collecting water pump, and the other water outlet is connected to the biomass boiler through a boiler water pump; the air outlet of the concentrating and collecting device is connected to the steam-water separator 1, the air outlet of the steam-water separator 1 is connected to one air inlet of the mixing valve, and the water outlet is connected to the circulating water tank; one air outlet of the biomass boiler is connected to the steam-water separator 2, and the other air outlet is connected to the deaerator; the air outlet of the steam-water separator 2 is connected to another air inlet of the mixing valve, and the water outlet is connected to the circulating water tank; the air outlet of the mixing valve is connected to the electric heater, and the outlet of the electric heater discharges superheated steam through the steam supply mother pipe for oil production.

[0064] Here’s how it works:

[0065] The external feed water first enters the deaerator, and the deoxygenated water enters the circulating water tank, mixes with the water from the steam-water separator, and then flows out in two ways. One way is to pump the water into the concentrated solar collector through the heat collection pump to heat it into saturated steam. The heated water vapor enters the steam-water separator 1, the separated saturated steam enters the mixing valve, and the separated hot water enters the circulating water tank; the other way enters the biomass boiler through the boiler water pump to be heated into saturated steam, a part of it enters the deaerator, and the rest enters the steam-water separator 2. The hot water enters the circulating water tank, and the saturated steam enters the mixing valve. After mixing with the steam from the concentrated solar collector, it enters the electric heater to be heated into superheated steam, which is discharged through the steam supply main pipe and injected into the underground air cavity to heat the heavy oil.

[0066] The entire system is controlled by a DCS system. In order to ensure the stability of the system's steam supply, a light power prediction system is configured, which can predict the solar thermal power within the next 30 minutes. The predicted power value is connected to the DCS system through a communication line. At the same time, steam flow, temperature and pressure sensors are installed on the pipelines of the two air inlets of the mixing valve, and the collected information is transmitted to the DCS system in real time for monitoring and flow deviation correction.

[0067] The steam supply of the biomass boiler can be adjusted within a certain load range, and the time required for the maximum load rise and fall is less than the maximum predicted duration of the optical power. Based on the prediction of the solar thermal power and the load adjustment rate of the biomass boiler, the DCS system adjusts the heat collector pump, boiler pump flow and biomass boiler power in advance to ensure the stability of the saturated steam supply, and ensures the stability of the superheated steam parameters by adjusting the output power of the electric heater.

[0068] In the above scheme, the electric heater is powered by photovoltaic power during the day, and a battery is configured to smooth the photovoltaic output. The battery capacity can meet the continuous operation of the electric heater for more than 2 hours. In rainy weather or at night, the power grid provides power.

[0069] In the embodiment of the present invention, the concentrating solar collection system may be a tower type, a linear Fresnel type or a trough type solar collection system.

[0070] The steam produced by the concentrated solar collector system and the biomass boiler is high-pressure saturated steam with a pressure of 6 to 12 MPa and a temperature of 275.5°C to 324.6°C.

[0071] The present invention also discloses a control method for a combined steam supply system for oil production, such as Figure 2 As shown, the process includes the following:

[0072] (1) Basic diagnosis: During normal daytime, the solar collector and biomass boiler operate simultaneously, with the solar collector as the main steam supply and the biomass boiler as the auxiliary steam supply. In this state, basic diagnosis of the steam supply flow rate is performed. If the flow rate does not meet the requirements, the system will alarm and shut down.

[0073] At time t, the steam flow rate of the steam supply main pipe needs to meet the following conditions:

[0074]

[0075] Among them, v Π is the steam flow demand of the steam supply main pipe, is the actual steam flow rate of the steam supply main at time t, δ Π It is the fluctuation value allowed by the steam supply main pipe. If the above conditions are not met, an alarm will be issued and the machine will be shut down.

[0076] (2) Cloud cover activation test: During operation, the optical power prediction system predicts possible cloud cover in the future. When cloud cover is predicted to occur in the future, the steam supply flow of the biomass boiler is gradually increased by adjusting the boiler water pump. When cloud cover occurs, the biomass boiler is the main source of steam supply, and the concentrated solar collector is the auxiliary source of steam supply.

[0077] DCS system warning time for cloud cover Δt cloudIt needs to be greater than the adjustment time of the biomass boiler from minimum to maximum output, and less than the maximum prediction time Δt of the optical power prediction system. forecast , expressed as:

[0078]

[0079] in, is the maximum steam flow rate of the biomass boiler, is the minimum steam flow rate of the biomass boiler, η GB is the rated load increase rate of the biomass boiler.

[0080] At time t, the optical power prediction system can predict t+Δt cloud The steam flow rate of the concentrating solar collector at the time is The wavy line above the variable indicates the predicted value, and the following formula is used to determine whether the cloud cover mode is activated:

[0081]

[0082]

[0083] Among them, dv1 represents the reduction in steam flow rate of the concentrating solar collector. represents the actual steam flow rate of the solar collector at time t, v active_cloud is the threshold for activating the cloud cover mode. When the optical power prediction system predicts that cloud During the time period, when the reduction in the solar thermal steam flow rate dv1 is greater than the threshold, the cloud cover mode is activated and the system enters the cloud cover mode;

[0084] At this time, the biomass boiler The regulation rate increases the flow rate, and its value is:

[0085]

[0086] After the cloud cover mode is turned on, the DCS system's coupling interlock Γ lock Locking, for a duration of Δt cloud The set adjustment parameters will no longer be changed.

[0087] (3) Cloud cover release test: When the DCS system determines that the cloud cover has completely ended based on the predicted value given by the optical power prediction system, the steam supply flow of the biomass boiler is gradually reduced by adjusting the boiler water pump, and the steam supply flow of the concentrating solar collector is simultaneously increased until the normal production mode is restored, with the concentrating solar collector as the main steam supply and the biomass boiler as the auxiliary steam supply.

[0088] In the cloud cover mode, the prediction [t+1,t+Δt cloud ]Minimum steam flow rate of the concentrated solar collector within the time period Determine whether the cloud cover release mode needs to be activated;

[0089]

[0090] in, represents the predicted steam production flow of the concentrated solar collector at t+1, and so on; v deactive_cloud represents the threshold for cloud cover removal, when [t+1,t+Δt cloud ]Minimum steam production flow rate of solar thermal energy within the time period When the difference with the current solar thermal steam production is greater than the threshold, the cloud cover release mode is activated;

[0091] After the mirror field activates the cloud cover release mode, the steam output flow rate of the concentrating solar collector is η CSP The flow rate is increased by the adjustment rate, and the biomass boiler increases at η GB The speed of the reduction flow, the two variables are given by the following formula:

[0092]

[0093] in, is the maximum load adjustment rate of the concentrated solar collector, is the maximum load adjustment rate of the biomass boiler;

[0094] The duration of the coupled linkage when the mirror field exits the cloud cover Δt coulple It is given by the following formula:

[0095]

[0096] in, The steam flow rate of the solar collector in the cloud cover release mode is at t+Δt cloud The expected value that can be achieved at any time, The steam supply flow for the current concentrating solar collector device;

[0097] During the cloud cover release duration Δt coulple Internal, control system coupling interlock Γ lock Lock and continuously monitor [t+n,t+Δt cloud ]Minimum steam flow rate of the concentrating solar collector during the time period Where n is Δt coulple At the nth moment in the time period, if Update And update the adjustment parameters of the biomass boiler according to the cloud cover release mode.

[0098] (4) Coupling test under production mode: Under normal production mode, by monitoring the changes in the steam flow of the concentrated solar collector system, the boiler water pump is adjusted to adjust the steam supply flow of the biomass boiler, so that the steam flow of the concentrated solar collector system and the total steam supply flow of the biomass boiler remain stable, thereby achieving coupled linkage control.

[0099] In normal production mode, except for cloud cover and cloud cover release mode, set the coupling activation threshold v tolerate , its value range is:

[0100]

[0101] in, Indicates the maximum load adjustment rate of the concentrated solar collector. Indicates the maximum load adjustment rate of the biomass boiler, δ Π Indicates the allowable fluctuation value of the steam supply main pipe;

[0102] when and The difference exceeds the threshold v tolerate , coupled linkage switch Γ active_couple is activated, otherwise the steam flow of the concentrated solar collector and the biomass boiler remains unchanged, as shown below:

[0103]

[0104]

[0105] in, represents the steam flow rate of the concentrated solar collector predicted at time t+1, represents the actual steam flow at time t;

[0106] When the coupling linkage switch Γ active_couple If activated, the steam load adjustment rate of the concentrated solar collector and biomass boiler is calculated:

[0107]

[0108] Among them, η CSP represents the load adjustment rate of the concentrated solar collector, η GB Indicates the load adjustment rate of the biomass boiler, Indicates the maximum load adjustment rate of the concentrated solar collector. Indicates the maximum load adjustment rate of the biomass boiler, The sign of the regulation used for a given steam flow rate;

[0109] The coupling duration is:

[0110]

[0111] During the duration, the coupling interlock Γ lock Lock and no longer change the set adjustment parameters.

[0112] (5) Night mode test: When the optical power prediction system detects that the solar altitude angle is less than the set value (generally 5°), it is judged to be night time. At this time, the coupling linkage control is stopped and all steam is supplied by the biomass boiler. In the morning, when the solar altitude angle is greater than the set value (generally 5°), it is judged to be daytime and the coupling linkage control starts to work.

[0113] In the above scheme, the output power of the electric heater at time t is determined by the following formula:

[0114]

[0115] in, is the enthalpy of superheated steam when the pressure is P and the superheat is ΔT, is the enthalpy of dry saturated steam at pressure P, is the steam flow rate of the steam supply main pipe at time t.

[0116] The solar collector and the biomass boiler steam supply control method ensure the stability of saturated steam parameters. In order to avoid frequent adjustment of the electric heater power, the power of the electric heater can also be simplified to

[0117]

[0118] Among them, v Π It is the rated steam supply flow rate of the steam supply main pipe.

[0119] The electric heater is preferably powered by photovoltaic + battery. When the battery energy storage is less than 30 minutes, it is switched to grid power supply. When the battery is charged by photovoltaic power and the energy storage is greater than 120 minutes, it is switched from grid power supply to battery power supply.

[0120] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A combined steam supply system for oil production, characterized in that: It includes a deaerator, a circulating water tank, a concentrating and heat-collecting device, a biomass boiler, a steam-water separator 1, a steam-water separator 2 and an electric heater. The water inlet of the deaerator is connected to the external water supply, and the water outlet is connected to the circulating water tank. One water outlet of the circulating water tank is connected to the concentrating and heat-collecting device through a heat-collecting water pump, and the other water outlet is connected to the biomass boiler through a boiler water pump; the air outlet of the concentrating and heat-collecting device is connected to the steam-water separator 1, the air outlet of the steam-water separator 1 is connected to one air inlet of a mixing valve, and the water outlet is connected to the circulating water tank; one air outlet of the biomass boiler is connected to the steam-water separator 2, and the other air outlet is connected to the deaerator; the air outlet of the steam-water separator 2 is connected to another air inlet of the mixing valve, and the water outlet is connected to the circulating water tank; the air outlet of the mixing valve is connected to the electric heater, and the outlet of the electric heater discharges superheated steam through a steam supply main pipe for oil production. The heat-collecting water pump and the boiler water pump are both electrically connected to a DCS system, and the DCS system is also electrically connected to an optical power prediction system.

2. A combined steam supply system for oil production according to claim 1, characterized in that: Steam flow, temperature and pressure sensors are respectively arranged on the pipelines of the two air inlets of the mixing valve, and the steam flow, temperature and pressure sensors are electrically connected to the DCS system.

3. A combined steam supply system for oil production according to claim 1, characterized in that: The electric heater is provided with electricity by photovoltaics during the day, and is equipped with a storage battery to smooth the photovoltaic output. In rainy weather or at night, the electric heater is provided with electricity by the power grid.

4. A combined steam supply system for oil production according to claim 1, characterized in that: The concentrated solar collector system may be a tower type, a linear Fresnel type or a trough type solar collector system.

5. A control method for a combined steam supply system for oil production as claimed in claim 1, characterized in that: The process includes the following: (1) Basic diagnosis: During normal daytime, the solar collector and the biomass boiler are running simultaneously, with the solar collector as the main steam supply and the biomass boiler as the auxiliary steam supply. In this state, basic diagnosis of the steam supply flow rate is performed. If the flow rate does not meet the requirements, the system will alarm and shut down; (2) Cloud cover activation test: During operation, the optical power prediction system predicts possible cloud cover in the future. When cloud cover is predicted to occur in the future, the steam supply flow of the biomass boiler is gradually increased by adjusting the boiler water pump. When cloud cover occurs, the biomass boiler is the main steam supply, and the concentrated solar collector is the auxiliary steam supply. (3) Cloud cover release test: When the DCS system determines that the cloud cover has completely ended based on the predicted value given by the optical power prediction system, the steam supply flow of the biomass boiler is gradually reduced by adjusting the boiler water pump, and the steam supply flow of the concentrating solar collector is simultaneously increased until the normal production mode is restored, with the concentrating solar collector as the main steam supply and the biomass boiler as the auxiliary steam supply; (4) Coupling test in production mode: In normal production mode, by monitoring the steam flow rate changes of the concentrated solar collector system, the boiler water pump is adjusted to adjust the steam flow rate of the biomass boiler, so that the total steam flow rate of the concentrated solar collector system and the steam flow rate of the biomass boiler remain stable, thereby achieving coupled linkage control; (5) Night mode test: When the optical power prediction system detects that the solar altitude angle is less than the set value, it is judged to be night time. At this time, the coupling linkage control is stopped and all steam is supplied by the biomass boiler. In the morning, when the solar altitude angle is greater than the set value, it is judged to be daytime and the coupling linkage control starts to work.

6. The control method for the combined steam supply system for oil production according to claim 5, characterized in that: In step (1), at time t, the steam flow rate of the steam supply main pipe needs to meet the following conditions: Among them, v Π is the steam flow demand of the steam supply main pipe, is the actual steam flow rate of the steam supply main at time t, δ Π It is the allowable fluctuation value of the steam supply main pipe.

7. The control method for the combined steam supply system for oil production according to claim 5, characterized in that: In step (2), the DCS system's warning time for cloud cover must be greater than the adjustment time of the biomass boiler from minimum to maximum output, and less than the maximum prediction time of the optical power prediction system; At time t, the optical power prediction system can predict t+Δt cloud The steam flow rate of the concentrating solar collector at the time is The wavy line above the variable indicates the predicted value, and the following formula is used to determine whether the cloud cover mode is activated: Among them, dv1 represents the reduction in steam flow rate of the concentrating solar collector. represents the actual steam flow rate of the solar collector at time t, v active_cloud is the threshold for activating the cloud cover mode. When the optical power prediction system predicts that cloud During the time period, when the reduction in the solar thermal steam flow rate dv1 is greater than the threshold, the cloud cover mode is activated and the system enters the cloud cover mode; At this time, the biomass boiler The regulation rate increases the flow rate, and its value is: After the cloud cover mode is turned on, the DCS system's coupling interlock Γ lock Locking, for a duration of Δt cloud The set adjustment parameters will no longer be changed.

8. The control method for the combined steam supply system for oil production according to claim 5, characterized in that: In step (3), in the cloud cover mode, predict [t+1,t+Δt cloud ]Minimum steam flow rate of the concentrated solar collector within the time period Determine whether the cloud cover release mode needs to be activated; in, represents the predicted steam flow rate of the concentrated solar collector at t+1, and so on; v deactive_cloud represents the threshold for cloud cover removal, when [t+1,t+Δt cloud ]Minimum steam production flow rate of solar thermal energy within the time period When the difference between the current solar thermal steam production and the current solar thermal steam production is greater than the threshold, the cloud cover release mode is activated; After the mirror field activates the cloud cover release mode, the steam output flow rate of the concentrating solar collector is η CSP The flow rate is increased by the adjustment rate, and the biomass boiler increases at η GB The speed of the reduction flow, the two variables are given by the following formula: in, is the maximum load adjustment rate of the concentrated solar collector, is the maximum load adjustment rate of the biomass boiler; The duration of the coupled linkage when the mirror field exits the cloud cover Δt coulple It is given by the following formula: in, The steam flow rate of the solar collector in the cloud cover release mode is at t+Δt cloud The expected value that can be achieved at any time, The steam supply flow for the current concentrating solar collector device; During the cloud cover release duration Δt coulple Internal, control system coupling interlock Γ lock Lock and continuously monitor [t+n,t+Δt cloud ]Minimum steam flow rate of the concentrating solar collector during the time period Where n is Δt coulple At the nth moment in the time period, if Update And update the adjustment parameters of the biomass boiler according to the cloud cover release mode.

9. The control method for the combined steam supply system for oil production according to claim 5, characterized in that: In step (4), in normal production mode, except for cloud cover and cloud cover release mode, the coupling activation threshold v is set tolerate , its value range is: in, Indicates the maximum load adjustment rate of the concentrated solar collector. Indicates the maximum load adjustment rate of the biomass boiler, δ Π Indicates the allowable fluctuation value of the steam supply main pipe; when and The difference exceeds the threshold v tolerate , coupled linkage switch Γ active_couple is activated, otherwise the steam flow of the concentrated solar collector and the biomass boiler remains unchanged, as shown below: in, represents the steam flow rate of the concentrated solar collector predicted at time t+1, represents the actual steam flow at time t; When the coupling linkage switch Γ active_couple If activated, the steam load adjustment rate of the concentrated solar collector and biomass boiler is calculated: Among them, η CSP represents the load adjustment rate of the concentrated solar collector, η GB Indicates the load adjustment rate of the biomass boiler, Indicates the maximum load adjustment rate of the concentrated solar collector. Indicates the maximum load adjustment rate of the biomass boiler, The sign of the regulation used for a given steam flow rate; The duration of the coupling linkage is: During the duration, the coupling interlock Γ lock Lock and no longer change the set adjustment parameters.

10. The control method for the combined steam supply system for oil production according to claim 5, characterized in that: The output power of the electric heater at time t is determined by the following formula: in, is the enthalpy of superheated steam when the pressure is P and the superheat is ΔT, is the enthalpy of dry saturated steam at pressure P, is the steam flow rate of the steam supply main at time t.