Cold region tunnel portal anti-freezing device and construction method
By setting up heating pipes and light insulation layers at the entrances of tunnels in cold areas, using geothermal energy and solar heaters to transfer heat, the problem of freezing damage at the entrance of tunnels is solved, the safety and service life of the tunnel structure is improved, and the frost damage removal is reduced to human resources Reliance on material resources.
Patent Information
- Application Number
- CN202411417408.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-11
- Publication Date
- 2024-12-06
AI Technical Summary
The entrances of tunnels in cold areas are susceptible to frost damage, resulting in structural cracking or damage, affecting traffic safety and operational stability. The existing technology is difficult to effectively resist extreme climatic conditions.
An antifreeze device for tunnel openings in cold zones including heating pipes, lightweight insulation layer and support fixed structure is designed. The heat is transferred to the openings through a heat exchange device using geothermal energy and solar heaters, and combined with a liquid medium that is easy to vaporize to improve the Heating efficiency and structural stability.
It realizes that without affecting the normal operation of the tunnel, prevent frost damage by cleaning renewable energy, extend the service life of the tunnel, improve structural safety, and facilitate maintenance.
Smart Images

Figure CN119085148A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of comprehensive utilization of renewable energy, and in particular to a freezing prevention device for a tunnel portal in a cold region and a construction method. Background Art
[0002] Shallow geothermal energy and solar energy are both widely distributed clean and renewable energy sources with broad development prospects. Their development and use are also important technologies in the field of public transportation. Pile foundation buried pipes, bored buried pipes and heat exchange pipes in tunnels can all extract shallow geothermal energy from soil or surrounding rock through heat transfer, which has high economic and environmental benefits. Solar heaters can convert solar energy into thermal energy, but they cannot operate in rainy and snowy weather.
[0003] Tunnel engineering can effectively avoid dangerous terrain, shorten traffic routes, and promote regional economic development. In cold regions, the tunnel entrance area is easily affected by factors such as groundwater infiltration, ice and snow accumulation, and temperature changes. This may cause groundwater to freeze, forming ice blocks to block the entrance, and even cause structural cracks or damage, seriously affecting the traffic safety and operational stability of the tunnel. Therefore, the problem of freezing damage at the tunnel entrance is a severe challenge. To meet this challenge, effective measures must be taken to ensure that the tunnel entrance area can withstand the impact of extreme climate conditions and ensure the safe operation of the tunnel. Summary of the invention
[0004] In view of the above-mentioned deficiencies in the prior art, the present invention provides a cold region tunnel entrance antifreeze device and construction method for preventing freezing damage at the cold region tunnel entrance.
[0005] In order to achieve the above-mentioned object of the invention, the technical solution adopted by the present invention is:
[0006] Provided is a cold region tunnel entrance antifreeze device, which comprises an entrance heating device arranged at the tunnel entrance, the entrance heating device comprising a heating pipe, a light insulation layer and a supporting and fixing structure; the supporting and fixing structure is used to fix the heating pipe and the light insulation layer on the lining at the tunnel entrance;
[0007] The heating pipes are connected to a heating system, which includes a geothermal heating system located inside the tunnel and a solar heater located outside the tunnel;
[0008] The geothermal heating system includes a pile foundation buried pipe or a drilled hole buried pipe embedded in the surrounding rock; the pile foundation buried pipe or the drilled hole buried pipe is connected to a ground source heat pump, and the ground source heat pump is connected to a heating pipe;
[0009] A heat exchange device is arranged between the ground source heat pump and the heating pipe, and the heat exchange device is connected to the solar heater.
[0010] Furthermore, the heating pipe includes an inflow section, a branch section and a return section which are connected in sequence, the inflow section is connected to the output end of the heat exchange device; and the return section is connected to the input end of the heat exchange device.
[0011] Furthermore, the geothermal heating system also includes a tunnel heat exchange pipe connected to the lining, and the tunnel heat exchange pipe is connected to the ground source heat pump; the tunnel heat exchange pipe is a lining inner wall attached pipe, a lining buried pipe or a tunnel air heat exchange pipe; the lining inner wall attached pipe is embedded between the lining and the surrounding rock; the lining buried pipe is embedded in the lining; the tunnel air heat exchange pipe is arranged on the surface of the lining close to the tunnel; the tunnel heat exchange pipe is used to extract heat from the surrounding rock in the middle section of the tunnel and the air in the tunnel.
[0012] Furthermore, the heating tube is filled with a heat exchange medium, which is a liquid medium that is easily vaporized after heating and decompression.
[0013] Furthermore, the heat exchange medium is methanol, ethanol or ether.
[0014] The present invention also provides a construction method for the above-mentioned cold region tunnel entrance antifreeze device, comprising the following specific steps:
[0015] S1: Collect and count the lighting conditions in the area where the tunnel is located, the geothermal resource data in and around the tunnel, and determine the design parameters of the heating device. The design parameters include the distance between the branch pipe and the lining, the thickness of the insulation layer, the thermal conductivity of the insulation layer, and the heating rate of the heating system;
[0016] S2: Install solar heaters outside the tunnel to absorb solar energy; arrange the number and position of pile foundation buried pipes, drilled hole buried pipes and heat exchange pipes in the tunnel according to design parameters, install the ground source heat pump in the tunnel, and connect the pile foundation buried pipes, drilled hole buried pipes and heat exchange pipes in the tunnel to the ground source heat pump;
[0017] S3: Install the tunnel entrance heating device and fix the heating pipe and lightweight insulation layer on the lining at the tunnel entrance;
[0018] S4: placing the heat exchange device at a position lower than the reflux section, connecting the heat exchange device to the inflow section and the reflux section of the heating pipe, and allowing the heat exchange medium in the reflux section to flow back to the heat exchange device through the pipeline;
[0019] S5: connecting the solar heater and the ground source heat pump to the heat exchange device respectively;
[0020] S6: Construction is completed, and heat exchange medium is added to the heating chamber, and the heat exchange medium is heated by solar energy and geothermal energy.
[0021] Furthermore, the relationship between the heating system design parameters and the tunnel construction parameters is:
[0022] T wy =0.055+1.16hcq +0.384l+0.335h bw +3.24k bw +0.149T sd +0.095W;
[0023] Among them, T wy The proposed rock temperature at the tunnel entrance after 180 days of freezing; h cq is the lining thickness; l is the distance between the branch pipe and the lining; h bw is the thickness of the insulation layer; k bw is the thermal conductivity of the insulation layer; T sd is the average temperature in the tunnel during the 180-day freezing period; W is the heating rate of the heating system;
[0024] The calculation formula for the heating rate of the heating system is:
[0025]
[0026] Among them, T lr is the inflow section temperature, T jy is the medium liquefaction temperature, ρ jq is the density of the medium gas, S is the cross section of the branch section, Q jq When the medium is gas, v jq When the medium is gas, T hl is the reflux temperature, ρ jy When the medium is liquid, Q jy When the medium is liquid, v jy is the flow rate when the medium is liquid, δ is the phase change enthalpy of the medium, S cq is the lining area at the tributary section.
[0027] The beneficial effects of the present invention are:
[0028] 1. The present invention combines the development of clean renewable energy with the prevention of frost damage at tunnel entrances. It only requires solar energy and a small amount of electricity for daily operation, which reduces the dependence of frost damage removal on manpower and material resources. It can also carry out frost damage prevention work without affecting the normal operation of the tunnel, thereby improving the safety of the tunnel structure.
[0029] 2. The heating device is installed on the inner wall of the tunnel lining at the tunnel entrance, which can transform the built tunnel and increase the service life of the built tunnel. In addition, the heating device is easy to inspect and maintain.
[0030] 3. The heating device uses easily gasified materials as the heating medium. During operation, greater heat absorption and release are achieved through material phase change, thereby improving heating efficiency. At the same time, the heated gas reduces the weight of the heating system, avoiding lining deformation caused by long-term use of the heating system, which is beneficial to the stability of the tunnel lining.
[0031] 4. In areas with abundant solar energy, the tunnel lining and surrounding rock are continuously heated by solar heaters, and the heat converted from solar energy is effectively stored in the tunnel lining and surrounding rock. In rainy and snowy weather, this heat and part of the geothermal energy can be consumed to maintain a temperature that does not cause frost damage, ensuring the effectiveness of use in areas where geothermal energy is not abundant. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 This is a structural schematic diagram of Example 1;
[0033] Figure 2 This is a cross-sectional view of the tunnel entrance of Example 1;
[0034] Figure 3 This is a schematic diagram of heat transfer in Example 1;
[0035] Figure 4 This is a schematic diagram of the inner wall lining tube-attached structure of Example 1;
[0036] Figure 5 This is a schematic diagram of the buried pipe structure in the lining of Example 2;
[0037] Figure 6 This is a schematic diagram of the air heat exchange tubular structure in the tunnel of Example 3;
[0038] Figure 7 This is a cross-sectional view of the tunnel entrance of Example 5;
[0039] Among them, 1. surrounding rock; 11. surrounding rock of the tunnel entrance; 12. surrounding rock of the middle section of the tunnel; 2. lining; 3. tunnel entrance heating device; 31. heating pipe; 311. inflow section; 312. tributary section; 313. return section; 32. lightweight insulation layer; 33. supporting fixed structure; 41. heat exchange equipment; 411. heating chamber; 412. heating pipe; 42. heat exchange medium; 5. heating system; 51. geothermal heating system; 511. ground source heat pump; 512. buried pipe in pile foundation; 513. buried pipe in drilling; 514. tunnel heat exchange pipe; 5141. pipe attached to the inner wall of lining; 5142. buried pipe in lining; 5143. air heat exchange pipe in tunnel; 52. solar heater. DETAILED DESCRIPTION
[0040] The specific implementation modes of the present invention are described below so that those skilled in the art can understand the present invention. However, it should be clear that the present invention is not limited to the scope of the specific implementation modes. For those of ordinary skill in the art, as long as various changes are within the spirit and scope of the present invention as defined and determined by the attached claims, these changes are obvious, and all inventions and creations utilizing the concept of the present invention are protected.
[0041] Example 1
[0042] like Figure 1-3 As shown, a cold region tunnel entrance antifreeze device includes a tunnel entrance heating device 3 arranged at the tunnel entrance, the tunnel entrance heating device 3 includes a heating pipe 31, a lightweight insulation layer 32 and a supporting and fixing structure 33; the supporting and fixing structure 33 is used to fix the heating pipe 31 and the lightweight insulation layer 32 on the lining 2 at the tunnel entrance; and in a specific implementation, the heating pipe 31 is embedded in the lightweight insulation layer 32.
[0043] The heating pipe 31 is connected to a heating system 5, which includes a geothermal heating system 51 located in the tunnel and a solar heater 52 located outside the tunnel;
[0044] The geothermal heating system 51 includes a pile foundation buried pipe 512 or a drilled buried pipe 513 embedded in the surrounding rock 1; the pile foundation buried pipe 512 or the drilled buried pipe 513 is connected to a ground source heat pump 511, and the ground source heat pump 511 is connected to the heating pipe 31;
[0045] A heat exchange device is provided between the ground source heat pump 511 and the heating pipe 31, and the heat exchange device is connected to the solar heater 52. The heat exchange device includes a heating chamber 411 and a heating pipe 412; the top end of the heating chamber 411 is connected to the inflow section 311 of the heating pipe 31, and the bottom end of the heating chamber 411 is connected to the return section 313 of the heating pipe 31;
[0046] The heating pipe 31 includes an inflow section 311, a branch section 312 and a return section 313 which are connected in sequence. The inflow section 311 is connected to the output end of the heat exchange device; and the return section 313 is connected to the input end of the heat exchange device.
[0047] The geothermal heating system 51 further includes a tunnel heat exchange pipe 514 connected to the lining 2, and the tunnel heat exchange pipe 514 is connected to the ground source heat pump 511; the tunnel heat exchange pipe 514 is a lining inner wall attached pipe 5141; the lining inner wall attached pipe 5141 is embedded between the lining 2 and the surrounding rock 1; the surrounding rock 1 includes the tunnel entrance surrounding rock 11 and the tunnel middle section surrounding rock 12;
[0048] The heating tube 31 is filled with a heat exchange medium 42, which is a liquid medium that is easily vaporized after heating and decompression. The heat exchange medium 42 is methanol, ethanol or ether.
[0049] The construction method of the above device is specifically as follows:
[0050] S1: Collect and count the light conditions in the area where the tunnel is located, the geothermal resource data in the tunnel and the surrounding area, and determine the design parameters of the heating device, the design parameters include the distance between the branch pipe and the lining 2, the thickness of the insulation layer, the thermal conductivity of the insulation layer and the heating rate of the heating system 5;
[0051] S2: Install the solar heater 52 outside the tunnel to absorb solar energy; arrange the number and position of the pile foundation buried pipe 512, the drilled hole buried pipe 513 and the heat exchange pipe in the tunnel according to the design parameters, install the ground source heat pump 511 in the tunnel, and connect the pile foundation buried pipe 512, the drilled hole buried pipe 513 and the heat exchange pipe in the tunnel to the ground source heat pump 511;
[0052] The relationship between the heating system design parameters and the tunnel construction parameters is:
[0053] T wy =0.055+1.16h cq +0.384l+0.335h bw +3.24k bw +0.149T sd +0.095W;
[0054] Among them, T wy The proposed rock temperature at the tunnel entrance after 180 days of freezing; h cq is the lining thickness; l is the distance between the branch pipe and the lining; h bw is the thickness of the insulation layer; k bw is the thermal conductivity of the insulation layer; T sd is the average temperature in the tunnel during the 180-day freezing period; W is the heating rate of the heating system;
[0055] The above formula is based on the situation that the temperature of the deep surrounding rock of the tunnel is about 5°C and the thermal conductivity of the lining is 1.8W / m·°C. When the thermal conductivity of the lining is different, it is necessary to carry out numerical simulation based on the new thermal conductivity, and perform regression analysis based on the simulation results. In specific implementation, the tunnel entrance antifreeze device is used when the average temperature of the deep surrounding rock of the tunnel is 0-5°C during the 180-day freezing period. When the temperature of the deep surrounding rock of the tunnel is less than or equal to 0°C, the location of the tunnel is permafrost and the heating device is not suitable. When the temperature of the deep surrounding rock of the tunnel is greater than 5°C, the heating efficiency calculated by this formula exceeds the heating demand of the tunnel entrance surrounding rock. The heating efficiency can be appropriately reduced, or numerical simulation research can be carried out based on the new deep surrounding rock temperature, and regression analysis can be performed based on the simulation results.
[0056] The heating rate of the heating system is related to the heat exchange medium, the power of the heating system and the operating parameters of the heat exchange equipment. The calculation formula for the heating rate of the heating system is:
[0057]
[0058] Among them, T lr is the inflow section temperature, T jy is the medium liquefaction temperature, ρ jq is the density of the medium gas, S is the cross section of the branch section, Q jq When the medium is gas, vjq When the medium is gas, T hl is the reflux temperature, ρ jy When the medium is liquid, Q jy When the medium is liquid, v jy is the flow rate when the medium is liquid, δ is the phase change enthalpy of the medium, S cq is the lining area at the tributary section.
[0059] S3: Install the tunnel heating device 3, drill holes on the lining 2, use expansion bolts or self-tapping screws as supporting and fixing structures 33, and fix the heating pipe 31 and the lightweight insulation layer 32 on the tunnel lining 2;
[0060] S4: Install the heat exchange device 41 at a lower position, connect the heating chamber 411 with the inflow section 311 and the return section 313 of the heating pipe 31, and ensure that the liquid heat exchange medium 42 in the return section 313 can flow back to the heating chamber 411 through the return pipe;
[0061] S5: Connect the solar heater 52 and the ground source heat pump 511 to the heating pipe 412 in the heat exchange device 41 respectively.
[0062] S6: After the construction is completed, a heat exchange medium 42 is added to the heating chamber 411, and the heat exchange medium 42 is heated by solar energy and geothermal energy.
[0063] Example 2
[0064] like Figure 4 As shown, the difference between this embodiment and embodiment 1 is that the tunnel heat exchange pipe 514 is a lining embedded pipe 5142; the lining embedded pipe 5142 is embedded in the lining 2.
[0065] Example 3
[0066] like Figure 5 As shown, the difference between this embodiment and embodiment 1 is that the tunnel heat exchange pipe 514 is a tunnel air heat exchange pipe 5143; the tunnel heat exchange pipe 514 is used to extract heat from the surrounding rock 12 in the middle section of the tunnel and the air in the tunnel.
[0067] Example 4
[0068] like Figure 6 As shown, the difference between this embodiment and embodiment 1 is that the tunnel heat exchange pipe 514 simultaneously adopts the lining inner wall tube 5141, the lining buried tube 5142 and the tunnel air heat exchange pipe 5143; the lining inner wall tube 5141 is embedded between the lining 2 and the surrounding rock 1; the lining buried tube 5142 is embedded in the lining 2; the tunnel air heat exchange pipe 5143 is arranged on the surface of the lining 2 close to the tunnel; the tunnel heat exchange pipe 514 is used to extract heat from the surrounding rock 12 in the middle section of the tunnel and the air in the tunnel.
[0069] Example 5
[0070] like Figure 7 As shown, the difference between this embodiment and embodiment 1 is that when installing the tunnel entrance heating device 3, the lining 2 of some tunnels is relatively thin, and drilling holes in the lining 2 to install expansion bolts or self-tapping screws may cause the structural strength of the lining 2 to decrease. Therefore, this embodiment adopts a prefabricated assembled arch truss as the supporting and fixing structure 33 of the tunnel entrance heating device 3, and fixes the heating pipe 31 and the lightweight insulation layer 32 on the arch truss, close to the tunnel lining 2.
Claims
1. A cold region tunnel entrance antifreeze device, characterized in that: The invention comprises a tunnel entrance heating device (3) arranged at a tunnel entrance, wherein the tunnel entrance heating device (3) comprises a heating pipe (31), a light insulation layer (32) and a supporting and fixing structure (33); the supporting and fixing structure (33) is used to fix the heating pipe (31) and the light insulation layer (32) on the lining (2) at the tunnel entrance; The heating pipe (31) is connected to a heating system (5), and the heating system (5) comprises a geothermal heating system (51) located in the tunnel and a solar heater (52) located outside the tunnel; The geothermal energy heating system (51) comprises a pile foundation buried pipe (512) or a drilled buried pipe (513) embedded in the surrounding rock (1); the pile foundation buried pipe (512) or the drilled buried pipe (513) is connected to a ground source heat pump (511), and the ground source heat pump (511) is connected to a heating pipe (31); A heat exchange device is provided between the ground source heat pump (511) and the heating pipe (31), and the heat exchange device is connected to the solar heater (52).
2. The cold region tunnel entrance antifreeze device according to claim 1, characterized in that: The heating pipe (31) comprises an inflow section (311), a branch section (312) and a return section (313) which are connected in sequence; the inflow section (311) is connected to the output end of the heat exchange device; and the return section (313) is connected to the input end of the heat exchange device.
3. The cold region tunnel entrance antifreeze device according to claim 1, characterized in that: The geothermal energy heating system (51) further comprises a tunnel heat exchange pipe (514) connected to the lining (2), and the tunnel heat exchange pipe (514) is connected to the ground source heat pump (511); the tunnel heat exchange pipe (514) is a lining inner wall attached pipe (5141), a lining inner buried pipe (5142) or a tunnel air heat exchange pipe (5143); the lining inner wall attached pipe (5141) is embedded between the lining (2) and the surrounding rock (1); the lining inner buried pipe (5142) is embedded in the lining (2); the tunnel air heat exchange pipe (5143) is arranged on the surface of the lining (2) close to the tunnel; the tunnel heat exchange pipe (514) is used to extract heat from the surrounding rock (12) in the middle section of the tunnel and the air in the tunnel.
4. The cold region tunnel entrance antifreeze device according to claim 1, characterized in that: The heating tube (31) is filled with a heat exchange medium (42), and the heat exchange medium (42) is a liquid medium that is easily vaporized after being heated and decompressed.
5. The cold region tunnel entrance antifreeze device according to claim 4, characterized in that: The heat exchange medium (42) is methanol, ethanol or ether.
6. A construction method for the cold region tunnel entrance antifreeze device according to any one of claims 1 to 5, characterized in that: The specific steps include: S1: Collect and collect data on the lighting conditions in the area where the tunnel is located, geothermal resources in the tunnel and the surrounding area, and determine the design parameters of the heating device, the design parameters including the distance between the branch pipe and the lining (2), the thickness of the insulation layer, the thermal conductivity of the insulation layer, and the heating rate of the heating system (5); S2: installing a solar heater (52) outside the tunnel to absorb solar energy; arranging the number and position of the pile foundation buried pipe (512), the drilled hole buried pipe (513) and the heat exchange pipe in the tunnel according to the design parameters, installing a ground source heat pump (511) in the tunnel, and connecting the pile foundation buried pipe (512), the drilled hole buried pipe (513) and the heat exchange pipe in the tunnel to the ground source heat pump (511); S3: Installing the tunnel entrance heating device (3), fixing the heating pipe (31) and the light insulation layer (32) on the lining (2) at the tunnel entrance; S4: placing the heat exchange device (41) at a position lower than the reflux section (313), connecting the heat exchange device (41) to the inflow section (311) and the reflux section (313) of the heating pipe (31), and allowing the heat exchange medium (42) in the reflux section (313) to flow back to the heat exchange device (41) through the pipeline; S5: connecting the solar heater (52) and the ground source heat pump (511) to the heat exchange device (41) respectively; S6: Construction is completed, and a heat exchange medium (42) is added to the heating chamber (411), and the heat exchange medium (42) is heated by solar energy and geothermal energy.
7. The construction method of the cold region tunnel entrance antifreeze device according to claim 6 is characterized in that: The relationship between the heating system design parameters and the tunnel construction parameters is: T wy =0.055+1.16h cq +0.384l+0.335h bw +3.24k bw +0.149T sd +0.095W; Among them, T wy The proposed rock temperature at the tunnel entrance after 180 days of freezing; h cq is the lining thickness; l is the distance between the branch pipe and the lining; h bw is the thickness of the insulation layer; k bw is the thermal conductivity of the insulation layer; T sd is the average temperature in the tunnel during the 180-day freezing period; W is the heating rate of the heating system; The calculation formula for the heating rate of the heating system is: Among them, T lr is the inflow section temperature, T jy is the medium liquefaction temperature, ρ jq is the density of the medium gas, S is the cross section of the branch section, Q jq When the medium is gas, v jq When the medium is gas, T hl is the reflux temperature, ρ jy When the medium is liquid, Q jy When the medium is liquid, v jy is the flow rate when the medium is liquid, δ is the phase change enthalpy of the medium, S cq is the lining area at the tributary section.