UPS (Uninterrupted Power Supply) test circuit and device

By connecting the output end of the UPS module to be tested in the UPS test circuit, and making the target UPS module work in the self-aging mode, returning the power to the power grid, the problem of excessive energy consumption during UPS testing is solved, and the realization is achieved Low-energy testing in scenarios ensures the accuracy and safety of test results.

CN119087282AActive Publication Date: 2024-12-06ZHANGZHOU KEHUA ELECTRIC TECH CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411043468.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2024-12-06
Estimated Expiration
2044-07-31

AI Technical Summary

Technical Problem

The use of fake load during UPS testing results in excessive energy consumption, and the existing technology cannot meet the testing needs of real UPS working scenarios.

Method used

A UPS test circuit is designed. By connecting the output end of the UPS module to be tested, the target UPS module is operated in the self-aging mode, the input power is returned to the grid through bypass, thereby reducing the intake of grid power. , achieve energy-saving effects and meet the testing requirements of real UPS working scenarios.

Benefits of technology

It effectively reduces the energy consumption during UPS testing and ensures that the test results are consistent with the real UPS working scenario, avoids interference with the power grid electrical signals, and improves test efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119087282A_ABST
    Figure CN119087282A_ABST
Patent Text Reader

Abstract

The invention provides a UPS (Uninterrupted Power Supply) test circuit and device. The UPS test circuit comprises a to-be-tested UPS module and a target UPS module. The input end of the UPS module to be tested is connected with a power grid; the output end of the UPS module to be tested is connected with the input end of the target UPS module, and the bypass of the target UPS module is connected with the input end of the UPS module to be tested; the target UPS module works in a self-aging mode; the UPS module to be tested works in a power supply mode; and the target UPS module is used as a load of the UPS module to be tested to test the UPS module to be tested. According to the method, the target UPS module can be used as the load of the UPS module to be tested, and the electric energy is returned to the power grid through the bypass, so that the intake of the electric energy of the power grid during the UPS test is reduced, and the energy-saving effect is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of uninterruptible power supply, and in particular to a UPS test circuit and device. Background Art

[0002] UPS (Uninterruptible Power System) is a constant voltage and frequency uninterruptible power supply with an energy storage device and an inverter as its main component. It is mainly used to provide uninterrupted power supply to a single computer, computer network system or other power electronic equipment. When the grid input is normal, UPS stabilizes the grid voltage and supplies it to the load; when the grid is interrupted, UPS immediately uses the power of the battery in the machine to continue to supply 220V AC to the load through inverter conversion, so that the load can maintain normal operation. UPS is becoming more and more popular among users due to its uninterruptible power supply characteristics.

[0003] In order to ensure the product quality of UPS, the UPS needs to be tested at full load before leaving the factory. During the test, a dummy load is usually used to test the UPS, but this method will cause the problem of excessive energy consumption. Summary of the invention

[0004] The embodiment of the present invention provides a UPS test circuit and device to solve the problem of excessive energy consumption caused by using a dummy load during UPS testing in the prior art.

[0005] In a first aspect, an embodiment of the present invention provides a UPS test circuit, comprising:

[0006] UPS module to be tested and target UPS module;

[0007] The input end of the UPS module to be tested is connected to the power grid;

[0008] The output terminal of the UPS module to be tested is connected to the input terminal of the target UPS module, and the bypass of the target UPS module is connected to the input terminal of the UPS module to be tested;

[0009] The target UPS module operates in a self-aging mode; the UPS module to be tested operates in a power supply mode; the target UPS module acts as a load of the UPS module to be tested to test the UPS module to be tested.

[0010] In a possible implementation, the UPS test circuit further includes a load device;

[0011] The load device is connected to the output terminal of the UPS module to be tested.

[0012] In a possible implementation, the UPS module to be tested includes a first bypass relay, a first bypass unit and a first main power unit;

[0013] The first main power unit includes a first inverter circuit and a first rectifier circuit;

[0014] The AC end of the first rectifier circuit is connected to the power grid, and the DC end of the first rectifier circuit is connected to the DC end of the first inverter circuit;

[0015] A first end of the first bypass relay is connected to the power grid, a second end of the first bypass relay is connected to a first end of the first bypass unit, and a second end of the first bypass unit is connected to an AC end of the first inverter circuit;

[0016] The first bypass relay is closed.

[0017] In a possible implementation, the target UPS module includes a second bypass relay, a second main circuit output relay, a second bypass unit, and a second main power unit;

[0018] The input end of the target UPS module is connected to the first end of the second main power unit, the second end of the second main power unit is connected to the first end of the second main circuit output relay, and the second end of the second main circuit output relay is the output end of the target UPS module;

[0019] The first end of the second bypass relay is connected to the input end of the UPS module to be tested, the second end of the second bypass relay is connected to the first end of the second bypass unit, and the second end of the second bypass unit is connected to the first end of the second main circuit output relay;

[0020] The first bypass relay is closed; the second main circuit relay is opened.

[0021] In a possible implementation manner, the load device is an adjustable resistive load.

[0022] In a possible implementation, the target UPS module includes at least one;

[0023] The input end of each target UPS module is connected to the output end of the UPS module to be tested, and the bypass of each target UPS module is connected to the input end of the UPS module to be tested.

[0024] In a possible implementation, the UPS module to be tested includes at least one;

[0025] The input end of each UPS module to be tested is connected to the power grid, the output end of each UPS module to be tested is connected to the input end of the target UPS module, and the bypass of the target UPS module is connected to the input end of each UPS module to be tested.

[0026] In a possible implementation, the second main power unit includes a second inverter circuit and a second rectifier circuit;

[0027] The AC end of the second rectifier circuit is the first end of the second main power unit, the DC end of the second rectifier circuit is connected to the DC end of the second inverter circuit, and the AC end of the second inverter circuit is the second end of the second main power unit.

[0028] In a second aspect, an embodiment of the present invention provides a UPS testing device, including a controller and a UPS testing circuit as described in the first aspect above;

[0029] The controller is used to control the operation of the UPS test circuit.

[0030] In a possible implementation, the controller is further configured to calculate and display power characteristic parameters of the UPS module to be tested.

[0031] The embodiment of the present invention provides a UPS test circuit and device, the UPS test circuit includes a UPS module to be tested and a target UPS module; the input end of the UPS module to be tested is connected to the power grid; the output end of the UPS module to be tested is connected to the input end of the target UPS module, and the bypass of the target UPS module is connected to the input end of the UPS module to be tested; the target UPS module works in a self-aging mode; the UPS module to be tested works in a power supply mode; the target UPS module acts as a load of the UPS module to be tested to test the UPS module to be tested. The above method can use the target UPS module as the load of the UPS module to be tested, and return the electric energy to the power grid through the bypass, thereby reducing the intake of power grid electric energy during UPS testing, and achieving energy saving effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0033] Figure 1 is a structural schematic diagram of a UPS test circuit provided by an embodiment of the present invention;

[0034] Figure 2is a specific circuit diagram of a UPS test circuit provided by an embodiment of the present invention;

[0035] Figure 3 is another specific circuit diagram of a UPS test circuit provided by an embodiment of the present invention;

[0036] Figure 4 This is another specific circuit diagram of the UPS test circuit provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0037] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present invention. However, it should be clear to those skilled in the art that the present invention may be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present invention.

[0038] In order to make the purpose, technical solutions and advantages of the present invention more clear, specific embodiments will be described below in conjunction with the accompanying drawings.

[0039] In the prior art, when a UPS is fully loaded, a dummy load of the same size as the rated power of the UPS is usually required to participate in the test. The dummy load is usually a resistive load, and the electric energy is consumed after being input into the dummy load. The UPS usually needs to be tested when it leaves the factory. As the output of UPS increases, the energy consumed by UPS testing will be very large. In order to reduce energy consumption, some people currently use the self-aging function of the UPS module to be tested to test the UPS to be tested, and return the electric energy input into the UPS module to be tested to the grid through a bypass. In this way, energy loss can be greatly reduced. However, since the UPS module to be tested uses its own bypass to return electric energy, its output power is zero and its output power factor is also zero. Therefore, this method cannot meet the actual UPS working scenario and the test effect is not good.

[0040] In order to solve the problem of high energy consumption during UPS testing and meet the testing requirements of real UPS working scenarios, this embodiment provides a UPS testing circuit. In the UPS testing circuit, the output end of the UPS module to be tested is connected to the target UPS module, the target UPS module is regarded as the load of the UPS module to be tested, and the target UPS module is controlled to work in a self-aging mode, and the power input to the target UPS module is returned to the power grid through the bypass, so as to reduce the energy consumption of the UPS test under the premise of simulating the real UPS working scenario.

[0041] The following is a detailed description of the specific structure of the UPS test circuit. Specifically, Figure 1 Schematic diagram of the structure of the UPS test circuit provided by the embodiment of the present invention. Figure 1 As shown, the UPS test circuit includes:

[0042] A UPS module to be tested 100 and a target UPS module 200;

[0043] The input terminal In1 of the UPS module 100 to be tested is connected to the power grid;

[0044] The output terminal Out1 of the UPS module 100 to be tested is connected to the input terminal In2 of the target UPS module 200, and the bypass bypass2 of the target UPS module 200 is connected to the input terminal In1 of the UPS module 100 to be tested;

[0045] The target UPS module 200 operates in a self-aging mode; the UPS module to be tested 100 operates in a power supply mode; the target UPS module acts as a load of the UPS module to be tested to test the UPS module to be tested.

[0046] The UPS test involved in this embodiment is mainly a performance test, including the test of input parameters, output parameters, rated operating parameters, current imbalance and other performance parameters. The UPS module includes a main power unit and a bypass unit. When the UPS module is normal, the power grid is converted by the main power module to supply power to the load. When the UPS module fails or is under maintenance, the power grid is directly transmitted to the load through the bypass unit to supply power to the load.

[0047] Specifically, the UPS module 100 to be tested is set to work in the power supply mode during the test, and the power grid outputs to the target UPS module 200 through its main power unit. The target UPS module 200 works in the self-aging mode. After obtaining the electric energy transmitted by the UPS module 100 to be tested, it passes through the main power unit and then returns to the power grid through the bypass unit. In the self-aging mode, the inverter in the main power unit of the target UPS module 200 tracks the voltage amplitude, phase, and frequency of its bypass unit, and converts the UPS inverter from the traditional voltage source mode to the current source mode, which is fed back to the front-end power grid through the bypass, thereby reducing the loss of electric energy on the basis of realizing the UPS full load test, and making the voltage amplitude, phase and frequency of the electric signal returned to the power grid from the bypass consistent with the electric signal of the power grid, thereby avoiding interference with the electric signal of the power grid.

[0048] In this embodiment, compared with the method of using the bypass unit of the UPS module 100 under test for self-aging, an additional target UPS module 200 is used as the load of the UPS module 100 under test, which can ensure that the output power of the UPS module 100 under test is not zero, so that the system efficiency of the UPS module 100 under test meets the test requirements of the actual application scenario.

[0049] In one possible implementation, Figure 2 FIG. 4 shows a specific structural diagram of a UPS test circuit provided in this embodiment. Figure 2 As shown, the UPS test circuit further includes a load device 300;

[0050] The load device 300 is connected to the output terminal Out1 of the UPS module 100 to be tested.

[0051] In this embodiment, the UPS test circuit also includes a load device 300. When using the UPS test device provided by this embodiment, a smaller load device 300 can be selected to avoid the problem of large power consumption when a large load device 300 is selected for UPS testing. At the same time, in order to ensure that the output power factor of the UPS module 100 to be tested meets the requirements of the actual application scenario, it is still necessary to set the load device 300 to consume the power output by the UPS module 100 to be tested.

[0052] In a possible implementation, the load device 300 is a resistive load.

[0053] In this embodiment, the load device 300 may be a load that is a mixture of a resistive load and a capacitive load, a load that is a mixture of a resistive load and an inductive load, or a load that is a mixture of a resistive load, a capacitive load, and an inductive load.

[0054] In a possible implementation manner, the resistive load is an adjustable resistive load.

[0055] In this embodiment, the resistive load includes multiple resistive load units, each resistive load unit is connected in parallel, and each resistive load unit includes a resistor and a switch connected in series. The user can determine the number of closed resistive load units based on the required size of the resistive load.

[0056] In this embodiment, the load device 300 may also include an adjustable resistive and inductive mixed load. In this case, the load device 300 includes a plurality of load units, each of which is connected in parallel, and each of which includes a switch, a resistor, and an inductor connected in series.

[0057] In this embodiment, the resistive load may also be an adjustable resistor.

[0058] Specifically, the target UPS module 200 and the load device 300 are combined to consume the electric energy of the UPS module 100 to be tested, which can not only avoid excessive consumption of grid electric energy and achieve energy saving effect, but also realize the diversion of the output power of the UPS module 100 to be tested, so as to avoid the bundle of wires and eliminate the potential safety hazards caused by the heating of wires.

[0059] In one possible implementation, Figure 2As shown, the UPS module 100 to be tested includes a first bypass relay K b1 , a first bypass unit 130 and a first main power unit;

[0060] The first main power unit includes a first inverter circuit 120 and a first rectifier circuit 110;

[0061] The AC end of the first rectifier circuit 110 is connected to the power grid, and the DC end of the first rectifier circuit 110 is connected to the DC end of the first inverter circuit 120;

[0062] The first bypass relay K b1 The first end of the first bypass relay K is connected to the power grid. b1 The second end of is connected to the first end of the first bypass unit 130, and the second end of the first bypass unit 130 is connected to the AC end of the first inverter circuit 120;

[0063] The first bypass relay K b1 closure.

[0064] In this embodiment, the first main power unit may include a first inverter circuit 120 and a first rectifier circuit 110; the UPS module to be tested 100 includes a first main circuit output relay K o1 And the first main circuit input relay K i1 .

[0065] Specifically, the first main circuit input relay K i1 The first end is connected to the grid, and the first main circuit input relay K i1 The second end of is connected to the AC end of the first rectifier circuit 110, the DC end of the first rectifier circuit 110 is connected to the DC end of the first inverter circuit 120, and the AC end of the first inverter circuit 120 is connected to the first main circuit output relay K o1 The first end of the first main circuit output relay K o1 The second end of is the output end Out1 of the UPS module 100 to be tested. b1 The first end of the UPS module 100 to be tested is the bypass terminal bypass1, which is used to connect to the power grid. The first bypass relay K b1 The second end of the first bypass unit 130 is connected to the first end of the first bypass unit 130, and the second end of the first bypass unit 130 is connected to the AC end of the first inverter unit. The UPS module 100 to be tested may also include a first battery module and a first DCDC module, wherein one end of the first DCDC module is connected to the DC end of the first rectifier circuit 110, and the other end is connected to the first battery module.

[0066] In this embodiment, the UPS module 100 to be tested is operated in a power supply state during the test. In the power supply state, the first main circuit input relay K i1 And the first main circuit output relay K o1 The first bypass relay K is closed to allow the power grid to be output after passing through the first rectifier circuit 110 and the first inverter circuit 120. In order to make the power unit in the first main circuit track the voltage amplitude, phase and frequency of the power grid, the first bypass relay K is controlled in this embodiment. b1 closure.

[0067] In one possible implementation, Figure 2 As shown, the target UPS module 200 includes a second bypass relay K b2 , Second main circuit output relay K o2 , a second bypass unit 230 and a second main power unit;

[0068] The input terminal In2 of the target UPS module 200 is connected to the first terminal of the second main power unit, and the second terminal of the second main power unit is connected to the second main circuit output relay K o2 The first end of the second main circuit output relay K o2 The second end is the output end of the target UPS module 200;

[0069] The second bypass relay K b2 The first end of the second bypass relay K is connected to the input end In1 of the UPS module 100 to be tested, and the second bypass relay K b2 The second end of the second bypass unit 230 is connected to the first end of the second bypass unit 230, and the second end of the second bypass unit 230 is connected to the second main circuit output relay K o2 A first end is connected;

[0070] The first bypass relay K b1 Close; the second main circuit output relay K o2 disconnect.

[0071] In this embodiment, the second main power unit may include a second inverter circuit 220 and a second rectifier circuit 210; the target UPS module 200 includes a second main circuit output relay Ko2 and a second main circuit input relay Ki2.

[0072] Specifically, the second main circuit input relay K i2 The first end is the input end In2 of the target UPS module 200, and the second main circuit input relay K i2 The second end of the second rectifier circuit 210 is connected to the AC end of the second rectifier circuit 210, the DC end of the second rectifier circuit 210 is connected to the DC end of the second inverter circuit 220, and the AC end of the second inverter circuit 220 is connected to the second main circuit output relay Ko2 The first end of the second main circuit output relay K o2 The second end of the bypass relay K is the output end of the target UPS module 200. b2 The first end is the bypass end, and the second bypass relay K b2 The second end of the second bypass unit 230 is connected to the first end of the second bypass unit 230, and the second end of the second bypass unit 230 is connected to the AC end of the second inverter circuit 220. The target UPS module 200 may also include a second battery module and a second DCDC module, wherein one end of the second DCDC module is connected to the DC end of the second rectifier circuit, and the other end is connected to the second battery module.

[0073] In this embodiment, when the UPS module 100 to be tested is tested, the input terminal In2 of the target UPS module 200 is connected to the output terminal Out1 of the UPS module 100 to be tested, the bypass bypass2 terminal of the target UPS module 200 is connected to the input terminal In1 of the UPS module 100 to be tested, and the second bypass relay K of the target UPS module 200 is connected to the output terminal Out1 of the UPS module 100 to be tested. b2 Close, the second main circuit input relay K i2 Close, the second main circuit output relay K o2 Disconnect, and the target UPS works in the self-aging mode. In this way, the output power of the UPS module 100 to be tested is transmitted to the target UPS module 200, and the output power passes through the second rectifier circuit 210 and the second inverter circuit 220 of the target UPS module 200, and then returns to the power grid through the second bypass unit 230. In the whole process, the main power units of the UPS module 100 to be tested and the target UPS module 200 track the voltage amplitude, phase and frequency of the bypass, that is, track the voltage amplitude, phase and frequency of the power grid, so the voltage amplitude, phase and frequency of the electrical signal returned to the power grid are consistent with the power grid, thereby realizing the recycling and reuse of the power grid and saving energy consumption.

[0074] In one possible implementation, Figure 3 As shown, the target UPS module 200 includes at least one; the input end of each target UPS module 200 is connected to the output end of the UPS module 100 to be tested, and the bypass of each target UPS module 200 is connected to the input end of the UPS module 100 to be tested.

[0075] In this embodiment, if a single target UPS module 200 cannot meet the load demand of the UPS module 100 to be tested, multiple target UPS modules 200 can be connected to the output end Out1 of the UPS module 100 to be tested, and the switch state inside each target UPS module 200 and the connection relationship with the UPS module 100 to be tested are the same as those of a single target UPS module 200.

[0076] The above method can avoid the problem of insufficient power of the target UPS module 200, and distribute the load of the UPS module 100 to be tested to multiple target UPS modules 200, which can disperse the wiring harness between the UPS module 100 to be tested and the target UPS module 200, reduce the heat generated by the clustering of the wiring harness, and ensure the safety of the UPS testing process.

[0077] In one possible implementation, Figure 4 As shown, the UPS module to be tested includes at least one;

[0078] The input end of each UPS module 100 under test is connected to the power grid, the output end of each UPS module 100 under test is connected to the input end of the target UPS module 200, and the bypass of the target UPS module 200 is connected to the input end of each UPS module 100 under test.

[0079] In this embodiment, if the load demand of the UPS module 100 to be tested is small and the rated power of the target UPS module 200 is large, the target UPS module 200 can be used as the load of multiple UPS modules 100 to be tested at the same time, thereby simultaneously testing multiple UPS modules to be tested and improving the test efficiency of the UPS modules to be tested.

[0080] In a possible implementation, the second main power unit includes a second inverter circuit 220 and a second rectifier circuit 210;

[0081] The AC end of the second rectifier circuit 210 is the first end of the second main power unit, the DC end of the second rectifier circuit 210 is connected to the DC end of the second inverter circuit 220, and the AC end of the second inverter circuit 220 is the second end of the second main power unit.

[0082] An embodiment of the present invention provides a UPS testing device, including a controller and the UPS testing circuit as described above;

[0083] The controller is used to control the operation of the UPS test circuit.

[0084] In this embodiment, the controller is used to control the working mode of the UPS module 100 to enter the power supply mode, control the working mode of the target UPS to enter the self-aging mode, and control the first main circuit input relay K i1 , Second main circuit input relay K i2 And the first main circuit output relay K o1 Close to control the second main circuit output relay K o2 Disconnect, control the first bypass relay K b1 And the second bypass relay K b2Close the UPS module 100 so that the UPS testing device can test the UPS module 100 to be tested.

[0085] Furthermore, the controller may also determine the load units in the load device 300 that need to be closed according to the load power set by the user, and control the switches of the corresponding load units to be closed, and the switches of other load units to be opened.

[0086] In a possible implementation, the controller is further configured to calculate and display power characteristic parameters of the UPS module 100 to be tested.

[0087] In this embodiment, the power characteristic parameters include voltage, current, input power, output power, output power factor, energy loss, etc. The UPS test circuit also includes a voltage acquisition module and a current acquisition module. The voltage acquisition module includes a first input voltage acquisition unit, a first output voltage acquisition unit, a second input voltage acquisition unit, and a second output voltage acquisition unit. The current acquisition module includes a first input current acquisition unit, a first output current acquisition unit, a second input current acquisition unit, and a second output current acquisition unit. The controller can obtain the input voltage of the UPS module 100 to be tested collected by the first input voltage acquisition unit, obtain the input current of the UPS module 100 to be tested collected by the first input current acquisition unit, obtain the output voltage of the UPS module 100 to be tested collected by the first output voltage acquisition unit, and obtain the output current of the UPS module 100 to be tested collected by the first output voltage acquisition unit. The controller obtains the input power of the UPS module 100 under test when it is fully loaded based on the input voltage and input current under full load, obtains the output power of the UPS module 100 under test when it is fully loaded based on the output voltage and output current under full load, obtains the energy loss based on the input power and output power of the UPS module 100 under test when it is fully loaded, and can also obtain the output power factor of the UPS module 100 under test when it is fully loaded based on the apparent power and active power of the UPS under test.

[0088] In this embodiment, the UPS testing device may further include a display screen, and the power characteristic parameters of the UPS module 100 to be tested may be displayed on the display screen.

[0089] Specifically, the controller may also acquire the input voltage of the target UPS module 200 acquired by the second input voltage acquisition unit, acquire the input current of the target UPS module 200 acquired by the second input current acquisition unit, acquire the output voltage of the target UPS module 200 acquired by the second output voltage acquisition unit, and acquire the output current of the target UPS module 200 acquired by the second output current acquisition unit. The controller obtains the input power of the target UPS module 200 based on the input voltage and the input current, and obtains the output power of the target UPS module 200 based on the output voltage and the output current.

[0090] In this embodiment, the controller can also obtain the switch status of each load unit in the load device 300, determine the current load of the load device 300 based on the switch status of each load unit, and display the current load on the display screen for user reference.

[0091] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example" or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, unless they are contradictory.

[0092] The embodiments described above are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention, and should all be included in the protection scope of the present invention.

Claims

1. A UPS test circuit, It is characterized in that include: UPS module to be tested and target UPS module; The input end of the UPS module to be tested is connected to the power grid; The output terminal of the UPS module to be tested is connected to the input terminal of the target UPS module, and the bypass of the target UPS module is connected to the input terminal of the UPS module to be tested; The target UPS module operates in a self-aging mode; the UPS module to be tested operates in a power supply mode; the target UPS module acts as a load of the UPS module to be tested to test the UPS module to be tested.

2. The UPS test circuit according to claim 1, It is characterized in that The UPS test circuit also includes a load device; The load device is connected to the output terminal of the UPS module to be tested.

3. The UPS test circuit according to claim 1, It is characterized in that The UPS module to be tested includes a first bypass relay, a first bypass unit and a first main power unit; The first main power unit includes a first inverter circuit and a first rectifier circuit; The AC end of the first rectifier circuit is connected to the power grid, and the DC end of the first rectifier circuit is connected to the DC end of the first inverter circuit; A first end of the first bypass relay is connected to the power grid, a second end of the first bypass relay is connected to a first end of the first bypass unit, and a second end of the first bypass unit is connected to an AC end of the first inverter circuit; The first bypass relay is closed.

4. The UPS test circuit according to claim 1, It is characterized in that The target UPS module includes a second bypass relay, a second main circuit output relay, a second bypass unit and a second main power unit; The input end of the target UPS module is connected to the first end of the second main power unit, the second end of the second main power unit is connected to the first end of the second main circuit output relay, and the second end of the second main circuit output relay is the output end of the target UPS module; The first end of the second bypass relay is connected to the input end of the UPS module to be tested, the second end of the second bypass relay is connected to the first end of the second bypass unit, and the second end of the second bypass unit is connected to the first end of the second main circuit output relay; The first bypass relay is closed; The second main circuit relay is disconnected.

5. The UPS test circuit according to claim 2, It is characterized in that The load device is an adjustable resistive load.

6. The UPS test circuit according to claim 1, It is characterized in that The target UPS module includes at least one; The input end of each target UPS module is connected to the output end of the UPS module to be tested, and the bypass of each target UPS module is connected to the input end of the UPS module to be tested.

7. The UPS test circuit according to claim 1, It is characterized in that The UPS module to be tested includes at least one; The input end of each UPS module to be tested is connected to the power grid, the output end of each UPS module to be tested is connected to the input end of the target UPS module, and the bypass of the target UPS module is connected to the input end of each UPS module to be tested.

8. The UPS test circuit according to claim 2, It is characterized in that The second main power unit includes a second inverter circuit and a second rectifier circuit; The AC end of the second rectifier circuit is the first end of the second main power unit, the DC end of the second rectifier circuit is connected to the DC end of the second inverter circuit, and the AC end of the second inverter circuit is the second end of the second main power unit.

9. A UPS testing device, It is characterized in that A UPS test circuit comprising a controller and a UPS test circuit as claimed in any one of claims 1 to 7; The controller is used to control the operation of the UPS test circuit.

10. The UPS testing device according to claim 9, It is characterized in that The controller is also used to calculate and display the power characteristic parameters of the UPS module to be tested.

Citation Information

Patent Citations

  • Self-feedback ageing soft start method and system for UPS power supply

    CN101931248A

  • UPS control method, UPS control device and UPS

    CN110854992A

  • High-power H-bridge power unit full-load test method and circuit

    CN114509627A

  • Novel UPS battery off -line and discharge test system

    CN205982580U

  • UPS aging testing topological structure and topological network

    CN206378576U