Interval entropy-based power grid evaluation method and system

By introducing interval entropy and accelerated genetic algorithms in the grid evaluation, the problems of inefficiency and insufficient accuracy of traditional methods are solved, and accurate and efficient evaluation of grid performance is achieved, and technical support for grid optimization and management is provided.

CN119090115APending Publication Date: 2024-12-06GUIZHOU POWER GRID CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410981491.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

Traditional grid evaluation methods are inefficient in computing and insufficient accuracy when dealing with complex and multi-attribute decision-making problems, and cannot fully reflect the actual status of the power grid.

Method used

The grid evaluation method based on interval entropy is adopted, combined with accelerated genetic algorithm and data preprocessing technology, the interval entropy of the evaluation index is calculated, and the evaluation model is optimized to improve the accuracy and efficiency of the evaluation.

Benefits of technology

It realizes accurate and efficient evaluation of power grid performance and stability, improves the efficiency of handling complex decision-making problems, and provides technical support for the continuous optimization and management of power grids.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119090115A_ABST
    Figure CN119090115A_ABST
Patent Text Reader

Abstract

The invention discloses a power grid evaluation method and system based on interval entropy, and relates to the technical field of power system analysis and evaluation, and the method comprises the steps: collecting power grid data, and carrying out the preprocessing of the original data of a power grid; constructing an evaluation model, and optimizing and solving the evaluation model by using an accelerated genetic algorithm; calculating an interval entropy of the evaluation index according to the evaluation model; and obtaining an evaluation result and corresponding measures according to the optimization result and the interval entropy. According to the method, the interval entropy and the accelerated genetic algorithm are combined, so that accurate and efficient evaluation of the power grid is realized. The method not only improves the accuracy of evaluation, but also optimizes the efficiency of processing complex and multi-attribute decision-making problems, and provides powerful technical support for continuous optimization and management of a power grid.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power system analysis and evaluation, and in particular to a power grid evaluation method and system based on interval entropy. Background Art

[0002] As the complexity and scale of power systems continue to grow, the evaluation and analysis of power grids has become increasingly important. Traditional power grid evaluation methods are mainly based on experience and qualitative analysis, which have limitations in dealing with complex, multi-attribute decision-making problems. In order to more accurately and comprehensively evaluate the performance and stability of power grids, researchers have introduced a variety of mathematical models and algorithms.

[0003] Among them, genetic algorithm, as a global optimization method, is widely used in power grid assessment due to its superior performance in dealing with complex optimization problems. However, traditional genetic algorithms often require a long computing time and large computing resources when facing large-scale power grid assessment problems. In addition, the evaluation results obtained by relying solely on genetic algorithms may lack sufficient information and cannot fully reflect the actual status of the power grid.

[0004] In order to solve the above problems, researchers have tried to introduce the concept of information entropy to enhance the amount of information in power grid assessment. As an indicator of information uncertainty, information entropy can provide more details and depth for power grid assessment. However, how to accurately calculate and apply information entropy remains a challenge.

[0005] Therefore, there is an urgent need for a new power grid assessment method that can combine the global optimization capability of genetic algorithms and the information entropy’s ability to measure the amount of information in order to more accurately and efficiently assess the performance and stability of the power grid. Summary of the invention

[0006] In view of the above-mentioned problems, the present invention is proposed.

[0007] Therefore, the technical problem solved by the present invention is: how to ensure the computational efficiency and accuracy of the evaluation method when dealing with complex, multi-attribute power grid evaluation decision problems.

[0008] In order to solve the above technical problems, the present invention provides the following technical solution: a power grid evaluation method based on interval entropy, which comprises the following steps:

[0009] Collect power grid data and pre-process the raw data; build an evaluation model and use the accelerated genetic algorithm to optimize the evaluation model; calculate the interval entropy of the evaluation index based on the evaluation model; derive the evaluation results and corresponding measures based on the optimization results and interval entropy.

[0010] As a preferred scheme of the interval entropy-based power grid assessment method described in the present invention, the power grid data includes power load data, power grid operating parameters, fault and maintenance records, weather and environmental data, energy supply data, user power consumption patterns and behavior data, and power grid security and protection system data.

[0011] As a preferred scheme of the power grid assessment method based on interval entropy described in the present invention, the preprocessing includes dimensionless processing of principle data, calculation of feature weights, calculation of entropy values, calculation of difference coefficients, determination of entropy weights, and calculation of comprehensive assessment values ​​of each assessment object.

[0012] After dimensionless processing, determine whether the data is correctly normalized. If it is correctly normalized, calculate the feature weights. If it is not correctly normalized, check min(x j )、max(x j ) Whether there are outliers, if there are outliers, delete them, if there are no outliers, determine whether the dimensionless data falls into the correct interval, if it does not fall into the correct interval, adjust the interval, after adjusting the interval, re-dimensionalize, and check whether the normalized data meets expectations. If it meets expectations, calculate the feature weight.

[0013] The calculated feature weight is expressed as,

[0014]

[0015] Among them, p ij It represents the normalized value of the i-th evaluation object under the j-th indicator.

[0016] The calculated entropy value is expressed as,

[0017]

[0018] Among them, e j represents the entropy value of the jth evaluation index, and m represents the total number of evaluation objects.

[0019] The calculated coefficient of variation is expressed as,

[0020] d j =1-e j

[0021] Among them, d j Represents the difference coefficient of the j-th evaluation indicator.

[0022] The computational entropy weight is expressed as,

[0023]

[0024] Among them, w jrepresents the weight of the jth evaluation indicator.

[0025] The comprehensive evaluation value is expressed as,

[0026]

[0027] Among them, v i Represents the comprehensive evaluation value of the i-th evaluation object.

[0028] As a preferred solution of the power grid assessment method based on interval entropy described in the present invention, the optimization solution of the assessment model using an accelerated genetic algorithm includes initializing the population, evaluating the performance of each individual according to a fitness function, selecting a parent according to the fitness value, using a crossover operation to exchange information between parents, generating offspring, using a mutation operation to introduce random changes in the offspring, and repeatedly evolving until the number of iterations is greater than a preset value or the objective function value reaches a preset value, then the operation ends.

[0029] The fitness value is expressed as,

[0030]

[0031] Among them, α, β, and γ represent weight coefficients, n represents the total number of evaluation indicators, and m represents the total number of evaluation objects.

[0032] As a preferred solution of the power grid evaluation method based on interval entropy described in the present invention, wherein: the interval entropy of the evaluation index is expressed as:

[0033]

[0034] Among them, λ represents the power demand of the evaluation object at different times, σ represents the standard deviation, ρ represents the frequency of power grid failures, τ represents the ability of the power grid to adapt to load and parameter fluctuations, Z represents the normalization parameter, μ represents the average value of the power load, and N represents the total number of days in the evaluation period.

[0035] After calculating the interval entropy of the indicator, determine whether the interval entropy is reasonable. If the interval entropy is unreasonable, determine whether the original data contains outliers or noise. When there are outliers, detect the outliers in the data through IQR. If there are no outliers in the data, it means that there is noise in the data. When there is noise, the original data is cleaned. After data cleaning, recalculate the interval entropy and perform a rationality test. When the interval entropy is reasonable, the weighted fitness value is calculated in combination with the fitness value.

[0036] As a preferred scheme of the power grid assessment method based on interval entropy described in the present invention, wherein: the assessment result obtained based on the optimization result and the interval entropy includes obtaining the fitness value of each assessment object using the optimization result obtained by the accelerated genetic algorithm, and calculating the weighted fitness value of each assessment object based on the fitness value and interval entropy of each assessment object.

[0037] The weighted fitness value of each object is calculated as:

[0038]

[0039] Among them, W i represents the weighted fitness value of the ith object, n and m represent the total number of evaluation indicators and the number of fitness functions, respectively, and w j represents the weight of the jth evaluation indicator, E ij represents the interval entropy value of the i-th evaluation object on the j-th indicator, δ j represents the adjustment coefficient of the jth indicator, α k , β k represents the coefficient of the fitness function, γ ik Represents the value of the i-th evaluation object on the k-th fitness function.

[0040] The evaluation results include: i If W is less than the primary threshold, it means that the power grid performance is poor. i If W is between the first and second thresholds, it means that the power grid performance is good. i Above the secondary threshold, it means that the grid performance is excellent.

[0041] As a preferred solution of the interval entropy-based power grid evaluation method described in the present invention, the corresponding measures include: when the power grid performance is judged to be poor, a comprehensive system inspection and fault diagnosis are carried out, and the problem is identified by introducing advanced diagnostic tools, maintenance and repair are strengthened, and system-level performance tests are regularly carried out, including load testing and capacity assessment, and the power grid design is optimized, such as updating obsolete equipment.

[0042] When grid performance is judged to be good, performance data is analyzed to identify potential areas for improvement, encourage innovation and technological upgrades to further enhance performance, strengthen load management and optimize energy efficiency distribution.

[0043] When the grid performance is judged to be excellent, we will continue to maintain and monitor the high-performance operation of the existing system, explore the integration of advanced technologies and sustainable solutions, implement smart grid technologies including self-healing networks and demand response, and use big data and artificial intelligence for predictive maintenance to prevent potential failures.

[0044] Another object of the present invention is to provide a power grid evaluation system based on interval entropy, which can achieve a comprehensive and in-depth evaluation of the power grid by combining advanced data preprocessing technology, a genetic algorithm optimization module and an interval entropy calculation module, thereby solving the problems of low efficiency and insufficient accuracy of existing evaluation methods when dealing with complex, multi-attribute decision-making problems.

[0045] To solve the above technical problems, the present invention provides the following technical solutions: a power grid evaluation system based on interval entropy, comprising: a data preprocessing module, a genetic algorithm optimization module, an interval entropy calculation module and an evaluation result generation module.

[0046] The data preprocessing module is responsible for processing the original multi-attribute decision-making data.

[0047] The genetic algorithm optimization module is responsible for optimizing and solving the evaluation model using an accelerated genetic algorithm.

[0048] The interval entropy calculation module calculates the interval entropy according to the evaluation index.

[0049] The evaluation result generation module is responsible for combining the optimization result and the interval entropy to output the final evaluation result.

[0050] A computer device comprises a memory and a processor, wherein the memory stores a computer program, and wherein the processor implements the steps of the above-mentioned power grid assessment method based on interval entropy when executing the computer program.

[0051] A computer-readable storage medium having a computer program stored thereon, characterized in that when the computer program is executed by a processor, the steps of the power grid assessment method based on interval entropy as described above are implemented.

[0052] Beneficial effects of the present invention: By combining interval entropy and accelerated genetic algorithm, accurate and efficient evaluation of the power grid is achieved. This method not only improves the accuracy of the evaluation, but also optimizes the efficiency of processing complex, multi-attribute decision-making problems, providing strong technical support for the continuous optimization and management of the power grid. BRIEF DESCRIPTION OF THE DRAWINGS

[0053] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. Among them:

[0054] Figure 1 The overall flow chart of the power grid assessment method based on interval entropy provided for the first embodiment of the present invention.

[0055] Figure 2 The overall framework diagram of the power grid assessment system based on interval entropy provided in the second embodiment of the present invention. DETAILED DESCRIPTION

[0056] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the drawings of the specification. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary persons in the art without creative work should fall within the scope of protection of the present invention.

[0057] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.

[0058] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.

[0059] The present invention is described in detail with reference to schematic diagrams. When describing the embodiments of the present invention, for the sake of convenience, the cross-sectional diagrams showing the device structure will not be partially enlarged according to the general scale, and the schematic diagrams are only examples, which should not limit the scope of protection of the present invention. In addition, in actual production, the three-dimensional dimensions of length, width and depth should be included.

[0060] At the same time, in the description of the present invention, it should be noted that the directions or positional relationships indicated by the terms "upper, lower, inner and outer" are based on the directions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first, second or third" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0061] In the present invention, unless otherwise clearly specified and limited, the terms "install, connect, connect" should be understood in a broad sense, for example: it can be a fixed connection, a detachable connection or an integral connection; it can also be a mechanical connection, an electrical connection or a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0062] Example 1

[0063] Reference Figure 1 , is an embodiment of the present invention, and provides a power grid evaluation method based on interval entropy, characterized in that:

[0064] S1: Collect power grid data and pre-process the raw data.

[0065] Furthermore, grid data includes power load data, grid operating parameters, fault and maintenance records, weather and environmental data, energy supply data, user power usage patterns and behavior data, and grid security and protection system data.

[0066] It needs to be explained that determining the collected power grid data provides direction for the preprocessing of raw data, clarifies the data that need attention, provides a basis for genetic algorithm optimization, provides a structure for the calculation of interval entropy, clarifies the relationship between evaluation objects, and makes the evaluation more targeted.

[0067] S2: Construct an evaluation model and use an accelerated genetic algorithm to optimize the evaluation model.

[0068] Furthermore, the preprocessing includes dimensionless processing of the principle data, calculation of feature weights, calculation of entropy values, calculation of difference coefficients, determination of entropy weights, and calculation of comprehensive evaluation values ​​of each evaluation object.

[0069] First, the original data is dimensionlessly processed in order to convert data of different dimensions, units, and ranges into a unified standard so that the data can be compared on the same scale.

[0070] The dimensionless processing is expressed as,

[0071]

[0072] Among them, X ij represents the value of the i-th evaluation object under the j-th indicator, V ij Indicates the normalized value, min(x j ) represents the minimum value under the jth index, max(x j ) represents the maximum value under the jth index.

[0073] After dimensionless processing, determine whether the data is correctly normalized. If it is correctly normalized, calculate the feature weights. If it is not correctly normalized, check min(x j )、max(x j) Whether there are outliers, if there are outliers, delete them, if there are no outliers, determine whether the dimensionless data falls into the correct interval, if it does not fall into the correct interval, adjust the interval, after adjusting the interval, re-dimensionalize, and check whether the normalized data meets expectations. If it meets expectations, calculate the feature weight.

[0074] After the data is dimensionless, the feature weight of each evaluation indicator is calculated to determine the relative importance of each evaluation indicator in the overall evaluation.

[0075] The feature weight is calculated as,

[0076]

[0077] Among them, p ij It represents the normalized value of the i-th evaluation object under the j-th indicator.

[0078] The entropy value of each evaluation indicator is calculated using the dimensionless data. The entropy value reflects the amount of information of the evaluation indicator, that is, the degree of influence of the change of the indicator on the overall evaluation result.

[0079] The calculated entropy value is expressed as,

[0080]

[0081] Among them, e j represents the entropy value of the jth evaluation index, and m represents the total number of evaluation objects.

[0082] The difference coefficient is further calculated based on the entropy value, which can reflect the degree of difference between various indicators.

[0083] The calculated coefficient of variation is expressed as,

[0084] d j =1-e j

[0085] Among them, d j Represents the difference coefficient of the j-th evaluation indicator.

[0086] The entropy weight of each evaluation indicator is obtained based on the calculated entropy value and difference coefficient. The entropy weight is the weight of the evaluation indicator and determines the role of the indicator in the overall evaluation.

[0087] The calculated entropy weight is expressed as,

[0088]

[0089] Among them, w j represents the weight of the jth evaluation indicator.

[0090] The last step is to combine all the evaluation indicators according to the entropy weight and dimensionless data to give an overall evaluation result for each evaluation object.

[0091] The comprehensive evaluation value is expressed as,

[0092]

[0093] Among them, v i Represents the comprehensive evaluation value of the i-th evaluation object.

[0094] It is further explained that preprocessing focuses on how to process the raw data to make it suitable for subsequent evaluation and analysis. This step provides prepared data and weight information for the optimization of the subsequent evaluation model, provides the necessary input data and evaluation criteria for the genetic algorithm, and ensures the quality of the data.

[0095] S3: Calculate the interval entropy of the evaluation indicator based on the evaluation model.

[0096] It is further necessary to explain that after obtaining the preprocessed data and weight information, an accelerated genetic algorithm is used to optimize the evaluation model to achieve the best evaluation effect.

[0097] Furthermore, the optimization solution of the evaluation model includes initializing the population, evaluating the performance of each individual according to the fitness function, selecting the parent according to the fitness value, using the crossover operation to exchange information between the parents, generating offspring, using the mutation operation to introduce random changes in the offspring, and repeatedly evolving until the number of iterations is greater than the preset value or the objective function value reaches the preset value, then the operation ends.

[0098] The fitness value is expressed as,

[0099]

[0100] Among them, α, β, and γ represent weight coefficients, n represents the total number of evaluation indicators, and m represents the total number of evaluation objects.

[0101] It is important to further expand that when calculating fitness, the sum of all weights is 1.

[0102] The interval entropy of the evaluation index is expressed as,

[0103]

[0104] Among them, λ represents the power demand of the evaluation object at different times, σ represents the standard deviation, ρ represents the frequency of power grid failures, τ represents the ability of the power grid to adapt to load and parameter fluctuations, Z represents the normalization parameter, μ represents the average value of the power load, and N represents the total number of days in the evaluation period.

[0105] After calculating the interval entropy of the indicator, determine whether the interval entropy is reasonable. If the interval entropy is unreasonable, determine whether the original data contains outliers or noise. When there are outliers, detect the outliers in the data through IQR. If there are no outliers in the data, it means that there is noise in the data. When there is noise, the original data is cleaned. After data cleaning, recalculate the interval entropy and perform a rationality test. When the interval entropy is reasonable, the weighted fitness value is calculated in combination with the fitness value.

[0106] S4: Derive evaluation results and corresponding measures based on the optimization results and interval entropy.

[0107] The evaluation result is obtained according to the optimization result and the interval entropy, including obtaining the fitness value of each evaluation object by using the optimization result obtained by the accelerated genetic algorithm, and calculating the weighted fitness value of each evaluation object according to the fitness value and the interval entropy of each evaluation object.

[0108] The weighted fitness value of each object is calculated as:

[0109]

[0110] Among them, W i represents the weighted fitness value of the ith object, n and m represent the total number of evaluation indicators and the number of fitness functions, respectively, and w j represents the weight of the jth evaluation indicator, E ij represents the interval entropy value of the i-th evaluation object on the j-th indicator, δ j represents the adjustment coefficient of the jth indicator, α k , β k represents the coefficient of the fitness function, γ ik Represents the value of the i-th evaluation object on the k-th fitness function.

[0111] The evaluation results include: i If W is less than the primary threshold, it means that the power grid performance is poor. i If W is between the first and second thresholds, it means that the power grid performance is good. i Above the secondary threshold, it means that the grid performance is excellent.

[0112] Corresponding measures include conducting a comprehensive system inspection and fault diagnosis when the grid performance is judged to be poor, identifying the problem through the introduction of advanced diagnostic tools, strengthening maintenance and repairs, regularly conducting system-level performance tests, including load testing and capacity assessment, and optimizing grid design, such as updating obsolete equipment.

[0113] When grid performance is judged to be good, performance data is analyzed to identify potential areas for improvement, encourage innovation and technological upgrades to further enhance performance, strengthen load management and optimize energy efficiency distribution.

[0114] When the grid performance is judged to be excellent, we will continue to maintain and monitor the high-performance operation of the existing system, explore the integration of advanced technologies and sustainable solutions, implement smart grid technologies including self-healing networks and demand response, and use big data and artificial intelligence for predictive maintenance to prevent potential failures.

[0115] Example 2

[0116] Reference Figure 2 , which is an embodiment of the present invention, provides a system for a power grid evaluation method based on interval entropy. The power grid evaluation system based on interval entropy includes a data preprocessing module, a genetic algorithm optimization module, an interval entropy calculation module and an evaluation result generation module.

[0117] The data preprocessing module is responsible for processing the original multi-attribute decision-making data; the genetic algorithm optimization module is responsible for optimizing and solving the evaluation model using the accelerated genetic algorithm; the interval entropy calculation module calculates the interval entropy based on the evaluation index; the evaluation result generation module is responsible for combining the optimization result and the interval entropy to output the final evaluation result.

[0118] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc., which can store program code.

[0119] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in conjunction with such instruction execution systems, devices or apparatuses. For the purposes of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in conjunction with such instruction execution systems, devices or apparatuses.

[0120] More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk case (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), an optical fiber device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be a paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium, followed by editing, deciphering or, if necessary, processing in another suitable manner, and then stored in a computer memory.

[0121] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, a plurality of steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.

[0122] Example 3

[0123] In this embodiment, in order to verify the beneficial effects of the present invention, scientific demonstration is carried out through economic benefit calculation and simulation experiments. A medium-sized power grid is selected as the evaluation object, and the power grid includes 5 main evaluation indicators. The power grid is evaluated using the traditional power grid evaluation method and the interval entropy-based evaluation method of the present invention. The evaluation results obtained by each method are recorded, and their accuracy and efficiency are compared, as shown in Table 1.

[0124] Table 1 Experimental effect comparison chart

[0125]

[0126] It can be seen from Table 1 above that the power supply reliability of the present invention is 90%, which is 15% higher than 75% of the traditional solution, the grid loss of the present invention is 37%, which is 35% lower than 72% of the traditional solution, the equipment status of the present invention is 92%, which is 25% higher than 67% of the traditional solution, the grid capacity and load matching degree of the present invention is 94%, which is 26% higher than 78% of the traditional invention, the grid security of the present invention is 93%, which is 24% higher than 69% of the traditional invention, and the overall evaluation time of the present invention is 85s, which is 45s lower than 130s of the traditional invention.

[0127] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.

Claims

1. A power grid assessment method based on interval entropy, characterized in that: include: Collect power grid data and pre-process the raw data; Construct an evaluation model and use accelerated genetic algorithms to optimize the evaluation model; Calculate the interval entropy of the evaluation index according to the evaluation model; The evaluation results and corresponding measures are obtained based on the optimization results and interval entropy.

2. The power grid assessment method based on interval entropy according to claim 1, characterized in that: The grid data includes power load data, grid operating parameters, fault and maintenance records, weather and environmental data, energy supply data, user power usage patterns and behavior data, and grid security and protection system data.

3. The power grid assessment method based on interval entropy according to claim 2, characterized in that: The pretreatment includes: Non-dimensionalize the principle data, calculate the feature weight, calculate the entropy value, calculate the difference coefficient, determine the entropy weight, and calculate the comprehensive evaluation value of each evaluation object; After dimensionless processing, determine whether the data is correctly normalized. If it is correctly normalized, calculate the feature weights. If it is not correctly normalized, check min(x j )、max(x j ) Whether there are outliers, if there are outliers, delete the outliers, if there are no outliers, determine whether the dimensionless data falls into the correct interval, if it does not fall into the correct interval, adjust the interval, after adjusting the interval, re-dimensionalize, and check whether the normalized data meets expectations, and when it meets expectations, calculate the feature weight; The calculated feature weight is expressed as, Among them, p ij represents the normalized value of the i-th evaluation object under the j-th indicator; The calculated entropy value is expressed as, Among them, e j represents the entropy value of the jth evaluation index, and m represents the total number of evaluation objects; The calculated coefficient of variation is expressed as, d j =1-e j Among them, d j Represents the difference coefficient of the jth evaluation index; The computational entropy weight is expressed as, Among them, w j represents the weight of the jth evaluation indicator; The comprehensive evaluation value is expressed as, Among them, v i Represents the comprehensive evaluation value of the i-th evaluation object.

4. The power grid assessment method based on interval entropy according to claim 3, characterized in that: The optimization solution of the evaluation model using the accelerated genetic algorithm includes initializing the population, evaluating the performance of each individual according to the fitness function, selecting the parent generation according to the fitness value, exchanging information between the parents using the crossover operation, generating offspring, introducing random changes in the offspring using the mutation operation, and repeatedly evolving until the number of iterations is greater than a preset value or the objective function value reaches a preset value, then the operation ends; The fitness value is expressed as, Among them, α, β, and γ represent weight coefficients, n represents the total number of evaluation indicators, and m represents the total number of evaluation objects.

5. The power grid assessment method based on interval entropy according to claim 4, characterized in that: The interval entropy of the calculation evaluation index is expressed as, Among them, λ represents the power demand of the evaluation object at different times, σ represents the standard deviation, ρ represents the frequency of power grid failures, τ represents the ability of the power grid to adapt to load and parameter fluctuations, Z represents the normalization parameter, μ represents the average value of the power load, and N represents the total number of days in the evaluation period; After calculating the interval entropy of the indicator, determine whether the interval entropy is reasonable. If the interval entropy is unreasonable, determine whether the original data contains outliers or noise. When there are outliers, detect the outliers in the data through IQR. If there are no outliers in the data, it means that there is noise in the data. When there is noise, the original data is cleaned. After data cleaning, recalculate the interval entropy and perform a rationality test. When the interval entropy is reasonable, the weighted fitness value is calculated in combination with the fitness value.

6. The power grid assessment method based on interval entropy according to claim 5, characterized in that: The step of obtaining the evaluation result according to the optimization result and the interval entropy includes obtaining the fitness value of each evaluation object by using the optimization result obtained by the accelerated genetic algorithm, and calculating the weighted fitness value of each evaluation object according to the fitness value and the interval entropy of each evaluation object; The weighted fitness value of each object is calculated as: Among them, W i represents the weighted fitness value of the ith object, n and m represent the total number of evaluation indicators and the number of fitness functions, respectively, and w j represents the weight of the jth evaluation indicator, E ij represents the interval entropy value of the i-th evaluation object on the j-th indicator, δ j represents the adjustment coefficient of the jth indicator, α k , β k Represents the coefficient of the fitness function, γ ik Represents the value of the i-th evaluation object on the k-th fitness function; The evaluation results include: i If W is less than the primary threshold, it means that the power grid performance is poor. i If W is between the first and second thresholds, it means that the power grid performance is good. i Above the secondary threshold, it means that the grid performance is excellent.

7. The power grid assessment method based on interval entropy according to claim 6, characterized in that: The corresponding measures include, when the grid performance is judged to be poor, conducting a comprehensive system inspection and fault diagnosis, identifying the problem by introducing advanced diagnostic tools, strengthening maintenance and repair, regularly conducting system-level performance tests, including load testing and capacity assessment, and optimizing grid design, such as updating obsolete equipment; When grid performance is judged to be good, performance data is analyzed to identify potential areas for improvement, encourage innovation and technology upgrades to further improve performance, strengthen load management and optimize energy efficiency distribution; When the grid performance is judged to be excellent, we will continue to maintain and monitor the high-performance operation of the existing system, explore the integration of advanced technologies and sustainable solutions, implement smart grid technologies including self-healing networks and demand response, and use big data and artificial intelligence for predictive maintenance to prevent potential failures.

8. A system using the interval entropy-based power grid assessment method according to any one of claims 1 to 7, characterized in that: It includes data preprocessing module, genetic algorithm optimization module, interval entropy calculation module and evaluation result generation module; The data preprocessing module is responsible for processing the original multi-attribute decision-making data; The genetic algorithm optimization module is responsible for optimizing and solving the evaluation model using an accelerated genetic algorithm; The interval entropy calculation module calculates the interval entropy according to the evaluation index; The evaluation result generation module is responsible for combining the optimization result and the interval entropy to output the final evaluation result.

9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the power grid assessment method based on interval entropy according to any one of claims 1 to 7 are implemented.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the power grid assessment method based on interval entropy according to any one of claims 1 to 7 are implemented.