Distributed photovoltaic power distribution terminal optimal configuration method and device

By considering the importance weight of photovoltaic power generation equipment in the distribution terminal optimization configuration model and optimizing the distribution terminal configuration solution, the economic cost and power supply reliability problems of the distribution network under the influence of distributed photovoltaics are solved, and the distribution network is realized. Rationally optimize the configuration.

CN119093465APending Publication Date: 2024-12-06CHINA ELECTRIC POWER RESEARCH INSTITUTE CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410943433.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-15
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The existing distribution terminal optimization configuration method is not applicable in distribution networks containing distributed photovoltaics, and the loss of power after photovoltaic failure cannot be effectively considered, which makes it difficult to optimize the economic cost and power supply reliability of the distribution network.

Method used

By determining its importance weight based on the capacity of a single photovoltaic power generation device and substituting it into the pre-constructed distribution terminal optimization configuration model, the optimization results are obtained to formulate a distribution terminal optimization configuration plan, including the upstream and downstream of the fault zone. The second and third free terminal configuration coefficients are used to minimize economic costs and power loss costs.

Benefits of technology

On the premise of meeting power supply reliability, scientifically and reasonably optimize the configuration of distribution terminals, reduce economic costs, and adapt to distribution networks of different sizes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119093465A_ABST
    Figure CN119093465A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of power distribution system measurement terminal configuration, and particularly provides a distributed photovoltaic power distribution terminal optimal configuration method and device, and the method comprises the steps: determining the importance weight of a single photovoltaic power generation device based on the capacity of the single photovoltaic power generation device; substituting the importance weight of the single photovoltaic power generation equipment into a pre-constructed power distribution terminal optimization configuration model and solving to obtain an optimization result; taking the optimization result as a power distribution terminal optimization configuration scheme; wherein the optimization result comprises at least one of the following: a two-remote terminal configuration coefficient at the upstream of the fault section, a three-remote terminal configuration coefficient at the upstream of the fault section, a two-remote terminal configuration coefficient at the downstream of the fault section, and a three-remote terminal configuration coefficient at the downstream of the fault section. The technical scheme provided by the invention is scientific and reasonable, and can minimize the economic cost on the premise of meeting the power supply reliability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power distribution system measurement terminal configuration, and in particular to a method and device for optimizing configuration of power distribution terminals taking distributed photovoltaics into account. Background Art

[0002] With the continuous development of the economy and society, users have higher and higher requirements for the reliability of distribution systems. Distribution automation is an effective way to improve the reliability of distribution networks, but the planning and construction of distribution automation still lacks systematic guidance. How to optimize the allocation of limited funds and resources as much as possible is an urgent problem to be solved in the planning and construction of distribution networks.

[0003] At present, establishing an objective function with the goal of minimizing economic costs and the constraints corresponding to the objective function is a key step in the optimal configuration of distribution terminals. Specifically, under the premise of satisfying power supply reliability, an objective function is established to minimize the sum of terminal installation costs and load power outage losses. However, with the access of distributed photovoltaics, photovoltaics will be shut down after a fault in the area where the distributed photovoltaics are located, resulting in more power outage costs. In summary, the optimal configuration of distribution terminals that only considers the sum of terminal installation costs and load power outage losses is no longer applicable to distribution networks containing distributed photovoltaics. Therefore, for distribution networks containing distributed photovoltaics, in order to achieve reasonable optimal configuration of distribution terminals, it is urgent to propose an optimal configuration scheme for distribution terminals that takes distributed photovoltaics into account to ensure the reasonable configuration of distribution terminals. Summary of the invention

[0004] In order to overcome the above-mentioned defects, the present invention proposes a method and device for optimizing the configuration of distribution terminals taking into account distributed photovoltaics.

[0005] In a first aspect, a method for optimizing the configuration of distribution terminals taking into account distributed photovoltaics is provided, and the method for optimizing the configuration of distribution terminals taking into account distributed photovoltaics comprises:

[0006] Determining the importance weight of a single photovoltaic power generation device based on the capacity of the single photovoltaic power generation device;

[0007] Substituting the importance weight of the single photovoltaic power generation equipment into a pre-built distribution terminal optimization configuration model and solving it to obtain an optimization result;

[0008] Using the optimization result as the optimization configuration scheme for the power distribution terminal;

[0009] Among them, the optimization result includes at least one of the following: a two-remote terminal configuration coefficient upstream of the fault section, a three-remote terminal configuration coefficient upstream of the fault section, a two-remote terminal configuration coefficient downstream of the fault section, and a three-remote terminal configuration coefficient downstream of the fault section.

[0010] Preferably, the importance weight of the photovoltaic power generation equipment is as follows:

[0011]

[0012] In the above formula, f(P) is the importance weight of a single photovoltaic power generation device, e is a natural constant, and P is the capacity of a single photovoltaic power generation device.

[0013] Preferably, the pre-built distribution terminal optimization configuration model includes: an objective function with the goal of minimizing economic cost and its corresponding constraints.

[0014] Furthermore, the objective function is as follows:

[0015] C=min(C F +C M +C G )

[0016] In the above formula, C is the objective function value, C F is the initial installation cost of the terminal, C M is the power outage loss cost, C G is the photovoltaic power loss cost.

[0017] Furthermore, the power outage loss cost is as follows:

[0018]

[0019] In the above formula, Ω i is the set of fault points on the feeder, Ω s ,Ω g ,Ω x are the sets of load types upstream of the fault section, the fault section, and the downstream of the fault section, respectively. s , P g , P x are the loads of the sth load upstream of the fault section, the gth load in the fault section, and the xth load downstream of the fault section, respectively. s (P s ), T g (P g ), T x (P x ) are the power outage time of the sth load in the upstream of the fault section, the gth load in the fault section, and the xth load in the downstream of the fault section, respectively. i is the probability of occurrence of fault i, C α The power outage loss fee per unit of electricity.

[0020] Furthermore, the photovoltaic power outage cost is as follows:

[0021]

[0022] In the above formula, PG is the capacity of the Gth photovoltaic power generation device, f(P G ) is the importance weight of the G-th photovoltaic power generation equipment, p(P G ) is the power failure probability of the G-th photovoltaic power generation equipment, is the benchmark electricity price of photovoltaic power generation equipment, Ω G is the total number of photovoltaic power generation equipment in the region.

[0023] Furthermore, the constraint condition is that the mathematical model is as follows:

[0024] ASAI ≥ β

[0025] In the above formula, ASAI is the average power supply availability, and β is the preset threshold.

[0026] Furthermore, the average power supply availability is as follows:

[0027]

[0028] In the above formula, ASAI is the average power supply availability, N is the total number of loads in the distribution network, and N s 、N g 、N x They are the total number of the sth type of load upstream of the fault section, the gth type of load in the fault section, and the xth type of load downstream of the fault section, respectively.

[0029] Furthermore, the constraint condition is that the mathematical model is as follows:

[0030]

[0031] In the above formula, T s , T g , T x are the power outage time of the upstream, fault section, and downstream of the fault section, respectively. S 、V1 E are the three-remote terminal configuration coefficient and the two-remote terminal configuration coefficient of the upstream of the fault section, V2 S 、V2 E are the three-remote terminal configuration coefficient and the two-remote terminal configuration coefficient of the downstream of the fault section respectively. t1, t2 and t3 are the fault inspection time, fault isolation time and fault recovery time respectively.

[0032] In a second aspect, a device for optimizing the configuration of distribution terminals taking into account distributed photovoltaics is provided, and the device for optimizing the configuration of distribution terminals taking into account distributed photovoltaics comprises:

[0033] A determination module, used to determine the importance weight of a single photovoltaic power generation device based on the capacity of the single photovoltaic power generation device;

[0034] An analysis module is used to substitute the importance weight of the single photovoltaic power generation equipment into a pre-built distribution terminal optimization configuration model and solve it to obtain an optimization result;

[0035] A configuration module, used to use the optimization result as an optimization configuration scheme for distribution terminals;

[0036] Among them, the optimization result includes at least one of the following: a two-remote terminal configuration coefficient upstream of the fault section, a three-remote terminal configuration coefficient upstream of the fault section, a two-remote terminal configuration coefficient downstream of the fault section, and a three-remote terminal configuration coefficient downstream of the fault section.

[0037] Preferably, the importance weight of the photovoltaic power generation equipment is as follows:

[0038]

[0039] In the above formula, f(P) is the importance weight of a single photovoltaic power generation device, e is a natural constant, and P is the capacity of a single photovoltaic power generation device.

[0040] Preferably, the pre-built distribution terminal optimization configuration model includes: an objective function with the goal of minimizing economic cost and its corresponding constraints.

[0041] Furthermore, the objective function is as follows:

[0042] C=min(C F +C M +C G )

[0043] In the above formula, C is the objective function value, C F is the initial installation cost of the terminal, C M is the power outage loss cost, C G is the photovoltaic power loss cost.

[0044] Furthermore, the power outage loss cost is as follows:

[0045]

[0046] In the above formula, Ω i is the set of fault points on the feeder, Ω s ,Ω g ,Ω x are the sets of load types upstream of the fault section, the fault section, and the downstream of the fault section, respectively. s , P g , P x are the loads of the sth load upstream of the fault section, the gth load in the fault section, and the xth load downstream of the fault section, respectively. s (P s ), Tg (P g ), T x (P x ) are the power outage time of the sth load in the upstream of the fault section, the gth load in the fault section, and the xth load in the downstream of the fault section, respectively. i is the probability of occurrence of fault i, C α The power outage loss fee per unit of electricity.

[0047] Furthermore, the photovoltaic power outage cost is as follows:

[0048]

[0049] In the above formula, P G is the capacity of the Gth photovoltaic power generation device, f(P G ) is the importance weight of the G-th photovoltaic power generation equipment, p(P G ) is the power failure probability of the G-th photovoltaic power generation equipment, is the benchmark electricity price of photovoltaic power generation equipment, Ω G is the total number of photovoltaic power generation equipment in the region.

[0050] Furthermore, the constraint condition is that the mathematical model is as follows:

[0051] ASAI ≥ β

[0052] In the above formula, ASAI is the average power supply availability, and β is the preset threshold.

[0053] Furthermore, the average power supply availability is as follows:

[0054]

[0055] In the above formula, ASAI is the average power supply availability, N is the total number of loads in the distribution network, and N s 、N g 、N x They are the total number of the sth type of load upstream of the fault section, the gth type of load in the fault section, and the xth type of load downstream of the fault section, respectively.

[0056] Furthermore, the constraint condition is that the mathematical model is as follows:

[0057]

[0058] In the above formula, T s , T g , T x are the power outage time of the upstream, fault section, and downstream of the fault section, respectively. S 、V1 Eare the three-remote terminal configuration coefficient and the two-remote terminal configuration coefficient of the upstream of the fault section, V2 S 、V2 E are the three-remote terminal configuration coefficient and the two-remote terminal configuration coefficient of the downstream of the fault section respectively. t1, t2 and t3 are the fault inspection time, fault isolation time and fault recovery time respectively.

[0059] In a third aspect, a computer device is provided, comprising: one or more processors;

[0060] The processor is configured to execute one or more programs;

[0061] When the one or more programs are executed by the one or more processors, the method for optimizing the configuration of distribution terminals taking distributed photovoltaics into account is implemented.

[0062] In a fourth aspect, a computer-readable storage medium is provided, on which a computer program is stored, and when the computer program is executed, the method for optimizing the configuration of distribution terminals taking into account distributed photovoltaics is implemented.

[0063] The above one or more technical solutions of the present invention have at least one or more of the following beneficial effects:

[0064] The present invention provides a method and device for optimizing the configuration of distribution terminals taking into account distributed photovoltaics, including: determining the importance weight of a single photovoltaic power generation device based on the capacity of the single photovoltaic power generation device; substituting the importance weight of the single photovoltaic power generation device into a pre-constructed distribution terminal optimization configuration model and solving it to obtain an optimization result; using the optimization result as a distribution terminal optimization configuration scheme; wherein the optimization result includes at least one of the following: a two-remote terminal configuration coefficient upstream of the fault section, a three-remote terminal configuration coefficient upstream of the fault section, a two-remote terminal configuration coefficient downstream of the fault section, and a three-remote terminal configuration coefficient downstream of the fault section. The technical solution provided by the present invention is scientific and reasonable, and can minimize the economic cost while meeting the reliability of power supply. BRIEF DESCRIPTION OF THE DRAWINGS

[0065] Figure 1 It is a schematic flow chart of main steps of a method for optimizing configuration of power distribution terminals taking distributed photovoltaic into account according to an embodiment of the present invention;

[0066] Figure 2 This is an IEEE33 node topology diagram of an embodiment of the present invention. DETAILED DESCRIPTION

[0067] The specific implementation modes of the present invention will be further described in detail below in conjunction with the accompanying drawings.

[0068] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0069] The above scheme is described in detail below.

[0070] Example 1

[0071] See attached Figure 1 , Figure 1 FIG. 1 is a flow chart of the main steps of a method for optimizing the configuration of power distribution terminals taking into account distributed photovoltaic power generation according to an embodiment of the present invention. Figure 1 As shown, the method for optimizing the configuration of distribution terminals taking into account distributed photovoltaics in the embodiment of the present invention mainly includes the following steps:

[0072] Step S101: determining the importance weight of a single photovoltaic power generation device based on the capacity of the single photovoltaic power generation device;

[0073] Step S102: Substituting the importance weight of the single photovoltaic power generation equipment into a pre-built distribution terminal optimization configuration model and solving it to obtain an optimization result;

[0074] Step S103: using the optimization result as an optimization configuration scheme for power distribution terminals;

[0075] Among them, the optimization result includes at least one of the following: a two-remote terminal configuration coefficient upstream of the fault section, a three-remote terminal configuration coefficient upstream of the fault section, a two-remote terminal configuration coefficient downstream of the fault section, and a three-remote terminal configuration coefficient downstream of the fault section.

[0076] In an application scenario, for example, Figure 2 The figure shows the IEEE33 node topology diagram. By using the enumeration method, all configurations are listed on the basis of meeting the power supply reliability, and finally the configuration scheme with the minimum objective function is obtained. It is scientific and reasonable, has good effects, and can adapt to distribution networks of different sizes.

[0077] In this embodiment, if the fault section contains photovoltaics, the photovoltaic power failure and exit will generate power failure costs. The larger the photovoltaic capacity, the greater the impact of photovoltaic power failure and exit. Therefore, the photovoltaic importance weight is introduced to measure the importance of photovoltaics by the size of photovoltaic capacity. The importance weight of the photovoltaic power generation equipment is as follows:

[0078]

[0079] In the above formula, f(P) is the importance weight of a single photovoltaic power generation device, e is a natural constant, and P is the capacity of a single photovoltaic power generation device.

[0080] In this embodiment, the pre-constructed distribution terminal optimization configuration model includes: an objective function with the goal of minimizing economic cost and its corresponding constraint conditions.

[0081] In one embodiment, the objective function is as follows:

[0082] C=min(C F +C M +C G )

[0083] In the above formula, C is the objective function value, C F is the initial installation cost of the terminal, C M is the power outage loss cost, C G is the photovoltaic power loss cost.

[0084] In one embodiment, the power outage loss cost is as follows:

[0085]

[0086] In the above formula, Ω i is the set of fault points on the feeder, Ω s ,Ω g ,Ω x are the sets of load types upstream of the fault section, the fault section, and the downstream of the fault section, respectively. s , P g , P x are the loads of the sth load upstream of the fault section, the gth load in the fault section, and the xth load downstream of the fault section, respectively. s (P s ), T g (P g ), T x (P x ) are the power outage time of the sth load in the upstream of the fault section, the gth load in the fault section, and the xth load in the downstream of the fault section, respectively. i is the probability of occurrence of fault i, C α The power outage loss fee per unit of electricity.

[0087] In one embodiment, the photovoltaic power outage cost is as follows:

[0088]

[0089] In the above formula, P G is the capacity of the Gth photovoltaic power generation device, f(P G) is the importance weight of the G-th photovoltaic power generation equipment, p(P G ) is the power failure probability of the G-th photovoltaic power generation equipment, is the benchmark electricity price of photovoltaic power generation equipment, Ω G is the total number of photovoltaic power generation equipment in the region.

[0090] In one embodiment, the constraint condition is a mathematical model as follows:

[0091] ASAI ≥ β

[0092] In the above formula, ASAI is the average power supply availability, and β is the preset threshold.

[0093] In one embodiment, the average power supply availability is as follows:

[0094]

[0095] In the above formula, ASAI is the average power supply availability, N is the total number of loads in the distribution network, and N s 、N g 、N x They are the total number of the sth type of load upstream of the fault section, the gth type of load in the fault section, and the xth type of load downstream of the fault section, respectively.

[0096] In one embodiment, considering whether there is a terminal between the load and the fault in the distribution network and the relative position of the load and the fault point, the distribution network can be divided into the upstream of the fault section, the fault section, and the downstream of the fault section. The power outage time of the loads upstream and downstream of the fault section is only related to the types of the distribution terminals upstream and downstream of the fault point, respectively, while the power outage time of the loads in the fault section is related to the types of the distribution terminals upstream and downstream of the fault point. Therefore, the constraint condition is that the mathematical model also includes:

[0097]

[0098] In the above formula, T s , T g , T x are the power outage time of the upstream, fault section, and downstream of the fault section, respectively. S 、V1 E are the three-remote terminal configuration coefficient and the two-remote terminal configuration coefficient of the upstream of the fault section, V2 S 、V2 E are the three-remote terminal configuration coefficient and the two-remote terminal configuration coefficient of the downstream of the fault section respectively. t1, t2 and t3 are the fault inspection time, fault isolation time and fault recovery time respectively.

[0099] Example 2

[0100] Based on the same inventive concept, the present invention also provides a distribution terminal optimization configuration device taking into account distributed photovoltaics, and the distribution terminal optimization configuration device taking into account distributed photovoltaics comprises:

[0101] A determination module, used to determine the importance weight of a single photovoltaic power generation device based on the capacity of the single photovoltaic power generation device;

[0102] An analysis module is used to substitute the importance weight of the single photovoltaic power generation equipment into a pre-built distribution terminal optimization configuration model and solve it to obtain an optimization result;

[0103] A configuration module, used to use the optimization result as an optimization configuration scheme for distribution terminals;

[0104] Among them, the optimization result includes at least one of the following: a two-remote terminal configuration coefficient upstream of the fault section, a three-remote terminal configuration coefficient upstream of the fault section, a two-remote terminal configuration coefficient downstream of the fault section, and a three-remote terminal configuration coefficient downstream of the fault section.

[0105] Preferably, the importance weight of the photovoltaic power generation equipment is as follows:

[0106]

[0107] In the above formula, f(P) is the importance weight of a single photovoltaic power generation device, e is a natural constant, and P is the capacity of a single photovoltaic power generation device.

[0108] Preferably, the pre-built distribution terminal optimization configuration model includes: an objective function with the goal of minimizing economic cost and its corresponding constraints.

[0109] Furthermore, the objective function is as follows:

[0110] C=min(C F +C M +C G )

[0111] In the above formula, C is the objective function value, C F is the initial installation cost of the terminal, C M is the power outage loss cost, C G is the photovoltaic power loss cost.

[0112] Furthermore, the power outage loss cost is as follows:

[0113]

[0114] In the above formula, Ω i is the set of fault points on the feeder, Ω s ,Ω g ,Ω xare the sets of load types upstream of the fault section, the fault section, and the downstream of the fault section, respectively. s , P g , P x are the loads of the sth load upstream of the fault section, the gth load in the fault section, and the xth load downstream of the fault section, respectively. s (P s ), T g (P g ), T x (P x ) are the power outage time of the sth load in the upstream of the fault section, the gth load in the fault section, and the xth load in the downstream of the fault section, respectively. i is the probability of occurrence of fault i, C α The power outage loss fee per unit of electricity.

[0115] Furthermore, the photovoltaic power outage cost is as follows:

[0116]

[0117] In the above formula, P G is the capacity of the Gth photovoltaic power generation device, f(P G ) is the importance weight of the G-th photovoltaic power generation equipment, p(P G ) is the power failure probability of the G-th photovoltaic power generation equipment, is the benchmark electricity price of photovoltaic power generation equipment, Ω G is the total number of photovoltaic power generation equipment in the region.

[0118] Furthermore, the constraint condition is that the mathematical model is as follows:

[0119] ASAI ≥ β

[0120] In the above formula, ASAI is the average power supply availability, and β is the preset threshold.

[0121] Furthermore, the average power supply availability is as follows:

[0122]

[0123] In the above formula, ASAI is the average power supply availability, N is the total number of loads in the distribution network, and N s 、N g 、N x They are the total number of the sth type of load upstream of the fault section, the gth type of load in the fault section, and the xth type of load downstream of the fault section, respectively.

[0124] Furthermore, the constraint condition is that the mathematical model is as follows:

[0125]

[0126] In the above formula, T s , T g , T x are the power outage time of the upstream, fault section, and downstream of the fault section, respectively. S 、V1 E are the three-remote terminal configuration coefficient and the two-remote terminal configuration coefficient of the upstream of the fault section, V2 S 、V2 E are the three-remote terminal configuration coefficient and the two-remote terminal configuration coefficient of the downstream of the fault section respectively. t1, t2 and t3 are the fault inspection time, fault isolation time and fault recovery time respectively.

[0127] Example 3

[0128] Based on the same inventive concept, the present invention also provides a computer device, which includes a processor and a memory, wherein the memory is used to store a computer program, the computer program includes program instructions, and the processor is used to execute the program instructions stored in the computer storage medium. The processor may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components, etc. It is the computing core and control core of the terminal, which is suitable for implementing one or more instructions, and is specifically suitable for loading and executing one or more instructions in the computer storage medium to implement the corresponding method flow or corresponding function, so as to implement the steps of a method for optimizing the configuration of a distribution terminal taking into account distributed photovoltaics in the above embodiment.

[0129] Example 4

[0130] Based on the same inventive concept, the present invention also provides a storage medium, specifically a computer-readable storage medium (Memory), which is a memory device in a computer device for storing programs and data. It can be understood that the computer-readable storage medium here can include both built-in storage media in a computer device and, of course, extended storage media supported by the computer device. The computer-readable storage medium provides a storage space, which stores the operating system of the terminal. In addition, one or more instructions suitable for being loaded and executed by a processor are also stored in the storage space, and these instructions can be one or more computer programs (including program codes). It should be noted that the computer-readable storage medium here can be a high-speed RAM memory or a non-volatile memory, such as at least one disk memory. The processor can load and execute one or more instructions stored in the computer-readable storage medium to implement the steps of a method for optimizing the configuration of distribution terminals taking into account distributed photovoltaics in the above embodiment.

[0131] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0132] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0133] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0134] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0135] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.

Claims

1. A method for optimizing the configuration of distribution terminals taking into account distributed photovoltaics, characterized in that: The method comprises: Determining the importance weight of a single photovoltaic power generation device based on the capacity of the single photovoltaic power generation device; Substituting the importance weight of the single photovoltaic power generation equipment into a pre-built distribution terminal optimization configuration model and solving it to obtain an optimization result; Using the optimization result as the optimization configuration scheme for the power distribution terminal; Among them, the optimization result includes at least one of the following: a two-remote terminal configuration coefficient upstream of the fault section, a three-remote terminal configuration coefficient upstream of the fault section, a two-remote terminal configuration coefficient downstream of the fault section, and a three-remote terminal configuration coefficient downstream of the fault section.

2. The method according to claim 1, characterized in that The importance weights of the photovoltaic power generation equipment are as follows: In the above formula, f(P) is the importance weight of a single photovoltaic power generation device, e is a natural constant, and P is the capacity of a single photovoltaic power generation device.

3. The method according to claim 1, characterized in that The pre-built distribution terminal optimization configuration model includes: an objective function with the goal of minimizing economic cost and its corresponding constraints.

4. The method according to claim 3, characterized in that The objective function is as follows: C=min(C F +C M +C G ) In the above formula, C is the objective function value, C F is the initial installation cost of the terminal, C M is the power outage loss cost, C G is the photovoltaic power loss cost.

5. The method according to claim 4, characterized in that The power outage loss costs are as follows: In the above formula, Ω i is the set of fault points on the feeder, Ω s ,Ω g ,Ω x are the sets of load types upstream of the fault section, the fault section, and the downstream of the fault section, respectively. s , P g , P x are the loads of the sth load upstream of the fault section, the gth load in the fault section, and the xth load downstream of the fault section, respectively. s (P s ), T g (P g ), T x (P x ) are the power outage time of the sth load in the upstream of the fault section, the gth load in the fault section, and the xth load in the downstream of the fault section, respectively. i is the probability of occurrence of fault i, C α The power outage loss fee per unit of electricity.

6. The method according to claim 5, characterized in that The photovoltaic power loss cost is as follows: In the above formula, P G is the capacity of the Gth photovoltaic power generation device, f(P G ) is the importance weight of the G-th photovoltaic power generation equipment, p(P G ) is the power failure probability of the G-th photovoltaic power generation equipment, is the benchmark electricity price of photovoltaic power generation equipment, Ω G is the total number of photovoltaic power generation equipment in the region.

7. The method according to claim 6, characterized in that The constraints are in the mathematical model as follows: ASAI ≥ β In the above formula, ASAI is the average power supply availability, and β is the preset threshold.

8. The method according to claim 7, characterized in that The average power supply availability is as follows: In the above formula, ASAI is the average power supply availability, N is the total number of loads in the distribution network, and N s 、N g 、N x They are the total number of the sth type of load upstream of the fault section, the gth type of load in the fault section, and the xth type of load downstream of the fault section, respectively.

9. The method according to claim 6, characterized in that The constraints are in the mathematical model as follows: In the above formula, T s 、T g 、T x are the power outage time of the upstream, fault section, and downstream of the fault section, respectively. They are the three-remote terminal configuration coefficient and the two-remote terminal configuration coefficient of the upstream of the fault section, are the three-remote terminal configuration coefficient and the two-remote terminal configuration coefficient of the downstream of the fault section respectively. t1, t2 and t3 are the fault inspection time, fault isolation time and fault recovery time respectively.

10. A device for optimizing the configuration of power distribution terminals taking into account distributed photovoltaics, characterized in that: The device comprises: A determination module, used to determine the importance weight of a single photovoltaic power generation device based on the capacity of the single photovoltaic power generation device; An analysis module is used to substitute the importance weight of the single photovoltaic power generation equipment into a pre-built distribution terminal optimization configuration model and solve it to obtain an optimization result; A configuration module, used to use the optimization result as an optimization configuration scheme for distribution terminals; Among them, the optimization result includes at least one of the following: a two-remote terminal configuration coefficient upstream of the fault section, a three-remote terminal configuration coefficient upstream of the fault section, a two-remote terminal configuration coefficient downstream of the fault section, and a three-remote terminal configuration coefficient downstream of the fault section.

11. The device according to claim 10, characterized in that The importance weights of the photovoltaic power generation equipment are as follows: In the above formula, f(P) is the importance weight of a single photovoltaic power generation device, e is a natural constant, and P is the capacity of a single photovoltaic power generation device.

12. The device according to claim 10, characterized in that The pre-built distribution terminal optimization configuration model includes: an objective function with the goal of minimizing economic cost and its corresponding constraints.

13. The device according to claim 12, characterized in that The objective function is as follows: C=min(C F +C M +C G ) In the above formula, C is the objective function value, C F is the initial installation cost of the terminal, C M is the power outage loss cost, C G is the photovoltaic power loss cost.

14. The device according to claim 13, characterized in that The power outage loss costs are as follows: In the above formula, Ω i is the set of fault points on the feeder, Ω s ,Ω g ,Ω x are the sets of load types upstream of the fault section, the fault section, and the downstream of the fault section, respectively. s , P g , P x are the loads of the sth load upstream of the fault section, the gth load in the fault section, and the xth load downstream of the fault section, respectively. s (P s ), T g (P g ), T x (P x ) are the power outage time of the sth load in the upstream of the fault section, the gth load in the fault section, and the xth load in the downstream of the fault section, respectively. i is the probability of occurrence of fault i, C α The power outage loss fee per unit of electricity.

15. The device according to claim 14, characterized in that The photovoltaic power loss cost is as follows: In the above formula, P G is the capacity of the Gth photovoltaic power generation device, f(P G ) is the importance weight of the G-th photovoltaic power generation equipment, p(P G ) is the power failure probability of the G-th photovoltaic power generation equipment, is the benchmark electricity price of photovoltaic power generation equipment, Ω G is the total number of photovoltaic power generation equipment in the region.

16. The device according to claim 15, characterized in that The constraints are in the mathematical model as follows: ASAI ≥ β In the above formula, ASAI is the average power supply availability, and β is the preset threshold.

17. The device according to claim 16, characterized in that The average power supply availability is as follows: In the above formula, ASAI is the average power supply availability, N is the total number of loads in the distribution network, and N s 、N g 、N x They are the total number of the sth type of load upstream of the fault section, the gth type of load in the fault section, and the xth type of load downstream of the fault section, respectively.

18. The device according to claim 15, characterized in that The constraints are in the mathematical model as follows: In the above formula, T s 、T g 、T x are the power outage time of the upstream, fault section, and downstream of the fault section, respectively. They are the three-remote terminal configuration coefficient and the two-remote terminal configuration coefficient of the upstream of the fault section, are the three-remote terminal configuration coefficient and the two-remote terminal configuration coefficient of the downstream of the fault section respectively. t1, t2 and t3 are the fault inspection time, fault isolation time and fault recovery time respectively.

19. A computer device, characterized in that: include: one or more processors; The processor is configured to execute one or more programs; When the one or more programs are executed by the one or more processors, the method for optimizing configuration of distribution terminals taking distributed photovoltaics into account as described in any one of claims 1 to 9 is implemented.

20. A computer-readable storage medium, characterized in that: A computer program is stored thereon, and when the computer program is executed, the method for optimizing the configuration of distribution terminals taking into account distributed photovoltaics as described in any one of claims 1 to 9 is implemented.