Transport system

By using controllers in the handling system to optimize the order and path of the transport vehicle entering the branch track, the problem of reducing the frequency of the upstream side of the handover caused by the transport vehicle to enter the downstream side branch track is solved, and the number of branches rails is balanced and efficient transportation of the system is achieved.

CN119096211APending Publication Date: 2024-12-06MURATA MASCH LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202380036059.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2022-06-06
Filing Date
2023-04-24
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

In the handling system, since the transport truck preferentially enters the branch track on the downstream side, the frequency of handover goods at the cross-section track on the upstream side is reduced, which may lead to delays in cargo handling and increased difficulty in smooth transportation of the transport truck.

Method used

Through the controller, the order and path of the transporter entering the branch track is optimized according to the entry status of each branch track and the number of transporters, the order and path of the transporter entering the branch track are ensured to balance the number of transporters in each branch track, avoid the shortage of specific branch tracks, and use spare and auxiliary branch lines to The track responds to faults or high load conditions.

Benefits of technology

It effectively suppresses the shortage of transport trucks on the branch track and the reduction of the frequency of handover goods, ensures that the transport trucks can transport goods smoothly, and improves the overall handling efficiency and reliability of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119096211A_ABST
    Figure CN119096211A_ABST
Patent Text Reader

Abstract

This transport system is provided with: a plurality of transport vehicles that travel along a track and transport goods; and a controller for controlling the travel of the plurality of transport vehicles. The track is provided with a main track and a first branch track branched from the main track through branch points different from each other; the controller executes an entry control for causing the carrier to enter each of the first branch rails, and in the entry control, the carrier is caused to enter any one of the first branch rails in a priority order corresponding to entry information relating to an entry state in which the carrier enters the first branch rails.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] One aspect of the present invention relates to a handling system. Background Art

[0002] A transport system is known, which includes a plurality of transport vehicles traveling along a track and a controller for controlling the movement of the plurality of transport vehicles. As a technology related to this transport system, for example, Patent Document 1 describes a system in which a transport vehicle preferentially enters a branch track on the downstream side of a plurality of branch tracks of a track. In this transport system, the transport vehicle delivers goods to a loading port provided along each of the plurality of branch tracks.

[0003] Prior art literature

[0004] Patent Literature

[0005] Patent Document 1: Patent No. 6935846 Summary of the invention

[0006] Problem that the invention aims to solve

[0007] In the above-mentioned transport system, since the transport vehicle is allowed to enter the branch track on the downstream side first, if the number of transport vehicles that can enter each branch track is insufficient due to some reasons, the frequency of the transport vehicle entering the branch track on the upstream side will decrease. In this case, the frequency of delivering goods to the delivery interface provided along the branch track on the upstream side will decrease. That is, the delivery of goods from a specific delivery interface may be delayed, and it may become difficult to smoothly transport goods using the transport vehicle.

[0008] One aspect of the present invention has been made in view of the above-mentioned actual situation, and an object of the present invention is to provide a transport system that enables a transport vehicle to smoothly transport cargo.

[0009] Means used to solve problems

[0010] (1) A transport system according to one aspect of the present invention comprises: a plurality of transport vehicles that move along a track to transport goods; and a controller that controls the movement of the plurality of transport vehicles. The track comprises a first main track and a plurality of branch tracks that branch from the first main track via mutually different branch points. The controller performs entry control for causing the transport vehicles to enter each of the plurality of branch tracks from the first main track. In the entry control, the transport vehicles are caused to enter the branch tracks in a priority order corresponding to entry information related to the entry status of each transport vehicle into the plurality of branch tracks.

[0011] In the transport system, transport vehicles are caused to enter the branch tracks from the first main track according to the priority order corresponding to the entry information related to the entry status of each transport vehicle into the plurality of branch tracks. Thus, for example, it is possible to cause the transport vehicles to enter each of the plurality of branch tracks to suppress the situation where there are always insufficient transport vehicles on a specific branch track. As a result, it is possible to suppress the situation where the frequency of delivering goods to the delivery interface provided along the specific branch track is reduced (the situation where the delivery of goods from the specific delivery interface is delayed), so that the transport vehicles can smoothly transport goods.

[0012] (2) In the transport system described in (1) above, the entry information may include information indicating the number of transport vehicles existing on each branch track. In the entry control, the transport vehicles may be allowed to preferentially enter the branch track with the least number of transport vehicles among the plurality of branch tracks based on the entry information. In this case, it is possible to specifically prevent a situation where there are always insufficient transport vehicles on a specific branch track.

[0013] (3) In the transport system described in (2) above, in the entry control, when there are multiple branch tracks with the least number of transport vehicles, the transport vehicles may enter the branch track corresponding to the branch point located on the most downstream side of the first main track among the multiple branch tracks. Thus, compared with the case where the transport vehicles are preferentially allowed to enter the branch track branching from the upstream side of the first main track among the multiple branch tracks, the transport vehicles can enter each branch track more smoothly.

[0014] (4) In the transport system described in (1) above, the entry information may also include information related to the entry branch track entered by the first transport vehicle. In the entry control, when there is another adjacent branch point on the upstream side of the branch point entering the branch track in the first main track, the second transport vehicle following the first transport vehicle may enter the branch track corresponding to the other branch point, and when there is no such other branch point, the second transport vehicle may enter the branch track corresponding to the branch point located on the most downstream side of the first main track. In this case, a plurality of transport vehicles can enter each branch track equally.

[0015] (5) In the transport system described in (1) above, the entry information may include information indicating the number of transport vehicles existing on each branch track. In the entry control, the transport vehicles may enter a branch track where the number of transport vehicles existing is less than a set number based on the entry information. In the entry control, when there is no branch track where the number of transport vehicles existing is less than a set number, the transport vehicles may be placed on standby on the first main track. In this case, it is possible to avoid a situation where transport vehicles enter a specific branch track in large numbers.

[0016] (6) In the transport system described in (5) above, in the entry control, after the transport vehicle is placed on standby on the first main track, when there are multiple branch tracks where the number of transport vehicles present is less than the set number, the waiting transport vehicle may be placed on standby to enter the branch track corresponding to the branch point located at the most downstream side of the first main track among the multiple branch tracks. Thus, compared with the case where the transport vehicle is placed on standby to enter the branch track branching from the upstream side of the first main track among the multiple branch tracks, the transport vehicle can enter the branch track more smoothly.

[0017] (7) In the transport system described in (5) or (6) above, in the entry control, when the number of transport vehicles on the branch track corresponding to the branch point located on the most downstream side decreases, the transport vehicles waiting on the first main track start to enter at least one of the plurality of branch tracks. This allows the transport vehicles to enter the branch track more smoothly than when the transport vehicles are allowed to enter the branch track branching from the upstream side of the first main track preferentially among the plurality of branch tracks.

[0018] (8) In the transport system described in any one of (2) to (7) above, the track may also have a second main track. A plurality of branch tracks may also be connected to the second main track via different meeting points. The controller may also perform departure control to cause each transport vehicle stopped at a stop position of each of the plurality of branch tracks to depart along each of the plurality of branch tracks toward the second main track. In the entry control, when the transport destination of the transport vehicle is determined, the number of transport vehicles existing on the branch track corresponding to the transport destination may be increased by one. In the departure control, when the transport vehicle departs on the branch track, the number of transport vehicles existing on the branch track may be reduced by one. In this case, the above-mentioned effect that the transport vehicle can smoothly transport goods can be specifically achieved.

[0019] (9) In the transport system described in any one of (1) to (8) above, the track may also have a second main track and a spare branch track. The plurality of branch tracks may also be connected to the second main track via different junctions. The spare branch track may also branch from the first main track via another branch point, namely a spare branch point, which is located further downstream than the plurality of branch points, and may be connected to the second main track via another junction point, namely a spare junction point, which is located further upstream than the plurality of junctions. During entry control, when cargo cannot be transferred on at least one of the plurality of branch tracks, a transport vehicle that is scheduled to enter the branch track where cargo cannot be transferred may be allowed to enter the spare branch track to replace the branch track. Thus, even when cargo cannot be transferred on at least one of the plurality of branch tracks, the spare branch track may be used to suppress a reduction in transport capacity.

[0020] (10) In the transport system described in (9) above, the track may also have an auxiliary branch track. The auxiliary branch track may also branch from the second main track via a branch point that is more downstream than the plurality of junctions, i.e., an auxiliary branch point, and connect to the first main track via a junction point that is more upstream than the plurality of branch points, i.e., an auxiliary junction point. The controller may also allow a transport vehicle that has entered the spare branch track to enter the auxiliary branch track. In this case, for example, even if the interface of the transport vehicle or the object being transported on the branch track fails and the cargo cannot be transferred, the reduction in the transport capacity of the transport system can be further suppressed.

[0021] Effects of the Invention

[0022] According to one aspect of the present invention, it is possible to provide a transport system in which a transport vehicle can smoothly transport cargo. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a schematic plan view showing a transport system according to one embodiment.

[0024] Figure 2 Yes means Figure 1 Side view of the transport vehicle of the transport system.

[0025] Figure 3 Yes means Figure 1 Schematic top view of the first building side of the handling system.

[0026] Figure 4 Yes Description Figure 1 Schematic top view of an example of access control in a handling system.

[0027] Figure 5 Yes Description Figure 4 A schematic top view of the follow-up.

[0028] Figure 6 Yes Description Figure 1 Schematic top view of an example of access control in a handling system.

[0029] Figure 7 Yes Description Figure 6 A schematic top view of the follow-up.

[0030] Figure 8 It is a schematic plan view showing the first building side of the transport system according to the fourth embodiment.

[0031] Fig. 9 It is a schematic plan view showing the first building side of the transport system according to the fifth embodiment. DETAILED DESCRIPTION

[0032] Hereinafter, one embodiment will be described with reference to the accompanying drawings. In the description of the drawings, the same or corresponding components are marked with the same reference numerals, and repeated descriptions are omitted. The dimensional ratios in the drawings are not necessarily the same as the dimensional ratios described.

[0033] The first embodiment is described. Figure 1 As shown, the transport system 1 of the first embodiment is a system for transporting between two points whose transport starting point and transport destination are patterned. The transport system 1 performs inter-building transport of goods between the first building F1 and the second building F2. The transport system 1 has a plurality of transport vehicles 10 and a controller 20. The transport vehicle 10 travels along the track 3 to transport the goods. The transport vehicle 10 is configured to be able to transfer goods. The transport vehicle 10 is an elevated unmanned transport vehicle. The transport vehicle 10 is also referred to as, for example, a trolley (transport trolley), an elevated traveling vehicle (elevated traveling trolley), or a traveling vehicle (traveling trolley). The number of transport vehicles 10 possessed by the transport system 1 is, for example, about 50, which can vary according to the transport requirement and the transport distance.

[0034] like Figure 2 As shown, the transport vehicle 10 includes a traveling trolley 144, a power supply trolley 145 that receives power from the track 3, a θ driver 147, and a lateral conveying unit 146 for lateral conveying a portion below the lateral conveying unit 146 relative to the track 3. The θ driver 147 rotates the lifting drive unit 148 in a horizontal plane to control the posture of the cargo L. The lifting drive unit 148 lifts and lowers a lifting platform 149 that holds the cargo L, thereby delivering the cargo L to the delivery port 4. The lifting platform 149 clamps the flange 120 on the upper part of the cargo L. In addition, the lateral conveying unit 146 and the θ driver 147 may not be provided. The cargo L is, for example, a container for storing a plurality of semiconductor wafers, but may also be a glass substrate or a general component.

[0035] The track 3 is laid on, for example, a ceiling or the like. The track 3 is supported by pillars 141. The track 3 is a predetermined travel path for the transport vehicle 10 to travel. The track 3 is a one-way travel path. In other words, in the transport system 1, the travel direction (forward direction) of the transport vehicle 10 on the track 3 is specified as one direction, and travel in the opposite direction is prohibited. The track 3 has a closed track layout that is not affected by the outside of the track 3. In the following, the terms "upstream" and "downstream" correspond to "upstream" and "downstream" in the travel direction of the transport vehicle 10, respectively.

[0036] exist Figure 1In the example shown, the track 3 includes: main tracks 31, 32; four first branch tracks 33a, 33b, 33c, 33d, which branch from the main track 32 and merge with the main track 31; and four second branch tracks 34a, 34b, 34c, 34d, which branch from the main track 31 and merge with the main track 32. The main tracks 31, 32 are tracks spanning between the first building F1 and the second building F2. The length of the main tracks 31, 32 is, for example, 200m. Between the first building F1 and the second building F2, the main tracks 31, 32 are surrounded and closed by a wall (not shown). The main tracks 31, 32, the first branch tracks 33a to 33d, and the second branch tracks 34a to 34d constitute a circular track for a plurality of transport vehicles 10 to travel around.

[0037] The first branch rails 33a to 33d are arranged in the first building F1. The first branch rails 33a to 33d extend in parallel. The first branch rails 33a to 33d are arranged in a comb shape between the main rails 31 and 32 extending in parallel. The first branch rails 33a to 33d are sequentially located on the upstream side of the main rail 31 (on the downstream side of the main rail 32). The second branch rails 34a to 34d are arranged in the second building F2. The second branch rails 34a to 34d extend in parallel. The second branch rails 34a to 34d are arranged in a comb shape between the main rails 31 and 32 extending in parallel. The second branch rails 34a to 34d are sequentially located on the upstream side of the main rail 32 (on the downstream side of the main rail 31).

[0038] Next, the structure and control of the transport system 1 will be specifically described. In the following description, the structure and control of the first building F1 will be described, and the structure and control of the second building F2 are the same as those of the first building F1, so the description thereof will be appropriately omitted.

[0039] like Figure 3 As shown, the first branch rails 33a to 33d merge with the main rail 31 at respective locations as merge points 35a, 35b, 35c, and 35d. The first branch rails 33a to 33d are connected to the main rail 31 via the merge points 35a, 35b, 35c, and 35d, respectively. That is, the rail 3 has a plurality of merge points, namely, merge points 35a to 35d, which are arranged on the main rail 31 in a manner separated from each other. The main rail 31 merges with each of the first branch rails 33a to 33d via mutually different merge points 35a, 35b, 35c, and 35d. In addition, for example, a portion of the rail 3 downstream of the merge point 35a is the main rail 31, and it is considered that it merges with the first branch rail 33a upstream thereof. The first branch rails 33a to 33d are connected to the main rail 31 via mutually different merge points 35a to 35d, respectively. The meeting points 35 a to 35 d are separated from each other by a predetermined distance on the main track 31 .

[0040] The first branch rails 33a to 33d are branch points 36a, 36b, 36c, and 36d at which they branch from the main rail 32. The first branch rails 33a to 33d are connected to the main rail 32 via the branch points 36a, 36b, 36c, and 36d, respectively. That is, the rail 3 has a plurality of branch points, namely, branch points 36a to 36d, which are arranged to be separated from each other on the main rail 32. The main rail 32 branches into the first branch rails 33a to 33d via different branch points 36a, 36b, 36c, and 36d, respectively. In addition, for example, it is considered that the portion of the rail 3 upstream of the branch point 36a is the main rail 32, and branches into the first branch rail 33a downstream thereof. The first branch rails 33a to 33d are connected to the main rail 32 via different branch points 36a to 36d, respectively. The branch points 36a to 36d are separated from each other by a predetermined distance on the main rail 32.

[0041] "Meeting point" refers to the part where the branch track connects to the main track. "Meeting point" refers to the part where you reach the main track from the branch track. "Meeting point" is the connection point used to enter the main track from the branch track. "Branch point" refers to the part where the main track connects to the branch track. "Branch point" refers to the part where you reach the branch track from the main track. "Branch point" is the connection point used to enter the branch track from the main track. Figure 3 In the example shown, the main rail 31 corresponds to the second main rail, the main rail 32 corresponds to the first main rail, and the first branch line rails 33a to 33d correspond to the branch line rails.

[0042] Each of the first branch rails 33a to 33d has a stop position corresponding to a handover port 4 for the transport vehicle 10 to hand over the cargo L. The handover port 4 is disposed along each of the first branch rails 33a to 33d. The handover port 4 is, for example, provided on a conveyor (not shown) for transporting the cargo L. The handover port 4 has a discharge port 41 and a loading port 42.

[0043] The unloading port 41 is a port for unloading the cargo L from the transport vehicle 10. After the cargo L is put down at the unloading port 41, the cargo L is carried out before the subsequent transport vehicle 10 arrives. The unloading port 41 is arranged at a predetermined interval on the upstream side of the loading port 42. In other words, the loading port 42 is arranged at a predetermined interval on the downstream side of the unloading port 41. The loading port 42 is a port for loading the cargo L onto the transport vehicle 10. The loading port 42 can carry the cargo L into the port within a span where a plurality of transport vehicles 10 arrive in succession. The unloading port 41 and the loading port 42 are not particularly limited, and various well-known ports can be used.

[0044] like Figure 3As shown, the controller 20 is an electronic control unit composed of a central processing unit (CPU), a read-only memory (ROM), and a random access memory (RAM). The controller 20 can be configured as software that loads the program stored in the ROM to the RAM and is executed by the CPU. The controller 20 can also be configured as hardware composed of circuits, etc. The controller 20 communicates with the plurality of transport vehicles 10 to control the movement of the plurality of transport vehicles 10.

[0045] The controller 20 performs departure control for each transport vehicle 10 stopped at a stop position corresponding to the respective handover interface 4 of the first branch rails 33a to 33d (here, a stop position corresponding to the loading port 42) to make them depart along each of the first branch rails 33a to 33d toward the main rail 31. In addition, hereinafter, the stop position corresponding to the loading port 42 is sometimes referred to as a "stop position". The upstream and downstream of the departure control correspond to the upstream and downstream of the main rail 31, and the upstream and downstream of the entry control correspond to the upstream and downstream of the main rail 32.

[0046] In the departure control, the transport vehicle 10 that is stopped on the first branch track 33 on the downstream side among the first branch tracks 33a to 33d is caused to depart at the same time as the transport vehicle 10 that is stopped on the first branch track 33 on the upstream side, or is caused to depart earlier. Specifically, in the departure control, the transport vehicle 10 that is stopped on the first branch track 33d is caused to depart at the same time as the transport vehicle 10 that is stopped on the first branch track 33c, or is caused to depart earlier. The transport vehicle 10 that is stopped on the first branch track 33c is caused to depart at the same time as the transport vehicle 10 that is stopped on the first branch track 33b, or is caused to depart earlier. The transport vehicle 10 that is stopped on the first branch track 33b is caused to depart at the same time as the transport vehicle 10 that is stopped on the first branch track 33a, or is caused to depart earlier.

[0047] More specifically, in the departure control, for each stopped transport vehicle 10, regardless of whether it is loaded with goods L, it is set off on each of the first branch tracks 33a~33d at a time that is repeated at a constant period (forced departure). For example, in the departure control, on each of the first branch tracks 33a~33d, a spacing timer is used to start counting down from the reference spacing time. When the count of the spacing timer reaches 0, the transport vehicle 10 stopped at the stop position is set off, and the count of the spacing timer is reset to the reference spacing time. Then, the spacing timer continues to count down. The reference spacing time can be a predetermined fixed value or a variable value. In the present embodiment, the time axis of the spacing timers of each of the first branch tracks 33a~33d is staggered so that the transport vehicle 10 that is stopped on the first branch track 33 on the downstream side starts first.

[0048] The controller 20 performs entry control to make the plurality of transport vehicles 10 traveling along the main track 32 enter the first branch track 33a to 33d in order from the downstream side to the upstream side. Specifically, in the entry control, the transport vehicle 10 enters the first branch track 33a, the next transport vehicle 10 enters the first branch track 33b, the next transport vehicle 10 enters the first branch track 33c, and the next transport vehicle 10 enters the first branch track 33d, and then the entry of the transport vehicle 10 is repeated.

[0049] In the entry control, a transport destination determination control is performed to determine (guide) the transport destination of the transport vehicle 10 traveling in a specific section R of the main track 32 that is upstream of each branch point 36a~36d. The specific section R is a straight section close to each branch point 36a~36d. The specific section R is not limited to a straight section, but can also be a section containing a curve, or can be various sections. The specific section R is not particularly limited as long as it is upstream of each branch point 36a~36d. In the transport destination determination control, the handover interface 4 of the transport destination (here, the unloading port 41 of one of the first branch lines 33a~33d) is determined.

[0050] The controller 20 grasps the number of transport vehicles 10 existing on each of the first branch rails 33a to 33d (entry number). Specifically, in the entry control, when the transport destination is determined by the above-mentioned transport destination determination control, the controller 20 increases the number of transport vehicles 10 existing on one of the first branch rails 33a to 33d corresponding to the transport destination by one (counting up). In the departure control, when the transport vehicle 10 stopped at the stop position of one of the first branch rails 33a to 33d is caused to depart, the controller 20 reduces the number of transport vehicles 10 existing on one of the first branch rails 33a to 33d at the departure timing by one (counting down).

[0051] Back to Figure 1 In the process, the controller 20 performs the above-mentioned virtual connection control of the departure control and the entry control for each transport vehicle group including a plurality of transport vehicles 10 (here, four) corresponding to the number of the first branch rails 33a to 33d. The controller 20 causes the plurality of transport vehicles 10 to travel along the circling rails (main rails 31, 32, first branch rails 33a to 33d, and second branch rails 34a to 34d) in a manner with the same circling distance or circling time. For example, in the entry control, the controller 20 causes the transport vehicle 10 that has entered the first branch rail 33d to enter the second branch rail 34a, causes the transport vehicle 10 that has entered the first branch rail 33c to enter the second branch rail 34b, causes the transport vehicle 10 that has entered the first branch rail 33b to enter the second branch rail 34c, and causes the transport vehicle 10 that has entered the first branch rail 33a to enter the second branch rail 34d. In addition, during the entry control, the transport vehicle 10 that has entered the second branch track 34d is made to enter the first branch track 33a, the transport vehicle 10 that has entered the second branch track 34c is made to enter the first branch track 33b, the transport vehicle 10 that has entered the second branch track 34b is made to enter the first branch track 33c, and the transport vehicle 10 that has entered the second branch track 34a is made to enter the first branch track 33d.

[0052] Next, the entry control performed by the controller 20 will be described in detail.

[0053] In the entry control, the transport vehicle 10 is caused to enter the first branch track 33a to 33d from the main track 32 according to the priority order corresponding to the entry information related to the entry status of each transport vehicle entering the first branch track 33a to 33d. Specifically, in the transport destination determination control included in the entry control, the delivery port 4 to which the transport vehicle 10 delivers the goods is determined according to the priority order corresponding to the entry status. In the entry control, the transport vehicle 10 is caused to enter one of the first branch tracks 33a to 33d corresponding to the delivery port 4 determined in the transport destination determination control.

[0054] As an example, in the entry control, entry information including information indicating the number of transport vehicles 10 existing on each of the first branch rails 33a to 33d is acquired. In the transport destination determination control, based on the acquired entry information, the intersection 4 of the first branch rail 33 where the number of transport vehicles 10 existing is the smallest among the first branch rails 33a to 33d is determined as the transport destination of the transport vehicle 10. In the entry control, the transport vehicle 10 is caused to enter the first branch rail 33 corresponding to the determined transport destination. That is, in the entry control, the transport vehicle 10 is caused to enter the first branch rail 33 where the number of transport vehicles 10 existing is the smallest among the first branch rails 33a to 33d. In addition, in the entry control, when there are a plurality of first branch rails 33 where the number of transport vehicles 10 existing is the smallest, the intersection 4 of the first branch rail 33 corresponding to the branch point 36 located on the most downstream side of the main rail 32 among the plurality of first branch rails 33 is determined as the transport destination of the transport vehicle 10. In the entry control, the transport vehicle 10 is caused to enter the first branch track 33 corresponding to the determined transport destination. That is, in the entry control, when there are a plurality of first branch tracks 33 with the least number of transport vehicles 10, the transport vehicle 10 is caused to enter the first branch track 33 corresponding to the branch point 36 located at the most downstream side of the main track 32 among the plurality of first branch tracks 33 among the first branch tracks 33a to 33d.

[0055] In addition, in the transport destination determination control, if the first branch line track 33 where the number of transport vehicles 10 present is less than the set number does not exist, the delivery port 4 of the transport destination is not determined. In this case, in the entry control, the transport vehicle 10 is not allowed to enter the plurality of first branch line tracks 33 but is allowed to wait on the main track 32. In the entry control, according to the timing when the number of transport vehicles 10 present on the first branch line track 33a corresponding to the branch point 36a located on the most downstream side decreases (the timing when the count of the interval timer becomes 0), the transport vehicle 10 waiting on the main track 32 starts to enter at least one of the plurality of first branch line tracks 33. In the entry control here, the transport destination determination control of the transport vehicle 10 waiting on the main track 32 is started with the count down of the transport vehicles 10 present on the first branch line track 33a corresponding to the branch point 36a located on the most downstream side as a trigger.

[0056] The set number is an arbitrary number set by the user, as long as it is below the upper limit of the number of transport vehicles 10 that can exist on each first branch track 33. For example, the set number can be one or more than two. In addition, there is a case where the number of transport vehicles 10 existing on the first branch track 33a does not decrease when the pitch timer counts to 0. In this case, during the entry control, the transport vehicle 10 waiting on the main track 32 can also start to enter at least one of the plurality of first branch tracks 33.

[0057] Figure 4 It is a schematic plan view for explaining an example of access control in the conveying system 1 . Figure 5 Yes means Figure 4 A schematic top view of the subsequent Figure 4 In the example shown, the transport vehicles 10a to 10c are traveling toward the specific section R. The transport vehicles 10d to 10f are located at the loading ports 42 of the first branch rails 33a to 33c, respectively. That is, the number of transport vehicles 10 on each of the first branch rails 33a to 33c is one, and the number of transport vehicles 10 on the first branch rail 33d is zero.

[0058] In such Figure 4 In the situation shown, for example, the following entry control is performed. First, when the transport vehicle 10a is located in the specific section R, the transfer port 4 of the first branch track 33d where the number of transport vehicles 10 present is the least, that is, 0, is determined as the transport destination of the transport vehicle 10a by the transport destination determination control. At this time, the number of transport vehicles 10 present on the first branch track 33d is counted up in the controller 20. In the entry control, the transport vehicle 10a is caused to enter the first branch track 33d.

[0059] Next, when the transport vehicle 10b is located in the specific section R, in the transport destination determination control, the intersection 4 of the first branch track 33a corresponding to the branch point 36a located at the most downstream side of the main track 32 among the first branch tracks 33a to 33d where there is one transport vehicle 10 is determined as the transport destination of the transport vehicle 10b. At this time, the number of transport vehicles 10 existing on the first branch track 33a is incremented in the controller 20. In the entry control, the transport vehicle 10b is caused to enter the first branch track 33a.

[0060] Finally, when the transport vehicle 10c is located in the specific section R, in the transport destination determination control, the intersection 4 of the first branch track 33b corresponding to the branch point 36b located on the most downstream side of the main track 32 among the first branch tracks 33b to 33d where the number of transport vehicles 10 present is the least, that is, one, is determined as the transport destination of the transport vehicle 10c. At this time, the number of transport vehicles 10 present on the first branch track 33b is incremented in the controller 20. In the entry control, the transport vehicle 10c is made to enter the first branch track 33b. The above result is as follows. Figure 5 As shown, the transport vehicle 10a enters the first branch track 33d, the transport vehicle 10b enters the first branch track 33a, and the transport vehicle 10c enters the first branch track 33b.

[0061] Figure 6 This is another schematic top view for explaining an example of access control. Figure 7 Yes means Figure 6 A schematic top view of the subsequent Figure 6 In the example shown, the transport vehicles 10a to 10c travel in the specific section R so as to approach the plurality of branch points 36. The plurality of transport vehicles 10 are located at all the unloading ports 41 and loading ports 42 of the first branch line tracks 33a to 33d. That is, the number of transport vehicles 10 present on each of the first branch line tracks 33a to 33d is two.

[0062] In such Figure 6 In the situation shown, for example, when the set number is two, the following entry control is performed. First, the number of transport vehicles 10 existing on each of the first branch line tracks 33a to 33d is the same as the set number, and the transport destination of the transport vehicle 10a is not determined in the transport destination determination control. In the entry control, for example, when the transport vehicle 10a approaches the terminal of the specific section R, the transport vehicle 10a is decelerated and the transport vehicle 10a is made to wait on the main track 32.

[0063] Then, if Figure 7As shown, by the departure control, the transport vehicles 10 existing on each of the first branch line rails 33a to 33d are caused to depart one by one. In the entry control, at the time when the number of transport vehicles 10 existing on the first branch line rail 33a corresponding to the branch point 36a located on the most downstream side decreases, the transport destination of the transport vehicle 10a is determined by the transport destination determination control. As a result, in the transport destination determination control, the intersection 4 of the first branch line rail 33a corresponding to the branch point 36a located on the most downstream side of the main track 32 among the first branch line rails 33a to 33d where the number of transport vehicles 10 existing is the least, that is, one, is determined as the transport destination of the transport vehicle 10a. At this time, in the controller 20, the number of transport vehicles 10 existing on the first branch line rail 33a is counted up. In the entry control, the transport vehicle 10a is caused to enter the first branch line rail 33a.

[0064] In the transport destination determination control, the transport destination of the transport vehicle 10b following the transport vehicle 10a is determined to be the handover interface 4 of the first branch track 33b. In the entry control, the transport vehicle 10b is caused to enter the first branch track 33b. In the transport destination determination control, the transport destination of the transport vehicle 10c following the transport vehicle 10b is determined to be the handover interface 4 of the first branch track 33c. In the entry control, the transport vehicle 10c is caused to enter the first branch track 33c.

[0065] As described above, the transport system 1 allows the transport vehicles 10 to enter the first branch rails 33 according to the priority order corresponding to the entry information related to the entry status of each transport vehicle 10 into the plurality of first branch rails 33. As a result, for example, the transport vehicles 10 can be allowed to enter each of the plurality of first branch rails 33 to suppress the situation where there are always insufficient transport vehicles 10 on a specific first branch rail 33. As a result, it is possible to suppress the situation where the frequency of delivering goods to the delivery interface 4 provided along the specific first branch rail 33 is reduced (the situation where the delivery of goods from the specific delivery interface 4 is delayed), so that the transport vehicles 10 can smoothly transport goods.

[0066] In the transport system 1, the entry information includes information indicating the number of transport vehicles 10 existing on each first branch track 33. In the entry control, based on the entry information, the transport vehicles 10 are caused to enter the first branch track 33 having the least number of transport vehicles 10 among the plurality of first branch tracks 33. In this case, it is possible to specifically prevent a situation in which there are always insufficient transport vehicles 10 on a specific first branch track 33.

[0067] In the transport system 1, during entry control, when there are a plurality of first branch rails 33 having the least number of transport vehicles 10, the transport vehicles 10 are allowed to preferentially enter the first branch rail 33a corresponding to the branch point 36a located at the most downstream side of the main rail 32 among the plurality of first branch rails 33. Thus, compared with the case where the transport vehicles 10 are allowed to preferentially enter the first branch rail 33 branching from the upstream side of the main rail 32 among the plurality of first branch rails 33, the transport vehicles 10 can enter each branch rail more smoothly.

[0068] Specifically, compared with the case where the transport vehicle 10 enters the first branch track 33 corresponding to the branch point 36 located on the upstream side of the main track 32 among the plurality of first branch tracks 33, the transport vehicle 10 can be prevented from obstructing the movement of another transport vehicle 10 following the transport vehicle 10, thereby preventing the occurrence of a jam. Figure 4 In the example shown, there is a case where the first branch track 33 for the transport vehicle 10b to enter fails, etc., and the transport vehicle 10b cannot enter. In this case, for example, when the transport vehicle 10b enters the first branch track 33d branching from the upstream side of the main track 32, if the transport vehicle 10b stops on the upstream side of the branch point 36, the transport vehicle 10b will prevent the transport vehicle 10c following the transport vehicle 10b from entering the first branch track 33a to 33c, and there is a possibility of congestion on the main track 32. In contrast, in the present embodiment, if Figure 5 As shown, the transport vehicle 10b is caused to enter the first branch track 33a branching from the most downstream side of the main track 32. As a result, the transport vehicle 10b can wait near the branch point 36a located at the most downstream side, thereby preventing the transport vehicle 10c following the transport vehicle 10b from being hindered in its travel. As a result, the transport vehicle 10c can smoothly enter the first branch track 33b to 33d. According to the above, the transport vehicle 10 can enter the first branch track 33 more smoothly, and the main track 32 can be prevented from being blocked.

[0069] In the transport system 1, in the entry control, when the number of transport vehicles 10 existing on the first branch track 33 corresponding to the branch point 36 located on the most downstream side decreases, the transport vehicles 10 waiting on the main track 32 start to enter at least any one of the plurality of first branch tracks 33. Thus, compared with the case where the transport vehicles 10 are preferentially allowed to enter the first branch track 33 branching from the upstream side of the main track 32 among the plurality of first branch tracks 33, the transport vehicles 10 can enter the first branch track 33 more smoothly.

[0070] In the transport system 1, the track 3 has a main track 31. A plurality of first branch tracks 33 are connected to the main track 31 via mutually different meeting points 35. The controller 20 performs departure control to make each transport vehicle 10 stopped at each stop position of the plurality of first branch tracks 33 depart along each of the plurality of first branch tracks 33 toward the main track 31. In the entry control, when the transport destination of the transport vehicle 10 is determined, the number of transport vehicles 10 existing on the first branch track 33 corresponding to the transport destination is increased by one. In the departure control, when the transport vehicle 10 departs from the first branch track 33, the number of transport vehicles 10 existing on the first branch track 33 is reduced by one. In this case, the above-mentioned effect that the transport vehicle 10 can smoothly transport goods can be specifically achieved.

[0071] Next, the second embodiment is described. In the above-mentioned first embodiment, although it is described that the transport vehicle 10 enters the first branch track 33 with the least number of transport vehicles 10 among the first branch tracks 33a to 33d during the entry control, it is not limited to this. In the entry control of the second embodiment, each intersection 4 of the first branch track 33a to 33d can also be determined as the transport destination of the transport vehicle 10 in the order from the downstream side to the upstream side of the main track 32 (cyclically), and the transport vehicle 10 can be sequentially entered into the first branch track 33 of the determined transport destination.

[0072] In more detail, in the entry control of the second embodiment, entry information including information related to the first branch track 33 (entry branch track) for the transport vehicle 10 (first transport vehicle) to enter may be obtained. In the transport destination determination control, based on the obtained entry information, when there is another adjacent branch point 36 on the upstream side of the branch point 36 of the first branch track 33 entered by the transport vehicle 10 in the main track 32, the intersection 4 of the first branch track 33 corresponding to the other branch point 36 may be determined as the transport destination of the other transport vehicle 10 (second transport vehicle) following the transport vehicle 10. In the entry control, the other transport vehicle 10 may be allowed to enter the first branch track 33 of the determined transport destination. That is, in the entry control, when there is another adjacent branch point 36 on the upstream side of the branch point 36 of the first branch track 33 entered by the transport vehicle 10 in the main track 32, the other transport vehicle 10 may be allowed to enter the first branch track 33 corresponding to the other branch point 36.

[0073] Furthermore, in the transport destination determination control of the entry control of the second embodiment, when the above-mentioned other branch point 36 does not exist, the intersection 4 of the first branch track 33a corresponding to the branch point 36a located at the most downstream side of the main track 32 may be determined as the transport destination of the other transport vehicle 10. In the entry control, the other transport vehicle 10 may be caused to enter the first branch track 33 of the determined transport destination. That is, in the entry control, when the above-mentioned other branch point 36 does not exist, the other transport vehicle 10 may be caused to enter the first branch track 33a corresponding to the branch point 36a located at the most downstream side of the main track 32.

[0074] In this case, for example Figure 4 In the situation shown, immediately after the transport vehicle 10f enters the first branch track 33c, the following entry control of the second embodiment is executed. First, in the transport destination determination control, since another branch point 36d is adjacent to the upstream side of the branch point 36c of the first branch track 33c entered by the transport vehicle 10f in the main track 32, the intersection 4 of the first branch track 33d corresponding to the other branch point 36d is determined as the transport destination of the transport vehicle 10a following the transport vehicle 10f. In the entry control, the transport vehicle 10a is caused to enter the first branch track 33d.

[0075] Next, in the transport destination determination control, since there is no branch point 36 on the upstream side of the branch point 36d of the first branch track 33d entered by the transport vehicle 10a in the main track 32, the intersection 4 of the first branch track 33a corresponding to the branch point 36a located on the most downstream side of the main track 32 is determined as the transport destination of the transport vehicle 10b. In the entry control, the transport vehicle 10b is caused to enter the first branch track 33a.

[0076] Finally, in the transport destination determination control, since there is another branch point 36b adjacent to the upstream side of the branch point 36a of the first branch track 33a entered by the transport vehicle 10b in the main track 32, the intersection 4 of the first branch track 33b corresponding to the other branch point 36b is determined as the transport destination of the transport vehicle 10c following the transport vehicle 10b. In the entry control, the transport vehicle 10c is caused to enter the first branch track 33b.

[0077] Thus, by executing the above-mentioned entry control, the transport vehicle 10 enters the first branch track 33a to 33d in order, and the transport vehicle 10 enters the first branch track 33a just after the transport vehicle 10 enters the first branch track 33d. As a result, the transport vehicle 10a enters the first branch track 33d, the transport vehicle 10b enters the first branch track 33a, and the transport vehicle 10c enters the first branch track 33b.

[0078] According to the transport system 1 that performs the access control of the second embodiment, a plurality of transport vehicles 10 can be made to enter each first branch track 33 evenly. As a result, it is possible to suppress a situation where the number of transport vehicles 10 departing from the first branch tracks 33a to 33d decreases, and thus it is possible to suppress a situation where the number of transport vehicles 10 on the second branch tracks 34a to 34d is insufficient. As a result, it is possible to suppress a decrease in the frequency of the transport vehicles 10 delivering goods to the delivery ports 4 provided along the second branch tracks 34a to 34d, and thus it is possible to suppress a decrease in the transport capacity.

[0079] Next, the third embodiment will be described. In the entry control of the third embodiment, the transport vehicle 10 may be caused to enter the first branch line track 33 where the number of transport vehicles 10 existing is less than the set number, based on the obtained entry information. More specifically, in the transport destination determination control, the intersection 4 of the first branch line track 33 where the number of transport vehicles 10 existing is less than the set number may be determined as the transport destination of the transport vehicle 10, based on the obtained entry information. In the entry control, the transport vehicle 10 may be caused to enter the first branch line track 33 of the determined transport destination.

[0080] In this case, for example Figure 4 In the situation shown, the following entry control of the third embodiment is performed. First, when the number of vehicles is set to one, in the transport destination determination control, the handover interface 4 of the first branch track 33d where the number of transport vehicles 10 present is 0 is determined as the transport destination of the transport vehicle 10a. In the entry control, the transport vehicle 10a is caused to enter the first branch track 33d. In addition, when the number of vehicles is set to two, in the transport destination determination control, one of the handover interfaces 4 of the first branch tracks 33a to 33d where the number of transport vehicles 10 present is one or less is determined as the transport destination of the transport vehicle 10a. In the entry control, the transport vehicle 10a is caused to enter the first branch track 33 of the determined transport destination.

[0081] In addition, for example, in the transport destination determination control of the entry control of the third embodiment, after the transport vehicle 10 is placed on standby on the main track 32, when there are a plurality of first branch tracks 33 where the number of transport vehicles 10 present is less than the set number, the intersection 4 of the first branch tracks 33 corresponding to the branch point 36 located at the most downstream side of the main track 32 among the plurality of first branch tracks 33 may be determined as the transport destination of the waiting transport vehicle 10. In the entry control, the transport vehicle 10 may be placed on standby on the main track 32. That is, in the entry control, after the transport vehicle 10 is placed on standby on the main track 32, when there are a plurality of first branch tracks 33 where the number of transport vehicles 10 present is less than the set number, the transport vehicle 10 may be placed on the first branch track 33 corresponding to the branch point 36 located at the most downstream side of the main track 32 among the plurality of first branch tracks 33.

[0082] In this case, for example Figure 7 In the situation shown, the following entry control of the third embodiment is performed. First, in the transport destination determination control, the handover port 4 of the first branch track 33a corresponding to the branch point 36a located at the most downstream side of the main track 32 among the first branch tracks 33a to 33d is determined as the transport destination of the transport vehicle 10a waiting on the main track 32. In the entry control, the transport vehicle 10a is caused to enter the determined transport destination.

[0083] In the entry control of the third embodiment, based on the entry information, the transport vehicles 10 are caused to enter the first branch track 33 where the number of transport vehicles 10 present is less than the set number. In the entry control, when the first branch track 33 where the number of transport vehicles 10 present is less than the set number does not exist, the transport vehicles 10 are caused to wait on the main track 32. Thus, it is possible to avoid a situation where the transport vehicles 10 enter a specific first branch track 33 in a concentrated manner. In other words, it is possible to prevent the transport vehicles 10 exceeding the number that can enter from entering each first branch track 33, and thus it is possible to prevent the first branch track 33 from being blocked. As a result, it is possible to prevent the reduction in the transport capacity of the transport system.

[0084] In the access control of the third embodiment, after the transport vehicle 10 is placed on standby on the main track 32, when there are a plurality of first branch tracks 33 where the number of transport vehicles 10 present is less than the set number, the waiting transport vehicle 10 is placed on standby to enter the first branch track 33a corresponding to the branch point 36a located at the most downstream side of the main track 32 among the plurality of first branch tracks 33. Thus, compared with the case where the transport vehicle 10 is placed on standby to enter the first branch track 33 branching from the upstream side of the main track 32 among the plurality of first branch tracks 33, the transport vehicle 10 can enter the first branch track 33 more smoothly.

[0085] Next, a fourth embodiment will be described. In the first to third embodiments, the rail 3 includes the main rails 31 and 32 , the first branch rail 33 , and the second branch rail 34 , but the structure of the rail 3 is not particularly limited. Figure 8 FIG. 1 is a schematic top view showing a transport system 101 according to a fourth embodiment. Figure 8 As shown, the transport system 101 of the fourth embodiment has a track 103 instead of the track 3 (see Figure 3 ). The track 103 includes main tracks 31, 32, a first branch track 33, a second branch track 34, and a spare branch track 133. The spare branch track 133 is connected to the main track 32 via a spare branch point 136, which is another branch point on the downstream side compared to the plurality of branch points 36a to 36d. The spare branch track 133 is connected to the main track 31 via a spare junction 135, which is another junction point on the upstream side compared to the plurality of junction points 35a to 35d. In addition, the main track 32 branches into the spare branch track 133 via the spare branch point 136. In addition, for example, the portion of the track 103 upstream of the spare branch point 136 is the main track 32, and it is considered that the portion downstream thereof branches into the spare branch track 133.

[0086] In the transport system 101 of the fourth embodiment, in the entry control, when at least one of the plurality of first branch rails 33 cannot transfer cargo, the transport vehicle 10 that is scheduled to enter the first branch rail 33 that cannot transfer cargo is caused to enter the backup branch rail 133 to replace the first branch rail 33. Thus, even when at least one of the plurality of first branch rails 33 cannot transfer cargo, the backup branch rail 133 can be used to suppress the reduction of the transport capacity. Specifically, it is possible to suppress the situation where the transport vehicle 10 that is scheduled to enter hinders the movement of another subsequent transport vehicle 10 and causes a jam. In addition, the backup meeting point 135 is separated from the meeting point 35a by a predetermined distance. The backup branch point 136 is separated from the branch point 36a by a predetermined distance.

[0087] In the transport system 101 of the fourth embodiment, the transfer port 4 is arranged along the backup branch rail 133. Therefore, since the cargo can be transferred on the backup branch rail 133, the reduction in the transport capacity of the transport system 1 can be further suppressed.

[0088] Next, a fifth embodiment will be described. Fig. 9 FIG. 2 is a schematic top view showing a transport system 201 according to a fifth embodiment. Fig. 9 As shown, the transport system 201 of the fifth embodiment has a track 203 instead of the track 3 (see Figure 3). The track 203 includes main tracks 31, 32, a first branch track 33, a second branch track 34, a backup branch track 133, and an auxiliary branch track 237. The auxiliary branch track 237 is connected to the main track 31 via an auxiliary branch point 236, which is a branch point on the downstream side of the plurality of junctions 35. That is, the main track 31 branches into the auxiliary branch track 237 via the auxiliary branch point 236. The auxiliary branch track 237 is connected to the main track 32 via an auxiliary junction point 235, which is a junction point on the upstream side of the plurality of junctions 36.

[0089] In the transport system 201 of the fifth embodiment, during the entry control, the transport vehicle 10 that has entered the backup branch track 133 can also enter the auxiliary branch track 237. In this case, for example, even when the interface of the transport vehicle 10 or the transported object on the first branch track 33 fails and the cargo cannot be transferred, the reduction in the transport capacity can be further suppressed. In addition, when there is a deviation in the number of transport vehicles 10 on each main track 31 and 32 between the main track 31 and the main track 32, the deviation can be eliminated by allowing the transport vehicle 10 that is not transporting the cargo L to enter the auxiliary branch track 237. In addition, the above-mentioned backup branch track 133 and the auxiliary branch track 237 can also be provided on the side of the second building F2.

[0090] Although the embodiments have been described above, the embodiments of the present invention are not limited to the above-described embodiments, and various modifications can be made within the scope of the present invention.

[0091] In the above embodiment, the track 3 includes four first branch tracks 33a-33d, but the number of first branch tracks may be 2, 3 or more than 5. Similarly, the track 3 includes four second branch tracks 34a-34d, but the number of second branch tracks may be 2, 3 or more than 5.

[0092] In the above embodiment, in the departure control, the departure is forced at a fixed period regardless of whether the cargo L is loaded, but the departure may be performed on the condition that the cargo L is loaded. In the above embodiment, although the destination determination control is performed to determine the destination of the transport vehicle 10 traveling in the specific section R, the destination determination control may not be performed, and the delivery port 4 of the destination may be determined at an arbitrary timing. In the above embodiment, although the virtual connection control is performed to control each transport vehicle group including a plurality of transport vehicles 10, the virtual connection control may not be performed.

[0093] In the above-mentioned embodiment, during the entry control, when the transport vehicle 10 is caused to enter the first branch track 33 corresponding to the transport destination, there is a case where the first branch track 33 fails, resulting in the transport vehicle 10 being unable to enter the first branch track 33 (a case where the first branch track 33 stops). In this case, during the entry control, the transport vehicle 10 may also be caused to enter the first branch track 33 corresponding to another branch point 36 adjacent to the upstream side of the branch point 36 of the first branch track 33. In addition, when the branch point 36 of the first branch track 33 where the failure occurs is the branch point 36 located on the most upstream side of the main track 32, the transport vehicle 10 may also be caused to wait on the main track 32.

[0094] Each structure in the above-mentioned embodiment is not limited to the above-mentioned shape, and various shapes can be applied. Each structure in each embodiment can be arbitrarily applied to each structure in other embodiments. A part of each structure in the above-mentioned embodiment can also be appropriately omitted without departing from the scope of the gist of one embodiment of the present invention.

[0095] Description of reference numerals:

[0096] 1, 101, 201: handling system, 3, 103, 203: track, 4: handover interface, 10, 10a~10f: transport vehicle, 20: controller, 31: main track (second main track), 32: main track (first main track), 33, 33a~33d: first branch track (branch track), 34a~34d: second branch track, 35, 35a~35d: meeting point, 36, 36a~36d: branch point, 41: unloading port, 42: loading port, 133: spare branch track, 135: spare meeting point, 136: spare branch point, 235: auxiliary meeting point, 236: auxiliary branch point, 237: auxiliary branch track, L: cargo, R: specific section.

Claims

1. A transport system, wherein: have: Multiple transport vehicles move along the track to transport goods; as well as A controller for controlling the movement of the plurality of transport vehicles; The track includes a first main track and a plurality of branch tracks branching from the first main track via different branch points. The controller performs entry control to make the transport vehicle enter each of the plurality of branch tracks from the first main track. In the entry control, the transport vehicles are caused to enter the branch tracks in a priority order corresponding to entry information related to entry states of the transport vehicles into the plurality of branch tracks.

2. The transport system according to claim 1, wherein: The entry information includes information indicating the number of transport vehicles present on each branch track; in the entry control, Based on the entry information, the transport vehicle is preferentially allowed to enter a branch track having the least number of transport vehicles among the plurality of branch tracks.

3. The transport system according to claim 2, wherein: In the access control, When there are a plurality of branch tracks on which the number of the transport vehicles is the smallest, the transport vehicle is caused to enter the branch track corresponding to the branch point located on the most downstream side of the first main track among the plurality of branch tracks.

4. The transport system according to claim 1, wherein: The entry information includes information related to the entry branch track entered by the first transport vehicle; In the access control, When there is another adjacent branch point on the upstream side of the branch point for entering the branch track in the first main track, a second transport vehicle following the first transport vehicle enters the branch track corresponding to the other branch point, When the other branch point does not exist, the second transport vehicle is caused to enter the branch line track corresponding to the branch point located on the most downstream side of the first main track.

5. The transport system according to claim 1, wherein: The entry information includes information indicating the number of transport vehicles present on each branch track; in the entry control, According to the entry information, the transport vehicle is caused to enter the branch track where the number of transport vehicles existing therein is less than a set number. When the branch track where the number of the transport vehicles is less than the set number does not exist, the transport vehicles are not allowed to enter the plurality of branch tracks but are made to wait on the first main track.

6. The transport system according to claim 5, wherein: In the access control, After the transport vehicle is placed on standby on the first main track, when there are multiple branch tracks where the number of transport vehicles present is less than the set number, the waiting transport vehicle is placed on standby into the branch track corresponding to the branch point located on the most downstream side of the first main track among the multiple branch tracks.

7. The transport system according to claim 5 or 6, wherein: In the access control, At a timing when the number of the transport vehicles on the branch track corresponding to the branch point located most downstream decreases, the transport vehicles waiting on the first main track start entering at least one of the plurality of branch tracks.

8. The transport system according to any one of claims 2 to 6, wherein: The track has a second main track, The plurality of branch rails are connected to the second main rail via different junction points, and the controller performs departure control to cause each transport vehicle stopped at a stop position of each of the plurality of branch rails to depart along each of the plurality of branch rails toward the second main rail. In the entry control, when a transport destination of the transport vehicle is determined, the number of the transport vehicles existing on the branch track corresponding to the transport destination is increased by one. In the departure control, at a timing when the transport vehicle is caused to depart on the branch track, the number of the transport vehicles present on the branch track is reduced by one.

9. The transport system according to claim 1, wherein: The track has a second main track and a spare branch track. The plurality of branch rails are connected to the second main rail via different junctions, the backup branch rail branches from the first main rail via another branch point, i.e., a backup branch point, which is located downstream of the plurality of branch points, and is connected to the second main rail via another junction point, i.e., a backup junction point, which is located upstream of the plurality of junctions, In the entry control, when the cargo cannot be transferred on at least one of the plurality of branch tracks, the transport vehicle scheduled to enter the branch track where the cargo cannot be transferred enters the spare branch track to replace the branch track.

10. The transport system according to claim 9, wherein: The track has an auxiliary branch track, The auxiliary branch track branches from the second main track via an auxiliary branch point which is a branch point on the downstream side of the plurality of junctions, and is connected to the first main track via an auxiliary junction point which is a junction point on the upstream side of the plurality of branch points. In the entry control, the transport vehicle that has entered the backup branch line track is caused to enter the auxiliary branch line track.