Manufacturing process of irregular polygonal power transmission twin-limb tower connected by inner flanges

Through the split overall assembly and integral pre-assembly process, combined with the special tire frame and inner flange connection, the manufacturing problem of irregular polygon transmission double-limb tower is solved, ensuring the realization of accuracy and shape requirements, reducing costs and improving efficiency.

CN119098703APending Publication Date: 2024-12-10CHINA RAILWAY BAOJI BRIDGE YANGZHOU CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411457852.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-18
Publication Date
2024-12-10

AI Technical Summary

Technical Problem

The prior art is difficult to effectively manufacture irregular polygon transmission double-limb towers connected by inner flange, especially in ensuring the flatness, through-pole ratio and tight fitting accuracy of the flange, as well as the overall line shape and shape requirements.

Method used

The split-type total assembly and integral pre-assembly process are adopted, and the linear twisted wall panels are divided and assembled through a special tire frame to ensure the accuracy control of the single-limb tower segments, and the inner flange connection is used during the overall pre-assembly process. Combining reasonable assembly sequence and process flow, the manufacturing of irregular polygonal double-limb towers is realized.

Benefits of technology

It effectively solves the accuracy and shape requirements of inner flange connections, reduces construction costs, improves production efficiency, and provides a reference for the manufacturing of similar transmission steel towers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119098703A_ABST
    Figure CN119098703A_ABST
Patent Text Reader

Abstract

The invention discloses a manufacturing process of an irregular polygonal power transmission twin-limb tower connected by inner flanges, which comprises the following steps of: split type total splicing: respectively carrying out continuous total splicing on single-limb towers on a single-limb tower total splicing jig frame to complete section manufacturing; according to the characteristics of the cross sections of the segments, the largest straight edge on the outermost side is used as a bottom edge for overall splicing manufacturing; and integral pre-assembly is conducted, specifically, the manufactured single-limb tower sections are subjected to whole-tower-type pre-assembly on a double-limb tower integral pre-assembly jig frame, and a double-limb tower is placed and pre-assembled according to the real tower position state. According to the method, the double-limb tower is reasonably segmented and blocked, the special total assembling jig frame is adopted for split type total assembling to manufacture the single-limb tower sections, and finally the double-limb tower is integrally pre-assembled on the special integral pre-assembling jig frame. Meanwhile, the irregular polygonal power transmission double-limb tower connected with the inner flanges is manufactured by setting a reasonable assembly sequence, a reasonable technological process and other measures, and the manufacturing problem of the irregular polygonal power transmission double-limb tower connected with the inner flanges is effectively solved; and the design precision is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a manufacturing process of a power transmission double-limb tower, in particular to a manufacturing process of an irregular polygonal power transmission double-limb tower with inner flange connection. Background Art

[0002] Electric towers can be divided into angle steel towers and steel pipe towers according to their structural forms. At present, most steel pipe towers in electric towers at home and abroad adopt external flange connection or plug-in connection. Their appearance is basically a single tower structure with regular 16-gons, regular 32-gons or regular 64-gons. The shape is stereotyped and relatively easy to manufacture. The special tower in the 275KV cross-sea transmission line project in Penang, Malaysia adopts an irregular polygonal double-tower structure with internal flange connection. Its segment connection design adopts internal flange connection; the cross-sectional form is composed of irregular polygons and changes continuously along the tower elevation direction; the whole tower is a double-tower structure. The overall shape is beautiful, similar to betel nut, also known as betel nut tower, but the overall manufacturing difficulty is very high. How to ensure the accuracy requirements of the internal flange connection without machining, among which the flatness of the flange, the flange through-hole rate and the close-fitting accuracy during connection are the control difficulties. How to ensure the overall linearity and shape requirements of the double-limb tower is a technical problem that needs to be solved urgently. Summary of the invention

[0003] Purpose of the invention: The purpose of the invention is to propose a manufacturing process for an irregular polygonal transmission double-limb tower with an inner flange connection to ensure the overall linear and shape requirements of the double-limb tower.

[0004] Technical solution: The present invention comprises the following steps:

[0005] Split-type assembly: The single-limb towers are assembled continuously on the single-limb tower assembly frame to complete the segment manufacturing; according to the characteristics of the segment cross section, the assembly is carried out with the outermost maximum straight edge as the bottom edge;

[0006] Integral pre-assembly: The manufactured single-limb tower segments are pre-assembled on the double-limb tower integral pre-assembly frame for whole-tower pre-assembly. The double-limb tower is placed and pre-assembled according to the actual tower position.

[0007] The split-type assembly specifically includes:

[0008] The single-leg tower assembly frame is manufactured. The single-leg tower assembly frame adopts a symmetrical structure, including a crossbeam, a plurality of vertical support plates are arranged on the top of the crossbeam, diagonal supports are symmetrically arranged on both sides of the vertical support plates, a supporting column is connected between the bottom of the diagonal support and the crossbeam, and a plurality of lateral support plates are arranged at intervals on opposite sides of the diagonal support on both sides, and the lateral support plates are arranged vertically with the diagonal support;

[0009] Establish plane measurement control network and elevation measurement control network: measure the tire frame, control the line deviation to be no more than 3mm, and release the ground sample line as the longitudinal reference line for subsequent segment assembly;

[0010] Assembling the wall panels into wall panel units and positioning the wall panel units on the tire frame;

[0011] Repeat the above steps, assembling each step in a step-by-step manner;

[0012] Measure the longitudinal line shape of the single-leg tower. The measurement positions are selected at both ends of the segment and the partition position. The top surface elevation deviation is controlled to be no more than 4mm;

[0013] Welding of anchor plates, wall panel butt welds, segments, flange plates.

[0014] Positioning the wall panel unit and the tire frame specifically includes:

[0015] After assembling the first wall panels into the first wall panel unit, positioning the first wall panel unit and the tire frame to ensure that the center line of the wall panel unit coincides with the longitudinal reference line and the wall panel is in close contact with the support plate;

[0016] Position the anchor plate and flange plate at the corresponding positions;

[0017] Position the second wall panel unit and the fifth wall panel unit on both sides in sequence, check the baseline spacing between the second wall panel unit, the fifth wall panel unit and the first wall panel unit, and control the spacing difference between the two to be no more than 3mm, while ensuring that the wall panel unit is in close contact with the support plate;

[0018] Position the third wall panel unit and the fourth wall panel unit on the upper side in sequence, check the cross-sectional height and the baseline spacing between the third wall panel unit, the fourth wall panel unit and the first wall panel unit, and control the cross-sectional height deviation to be no more than 2mm and the baseline spacing difference to be no more than 3mm.

[0019] The welded anchor plates, wall plate butt welds, segments, and flange plates specifically include:

[0020] After the longitudinal line measurement of the single-leg tower is qualified, the upper and lower flange plates are removed as a whole, and the upper and lower anchor plates and the wall plates are welded with full penetration fillet welds. The upper and lower anchor plates are fixed before welding;

[0021] Weld the wall panel butt welds, then hoist each segment onto the segment welding cradle for the remaining welding work;

[0022] After the segment trimming is completed, each segment is returned to the general assembly frame for resetting, the upper and lower flange plates are assembled, and the flange plates and anchor plates are fixed;

[0023] Weld the flange plate and the wall plate with full penetration welds;

[0024] The segments are repositioned, the flange plates are assembled and the flanges are welded for stiffening.

[0025] The integral pre-assembled tire frame includes a tire frame crossbeam, a support plate assembly is arranged in a mirror image on the top of the tire frame crossbeam, the support plate assembly includes a first support plate and a tire frame diagonal support, a plurality of second support plates are vertically fixed to the surface of the tire frame diagonal support, the first support plate is arranged with the support plate elevation according to the slope of the linear twisted wall panel, and the second support plate is used for limiting the position.

[0026] The integral pre-assembly specifically comprises the following steps:

[0027] Make the pre-assembled frame of the double-limb tower. The first support plate is used to arrange the support plate elevation according to the slope of the linear twisted wall plate, and ensure that the horizontal tower center lines of all steel tower segments are at the same elevation. The second support plate is used for limiting.

[0028] Arrange the plane measurement control network and the elevation measurement control network, and at the same time lay out the tower longitudinal centerline as the positioning reference for subsequent segment assembly;

[0029] Measure the overall pre-assembled tire frame and control the elevation deviation of the first support plate to be no more than 2mm;

[0030] Position the left and right sections on the overall pre-assembly frame in sequence for pre-assembly;

[0031] Measure the dimensions of the two ends of the left and right segments and the longitudinal center line of the tower respectively, and control the linear deviation to be no more than 5mm. The height of the center of the hole group at the end of the segment from the top surface of the tire frame shall be controlled to have a deviation of no more than 2mm.

[0032] Assemble segments: fix the designed segments to the tire frame, assemble the designed segments in sequence, use internal flanges to connect the designed segments, measure the longitudinal deviations of the left and right segments when assembling to the tower top segment, cut the top margin of the joint segment in the tower top segment according to the actual deviation, assemble the tower crown, and weld the tower crown and the joint segment into an integral segment; weld the transverse butt welds between the manufactured segments;

[0033] After welding is completed, measure the overall line shape and arrange monitoring points.

[0034] The designed segments include a tower bottom segment, a tower top segment and a plurality of mid-tower segments, wherein the tower top segment and a single mid-tower segment are respectively divided into at least two manufactured segments.

[0035] The segments in the tower include a plurality of standard length segments and a plurality of special position segments. Each standard length segment is further divided into manufacturing segments, and the special position segments are divided into manufacturing segments according to the cross arm positions.

[0036] When the manufacturing segments within the standard length segment are divided, the positions of the partitions within the standard length segment are staggered for segmentation.

[0037] The tower top segment is divided into segments according to the position of the cross arm, including a tower crown and a double-limb segment, wherein a reserved amount is set at the top of the double-limb segment.

[0038] Beneficial effects: The present invention has the following advantages:

[0039] (1) The present invention reasonably segments and blocks the double-limb tower with special shape and line type, uses a special frame to manufacture linear twisted wall panels, then uses a special assembly frame to perform split assembly to manufacture single-limb tower segments, and finally performs integral pre-assembly of the double-limb tower on a special integral pre-assembly frame. At the same time, by setting a reasonable assembly sequence, process flow and other measures, the manufacturing of irregular polygonal power transmission double-limb towers with inner flange connections is achieved, effectively solving the manufacturing difficulties of irregular polygonal power transmission double-limb towers with inner flange connections; ensuring the design accuracy requirements, including the connection accuracy of the inner flange, the overall line type and shape requirements of the special tower;

[0040] (2) In the case where no machining process is adopted, the upper and lower flanges are matched and connected into a whole and then assembled. The flange plate and the anchor plate are positioned as a whole. The segments are welded first. After the influence of the segment welding deformation is eliminated, the flange plate is re-installed and welded. This greatly ensures the close fit requirements of the upper and lower flange plates, reduces the construction cost overall, greatly improves the production efficiency, and provides a reference for the manufacture of similar transmission steel towers in the future. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] Figure 1 It is a schematic diagram of the double-limb tower structure of the present invention;

[0042] Figure 2 This is a schematic diagram of the inner flange connection of the present invention;

[0043] Figure 3 It is a schematic diagram of segment division of the double-limb tower manufacturing of the present invention;

[0044] Figure 4 It is a schematic diagram of the segment blocks of the double-limb tower of the present invention;

[0045] Figure 5 for Figure 4 Schematic diagram of a linearly twisted siding in;

[0046] Figure 6 for Figure 5 Special tire frame for manufacturing linear twisted siding;

[0047] Figure 7 It is a schematic diagram of the overall assembly frame of a single-limb tower of the present invention;

[0048] Figure 8 It is a front view of the overall assembly frame of the single-limb tower of the present invention;

[0049] Fig. 9 It is a schematic diagram of the overall pre-assembled frame of the double-limb tower of the present invention;

[0050] Fig.10 This is a schematic diagram of the left and right sections of the present invention participating in the overall pre-assembly of the entire tower;

[0051] Fig.11 for Figure 6 Cross-sectional views of the support plate of the special tire frame for manufacturing linear twisted wall panels; wherein, (a) is the AA cross-sectional view; (b) is the BB cross-sectional view; (c) is the CC cross-sectional view; (d) is the DD cross-sectional view; (e) is the EE cross-sectional view;

[0052] Fig.12 It is a schematic diagram of positioning the first wall panel unit and the tire frame;

[0053] Fig.13 Schematic diagram of positioning flange plate and anchor plate for assembly;

[0054] Fig.14 It is a schematic diagram of positioning the second wall panel unit and the fifth wall panel unit with the tire frame;

[0055] Fig.15 It is a schematic diagram of positioning the third wall panel unit and the fourth wall panel unit with the tire frame. DETAILED DESCRIPTION

[0056] The present invention will be further described below in conjunction with the accompanying drawings.

[0057] The double-limb tower of the present invention is as Figure 1 As shown, it includes wall panels and partitions. Multiple partitions are arranged along the longitudinal direction of the double-limb tower. Several longitudinal ribs are arranged on the inner side of the wall panels. The cross section of the double-limb tower is an irregular polygonal cross section, and the cross section shape changes continuously along the longitudinal direction. There is an arc bend in the cross section. In addition, there is also a bend in the longitudinal direction of the double-limb tower. The superposition of the transverse bend and the vertical bend causes irregular distortion at each arc of the steel tower wall panel, which cannot be processed. Therefore, the longitudinal bend is manufactured by replacing the curve with a straight line. At the same time, in order to ensure the overall linear accuracy requirements of the double-limb tower, the design segment is further divided into smaller manufacturing segments. The overall principle is to control the linear deviation to be no more than 5mm, such as Figure 3 As shown. The adjacent design segments are connected by internal flanges, such as Figure 2 As shown, the inner flange connection includes an anchor plate and a flange plate. The anchor plate includes an upper anchor plate 41 and a lower anchor plate 42. The flange plate includes an upper flange plate 51 and a lower flange plate 52. An upper flange plate 51 and a lower flange plate 52 are provided between the upper anchor plate 41 and the lower anchor plate 42. A plurality of flange stiffeners 53 are connected between the flange plate and adjacent anchor plates.

[0058] like Figure 3As shown in the figure, the design segments of the double-limb tower are divided into the bottom segment, the middle segment and the top segment. The length of the bottom segment is less than 7m. The length of the bottom segment in this embodiment is 6.3m. The length of the bottom segment is small and the longitudinal line shape of the bottom is small, so it is not considered to be segmented again. The middle segment includes standard length segments and special position segments. The standard length segment in this embodiment is Figure 3 Segments 02 to 07 in the standard length are 10m, and each standard length segment is further divided into manufacturing segments. When dividing the manufacturing segments, the partition position in the standard length segment is staggered by 100mm, and the segment lengths are 5.1m and 4.9m respectively. Segments 08 to 10 are special position segments, which are segmented according to the cross arm position. The remaining segments are tower top segments. The tower top segment of this embodiment is segment 11, with a length of 6.2 meters. The tower top segment includes two manufacturing segments, which are welded by the upper tower crown and the lower double-limb segment. The lower double-limb segment is used as the double-limb tower joint segment and a 30mm reserve is set at the top. The upper tower crown is a non-expandable curved surface and is manufactured separately.

[0059] Since the cross section of the double-limb tower is an irregular polygonal cross section that keeps changing, and the angle between the wall panel and the horizontal keeps changing, the wall panels in the segment will be linearly twisted. Therefore, the wall panels with linear twist need to be divided and manufactured separately. The remaining wall panels are divided according to the principle that the unfolded length is not more than 3.6m, and the distance between the arc start and end line and the free edge of the panel is not more than 1.2m. Figure 4 As shown, the wall panels are divided into a first wall panel 31, a second wall panel 32, a third wall panel 33, a fourth wall panel 34 and a fifth wall panel 35. The slopes of the upper and lower sections of the second wall panel 32 and the fifth wall panel 35 are different, resulting in distortion of the wall panels. According to the actual BIM model, the slopes of the sections of the wall panels along the elevation direction change linearly, as shown below Figure 5 The first wall panel 31, the third wall panel 33 and the fourth wall panel 34 are divided into blocks according to the principle that the unfolded length is not greater than 3.6m and the distance between the arc start and end lines and the free edge of the panel is not greater than 1.2m.

[0060] The second wall plate 32 and the fifth wall plate 35 are made of Figure 6 The tire frame shown in the figure is manufactured, and the tire frame includes a ground platform 326 and a plurality of integral support plates. The ground platform 326 is fixed to the foundation with expansion bolts, and linear twisted wall panels are placed on the surfaces of the plurality of integral support plates. The thickness of the integral support plates is not less than 16 mm, and the slope of the support plates on each section must be consistent with the linear twisted wall panels. The integral support plates include a first support plate 321, a second support plate 322, a third support plate 323, a fourth support plate 324 and a fifth support plate 325. A ground platform 326 is provided at the bottom of each support plate. The cross-sectional views of the first support plate 321, the second support plate 322, the third support plate 323, the fourth support plate 324 and the fifth support plate 325 are respectively shown in FIG. Fig.11 As shown in (a) to (e).

[0061] The manufacturing process of the second wall panel 32 and the fifth wall panel 35 includes the following steps:

[0062] 1) First, assemble the tire frame. The tire frame is composed of a ground platform and an integral support plate. The entire tire frame must have a certain rigidity. The ground platform and the foundation are fixed with expansion bolts. The thickness of the integral support plate is 20mm, and the slope of the support plate on each section must be consistent with the linear twist wall plate. Inspect the tire frame and control the linear error to not exceed 2mm;

[0063] 2) placing the second wall panel 32 or the fifth wall panel 35 on the tire frame, fixing the wall panel and the tire frame with a U-shaped clamp, and forming them with a heat straightening process. The heat straightening temperature does not exceed 650° C. The heat straightening should be performed in a step-by-step manner until the wall panel and the tire frame are 100% in close contact;

[0064] 3) During the thermal correction process, a level is used to measure the elevation of each feature point and monitor the linear shape of the siding until the thermal correction is qualified.

[0065] The manufacturing process of the irregular polygonal double-limb power transmission tower with inner flange connection of the present invention comprises the following steps:

[0066] S1. Split-type assembly: Continuously assemble the left and right single-limb towers on the single-limb tower assembly frame to complete segment manufacturing; according to the characteristics of the segment cross section, the assembly is carried out with the outermost maximum straight edge as the bottom edge, which is convenient for the longitudinal line control of the single-limb tower and the assembly frame design. Specifically include:

[0067] S11, make a single-limb tower assembly frame, such as Figure 7 and Figure 8 As shown, the overall assembly frame of the single-leg tower adopts a symmetrical structure, including a crossbeam 1, a plurality of vertical support plates 3 are arranged on the top of the crossbeam 1, and diagonal supports 4 are symmetrically arranged on both sides of the vertical support plates 3. A supporting column 5 is connected between the bottom of the diagonal support and the crossbeam 1, and a plurality of lateral support plates 2 are arranged at intervals on the opposite sides of the diagonal supports 4 on both sides, and the lateral support plates 2 are arranged vertically to the diagonal supports 4; a platform is set up on the top of the diagonal support 4, and a skirting board is respectively arranged on one side of the two side platforms close to each other, and a guardrail is arranged on the other side, and a supporting column 5 is also connected between the bottom of the platform and the crossbeam 1.

[0068] The vertical curve of the single-leg tower is achieved by setting and adjusting the elevation of the vertical support plate 3. The lateral support plate 2 is set according to the slope of different sections of the linear twisted wall plate to ensure that the elevation of the tire frame support plate at different sections is consistent with the outer surface contour of the single-leg tower. The overall contour of the tire frame support plate is 2mm larger than the outer surface contour of the steel tower, which has a certain adjustment margin when assembling the total segment and is easy to assemble.

[0069] S12. Establish a plane measurement control network and an elevation measurement control network: measure the tire frame and control the linear deviation to be no more than 3mm. At the same time, lay out the ground sample line as the longitudinal reference line for subsequent segment assembly.

[0070] S13, assembling the wall panels into a wall panel unit, and positioning the wall panel unit and the tire frame, wherein the wall panel unit includes wall panels, longitudinal ribs and partitions, specifically including:

[0071] S131, after assembling the first wall panel 31 into the first wall panel unit 310, the first wall panel unit 310 is positioned with the tire frame to ensure that the center line of the wall panel unit coincides with the longitudinal reference line, and the wall panel is closely attached to the support plate, such as Fig.12 As shown;

[0072] S132. Position the anchor plates and flange plates in the corresponding positions. The upper and lower flange plates need to be matched and made in pairs, and connected into a whole with bolts and rivets. The whole is assembled and positioned during assembly. In addition, when assembling the anchor plates and flange plates, the through-hole rate of the upper and lower anchor plates and the upper and lower flange plates needs to be controlled to reach 100%, and then the anchor plates and flange plates are positioned. The flange plates are only temporarily positioned, such as Fig.13 As shown;

[0073] S133, sequentially locate the second wall panel unit 320 and the fifth wall panel unit 350 on both sides, check the baseline spacing between the second wall panel unit 320, the fifth wall panel unit 350 and the first wall panel unit 310, and control the spacing difference between the two to be no more than 3mm, while ensuring that the wall panel unit is in close contact with the support plate, such as Fig.14 As shown;

[0074] S134, sequentially locate the third wall panel unit 330 and the fourth wall panel unit 340 on the upper side, check the cross-sectional height and the baseline spacing between the third wall panel unit 330, the fourth wall panel unit 340 and the first wall panel unit 310, and control the cross-sectional height deviation to be no greater than 2 mm and the baseline spacing difference to be no greater than 3 mm. Fig.15 As shown;

[0075] S14. Repeat the above step S13, and assemble each step in a step-by-step manner, that is, assemble the first wall panel unit 310 in a step-by-step manner, assemble the anchor plate and the flange plate in a step-by-step manner, assemble the second wall panel unit 320 and the fifth wall panel unit 350 in a step-by-step manner, and assemble the third wall panel unit 330 and the fourth wall panel unit 340 in a step-by-step manner.

[0076] S15. Measure the longitudinal line shape of the single-limb tower. The measurement positions are selected at both ends of the segment and the partition position. The top surface elevation deviation is controlled to be no more than 4mm.

[0077] S16, welding anchor plates, wall plate butt welds, segments, flange plates, specifically including:

[0078] S161. After the measurement is qualified, the upper and lower flange plates are removed as a whole, and the upper and lower anchor plates are welded to the wall plate with full penetration fillet welds. Before welding, long bolts and long punches are used to fix the upper and lower anchor plates to reduce welding deformation;

[0079] S162, welding wall panel butt weld, only the base welding is performed, after completion, the bolts, rivets and decode are removed, each segment is hoisted to the special segment welding cradle, the remaining welding work is carried out, and the welding operation is carried out by turning over process, the welding position is optimized, the welding deformation is reduced, and the weld quality is improved. After the segment welding is completed, the segment is trimmed and corrected to control the segment distortion deformation to be less than L / 3000;

[0080] S163. After the segment trimming is completed, each segment is returned to the general assembly frame for reset, and the upper and lower flange plates are assembled to ensure that the hole group of the upper and lower flange plates and the upper and lower anchor plates has a 100% through-hole rate, and the gap between the upper and lower flange plates is not greater than 1.0 mm. The flange plate is positioned, and the flange plate and the anchor plate are fixed with bolts and rivets;

[0081] S164, welding the flange plate and the wall plate through penetration weld. When welding the flange plate and the wall plate through penetration weld, two people need to weld synchronously in the same direction to reduce welding deformation and avoid angular deformation after welding the flange plate and the wall plate, which may lead to excessive clearance between the upper and lower flange plates.

[0082] S165. After the segment is reset, the flange plate is assembled and welded, the flange is assembled and stiffened, the whole is disassembled, and the lower tire of the segment is turned over and the flange is welded and stiffened.

[0083] S2. Integral pre-assembly: The completed left and right single-limb tower segments are pre-assembled on the double-limb tower integral pre-assembly frame for the whole tower. The double-limb tower is placed and pre-assembled according to the actual tower position. Fig. 9 As shown, the integral pre-assembled tire frame includes a tire frame cross beam 20, and a support plate assembly is arranged on the top of the tire frame cross beam 20 in a mirror image. The support plate assembly includes a first support plate 22 and a tire frame diagonal support 21. A plurality of second support plates 23 are vertically fixed on the surface of the tire frame diagonal support 21. The first support plate 22 is arranged at a support plate elevation according to the slope of the linear twisted wall plate, and ensures that the horizontal tower center lines of all steel tower segments are at the same elevation. The second support plate 23 is used for limiting. Specifically, the following steps are included:

[0084] S21, making a pre-assembled frame of a double-limb tower, arranging the elevation of the first support plate 22 according to the slope of the linear twisted wall plate, and ensuring that the transverse tower center lines of all steel tower segments are at the same elevation, and the second support plate 23 is used for limiting;

[0085] S22, arrange the plane measurement control network, the elevation measurement control network, and at the same time release the tower longitudinal center line as the subsequent segment assembly positioning reference;

[0086] S23, measuring the overall pre-assembled tire frame, and controlling the elevation deviation of the first support plate 22 to be no greater than 2 mm;

[0087] S24, sequentially positioning the left and right sections on the overall pre-assembly frame for pre-assembly, such as Fig.10 As shown;

[0088] S25. Measure the dimensions of the two ends of the left and right segments and the longitudinal center line of the tower respectively, and control the linear deviation to be no more than 5mm. The height of the center of the hole group at the end of the segment from the top surface of the tire frame shall be controlled to be no more than 2mm.

[0089] S26, assembling segments: after passing the test, fix the segments to the tire frame, assemble the segments in sequence, use bolts and rivets to fix the segments to ensure 100% through-hole rate, and when assembling to the tower top segment, measure the longitudinal deviation of the left and right segments, and cut the top opening margin of the joint segment in the tower top segment according to the actual deviation, assemble the tower crown, and weld the tower crown and the joint segment into an integral segment; weld the transverse butt welds between the manufactured segments;

[0090] S27. After welding is completed, measure the overall line shape and arrange monitoring points according to monitoring requirements, remove the tire and hand it over to sandblasting and painting operations.

Claims

1. A manufacturing process for an irregular polygonal double-limb transmission tower with inner flange connection, characterized in that: The following steps are involved: Split-type assembly: The single-limb towers are assembled continuously on the single-limb tower assembly frame to complete the segment manufacturing; according to the characteristics of the segment cross section, the assembly is carried out with the outermost maximum straight edge as the bottom edge; Integral pre-assembly: The manufactured single-limb tower segments are pre-assembled on the double-limb tower integral pre-assembly frame for whole-tower pre-assembly. The double-limb tower is placed and pre-assembled according to the actual tower position.

2. The manufacturing process of an irregular polygonal double-limb power transmission tower with inner flange connection according to claim 1 is characterized in that: The split-type assembly specifically includes: The single-leg tower assembly frame is manufactured. The single-leg tower assembly frame adopts a symmetrical structure, including a crossbeam, a plurality of vertical support plates are arranged on the top of the crossbeam, diagonal supports are symmetrically arranged on both sides of the vertical support plates, a supporting column is connected between the bottom of the diagonal support and the crossbeam, and a plurality of lateral support plates are arranged at intervals on opposite sides of the diagonal support on both sides, and the lateral support plates are arranged vertically with the diagonal support; Establish plane measurement control network and elevation measurement control network: measure the tire frame, control the line deviation to be no more than 3mm, and release the ground sample line as the longitudinal reference line for subsequent segment assembly; Assembling the wall panels into wall panel units and positioning the wall panel units on the tire frame; Repeat the above steps, assembling each step in a step-by-step manner; Measure the longitudinal line shape of the single-leg tower. The measurement positions are selected at both ends of the segment and the partition position. The top surface elevation deviation is controlled to be no more than 4mm; Welding of anchor plates, wall panel butt welds, segments, flange plates.

3. The manufacturing process of an irregular polygonal double-limb power transmission tower with inner flange connection according to claim 2 is characterized in that: Positioning the wall panel unit and the tire frame specifically includes: After assembling the first wall panels into the first wall panel unit, positioning the first wall panel unit and the tire frame to ensure that the center line of the wall panel unit coincides with the longitudinal reference line and the wall panel is in close contact with the support plate; Position the anchor plate and flange plate at the corresponding positions; Position the second wall panel unit and the fifth wall panel unit on both sides in sequence, check the baseline spacing between the second wall panel unit, the fifth wall panel unit and the first wall panel unit, and control the spacing difference between the two to be no more than 3mm, while ensuring that the wall panel unit is in close contact with the support plate; Position the third wall panel unit and the fourth wall panel unit on the upper side in sequence, check the cross-sectional height and the baseline spacing between the third wall panel unit, the fourth wall panel unit and the first wall panel unit, and control the cross-sectional height deviation to be no more than 2mm and the baseline spacing difference to be no more than 3mm.

4. The manufacturing process of an irregular polygonal double-limb power transmission tower with inner flange connection according to claim 2 is characterized in that: The welded anchor plates, wall plate butt welds, segments, and flange plates specifically include: After the longitudinal line measurement of the single-leg tower is qualified, the upper and lower flange plates are removed as a whole, and the upper and lower anchor plates and the wall plates are welded with full penetration fillet welds. The upper and lower anchor plates are fixed before welding; Weld the wall panel butt welds, then hoist each segment onto the segment welding cradle for the remaining welding work; After the segment trimming is completed, each segment is returned to the general assembly frame for resetting, the upper and lower flange plates are assembled, and the flange plates and anchor plates are fixed; Weld the flange plate and the wall plate with full penetration welds; The segments are repositioned, the flange plates are assembled and the flanges are welded for stiffening.

5. The manufacturing process of an irregular polygonal double-limb power transmission tower with inner flange connection according to claim 1 is characterized in that: The integral pre-assembled tire frame includes a tire frame crossbeam, a support plate assembly is arranged in a mirror image on the top of the tire frame crossbeam, the support plate assembly includes a first support plate and a tire frame diagonal support, a plurality of second support plates are vertically fixed to the surface of the tire frame diagonal support, the first support plate is arranged with the support plate elevation according to the slope of the linear twisted wall panel, and the second support plate is used for limiting the position.

6. The manufacturing process of an irregular polygonal double-limb power transmission tower with inner flange connection according to claim 5 is characterized in that: The integral pre-assembly specifically comprises the following steps: Make the pre-assembled frame of the double-limb tower. The first support plate is used to arrange the support plate elevation according to the slope of the linear twisted wall plate, and ensure that the horizontal tower center lines of all steel tower segments are at the same elevation. The second support plate is used for limiting. Arrange the plane measurement control network and the elevation measurement control network, and at the same time lay out the tower longitudinal centerline as the positioning reference for subsequent segment assembly; Measure the overall pre-assembled tire frame and control the elevation deviation of the first support plate to be no more than 2mm; Position the left and right sections on the overall pre-assembly frame in sequence for pre-assembly; Measure the dimensions of the two ends of the left and right segments and the longitudinal center line of the tower respectively, and control the linear deviation to be no more than 5mm. The height of the center of the hole group at the end of the segment from the top surface of the tire frame shall be controlled to have a deviation of no more than 2mm. Assemble segments: fix the designed segments to the tire frame, assemble the designed segments in sequence, use internal flanges to connect the designed segments, measure the longitudinal deviations of the left and right segments when assembling to the tower top segment, cut the top margin of the joint segment in the tower top segment according to the actual deviation, assemble the tower crown, and weld the tower crown and the joint segment into an integral segment; weld the transverse butt welds between the manufactured segments; After welding is completed, measure the overall line shape and arrange monitoring points.

7. The manufacturing process of an irregular polygonal double-limb power transmission tower with inner flange connection according to claim 6 is characterized in that: The designed segments include a tower bottom segment, a tower top segment and a plurality of mid-tower segments, wherein the tower top segment and a single mid-tower segment are respectively divided into at least two manufactured segments.

8. The manufacturing process of an irregular polygonal double-limb power transmission tower with inner flange connection according to claim 7 is characterized in that: The segments in the tower include a plurality of standard length segments and a plurality of special position segments. Each standard length segment is further divided into manufacturing segments, and the special position segments are divided into manufacturing segments according to the cross arm positions.

9. The manufacturing process of an irregular polygonal double-limb power transmission tower with inner flange connection according to claim 8 is characterized in that: When the manufacturing segments within the standard length segment are divided, the positions of the partitions within the standard length segment are staggered for segmentation.

10. The manufacturing process of an irregular polygonal double-limb power transmission tower with inner flange connection according to claim 7, characterized in that: The tower top segments are divided into manufacturing segments according to the positions of the cross arms.