Intelligent safety monitoring method and system for large-current dry-type power transformer of data center

By deploying sensors and communication networks in the data center and using neural network models to monitor the transformer status in real time, the problem of difficult warning by traditional monitoring methods is solved, the safety and reliability of the power system is improved, and the risk of failure is reduced.

CN119134651AInactive Publication Date: 2024-12-13NAN JING DA QUAN BIAN YA QI YOU XIAN GONG SI

Patent Information

Application Number
CN202411241126.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-05
Publication Date
2024-12-13
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Traditional transformer monitoring methods rely on regular manual inspections and simple monitoring equipment, which are difficult to capture the operating status and changes of the transformer in a timely and comprehensive manner, and cannot provide sufficient early warning information, resulting in the risk of equipment failure and power interruption.

Method used

Deploy sensors and communication networks, establish a transformer security monitoring model through neural network structure, use cloud databases for data training and optimization, monitor the operating status of the transformer in real time, and trigger an alarm when an abnormality is detected by the model.

Benefits of technology

Real-time monitoring and accurate prediction of power transformers are achieved, the safety and reliability of the data center power system is improved, manual inspection workload is reduced, the risk of power interruption caused by failures is reduced, and equipment life is extended.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119134651A_ABST
    Figure CN119134651A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of safety monitoring, in particular to an intelligent safety monitoring method and system for a large-current dry-type power transformer of a data center, and the method comprises the steps: deploying a proper sensor, and configuring a communication network for data transmission; operating data of the power transformer is collected through a sensor, and the operating data is transmitted to a cloud database through a communication network; establishing a transformer safety monitoring model; historical operation data of the power transformer are called from the cloud database to train and optimize the transformer safety monitoring model; and deploying the optimized transformer safety monitoring model to the cloud, inputting the operation data of the power transformer into the transformer safety monitoring model, and carrying out safety monitoring on the power transformer. According to the invention, the real-time monitoring and accurate prediction of the power transformer are effectively realized, the safety and reliability of a data center power system are improved, the power interruption risk caused by the fault of the transformer is reduced, and the stable operation of the data center is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of safety monitoring, and in particular to an intelligent safety monitoring method and system for a large current dry-type power transformer in a data center. Background Art

[0002] With the continuous expansion of data center scale and the widespread use of high-power equipment, the power supply system of data center faces huge challenges. As a key power equipment, high-current dry-type power transformers bear the heavy responsibility of power conversion and distribution in data centers. However, due to long-term high-load operation, these transformers are prone to overheating, insulation aging and other problems, leading to potential safety hazards. If these problems are not discovered and handled in time, they may cause equipment failures or even serious power outages, affecting the normal operation of the data center.

[0003] Traditional transformer monitoring methods mostly rely on regular manual inspections or simple monitoring equipment, and only collect limited parameters, resulting in insufficient coverage of monitoring data. It is difficult to capture the operating status and changes of the transformer in a timely and comprehensive manner. This method is not only inefficient, but also mainly relies on experience and standard thresholds for judgment, and cannot provide sufficient early warning information to take effective preventive measures before a fault occurs. Therefore, an intelligent safety monitoring method for high-current dry-type power transformers in data centers has become one of the current research directions. Summary of the invention

[0004] The present invention provides an intelligent safety monitoring method and system for a large current dry-type power transformer in a data center, which can effectively solve the problems in the background technology.

[0005] In order to achieve the above object, the technical solution adopted by the present invention is: An intelligent safety monitoring method for a high-current dry-type power transformer in a data center, the method comprising: Deploy appropriate sensors and configure communication networks for data transmission; Collecting operating data of the power transformer through the sensor, and transmitting the operating data to a cloud database using the communication network; Select appropriate neural network structure to establish transformer safety monitoring model; Retrieving the historical operation data of the power transformer in the cloud database to train and optimize the transformer safety monitoring model; The optimized transformer safety monitoring model is deployed to the cloud, and the operation data of the power transformer is input into the transformer safety monitoring model to perform safety monitoring of the power transformer.

[0006] Further, the communication network configured for data transmission includes: Determine the coverage of the communication network and select the type of the communication network; Design the topology of the communication network and perform data flow planning; Configuring the communication network device according to the topology structure, and selecting a suitable secure communication protocol for the communication network device; The communication network after configuration is performed and optimized.

[0007] Furthermore, it also includes performing redundant design on the communication network and configuring a backup channel of the communication network path.

[0008] Furthermore, the data flow planning includes: Identify the type of the data flow and set the priority of the data flow; Based on the priority of the data stream, a transmission path for each type of the data stream is planned, and network bandwidth is allocated to the data stream.

[0009] Furthermore, the established transformer safety monitoring model includes: An input layer, receiving the operation data as input data; A plurality of GRU layers, each of which is composed of an update gate and a reset gate, and is used to capture the time dependency and dynamic changes of the input data; Several fully connected layers map the features extracted from the GRU layer to the target space; A batch normalization layer is added after the fully connected layer to stabilize feature distribution and accelerate model training; Output layer generates the final prediction results.

[0010] Furthermore, the historical operation data of the power transformer is retrieved from the cloud database to train and optimize the transformer safety monitoring model, including: Retrieving historical operation data of the power transformer from the cloud database, and dividing the historical operation data into a training set, a validation set, and a test set; Initializing the transformer safety monitoring model, and inputting the training set into the transformer safety monitoring model for training; Monitoring the training process of the transformer safety monitoring model, and verifying the performance of the transformer safety monitoring model on the verification set to obtain a model verification result; According to the model verification result, the hyperparameters of the transformer safety monitoring model are tuned; The optimized transformer safety monitoring model is finally evaluated through the test set.

[0011] Furthermore, it also includes integrating an alarm mechanism in the transformer safety monitoring model, and when the transformer safety monitoring model detects an abnormal situation, the alarm mechanism is triggered to send out an alarm signal.

[0012] An intelligent safety monitoring system for high current dry-type power transformers in a data center, the system comprising: A communication network configuration module deploys appropriate sensors and configures a communication network for data transmission; An operation data acquisition module, which collects the operation data of the power transformer through the sensor and transmits the operation data to a cloud database using the communication network; Monitoring model building module, selects appropriate neural network structure to build transformer safety monitoring model; A model training and optimization module, which retrieves the historical operation data of the power transformer in the cloud database to train and optimize the transformer safety monitoring model; The real-time safety monitoring module deploys the optimized transformer safety monitoring model to the cloud, inputs the operating data of the power transformer into the transformer safety monitoring model, and performs safety monitoring of the power transformer.

[0013] Furthermore, the communication network configuration module includes: A coverage determination unit, which determines the coverage of the communication network and selects the type of the communication network; A network topology design unit, which designs the topology of the communication network and performs data flow planning; A network device configuration unit, configured according to the topology structure of the communication network device, and selecting a suitable security communication protocol for the communication network device; The network testing and optimization unit tests and optimizes the communication network after configuration.

[0014] Furthermore, the model training optimization module includes: A data set division unit, which retrieves the historical operation data of the power transformer from the cloud database and divides the historical operation data into a training set, a validation set and a test set; A model initialization unit, which initializes the transformer safety monitoring model and inputs the training set into the transformer safety monitoring model for training; A training monitoring unit monitors the training process of the transformer safety monitoring model and verifies the performance of the transformer safety monitoring model on the verification set to obtain a model verification result; A model tuning unit, which tunes the hyperparameters of the transformer safety monitoring model according to the model verification result; The final evaluation unit performs a final evaluation on the optimized transformer safety monitoring model through the test set.

[0015] The technical solution of the present invention can achieve the following technical effects: Through the present invention, real-time monitoring and accurate prediction of power transformers are effectively achieved, the safety and reliability of the data center power system are improved, the workload of manual inspection is greatly reduced, the accuracy of fault prediction is significantly improved, the risk of power interruption due to transformer failure is reduced, the equipment life is increased, and the stable operation of the data center is guaranteed.

[0016] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0018] Figure 1 A flow chart of an intelligent safety monitoring method for a high-current dry-type power transformer in a data center; Figure 2 The schematic diagram of the structure of the established transformer safety monitoring model; Figure 3 This is a structural diagram of the intelligent safety monitoring system for high-current dry-type power transformers in a data center. DETAILED DESCRIPTION

[0019] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0020] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.

[0021] Embodiment 1 like Figure 1 As shown, the intelligent safety monitoring method for high current dry-type power transformers in a data center includes: S1: Deploy appropriate sensors and configure the communication network for data transmission; S2: Collect the operating data of the power transformer through sensors and transmit the operating data to the cloud database using the communication network; Specifically, in order to collect the operating data of the power transformer, suitable sensors such as current sensors, temperature sensors, vibration sensors, etc. can be selected to ensure that the monitored parameters accurately reflect the operating status of the transformer. At the same time, a reliable communication network is configured to ensure that the sensor data can be stably transmitted to the cloud database. When installing the sensor, a suitable fixture or adhesive can be used to firmly install the sensor in the specified position. It is necessary to ensure that the sensor is in close contact with the monitored object to avoid looseness. Before deploying the sensor, the sensor needs to be calibrated and verified to ensure their measurement accuracy and reliability. It is also important to calibrate the sensor regularly to prevent measurement errors after long-term use.

[0022] S3: Select appropriate neural network structure to establish transformer safety monitoring model; S4: Retrieving historical operation data of power transformers from the cloud database to train and optimize the transformer safety monitoring model; S5: Deploy the optimized transformer safety monitoring model to the cloud, input the operating data of the power transformer into the transformer safety monitoring model, and perform safety monitoring of the power transformer.

[0023] In this embodiment, in order to establish a model that can effectively predict and monitor the safety of high-current dry-type power transformers in data centers, a suitable neural network structure can be selected to preliminarily build a transformer safety monitoring model, such as a long short-term memory network, a convolutional neural network and other structures; in order to enable the model to have the ability to accurately predict and detect faults, the historical operation data can be used to comprehensively train and tune the model so that it has good prediction and monitoring capabilities, ensuring that the model can accurately identify and predict abnormal conditions in transformer operation; the optimized neural network model is deployed on a cloud server and applied to actual transformer safety monitoring to achieve real-time data analysis and fault warning.

[0024] Through the present invention, real-time monitoring and accurate prediction of power transformers are effectively achieved, the safety and reliability of the data center power system are improved, the workload of manual inspection is greatly reduced, the accuracy of fault prediction is significantly improved, the risk of power interruption due to transformer failure is reduced, the equipment life is increased, and the stable operation of the data center is guaranteed.

[0025] Based on the above embodiment, configuring a communication network for data transmission includes: A1: Determine the coverage of the communication network and select the type of communication network; Specifically, in order to ensure that the communication network can fully cover all sensors and other related equipment and enable data to be seamlessly transmitted to the cloud database, all devices that need to be connected and their distribution locations can be identified, ensuring that the communication network can cover all areas that need to be monitored, and selecting the appropriate network type based on the coverage and data transmission requirements, such as Wi-Fi, Ethernet, LoRa, 5G, etc., to meet the bandwidth and latency requirements of data transmission.

[0026] A2: Design the topology of the communication network and plan the data flow; Specifically, reasonable design of the topology of the communication network and planning of the transmission path and bandwidth allocation of data flow can ensure efficient data transmission and avoid network congestion or bottleneck problems. The topology of the communication network can be star topology, bus topology, ring topology, etc.

[0027] A3: Configure communication network devices according to the topology structure and select appropriate security communication protocols for the communication network devices; In this step, you can select and configure appropriate network devices, such as routers, switches, gateways, etc. according to the topology, and select appropriate communication protocols for the communication network, such as TCP / IP, MQTT, CoAP, etc., to ensure stable and reliable communication between devices; when selecting communication protocols, give priority to protocols that support encryption, such as HTTPS, MQTT over SSL / TLS, etc., to ensure that data cannot be easily interpreted or tampered with even when transmitted on a public network.

[0028] A4: Test and optimize the communication network after configuration.

[0029] Conduct network testing on the deployed communication network. By simulating actual data traffic or using specialized testing tools, the network is comprehensively tested, including connection stability, data transmission speed, latency, packet loss rate and other indicators. Potential problems in the communication network, such as reducing latency and increasing redundancy, are detected. Communication network performance is optimized by adjusting equipment configuration, optimizing protocol parameters, and strengthening network coverage.

[0030] Furthermore, it also includes redundancy design of the communication network and configuration of backup channels of the communication network paths.

[0031] In this embodiment, in order to avoid data transmission interruption due to communication network failure, the communication network can be redundantly designed through methods such as active-active data centers and link aggregation, and a backup channel can be added to ensure that the communication network can still work normally when the main channel fails or has problems. The redundant design of the communication network in this step can improve the fault tolerance of the system and ensure that the communication network can still maintain the continuity of data transmission when the main network path fails. The redundant design can ensure that the system can continue to operate through the backup path when a certain part fails, and can avoid single point failures affecting the stability of the overall system. At the same time, the configuration of the backup channel can quickly switch to the backup channel when a problem occurs in the main network path, ensuring uninterrupted data transmission and improving the reliability of the system.

[0032] As a preferred embodiment of this embodiment, performing data flow planning includes: B1: Identify the type of data flow and set the priority of the data flow; Based on the above embodiments, different types of data streams may have different requirements for bandwidth, delay and reliability. Different types of data streams can be identified and classified, such as real-time monitoring data, alarm data, historical data, management instructions, etc.; and priorities can be assigned to different data streams. For example, real-time monitoring and alarm data usually require the highest priority to ensure timely transmission, while historical data can be assigned a lower priority; the classification and importance ranking of data streams are clarified to ensure that key data streams are given priority.

[0033] B2: Based on the priority of data flows, plan the transmission path for each type of data flow and allocate network bandwidth for the data flow.

[0034] After determining the priority of the data stream, the transmission path of each type of data stream can be planned. A low-latency, high-bandwidth main path can be planned for high-priority data streams, and backup paths can be configured for all data streams to ensure fault tolerance. After path planning, bandwidth management and allocation are carried out to reserve sufficient bandwidth for high-priority data streams to ensure that they can still be transmitted normally under high load conditions. A dynamic bandwidth allocation mechanism is used to adjust the bandwidth allocation of each data stream according to the real-time network load to ensure that each data stream can obtain appropriate bandwidth resources under different load conditions. In the process of data stream planning, traffic shaping and congestion control technologies can be used to prevent low-priority data streams from occupying too many network resources and ensure the stability and reliability of the network.

[0035] Furthermore, if Figure 2 As shown in the figure, the established transformer safety monitoring model includes: Input layer, receiving running data as input data; The input layer is a linear layer that maps multidimensional time series data to a specific dimension. The received data is usually time series data, such as the current, voltage, temperature, vibration and other parameters of the power transformer. The main task of the input layer is to organize the raw data into a format that the model can process and pass it to the next layer.

[0036] Several GRU layers, which consist of update gates and reset gates to capture the temporal dependencies and dynamic changes of input data; The GRU layer can process time series data and capture the time dependency and dynamic changes of the data. Stacking multiple layers of GRU units can capture deeper time dependencies and patterns. Each layer of GRU can extract higher-level time series features from the output of the previous layer. The GRU layer consists of an update gate and a reset gate. The update gate can control the combination ratio of current state information and past state information, while the reset gate can determine how much past state information should be ignored, thereby updating the hidden state more flexibly.

[0037] Several fully connected layers map the features extracted from the GRU layer to the target space; The fully connected layer is used to further process the output of the GRU layer, compressing or expanding the dimension of the data. It consists of a series of linear layers and can convert high-dimensional time series features into the final output form. The fully connected layer usually has a nonlinear activation function to introduce nonlinear capabilities, such as ReLU, tanh, etc.

[0038] Batch normalization layer: Add batch normalization layer after the fully connected layer to stabilize feature distribution and accelerate model training; The batch normalization layer normalizes the data of each batch to keep the distribution of features stable, help accelerate model training, reduce sensitivity to initial parameters, and stabilize the model convergence process.

[0039] Output layer generates the final prediction results.

[0040] Based on the above embodiment, the historical operation data of the power transformer is retrieved from the cloud database to train and optimize the transformer safety monitoring model, including: C1: Retrieve the historical operation data of the power transformer from the cloud database and divide the historical operation data into training set, validation set and test set; Specifically, for the training data of the transformer safety monitoring model, historical operation data can be retrieved from the cloud database, and the extracted data can be cleaned, sorted and formatted, for example, to handle missing data, outliers, and perform standardization or normalization operations. Before model training, the historical operation data can be divided into training set, validation set and test set. The training set is used for model training, and the parameters of the model are adjusted through this training set so that it can learn the rules in the data; the validation set is used for verification during the training process to evaluate the performance of the model and adjust the hyperparameters to prevent the model from overfitting; the test set is used for final evaluation after the model training and tuning are completed to evaluate the performance of the model on unseen data.

[0041] C2: Initialize the transformer safety monitoring model and input the training set into the transformer safety monitoring model for training; C3: Monitor the training process of the transformer safety monitoring model, and verify the performance of the transformer safety monitoring model on the validation set to obtain the model validation results; C4: Based on the model validation results, the hyperparameters of the transformer safety monitoring model are optimized; In this embodiment, when the model is trained, the training set can be input into the model, and the model learns the patterns and features in the data through multiple iterations. The model calculates the gradient of the loss function through the back-propagation algorithm, and updates the parameters through gradient descent or other optimization methods to minimize the loss function; during the training process, the performance of the model is usually tested with a validation set after each training cycle or a certain training interval, and the model is judged by indicators to determine whether it has overfitting or underfitting problems, such as loss and accuracy on the validation set; if the verification result is not ideal, it can be tuned by adjusting hyperparameters, such as learning rate, regularization parameters, network structure, etc., to improve the generalization ability of the model. The larger the training set, the richer the patterns that the model can learn, but it is also more likely to overfit, so reasonable regularization techniques are needed, including early stopping method, data enhancement, etc.

[0042] C5: Perform a final evaluation on the optimized transformer safety monitoring model through the test set.

[0043] In order to ensure the safety of high-current dry-type power transformers in data centers, an alarm mechanism is also integrated into the transformer safety monitoring model. When the transformer safety monitoring model detects an abnormal situation, the alarm mechanism is triggered and an alarm signal is issued.

[0044] In addition to model monitoring, a reasonable alarm mechanism can be established, adding a key safety function to the original monitoring method. When the model detects an abnormality in the operating data, the alarm mechanism will be activated and immediately triggered to send out an alarm signal, such as an audible alarm, a visual signal, or even a notification sent over the network, so that relevant personnel can respond in time.

[0045] Embodiment 2: like Figure 3 As shown, the intelligent safety monitoring system for high current dry-type power transformers in data centers includes: A communication network configuration module deploys appropriate sensors and configures a communication network for data transmission; An operation data acquisition module collects the operation data of the power transformer through sensors and transmits the operation data to a cloud database using a communication network; Monitoring model building module, selects appropriate neural network structure to build transformer safety monitoring model; Model training and optimization module, which retrieves historical operation data of power transformers from the cloud database to train and optimize the transformer safety monitoring model; The real-time safety monitoring module deploys the optimized transformer safety monitoring model to the cloud, inputs the operating data of the power transformer into the transformer safety monitoring model, and conducts safety monitoring of the power transformer.

[0046] The above-mentioned adjustment system in the present invention can effectively realize the intelligent safety monitoring method of large-current dry-type power transformers in data centers, and the technical effects that can be achieved are as described in the above-mentioned embodiments and will not be repeated here.

[0047] Furthermore, the communication network configuration module includes: A coverage determination unit, which determines the coverage of the communication network and selects the type of the communication network; Network topology design unit, which designs the topology of the communication network and performs data flow planning; A network device configuration unit, configured according to the topology structure of the communication network device, and selected a suitable security communication protocol for the communication network device; The network testing and optimization unit tests and optimizes the communication network after configuration.

[0048] Furthermore, the model training optimization module includes: A data set division unit, which retrieves historical operation data of the power transformer from a cloud database and divides the historical operation data into a training set, a validation set, and a test set; A model initialization unit is used to initialize the transformer safety monitoring model and input the training set into the transformer safety monitoring model for training; A training monitoring unit is used to monitor the training process of the transformer safety monitoring model, and the performance of the transformer safety monitoring model on the verification set is verified to obtain the model verification result; The model tuning unit tunes the hyperparameters of the transformer safety monitoring model according to the model verification results; The final evaluation unit conducts a final evaluation on the optimized transformer safety monitoring model through the test set.

[0049] Similarly, the above-mentioned optimization schemes for the system can also respectively achieve the optimization effects corresponding to the method in Example 1, which will not be repeated here.

[0050] Although the present application has been described in conjunction with specific features and embodiments thereof, it is apparent that various modifications and combinations may be made thereto without departing from the spirit and scope of the present application. Accordingly, this specification and the accompanying drawings are merely exemplary illustrations of the present application as defined herein, and are deemed to have covered any and all modifications, variations, combinations or equivalents within the scope of the present application. Obviously, a person skilled in the art may make various modifications and variations to the present application without departing from the scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the present application and its equivalents, the present application is intended to include these modifications and variations.

Claims

1. Intelligent safety monitoring method for high current dry-type power transformers in data centers, It is characterized in that The method comprises: Deploy appropriate sensors and configure communication networks for data transmission; Collecting operating data of the power transformer through the sensor, and transmitting the operating data to a cloud database using the communication network; Select appropriate neural network structure to establish transformer safety monitoring model; Retrieving the historical operation data of the power transformer in the cloud database to train and optimize the transformer safety monitoring model; The optimized transformer safety monitoring model is deployed to the cloud, and the operation data of the power transformer is input into the transformer safety monitoring model to perform safety monitoring of the power transformer.

2. According to claim 1, the intelligent safety monitoring method for high current dry-type power transformers in data centers, It is characterized in that The communication network configured for data transmission includes: Determine the coverage of the communication network and select the type of the communication network; Design the topology of the communication network and perform data flow planning; Configuring the communication network equipment according to the topology structure, and selecting a suitable secure communication protocol for the communication network equipment; The communication network after configuration is performed is tested and optimized.

3. According to claim 2, the intelligent safety monitoring method for high current dry-type power transformers in data centers, It is characterized in that It also includes redundancy design of the communication network and configuration of backup channels of the communication network paths.

4. The intelligent safety monitoring method for high current dry-type power transformers in a data center according to claim 2, It is characterized in that The data flow planning includes: Identify the type of the data flow and set the priority of the data flow; Based on the priority of the data stream, a transmission path for each type of the data stream is planned, and network bandwidth is allocated to the data stream.

5. According to claim 1, the intelligent safety monitoring method for high current dry-type power transformers in data centers, It is characterized in that The established transformer safety monitoring model includes: An input layer, receiving the operation data as input data; A plurality of GRU layers, each of which is composed of an update gate and a reset gate, and is used to capture the time dependency and dynamic changes of the input data; Several fully connected layers map the features extracted from the GRU layer to the target space; A batch normalization layer is added after the fully connected layer to stabilize feature distribution and accelerate model training; Output layer generates the final prediction results.

6. The intelligent safety monitoring method for high current dry-type power transformers in a data center according to claim 1, It is characterized in that Retrieving the historical operation data of the power transformer in the cloud database to train and optimize the transformer safety monitoring model includes: Retrieving the historical operation data of the power transformer from the cloud database, and dividing the historical operation data into a training set, a verification set, and a test set; Initializing the transformer safety monitoring model, and inputting the training set into the transformer safety monitoring model for training; Monitoring the training process of the transformer safety monitoring model, and verifying the performance of the transformer safety monitoring model on the verification set to obtain a model verification result; According to the model verification result, the hyperparameters of the transformer safety monitoring model are tuned; The optimized transformer safety monitoring model is finally evaluated through the test set.

7. The intelligent safety monitoring method for high current dry-type power transformers in a data center according to claim 1, It is characterized in that It also includes integrating an alarm mechanism in the transformer safety monitoring model. When the transformer safety monitoring model detects an abnormal situation, the alarm mechanism is triggered to send out an alarm signal.

8. Intelligent safety monitoring system for high current dry-type power transformers in data centers, It is characterized in that The system comprises: A communication network configuration module deploys appropriate sensors and configures a communication network for data transmission; An operation data acquisition module, which collects the operation data of the power transformer through the sensor and transmits the operation data to a cloud database using the communication network; Monitoring model building module, selects appropriate neural network structure to build transformer safety monitoring model; A model training and optimization module, which retrieves the historical operation data of the power transformer in the cloud database to train and optimize the transformer safety monitoring model; The real-time safety monitoring module deploys the optimized transformer safety monitoring model to the cloud, inputs the operating data of the power transformer into the transformer safety monitoring model, and performs safety monitoring of the power transformer.

9. The intelligent safety monitoring system for high current dry-type power transformers in a data center according to claim 8, It is characterized in that The communication network configuration module includes: A coverage determination unit, which determines the coverage of the communication network and selects the type of the communication network; A network topology design unit, which designs the topology of the communication network and performs data flow planning; A network device configuration unit, configured according to the topology structure of the communication network device, and selecting a suitable security communication protocol for the communication network device; The network testing and optimization unit tests and optimizes the communication network after configuration.

10. The intelligent safety monitoring system for high current dry-type power transformers in a data center according to claim 8, It is characterized in that The model training optimization module includes: A data set division unit, which retrieves the historical operation data of the power transformer from the cloud database and divides the historical operation data into a training set, a validation set and a test set; A model initialization unit, which initializes the transformer safety monitoring model and inputs the training set into the transformer safety monitoring model for training; A training monitoring unit monitors the training process of the transformer safety monitoring model and verifies the performance of the transformer safety monitoring model on the verification set to obtain a model verification result; A model tuning unit, which tunes the hyperparameters of the transformer safety monitoring model according to the model verification result; The final evaluation unit performs a final evaluation on the optimized transformer safety monitoring model through the test set.

Citation Information

Patent Citations

  • Motor fault diagnosis method and system based on GRU network stator current analysis

    CN114002597A

  • Method and system for detecting power grid data based on neural network

    CN116361725A

  • Data monitoring and auxiliary treatment method based on power model

    CN117909855A

Cited By

  • Intelligent control monitoring system for power transformer

    CN120301045A