Fabricated drainage energy dissipation structure and using method thereof
Through the prefabricated drainage energy dissipation structure, the multi-stage energy dissipation design and slag removal mechanism are used to solve the problems of poor energy dissipation effect and maintenance difficulties in the existing technology, and efficient energy dissipation effect and convenient installation and maintenance are achieved. In various drainage environments, the impact of water flow is reduced.
Patent Information
- Application Number
- CN202411425027.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-12
- Publication Date
- 2024-12-17
- Estimated Expiration
- 2044-10-12
AI Technical Summary
The existing drainage and energy dissipation structure has poor energy dissipation effect, complex structure and inconvenient maintenance, especially in pipelines and drainage ditches, which have problems such as difficulty in dismantling and low space utilization.
Adopt prefabricated drainage energy dissipation structure, including energy dissipation pipe, flow top, flow picking plate, water outlet pipe and connecting sleeve. Through multi-stage energy dissipation design and slag removal mechanism, efficient construction and maintenance are achieved, easy to install and replace, and suitable for Different drainage environments.
It realizes multi-stage energy dissipation effect, simplifies the installation and maintenance process, is highly adaptable, can be used in different drainage environments, and reduces impact through water flow potential energy dispersion, improving the protection effect of the drainage system.
Smart Images

Figure CN119145370A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of drainage and energy dissipation, and in particular to an assembled drainage and energy dissipation structure and a use method thereof. Background Art
[0002] Drainage energy dissipation refers to measures taken in drainage and water delivery systems to consume or disperse the energy of water flow drop to prevent or reduce the scouring damage caused by water flow to hydraulic structures and their downstream riverbeds, riverbanks, etc. These measures are particularly important in discharge structures and drop structures because they can effectively protect the structures from damage caused by the impact of water flow, and also help protect downstream rivers and canals from damage.
[0003] The methods of drainage energy dissipation include but are not limited to installing energy dissipation devices, adopting specific pipe structures, and using silencers and energy dissipators. The purpose of these measures is to reduce drainage noise and energy by controlling the movement of the fluid, thereby reducing the scouring effect of water flow on building structures and riverbeds. The locations where energy dissipation is required are generally set in drainage pipes, drainage ditches or drainage channels in the drainage and water supply system.
[0004] In the pipeline drainage system, the energy dissipation method of installing energy dissipation nodes or multi-stage energy dissipation elbows is often used. Although it can achieve a certain energy dissipation effect, the energy dissipation effect is poor and is only suitable for small-sized pipelines. In addition, the existing pipeline energy dissipation structure needs to be replaced at multiple locations during maintenance, which is not convenient for later maintenance; For example, the pipeline-type waterfall energy dissipation drainage structure proposed in patent CN219731905U has a complex energy dissipation structure and is difficult to maintain and repair in the later stage.
[0005] In drainage ditches or drainage channels, energy dissipation methods such as waterfalls and energy dissipation pools are commonly used. However, the waterfall structure is relatively fragile and easily damaged after long-term use, and it is difficult to repair in the later stage. The energy dissipation pool has low space utilization rate and occupies a large area of land, which is also not conducive to later maintenance. For example, the energy dissipation structure for water conservancy projects proposed in patent CN111997007A has an energy dissipation effect, but the structure is complex and subsequent maintenance and repair are also difficult. Summary of the invention
[0006] The main purpose of the present invention is to provide an assembled drainage energy dissipation structure and a method of using the same, so as to solve the problems of poor energy dissipation effect and complex structure and inconvenient maintenance of existing drainage energy dissipation structures.
[0007] In order to solve the above technical problems, the technical solution adopted by the present invention is: An assembled drainage energy dissipation structure and a method of using the same, comprising an energy dissipation pipe, one end of which is provided with a first overflow top, a surface of which is provided with a plurality of water inlet holes, a flow plate is provided inside the energy dissipation pipe, and an outlet pipe is provided inside the energy dissipation pipe away from the first overflow top; The outlet pipe is located inside the energy dissipation pipe, and a flow diversion cavity is formed between the outlet pipe and the energy dissipation pipe. A connecting sleeve is provided at one end of the outlet pipe close to the diversion plate, and a second overflow top is provided at one end of the connecting sleeve close to the diversion plate. The connecting sleeve is provided with multiple water holes.
[0008] The energy dissipation pipe, the first overflow top, the water inlet hole, the flow plate, the water outlet pipe, the connecting sleeve, the second overflow top and the water hole do not need to be constructed on site. After being processed and formed, they can be directly carried to the construction site for installation for efficient construction.
[0009] In the preferred solution, the first diffuse roof is divided into two sections with different slopes, the end with a larger slope is connected to the energy dissipation pipe, and the end with a smaller slope is conical; The second diffuse top is conical, and the edge diameter of the second diffuse top is larger than the diameter of the connecting sleeve; A water leakage hole is arranged in the center of the flow plate.
[0010] In a preferred solution, a connecting pipe is sleeved on the outside of the energy dissipation pipe, a retaining ring is provided inside the connecting pipe, and the water outlet pipe in the energy dissipation pipe is close to the retaining ring; The end of the connecting pipe is connected to the drain pipe through a pipe clamp.
[0011] In a preferred solution, a limiting groove is provided on the circumferential surface of the connecting pipe, and a mounting buckle is provided in the limiting groove; The connecting pipe is arranged in the drainage ditch, a mounting groove is arranged in the drainage ditch, and the mounting buckle extends into the mounting groove.
[0012] In a preferred embodiment, the mounting buckle comprises a circular bottom buckle arranged in the mounting groove, the circular bottom buckle extends to the inside of the limiting groove, the circular bottom buckle is connected to a first top buckle, the first top buckle extends to the inside of the limiting groove, and the circular bottom buckle and the first top buckle are connected by screws; Or a guide rod is provided on the top of the circular bottom buckle, the guide rod passes through the first top buckle, and the guide rod is arranged obliquely or vertically.
[0013] In a preferred embodiment, the mounting buckle includes a square bottom buckle arranged in the mounting groove, the square bottom buckle is connected to a second top buckle, the square bottom buckle and the second top buckle both extend to the interior of the limiting groove, one end of the square bottom buckle and the second top buckle are hinged by a hinge shaft, and the other end is connected by a screw.
[0014] In the preferred solution, a slag removal mechanism is provided inside the drainage ditch to handle large-sized impurities and avoid blockage of the energy dissipation pipe; The slag removal mechanism includes a buffer tank arranged inside the drainage ditch, and a filter plate is arranged in the buffer tank; A fixing rod is provided on the inner wall of the drainage ditch, and the fixing rod is located between the filter plate and the energy dissipation pipe. A fixing sleeve is provided in the middle of the fixing rod, and a rotating shaft is rotatably connected in the fixing sleeve. One end of the rotating shaft is provided with a fan blade located on the side of the fixing sleeve. One end of the rotating shaft passes through the filter plate and is provided with a rotating block. A plurality of connecting rods are provided on the side of the rotating block. A scraper is provided at one end of the connecting rod away from the rotating block. The rotating block is connected to the rotating shaft by bolts. A slag removal port connected to the buffer tank is provided on the side of the drainage ditch, and a collecting chamber is provided on the side of the drainage ditch; An elastic rod is connected between the connecting rod and the scraper.
[0015] In the preferred solution, a fixed shaft is further provided inside the drainage ditch, a center sleeve is rotatably sleeved in the middle of the fixed shaft, a plurality of rotating plates are provided along the circumference of the center sleeve, side sleeves are rotatably sleeved at both ends of the fixed shaft, a plurality of guide plates are provided along the circumference of the side sleeve, a movable shaft is rotatably connected to the outside of the fixed shaft, a driving tooth is provided on the side of the movable shaft away from the fixed shaft, the driving tooth is located between the center sleeve and the side sleeve, a driven tooth is provided on the side of the driving tooth away from the fixed shaft, a first crown gear is provided at both ends of the center sleeve, the first crown gear is meshed with the driving tooth, a second crown gear is provided on the side of the side sleeve close to the center sleeve, the second crown gear is meshed with the driven tooth; The number of teeth on the driving gear is less than that on the driven gear; When the rotating plate rotates to the bottom, the rotating plate is located close to the center of the water flow cross section; The rotating plate is a V-shaped plate, and the guide plate is inclined.
[0016] A method for using an assembled drainage and energy dissipation structure comprises the following steps: S1. Place the energy dissipation pipe into the connecting pipe, with the end close to the water outlet pipe placed first, until the energy dissipation pipe rests against the retaining ring; S2. Determine the approximate installation position of the connecting pipe at the drainage position; S3. Debug the installation position and calculate:
[0017] Where: is the maximum flow rate of one energy dissipation process, in m / s; It is the single width water flow weight, unit is KN; is the height difference of an energy dissipation process, in m; It is the unit friction resistance of an energy dissipation process, in KN; is the water flow path length of an energy dissipation process, in meters; is the allowable flow rate of the material, in m / s; S4. Determine the distance between each connecting pipe under the same flow path according to calculation, that is, , determine the installation location; S5. Install the connecting pipe equipped with the energy dissipation pipe to the determined installation position to complete the installation; S6, the water flows through the connecting pipe and the energy dissipation pipe to complete drainage and energy dissipation; In S1, one end of the connecting pipe placed in the energy dissipation pipe is the water inlet end, and the other end is the water outlet end.
[0018] In a preferred solution, in S5, draining the drainage ditch comprises the following steps: S511. Construct drainage ditches at drainage locations and make grooves in the drainage ditches; S512, arranging a slag removal mechanism; S513, placing the bottom buckle into the groove in the drainage ditch, and setting a seal at the position where the bottom buckle and the groove are connected; S514, align the limiting groove of the connecting pipe with the bottom buckle, then lower the connecting pipe, and ensure that water enters from the water inlet end of the connecting pipe; S515, install the top buckle to complete the fixation; In S512: S5121. A buffer groove is provided in the drainage ditch, the lower end of the cross section of the buffer groove is semicircular and the upper end is directional; S5122, fixing the slag removal mechanism in the drainage ditch, and fixing the fixing rod to the inner wall of the drainage ditch; S5123, install the filter plate so that the rotating shaft of the slag removal mechanism passes through the filter plate; S5124, connecting the rotating shaft and the rotating block; S5125. Set a slag removal port and a collection chamber.
[0019] In a preferred solution, in S5, draining water from the drain pipe comprises the following steps: S521. Prepare drainage pipes of corresponding quantity and length according to the determined installation location; S522, installing a drainage pipe at the initial section of the drainage position; S523, connecting the water inlet end of the connecting pipe to the drain pipe through a pipe clamp; S524, connecting another drainage pipe to the water outlet end of the previous connecting pipe through a pipe clamp; S525, connecting the water inlet end of another connecting pipe to the previous drainage pipe through a pipe clamp; S526. Repeat S524-S525, installing the drain pipe and connecting pipes one by one until the installation is completed.
[0020] The present invention provides an assembled drainage and energy dissipation structure and a method for using the same. By adopting the above scheme, the following beneficial effects are achieved: 1. The energy dissipation effect is ensured through multi-level energy dissipation and reasonable control of the position of the energy dissipation structure.
[0021] 2. The energy dissipation structure is disassembled and assembled in an assembled manner, which does not require on-site construction, making it not only easy to install, but also easy to maintain and replace later.
[0022] 3. It can be installed in various drainage environments such as drain pipes, drain ditches or drainage channels, with better adaptability.
[0023] 4. It can perform unpowered slag discharge operation to prevent solid waste from entering the energy dissipation pipe and ensure the energy dissipation effect.
[0024] 5. Use the potential energy of water flow to dissipate energy and divert flow, avoid excessive flow velocity in the center of the water flow section, disperse the potential energy, and thus reduce the impact of the water flow. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The present invention will be further described below in conjunction with the accompanying drawings and embodiments: Figure 1 It is a structural schematic diagram of an assembled drainage and energy dissipation structure of the present invention; Figure 2 It is a cross-sectional structural schematic diagram of an assembled drainage and energy dissipation structure of the present invention; Figure 3 This is a schematic diagram of the pipeline installation structure of an assembled drainage energy dissipation structure of the present invention. Figure 4 It is a structural schematic diagram of a drainage ditch installation of an assembled drainage energy dissipation structure of the present invention; Figure 5 It is a cross-sectional structural schematic diagram of a drainage ditch installation of an assembled drainage energy dissipation structure of the present invention; Figure 6 It is a structural schematic diagram of the present invention with a slag removal mechanism; Figure 7 It is a structural schematic diagram of the present invention with a slag removal mechanism; Figure 8 It is a schematic cross-sectional structural diagram of the slag removal mechanism of the present invention; Fig. 9 is a schematic structural diagram of an embodiment of the connecting rod of the present invention; Fig.10 It is a schematic diagram of the structure of an embodiment of the mounting buckle of the present invention; Fig.11 is a schematic cross-sectional structural diagram of an embodiment of the mounting buckle of the present invention; Fig.12 It is a schematic structural diagram of an embodiment of the installation of a drainage ditch of an assembled drainage energy dissipation structure of the present invention; Fig.13 It is a schematic diagram of the structure of an embodiment of the mounting buckle of the present invention; Fig.14 It is a structural schematic diagram of multiple installations of drainage ditches of an assembled drainage energy dissipation structure of the present invention; Fig.15 It is a schematic diagram of the structure of an embodiment of an assembled drainage and energy dissipation structure of the present invention; Fig.16 The present invention Fig.15 The structural diagram at A in the middle; Fig.17 It is a top view of the guide plate of the present invention.
[0026] In the figure: 1 energy dissipation pipe, 101 first overflow top, 102 water inlet hole, 103 flow plate, 104 water outlet pipe, 105 connecting sleeve, 106 second overflow top, 107 water hole, 2 connecting pipe, 201 limit groove, 3 retaining ring, 4 drainage ditch, 401 installation groove, 402 buffer groove, 403 slag removal port, 404 collection chamber, 5 installation buckle, 501 round bottom buckle, 502 first top buckle, 503 screw, 504 square bottom buckle, 505 The second top buckle, 506 hinge shaft, 507 guide rod, 601 fixed rod, 602 fixed sleeve, 603 rotating shaft, 604 fan blade, 605 rotating block, 606 connecting rod, 607 scraper, 608 elastic rod, 7 filter plates, 801 fixed shaft, 802 center sleeve, 803 rotating plate, 804 side sleeve, 805 guide plate, 806 movable shaft, 807 driving tooth, 808 driven tooth, 809 first crown gear, 810 second crown gear. DETAILED DESCRIPTION
[0027] Embodiment 1: like Figure 1 and 2 As shown, an assembled drainage energy dissipation structure and a method of using the same include an energy dissipation pipe 1, a first overflow top 101 is provided at one end of the energy dissipation pipe 1, a plurality of water inlet holes 102 are provided on the surface of the first overflow top 101, a flow diversion plate 103 is provided inside the energy dissipation pipe 1, and a water outlet pipe 104 is provided inside the energy dissipation pipe 1 away from the first overflow top 101. The high potential energy water flow first contacts the first overflow top 101, undergoes primary energy dissipation, and then enters the energy dissipation pipe 1 through the water inlet holes 102, and then flows through the flow diversion plate 103 to complete secondary energy dissipation, and then the water flow continues to flow after passing through the flow diversion plate 103; The water outlet pipe 104 is located inside the energy dissipation pipe 1, and a flow diversion cavity is formed between the water outlet pipe 104 and the energy dissipation pipe 1. A connecting sleeve 105 is provided at one end of the water outlet pipe 104 close to the diversion plate 103, and a second overflow top 106 is provided at one end of the connecting sleeve 105 close to the diversion plate 103. The connecting sleeve 105 is provided with a plurality of water holes 107. The water flow passing through the secondary energy dissipation contacts the second overflow top 106, completes the third level of energy dissipation through the second overflow top 106, and then enters the flow diversion cavity to complete the fourth level of energy dissipation, and finally passes through the water holes 107 and is discharged through the water outlet pipe 104.
[0028] Through multi-stage energy dissipation, the energy dissipation effect of high potential energy water flow can be guaranteed.
[0029] The energy dissipation pipe 1, the first overflow top 101, the water inlet 102, the flow plate 103, the water outlet pipe 104, the connecting sleeve 105, the second overflow top 106 and the water hole 107 do not require on-site construction. After being processed and formed, they can be directly carried to the construction site for installation for efficient construction. In addition, the energy dissipation structure is integrated into one, and does not require multiple connections, so that disassembly and assembly are more convenient.
[0030] The energy dissipation pipe 1, the first overflow top 101, the flow plate 103, the water outlet pipe 104, the connecting sleeve 105 and the second overflow top 106 are preferably made of PET material, which has low material cost and is easy to process. In addition, the energy dissipation structure made of PET material has high strength, good toughness, good stability and good durability.
[0031] In the preferred solution, the first flood roof 101 is divided into two sections with different slopes, the end with a larger slope is connected to the energy dissipation pipe 1, and the end with a smaller slope is conical, first passing through the conical section for diversion, and then flowing into the water inlet 102; The second diffuser top 106 is conical, and the edge diameter of the second diffuser top 106 is larger than the diameter of the connecting sleeve 105. As required, the edge of the second diffuser top 106 can be bent upward to complete the flow diversion on one side while diverting the flow, further increasing the energy dissipation effect; A water leakage hole is provided at the center of the diverting plate 103, so that the water flow diverted through the diverting plate 103 will gather at the water leakage hole to complete the hedging, that is, diverting hedging, thereby further increasing the energy dissipation effect.
[0032] The water flow can be guided to the surroundings through the second overflow top 106, and then gathered in the connecting sleeve 105 through the water hole 107 after being diverted by the diversion cavity, completing the diversion and hedging for the second time, and the energy dissipation effect is better.
[0033] In the preferred embodiment, Figure 3 As shown, the outside of the energy dissipation pipe 1 is sleeved with a connecting pipe 2, and a retaining ring 3 is provided inside the connecting pipe 2. The outlet pipe 104 in the energy dissipation pipe 1 is close to the retaining ring 3. When in use, the energy dissipation pipe 1 can be placed in the connecting pipe 2. The outer diameter of the connecting pipe 2 can be determined according to the size of the connection at the installation position. The inner diameter of the connecting pipe 2 is adapted to the energy dissipation pipe 1, and the connection is more convenient through the connecting pipe 2.
[0034] For example, the end of the connecting pipe 2 is connected to the drain pipe through a pipe clamp in the prior art, and no additional connecting structure is required, and no heterosexual connection or switching is required. While ensuring the energy dissipation effect, it is easy to disassemble and assemble.
[0035] Embodiment 2: like Figure 1 , 2 , 4, 5, 10, 11 and 13, as shown, the circumferential surface of the connecting pipe 2 is provided with a limiting groove 201, and a mounting buckle 5 is provided in the limiting groove 201; The connecting pipe 2 is arranged in the drain ditch 4, and the drain ditch 4 refers to the existing drain ditch or drainage channel. The drain ditch 4 is provided with an installation groove 401, and the installation buckle 5 extends into the installation groove 401. The present application can not only be connected to the drain pipe, but also to the drain ditch 4, so as to adapt to different installation requirements, have better adaptability, and be easy to disassemble and assemble. It is convenient to replace after long-term use and easy to maintain.
[0036] In the preferred scheme, the mounting buckle 5 includes a bottom buckle arranged in the mounting groove 401, the bottom buckle extends to the inside of the limiting groove 201, the bottom buckle is connected to a top buckle, the top buckle extends to the inside of the limiting groove 201, and is connected in the limiting groove 201 by a combination of the bottom buckle and the top buckle. While clamping the connecting pipe 2, the connecting pipe 2 can be prevented from sliding relative to the bottom buckle and the top buckle. At the same time, the bottom buckle is located in the mounting groove 401, which can prevent the connecting pipe 2 from sliding relative to the drain ditch 4. When in use, the connecting pipe 2 is placed on the bottom buckle, and then the top buckle is connected to complete the fixing of the connecting pipe 2 and the installation of the energy dissipation pipe 1. Otherwise, it can be disassembled, which is convenient for the installation of the connecting pipe 2 in the drain ditch 4 and the drainage channel. No on-site construction is required, only unified modular installation is required, which is more efficient and more convenient for later maintenance.
[0037] In a further embodiment, the bottom buckle is a circular bottom buckle 501 or a square bottom buckle 504 or a heterogeneous bottom buckle, which is determined according to the actual situation of the actual drainage ditch 4 or drainage channel.
[0038] In a further embodiment, the top buckle is a first top buckle 502, and both ends of the first top buckle 502 are connected to the bottom buckle through a connecting piece; The top buckle or the second top buckle 505, one end of the second top buckle 505 is hinged to the bottom buckle through a hinge shaft 506, and the other end is connected to the bottom buckle through a connecting piece; When in use, the first top buckle 502 or the second top buckle 505 is selected according to actual conditions and needs, so as to have better adaptability.
[0039] When in use, the first top buckle 502, the second top buckle 505, the round bottom buckle 501, the square bottom buckle 504 or the opposite bottom buckle can be combined as needed.
[0040] In a further embodiment, the connecting member is a screw 503, which passes through the top buckle and is threadedly connected to the bottom buckle; The connecting piece may be a guide rod 507, which is connected to the bottom buckle and passes through the top buckle. The guide rod 507 may be tilted, vertical or curved as required, and it is necessary to ensure that it does not affect the placement of the top buckle. When in use, screws 503 or guide rods 507 can be selected as connecting pieces according to different needs.
[0041] Embodiment 3, like Figure 6 ,7 As shown in FIG8 , a slag removal mechanism is provided inside the drainage ditch 4 to handle large-sized impurities and prevent the energy dissipation pipe 1 from being blocked; The slag removal mechanism includes a buffer tank 402 disposed inside the drainage ditch 4, and a filter plate 7 is disposed inside the buffer tank 402. The filter plate 7 is used to isolate large impurities in the water flow to prevent the impurities from clogging the energy dissipation pipe 1. A fixing rod 601 is provided on the inner wall of the drainage ditch 4, and the fixing rod 601 is located between the filter plate 7 and the energy dissipation pipe 1. A fixing sleeve 602 is provided in the middle of the fixing rod 601, and a rotating shaft 603 is rotatably connected in the fixing sleeve 602. One end of the rotating shaft 603 is provided with a fan blade 604 located on the side of the fixing sleeve 602. One end of the rotating shaft 603 passes through the filter plate 7 and is provided with a rotating block 605. A plurality of connecting rods 606 are provided on the side of the rotating block 605, and the connecting rods 606 are away from the rotating block 605. A scraper 607 is provided at one end, and the rotating block 605 is connected to the rotating shaft 603 by bolts. In the process of drainage, water flows through the drainage ditch 4, and the fan blade 604 is affected by the water flow and rotates, thereby driving the rotating shaft 603 to rotate, thereby driving the rotating block 605, the connecting rod 606 and the scraper 607 to rotate. The scraper 607 can scrape away the impurities blocked by the filter plate 7, and in the process of the scraper 607 rotating, it will have a certain impact on the water flow, causing the water flow to be disturbed, and play an energy dissipation role; A slag removal port 403 connected to the buffer tank 402 is provided on the side of the drainage ditch 4. A collection chamber 404 is provided on the side of the drainage ditch 4. Impurities brought up by the scraper 607 can enter the collection chamber 404 through the slag removal port 403 and be collected. The collection chamber 404 can be dug into a pit or prefabricated collection box as needed, and the staff can handle the impurities regularly. like Fig. 9 As shown, an elastic rod 608 is connected between the connecting rod 606 and the scraper 607. The elastic rod 608 is preferably a rubber rod. The elastic rod 608 is bent. When in use, the elastic force of the elastic rod 608 enables the scraper 607 to always be close to the inner wall of the buffer groove 402 to ensure the impurity scraping effect.
[0042] Example 4 like Fig.15 , 16As shown in FIG. 17 , a fixed shaft 801 is further provided inside the drainage ditch 4. A central sleeve 802 is rotatably sleeved in the middle of the fixed shaft 801. A plurality of rotating plates 803 are provided along the circumference of the central sleeve 802. At least one rotating plate 803 is ensured to be located below the water surface. Side sleeves 804 are rotatably sleeved at both ends of the fixed shaft 801. A plurality of guide plates 805 are provided along the circumference of the side sleeve 804. A movable shaft 806 is rotatably connected to the outside of the fixed shaft 801. The movable shaft 806 is A driving tooth 807 is provided on the side away from the fixed shaft 801, and the driving tooth 807 is located between the central sleeve 802 and the side sleeve 804. A driven tooth 808 is provided on the side away from the fixed shaft 801. First crown gears 809 are provided at both ends of the central sleeve 802, and the first crown gears 809 mesh with the driving tooth 807. A second crown gear 810 is provided on the side of the side sleeve 804 close to the central sleeve 802, and the second crown gear 810 meshes with the driven tooth 808. The number of teeth of the active teeth 807 is smaller than that of the driven teeth 808, so as to ensure that the rotation of the rotating plate 803 can drive the guide plate 805 to rotate; When the rotating plate 803 rotates to the lowest position, the rotating plate 803 is located near the center of the water flow cross section. During drainage in the gutter or drainage channel, the water flow velocity near the center of the cross section is greater, and the potential energy is greater, while the water flow velocity near the edge of the cross section is lower. Therefore, the rotating plate 803 located at the center position will be subject to the maximum potential energy of the water flow, ensuring that the rotating plate 803 can rotate and drive the guide plate 805 to rotate.
[0043] The rotating plate 803 is a V-shaped plate, and the guide plate 805 is set at an angle. Under the influence of the V-shaped plate, the central water flow can be guided to both sides. The guide plate 805 can also guide the water flow to both sides, thereby avoiding excessive potential energy in the center of the water flow and achieving the purpose of energy dissipation. Since the potential energy in the center of the water flow is greater, the impact of the water flow on buildings and the like will be concentrated in the center, causing greater impact and damage. It is applied to guide the central water flow to both sides and generate turbulence to disperse the potential energy, thereby ultimately reducing the impact of the water flow on the building.
[0044] When in use, as the high-potential-energy water flow passes through, the central high-potential-energy water flow will push the rotating plate 803, thereby driving the central sleeve 802 to rotate, and then driving the first crown gear 809, the driving tooth 807, the driven tooth 808 and the second crown gear 810 to rotate in sequence, which can drive the side sleeve 804 and the guide plate 805 to rotate. When the rotating plate 803 is pushed, it will guide the flow while being pushed, generating turbulence, while the guide plate 805 rotates in the opposite direction and contacts the water flow during rotation, which will guide the flow while dissipating energy, guiding the central high-velocity water flow to the edge and generating turbulence, while dissipating energy and reducing the water flow in the center of the water flow, thereby reducing the impact on the building.
[0045] The angles of the rotating plate 803 and the guide plate 805 are determined according to the actual situation. Protective plates are fixed at both ends of the fixed shaft 801 , and the protective plates are arranged close to the inner wall of the drainage ditch 4 .
[0046] Embodiment 5: A method for using an assembled drainage and energy dissipation structure comprises the following steps: S1, put the energy dissipation pipe 1 into the connecting pipe 2, and put the end close to the water outlet pipe 104 first, until the energy dissipation pipe 1 abuts against the retaining ring 3; S2, determining the approximate installation position of the connecting pipe 2 at the drainage position; S3. Debug the installation position and calculate:
[0047] Where: is the maximum flow rate of one energy dissipation process, in m / s; It is the single width water flow weight, unit is KN; is the height difference of an energy dissipation process, in m; It is the unit friction resistance of an energy dissipation process, in KN; is the water flow path length of an energy dissipation process, in meters; is the allowable flow rate of the material, in m / s; S4, determine the distance between each connecting pipe 2 under the same flow path according to calculation, that is, , determine the installation location; S5, installing the connecting pipe 2 equipped with the energy dissipation pipe 1 to the determined installation position to complete the installation; S6, the water flows through the connecting pipe 2 and the energy dissipation pipe 1 to complete the drainage and energy dissipation; In S1, one end of the connecting pipe 2 placed in the energy dissipation pipe 1 is the water inlet end, and the other end is the water outlet end.
[0048] At the same time, the optimal spacing of the energy dissipation pipes 1 is calculated to ensure good energy dissipation effect and service life.
[0049] In a preferred solution, in S5, draining the drainage ditch comprises the following steps: S511, constructing a drainage ditch 4 at the drainage position, and making grooves in the drainage ditch 4; S512, arranging a slag removal mechanism; S513, placing the bottom buckle into the groove in the drainage ditch 4, and setting a seal at the position where the bottom buckle and the groove are connected; S514, align the limiting groove 201 provided on the connecting pipe 2 with the bottom buckle, then lower the connecting pipe 2, and ensure that water enters from the water inlet end of the connecting pipe 2; S515, install the top buckle to complete the fixation; According to the site conditions, when encountering a long drainage ditch, Fig.14As shown, a plurality of energy dissipation pipes 1 may be arranged along the drainage ditch; When encountering a wider drainage ditch, Fig.12 As shown, a plurality of energy dissipation pipes 1 are arranged side by side, and can drain water from a wider drainage ditch.
[0050] In S512: S5121, a buffer groove 402 is provided in the drainage ditch 4, the lower end of the cross section of the buffer groove 402 is semicircular, and the upper end is a direction; S5122, fix the slag removal mechanism in the drainage ditch 4, and fix the fixing rod 601 to the inner wall of the drainage ditch 4; S5123, install the filter plate 7, so that the rotating shaft 603 of the slag removal mechanism passes through the filter plate 7; S5124, connecting the rotating shaft 603 and the rotating block 605; S5125. Set a slag removal port 403 and a collection chamber 404.
[0051] In a preferred solution, in S5, draining water from the drain pipe comprises the following steps: S521. Prepare drainage pipes of corresponding quantity and length according to the determined installation location; S522, installing a drainage pipe at the initial section of the drainage position; S523, connecting the water inlet end of the connecting pipe 2 to the drain pipe through a pipe clamp; S524, connecting another drainage pipe to the water outlet end of the previous connecting pipe 2 through a pipe clamp; S525, connecting the water inlet end of another connecting pipe 2 to the previous drainage pipe through a pipe clamp; S526, repeat S524-S525, install the drain pipe and connecting pipe 2 one by one until the installation is completed The energy dissipation pipe 1 of the present application can be installed in a drain pipe, drain ditch or drain channel as required, has better adaptability, and can be installed in an assembled manner, thereby facilitating subsequent maintenance and replacement.
[0052] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limiting the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.
Claims
1. An assembled drainage and energy dissipation structure, characterized by: It comprises an energy dissipation pipe (1), wherein one end of the energy dissipation pipe (1) is provided with a first overflow top (101), a surface of the first overflow top (101) is provided with a plurality of water inlet holes (102), a flow-providing plate (103) is provided inside the energy dissipation pipe (1), and a water outlet pipe (104) is provided inside the energy dissipation pipe (1) away from the first overflow top (101); The water outlet pipe (104) is located inside the energy dissipation pipe (1), a flow diversion cavity is formed between the water outlet pipe (104) and the energy dissipation pipe (1), a connecting sleeve (105) is provided at one end of the water outlet pipe (104) close to the diversion plate (103), a second overflow top (106) is provided at one end of the connecting sleeve (105) close to the diversion plate (103), and a plurality of water passing holes (107) are provided on the connecting sleeve (105); The energy dissipation pipe (1), the first overflow top (101), the water inlet hole (102), the flow diverter plate (103), the water outlet pipe (104), the connecting sleeve (105), the second overflow top (106) and the water passage hole (107) do not require on-site construction and can be directly carried to the construction site for installation after being processed and formed, thereby achieving efficient construction.
2. According to claim 1, the assembled drainage and energy dissipation structure is characterized by: The first diffuse roof (101) is divided into two sections with different slopes, the end with a larger slope is connected to the energy dissipation pipe (1), and the end with a smaller slope is conical; The second diffuser top (106) is conical, and the edge diameter of the second diffuser top (106) is greater than the diameter of the connecting sleeve (105); A water leakage hole is provided at the center of the flow-stirring plate (103).
3. According to claim 1, the assembled drainage and energy dissipation structure is characterized by: The outside of the energy dissipation pipe (1) is sleeved with a connecting pipe (2), a retaining ring (3) is provided inside the connecting pipe (2), and the water outlet pipe (104) in the energy dissipation pipe (1) is close to the retaining ring (3); The end of the connecting pipe (2) is connected to the drainage pipe via a pipe clamp.
4. According to claim 4, the assembled drainage and energy dissipation structure is characterized by: A limiting groove (201) is provided on the circumferential surface of the connecting pipe (2), and a mounting buckle (5) is provided in the limiting groove (201); The connecting pipe (2) is arranged in the drainage ditch (4), a mounting groove (401) is arranged in the drainage ditch (4), and the mounting buckle (5) extends into the mounting groove (401).
5. The assembled drainage and energy dissipation structure according to claim 5 is characterized by: The mounting buckle (5) comprises a circular bottom buckle (501) arranged in the mounting groove (401), the circular bottom buckle (501) extending to the inside of the limiting groove (201), the circular bottom buckle (501) being connected to a first top buckle (502), the first top buckle (502) extending to the inside of the limiting groove (201), and the circular bottom buckle (501) and the first top buckle (502) being connected by a screw (503); or A guide rod (507) is provided at the top of the circular bottom buckle (501), the guide rod (507) passes through the first top buckle (502), and the guide rod (507) is arranged obliquely or vertically; or The mounting buckle (5) comprises a square bottom buckle (504) arranged in the mounting groove (401), the square bottom buckle (504) being connected to a second top buckle (505), the square bottom buckle (504) and the second top buckle (505) both extending into the interior of the limiting groove (201), one end of the square bottom buckle (504) and the second top buckle (505) being hinged via a hinge shaft (506), and the other end being connected via a screw (503).
6. The assembled drainage and energy dissipation structure according to claim 4 is characterized in that: A slag removal mechanism is also provided inside the drainage ditch (4) for handling large-sized impurities to prevent the energy dissipation pipe (1) from being blocked; The slag removal mechanism comprises a buffer tank (402) arranged inside the drainage ditch (4), and a filter plate (7) is arranged inside the buffer tank (402); A fixing rod (601) is provided on the inner wall of the drainage ditch (4), the fixing rod (601) being located between the filter plate (7) and the energy dissipation pipe (1), a fixing sleeve (602) being provided in the middle of the fixing rod (601), a rotating shaft (603) being rotatably connected in the fixing sleeve (602), a fan blade (604) being provided at one end of the rotating shaft (603) being located at a side of the fixing sleeve (602), one end of the rotating shaft (603) passing through the filter plate (7) and being provided with a rotating block (605), a plurality of connecting rods (606) being provided on the side of the rotating block (605), a scraper (607) being provided at one end of the connecting rod (606) away from the rotating block (605), and the rotating block (605) being connected to the rotating shaft (603) by bolts; A slag removal port (403) communicating with the buffer tank (402) is provided on the side of the drainage ditch (4), and a collecting chamber (404) is provided on the side of the drainage ditch (4); An elastic rod (608) is connected between the connecting rod (606) and the scraper (607).
7. The assembled drainage and energy dissipation structure according to claim 4 is characterized by: A fixed shaft (801) is further provided inside the drainage ditch (4), the middle of the fixed shaft (801) is rotatably sleeved with a center sleeve (802), the middle of the center sleeve (802) is provided with a plurality of rotating plates (803) along the circumference, both ends of the fixed shaft (801) are rotatably sleeved with side sleeves (804), a plurality of guide plates (805) are provided along the circumference of the side sleeves (804), the outside of the fixed shaft (801) is rotatably connected with a movable shaft (806), and a main shaft (806) is provided on a side away from the fixed shaft (801). A moving tooth (807), the driving tooth (807) is located between the center sleeve (802) and the side sleeve (804), a driven tooth (808) is provided on the side of the driving tooth (807) away from the fixed shaft (801), a first crown gear (809) is provided at both ends of the center sleeve (802), the first crown gear (809) is meshed with the driving tooth (807), and a second crown gear (810) is provided on the side of the side sleeve (804) close to the center sleeve (802), the second crown gear (810) is meshed with the driven tooth (808); The number of teeth of the driving teeth (807) is less than the number of teeth of the driven teeth (808); When the rotating plate (803) rotates to the bottom, the rotating plate (803) is located close to the center of the water flow cross section; The rotating plate (803) is a V-shaped plate, and the guide plate (805) is arranged at an angle.
8. A method for using an assembled drainage and energy dissipation structure, characterized by: The steps include: S1, inserting the energy dissipation pipe (1) into the connecting pipe (2), with the end close to the water outlet pipe (104) inserted first, until the energy dissipation pipe (1) abuts against the retaining ring (3); S2. Determine the approximate installation position of the connecting pipe (2) at the drainage position; S3. Debug the installation position and calculate: ; Where: is the maximum flow rate of one energy dissipation process, in m / s; It is the single width water flow weight, unit is KN; is the height difference of an energy dissipation process, in m; It is the unit friction resistance of an energy dissipation process, in KN; is the water flow path length of an energy dissipation process, in meters; is the allowable flow rate of the material, in m / s; S4. Determine the distance between each connecting pipe (2) under the same flow path according to calculation, that is, , determine the installation location; S5, installing the connecting pipe (2) equipped with the energy dissipation pipe (1) to the determined installation position to complete the installation; S6, the water flows through the connecting pipe (2) and the energy dissipation pipe (1), completing drainage and energy dissipation; In S1, one end of the connecting pipe (2) placed in the energy dissipation pipe (1) is the water inlet end, and the other end is the water outlet end.
9. The method for using the assembled drainage and energy dissipation structure according to claim 8 is characterized by: In S5, draining the drainage ditch includes the following steps: S511, constructing a drainage ditch (4) at the drainage position, and cutting a groove in the drainage ditch (4); S512, arranging a slag removal mechanism; S513, placing the bottom buckle into the groove in the drainage ditch (4), and setting a seal at the position where the bottom buckle connects with the groove; S514, aligning the limiting groove (201) provided on the connecting pipe (2) with the bottom buckle, and then lowering the connecting pipe (2), and ensuring that water enters from the water inlet end of the connecting pipe (2); S515, install the top buckle to complete the fixation; In S512: S5121. A buffer groove (402) is provided in the drainage ditch (4). The lower end of the cross section of the buffer groove (402) is semicircular, and the upper end is a direction; S5122, fixing the slag removal mechanism in the drainage ditch (4), and fixing the fixing rod (601) to the inner wall of the drainage ditch (4); S5123, installing the filter plate (7) so that the rotating shaft (603) of the slag removal mechanism passes through the filter plate (7); S5124, connecting the rotating shaft (603) and the rotating block (605); S5125. Set a slag removal port (403) and a collection chamber (404).
10. The method for using the assembled drainage and energy dissipation structure according to claim 8 is characterized by: In S5, draining water through the drain pipe includes the following steps: S521. Prepare drainage pipes of corresponding quantity and length according to the determined installation location; S522, installing a drainage pipe at the initial section of the drainage position; S523, connecting the water inlet end of the connecting pipe (2) to the drainage pipe through a pipe clamp; S524, connecting another drainage pipe to the water outlet end of the previous connecting pipe (2) through a pipe clamp; S525, connecting the water inlet end of another connecting pipe (2) to the previous drainage pipe through a pipe clamp; S526. Repeat S524-S525 to install the drain pipe and the connecting pipe (2) one by one until the installation is completed.
Citation Information
Patent Citations
Multi-stage ski-jump energy dissipation drainage system
CN110528478A
Energy dissipation device for drainage inspection well
CN115538562A
Pipeline type drop energy dissipation and drainage structure
CN212453011U
Energy dissipation device for drainage pipeline
CN216075424U
PVC (polyvinyl chloride) drainage and energy dissipation pipe fitting
CN219118296U