Novel tower crane type continuous pouring device and operation method thereof
Through the new tower crane continuous pouring device, the use of gantry, casting, conveying and lifting systems, the problems of traditional construction efficiency and safety risks are solved, and efficient continuous pouring is achieved in channels and other occasions.
Patent Information
- Application Number
- CN202411403678.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-09
- Publication Date
- 2024-12-27
AI Technical Summary
In large-scale channel construction, the casting efficiency of traditional door tower machines is low, and continuous casting cannot be achieved. There are large interference between equipment, which has safety risks and affects construction efficiency.
Design a new type of tower crane continuous casting device, including a gantry system, a casting system, a conveying system and a lifting system, and conveying concrete along the channel through the conveying system, the gantry system supports the crane system, and the lifting system can be detached to the tower section. Match the pouring height to achieve continuous and rapid pouring.
It improves construction efficiency and realizes continuous and rapid pouring of concrete. It is suitable for channels, canyons and other occasions. It has high integration and low equipment requirements, reducing safety risks during construction.
Smart Images

Figure CN119195145A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of casting equipment, and in particular to a novel tower crane type continuous casting device and an operating method thereof. Background Art
[0002] In some large-scale channel construction, because it involves linear large-volume excavation, warehouse preparation, and pouring construction, the workload of various construction contents is very large and high efficiency is required. General gantry cranes have low pouring efficiency, and many units need to be arranged for centralized pouring to meet the construction needs. There is a lot of interference between the gantry cranes, and there are great safety risks. At the same time, continuous pouring cannot be achieved, which seriously affects the pouring efficiency. Summary of the invention
[0003] The technical problem to be solved by the present invention is to provide a novel tower crane type continuous casting device and an operation method thereof, which can be installed in a construction environment such as a channel or a canyon to realize continuous and rapid casting.
[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is: a novel tower crane type continuous casting device, comprising a gantry system, a casting system, a conveying system, a crane system and a lifting system; The conveying system is used to transport concrete and is laid along the channel; The gantry system includes tracks laid along both sides of the channel, a supporting gantry is set across the channel, a trolley running along the track is set at the lower end of the supporting gantry, and a crane system is set on the supporting gantry; The crane system comprises a slewing bearing arranged on a supporting gantry, a top tower section is arranged on an outer ring of the slewing bearing, a gear is arranged on the outer ring of the slewing bearing, a driving gear is meshed with the gear, the driving gear is arranged on an output shaft of a driving motor, and a crane is arranged on the upper end of the top tower section; The lifting system includes a jacking section, which is fixedly mounted on the supporting gantry corresponding to the jacking tower section, and a plurality of standard tower sections are arranged at the lower end of the jacking section, the lowest standard tower section is connected to the base tower section, and the lower end of the base tower section is connected to the material transfer platform, which is arranged in the channel; The casting system includes a first feeder fixed on the supporting gantry, a second feeder is arranged on the rotating platform, the first feeder is used to transfer the concrete transported by the conveying system to the second feeder, a feeding hopper is arranged at the feeding end of the first feeder, and the discharging end is connected with the second feeder through the first rotating hopper, a second rotating hopper is arranged at one end of the rotating platform, and the discharging end of the second feeder is arranged above the second rotating hopper, the feeding end of the inner feeder is hinged to the lower end of the second rotating hopper, the discharging end of the inner feeder is provided with a third rotating hopper, the feeding end of the outer feeder is hinged to the lower end of the third rotating hopper, the hook of the crane is connected to the lifting ring on the truss of the outer feeder, and the base tower section is connected to the truss of the inner feeder through a pull rope mechanism.
[0005] In a preferred embodiment, the conveying system includes multiple belt conveyors connected end to end, and a discharge trolley is provided on the frame of the belt conveyor. After the discharge trolley moves so that the discharge chute of the discharge trolley moves to the upper side of the feed hopper, the discharge trolley discharges the concrete conveyed by the belt conveyor.
[0006] In the preferred solution, the supporting door frame includes a main crossbeam arranged on the top, two groups of inclined columns are arranged at both ends of the main crossbeam, the two groups of inclined columns form an eight-shaped inclined column support, a bottom longitudinal beam is arranged between the two groups of inclined columns, and a main diagonal brace is arranged between the main crossbeam and the bottom longitudinal beam.
[0007] In a preferred solution, a secondary diagonal brace is provided between the main diagonal brace and the jacking section.
[0008] In a preferred solution, the first feeder is fixedly arranged on the bottom longitudinal beam supporting one end of the portal frame.
[0009] In a preferred solution, a driver's cab and an electric control cabinet are provided on the bottom longitudinal beam, and a counterweight is placed on the trolley.
[0010] In the preferred solution, a top seat is provided on one side of the lifting section, the tail of the cylinder body of the lifting cylinder is hinged to the top seat, a tail seat is provided on one side of the target tower section and the base tower section, and the piston rod of the lifting cylinder is hinged to the tail seat on one side of the target tower section or the base tower section.
[0011] In the preferred solution, a hook is provided on one side of the lower end of the jacking section, a hinged plate is provided on one side of the upper end of the tower section, the lower end of the hinged plate is hinged to the tower section, and the other end is provided with a lifting hole matching the hook, and a front lifting point and a rear lifting point are respectively provided on the upper and lower ends of one side of the tower section.
[0012] In a preferred solution, a sling point is provided at the bottom of the rotary table, and the sling point is used to connect with a locking rope, and the other end of the locking rope is connected to a sling ring on the truss of the external material placing machine to lock the external material placing machine.
[0013] In a preferred solution, the rope pulling mechanism comprises rope pulling connecting rings respectively arranged on the trusses of the base tower section and the inner material placing machine, and ropes are arranged between the rope pulling connecting rings.
[0014] In a preferred solution, the first rotating hopper includes multiple intermediate hoppers, the top hopper is inserted into the uppermost intermediate hopper, the lowermost intermediate hopper is inserted into the tail hopper, the top hopper is connected to the truss of the first feeder through a support frame, the tail hopper is connected to the truss of the second feeder through a rib plate, a wheel frame is arranged on the outer side of the top hopper and the intermediate hopper, a pulley is arranged on the wheel frame, and a slide groove cooperating with the pulley is arranged on the inner side of the intermediate hopper and the tail hopper.
[0015] In a preferred solution, the wheel frame includes a connecting tube, a connecting rod is slidably installed in the connecting tube, a pulley is provided at the end of the connecting rod, limiting ring plates are provided on the outside of the connecting tube and the connecting rod, and a tightening spring is provided between the two sets of limiting ring plates.
[0016] In a preferred solution, baffles for limiting the position of the pulley are provided at both ends of the slide groove.
[0017] In a preferred solution, the second rotating hopper includes a hopper rotatably mounted on a mounting hole on the rotating platform through a first bearing, a first hinged ear plate is provided on the outer side of the hopper, and the first hinged ear plate is hinged to a first hinged frame arranged on the truss of the inner material distribution machine.
[0018] In a preferred embodiment, the third rotating hopper includes a support ring connected to the truss of the inner material distribution machine. The barrel of the third rotating hopper is rotatably installed in the support ring through a second bearing. A second hinged ear plate is provided on the outside of the barrel. The second hinged ear plate is hinged to the second hinged frame on the truss of the outer material distribution machine.
[0019] In a preferred solution, a discharging hopper is provided at the discharging end of the external material distributing machine, and a distributing cylinder is provided at the lower end of the discharging hopper.
[0020] The present invention also provides an operating method of a novel tower crane type continuous casting device, comprising the following steps: Step 1: Operate the gantry system and drive along the track to the area to be poured, and align the unloading chute of the unloading trolley with the feed hopper of the first feeder; Step 2: Start the crane system, align the crane hook with the lifting ring on the external concrete placing machine, connect the hook with the lifting ring through the lifting rope, and release the connection between the locking rope and the lifting ring; Step 3: Start the conveying system to convey concrete, and convey it to the first feeder, the second feeder, the inner concrete distributor and the outer concrete distributor in sequence. The top tower section is driven by the driving motor to rotate, so that the outer concrete distributor rotates horizontally. The crane is lifted up and down to make the outer concrete distributor swing up and down. After the discharge end of the outer concrete distributor is aligned with the pouring position, pouring can begin. The conveying system and the conveying system are started in sequence in the manner of starting the far end first and then the near end. After the concrete is conveyed to the outer concrete distributor, the warehouse is poured; Step 4: When pouring without using the pouring system, connect the lifting ring to the lifting point through the locking rope, and then release the connection between the hook and the lifting ring, and the crane system can carry out the lifting operation; Step 5. With the increase of the casting height of the warehouse, when the number of originally installed tower sections is too large, the casting height of the external concrete placing machine cannot match the casting point elevation, and some tower sections are dismantled. The operation method is: extend the piston rod of the lifting cylinder and connect it with the tail seat on the second tower section, release the pin connection between the lower part of the first tower section and the second tower section, continue to extend the piston rod of the lifting cylinder, so that there is enough dismantling space between the first tower section and the second tower section, and then use the hinged plate to connect the hook on one side of the lifting section. Connect the hook of the crane with the rear lifting point of the first tower section, lift the crane, and rotate the first tower section around the hook until it is horizontal. Then connect the hook to the front lifting point of the first tower section through the lifting rope, release the connection between the hinged plate and the hook, and complete the removal of the first tower section. Then retract the piston rod of the lifting cylinder, align the second tower section with the lifting section and insert the pin. Repeat the above steps to remove the subsequent tower sections until the height of the lifting system meets the casting height requirement of the external concrete placing crane.
[0021] The novel tower crane type continuous casting device and the operation method thereof provided by the present invention have the following beneficial effects: 1. The working method is novel and efficient. The present invention adopts the working mode of combining a gantry crane with a crane, a conveying system and a pouring system, which can realize continuous and rapid pouring of concrete with high working efficiency.
[0022] 2. Wide application scope. This device can be used in large-volume concrete preparation and pouring places such as channels, canyons, and flat lands. It has good applicability and low requirements on the conditions of the use site, and can be quickly promoted.
[0023] 3. Integrated construction. This device realizes the idea of continuous integrated construction of warehouse hoisting and belt conveyor, covering the main links of engineering concrete construction. The equipment has a high degree of integration and does not require more equipment to cooperate, which well reflects the effect of integrated construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0025] Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 is a side view of the present invention; Figure 3 This is the side view of the tower section of the hoisting system when it is disassembled and assembled; Figure 4for Figure 3 The enlarged view of point A in the middle; Figure 5 This is a schematic diagram of the installation structure of the first transfer hopper; Figure 6 It is a schematic diagram of the matching structure of the pulley and the slideway; Figure 7 is a schematic diagram of the structure of a preferred wheel frame; Figure 8 This is a schematic diagram of the installation structure of the second transfer hopper; Fig. 9 This is a schematic diagram of the installation structure of the third transfer hopper; In the figure: gantry system 100, track 110, supporting gantry 120, main cross beam 121, inclined column 122, bottom longitudinal beam 123, main diagonal brace 124, secondary diagonal brace 125, trolley 130, driver's cab 140, electric control cabinet 150, counterweight 160; Casting system 200, first feeder 210, feed hopper 211, second feeder 220, first transfer hopper 230, top hopper 231, middle hopper 232, tail hopper 233, support frame 234, rib plate 235, wheel frame 236, connecting tube 2361, connecting rod 2362, limiting ring plate 2363, tightening spring 2364, pulley 237, slide 238, baffle 239, second transfer hopper 240, first bearing 241, hopper 242, first hinged ear plate 243, first hinged frame 244, third transfer hopper 250, support ring 251, barrel 252, second bearing 253, second hinged ear plate 254, second hinged frame 255, outer material distributor 260, lifting ring 261, discharge hopper 262, material distributor tube 263, inner material distributor 270; Conveying system 300, belt conveyor 310, unloading trolley 320, unloading chute 321; Crane system 400, slewing bearing 410, gear 411, top tower section 420, drive gear 430, drive motor 440, crane 450, hook 451; Lifting system 500, lifting section 510, top seat 511, hook 512, tower section 520, tail seat 521, hinged plate 522, front lifting point 523, rear lifting point 524, base tower section 530, transfer table 540, sling point 541, rope pulling mechanism 550, rope pulling connecting ring 551, rope pulling 552, lifting cylinder 560. DETAILED DESCRIPTION
[0026] The following will be combined with the attached Figures 1 to 9 The technical solution of the present invention is further described.
[0027] The described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0028] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0029] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0030] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0031] Embodiment 1: like Figure 1~2 As shown, a novel tower crane type continuous casting device includes a gantry system 100, a casting system 200, a conveying system 300, a crane system 400 and a lifting system 500.
[0032] The conveying system 300 is used to convey concrete and other casting materials and is arranged along the channel. The conveying system 300 includes a plurality of belt conveyors 310 connected end to end. A discharge trolley 320 is provided on the frame of the belt conveyor 310. After the discharge trolley 320 moves so that the discharge chute 321 of the discharge trolley 320 moves to the upper side of the feed hopper 211, the discharge trolley 320 discharges the concrete conveyed on the belt conveyor 310.
[0033] The gantry system 100 includes a track 110 laid along both sides of the channel, and a support gantry 120 is arranged across the channel. The support gantry 120 is the support system of the entire device. In this embodiment, in order to reduce interference with the crane rotation process, it is set as a single main beam eight-shaped support gantry. Specifically, the support gantry 120 includes a main crossbeam 121 set at the top, and two groups of inclined columns 122 are arranged at both ends of the main crossbeam 121. The two groups of inclined columns 122 form an eight-shaped inclined column support. A bottom longitudinal beam 123 is arranged between the two groups of inclined columns 122, and a main diagonal brace 124 is arranged between the main crossbeam 121 and the bottom longitudinal beam 123 for strengthening the connection. A jacking section 510 is fixedly connected to the lower part of the bearing 1 in the upper hole of the main crossbeam 121, and a secondary diagonal brace 125 is arranged between the main diagonal brace 124 and the jacking section 510 to further strengthen the supporting capacity. On the other side of the top tower section 510, one or more lifting rings for installing the new standard tower section 520 are fixedly connected.
[0034] A crane system 400 is provided on the supporting gantry 120 , and a trolley 130 that travels along the track 110 is provided at the lower end of the supporting gantry 120 for supporting the movement of the gantry 120 and its accessory structures.
[0035] A driver's cab 140 is provided on the bottom longitudinal beam 123 to facilitate on-site operation by the operator. An electric control cabinet 150 is also provided on the bottom longitudinal beam 123 to facilitate electrical control and signal transmission of the equipment. A counterweight block 160 of corresponding weight is also provided on each trolley 130 after calculation of the anti-overturning moment to prevent the risk of overturning of the crane during operation. The device can be controlled and operated on-site through the driver's cab 140 and the electric control cabinet 150, and can also be remotely controlled and operated through a remotely provided control device.
[0036] The crane system 400 includes a slewing bearing 410 arranged on the supporting gantry 120, the inner ring of the slewing bearing 410 is fixedly arranged on the main crossbeam 121, the top tower section 420 is installed on the outer ring of the slewing bearing 410, the outer ring of the slewing bearing 410 is provided with gear teeth 411, the driving gear 430 is meshed with the gear teeth 411, the driving gear 430 is installed on the output shaft of the driving motor 440, and the upper end of the top tower section 420 is provided with a crane 450.
[0037] The motor 440 rotates the driving gear 430, driving the outer ring of the slewing bearing 410 to rotate, thereby causing the top tower section 420 to rotate synchronously. A crane 450 is provided at the upper end of the top tower section 420 to realize the slewing drive of the crane 450. The crane 450 includes structures such as an arm, an arm trolley, and a winch. The arm trolley moves along the arm, and a fixed pulley is provided on the arm trolley. The wire rope of the winch is connected to the arm trolley after passing through the fixed pulley and the movable pulley in turn. A hook 451 is provided on the movable pulley. The arm trolley moves along the arm to realize the horizontal movement of the hook 451. The hook 451 is driven up and down by the winch to realize the lifting of the hook 451.
[0038] The lifting system 500 includes a lifting section 510, which is fixedly mounted on the lower side of the main beam 121 corresponding to the top tower section 420, and a plurality of standard tower sections 520 are arranged at the lower end of the lifting section 510, and the standard tower section 520 at the lower end is connected to the base tower section 530, and the lower end of the base tower section 530 is connected to the transfer platform 540. The lifting section 510 and the standard tower section 520, the adjacent standard tower sections 520, and the standard tower section 520 and the base tower section 530 are connected by pins or bolts.
[0039] If the length of the pylon section 520 needs to be increased, one or more sections are added according to the required length.
[0040] Preferably, Figure 3~4 As shown, a top seat 511 is provided on one side of the lifting section 510, the tail of the cylinder body of the lifting cylinder 560 is hinged to the top seat 511, a tail seat 521 is provided on one side of the target tower section 520 and the base tower section 530, and the piston rod of the lifting cylinder 560 is hinged to the tail seat 521 on one side of the target tower section 520 or the base tower section 530.
[0041] A hook 512 is provided on one side of the lower end of the lifting section 510, and a hinged plate 522 is provided on one side of the upper end of the tower section 520. The lower end of the hinged plate 522 is hinged to the tower section 520, and the other end is provided with a hanging hole that cooperates with the hook 512. A front hanging point 523 and a rear hanging point 524 are respectively provided on the upper and lower ends of one side of the tower section 520.
[0042] The above structural design is conducive to the removal of the tower section 520. As the casting height of the warehouse is raised, when the number of tower sections 520 originally installed is too large, the casting height of the external feeder 260 cannot match the casting point elevation, and some tower sections 520 are removed. The operation method is: extend the piston rod of the lifting cylinder 560 and connect it with the tailstock 521 on the second tower section 520, release the pin connection between the lower part of the first tower section 520 and the second tower section 520, continue to extend the piston rod of the lifting cylinder 560, so that there is enough removal space between the first tower section 520 and the second tower section 520, and then use the hinged plate 522 to connect the hook 512 on one side of the jacking section 510, and use the hook 451 of the crane 450. It is connected to the rear lifting point 524 of the first tower section 520, the crane 450 is lifted, and the first tower section 520 is rotated around the hook 512 until the first tower section 520 is rotated to a horizontal state, and then the hook 451 is connected to the front lifting point 523 of the first tower section 520 through a lifting rope, and the connection between the hinged plate 522 and the hook 512 is released to complete the removal of the first tower section 520, and then the piston rod of the lifting cylinder 560 is retracted, and the second tower section 520 is aligned with the lifting section 510 and then pinned, and the above steps are repeated to remove the subsequent tower sections 520 until the height of the lifting system 500 meets the pouring height requirement of the external concrete placing machine 260.
[0043] The pouring system 200 is used to transfer the concrete and other materials delivered by the conveying system 300 to the feeders and the placing machine belts connected to the gantry, and then further pour the warehouse. Specifically, it includes a first feeder 210 fixed on the supporting gantry 120. Preferably, the first feeder 210 is fixed on the bottom longitudinal beam 123 at one end of the supporting gantry 120. A second feeder 220 is provided on the rotary table 540. The first feeder 210 is used to transfer the concrete transported by the conveying system 300 to the second feeder 220. A feed hopper 211 is provided at the feed end of the first feeder 210, and a discharge end is connected to the second feeder 220 through a first transfer hopper 230. A second transfer hopper 240 is provided at one end of the rotary table 540, and the discharge end of the second feeder 220 is arranged above the second transfer hopper 240. The feed end of the inner feeder 270 is hinged to the lower end of the second transfer hopper 240, and the discharge end of the inner feeder 270 is provided with a third transfer hopper 250. The feed end of the outer feeder 260 is hinged to the lower end of the third transfer hopper 250, and the discharge end of the outer feeder 260 is provided with a discharge hopper 262, and a distribution cylinder 263 is provided at the lower end of the discharge hopper 262, so as to facilitate the feeding of the casting part.
[0044] The hook 451 of the crane 450 is connected to the lifting ring 261 on the truss of the outer fabric machine 260, and is driven by the crane 450 to swing and pitch, and the base tower section 530 is connected to the truss of the inner fabric machine 270 through a pull rope mechanism 550. Preferably, the pull rope mechanism 550 includes pull rope connection rings 551 respectively arranged on the trusses of the base tower section 530 and the inner fabric machine 270, and a pull rope 552 is arranged between the pull rope connection rings 551.
[0045] Each transfer hopper has different structural designs according to different functions.
[0046] like Figures 5 to 7 As shown, the first transfer hopper 230 includes a plurality of intermediate hoppers 232, the top hopper 231 is inserted into the uppermost intermediate hopper 232, the lowermost intermediate hopper 232 is inserted into the tail hopper 233, the top hopper 231 is connected to the truss of the first feeder 210 through a support frame 234, the tail hopper 233 is connected to the truss of the second feeder 220 through a rib plate 235, a wheel frame 236 is arranged on the outer side of the top hopper 231 and the intermediate hopper 232, a pulley 237 is arranged on the wheel frame 236, a slide groove 238 cooperating with the pulley 237 is arranged on the inner side of the intermediate hopper 232 and the tail hopper 233, and the plurality of intermediate hoppers 232 are inserted into each other to form a telescopic cylinder structure.
[0047] The first transfer hopper 230 can be freely extended and retracted in the height direction. When the lifting system 500 is adjusted in height by adding or removing the tower section 520, the second feeder 220 can automatically adjust the length of the first transfer hopper 230 at any time as the height of the transfer platform 540 changes to ensure reliable material feeding.
[0048] Preferably, Figure 7 As shown, the wheel frame 236 includes a connecting tube 2361, a connecting rod 2362 is slidably installed in the connecting tube 2361, a pulley 237 is provided at the end of the connecting rod 2362, a limiting ring plate 2363 is provided on the outside of the connecting tube 2361 and the connecting rod 2362, and a tightening spring 2364 is provided between the two sets of limiting ring plates 2363.
[0049] In this embodiment, the top bucket 231, the middle bucket 232 and the tail bucket 233 are configured as conical cylinders that are larger at the top and smaller at the bottom. By providing a tightening spring 2364, the pulley 237 can always be set close to the slide groove 238 during the up and down movement of the middle bucket 232, thereby preventing the two adjacent groups of middle buckets 232 from detaching.
[0050] Preferably, baffles 239 are provided at both ends of the chute 238 to limit the pulley 237. By providing the baffles 239, when the pulley 237 moves to the end of the chute 238, the pulley is prevented from detaching from the chute 238 and causing the adjacent two groups of intermediate buckets 232 to detach.
[0051] like Figure 8As shown, the second rotating hopper 240 includes a hopper 242, which is rotatably mounted in the mounting hole of the rotating platform 540 through a first bearing 241, so that the inner material distributor 270 can be horizontally rotated relative to the axis of the hopper 242. A first hinged ear plate 343 is provided on the outer side of the hopper 242, and the first hinged ear plate 243 is hinged to a first hinge frame 244 provided on the truss of the inner material distributor 270. So that the inner material distributor 270 can swing relative to the second rotating hopper 240 through the hinge point to adjust the angle.
[0052] like Fig. 9 As shown, the third rotating hopper 250 includes a support ring 251 connected to the truss of the inner material distributor 270, and the support ring 251 is arranged below the end of the truss of the inner material distributor 270. The barrel 252 of the third rotating hopper 250 is rotatably installed in the support ring 251 through the second bearing 253. The outer side of the barrel 252 is provided with a second hinged ear plate 254, and the second hinged ear plate 254 is hinged to the second hinged frame 255 on the truss of the outer material distributor 260. The outer material distributor 260 can rotate horizontally relative to the axis of the barrel 252, and can also swing up and down relative to the hinge point of the second hinged frame 255 and the second hinged ear plate 254, so as to facilitate the adjustment of the position and posture of the outer material distributor 260.
[0053] Embodiment 2: Different from Example 1, a sling point 541 is provided at the bottom of the rotating platform 540, and the sling point 541 is used to connect with a locking rope. The other end of the locking rope is connected to a sling ring 261 on the truss of the external material placing machine 260 for locking the external material placing machine 260.
[0054] When the pouring system 200 is not used for pouring, the lifting ring 261 is connected to the lifting point 541 by a locking rope, and then the connection between the hook 451 and the lifting ring 261 is released, and the crane system 400 can perform a separate lifting operation.
[0055] Embodiment 3: Before using the device, the equipment should be installed first. First, the track 110 should be laid and installed, and then the gantry system 100 should be installed in the order from bottom to top, first the main and then the secondary. The top tower section 420 should be installed on the main crossbeam 121, and then the auxiliary devices such as the boom, counterweight, trolley, hoisting winch, hoisting rope and hook of the crane 450 should be installed. After the electrical commissioning of the gantry system 100 and the crane system 400 is completed, the crane 450 can be used to install the lifting system 500 in sequence, and then the crane 450 can be used to install the casting system 200 in sequence. After the overall commissioning is completed, the installation is completed.
[0056] An operating method of a novel tower crane type continuous casting device comprises the following steps: Step 1: operate the gantry system 100 and drive along the track 110 to the area to be poured, and align the discharge chute 321 of the discharge trolley 320 with the feed hopper 211 of the first feeder 210 .
[0057] Step 2, start the crane system 400, drive the top tower section 420 to rotate through the driving motor 440, so as to realize the rotation of the crane 450, and the trolley of the crane 450 moves back and forth on the arm, adjust the position of the hook 451, make the hook 451 align with the ring 261 on the external fabric machine 260, connect the hook 451 with the ring 261 through the rope, and release the connection between the lock rope and the ring 261.
[0058] Step 3: The conveying system 300 is started to convey concrete, and the concrete is conveyed to the first feeder 210, the second feeder 220, the inner distributor 270 and the outer distributor 260 in sequence. The top tower section 420 is driven by the driving motor 440 to rotate, so that the outer distributor 260 rotates horizontally. The crane 450 is used to lift the concrete up and down, so that the outer distributor 260 can swing up and down. After the discharge end of the outer distributor 260 is aligned with the pouring position, pouring can begin. The conveying system 300 and the conveying system 200 are started in sequence in the manner of starting the far end first and then the near end. After the concrete is conveyed to the outer distributor 260, the warehouse is distributed and poured.
[0059] Step 4: When the pouring system 200 is not used for pouring, the lifting ring 261 is connected to the lifting point 541 by a locking rope, and then the connection between the hook 451 and the lifting ring 261 is released, and the crane system 400 can perform lifting operations. This is the lifting working condition.
[0060] Step 5. With the increase of the pouring height of the warehouse, when the number of originally installed tower sections 520 is too large, resulting in the pouring height of the external placing machine 260 being unable to match the pouring point elevation, some tower sections 520 are dismantled. The operation method is: extend the piston rod of the lifting cylinder 560 and connect it with the tailstock 521 on the second tower section 520, release the pin connection between the lower part of the first tower section 520 and the second tower section 520, continue to extend the piston rod of the lifting cylinder 560, so that there is enough dismantling space between the first tower section 520 and the second tower section 520, and then use the hinged plate 522 to connect the hook 512 on one side of the jacking section 510, and use the hook 451 of the crane 450 to connect with the first tower section 520. The rear suspension point 524 is connected, and then the pin connection between the jacking section 510 and the first tower section 520 is released. The crane 450 is lifted, and the first tower section 520 rotates around the hook 512 until the first tower section 520 rotates to a horizontal state. Then the hook 451 and the front suspension point 523 of the first tower section 520 are connected through the suspension rope, and the connection between the hinged plate 522 and the hook 512 is released to complete the removal of the first tower section 520. Then the piston rod of the lifting cylinder 560 is retracted, and the second tower section 520 is aligned with the jacking section 510 and then pinned. Repeat the above steps to remove the subsequent tower sections 520 until the height of the lifting system 500 meets the pouring height requirement of the external concrete placing machine 260.
[0061] After the pouring operation or lifting operation is completed, the gantry system 100 stops running, the lifting ring 261 is connected to the lifting point 541 by a locking rope, and then the connection between the hook 451 and the lifting ring 261 is released, and the hook 451 is lifted to near the highest limit position, and then the trolley 130 is parked in a safe position and the power is disconnected.
[0062] As an alternative embodiment, the feeder 1 can be mounted on the bottom longitudinal beam 123 in a fixed manner or in a hinged and rotatable manner.
[0063] As an alternative embodiment, the portal system 100 may be in the form of multiple main beams and vertical columns in addition to the single main beam 121 and the inclined column 122 .
[0064] The above-mentioned embodiments are only preferred technical solutions of the present invention and should not be regarded as limitations of the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. For ordinary technicians in the relevant field, other different forms of changes or modifications can be made on the basis of the above description. It is not necessary and impossible to list all the implementation methods here, that is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.
Claims
1. A new type of tower crane continuous casting device, characterized in that: It comprises a gantry system (100), a pouring system (200), a conveying system (300), a crane system (400) and a lifting system (500); The conveying system (300) is used to convey concrete and is arranged along the channel; The gantry system (100) comprises tracks (110) laid along both sides of the channel, a supporting gantry (120) arranged across the channel, a trolley (130) travelling along the tracks (110) arranged at the lower end of the supporting gantry (120), and a crane system (400) arranged on the supporting gantry (120); The crane system (400) comprises a slewing bearing (410) arranged on a supporting gantry (120); a top tower section (420) is mounted on an outer ring of the slewing bearing (410); the outer ring of the slewing bearing (410) is provided with gear teeth (411); a driving gear (430) is meshed with the gear teeth (411); the driving gear (430) is mounted on an output shaft of a driving motor (440); and a crane (450) is provided at the upper end of the top tower section (420); The lifting system (500) comprises a lifting section (510), the lifting section (510) being fixedly mounted on the supporting gantry (120) corresponding to the tower section (420), a plurality of tower sections (520) being arranged at the lower end of the lifting section (510), the lowermost tower section (520) being connected to the base tower section (530), the lower end of the base tower section (530) being connected to a material transfer platform (540), and the material transfer platform (540) being arranged in the channel; The pouring system (200) comprises a first feeder (210) fixed on a supporting gantry (120); a second feeder (220) is provided on a rotating platform (540); the first feeder (210) is used to transfer concrete transported by the conveying system (300) to the second feeder (220); a feed hopper (211) is provided at a feeding end of the first feeder (210); a discharge end is connected to the second feeder (220) via a first rotating hopper (230); a second rotating hopper (240) is provided at one end of the rotating platform (540); and the second feeder (210) is provided at a feeding end of the first feeder (210). The discharge end of the machine (220) is arranged above the second transfer hopper (240), the feed end of the inner material distribution machine (270) is hinged to the lower end of the second transfer hopper (240), the discharge end of the inner material distribution machine (270) is provided with a third transfer hopper (250), the feed end of the outer material distribution machine (260) is hinged to the lower end of the third transfer hopper (250), the hook (451) of the crane (450) is connected to the lifting ring (261) on the truss of the outer material distribution machine (260), and the base tower section (530) is connected to the truss of the inner material distribution machine (270) through a pull rope mechanism (550).
2. A novel tower crane type continuous casting device according to claim 1, characterized in that: The conveying system (300) comprises a plurality of adhesive belt conveyors (310) connected end to end, and a discharge trolley (320) is provided on the frame of the adhesive belt conveyors (310). After the discharge trolley (320) moves so that the discharge chute (321) of the discharge trolley (320) moves to the upper side of the feed hopper (211), the discharge trolley (320) discharges the concrete conveyed on the adhesive belt conveyors (310).
3. A novel tower crane type continuous casting device according to claim 1, characterized in that: The support door frame (120) comprises a main crossbeam (121) arranged at the top, two groups of inclined columns (122) are arranged at both ends of the main crossbeam (121), the two groups of inclined columns (122) form an eight-shaped inclined column support, a bottom longitudinal beam (123) is arranged between the two groups of inclined columns (122), and a main diagonal brace (124) is arranged between the main crossbeam (121) and the bottom longitudinal beam (123).
4. A novel tower crane type continuous casting device according to claim 3, characterized in that: A secondary diagonal brace (125) is provided between the main diagonal brace (124) and the jacking joint (510).
5. A novel tower crane type continuous casting device according to claim 3, characterized in that: The first feeder (210) is fixedly arranged on a bottom longitudinal beam (123) at one end of the supporting portal frame (120).
6. A novel tower crane type continuous casting device according to claim 3, characterized in that: A driver's cab (140) and an electric control cabinet (150) are provided on the bottom longitudinal beam (123), and a counterweight (160) is placed on the trolley (130).
7. The novel tower crane type continuous casting device according to claim 1 is characterized in that: A top seat (511) is provided on one side of the jacking section (510); the rear end of the cylinder body of the lifting cylinder (560) is hinged to the top seat (511); a tail seat (521) is provided on one side of the tower section (520) and the base tower section (530); and a piston rod of the lifting cylinder (560) is hinged to the tail seat (521) on one side of the tower section (520) or the base tower section (530).
8. A novel tower crane type continuous casting device according to claim 7, characterized in that: A hook (512) is provided on one side of the lower end of the lifting section (510), and a hinged plate (522) is provided on one side of the upper end of the tower section (520). The lower end of the hinged plate (522) is hinged to the tower section (520), and the other end is provided with a hanging hole that cooperates with the hook (512). A front hanging point (523) and a rear hanging point (524) are respectively provided at the upper and lower ends of one side of the tower section (520).
9. The novel tower crane type continuous casting device according to claim 1 is characterized in that: A sling point (541) is provided at the bottom of the transfer table (540), and the sling point (541) is used to connect with a locking rope, and the other end of the locking rope is connected to a sling ring (261) on the truss of the external material placing machine (260) to lock the external material placing machine (260).
10. The novel tower crane type continuous casting device according to claim 1, characterized in that: The pull rope mechanism (550) comprises pull rope connection rings (551) respectively arranged on the trusses of the base tower section (530) and the inner material placing machine (270), and pull ropes (552) are arranged between the pull rope connection rings (551).
11. The novel tower crane type continuous casting device according to claim 1, characterized in that: The first transfer hopper (230) comprises a plurality of intermediate hoppers (232), the top hopper (231) being mounted in the uppermost intermediate hopper (232), the lowermost intermediate hopper (232) being mounted in the tail hopper (233), the top hopper (231) being connected to the truss of the first feeder (210) via a support frame (234), the tail hopper (233) being connected to the truss of the second feeder (220) via a rib plate (235), a wheel frame (236) being arranged outside the top hopper (231) and the intermediate hopper (232), a pulley (237) being arranged on the wheel frame (236), and a slide groove (238) cooperating with the pulley (237) being arranged inside the intermediate hopper (232) and the tail hopper (233).
12. A novel tower crane type continuous casting device according to claim 11, characterized in that: The wheel frame (236) comprises a connecting tube (2361), a connecting rod (2362) slidably mounted in the connecting tube (2361), a pulley (237) being provided at the end of the connecting rod (2362), limiting ring plates (2363) being provided on the outside of the connecting tube (2361) and the connecting rod (2362), and a tightening spring (2364) being provided between the two sets of limiting ring plates (2363).
13. The novel tower crane type continuous casting device according to claim 11, characterized in that: Baffles (239) for limiting the position of the pulley (237) are provided at both ends of the slide groove (238).
14. The novel tower crane type continuous casting device according to claim 1, characterized in that: The second rotating hopper (240) comprises a hopper (242) rotatably mounted on a mounting hole on the rotating platform (540) via a first bearing (241); a first hinged ear plate (243) is provided on the outside of the hopper (242); the first hinged ear plate (243) is hingedly connected to a first hinged frame (244) provided on a truss of the inner material distribution machine (270).
15. The novel tower crane type continuous casting device according to claim 1, characterized in that: The third rotating hopper (250) comprises a support ring (251) connected to the truss of the inner material distributor (270); a barrel (252) of the third rotating hopper (250) is rotatably mounted in the support ring (251) via a second bearing (253); a second hinged ear plate (254) is provided on the outer side of the barrel (252); and the second hinged ear plate (254) is hinged to a second hinged frame (255) on the truss of the outer material distributor (260).
16. The novel tower crane type continuous casting device according to claim 1, characterized in that: A material distributing hopper (262) is provided at the discharging end of the external material distributing machine (260), and a material distributing cylinder (263) is provided at the lower end of the discharging hopper (262).
17. A novel method for operating a tower crane type continuous casting device, characterized in that: The following steps are involved: Step 1: operate the gantry system (100) to travel along the track (110) to the area to be poured, and align the discharge chute (321) of the discharge trolley (320) with the feed hopper (211) of the first feeder (210); Step 2: Start the crane system (400), align the hook (451) of the crane (450) with the lifting ring (261) on the external material placing machine (260), connect the hook (451) and the lifting ring (261) via the lifting rope, and release the connection between the locking rope and the lifting ring (261); Step 3: The conveying system (300) is started to convey concrete, and the concrete is conveyed to the first feeder (210), the second feeder (220), the inner distributor (270), and the outer distributor (260) in sequence. The top tower section (420) is driven to rotate by the driving motor (440), so that the outer distributor (260) is rotated horizontally. The outer distributor (260) is lifted up and down by the crane (450), so that the outer distributor (260) is swung up and down. After the discharge end of the outer distributor (260) is aligned with the pouring position, pouring can begin. The belt conveyors of the conveying system (300) and the pouring system (200) are started in sequence in the manner of starting the far end first and the near end later, and the concrete is conveyed to the outer distributor (260) and then the bin is distributed and poured. Step 4: When the pouring system (200) is not used for pouring, the lifting ring (261) is connected to the lifting point (541) by a locking rope, and then the connection between the lifting hook (451) and the lifting ring (261) is released, and the crane system (400) can perform the lifting operation; Step 5. As the height of the warehouse casting is raised, when the number of originally installed tower sections (520) is too large, resulting in the casting height of the external placing machine (260) not matching the casting point elevation, some tower sections (520) are removed. The operation method is as follows: extend the piston rod of the lifting cylinder (560) to connect with the tailstock (521) on the second tower section (520), release the pin connection between the lower part of the first tower section (520) and the second tower section (520), continue to extend the piston rod of the lifting cylinder (560), so that there is enough removal space between the first tower section (520) and the second tower section (520), and then use the hinged plate (522) to connect the hook (512) on one side of the jacking section (510), and use the hook (451) of the crane (450) to remove the tower section (510). ) is connected to the rear lifting point (524) of the first tower section (520), the crane (450) is lifted, and the first tower section (520) is rotated around the hook (512) until the first tower section (520) is rotated to a horizontal state, and then the hook (451) and the front lifting point (523) of the first tower section (520) are connected through the lifting rope, and the connection between the hinge plate (522) and the hook (512) is released to complete the removal of the first tower section (520), and then the piston rod of the lifting cylinder (560) is retracted, and the second tower section (520) is aligned with the lifting section (510) and then pinned, and the above steps are repeated to remove the subsequent tower sections (520) until the height of the lifting system (500) meets the pouring height requirement of the external concrete placing machine (260).