Automatic sand laying device for directly-buried pipe

Through the design of the automatic laying device for sand-shaking of direct buried pipes, the use of the field level robot arm and particle size control network, the problems of low efficiency and difficult particle size of artificial landfill sand-shaking are solved, and the construction efficiency and quality are improved, ensuring that Construction safety and progress.

CN119195165APending Publication Date: 2024-12-27CHINA THIRD METALLURGICAL GRP
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411445228.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-16
Publication Date
2024-12-27

AI Technical Summary

Technical Problem

When the pipe is buried directly in the outer network of the construction, the strength of artificial landfill sand is high and the efficiency is low, and the particle size of the sand at the bottom of the foundation pit is difficult to control, which affects the construction progress and quality, especially in the presence of deep foundation pits and groundwater. There are safety hazards.

Method used

A direct buried pipe sand-shaking automatic laying device was designed, using a field-level robot arm to level the ground, combined with an elevation control unit and a vibrating particle size control network to ensure the uniformity of sand-shaking thickness and particle size, and improve construction efficiency and safety. sex. The device includes laying a cart, a control panel, an adjustable conveying device, a field level robot arm, a main engine power system, a walking wheel and a particle size control network, which achieves a shock through the robotic arm hammer, a conveying device, an elevation control unit and a particle size control network Automatic laying of sand.

Benefits of technology

It improves construction efficiency and quality, reduces labor intensity, ensures the uniformity of the elevation at the bottom of the foundation pit and the particle size control of sand shaking, reduces construction difficulty and safety risks, and achieves a time-saving construction effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119195165A_ABST
    Figure CN119195165A_ABST
Patent Text Reader

Abstract

The invention relates to an automatic sand laying device for a directly-buried pipe, and the device comprises a laying trolley, a control panel, an adjustable conveying device, a field leveling mechanical arm, a host power system assembly, a particle size control net, walking wheels, an elevation control unit, and a push-pull handle. A main engine power system assembly is arranged in the laying trolley below the control panel, an adjustable conveying device is arranged on the side face of one side of the laying trolley, an elevation control unit is arranged on the end face of the laying trolley, walking wheels are arranged at the bottom of the laying trolley, and a field leveling mechanical arm is arranged on the outer surface of the lower portion of the laying trolley in an extending mode. The device has the beneficial effects that the structure is simple, the operation is convenient, the action is flexible, the laying quality is high, the workload of constructors is reduced, the elevation of the bottom of a foundation pit is effectively controlled, and the construction progress is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of external direct buried pipe network, and in particular to an automatic sand-shaking laying device for direct buried pipes. Background Art

[0002] At present, when constructing external network direct buried pipes, the laying of direct buried pipes requires foundation pit treatment first. The bottom of the on-site foundation pit is mostly filled with shaken sand manually, which has high labor intensity, large workload and low construction efficiency. The particle size of the shaken sand manually filled on site is difficult to control, which affects the subsequent foundation pit construction and the laying construction of the direct buried pipes, and affects the construction progress.

[0003] At the same time, the working conditions of foundation pit construction are complicated, especially for deep foundation pit construction. Some sites have groundwater and support difficulties, which makes it difficult to shake the sand in the foundation pit. The personal safety of construction workers is also difficult to guarantee. The complex working conditions at the bottom of the foundation pit also make the thickness of the artificially laid shaking sand uneven, and the elevation of the bottom of the foundation pit cannot be effectively controlled. Summary of the invention

[0004] In order to overcome the shortcomings of the prior art, the present invention provides an automatic sand-shaking laying device for direct-buried pipes. Before the sand-shaking laying, a field-leveling mechanical arm is used to hammer the uneven ground in the site, and then the elevation control unit is set at the front end of the automatic laying device to effectively control the thickness of the sand-shaking, thereby ensuring the sand-shaking elevation at the bottom of the foundation pit and ensuring that each section of pipe can be constructed and operated on the sand-shaking, which is convenient and improves work efficiency. A vibrating particle size control net is arranged inside to control the particle size of the laid sand-shaking, thereby improving the quality of the sand-shaking laying, thereby achieving the purpose of saving time, saving labor, and ensuring construction quality.

[0005] In order to achieve the above object, the present invention adopts the following technical solutions:

[0006] A direct buried pipe shaking sand automatic laying device comprises a laying trolley, a control panel, an adjustable conveying device, a field leveling mechanical arm, a main engine power system integration, a particle size control network, walking wheels, an elevation control unit and a push-pull handle. A control panel is arranged on an upper surface of one side of the laying trolley, a main engine power system integration is arranged in the laying trolley below the control panel, an adjustable conveying device is arranged on a side surface of one side of the laying trolley, an elevation control unit is arranged on an end surface of the laying trolley, walking wheels are arranged on the bottom of the laying trolley, a field leveling mechanical arm is extended from the lower outer surface of the laying trolley, a particle size control network is arranged inside the laying trolley, and a push-pull handle is arranged on one side of the particle size control network.

[0007] Furthermore, the adjustable conveying device is a segmented telescopic combined structure, and an adjustable telescopic belt is arranged inside.

[0008] Furthermore, a heavy hammer is arranged at the end of the field leveling robot arm, and the heavy hammer performs an up and down hammering action outside the laying trolley.

[0009] Furthermore, the elevation control unit includes an elevation control ruler, an elevation slider and a sliding track. The elevation control ruler is arranged at the bottom of the end surface in the traveling direction of the laying trolley, elevation sliders are arranged on both sides of the elevation control ruler, and a sliding track is arranged behind the elevation slider.

[0010] Furthermore, a size scale is provided on the sliding track.

[0011] Furthermore, the traveling wheel is a universal wheel with a braking device.

[0012] Furthermore, a vibrator is provided at one end of the particle size control net.

[0013] Furthermore, the specific steps of the construction method of the direct buried pipe sand shaking automatic laying device are as follows:

[0014] S1. First, place the automatic laying device on the foundation pit working surface, and use the heavy hammer at the end of the field leveling robot arm to hammer up and down to make the uneven positions in the foundation pit level, so as to ensure that the automatic laying device can move freely in the foundation pit;

[0015] S2. On the premise that the automatic laying device can move freely, the adjustable conveying device is stretched by using the segmented telescopic combined structure to extend the adjustable conveying device to the upper edge of the foundation pit. The telescopic belt in the adjustable conveying device is installed, and the sand material on the upper edge of the foundation pit is conveyed to the laying trolley of the automatic laying device by belt transmission;

[0016] S3. The control panel controls the walking wheels to move in sequence at the bottom of the foundation pit, the lower discharge port is opened, the vibrator on one side of the particle size control net vibrates, the particle size control net controls the diameter of the sand particles, and the sand is laid on the working surface at the bottom of the foundation pit;

[0017] S4. Use the elevation slider at the front end of the laying trolley to control the height of the elevation control ruler. The walking wheels ensure the normal movement of the laying trolley. During the movement, the elevation control ruler ensures the laying height of the shaking sand. The elevation slider is lifted through the sliding track between the laying trolley. The size scale is set on the sliding track to ensure the accuracy of the height of the elevation control ruler and the construction quality.

[0018] S5. The power system of the main engine is integrated to provide power for the normal operation of the entire automatic laying device. Through the control panel, it ensures that the laying trolley can move normally in the front, back, left and right of the foundation pit, the field leveling robot arm can level the bottom of the foundation pit, and the particle size control network and the discharge port can operate effectively;

[0019] S6. After the shaking sand is laid, the large-sized stones and gravel on the particle size control net are screened out by pulling the handle and moved out of the foundation pit.

[0020] Compared with the prior art, the present invention has the following beneficial effects:

[0021] 1) The site-leveling robot arm levels the bottom surface of the foundation pit to ensure that the walking wheels can move freely. The automatic sand-shaking laying device is flexible to operate. The particle size control net controls the particle size of the shaking sand. The elevation control ruler controls the thickness of the shaking sand laying. This can ensure the construction quality of the direct buried pipe shaking sand, with high laying efficiency and good laying effect.

[0022] 2) The adjustable conveying device can arbitrarily adjust the angle, height and direction to convey the sand on the edge of the pit to the laying trolley, saving conveying time, improving conveying efficiency and saving labor intensity of construction workers.

[0023] 3) The automatic laying device has a simple structure, is easy to operate, flexible in action, has high laying quality, reduces the workload of construction personnel, effectively controls the elevation of the bottom of the foundation pit, and ensures the construction progress. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a structural schematic diagram of a direct buried pipe sand shaking automatic laying device of the present invention.

[0025] Figure 2 It is a structural front view of a direct buried pipe sand shaking automatic laying device of the present invention.

[0026] In the figure: 1. Laying trolley; 2. Control panel; 3. Adjustable conveyor; 4. Field leveling robot arm; 5. Host power system integration; 6. Particle size control net; 7. Traveling wheel; 8. Elevation control ruler; 9. Elevation slider; 10. Sliding track; 11. Push-pull handle. DETAILED DESCRIPTION

[0027] The specific implementation of the present invention will be further described below in conjunction with the accompanying drawings:

[0028] like Figure 1-Figure 2 As shown, the working principle of the structure of an automatic laying device for direct buried pipes by shaking sand is as follows: before laying sand, the gravel and earth bags at the bottom of the foundation pit for laying the direct buried pipes are leveled by a field leveling mechanical arm 4 to ensure that the laying trolley 1 can move freely, and the sand is transported into the laying trolley 1 by an adjustable conveying device 3. The sand is controlled by a particle size control net 6 to control the particle size of the shaking sand and is laid from the lower discharge port of the laying trolley 1 to the bottom of the foundation pit. The elevation control ruler 8 controls the laying elevation of the sand. The laying trolley 1 moves at the bottom of the foundation pit to lay the sand to the bottom of the foundation pit. The laying quality is good, the laying efficiency is high, the elevation is effectively controlled, and the construction progress is guaranteed.

[0029] like Figure 1-Figure 2As shown, an automatic laying device for direct buried pipe shaking sand comprises a laying trolley 1, a control panel 2, an adjustable conveying device 3, a field leveling mechanical arm 4, a main engine power system integration 5, a particle size control network 6, a walking wheel 7, an elevation control unit and a push-pull handle 11. The control panel 2 is arranged on the upper surface of one side of the laying trolley 1, and the main engine power system integration 5 is arranged in the laying trolley 1 below the control panel 2. The control panel 2 controls the front and rear movement, left and right movement, vibrator start, and sand shaking laying control assembly of the overall automatic laying device through the main engine power system integration 5. An adjustable conveying device 3 is arranged on the side of one side of the laying trolley 1. The adjustable conveying device 3 can be stretched by stretching. With the surrounding foundation pit as the bottom, the sand on the upper edge plane of the foundation pit can be conveyed to the automatic laying device through the adjustable conveying device 3. The laying trolley 1 An elevation control unit is set on the end face, which controls the laying thickness of the shaking sand and the elevation of the bottom of the foundation pit. A walking wheel 7 is set at the bottom of the laying trolley 1, which is a necessary tool for realizing the movement of the automatic laying device. A field leveling mechanical arm 4 is extended to the lower outer surface of the laying trolley 1. The two field leveling mechanical arms 4 are used to hammer and level the stones and earth bags existing in the walking process of the automatic laying device, so as to ensure that the automatic laying device can work on an effectively leveled operating surface. A particle size control net 6 is set inside the laying trolley 1, which is made of a 10-20 mesh screen. The main purpose is to filter out stones with larger particle sizes in the sand material and effectively control the construction quality of the shaking sand. A push-pull handle 11 is set on one side of the particle size control net 6, and the stones with larger particle sizes screened out are removed from the automatic laying device through the push-pull handle.

[0030] like Figure 2 As shown, further, the adjustable conveying device 3 is a segmented telescopic combined structure, an adjustable telescopic belt is arranged inside, and the adjustable transmission device 3 can be stretched in segments, and the sand material is transported by installing the adjustable telescopic belt.

[0031] Furthermore, a heavy hammer is arranged at the end of the field leveling robot arm 4, and the heavy hammer performs an up and down hammering action outside the laying trolley 1. Before laying the shaking sand, the automatic laying device walks at the bottom of the foundation pit, and hammers the protruding earth bags and stones at the bottom of the foundation pit into the soil at the bottom of the foundation pit, so as to avoid the protruding earth bags and stones affecting the laying process during the operation of the automatic laying device.

[0032] Furthermore, the elevation control unit includes an elevation control ruler 8, an elevation slider 9 and a sliding track 10. The elevation control ruler 8 is arranged at the bottom of the end face in the traveling direction of the laying trolley. Elevation sliders 9 are arranged on both sides of the elevation control ruler 8. The sliding track 10 is arranged behind the elevation slider 9. The elevation control ruler 8 is a device for controlling the thickness of the shaking sand, and controls the height of the shaking sand laid during the construction process. The elevation slider 9 adjusts the height of the elevation control ruler 8 by sliding on the sliding track 10.

[0033] Furthermore, a size scale is provided on the sliding track 10 to accurately control the height of the elevation control ruler 8 .

[0034] Furthermore, the travel wheel 7 is a universal wheel with a brake device, and the universal wheel with a brake is flexible in travel and convenient in braking.

[0035] Furthermore, a vibrator is provided at one end of the particle size control net 6, and the vibrator allows the particle size control net 6 to discharge materials more smoothly, and screen large-size particles more easily, thereby improving the efficiency of discharge.

[0036] Furthermore, the specific steps of the construction method of the direct buried pipe sand shaking automatic laying device are as follows:

[0037] S1. First, place the automatic sand-shaking device on the working surface of the foundation pit, and use the heavy hammer at the end of the field-leveling robot arm 4 to hammer upward and downward to make the uneven positions in the foundation pit level, so as to ensure that the automatic sand-shaking device can move freely in the foundation pit;

[0038] S2. On the premise that the automatic sand-shaking device can move freely, the adjustable conveying device 3 is stretched by using the segmented telescopic combined structure to extend the adjustable conveying device 3 to the upper edge of the foundation pit. The telescopic belt in the adjustable conveying device 3 is installed, and the sand material on the upper edge of the foundation pit is conveyed to the laying trolley 1 of the automatic laying device by belt transmission;

[0039] S3, the control panel 2 controls the walking wheel 7 to move in sequence at the bottom of the foundation pit, the lower discharge port is opened, the vibrator on one side of the particle size control net 6 vibrates, the particle size control net 6 controls the diameter of the sand particles, and the sand is laid on the working surface at the bottom of the foundation pit;

[0040] S4. Usually, the height of the sand shaking is 200mm. The elevation slider 9 at the front end of the laying trolley 1 is used to control the elevation control ruler 8 at a height of 200mm. The running wheels 7 ensure that the laying trolley 1 moves normally. During the walking process, the elevation control ruler 8 ensures the laying height of the sand shaking. The elevation slider 9 is lifted by the sliding track 10 between the laying trolley 1. The sliding track 10 is provided with a size scale to ensure the height accuracy of the elevation control ruler 8 and the construction quality.

[0041] S5, the main engine power system integration 5 provides power for the normal operation of the entire automatic laying device, and ensures that the laying trolley 1 moves normally in the front, back, left and right of the foundation pit, the field leveling robot arm 4 levels the bottom of the foundation pit, and the particle size control network 6 and the discharge port operate effectively through the control panel 2;

[0042] S6. After the shaking sand laying is completed, the stones and gravels with large particle sizes on the particle size control net 6 are screened out by pulling the handle 11 and moved out of the foundation pit.

[0043] The above description is only a preferred specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solutions and concepts of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A direct buried pipe shaking sand automatic laying device, comprising a laying trolley, a control panel, an adjustable conveying device, a field leveling mechanical arm, a main engine power system integration, a particle size control network, a walking wheel, an elevation control unit and a push-pull handle, characterized in that: A control panel is arranged on the upper surface of one side of the laying trolley, a main engine power system integration is arranged in the laying trolley below the control panel, an adjustable conveying device is arranged on the side of one side of the laying trolley, an elevation control unit is arranged on the end face of the laying trolley, walking wheels are arranged on the bottom of the laying trolley, a field leveling mechanical arm is extended from the lower outer surface of the laying trolley, a particle size control net is arranged inside the laying trolley, and a push-pull handle is arranged on one side of the particle size control net.

2. The automatic laying device for direct buried pipe shaking sand according to claim 1 is characterized in that: The adjustable conveying device is a segmented telescopic combined structure, and an adjustable telescopic belt is arranged inside.

3. The automatic laying device for direct buried pipe shaking sand according to claim 1 is characterized in that: A heavy hammer is arranged at the end of the field leveling mechanical arm, and the heavy hammer performs an up and down hammering action outside the laying trolley.

4. The automatic laying device for direct buried pipe shaking sand according to claim 1 is characterized in that: The elevation control unit comprises an elevation control ruler and an elevation slider. The elevation control ruler is arranged at the bottom of the end face in the travel direction of the laying trolley, elevation sliders are arranged on both sides of the elevation control ruler, and sliding tracks are arranged behind the elevation sliders.

5. The automatic laying device for direct buried pipe shaking sand according to claim 4 is characterized in that: The sliding track is provided with size scales.

6. The automatic laying device for direct buried pipe shaking sand according to claim 1 is characterized in that: The traveling wheel is a universal wheel with a braking device.

7. The automatic laying device for direct buried pipe shaking sand according to claim 1 is characterized in that: A vibrator is arranged at one end of the particle size control net.

8. The construction method of the automatic laying device for directly buried pipe shaking sand according to claim 1 is characterized in that: The specific steps of the construction method of the direct buried pipe sand shaking automatic laying device are as follows: S1. First, place the automatic laying device on the foundation pit working surface, and use the heavy hammer at the end of the field leveling robot arm to hammer up and down to make the uneven positions in the foundation pit level, so as to ensure that the automatic laying device can move freely in the foundation pit; S2. On the premise that the automatic laying device can move freely, the adjustable conveying device is stretched by using the segmented telescopic combined structure to extend the adjustable conveying device to the upper edge of the foundation pit. The telescopic belt in the adjustable conveying device is installed, and the sand material on the upper edge of the foundation pit is conveyed to the laying trolley of the automatic laying device by belt transmission; S3. The control panel controls the walking wheels to move in sequence at the bottom of the foundation pit, the lower discharge port is opened, the vibrator on one side of the particle size control net vibrates, the particle size control net controls the diameter of the sand particles, and the sand is laid on the working surface at the bottom of the foundation pit; S4. Use the elevation slider at the front end of the laying trolley to control the height of the elevation control ruler. The walking wheels ensure the normal movement of the laying trolley. During the movement, the elevation control ruler ensures the laying height of the shaking sand. The elevation slider is lifted through the sliding track between the laying trolley. The size scale is set on the sliding track to ensure the accuracy of the height of the elevation control ruler and the construction quality. S5. The power system of the main engine is integrated to provide power for the normal operation of the entire automatic laying device. Through the control panel, it ensures that the laying trolley can move normally in the front, back, left and right of the foundation pit, the field leveling robot arm can level the bottom of the foundation pit, and the particle size control network and the discharge port can operate effectively; S6. After the shaking sand is laid, the large-sized stones and gravel on the particle size control net are screened out by pulling the handle and moved out of the foundation pit.

Citation Information

Patent Citations

  • Fast leveling device applied to assembly type composite wallboard and composite column location elevation

    CN108843028A

  • Cable direct burial laying device

    CN117154599A

  • Sandy soil backfilling device for buried pipe

    CN213805555U

  • Dam slope sand gravel laying device

    CN220644297U

  • AU2020103346A4