Membrane shell wall mounting structure and mounting construction method
By using vertical steel bar connections and oblique strut components of upper and lower membrane shell walls in the construction of mold shell walls, the problems of poor structural stability and low construction efficiency in the existing technology are solved, and the efficiency and rapid membrane shell walls are achieved Installation and excellent quality.
Patent Information
- Application Number
- CN202411614984.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-13
- Publication Date
- 2024-12-27
AI Technical Summary
The existing mold shell wall construction technology has problems such as poor structural stability, low construction efficiency, and non-perpendicularity and plane position.
The upper membrane shell wall and the lower membrane shell wall are connected by extended vertical steel bars or vertical additional steel bars, combined with the use of oblique strut rod components and formwork components to ensure structural stability and construction efficiency, and achieve through measurement, positioning and calibration steps. Verticality and plane position accuracy.
The structural stability and construction efficiency of the membrane shell wall are improved, the construction time is shortened, and the verticality, elevation and plane position after installation are met, and the overall quality is excellent.
Smart Images

Figure CN119195380A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field related to building construction, and in particular to a membrane shell wall installation structure and an installation construction method. Background Art
[0002] Formwork wall belongs to the scope of vertical component prefabrication. Formwork wall system refers to the concrete frame system formed by installing the formwork components at the construction site, installing connecting steel bars in the formwork and then pouring concrete, referred to as formwork wall system.
[0003] The formwork components are composed of templates + formed steel bars + integrated electromechanical pipelines, and are prefabricated in factories. Since the formwork system is basically equivalent to cast-in-place in structure, the design of building component splitting, component type, and construction technology selection should be based on the principles of structural reliability, overall cost economy, and convenient construction. Summary of the invention
[0004] In order to solve one or more technical problems existing in the prior art, the present invention provides a membrane shell wall installation structure and an installation construction method.
[0005] The technical solution of the present invention to solve the above technical problems is as follows: a membrane shell wall installation structure, comprising an upper membrane shell wall and a lower membrane shell wall, wherein the upper membrane shell wall is placed above the lower membrane shell wall;
[0006] The lower vertical reinforcement of the lower membrane shell wall extends upward into the upper membrane shell wall, and the lower end of the upper vertical reinforcement of the upper membrane shell wall partially overlaps and is connected and fixed with the upper end of the lower vertical reinforcement of the lower membrane shell wall; or, the upper end of the lower vertical reinforcement of the lower membrane shell wall and the lower end of the upper vertical reinforcement of the upper membrane shell wall are arranged at intervals, and the upper end of the lower vertical reinforcement of the lower membrane shell wall and the lower end of the upper vertical reinforcement of the upper membrane shell wall are connected and fixed by additional vertical reinforcement.
[0007] The beneficial effects of the present invention are: a membrane shell wall installation structure of the present invention, the upper membrane shell wall and the lower membrane shell wall are connected by an extended section of lower vertical steel bars or vertical additional steel bars, the structure has good stability, the construction is efficient and fast, the construction time of the formwork wall is shortened, and after the installation is completed, the verticality, elevation, and plane position of the formwork wall meet the requirements, and the overall installation quality appearance is excellent.
[0008] Based on the above technical solution, the present invention can also be improved as follows.
[0009] Furthermore, the upper vertical steel bars of the upper membrane shell wall and the lower vertical steel bars of the lower membrane shell wall are arranged one by one in vertical correspondence.
[0010] The beneficial effect of adopting the above further solution is that the connection between the upper and lower membrane shell walls can be made more stable and reliable.
[0011] Furthermore, the transverse reinforcement of one upper membrane shell wall and the transverse reinforcement of an adjacent upper membrane shell wall are arranged one by one in the horizontal direction and are connected and fixed by additional transverse reinforcement.
[0012] Furthermore, the outer side wall of the upper membrane shell wall is connected and supported to the construction floor through an oblique bracing rod assembly.
[0013] Furthermore, a first pull ring and a second pull ring are arranged vertically on both side surfaces of the upper membrane shell wall, a ground support pull ring is provided on the floor, and the diagonal brace rod assembly includes a first diagonal brace rod and a second diagonal brace rod, the two ends of the first diagonal brace rod are respectively connected to the first pull ring and the ground support pull ring, and the two ends of the second diagonal brace rod are respectively connected to the second pull ring and the ground support pull ring.
[0014] Furthermore, the first diagonal brace and the second diagonal brace are both length-adjustable pull rods.
[0015] Furthermore, the lower vertical steel bars of the lower membrane shell wall extend upward to form an extension section, and a layer of lower vertical steel bars is respectively provided on the inner side of the two side walls of the lower membrane shell wall, and the spacing between the extension sections of the two layers of lower vertical steel bars is smaller than the spacing between the two layers of lower vertical steel bars; the extension section is connected and fixed to the lower end of the upper vertical steel bars of the upper membrane shell wall.
[0016] Furthermore, the extension section is connected and fixed to the lower end of the upper vertical reinforcement of the upper membrane shell wall by a connector or welding or is mechanically connected by a mechanical connection joint.
[0017] Furthermore, a template assembly is provided at the junction of the upper membrane shell wall and the floor, the template assembly is abutted against the root of the upper membrane shell wall, and the template assembly is fixed to the floor panel by iron nails.
[0018] The beneficial effect of adopting the above further solution is that by setting the template assembly, it can be ensured that the base of the membrane shell wall does not leak, rot or deform.
[0019] A construction method of the membrane shell wall installation structure comprises the following steps:
[0020] S1, measurement, positioning and laying out;
[0021] S2, review and correct the lower vertical reinforcement of the lower membrane shell wall, correct the lower vertical reinforcement that does not meet the requirements, and adjust the deviated lower vertical reinforcement in time;
[0022] S3, after the upper membrane shell wall is hoisted and put in place, the diagonal bracing rod assembly is installed;
[0023] S4, connecting and fixing the upper vertical steel bars of the upper membrane shell wall and the lower vertical steel bars of the lower membrane shell wall;
[0024] S5, correcting the upper membrane shell wall and installing the formwork assembly to obtain the membrane shell wall installation structure.
[0025] The beneficial effects of the present invention are: the construction method of the present invention adopts a temporary diagonal brace connection method, and connects and fixes the upper and lower membrane shell walls, shortening the shear wall construction time. After the installation is completed, the verticality, elevation, and plane position of the shear wall meet the requirements, and the overall quality appearance is excellent. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 This is a schematic diagram of the installation structure of the upper membrane shell wall of the present invention;
[0027] Figure 2 The schematic diagram of the connection structure of the upper membrane shell wall and the lower membrane shell wall of the present invention is shown in FIG. Figure 1 ;
[0028] Figure 3 The schematic diagram of the connection structure of the upper membrane shell wall and the lower membrane shell wall of the present invention is shown in FIG. Figure 2 ;
[0029] Figure 4 It is a structural schematic diagram of the connection between the upper vertical steel bars and the transverse steel bars in the upper membrane shell wall of the present invention;
[0030] Figure 5 It is a structural schematic diagram of the connection between the lower vertical steel bars and the transverse steel bars in the lower membrane shell wall of the present invention;
[0031] Figure 6 This is a schematic diagram of the connection structure of two adjacent upper membrane shell walls of the present invention;
[0032] Figure 7 This is a schematic diagram of the connection structure of two adjacent lower membrane shell walls of the present invention;
[0033] Figure 8 This is a schematic diagram of the presser foot plate at the base of the upper membrane shell wall of the present invention;
[0034] Fig. 9 It is a schematic diagram of the connection structure between the upper membrane shell wall and the cast-in-place wall of the present invention.
[0035] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0036] 1. Upper membrane shell wall; 11. Upper vertical reinforcement; 2. Lower membrane shell wall; 21. Lower vertical reinforcement; 22. Extension section; 3. Additional vertical reinforcement; 4. Transverse reinforcement; 5. Additional transverse reinforcement; 6. First pull ring; 61. Second pull ring; 62. Ground support pull ring; 7. First diagonal brace; 71. Second diagonal brace; 8. Formwork assembly; 81. Nail; 9. Floor slab; 91. Wooden square; 92. Roughening of base surface; 10. Anchor; 101. Cast-in-place wall; 102. Connecting reinforcement; 103. Post-casting strip; 104. Mesh cloth. DETAILED DESCRIPTION
[0037] The principles and features of the present invention are described below in conjunction with the accompanying drawings. The examples given are only used to explain the present invention and are not used to limit the scope of the present invention.
[0038] like Figure 2 and Figure 3 As shown, a membrane shell wall installation structure of this embodiment includes an upper membrane shell wall 1 and a lower membrane shell wall 2, wherein the upper membrane shell wall 1 is placed above the lower membrane shell wall 2;
[0039] The lower vertical steel bars 21 of the lower membrane shell wall 2 extend upward into the upper membrane shell wall 1, and the lower ends of the upper vertical steel bars 11 of the upper membrane shell wall 1 partially overlap and are connected and fixed with the upper ends of the lower vertical steel bars 21 of the lower membrane shell wall 2; or, the upper ends of the lower vertical steel bars 21 of the lower membrane shell wall 2 and the lower ends of the upper vertical steel bars 11 of the upper membrane shell wall 1 are arranged at intervals, and the upper ends of the lower vertical steel bars 21 of the lower membrane shell wall 2 and the lower ends of the upper vertical steel bars 11 of the upper membrane shell wall 1 are connected and fixed by vertical additional steel bars 3.
[0040] The two wall side walls of the upper membrane shell wall 1 and the two wall side walls of the lower membrane shell wall 2 are fastened and fixed by fastening pieces 10 .
[0041] Preferably, the upper vertical steel bars 11 of the upper membrane shell wall 1 and the lower vertical steel bars 21 of the lower membrane shell wall 2 are arranged one by one, so that the connection between the upper and lower membrane shell walls can be more stable and reliable.
[0042] Further preferably, Figure 6 and Figure 7 As shown, the transverse reinforcement 4 of one upper membrane shell wall 1 of this embodiment is arranged one-to-one with the transverse reinforcement 4 of the adjacent upper membrane shell wall 1 in the horizontal direction, and is connected and fixed by the transverse additional reinforcement 5.
[0043] like Figure 1 As shown, the outer side wall of the upper membrane shell wall 1 of this embodiment is connected and supported by the construction floor through a diagonal bracing rod assembly.
[0044] like Figure 1As shown, the upper membrane shell wall 1 of this embodiment is provided with a first pull ring 6 and a second pull ring 61 arranged up and down on both sides, the floor is provided with a ground support pull ring 62, the diagonal brace assembly includes a first diagonal brace 7 and a second diagonal brace 71, the two ends of the first diagonal brace 7 are respectively connected to the first pull ring 6 and the ground support pull ring 62, and the two ends of the second diagonal brace 71 are respectively connected to the second pull ring 61 and the ground support pull ring 62. Specifically, as Figure 1 As shown, the length of the first diagonal brace rod 7 in this embodiment is greater than the length of the second diagonal brace rod 71 .
[0045] like Figure 1 As shown, the first diagonal support rod 7 and the second diagonal support rod 71 of this embodiment are both length-adjustable pull rods, that is, threaded sleeves are respectively provided at both ends of the screw rod, and the length can be adjusted by tightening or loosening the threaded sleeves.
[0046] like Figure 2 As shown, the lower vertical steel bars 21 of the lower membrane shell wall 2 of this embodiment extend upward to form an extension section 22, and a layer of lower vertical steel bars 21 is respectively provided on the inner side of the two side walls of the lower membrane shell wall 2, and the spacing between the extension sections 22 of the two layers of lower vertical steel bars 21 is smaller than the spacing between the two layers of lower vertical steel bars 21; the extension section 22 is connected and fixed to the lower end of the upper vertical steel bars 11 of the upper membrane shell wall 1.
[0047] Specifically, the extension section 22 is connected and fixed to the lower end of the upper vertical reinforcement 11 of the upper membrane shell wall 1 by a connector or welding or mechanically connected by a mechanical connection joint. When mechanical connection is adopted, the mechanical connection joint is in the form of a concrete sleeve or a cold extrusion sleeve.
[0048] like Figure 8 As shown, a template assembly 8 is provided at the junction of the upper membrane shell wall 1 and the floor in this embodiment, and the template assembly 8 abuts against the root of the upper membrane shell wall 1, and the template assembly 8 is fixed to the floor panel 9 by iron nails 81. By setting the template assembly, it can be ensured that the root of the membrane shell wall does not leak, rot, or deform. The template assembly 8 can be fixed to the floor panel 9 by iron nails 81 after two or more templates are spliced. A wooden square 91 can be set above the template assembly 8. The connection between the floor panel 9 and the upper membrane shell wall 1 can be provided with a base surface roughening 92 to facilitate connection and fixation.
[0049] like Figure 4 As shown, the upper vertical steel bars 11 of this embodiment are also connected and fixed by transverse steel bars 4. Figure 5 As shown, the lower layer vertical steel bars 21 are also connected and fixed by transverse steel bars 4.
[0050] like Fig. 9As shown, the upper membrane shell wall 1 and the cast-in-place wall 101 of this embodiment are connected and fixed in the transverse direction by connecting steel bars 102, a post-cast strip 103 is reserved between the upper membrane shell wall 1 and the cast-in-place wall 101, and mesh cloths 104 are pre-embedded on both sides of one end of the upper membrane shell wall 1 close to the cast-in-place wall 101.
[0051] A membrane shell wall installation structure of the present embodiment, the upper membrane shell wall and the lower membrane shell wall are connected by an extended section of lower vertical steel bars or vertical additional steel bars, the structure has good stability, the construction is efficient and fast, the construction time of the formwork wall is shortened, and after the installation is completed, the verticality, elevation and plane position of the formwork wall meet the requirements, and the overall installation quality appearance is excellent.
[0052] This embodiment also provides a construction method of the membrane shell wall installation structure, comprising the following steps:
[0053] S1, measurement, positioning and layout; after the floor concrete reaches the designed strength, clean the joint surface, and have a professional surveyor lay out the measurement and positioning control axis, formwork wall positioning edge line and 200mm control line, and mark them.
[0054] S2, review and correct the lower vertical steel bars 21 of the lower membrane shell wall 2, correct the lower vertical steel bars 21 that do not meet the requirements, and adjust the lower vertical steel bars 21 that are offset in time;
[0055] S3, after the upper membrane shell wall 1 is hoisted and put in place, the diagonal brace assembly is installed; before the hoisting construction, the quality inspector shall check the model and size of the formwork wall. After checking the quality, a special person shall be responsible for hooking. After the hooking personnel evacuate to the safe area, the signalman shall confirm the safety of the components around. After confirmation, a trial hoisting shall be carried out, and the hoisting shall be directed to be slowly hoisted. When the hoisting is about 0.5m from the ground, the safety of the hoisting device shall be confirmed. After confirming the safety of the hoisting device, the hoisting operation shall be continued. When the formwork wall is hoisted to the construction floor 500mm away from the floor, it will be paused for a while. The installer will stabilize the formwork wall against the formwork wall positioning line that has been marked on the floor. After checking that it is qualified, the hook will be slowly dropped to make the position of the formwork wall steel bar close to the position of the lower embedded steel bar. After the formwork wall is in place, two long and short diagonal supports are used to temporarily fix the formwork wall. The diagonal support is mainly used to fix and adjust the formwork wall, ensure the verticality of the formwork wall installation, strengthen the connection between the formwork wall and the main structure, and ensure that the wall does not move during concrete pouring. The inclined floor supports are installed by using pre-buried lifting rings on the floor slab or installing expansion bolts.
[0056] S4, connect and fix the upper vertical steel bars 11 of the upper membrane shell wall 1 and the lower vertical steel bars 21 of the lower membrane shell wall 2; the lower reserved steel bars of the formwork wall can be directly raised to the upper layer by the vertical steel bars of the lower formwork wall, or additional steel bars can be added to connect the vertical steel bars of the upper and lower formwork walls. The upper and lower steel bars of the formwork wall can be connected by binding or mechanical connection. When mechanical connection is used, the mechanical connection joint is in the form of a gold concrete sleeve or a cold extrusion sleeve.
[0057] S5, calibrate the upper membrane shell wall 1, and install the template assembly 8 to obtain the membrane shell wall installation structure. Use the positioning adjustment tool to fine-tune the formwork wall. Adjust the second diagonal brace to adjust the position of the wall, adjust the first diagonal brace to adjust the verticality of the wall, use a crowbar to move the formwork wall, use a plumb bob and a ruler to calibrate the position and verticality of the formwork wall, and use a total station to check. After checking that the horizontal positioning, elevation and verticality of the formwork wall are correct, tighten the diagonal brace assembly and remove the sling clamp.
[0058] Double-sided foam tape is pasted on the contact area between the bottom of the formwork wall and the floor slab. A 200mm wide formwork strip is set at the bottom of the formwork wall as a footboard. The formwork strip is nailed to the concrete floor slab. A 150mm wide formwork strip is nailed above the 200mm wide formwork strip to form a formwork assembly to fix the root of the vertical formwork wall to ensure that the root of the formwork wall does not leak, rot, or deform.
[0059] The construction method of this embodiment adopts a temporary diagonal brace connection method, and connects and fixes the upper and lower membrane shell walls, shortening the shear wall construction time. After the installation is completed, the verticality, elevation, and plane position of the shear wall meet the requirements, and the overall quality appearance is excellent.
[0060] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0061] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0062] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0063] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0064] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0065] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.
Claims
1. A membrane shell wall installation structure, characterized in that: It comprises an upper membrane shell wall and a lower membrane shell wall, wherein the upper membrane shell wall is placed above the lower membrane shell wall; The lower vertical reinforcement of the lower membrane shell wall extends upward into the upper membrane shell wall, and the lower end of the upper vertical reinforcement of the upper membrane shell wall partially overlaps and is connected and fixed with the upper end of the lower vertical reinforcement of the lower membrane shell wall; or, the upper end of the lower vertical reinforcement of the lower membrane shell wall and the lower end of the upper vertical reinforcement of the upper membrane shell wall are arranged at intervals, and the upper end of the lower vertical reinforcement of the lower membrane shell wall and the lower end of the upper vertical reinforcement of the upper membrane shell wall are connected and fixed by additional vertical reinforcement.
2. A membrane shell wall installation structure according to claim 1, characterized in that: The upper vertical steel bars of the upper membrane shell wall and the lower vertical steel bars of the lower membrane shell wall are arranged one by one in vertical correspondence.
3. A membrane shell wall installation structure according to claim 1, characterized in that: The transverse reinforcement of one upper membrane shell wall and the transverse reinforcement of the adjacent upper membrane shell wall are arranged one by one in the horizontal direction and are connected and fixed by additional transverse reinforcement.
4. A membrane shell wall installation structure according to claim 1, characterized in that: The outer side wall of the upper membrane shell wall is connected and supported with the construction floor through an oblique bracing rod assembly.
5. A membrane shell wall installation structure according to claim 4, characterized in that: A first pull ring and a second pull ring are arranged vertically on both side surfaces of the upper membrane shell wall, a ground support pull ring is provided on the floor, and the diagonal brace rod assembly includes a first diagonal brace rod and a second diagonal brace rod, the two ends of the first diagonal brace rod are respectively connected to the first pull ring and the ground support pull ring, and the two ends of the second diagonal brace rod are respectively connected to the second pull ring and the ground support pull ring.
6. A membrane shell wall installation structure according to claim 5, characterized in that: The first diagonal brace and the second diagonal brace are both length-adjustable pull rods.
7. A membrane shell wall installation structure according to claim 1, characterized in that: The lower vertical steel bars of the lower membrane shell wall extend upward to form an extension section, and a layer of lower vertical steel bars is respectively arranged on the inner side of the two side walls of the lower membrane shell wall, and the spacing between the extension sections of the two layers of lower vertical steel bars is smaller than the spacing between the two layers of lower vertical steel bars; the extension section is connected and fixed to the lower end of the upper vertical steel bars of the upper membrane shell wall.
8. A membrane shell wall installation structure according to claim 7, characterized in that: The extension section is connected and fixed to the lower end of the upper vertical reinforcement of the upper membrane shell wall by a connecting piece or welding, or is mechanically connected by a mechanical connection joint.
9. The membrane shell wall installation structure according to claim 1, characterized in that: A template assembly is provided at the junction of the upper membrane shell wall and the floor, the template assembly abuts against the root of the upper membrane shell wall, and the template assembly is fixed on the floor panel by iron nails.
10. A construction method for the membrane shell wall installation structure according to any one of claims 1 to 9, characterized in that: The following steps are involved: S1, measurement, positioning and laying out; S2, review and correct the lower vertical reinforcement of the lower membrane shell wall, correct the lower vertical reinforcement that does not meet the requirements, and adjust the deviated lower vertical reinforcement in time; S3, after the upper membrane shell wall is hoisted and put in place, the diagonal bracing rod assembly is installed; S4, connecting and fixing the upper vertical steel bars of the upper membrane shell wall and the lower vertical steel bars of the lower membrane shell wall; S5, correcting the upper membrane shell wall and installing the formwork assembly to obtain the membrane shell wall installation structure.