Expressway tunnel inspection device

By installing arch support skeletons and multi-functional inspection robots in highway tunnels, the problems of patrol tracks being susceptible to debris and track lifting damage are solved, and the inspection accuracy and tunnel pipe maintenance efficiency are improved.

CN119260759APending Publication Date: 2025-01-07SHANDONG EXPRESSWAY INFRASTRUCTURE CONSTR CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411500568.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-25
Publication Date
2025-01-07

AI Technical Summary

Technical Problem

The existing highway tunnel inspection equipment has problems such as the inspection tracks being easily affected by debris accumulation, the rail lifting may damage the inner wall of the tunnel, and the inspection results are insufficient.

Method used

Design a highway tunnel inspection device, installed in the tunnel, adopting multiple arch support frames to support the track, the track is equipped with tunnel environmental inspection robot and wall inspection robot, and use auxiliary tracks and electric slide rails to reduce track load , equipped with high-definition camera, infrared water detector and water quality detector for fine inspection.

Benefits of technology

It improves the bearing capacity of the tunnel wall, reduces track failures, enhances patrol accuracy, and facilitates management and maintenance work.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119260759A_ABST
    Figure CN119260759A_ABST
Patent Text Reader

Abstract

The invention discloses an expressway tunnel inspection device which is installed in a tunnel and comprises supporting frameworks, the supporting frameworks are installed in the tunnel, the supporting frameworks are in an arch shape and support the wall face of the tunnel, the number of the supporting frameworks is multiple, and the supporting frameworks are evenly distributed in the length direction of the tunnel; the inspection track is distributed in the length direction of the tunnel and located below the supporting framework, the two ends of the inspection track are close to openings in the two ends of the tunnel respectively, and the upper surface of the inspection track is fixed to the lower surface of the top end of the supporting framework; the invention belongs to the technical field of security inspection, and can support the tunnel environment inspection robot and reduce the influence of the self weight of the tunnel environment inspection robot on the inspection track and the supporting framework, so that the wall surface of a tunnel is prevented from being damaged due to the addition of the track, and through the hoisting design of the inspection track, the safety of the tunnel is improved. The track can be prevented from being influenced by sundry accumulation, so that normal work of the inspection track is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of security inspection, and in particular to a highway tunnel inspection device. Background Art

[0002] Compared with ordinary roads, expressways have the characteristics of fast driving speed, large traffic capacity, and fully closed management and operation. The road infrastructure and road safety facilities are relatively complete. They bear a huge passenger and freight transportation volume and are the main artery of road transportation. Tunnels, as an important part of expressways, have the characteristics of complex structure, closed environment, poor ventilation and lighting conditions. In recent years, the frequent occurrence of serious and major accidents in expressway tunnels has made the management and maintenance of expressway tunnels increasingly concerned. However, the current tunnel management and maintenance is mainly manual, relying only on patrol personnel and monitors to regularly conduct on-site walk inspections and fixed camera monitoring, which makes the labor intensity of staff high, time-consuming and labor-intensive, and the inspection efficiency is low.

[0003] In order to solve the above problems, the existing Chinese patent with the announcement number CN 115977740 A discloses a highway tunnel inspection device, including an inspection track, on which a main inspection vehicle body and an auxiliary inspection vehicle body are movably arranged respectively, the main inspection vehicle body is provided with a mobile driving unit for driving it to move on the inspection track, and an electromagnetic suction connection structure for realizing a detachable electromagnetic suction connection between the main inspection vehicle body and the auxiliary inspection vehicle body is provided between the main inspection vehicle body and the auxiliary inspection vehicle body; although the above device can automatically inspect the tunnel, it still has the following shortcomings:

[0004] 1. The inspection track is erected on the ground, and the inspection vehicle moves on the inspection track. During the actual inspection process, leaves, dust and other debris will gradually accumulate on the track and form obstacles, affecting the normal movement of the inspection vehicle, resulting in a high automatic inspection failure rate, thereby increasing the cost of manual maintenance and repair;

[0005] 2. Since the load of the hoisting rail is not considered during the construction of ordinary tunnels, if the rail is directly hoisted above the tunnel cavity, it may affect the bearing capacity of the inner wall of the tunnel, thereby causing damage to the inner wall of the tunnel and affecting the driving safety of the tunnel;

[0006] 3. The above inspection vehicle can only conduct routine inspections on the environment inside the tunnel. It is difficult to conduct inspections on the tunnel wall during routine inspections, such as whether there are water seepage, cracks, etc. on the tunnel wall. This results in insufficient accuracy of the inspection results, affecting the actual maintenance of the tunnel. Summary of the invention

[0007] To this end, the present invention provides a highway tunnel inspection device to solve the above-mentioned problems in the prior art.

[0008] In order to achieve the above object, the present invention provides the following technical solutions:

[0009] A highway tunnel inspection device, installed in the tunnel, comprising:

[0010] A support frame, wherein the support frame is installed in the tunnel, the support frame is arched and supports the wall surface of the tunnel, and the number of the support frames is multiple and evenly distributed along the length direction of the tunnel;

[0011] Inspection tracks, which are distributed along the length of the tunnel and are located below the support frame, with two ends of the inspection track close to two end openings of the tunnel respectively, and the upper surface of the inspection track is fixed to the lower surface of the top end of the support frame;

[0012] A tunnel environment inspection robot, wherein the tunnel environment inspection robot is installed on an inspection track, an inspection camera is installed on the tunnel environment inspection robot, and the tunnel environment inspection robot can reciprocate along the length direction of the inspection track;

[0013] An auxiliary track, the auxiliary track is installed on a side of the tunnel environment inspection robot close to the passage step, the upper end surface of the passage step close to the inner wall of the tunnel has a slideway, the end of the auxiliary track away from the tunnel environment inspection robot extends downward into the slideway and is equipped with rollers, and the rollers are rollingly connected in the slideway;

[0014] A tunnel wall inspection robot is installed on an auxiliary track, and the tunnel wall inspection robot can reciprocate along the length direction of the auxiliary track.

[0015] As a further optimized solution of the present invention, the tunnel wall inspection robot includes a box body, a high-definition camera, an infrared water detector, and a fill light. The box body is installed on an auxiliary track and can reciprocate along the length direction of the auxiliary track. The high-definition camera, infrared water detector and fill light are all installed on the side of the box body opposite to the tunnel wall. The number of the fill lights is multiple and evenly distributed on the periphery of the high-definition camera.

[0016] As a further optimized solution of the present invention, a water quality detector, an electric push rod, a cantilever, an electric telescopic rod, and a tunnel wall water seepage collector are installed inside the box body, the first end of the cantilever is installed on the movable end of the electric push rod, the second end of the cantilever is rotatably connected to the first end of the electric telescopic rod and driven by a micro motor, the tunnel wall water seepage collector is installed on the second end of the electric telescopic rod, the cantilever is driven by the electric push rod to extend to the outside of the box body, and the electric telescopic rod is driven by the micro motor to flip outward, the tunnel wall water seepage collector contacts the wall of the tunnel to collect the wall seepage, and the collected water quality is tested and analyzed by the water quality detector.

[0017] As a further optimized solution of the present invention, the tunnel wall water seepage collector has a moisture containing cavity, and the end of the tunnel wall water seepage collector away from the cantilever has a collection port that is connected to the moisture containing cavity and can be automatically opened and closed.

[0018] As a further optimized solution of the present invention, a micro negative pressure pump is installed on the water quality detector, the outlet end of the micro negative pressure pump is connected to the water quality testing chamber of the water quality detector, and the inlet end of the micro negative pressure pump is installed with a suction tube, the suction port of the suction tube extends to the moisture containing cavity of the tunnel wall seepage collector housed in the box body, and the length of the suction tube is adjustable.

[0019] As a further optimized solution of the present invention, the auxiliary track includes a track frame and an electric slide rail, the track frame is arc-shaped, the upper end of the track frame is connected to the side of the tunnel environment inspection robot, the lower end of the track frame is equipped with rollers and connected to the slide rail, the electric slide rail is installed in the inner frame of the track frame, and the track path of the electric slide rail is consistent with the length direction of the track frame, and the tunnel wall inspection robot is installed on the movable end of the electric slide rail.

[0020] As a further optimized solution of the present invention, the long side of the track frame is a track socket, the tunnel wall inspection robot has a conductive copper bar, and the conductive copper bar is slidably connected to the track socket of the track socket.

[0021] As a further optimized solution of the present invention, a fire extinguishing pipe is installed at the bottom of the tunnel environment inspection robot, and the fire extinguishing pipe spans over the road surface in the tunnel, the side wall of the tunnel has a fire extinguishing agent storage chamber, and a fire extinguishing agent supply pipe is pre-buried inside the tunnel, one end of the fire extinguishing agent supply pipe is connected to the fire extinguishing agent storage chamber, and the other end of the fire extinguishing agent supply pipe is connected to the fire extinguishing pipe through a fire extinguishing agent transmission pipe.

[0022] As a further optimized solution of the present invention, a drag chain guide groove is installed at the bottom of the supporting frame, and the drag chain guide groove is distributed along the length direction of the tunnel and is arranged adjacent to the inspection track. A drag chain is installed in the drag chain guide groove, and the fire extinguishing agent transmission pipe is installed on the drag chain. The inlet end of the fire extinguishing agent transmission pipe is connected to the outlet end of the fire extinguishing agent supply pipe, and the outlet end of the fire extinguishing agent transmission pipe is connected to the inlet end of the fire extinguishing pipe.

[0023] As a further optimized solution of the present invention, a nozzle is installed on the fire extinguishing pipe, and the number of the nozzles is multiple and evenly distributed along the length direction of the fire extinguishing pipe.

[0024] The present invention has the following advantages:

[0025] (i) By installing multiple support frames in the tunnel and utilizing the arched design of the support frames to support the tunnel wall at multiple points, the bearing capacity of the tunnel wall can be improved, so that the inspection track and the tunnel environment inspection robot can be installed on the top of the tunnel wall, and then the auxiliary track on the side of the tunnel environment inspection robot can be connected to the passage step to support the tunnel environment inspection robot, thereby reducing the impact of the tunnel environment inspection robot's own weight on the inspection track and the support frame, thereby avoiding damage to the tunnel wall due to the installation of the track, and through the hoisting design of the inspection track, the track can be prevented from being affected by the accumulation of debris, thereby ensuring the normal operation of the inspection track;

[0026] (ii) The tunnel environment inspection robot is driven by the inspection track to move along the length of the tunnel, and the inspection camera is used to monitor and inspect the environment inside the tunnel. While the tunnel environment inspection robot moves and drives the auxiliary track to move, the tunnel wall inspection robot moves back and forth along the length of the auxiliary track, thereby inspecting the wall surface it passes through to observe whether there is water seepage or cracks on the wall surface, which is conducive to improving the accuracy of the actual inspection results and facilitating the actual maintenance work of the tunnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a front structural schematic diagram of the present invention;

[0028] Figure 2 It is a schematic diagram of the side structure of the auxiliary track of the present invention;

[0029] Figure 3 It is a schematic cross-sectional structure diagram of the first state of the tunnel wall robot of the present invention;

[0030] Figure 4 It is a schematic diagram of the cross-sectional structure of the tunnel wall robot in the second state of the present invention.

[0031] In the figure: 1. Tunnel; 2. Support frame; 3. Inspection track; 4. Tunnel environment inspection robot; 5. Inspection camera; 6. Auxiliary track; 61. Track frame; 62. Electric slide rail; 7. Passage steps; 8. Tunnel wall inspection robot; 81. Box body; 82. High-definition camera; 83. Infrared water detector; 84. Fill light; 9. Slide; 10. Roller; 11. Fire extinguishing pipe; 12. Nozzle; 13. Fire extinguishing agent storage room; 14. Fire extinguishing agent supply pipe; 15. Fire extinguishing agent transmission pipe; 16. Motor; 17. Drag chain guide groove; 18. Drag chain; 19. Tunnel wall lamp; 20. Light sensor; 21. Water quality detector; 22. Electric push rod; 23. Cantilever; 24. Electric telescopic rod; 25. Tunnel wall seepage collector; 26. Micro negative pressure pump; 27. Suction tube. DETAILED DESCRIPTION

[0032] The following is a description of the implementation of the present invention by specific embodiments. People familiar with the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0033] like Figure 1 As shown, a highway tunnel inspection device is installed in a tunnel 1, and both sides of the ground in the tunnel 1 are provided with passage steps 7. The device specifically includes a support frame 2, an inspection track 3, a tunnel environment inspection robot 4, an inspection camera 5, an auxiliary track 6, and a tunnel wall inspection robot 8;

[0034] The support frame 2 is installed in the tunnel 1. The support frame 2 is arched and supports the wall surface of the tunnel 1. There are multiple support frames 2 and they are evenly distributed along the length direction of the tunnel 1. At least one support frame 2 is installed at the two openings of the tunnel 1 to improve the support effect on the wall surface of the tunnel 1.

[0035] The inspection track 3 is distributed along the length direction of the tunnel 1 and is located below the support frame 2. The two ends of the inspection track 3 are respectively close to the two end openings of the tunnel 1, and the upper surface of the inspection track 3 is fixed to the lower surface of the top of the support frame 2. The inspection track 3 is connected with multiple support frames 2 to realize multi-point lifting of the inspection track 3, so that the load added by the inspection track 3 to the wall of the tunnel 1 is evenly distributed, and combined with the support of the support frame 2 to the wall of the tunnel 1, the wall is prevented from being damaged;

[0036] The tunnel environment inspection robot 4 is installed on the inspection track 3. The inspection camera 5 is installed on the tunnel environment inspection robot 4. The tunnel environment inspection robot 4 can reciprocate along the length direction of the inspection track 3. The tunnel environment inspection robot 4 is a conventional inspection robot. The tunnel environment inspection robot 4 has a self-driving force, so that the tunnel environment inspection robot 4 can slide or roll forward on the inspection track 3. While the tunnel environment inspection robot 4 moves, the inspection camera 5 is used to monitor the tunnel environment. If an abnormal situation such as illegal driving, traffic accidents, tunnel obstacles, fires, missing road signs, etc. is found, the tunnel environment inspection robot 4 sends the inspection abnormality information to the highway background management center to remind the staff to inspect the tunnel;

[0037] The tunnel environment inspection robot 4 is also equipped with a gas sensor to inspect oxygen, carbon dioxide or other harmful gases in the tunnel, and also monitor the ventilation conditions in the tunnel in real time;

[0038] The auxiliary rail 6 is installed on the side of the tunnel environment inspection robot 4 close to the passage step 7. There are two auxiliary rails 6 and they are symmetrically distributed on both sides of the tunnel environment inspection robot 4. The upper end face of the passage step 7 is close to the inner wall of the tunnel 1. There is a slideway 9. The end of the auxiliary rail 6 away from the tunnel environment inspection robot 4 extends downward into the slideway 9 and is equipped with rollers 10. The rollers 10 are connected in a rolling manner in the slideway 9. The tunnel environment inspection robot 4 is symmetrically supported by the two auxiliary rails 6, and the dead weight of the tunnel environment inspection robot 4 and the inspection rail 3 is distributed to the passage step 7, which is beneficial to reduce the load of the support frame 2, thereby improving the support effect of the support frame 2 on the inner wall of the tunnel 1. The rollers 10 roll in the slideway 9, which facilitates the tunnel environment inspection robot 4 to drive the auxiliary rails 6 to move synchronously;

[0039] The tunnel wall inspection robot 8 is installed on the auxiliary track 6, and the tunnel wall inspection robot 8 can reciprocate along the length direction of the auxiliary track 6. When the tunnel environment inspection robot 4 reciprocates on the inspection track 3 to inspect the environment inside the tunnel 1, the tunnel environment inspection robot 4 drives the auxiliary track 6 to move synchronously, and the tunnel wall inspection robot 8 reciprocates on the auxiliary track 6 to inspect the wall surface it passes through. When the tunnel wall inspection robot 8 finds cracks or water seepage on the wall surface during inspection, the tunnel wall inspection robot 8 sends abnormal information to the highway background management center to remind the staff to conduct on-site inspection and maintenance.

[0040] Specifically, Figure 2 As shown, the tunnel wall inspection robot 8 includes a box body 81, a high-definition camera 82, an infrared water detector 83, and a fill light 84. The box body 81 is installed on the auxiliary track 6 and can reciprocate along the length direction of the auxiliary track 6. The high-definition camera 82, the infrared water detector 83 and the fill light 84 are all installed on the side of the box body 81 opposite to the wall of the tunnel 1. The number of the fill lights 84 is multiple and evenly distributed on the periphery of the high-definition camera 82. Through the combined design of the high-definition camera 82 and the fill light 84, the wall surface can be monitored and inspected to detect water seepage or cracks. , infrared water detector 83 emits infrared light of a specific wavelength to illuminate the wall of tunnel 1, and then measures the intensity of the reflected infrared light. Since water molecules have a strong absorption capacity for infrared light, when an object contains more water, its absorption capacity for infrared light will also increase accordingly, resulting in a decrease in the intensity of the reflected infrared light. By measuring the intensity change of the reflected infrared light, the moisture content of the wall can be indirectly inferred. When the moisture content exceeds the preset value, the infrared water detector 83 sends an abnormal signal to the highway back-end management center to alert the staff;

[0041] Furthermore, if Figure 3 and Figure 4As shown, a water quality detector 21, an electric push rod 22, a cantilever 23, an electric telescopic rod 24, and a tunnel wall water seepage collector 25 are installed inside the box body 81. The first end of the cantilever 23 is installed on the movable end of the electric push rod 22, the second end of the cantilever 23 is rotatably connected to the first end of the electric telescopic rod 24 and driven by a micro motor, and the tunnel wall water seepage collector 25 is installed on the second end of the electric telescopic rod 24;

[0042] When the infrared water detector 83 detects that the water content exceeds the preset value, the electric push rod 22 drives the cantilever 23 to penetrate the opening at the bottom of the box body 81 and extend to the outside of the box body 81. At this time, the electric telescopic rod 24 and the tunnel wall water seepage collector 25 are moved to the outside of the box body 81, and then the electric telescopic rod 24 is driven by the micro motor to flip outward. The electric telescopic rod 24 automatically extends and drives the tunnel wall water seepage collector 25 to contact the wall of the tunnel 1, and the wall water seepage is collected by the tunnel wall water seepage collector 25. After the collection is completed, the electric telescopic rod 24, the cantilever 23 and the electric push rod 22 are reset, and the collected water quality is tested and analyzed by the water quality detector 21 to evaluate the corrosiveness of the seepage to the tunnel structure, analyze the source of the seepage, and judge the impact of the seepage on the tunnel environment. According to the test results of the seepage, a targeted treatment plan can be formulated. For example, if the seepage is corrosive, it is necessary to use corrosion-resistant materials for repair. If the seepage comes from the groundwater layer, it may be necessary to take measures such as drainage and decompression to lower the groundwater level.

[0043] Furthermore, the tunnel wall water seepage collector 25 has a water storage cavity, and one end of the tunnel wall water seepage collector 25 away from the cantilever 23 has a collection port that is connected to the water storage cavity and can be automatically opened and closed. A conventional automatic switch design can be adopted. After the water seepage collection is completed, the collection port can be closed so that the tunnel wall water seepage collector 25 can be stored in the box body 81. The water can be directly collected by a micro pump or a diversion structure.

[0044] Furthermore, a micro negative pressure pump 26 is installed on the water quality detector 21, and the outlet end of the micro negative pressure pump 26 is connected to the water quality test chamber of the water quality detector 21, and a suction tube 27 is installed on the inlet end of the micro negative pressure pump 26, and the suction port of the suction tube 27 extends to the water receiving cavity of the tunnel wall seepage collector 25 housed in the box body 81, and the length of the suction tube 27 is adjustable, and can be designed as an automatic telescopic tube, or the length of the suction tube 27 can be adjusted by a height adjustment component, such as a micro electric push rod, etc., when the tunnel wall seepage collector 25 collects When the seepage water is collected and stored in the box body 81, the collection port of the tunnel wall seepage collector 25 is automatically opened, the suction tube 27 is extended and extended into the water storage chamber, the collected water is sucked by the micro negative pressure pump 26 and transmitted to the water quality test chamber, the water quality is tested and analyzed by the water quality detector 21, and after the test results are obtained, the test water is injected into the tunnel wall seepage collector 25, the collection port is closed, and then the tunnel wall seepage collector 25 is turned over to the outside of the box body 81 to pour the test water. After the pouring is completed, the tunnel wall seepage collector 25 can be reset;

[0045] It should be noted that the box body 81 has a built-in battery inside, which is responsible for supplying power to the above-mentioned electrical components, and the built-in battery can be charged through the auxiliary track 6.

[0046] Specifically, Figure 2 As shown, the auxiliary track 6 includes a track frame 61 and an electric slide rail 62. The track frame 61 is arc-shaped. The upper end of the track frame 61 is connected to the side of the tunnel environment inspection robot 4. The lower end of the track frame 61 is equipped with a roller 10 and connected to the slideway 9. The electric slide rail 62 is installed in the inner frame of the track frame 61, and the track path of the electric slide rail 62 is consistent with the length direction of the track frame 61. The tunnel wall inspection robot 8 is installed on the active end of the electric slide rail 62. The electric slide rail 62 is a conventional electric slide rail. The box body 81 is driven by the electric slide rail 62 to slide up and down in an arc so as to perform up and down scanning and inspection on the wall surface passing through.

[0047] Furthermore, the upper end of the track frame 61 can cover the upper end surface of the tunnel environment inspection robot 4, so that the tunnel wall inspection robot 8 slides above the tunnel environment inspection robot 4, thereby inspecting the top of the wall of the tunnel 1;

[0048] Furthermore, the long side of the track frame 61 is a track socket, the tunnel wall inspection robot 8 has a conductive copper bar, and the conductive copper bar is slidably connected to the track socket of the track socket, the conductive copper bar is installed in the box body 81 and connected to the charging end of the built-in battery, when the tunnel wall inspection robot 8 slides under the drive of the electric slide rail 62, the built-in battery can be slidably connected to the track socket through the conductive copper bar and charged, so as to power the electrical components in the box body 81.

[0049] Specifically, Figure 1 As shown, tunnel wall lamps 19 are installed on both sides of the wall of the tunnel 1, and light sensors 20 arranged opposite to the tunnel wall lamps 19 are installed on the side of the auxiliary track 6. The light sensor 20 can monitor the light intensity of the tunnel wall lamps 19 on the inspection path in real time. When the light of the tunnel wall lamps 19 becomes weak or cannot illuminate normally, the light sensor 20 generates an electrical signal to the highway backend management center to remind the staff to come for inspection and maintenance;

[0050] Specifically, Figure 1 As shown, a fire extinguishing pipe 11 is installed at the bottom of the tunnel environment inspection robot 4, and the fire extinguishing pipe 11 spans over the road surface in the tunnel 1. The side wall of the tunnel 1 has a fire extinguishing agent storage chamber 13. A fire extinguishing agent supply pipe 14 is pre-buried inside the tunnel 1. One end of the fire extinguishing agent supply pipe 14 is connected to the fire extinguishing agent storage chamber 13, and the other end of the fire extinguishing agent supply pipe 14 is connected to the fire extinguishing agent supply pipe 11 through a fire extinguishing agent transmission pipe 15. When the inspection camera 5 finds a fire during inspection, the fire extinguishing agent is supplied to the fire extinguishing agent supply pipe 14 through the fire extinguishing agent storage chamber 13, and the fire extinguishing agent storage chamber 13 transmits the fire extinguishing agent to the fire extinguishing pipe 11 through the fire extinguishing agent transmission pipe 15. A nozzle 12 is installed on the fire extinguishing pipe 11. The number of the nozzles 12 is multiple and evenly distributed along the length direction of the fire extinguishing pipe 11. The fire extinguishing pipe 11 sprays the fire extinguishing agent through the nozzle 12 to extinguish the fire in the tunnel 1.

[0051] Furthermore, a motor 16 is installed inside the tunnel environment inspection robot 4, and the upper end of the fire extinguishing pipe 11 is connected to the output end of the motor 16. The motor 16 drives the fire extinguishing pipe 11 to rotate at a certain amplitude, so as to extinguish the fire in a circumferential direction at the fire location. There are two fire extinguishing pipes 11 and they are symmetrically distributed on both sides of the bottom of the tunnel environment inspection robot 4, which can increase the fire extinguishing range, thereby improving the actual fire extinguishing effect. When the inspection camera 5 inspects a fire, the fire can be extinguished in time, which is conducive to reducing safety hazards and facilitating tunnel rescue work;

[0052] Furthermore, a drag chain guide groove 17 is installed at the bottom of the support frame 2. The drag chain guide groove 17 is distributed along the length direction of the tunnel 1 and is arranged adjacent to the inspection track 3. A drag chain 18 is installed in the drag chain guide groove 17. The fire extinguishing agent transmission pipe 15 is installed on the drag chain 18. The inlet end of the fire extinguishing agent transmission pipe 15 is connected to the outlet end of the fire extinguishing agent supply pipe 14, and the outlet end of the fire extinguishing agent transmission pipe 15 is connected to the inlet end of the fire extinguishing pipe 11. Through the combined design of the drag chain guide groove 17 and the drag chain 18, the tunnel environment inspection robot 4 is convenient for dragging the fire extinguishing agent transmission pipe 15 to extend and shorten during inspection, thereby facilitating actual fire extinguishing work.

[0053] In summary, the present invention installs a plurality of support frames 2 in the tunnel 1 and utilizes the arched design of the support frames 2 to provide multi-point support for the wall of the tunnel 1, which is beneficial to improving the bearing capacity of the wall of the tunnel 1, thereby installing the inspection track 3 and the tunnel environment inspection robot 4 on the top of the wall of the tunnel 1, and then supporting the tunnel environment inspection robot 4 by the auxiliary track 6 on the side of the tunnel environment inspection robot 4 and abutting against the passage step 7, thereby reducing the influence of the tunnel environment inspection robot 4's own weight on the inspection track 3 and the support frames 2, thereby avoiding damage to the wall of the tunnel 1 due to the installation of the track, and by The hoisting design of the inspection track 3 can prevent the track from being affected by the accumulation of debris, thereby ensuring the normal operation of the inspection track 3; the inspection track 3 drives the tunnel environment inspection robot 4 to move along the length direction of the tunnel 1, and uses the inspection camera 5 to monitor and inspect the environment inside the tunnel 1. While the tunnel environment inspection robot 4 moves and drives the auxiliary track 6 to move, the tunnel wall inspection robot 8 moves back and forth along the length direction of the auxiliary track 6, thereby inspecting the wall surface it passes through to observe whether there is water seepage or cracks on the wall surface, which is beneficial to improving the accuracy of the actual inspection results and facilitating the actual maintenance work of the tunnel.

Claims

1. A highway tunnel inspection device, installed in a tunnel (1), characterized in that: include: A support frame (2), the support frame (2) being installed in the tunnel (1), the support frame (2) being arched and supporting the wall surface of the tunnel (1), and the number of the support frames (2) being multiple and evenly distributed along the length direction of the tunnel (1); An inspection track (3), the inspection track (3) being distributed along the length direction of the tunnel (1) and being located below the support frame (2), the two ends of the inspection track (3) being respectively close to the two end openings of the tunnel (1), and the upper surface of the inspection track (3) being fixed to the lower surface of the top end of the support frame (2); A tunnel environment inspection robot (4), the tunnel environment inspection robot (4) being installed on an inspection track (3), the tunnel environment inspection robot (4) being installed with an inspection camera (5), and the tunnel environment inspection robot (4) being capable of reciprocating along the length direction of the inspection track (3); An auxiliary track (6), the auxiliary track (6) being installed on a side of the tunnel environment inspection robot (4) close to the passage step (7), the upper end surface of the passage step (7) close to the inner wall of the tunnel (1) having a slideway (9), the end of the auxiliary track (6) away from the tunnel environment inspection robot (4) extending downward into the slideway (9) and being installed with a roller (10), the roller (10) being rollingly connected in the slideway (9); A tunnel wall inspection robot (8), wherein the tunnel wall inspection robot (8) is installed on an auxiliary track (6), and the tunnel wall inspection robot (8) can reciprocate along the length direction of the auxiliary track (6).

2. A highway tunnel inspection device according to claim 1, characterized in that: The tunnel wall inspection robot (8) comprises a box body (81), a high-definition camera (82), an infrared water detector (83), and a fill light (84); the box body (81) is mounted on an auxiliary track (6) and can reciprocate along the length direction of the auxiliary track (6); the high-definition camera (82), the infrared water detector (83), and the fill light (84) are all mounted on a side of the box body (81) opposite to the wall of the tunnel (1); and the fill light (84) is in plurality and evenly distributed around the periphery of the high-definition camera (82).

3. A highway tunnel inspection device according to claim 2, characterized in that: A water quality detector (21), an electric push rod (22), a cantilever (23), an electric telescopic rod (24), and a tunnel wall water seepage collector (25) are installed inside the box body (81). The first end of the cantilever (23) is installed on the movable end of the electric push rod (22). The second end of the cantilever (23) is rotatably connected to the first end of the electric telescopic rod (24) and driven by a micro motor. The tunnel wall water seepage collector (25) is installed on the second end of the electric telescopic rod (24). The cantilever (23) is driven by the electric push rod (22) to extend to the outside of the box body (81). The electric telescopic rod (24) is driven by the micro motor to flip outward. The tunnel wall water seepage collector (25) contacts the wall of the tunnel (1) to collect the wall water seepage. The collected water quality is tested and analyzed by the water quality detector (21).

4. A highway tunnel inspection device according to claim 3, characterized in that: The tunnel wall water seepage collector (25) has a water containing cavity, and one end of the tunnel wall water seepage collector (25) away from the cantilever (23) has a collection port which is connected to the water containing cavity and can be opened and closed automatically.

5. A highway tunnel inspection device according to claim 4, characterized in that: The water quality detector (21) is provided with a micro negative pressure pump (26), the outlet end of the micro negative pressure pump (26) is connected to the water quality test chamber of the water quality detector (21), the inlet end of the micro negative pressure pump (26) is provided with a suction tube (27), the suction port of the suction tube (27) extends to the water receiving chamber of the tunnel wall seepage collector (25) housed in the box body (81), and the length of the suction tube (27) is adjustable.

6. A highway tunnel inspection device according to claim 1, characterized in that: The auxiliary track (6) comprises a track frame (61) and an electric slide rail (62); the track frame (61) is arc-shaped; the upper end of the track frame (61) is connected to the side of the tunnel environment inspection robot (4); the lower end of the track frame (61) is equipped with a roller (10) and is connected to a slideway (9); the electric slide rail (62) is installed in an inner frame of the track frame (61); and the track path of the electric slide rail (62) is consistent with the length direction of the track frame (61); and the tunnel wall inspection robot (8) is installed on the movable end of the electric slide rail (62).

7. A highway tunnel inspection device according to claim 6, characterized in that: The long side of the track frame (61) is a track socket, and the tunnel wall inspection robot (8) has a conductive copper bar, which is slidably connected to the track socket of the track socket.

8. A highway tunnel inspection device according to claim 1, characterized in that: A fire extinguishing pipe (11) is installed at the bottom of the tunnel environment inspection robot (4), and the fire extinguishing pipe (11) spans over the road surface in the tunnel (1). The side wall of the tunnel (1) has a fire extinguishing agent storage chamber (13). A fire extinguishing agent supply pipe (14) is pre-buried inside the tunnel (1), one end of the fire extinguishing agent supply pipe (14) is connected to the fire extinguishing agent storage chamber (13), and the other end of the fire extinguishing agent supply pipe (14) is connected to the fire extinguishing pipe (11) through a fire extinguishing agent transmission pipe (15).

9. A highway tunnel inspection device according to claim 8, characterized in that: A drag chain guide groove (17) is installed at the bottom of the support frame (2), and the drag chain guide groove (17) is distributed along the length direction of the tunnel (1) and is arranged adjacent to the inspection track (3). A drag chain (18) is installed in the drag chain guide groove (17), and the fire extinguishing agent transmission pipe (15) is installed on the drag chain (18). The inlet end of the fire extinguishing agent transmission pipe (15) is connected to the outlet end of the fire extinguishing agent supply pipe (14), and the outlet end of the fire extinguishing agent transmission pipe (15) is connected to the inlet end of the fire extinguishing pipe (11).

10. The highway tunnel inspection device according to claim 8, characterized in that: The fire extinguishing pipe (11) is provided with a nozzle (12), and the nozzles (12) are multiple in number and evenly distributed along the length direction of the fire extinguishing pipe (11).

Citation Information

Patent Citations

  • Expressway tunnel inspection device

    CN115977740A