Pavement pouring device for concrete construction

By introducing buoyancy balls and connecting rod systems into the pavement casting device for concrete construction, combining one-way twisting dragons and cutting pipes, the problems of uneven thickness and settlement of inclined pavement are solved, the concrete casting efficiency and pavement quality are improved, and the different widths are adapted to concrete pavement requirements.

CN119266057AInactive Publication Date: 2025-01-07XINXIANG CHUANGDA HIGHWAY EQUIP CO LTD

Patent Information

Application Number
CN202411805950.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-10
Publication Date
2025-01-07
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing pavement casting device for concrete construction is difficult to deal with inclined pavement, resulting in uneven thickness of concrete pavement and uneven stress during solidification, which affects service life and cannot meet the requirements of concrete pavement of different widths.

Method used

A concrete pavement casting device including a moving drive mechanism, an angle adjustment mechanism, a material storage mechanism and a vibration discharge mechanism is designed. The concrete flowability and filling efficiency are adjusted through a buoyancy ball and connecting rod system to ensure uniform pavement thickness. And prevent settlement and bubble formation through a one-way twisting and drain pipe system.

Benefits of technology

The uniformity of concrete pouring thickness on inclined pavement is achieved, casting defects are reduced, concrete pouring efficiency and pavement quality are improved, and concrete pavement needs are adapted to the needs of concrete pavement of different widths.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119266057A_ABST
    Figure CN119266057A_ABST
Patent Text Reader

Abstract

The invention relates to the field of concrete pouring, in particular to a pavement pouring device for concrete construction. The technical problems that an existing device cannot well construct an inclined road surface, and stress is not uniform when the inclined road surface is solidified are solved. According to the technical scheme, the device comprises two first supporting frames, the tops of the two first supporting frames are jointly connected with a supporting plate in a sliding mode, and the device further comprises a movable driving mechanism, an angle adjusting mechanism, a containing mechanism and a vibration discharging mechanism. The height of the buoyancy ball is controlled through the inclined first connecting rod when the second connecting rod rotates, so that the height of the buoyancy ball is lower when an inclined road surface is poured, the thickness judgment during pouring of the inclined concrete road surface is reduced, the thickness of the buoyancy ball is matched with the inclination angle of the concrete road surface, and a flowing space is reserved for flowing of concrete; the thickness uniformity of the concrete pavement is ensured, and the thickness detection of the concrete pavement at different inclination angles is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of concrete pouring, and in particular to a pavement pouring device for concrete construction. Background Art

[0002] The concrete pavement construction process covers the entire process from preliminary preparation to final formation, including preliminary site cleaning and surveying and setting out, construction of base and subbase, installation of formwork, concrete paving, vibration and leveling, and later pavement joint treatment and maintenance, and finally quality inspection and demolding.

[0003] In the process of paving, vibrating and leveling concrete, a concrete construction pavement casting device is needed. The existing concrete construction pavement casting device is designed based on a horizontal pavement, but in the construction process in mountainous areas, it is often necessary to construct an inclined pavement. Since concrete is fluid during construction, it will flow downward along the roadbed, resulting in the concrete pavement being thinner at the upper end and thicker at the bottom end. During solidification, excessive local stress is generated, which affects the service life of the pavement. In addition, the existing concrete construction pavement casting device can only handle concrete pavements of specified widths, and is difficult to apply to concrete pavements with different width requirements. Summary of the invention

[0004] In order to overcome the shortcomings of existing devices that cannot construct inclined road surfaces well and cause uneven force on the inclined road surfaces during solidification, the present invention provides a pavement pouring device for concrete construction that can construct inclined road surfaces.

[0005] The technical solution is: a pavement pouring device for concrete construction, comprising two first support frames, the tops of the two first support frames are slidably connected with a support plate, and also comprising a mobile drive mechanism, an angle adjustment mechanism, a material holding mechanism and a vibration material discharge mechanism, wherein a mobile drive mechanism is installed on one side of one of the first support frames, the two first support frames are both installed with an angle adjustment mechanism, and the two first support frames are jointly installed with a vibration material discharge mechanism, and a material holding mechanism is installed on the support plate; The mobile driving mechanism includes a motor mounting plate and a third support frame, the motor mounting plate and the third support frame are fixedly connected to the bottom of the support plate, a first motor is installed on one side of the motor mounting plate, an output shaft of the first motor passes through the motor mounting plate and is fixedly connected to the first friction column, the first friction column is rotatably connected to the third support frame, one side of the third support frame is rotatably connected to a rotating shaft, a second friction column is slidably connected in the rotating shaft, the second friction column is in frictional contact with the first friction column, and a first spring is connected between the rotating shaft and the second friction column, a sliding block is slidably connected to the bottom of the second friction column, the sliding block passes through the bottom of the third support frame and is slidably connected to the third support frame, a rectangular sliding groove is mirror-distributed at the bottom of the third support frame, a first connecting rod is mirror-distributed and fixed to the bottom of the sliding block, the first connecting rod passes through the rectangular sliding groove of the third support frame, and is rotatably connected to the second connecting rod, and a buoyancy ball is fixed to the bottom of the second connecting rod.

[0006] Preferably, the mobile driving mechanism also includes a first belt transmission assembly and a first roller, one end of the rotating shaft passes through the first support frame and is rotatably connected to the first support frame, one end of the rotating shaft is installed with the first belt transmission assembly, the first support frame is fixedly connected with a support foot in a mirror-image distribution, the support foot is rotatably connected to the first roller, the first roller is in contact with a casting template below, and the first roller located on the front right side passes through the support foot and is connected to the first belt transmission assembly.

[0007] Preferably, the angle adjustment mechanism includes a first sliding rod, a first sliding rod is fixedly connected to one side of the first support frame, a first sliding frame is slidably connected to the first sliding rod, a second spring is connected between the first sliding frame and the first support frame, a C-shaped frame is rotatably connected to the bottom of the first sliding frame, and second rollers are rotatably connected to both ends of the C-shaped frame, and the two second rollers are in contact with the casting template.

[0008] Preferably, the material holding mechanism includes a one-way auger, a material holding trough is fixedly connected to the top of the support plate, the one-way auger is rotatably connected to the material holding trough, a second motor is installed on one side of the material holding trough through a motor support frame, the output shaft of the second motor passes through the motor support frame and is fixedly connected to the one-way auger, a second belt drive assembly is installed on the one-way auger, and the second belt drive assembly is connected to a vibrating feeding mechanism.

[0009] Preferably, the vibrating unloading mechanism includes a third connecting rod, and several groups of third connecting rods are linearly distributed between the two first support frames, each group of third connecting rods is provided with four, and every two third connecting rods are commonly hinged with a first hinge column, and the two first hinge columns are commonly slidably connected with a cross rod, and the two third connecting rods distributed front and back are commonly hinged with a second hinge column, and the cross rod is slidably connected to two adjacent second hinge columns, and linear slide grooves are symmetrically distributed on the first support frame, and the third hinge column is slidably connected in the linear slide groove, and the third hinge column is rotatably connected to the adjacent third connecting rod.

[0010] Preferably, the vibrating unloading mechanism further includes a second sliding frame, the bottoms of the plurality of cross rods are fixedly connected to the second sliding frame, a unloading pipe is slidably connected inside the second sliding frame, and one end of the unloading pipe is connected to the material trough through a hose.

[0011] Preferably, the vibrating feeding mechanism also includes a mounting ring and a gear block. The mounting ring is fixedly connected to the feeding tube in a sleeve-type manner. Racks are fixedly connected to the front and rear sides of the mounting ring. The front and rear sides of the second sliding frame are slidably connected to gear blocks. A third spring is connected between the second sliding frame and the gear block. The gear block and the rack are in a meshing state. A vibration rod is fixedly connected to the bottom of the gear block.

[0012] Preferably, the vibrating feeding mechanism also includes a fifth connecting rod, the outer walls of several feeding pipes are rotatably connected to the fifth connecting rod, one end of the fifth connecting rod is rotatably connected to the crankshaft, one side of the crankshaft is fixedly connected to the second sliding rod, and the other side is fixedly connected to the third sliding rod, the second sliding rod is slidably connected to the third sliding rod, the two second sliding rods located on the front and rear sides are respectively rotatably connected to the two first support frames, and the second sliding rod located on the rear side is connected to the second belt drive assembly.

[0013] Preferably, it also includes a rolling flattening assembly and a residual material scraping assembly. A second support frame is fixedly connected to the left side of the first support frame, a gear group is installed on the second support frame, and a rolling flattening assembly and a residual material scraping assembly are installed between the two first support frames. The rolling flattening assembly includes a friction roller, a friction roller is rotatably connected to one side of the first support frame, one end of the friction roller is connected to the gear group, a plurality of rolling rods are linearly distributed between the two friction rollers, two adjacent rolling rods are threadedly connected, and the rolling rods located on the front and rear sides are respectively threadedly connected to the two friction rollers.

[0014] Preferably, the residual material scraping assembly includes an auger sleeve, one side of the first support frame is rotatably connected with the auger sleeve, one end of the auger sleeve is connected to the gear set, and the two auger sleeves are commonly threadedly connected with a bidirectional auger.

[0015] The beneficial effects of the present invention are as follows: 1. When the second connecting rod rotates, the height of the buoyancy ball is controlled by the inclined first connecting rod, so that when pouring an inclined road surface, the height of the buoyancy ball is lower, thereby reducing the thickness judgment when pouring the inclined concrete road surface, making the thickness of the buoyancy ball adapt to the inclination angle of the concrete road surface, reserving flow space for the flow of concrete, ensuring the uniform thickness of the concrete road surface, and realizing the thickness detection of concrete road surfaces with different inclination angles.

[0016] 2. The buoyancy of the concrete on the buoyancy ball causes the second connecting rod to squeeze or loosen the second friction column through the first connecting rod and the sliding block, so that the first motor drives the first roller to rotate or stop, thereby achieving uniform filling of the space between the casting templates during concrete pouring, reducing concrete pouring defects and improving concrete pouring efficiency.

[0017] 3. When the device is pouring concrete pavement, the concrete is stirred by the rotating one-way auger in the trough to prevent the concrete from settling and keep the concrete in a uniform state. At the same time, the concrete continues to flow out of the discharge pipe through the hose, thereby improving the quality of concrete pouring. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 It is a partial explosion schematic diagram of the present invention; Figure 3 It is a structural schematic diagram of the first support frame of the present invention; Figure 4 is a schematic structural diagram of a first motor of the present invention; Figure 5 It is a partial cutaway schematic diagram of the mobile drive mechanism of the present invention; Figure 6 is a partial cutaway schematic diagram of a third support frame of the present invention; Figure 7 It is a structural schematic diagram of the angle adjustment mechanism of the present invention; Figure 8 It is a partial cutaway schematic diagram of the material holding mechanism of the present invention; Fig. 9 It is a structural schematic diagram of the cross rod of the present invention; Fig.10 It is a structural schematic diagram of the feeding pipe of the present invention; Fig.11 It is a structural schematic diagram of the gear block of the present invention; Fig.12 It is a partial cutaway schematic diagram of the rolling flattening assembly of the present invention; Fig.13 It is a structural schematic diagram of the residual material scraping assembly of the present invention.

[0019] Figure numbers: 1_first support frame, 101_support foot, 102_second support frame, 103_gear set, 2_mobile drive mechanism, 201_motor mounting plate, 202_first motor, 203_first friction column, 204_third support frame, 205_rotating shaft, 206_second friction column, 207_sliding block, 208_first connecting rod, 209_second connecting rod, 210_buoyancy ball, 211_first belt drive assembly, 212_first roller, 3_angle adjustment mechanism, 301_first sliding rod, 302_first sliding frame, 303_C-shaped frame, 304_second roller, 4_support plate, 5_material holding mechanism, 501_material holding trough, 502_ One-way auger, 503_second motor, 504_second belt drive assembly, 6_vibration unloading mechanism, 601_third connecting rod, 602_first hinged column, 6021_second hinged column, 6022_third hinged column, 603_cross rod, 604_second sliding frame, 605_unloading pipe, 6051_mounting ring, 6052_rack, 6053_tooth block, 6054_vibration rod, 606_fifth connecting rod, 607_crankshaft, 608_second sliding rod, 609_third sliding rod, 7_rolling flattening assembly, 701_friction roller, 702_rolling rod, 8_residue scraping assembly, 801_auger sleeve, 802_bidirectional auger, 9_casting template. DETAILED DESCRIPTION

[0020] The present invention will be further described below in conjunction with the accompanying drawings and embodiments. Example 1

[0021] A road surface pouring device for concrete construction, such as Figure 1-Figure 13 As shown, it includes two first support frames 1, the tops of the two first support frames 1 are slidably connected with a support plate 4, and also includes a mobile drive mechanism 2, an angle adjustment mechanism 3, a material holding mechanism 5 and a vibration unloading mechanism 6, one side of one of the first support frames 1 is equipped with a mobile drive mechanism 2, the two first support frames 1 are both equipped with an angle adjustment mechanism 3, and the two first support frames 1 are jointly equipped with a vibration unloading mechanism 6, and a material holding mechanism 5 is installed on the support plate 4; The mobile driving mechanism 2 includes a motor mounting plate 201 and a third support frame 204, the motor mounting plate 201 and the third support frame 204 are fixedly connected to the bottom of the support plate 4, a first motor 202 is installed on one side of the motor mounting plate 201, the output shaft of the first motor 202 passes through the motor mounting plate 201 and is fixedly connected to the first friction column 203, the first friction column 203 is rotatably connected to the third support frame 204, one side of the third support frame 204 is rotatably connected to a rotating shaft 205, a second friction column 206 is slidably connected in the rotating shaft 205, the second friction column 206 is located in the third support frame 204 and does not contact the third support frame 204, and the second friction column 206 is frictionally connected to the first friction column 203 The second friction column 206 is in rubbing contact, and a first spring is connected between the rotating shaft 205 and the second friction column 206, the first spring is always in a stretched state, the second friction column 206 is slidably connected to a sliding block 207 at the bottom, the sliding block 207 passes through the bottom of the third support frame 204, and is slidably connected to the third support frame 204, the third support frame 204 has a rectangular slide groove in a mirror distribution at the bottom, the sliding block 207 is fixedly connected to a first connecting rod 208 in a mirror distribution at the bottom, the first connecting rod 208 passes through the rectangular slide groove of the third support frame 204, and is rotatably connected to the second connecting rod 209, a damping is arranged at the connection between the first connecting rod 208 and the second connecting rod 209, and a buoyancy ball 210 is fixedly connected to the bottom of the second connecting rod 209.

[0022] The mobile driving mechanism 2 also includes a first belt transmission assembly 211 and a first roller 212. One end of the rotating shaft 205 passes through the first supporting frame 1 and is rotatably connected to the first supporting frame 1. The first belt transmission assembly 211 is installed at one end of the rotating shaft 205. The first belt transmission assembly 211 includes a first driving pulley, a first driven pulley and a first transmission belt. One end of the rotating shaft 205 is fixedly connected to the first driving pulley. A support foot 101 is fixedly connected to the first supporting frame 1 in a mirror-image distribution. The support foot 101 is rotatably connected to the first roller 212. The outer wall of the first roller 212 is provided with a damper for controlling the rotation speed of the first roller 212. The first roller 212 is in contact with a casting template 9 below. The first roller 212 located on the front right side passes through the supporting foot 101 and is fixedly connected to the first driven pulley. A first transmission belt is sleeved between the first driving pulley and the first driven pulley.

[0023] The angle adjustment mechanism 3 includes a first sliding rod 301, a first sliding rod 301 is fixedly connected to one side of the first support frame 1, a first sliding frame 302 is slidably connected to the first sliding rod 301, a second spring is connected between the first sliding frame 302 and the first support frame 1, and the second spring is always in a stretched state. The bottom of the first sliding frame 302 is rotatably connected to a C-shaped frame 303, and both ends of the C-shaped frame 303 are rotatably connected to second rollers 304, and the two second rollers 304 are in contact with the casting template 9.

[0024] The material holding mechanism 5 includes a one-way auger 502, a material holding trough 501 is fixedly connected to the top of the support plate 4, the one-way auger 502 is rotatably connected to the material holding trough 501, a second motor 503 is installed on one side of the material holding trough 501 through a motor support frame, the output shaft of the second motor 503 passes through the motor support frame and is fixedly connected to the one-way auger 502, a second belt transmission assembly 504 is installed on the one-way auger 502, the second belt transmission assembly 504 includes a second driving pulley, a second driven pulley and a second transmission belt, the one-way auger 502 is fixedly connected to the second driving pulley, the second driven pulley is connected to the vibrating unloading mechanism 6, and a second transmission belt is sleeved between the second driving pulley and the second driven pulley.

[0025] The vibrating unloading mechanism 6 includes a third connecting rod 601, and several groups of third connecting rods 601 are linearly distributed between the two first support frames 1. Each group of third connecting rods 601 is provided with four, and every two third connecting rods 601 are X-shaped and are jointly hinged with a first hinge column 602. The two first hinge columns 602 are jointly slidably connected with a cross rod 603. A second hinge column 6021 is jointly hinged between the two third connecting rods 601 distributed front and back, and the cross rod 603 is slidably connected with two adjacent second hinge columns 6021. Linear slide grooves are symmetrically distributed on the first support frame 1, and the third hinge column 6022 is slidably connected in the linear slide groove, and the third hinge column 6022 is rotatably connected with the adjacent third connecting rod 601.

[0026] The vibrating feeding mechanism 6 also includes a second sliding frame 604, and the bottoms of several cross rods 603 are fixedly connected to the second sliding frame 604. A feeding pipe 605 is slidably connected inside the second sliding frame 604. The feeding pipe 605 is curved to facilitate mixing of concrete on the outer wall during concrete pouring and remove bubbles in the concrete. One end of the feeding pipe 605 is connected to the material trough 501 through a hose.

[0027] The vibrating feeding mechanism 6 also includes a mounting ring 6051 and a gear block 6053. The mounting ring 6051 is fixedly connected to the feeding tube 605 in a sleeve manner. Racks 6052 are fixedly connected to the front and rear sides of the mounting ring 6051. The front and rear sides of the second sliding frame 604 are slidably connected to the gear blocks 6053. A third spring is connected between the second sliding frame 604 and the gear block 6053. The gear block 6053 and the rack 6052 are in a meshing state. A vibration rod 6054 is fixedly connected to the bottom of the gear block 6053. The bottom of the vibration rod 6054 is slightly higher than the bottom of the casting template 9, so that the vibration rod 6054 can remove bubbles in the concrete when pouring concrete.

[0028] The vibrating unloading mechanism 6 also includes a fifth connecting rod 606, and the outer walls of several unloading tubes 605 are rotatably connected to the fifth connecting rod 606. One end of the fifth connecting rod 606 is rotatably connected to a crankshaft 607. Two adjacent crankshafts 607 face opposite directions. A second sliding rod 608 is fixedly connected to one side of the crankshaft 607, and a third sliding rod 609 is fixedly connected to the other side. The second sliding rod 608 is slidably connected to the third sliding rod 609. The two second sliding rods 608 located on the front and rear sides are respectively rotatably connected to the two first support frames 1, and the second sliding rod 608 located on the rear side is connected to the second driven pulley of the second belt transmission assembly 504.

[0029] It also includes a rolling flattening component 7 and a residual material scraping component 8. A second support frame 102 is fixedly connected to the left side of the first support frame 1. A gear set 103 is installed on the second support frame 102. The gear set 103 includes a meshing driving gear and a driven gear. A rolling flattening component 7 and a residual material scraping component 8 are installed between the two first support frames 1. The rolling flattening component 7 includes a friction roller 701. A friction roller 701 is rotatably connected to one side of the first support frame 1. One end of the friction roller 701 is connected to the driving gear of the gear set 103. A plurality of rolling rods 702 are linearly distributed between the two friction rollers 701. Two adjacent rolling rods 702 are connected by threads, and the rolling rods 702 located on the front and rear sides are respectively threadedly connected to the two friction rollers 701.

[0030] The residual material scraping assembly 8 includes an auger sleeve 801 , one side of the first support frame 1 is rotatably connected with the auger sleeve 801 , one end of the auger sleeve 801 is connected to the driven gear of the gear set 103 , and the two auger sleeves 801 are commonly threadedly connected with a bidirectional auger 802 .

[0031] In the initial state, the first friction column 203 and the second friction column 206 remain separated, and the rolling rod 702 is not installed on the friction roller 701. The staff first installs a number of casting templates 9 in the construction area, and moves the first support frame 1 according to the distance between the casting templates 9 on both sides to adjust the distance between the two first support frames 1. In the process of adjusting the distance between the two first support frames 1, the third hinge column 6022 slides in the linear slide groove of the first support frame 1, so that the third hinge column 6022 drives the third connecting rod 601 to move synchronously, and the two adjacent third connecting rods 601 are squeezed and rotated by the first hinge column 602 and the second hinge column 6021. If the two first support frames 1 move away from each other, the first support frames 1 will move away from each other. The two third hinged columns 6022 sliding on the support frame 1 are close to each other, so that the first hinged columns 602 are separated from each other, and the second hinged columns 6021 of the same group are close to each other. The first hinged columns 602 and the second hinged columns 6021 move together to separate the cross bars 603. If the two first support frames 1 are close to each other, the two third hinged columns 6022 sliding on the first support frame 1 are separated from each other, so that the first hinged columns 602 are close to each other, and the second hinged columns 6021 are separated from each other in the left and right directions. The first hinged columns 602 and the second hinged columns 6021 move together to separate the cross bars 603. The cross bars 603 are close to each other through the second hinged columns 602. The sliding frame 604 drives the feeding tube 605 to move synchronously, so that the feeding tube 605 can adapt to the casting templates 9 at different distances. The movement of the second sliding frame 604 will also drive the gear blocks 6053 on the front and rear sides to move synchronously through the third spring. The gear blocks 6053 drive the vibration rod 6054 to move synchronously, so that the vibration rod 6054 can adapt to the casting templates 9 at different distances. The movement of the feeding tube 605 drives the rack 6052 to move synchronously through the mounting ring 6051. At the same time, the feeding tube 605 drives the crankshaft 607 to move synchronously through the fifth connecting rod 606, so that the third sliding rod 609 slides in the second sliding rod 608, so that the crankshaft 607 can adapt to the feeding tubes 605 at different positions. At the same time, the first supporting frame 1 moves away from each other so that The auger sleeve 801 drives the two-way auger 802 to rotate through the threaded groove, so that the distance between the two auger sleeves 801 becomes longer, thereby lengthening the entire excess material scraping assembly 8, so that the excess material scraping assembly 8 can adapt to casting templates 9 at different distances. The staff connects several rolling rods 702 through threads to realize that the rolling flattening assembly 7 can adapt to casting templates 9 at different distances. After several rolling rods 702 are connected, the length of the rolling flattening assembly 7 is fixed, so that the distance between the two second support frames 102 is fixed, and then the distance between the two first support frames 1 is fixed. At this time, the vibrating unloading mechanism 6, the rolling flattening assembly 7 and the excess material scraping assembly 8 can adapt to casting templates 9 at different distances, which is convenient for casting concrete pavements of different widths.

[0032] The staff places the device on the casting template 9, so that the bottom of the first roller 212 and the friction roller 701 are in contact with the top of the casting template 9. The second spring contracts to drive the C-shaped frame 303 to move through the first sliding frame 302, so that the C-shaped frame 303 drives the second roller 304 to contact and squeeze the casting template 9, so that the second roller 304 can roll on the casting template 9, completing the placement of the device.

[0033] After placing the device, the staff needs to start the device first to improve the pouring effect of concrete, and start the first motor 202. The output shaft of the first motor 202 rotates clockwise to drive the first friction column 203 to rotate. Since the first friction column 203 is disengaged from the second friction column 206, the first friction column 203 idles; at the same time, the staff starts the second motor 503. The output shaft of the second motor 503 rotates to drive the one-way auger 502 to rotate. The one-way auger 502 rotates through the second belt transmission assembly 504 to drive the second sliding rod 608 to rotate. The second sliding rod 608 drives the crankshaft 607 to rotate synchronously through the third sliding rod 609. The crankshaft 607 rotates through the fifth connecting rod 606 to drive the discharge pipe 605 to slide back and forth in the second sliding frame 604. The discharge pipe 605 reciprocates The motion can stir the concrete, thereby removing the bubbles in the concrete. At the same time, the feed tube 605 reciprocates and slides through the mounting ring 6051 to drive the rack 6052 to move synchronously, so that the rack 6052 pushes the tooth block 6053 to move toward the left and right sides through its own teeth during the movement, so that the tooth block 6053 is disengaged from the tooth groove of the rack 6052, and the third spring is stretched by force. When the teeth of the rack 6052 pass over the tooth block 6053 it pushes, the third spring contracts, so that the tooth block 6053 is stuck in another tooth groove of the rack 6052 and collides with the tooth groove to generate vibration. The vibration will be transmitted from the tooth block 6053 to the vibration rod 6054, and then transmitted from the vibration rod 6054 to the concrete, thereby removing the bubbles in the concrete. At this time, the device start-up before concrete pouring is completed.

[0034] After the first motor 202 and the second motor 503 are started, the staff pours the prepared concrete into the trough 501. The concrete is stirred by the rotating one-way auger 502 in the trough 501 to avoid the concrete from settling and keep the concrete in a uniform state, thereby improving the quality of concrete pouring. At the same time, the concrete enters the discharge pipe 605 through the hose and flows out from the discharge pipe 605, so that the concrete is injected into and fills the casting templates 9 on both sides. Since the concrete itself has a large viscosity, the accumulated concrete pile is approximately in the shape of a cone. As the concrete continues to flow out of the discharge pipe 605, the concrete liquid level gradually increases, and the concrete gradually submerges the discharge pipe 605 and the vibration rod 6054, so that the discharge pipe 6 The reciprocating motion of 05 and the vibration of the vibration rod 6054 drive the bubbles in the surrounding concrete to vibrate, so that the bubbles in the concrete float upward and detach from the concrete under the buoyancy of the concrete, thereby eliminating the bubbles in the concrete, improving the mechanical strength of the concrete pouring, and further improving the service life of the concrete at the pouring location. When the concrete contacts the buoyancy ball 210, the buoyancy ball 210 moves upward, and controls the first connecting rod 208 to move upward through the second connecting rod 209, so that the first connecting rod 208 moves to drive the sliding block 207 to squeeze the second friction column 206. It is worth noting that if there is an angular deviation between the device and the horizontal plane, that is, the concrete pavement to be poured is an inclined pavement, then under the gravity and the damping between the first connecting rod 208 and the second connecting rod 209, the sliding block 207 is pressed against the second friction column 206. , the two buoyancy balls 210 will respectively drive the two second connecting rods 209 to rotate slowly until the second connecting rod 209 returns to verticality. If the second connecting rod 209 rotates clockwise, the buoyancy ball 210 on the left side is closer to the concrete. If the second connecting rod 209 rotates counterclockwise, the buoyancy ball 210 on the right side is closer to the concrete. At this time, the driving force for the sliding block 207 to rise is provided by the buoyancy ball 210 closest to the concrete. Since concrete has fluidity, when pouring an inclined road surface, a small amount of concrete will flow downward along the inclined surface. Since the first connecting rod 208 is inclined, when the second connecting rod 209 returns to verticality, the height of the buoyancy ball 210 closest to the concrete will be lower, thereby reducing the thickness judgment of the inclined concrete road surface when pouring. The flow reserves flow space to ensure the uniform thickness of the concrete pavement, so that the thickness of the buoyancy ball 210 is adapted to the inclination angle of the concrete pavement, and the thickness detection of the concrete pavement with different inclination angles is realized. Since the second connecting rod 209 rotates slowly, the thickness judgment of the inclined concrete pavement during pouring changes slowly, that is, the inclined concrete pavement is thicker at the bottom and thinner at the top during pouring. It is worth noting that the difference in thickness of the concrete pavement caused by the flow of concrete is due to the fact that the flow of concrete will cause the inside of the concrete to be squeezed and bulge outward, and the bulging concrete can use its own viscosity to make more concrete flow. Compared with the difference in thickness of the concrete pavement caused by the flow of concrete, the contour of the poured inclined concrete pavement is approximately a natural logarithmic curve.The inclined concrete pavement below is made to have a smaller inclination angle, and the inclined concrete pavement below has a better supporting effect on the inclined concrete pavement above, thereby reducing the convexity of the inclined concrete pavement when it flows, and utilizing the viscosity of the concrete itself to suppress the convex concrete and drive more concrete to flow, so that the inclined concrete pavement has a stronger shear resistance, and the flow of concrete is suppressed. There is an essential difference between the two; the second friction column 206 is squeezed and moves toward the first friction column 203, and at the same time the first spring is stretched, and the second friction column 206 moves to contact with the first friction column 203 and squeeze each other, so that the first friction column 203 drives the second friction column 206 to rotate, and at this time the second friction column 206 drives the first spring and the rotating shaft 205 to rotate synchronously, so that the rotating shaft 205 drives the first roller 212 to rotate through the first belt transmission assembly 211 The first roller 212 is moved clockwise to control the whole device to move rightward along the casting template 9. When the concrete cannot provide enough buoyancy, the buoyancy ball 210 moves downward, and the first link 208 is controlled to move downward by the second link 209, so that the first link 208 moves to drive the sliding block 207 to release the second friction column 206. The first spring contracts to make the second friction column 206 move away from the first friction column 203, and the second friction column 206 no longer rotates, so that the second friction column 206 drives the rotating shaft 205 to stop synchronously, and the rotating shaft 205 keeps the first roller 212 stationary through the first belt transmission assembly 211, so that the device stops moving. Through the above actions, the concrete is evenly filled between the casting templates 9 on both sides, reducing the casting defects of the concrete and improving the casting efficiency of the concrete, and completing the casting of the concrete pavement.

[0035] During the further movement of the device, if the device needs to rotate left and right along the casting templates 9 on both sides, the side walls of the casting templates 9 will squeeze the two second rollers 304, so that the two second rollers 304 drive the C-shaped frame 303 to rotate on the first sliding frame 302, and at the same time, the C-shaped frame 303 drives the first sliding frame 302 to move so that the second spring stretches or contracts. During the rotation of the C-shaped frame 303, the plane where the axes of the two second rollers 304 are located always remains parallel to the casting template 9, so that the two second rollers 304 guide the C-shaped frame 303, so that the C-shaped frame 303 drives the device to always keep moving on the casting template 9 without deviation, thereby ensuring the stability of the device during movement.

[0036] When the device moves to the right, the friction roller 701 rolls on the top of the casting template 9, and the rolling of the friction roller 701 drives the rolling rod 702 to rotate synchronously. At the same time, the rolling of the friction roller 701 drives the auger sleeve 801 to rotate counterclockwise through the gear set 103. The rotation of the auger sleeve 801 drives the two-way auger 802 to rotate synchronously. The auger sleeve 801 and the two-way auger 802 rotate to make their own spiral protrusions scrape on the top of the concrete, so that the residual concrete is scraped to the center of the two-way auger 802. In the process of scraping, the residual concrete will be filled into the gap defects of the concrete pile to enhance the mechanical strength of the concrete pavement during molding. Thereby, the auger sleeve 801 and the two-way auger 802 can recycle the residual material on the top of the poured concrete pile. The residual concrete after filling the gap defects will be pushed by the auger sleeve 801 and the two-way auger 802 to move synchronously, so as to prevent the residual concrete from affecting the subsequent operations. The concrete pavement with the residual material scraped off will be squeezed by the rolling rod 702 rolling to the right, so that the scratches on the concrete pavement are squeezed out and the concrete pavement is smoothed. At the same time, the concrete is squeezed by the rolling rod 702, which makes the internal structure more compact and the mechanical structure more stable, so as to avoid cracking of the concrete pavement when it solidifies and realize the flattening and strength enhancement of the concrete pavement.

[0037] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

Claims

1. A pavement pouring device for concrete construction, comprising two first support frames (1), the tops of the two first support frames (1) being slidably connected to a support plate (4), characterized in that: It also comprises a moving drive mechanism (2), an angle adjustment mechanism (3), a material holding mechanism (5) and a vibrating material discharge mechanism (6), wherein the moving drive mechanism (2) is mounted on one side of one of the first support frames (1), the angle adjustment mechanism (3) is mounted on both of the two first support frames (1), and the vibrating material discharge mechanism (6) is mounted on both of the two first support frames (1), and the material holding mechanism (5) is mounted on the support plate (4); The mobile drive mechanism (2) comprises a motor mounting plate (201) and a third support frame (204); the motor mounting plate (201) and the third support frame (204) are fixedly connected to the bottom of the support plate (4); a first motor (202) is installed on one side of the motor mounting plate (201); an output shaft of the first motor (202) passes through the motor mounting plate (201) and is fixedly connected to a first friction column (203); the first friction column (203) is rotatably connected to the third support frame (204); a rotating shaft (205) is rotatably connected to one side of the third support frame (204); a second friction column (206) is slidably connected inside the rotating shaft (205); the second friction column (206) is rotatably connected to the first friction column (203) frictionally contacted, and a first spring is connected between the rotating shaft (205) and the second friction column (206), the bottom of the second friction column (206) is slidably connected to a sliding block (207), the sliding block (207) passes through the bottom of the third support frame (204) and is slidably connected to the third support frame (204), the bottom of the third support frame (204) is mirror-distributed with a rectangular slide groove, the bottom of the sliding block (207) is mirror-distributed and fixedly connected to a first connecting rod (208), the first connecting rod (208) passes through the rectangular slide groove of the third support frame (204), and is rotatably connected to a second connecting rod (209), and the bottom of the second connecting rod (209) is fixedly connected to a buoyancy ball (210).

2. A pavement pouring device for concrete construction according to claim 1, characterized in that: The mobile drive mechanism (2) further comprises a first belt transmission assembly (211) and a first roller (212); one end of the rotating shaft (205) passes through the first support frame (1) and is rotatably connected to the first support frame (1); one end of the rotating shaft (205) is mounted with the first belt transmission assembly (211); a support foot (101) is fixedly connected to the first support frame (1) in a mirror-image distribution; the support foot (101) is rotatably connected with the first roller (212); a casting template (9) is in contact with the first roller (212) below; and the first roller (212) located on the front right side passes through the support foot (101) and is connected to the first belt transmission assembly (211).

3. A pavement pouring device for concrete construction according to claim 2, characterized in that: The angle adjustment mechanism (3) comprises a first sliding rod (301), one side of the first support frame (1) is fixedly connected to the first sliding rod (301), the first sliding frame (302) is slidably connected to the first sliding rod (301), a second spring is connected between the first sliding frame (302) and the first support frame (1), the bottom of the first sliding frame (302) is rotatably connected to a C-shaped frame (303), both ends of the C-shaped frame (303) are rotatably connected to second rollers (304), and the two second rollers (304) are in contact with the casting template (9).

4. A pavement pouring device for concrete construction according to claim 1, characterized in that: The material holding mechanism (5) comprises a one-way auger (502), a material holding trough (501) is fixedly connected to the top of the support plate (4), the one-way auger (502) is rotatably connected to the material holding trough (501), a second motor (503) is installed on one side of the material holding trough (501) through a motor support frame, an output shaft of the second motor (503) passes through the motor support frame and is fixedly connected to the one-way auger (502), a second belt transmission assembly (504) is installed on the one-way auger (502), and the second belt transmission assembly (504) is connected to the vibration unloading mechanism (6).

5. A pavement pouring device for concrete construction according to claim 4, characterized in that: The vibrating unloading mechanism (6) comprises a third connecting rod (601), a plurality of groups of third connecting rods (601) are linearly distributed between the two first supporting frames (1), each group of third connecting rods (601) comprises four third connecting rods, each two third connecting rods (601) are hinged together with a first hinge column (602), the two first hinge columns (602) are slidably connected with a cross rod (603), the two third connecting rods (601) distributed front and rear are hinged together with a second hinge column (6021), the cross rod (603) is slidably connected with two adjacent second hinge columns (6021), linear slide grooves are symmetrically distributed on the first supporting frame (1), the third hinge columns (6022) are slidably connected in the linear slide grooves, and the third hinge columns (6022) are rotatably connected with the adjacent third connecting rods (601).

6. A pavement pouring device for concrete construction according to claim 5, characterized in that: The vibrating material discharge mechanism (6) further comprises a second sliding frame (604), the bottoms of the plurality of cross rods (603) are all fixedly connected to the second sliding frame (604), a material discharge pipe (605) is slidably connected inside the second sliding frame (604), and one end of the material discharge pipe (605) is connected to the material trough (501) via a hose.

7. A pavement pouring device for concrete construction according to claim 6, characterized in that: The vibrating unloading mechanism (6) further comprises a mounting ring (6051) and a tooth block (6053); the mounting ring (6051) is sleeved and fixedly connected to the unloading tube (605); racks (6052) are fixedly connected to the front and rear sides of the mounting ring (6051); the tooth blocks (6053) are slidably connected to the front and rear sides of the second sliding frame (604); a third spring is connected between the second sliding frame (604) and the tooth block (6053); the tooth block (6053) and the rack (6052) are in a meshing state; and a vibration rod (6054) is fixedly connected to the bottom of the tooth block (6053).

8. A pavement pouring device for concrete construction according to claim 7, characterized in that: The vibrating unloading mechanism (6) also includes a fifth connecting rod (606), the outer walls of a plurality of unloading tubes (605) are rotatably connected to the fifth connecting rod (606), one end of the fifth connecting rod (606) is rotatably connected to a crankshaft (607), one side of the crankshaft (607) is fixedly connected to a second sliding rod (608), and the other side is fixedly connected to a third sliding rod (609), the second sliding rod (608) and the third sliding rod (609) are slidably connected, the two second sliding rods (608) located on the front and rear sides are respectively rotatably connected to the two first support frames (1), and the second sliding rod (608) located on the rear side is connected to the second belt transmission assembly (504).

9. A pavement pouring device for concrete construction according to claim 1, characterized in that: The invention also comprises a rolling flattening assembly (7) and a residual material scraping assembly (8); a second supporting frame (102) is fixedly connected to the left side of the first supporting frame (1); a gear set (103) is installed on the second supporting frame (102); a rolling flattening assembly (7) and a residual material scraping assembly (8) are installed between the two first supporting frames (1); the rolling flattening assembly (7) comprises a friction roller (701); a friction roller (701) is rotatably connected to one side of the first supporting frame (1); one end of the friction roller (701) is connected to the gear set (103); a plurality of rolling rods (702) are linearly distributed between the two friction rollers (701); two adjacent rolling rods (702) are threadedly connected; and the rolling rods (702) located at the front and rear sides are respectively threadedly connected to the two friction rollers (701).

10. A pavement pouring device for concrete construction according to claim 9, characterized in that: The residual material scraping assembly (8) comprises an auger sleeve (801), one side of the first support frame (1) is rotatably connected to the auger sleeve (801), one end of the auger sleeve (801) is connected to the gear set (103), and the two auger sleeves (801) are threadedly connected to a bidirectional auger (802).

Citation Information

Patent Citations

  • Double-layer continuous paving construction process for road construction

    CN111074730A

  • Asphalt concrete pavement uniform paving and thickness detecting device and using method

    CN112431094A

  • Large-slump concrete pavement uniformity on-site testing device and method

    CN113605186A

  • Concrete vibration extrusion bulldozing device for prefabricated part production and concrete spreader

    CN214925531U

  • Method and apparatus for creating multilayer global map by using agent equipped with multimodal sensor

    KR1020210136330A

Cited By

  • Pouring equipment for foamed concrete

    CN120816587A

  • Vibration compaction device capable of improving edge collapse of subgrade filling, and construction method

    WO2026184007A1