Six-arm top anchor rod driving and anchoring machine

By designing a six-arm top anchor bolt excavator, synchronous top anchor bolt operation and large platform support of coal mine tunnel bolt equipment is achieved, solving the problems of excavation imbalance and low anchor bolt support efficiency, and improving the excavation safety and efficiency.

CN119266848APending Publication Date: 2025-01-07HEBEI JINGLONG INTELLIGENT EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411568210.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-05
Publication Date
2025-01-07

AI Technical Summary

Technical Problem

The existing coal mine tunnel boring equipment in most parts of China has caused imbalance in the excavation and subsidies, high labor intensity for workers, low support efficiency for top anchors and poor safety.

Method used

A six-arm top anchor bolt anchor excavator is designed. Through the extension and rotation settings of the right anchor bolt drill part and the left anchor bolt drill rig, the synchronous operation of the six-part top anchor bolt drill rig is achieved, and it is equipped with a large platform and an intermediate big arm support group. , improve support efficiency and safety.

Benefits of technology

It achieves full coverage support of the top anchor in the shortest time, reduces the labor intensity of workers, improves the safety of excavation and equipment use efficiency, and is suitable for large tunnel construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119266848A_ABST
    Figure CN119266848A_ABST
Patent Text Reader

Abstract

The invention discloses a six-arm top anchor rod driving and anchoring machine which comprises a body part, a cutting part, a right anchor rod drilling machine part and a left anchor rod drilling machine part. The right jumbolter part is assembled on the right side of the upper part of the body part through a right telescopic arm and can extend out to move to the head-on right side of the bolter miner; the left jumbolter part is assembled on the left side of the upper part of the body part through a left telescopic arm and can extend out to move to the head-on left side of the miner; the structure of the left jumbolter part and the structure of the right jumbolter part are symmetrical, synchronous stretching and synchronous symmetrical rotation are achieved, and synchronous operation of six-arm top anchor rods is achieved. When needing anchor rods, the six-part top anchor rod drilling machine slides to the head, symmetrically rotates by 90 degrees to form a row, synchronously stretches out and synchronously rotates, does not interfere with one another, meets the requirement for height lifting, achieves synchronous top anchor rod operation of the six-part top anchor rod drilling machine with the head evenly arranged, can achieve all supporting of top anchor rods in the shortest time, and improves the working efficiency. The hollow roof tunneling time is greatly shortened, the safety of head-on workers is guaranteed, and the construction requirements of large roadways are met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of coal mine tunnel excavation support equipment, in particular to a six-arm top bolt bolter. Background Art

[0002] With the national policy of building green mines and smart mines in the coal mining field in recent years, coal mining production has reached a new level in terms of safety, efficiency, greenness, intelligence, etc., and various main engine manufacturers are also vigorously responding to national policies, making every effort to ensure the safety and efficiency of tunnel excavation, and constantly upgrading their products. However, the imbalance between mining and excavation is still the most prominent, and the main reason is the imbalance between excavation and support.

[0003] At present, the methods to solve the imbalance of excavation and support are divided into two categories: one is the synchronous operation of excavation and support; the other is to excavate first and then support. Among them, the excavation and anchoring machine (such as Sandvik's MB670, etc.) used in the synchronous operation of excavation and support is currently a very good way to solve this problem. The equipment forms a lane in one time, supports the top anchor and the side anchor in parallel, the working process is continuous, the empty top time is short, the excavation efficiency is high, and it is safe and efficient. However, due to structural limitations, this equipment requires a large empty top distance in the lane, at least between 1.5 and 2m, and has a large disturbance to the surrounding rock of the lane. Since most of the geological conditions in my country are poor and the surrounding rock is unstable, it is easy to have various adverse working conditions such as roof collapse, side wall spalling, bulging top, bulging bottom, faults, etc., so this type of equipment cannot exert its powerful excavation capacity in 90% of the mines in China, and the cost is more than 10 million yuan, which is very expensive. It is not the current mainstream excavation and anchoring equipment and cannot solve the problem of mining and excavation imbalance in about 90% of China's coal mines.

[0004] There are many methods of tunneling with excavation first and support later, such as: (1) The most common method is to use a tunneling machine and a mining pneumatic anchor drill in combination. The general working steps are as follows: the tunneling machine first excavates and then leaves the bottom coal before retreating. The worker stands on the coal pile and holds the pneumatic anchor drill to carry out anchor and cable support. This method has good mobility and simple operation, but the labor intensity of the workers is high and the safety is poor. (2) The tunneling machine and the mining two-arm anchor drill vehicle are used in combination. The general working steps are as follows: the tunneling machine first excavates without leaving the bottom coal and then retreats to pass the anchor drill vehicle. The anchor drill vehicle enters the working face and supports the entire section or part of the section. This method greatly reduces the labor intensity of the workers and is slightly safer than a handheld pneumatic drill. However, due to the limited space of the entire machine, the operating station platform is relatively small, the movement space is limited, the ergonomic matching is not satisfactory, the equipment movement is relatively complex and the hole is difficult to align, and the anchor support efficiency is lower than that of a handheld pneumatic anchor. (3) The continuous mining machine and the mining anchor drill vehicle are used in combination. Two or three tunnels are excavated simultaneously, and joint tunnels are opened between the tunnels. The continuous mining machine excavates tunnel 1, and the anchor drilling vehicle supports tunnel 2. The equipment works in a staggered manner. This method has a long effective working time of the equipment, a high equipment utilization rate, and high excavation efficiency. Since the geological conditions of most coal mines in China are relatively poor, this excavation work method has a long staggered time, resulting in a long empty roof reservation time, which is prone to accidents such as roof collapse and rock collapse. The country prohibits the use of this excavation method. (4) The rear-mounted anchor mining machine is used in conjunction with various anchor rod and cable equipment. The general working steps are as follows: first dig one row, without retreating the machine, the cutting part is centered, the cutting head is grounded, and then the anchor drills on the two platforms slide to the front. The two anchor drills theoretically support the entire section, but the actual efficiency is low, and the supporting equipment needs to be used in conjunction with each other. In addition, due to the limited space of the entire machine, the operating station platform is relatively small, the movement space is limited, the ergonomic matching is not satisfactory, the equipment movement is relatively complex and the hole is difficult to align, and the anchor support efficiency is lower than that of handheld pneumatic anchors. (5) The anchor drill and anchor transfer unit are used in conjunction with each other. The general working steps are as follows: the anchor drill first digs one or two rows without retracting the machine, with the cutting part centered and the cutting head grounded. The operator then stands on the platform and uses its own hydraulic anchor drill to carry out top anchor support and partial auxiliary anchor support. The anchor transfer unit that follows immediately drives the remaining anchors and cables. This anchor drill is more advanced than the above equipment that digs first and then supports. It is safer for personnel and more efficient in digging. The disadvantage is that the workload for later maintenance is also large. At present, domestic and foreign products are relatively immature and are all under research and improvement.

[0005] This application is based on the above-mentioned unbalanced situation of excavation and support, and innovates a six-arm top anchor bolter and boring machine, which enables workers to stand on a large platform with a full section and operate six top anchor drilling rigs for synchronous support, thereby improving the efficiency of top anchor support and shortening the excavation empty top time, thereby solving the difficult problems of high labor intensity of workers, low efficiency of top anchor support and poor personnel safety. It is the first top anchor bolter and boring machine in the country with strong integration and reasonable design. Summary of the invention

[0006] The technical problem to be solved by the present invention is to provide a six-arm top anchor bolter, which enables workers to stand on a large platform with a full section and operate six top anchor drilling rigs for synchronous support, thereby improving the efficiency of top anchor support and shortening the time of empty top excavation. It is the first top anchor bolter in the country with a high degree of integration and reasonable design, thus solving the problems of high labor intensity for workers, low efficiency of top anchor support and poor personnel safety.

[0007] In order to solve the above technical problems, the present invention provides a six-arm top bolt bolter, comprising a main body, a walking part arranged at the bottom of the main body, a cutting part arranged at the front end of the main body, and a right bolt drilling machine part and a left bolt drilling machine part;

[0008] The right anchor drilling rig part is arranged on the upper right side of the main body part through the right telescopic arm group, and can be moved to the right side position of the anchor mining machine under the telescopic action of the right telescopic arm group; the right anchor drilling rig part comprises a right rotary sliding seat group, a right sliding frame group, a right lifting frame group, a right lifting slide group, a first anchor drilling rig, a second anchor drilling rig and a third anchor drilling rig, the right rotary sliding seat group is installed on the protruding end of the right telescopic arm group through a right hydraulic swing cylinder arranged at the lower part thereof, the right sliding frame group is arranged on the right rotary sliding seat group through a right speed-multiplying mechanism, the right lifting frame group is fixed on the right sliding frame group, the right lifting slide group is arranged on the right lifting frame group for lifting up and down through the right lifting speed-multiplying mechanism, the first anchor drilling rig and the second anchor drilling rig The machines are respectively arranged at the left and right ends of the right lifting slide group through the rotation of the first swing seat group and the second swing seat group, and the third anchor drilling rig is rotationally arranged in the middle position of the right lifting slide group, and the first anchor drilling rig, the second anchor drilling rig and the third anchor drilling rig are all adjusted in front and back, left and right directions through the left and right swing cylinders and the front and back swing cylinders. When the right rotary sliding seat group moves to the head position of the anchor mining machine under the extension of the right telescopic arm group, it is rotated under the swinging action of the right hydraulic swing cylinder, so that the first anchor drilling rig, the second anchor drilling rig and the third anchor drilling rig are flush with the head working surface, and are lifted up under the action of the right lifting speed mechanism, and the synchronous top anchor operation of the hole is quickly realized under the action of the left and right swing cylinders and the front and back swing cylinders;

[0009] The left anchor drilling rig part is arranged on the upper left side of the main body part through the left telescopic arm group, and can be moved to the left side of the front of the anchor driller under the extension of the left telescopic arm group. The structure of the left anchor drilling rig part is symmetrical with that of the right anchor drilling rig part, realizing synchronous telescopic movement and synchronous symmetrical rotation, so as to achieve synchronous operation of the six-arm top anchor.

[0010] Further improvement, the first anchor drilling rig, the second anchor drilling rig and the third anchor drilling rig are respectively provided with a vertically arranged top anchor operating table for controlling the precise hole finding operation of the corresponding drilling rig, and the top anchor operating tables arranged on the first anchor drilling rig and the second anchor drilling rig are symmetrically arranged in structure and are both arranged on the inner side of the corresponding drilling rig;

[0011] An emergency stop button is arranged on the upper part of the top anchor rod operating platform, and an emergency stop cover is arranged on the outer periphery of the emergency stop button.

[0012] As a further improvement, the distances between the first anchor drilling rig, the second anchor drilling rig and the third anchor drilling rig are equal, and the spacing distance is 800-1000mm.

[0013] Further improvement, the right telescopic arm group includes a right slide group, a right fixed plate, a right outer sleeve, a right inner sleeve, a right first-level telescopic oil cylinder, and a right second-level telescopic oil cylinder. The right slide group is installed on the upper right side of the walking part, and the right outer sleeve is slidably installed on the right slide group through the right fixed plate, and the right outer sleeve slides forward and backward along the right slide group under the action of the right first-level telescopic oil cylinder, the right inner sleeve is arranged inside the right outer sleeve, and realizes the second-level sliding forward and backward under the action of the right second-level telescopic oil cylinder, the right hydraulic swing cylinder is fixed to the protruding end of the right inner sleeve, and a right adjustment pressure plate group is installed between the right outer sleeve and the right inner sleeve, which is used to adjust the gap between the right outer sleeve and the right inner sleeve;

[0014] The structure of the left telescopic arm group is symmetrical to the structure of the right telescopic arm group.

[0015] Further improvement, also includes an intermediate boom support group, the intermediate boom support group includes a boom outer sleeve, a secondary telescopic sleeve, a tertiary telescopic sleeve that are sleeved together, and a boom telescopic cylinder disposed between the boom outer sleeve and the tertiary telescopic sleeve, as well as a boom lifting cylinder and a support main frame group;

[0016] The rear end of the boom outer sleeve is used to be hinged with the rear support part of the anchor mining machine, the front end bottom of the boom outer sleeve is hinged with one end of the boom lifting cylinder, and the other end of the boom lifting cylinder is hinged in the middle of the upper part of the main body. A front and rear swing cylinder is installed on the front end base of the three-stage telescopic sleeve, and a swing cylinder connecting frame is straddled at both ends of the front and rear swing cylinders, and a left and right swing cylinder is installed on the swing cylinder connecting frame. The support main frame group is installed on the left and right swing cylinders. The support main frame group can be lifted and extended to a head-on position of 1m beyond the cutting head of the cutting part under the action of the boom lifting cylinder and the boom telescopic cylinder, corresponding to the six-arm drilling rig position of the right anchor drilling rig part and the left anchor drilling rig part of the extending operation, and the support main frame group can realize left and right angular rotation under the action of the left and right swing cylinders, and realize front and rear angular rotation under the action of the front and rear swing cylinders.

[0017] A further improvement is provided in that the supporting main frame group comprises a main frame and a front telescopic frame, a right telescopic frame and a left telescopic frame arranged thereon, the front telescopic frame being extended forward relative to the main frame by a front telescopic cylinder, and a right head-on protection frame and a left head-on protection frame are also provided below the front end of the front telescopic frame, the right head-on protection frame and the left head-on protection frame are both extended forward by a head-on protection cylinder to achieve the function of protecting the head; the right telescopic frame and the left telescopic frame are respectively extended to the right and to the left relative to the main frame by side telescopic cylinders, and front telescopic rods are provided at the outer side rods of the right telescopic frame and the left telescopic frame to achieve the same forward and backward telescopic movement as the front telescopic frame.

[0018] A further improvement further includes a flip platform assembly arranged on the upper part of the cutting part, wherein the flip platform assembly includes a sliding platform and a main platform, wherein the bottom surface of the sliding platform is fixedly connected to the upper cover plate of the cutting part, and the top surface of the sliding platform is connected to the main platform via a rotating oil cylinder, so that the main platform can be flipped forward under the action of the rotating oil cylinder, and under the action of the sliding platform, the main platform can be brought close to the six-arm drilling rigs of the right anchor drilling rig part and the left anchor drilling rig part that are extended for operation;

[0019] The left and right sides of the main platform are respectively provided with a left platform and a right platform that can be turned 180 degrees. When the left and right platforms are unfolded, the total platform area is 2.6 times the area of ​​the folded platform.

[0020] It also includes guardrail posts inserted on the edges of the unfolding platform. There are multiple guardrail posts, which are connected to each other by circular chain to play a safety protection role.

[0021] Further improvement, the main body includes a main body frame, a rotary oil cylinder, a rotary bearing, and a rotary table, the main body frame is connected to the bottom of the outer ring of the rotary bearing, the inner ring of the rotary bearing is connected to the rotary table, and the rotary oil cylinder is connected between the main body frame and the rotary table by a pin shaft;

[0022] The cutting part includes a cutting motor, a reducer, a telescopic part and a cutting head which are connected in sequence. The rear end of the cutting motor is hinged to the rotating table of the main body. A telescopic cylinder is installed between the reducer and the telescopic part. The cutting head can move forward, backward, left and right under the action of the rotating cylinder and the telescopic cylinder to complete the coal and rock cutting operation.

[0023] Further improvement, including a shovel plate part, a first conveyor part, a rear support part and a second conveyor connecting frame assembly,

[0024] The shovel plate part is hinged to the front lower part of the main body part, and a shovel plate oil cylinder is provided between the shovel plate part and the main body part, which is used to realize the lifting and lying of the shovel plate through the extension and contraction of the shovel plate oil cylinder;

[0025] The first conveyor part runs through the interior of the main body part, and includes a front chute of the conveyor, a middle part of the conveyor, a conveyor swing cylinder, a conveyor swing part, a driving device, a spray block, a scraper chain, a chain pressure plate, and a tensioning cylinder. The front chute of the conveyor is connected to the middle part of the conveyor part by a pin shaft, and the conveyor swing part is connected to the middle part of the conveyor part by upper and lower pin shafts, and swings left and right under the action of the conveyor swing cylinder. The driving device is inserted at the rear end of the conveyor swing part, and the spray block is installed above the conveyor swing part to spray dust reduction. The scraper chain is laid in the first conveyor chute and enters the first conveyor chain return cavity through the driving device and then bypasses the driven wheel to form a closed loop for transporting materials. The chain pressure plate is installed on the inner side of the chute to maintain a certain distance from the scraper chain to prevent the scraper chain from jumping and falling off. The tensioning cylinder is installed on the conveyor swing part and the middle part of the conveyor so that the conveyor swing part can swing left and right to adapt to various working conditions.

[0026] The front half-open waist-shaped hole of the front chute of the conveyor cooperates with the pin shaft installed at the connection between the shovel plate part and the main body part as a fulcrum, and the rear end hole of the front chute of the conveyor is connected with the rear end hole of the rear support part through a pin shaft as a fulcrum, so that the front chute of the conveyor is fixed by the front and rear fulcrums, and the middle part of the conveyor is connected with the rear support part through an oil cylinder support, and the up and down lifting and lowering activities of the middle part of the conveyor and the swing part of the conveyor are realized by the up and down extension and retraction of the supporting oil cylinder;

[0027] The rear support part comprises a rear support frame, a support leg oil cylinder and a support leg, wherein the rear support frame is mounted at the rear end of the main body, the bottom of the rear support frame is hinged to the support leg, and the support leg oil cylinder is connected between the rear support frame and the support leg to realize downward support and upward retraction of the support leg;

[0028] The second transport connecting frame assembly is installed at the rear end of the rear support part to achieve connection with the second transport machine.

[0029] Further improvements include a right control panel assembly and a left control panel assembly, wherein the right control panel assembly is installed on the right side of the overlapping connection between the main body and the rear support portion, and the left control panel assembly is installed on the left side of the overlapping connection between the main body and the rear support portion. The right control panel assembly is used to control anchoring operations and has "one-key deployment" and "one-key retraction" functions, and the left control panel assembly is used to control the cutting, walking and transportation operations of the anchor mining machine, and the two operating platforms are hydraulically interlocked and do not interfere with each other.

[0030] After adopting such a design, the present invention has at least the following advantages:

[0031] 1. The six-arm top anchor bolter of the present invention can realize that when the anchor bolt is needed, the six top anchor bolters can slide to the head and rotate 90 degrees into a row, extend and rotate synchronously, without interfering with each other, and meet the height lifting requirements, so as to realize the synchronous top anchor operation of the six anchor bolters arranged evenly in the head, support the head anchors and anchor cables in rows, ensure the safety of the personnel in the tunnel, and realize the full support of the top anchor in the shortest time, greatly shorten the time of excavation hollow top, ensure the safety of the head workers in the shortest time, and meet the construction requirements of large tunnels. The six-arm top anchor bolter will become the most arranged structure of the anchor bolter that can be normally used in conventional large tunnels in the coal machinery industry.

[0032] 2. The six-arm top anchor bolter of the present invention adopts a multi-degree-of-freedom telescopic middle arm support group structure for long-distance transportation, so that it has good rigidity and is not prone to deflection and deformation. The supporting force meets the coal safety standards, and it has left and right telescopic functions, forward telescopic functions, and head-on protection functions. The unfolded area is 3 times the unfolded area, providing a safe and efficient working environment for lifting meshes, steel beams, and workers below.

[0033] 3. The six-arm top anchor bolter of the present invention is also able to realize the unfolding of the platform during the anchor support operation by arranging a flip platform assembly on the upper part of the cutting part, so that the total platform area after the platform is unfolded is 2.6 times the area of ​​the folded platform, almost reaching the large platform structure of the whole section, and the large platform also has the functions of up and down leveling and front and rear distance adjustment, which greatly facilitates the anchor support operation of personnel and greatly expands the space for personnel to move. It is convenient and quick to escape in case of emergencies. During the support operation, the personnel's body is stable, and there is no need to worry about the unsafe factors of not being able to stand firmly or tilting the body. It ensures the safety and efficiency of the personnel at work and completely changes the traditional small platform structure.

[0034] 4. The anchor miner of the present invention adopts a double operating platform symmetrically arranged structure to improve the stability of the left and right sliding of the anchor miner. The left operating platform controls the cutting, walking, transportation and other operations of the anchor miner, and the right working platform controls the anchor protection operations. The two operating platforms are hydraulically interlocked and do not interfere with each other. The operation is completed by one driver, which is safe and reliable. In the support mode, the anchor miner also has the functions of "one-key expansion" and "one-key retraction", automatically performs the drilling state and the cutting state, and completes nine actions with one key, which simplifies the complexity and works efficiently.

[0035] 5. The left and right anchor drills in the anchor drill of the present invention are both equipped with the "one-button drilling" function. The left and right top anchor drills are symmetrically arranged and reasonably spaced according to the process requirements of the mine's anchor support. Each top anchor drill is equipped with a one-button drilling automatic drilling valve group. When the automatic drilling valve group switch is operated, the drilling motor rotates forward and the drilling mechanism moves upward. The anchor drill of the present invention can adopt manual and semi-automatic integrated drilling functions. One person can operate three top anchor drills at the same time without affecting each other and working in coordination. Each anchor drill is also equipped with an emergency stop button function to maximize the safety of personnel operation and reduce the labor intensity of workers. A structure is designed to prevent accidental touching of the handle and a structure is designed to lock the operating handle when not in operation.

[0036] 6. The first conveyor of the anchor miner of the present invention adopts a middle single chain for transportation, and the tail of the machine can realize the functions of up and down lifting and left and right swinging, which can adapt to the coal dropping of the rear supporting equipment of different heights and forms, various tunnels deformed by mine pressure, and material transportation when turning, saving the pulling and moving time of the rear supporting belt conveyor, making the equipment more adaptable in production and more efficient in excavation.

[0037] 7. In the cutting mode, the anchor miner of the present invention has the function of completing cutting and centering the cutting part with one button. It has accurate positioning and quick response. Several complicated actions can be controlled with one button, which saves tunnel excavation time and ensures the execution of related actions such as sliding of the support mechanism.

[0038] 8. The anchor digger of the present invention also has intelligent functions, which can realize local operation, line-of-sight wireless remote operation, underground remote visualization operation or ground remote control operation. The control system has the functions of autonomous positioning, attitude determination and orientation of the tunnel boring machine equipment; it has the function of deviation reminder alarm; it has the real-time position of the cutting head and the tunneling trajectory, and displays the real-time position of the cutting head relative to the section. It is used to judge the forming condition of the section when the dust is blindly excavated. It has the function of automatic cutting with one key start, and the function of automatically returning to the initial position after the cutting is completed; the equipment has the function of profiling and memory cutting, and the system records multiple sets of different profiling actions; it has the function of stopping when personnel approach; it has a variety of intelligent functions such as accurate positioning of personnel and accurate display of the relative position of personnel and the tunnel boring machine, making excavation more intelligent, personnel safer, and production more efficient. The anchor digger has made corresponding changes in the product mechanical structure, hydraulic pipeline direction, layout, valve block, operation mode, worker safety, operability, and maintainability. It is a truly fully functional, safe, reliable, and efficient anchor digger equipment, which is a great progress in the entire industry. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] The above is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0040] Figure 1 , 2 They are respectively the front view and the top view of the bolter digging machine of the present invention in the retracted walking state.

[0041] Figure 3 It is a right side schematic diagram of the bolter excavator of the present invention in the retracted walking state.

[0042] Figure 4 It is a front view schematic diagram of the main body of the bolter digging machine of the present invention.

[0043] Figure 5 It is a front schematic diagram of the cutting part of the bolter miner of the present invention.

[0044] Figure 6 It is a front schematic diagram of the traveling part of the bolter excavator of the present invention.

[0045] Figure 7 It is a schematic front view of the shovel plate portion of the bolter digging machine of the present invention.

[0046] Figure 8 , 9 They are respectively the front view and top view of the first conveyor of the anchor miner of the present invention.

[0047] Fig.10 It is a schematic cross-sectional view of the first conveyor of the anchor miner of the present invention.

[0048] Fig.11It is a top view schematic diagram of the swinging of the first conveyor of the anchor miner of the present invention.

[0049] Fig.12 It is a front schematic diagram of the lifting of the first conveyor of the anchor miner of the present invention.

[0050] Fig.13 It is a front schematic diagram of the rear support portion of the bolter miner of the present invention.

[0051] Fig.14 , 15 16 are respectively the front view, right view and rear view schematic diagrams of the right bolting machine part of the anchor drill of the present invention.

[0052] Fig.17 , 18 They are respectively the front view and top view of the right telescopic arm group of the bolter miner of the present invention.

[0053] Fig.19 , 20 21 are respectively the front view, right view and rear view schematic diagram of the left anchor drilling machine part of the anchor mining machine of the present invention.

[0054] Fig. 22 It is a front schematic diagram of the lifting of the left anchor drilling rig part of the bolter digging machine of the present invention.

[0055] Fig.23 , 24 They are respectively the front view and top view of the left telescopic arm group of the anchor miner of the present invention.

[0056] Fig.25 , 26 They are respectively the front view and top view of the middle boom support group of the anchor miner of the present invention.

[0057] Fig. 27 , 28 They are respectively the front view and top view of the unfolded left flip platform assembly of the anchor miner of the present invention.

[0058] Fig.29 , 30 They are respectively the front view and top view of the anchor drill of the present invention in the state of deploying the anchor.

[0059] The above drawings include the following reference numerals:

[0060] 1. Cutting part, 2. Right anchor drilling rig part, 3. Right telescopic arm group, 4. Right operating console assembly, 5. Electrical system, 6. First conveyor part, 7. Second transport connecting frame assembly, 8. Water system, 9. Hydraulic system, 10. Rear support part, 11. Main body, 12. Left anchor drilling rig part), 13. Traveling part, 14. Flip platform assembly, 15. Shovel board part, 16. Lubrication system, 17. Left operating console assembly, 18. Left telescopic arm group, 19. Middle boom support group.

[0061] 1-1. Cutting motor, 1-2. Reducer, 1-3. Telescopic part, 1-4. Cutting head, 1-5. Telescopic cylinder.

[0062] 2-1 top anchor operating table, 2-2 emergency stop button, 2-3 emergency stop cover, 2-5 second right anchor drilling rig, 2-6 right lifting and speed increasing mechanism, 2-8 first right swing seat group, 2-10 right sliding frame group, 2-11 right lifting frame group, 2-12 right lifting slide group, 2-14 second right swing seat group, 2-16 right speed increasing mechanism, 2-17 right hydraulic swing cylinder, 2-18 right rotary sliding seat group, 2-19 first right anchor drilling rig, 2-20. Third right anchor drilling rig.

[0063] 3-1. Right telescopic cylinder fixing seat, 3-2. Right first-stage telescopic cylinder, 3-3. Right boom cylinder fixing seat, 3-4. Right slideway assembly, 3-5. Right second-stage telescopic cylinder, 3-6. Right outer sleeve, 3-7. Right inner sleeve, 3-8. Right adjustment pressure plate assembly, 3-9. Right fixing plate.

[0064] 6-1. Conveyor front chute, 6-2. Conveyor middle part, 6-3. Conveyor swing cylinder, 6-4. Conveyor swing part, 6-5. Driving device, 6-6. Spray block, 6-7. Scraper chain, 6-8. Chain pressure plate, 6-9. Tensioning cylinder, 6-10. Support seat.

[0065] 10-1. Rear support frame, 10-2. Support leg cylinder, 10-3. Support leg.

[0066] 11-1. Main frame, 11-2. Rotary cylinder, 11-3. Rotary bearing, 11-4. Rotary table.

[0067] 12-5. The second left anchor drilling rig, 12-6. The left lifting and speed increasing mechanism, 12-8. The first left swing seat group, 12-10. The left sliding frame group, 12-11. The left lifting frame group, 12-12. The left lifting slide group, 12-14. The second left swing seat group, 12-16. The left speed increasing mechanism, 12-17. The left hydraulic swing cylinder, 12-18. The left rotary sliding seat group, 12-19. The first left anchor drilling rig, 12-20. The third left anchor drilling rig.

[0068] 13-1. Walking frame, 13-2. Track chain, 13-3. Tensioning cylinder, 13-4. Guide wheel, 13-5. Supporting wheel, 13-6. Driving wheel.

[0069] 14-1. Right platform, 14-2. Rotating cylinder, 14-3. Flipping cylinder, 14-4. Sliding platform, 14-5. Main platform, 14-6. Left platform, 14-7. Guardrail column, 14-8. Left connecting rod plate, 14-9. Round link chain, 14-10. Right connecting rod plate.

[0070] 15-1. Main shovel plate, 15-2. Left star wheel, 15-3. Left shovel plate, 15-4. Right star wheel, 15-5. Right shovel plate, 15-6. Driven wheel.

[0071] 18-1. Left telescopic cylinder fixing seat, 18-2. Left first-stage telescopic cylinder, 18-3. Left boom cylinder fixing seat, 18-4. Left slideway assembly, 18-5. Left second-stage telescopic cylinder, 18-6. Left outer sleeve, 18-7. Left inner sleeve, 18-8. Left adjustment pressure plate assembly, 18-9. Left fixing plate.

[0072] 19-1. Left and right swing cylinders, 19-2. Swing cylinder connecting frame, 19-3. Three-stage telescopic sleeve, 19-4. Two-stage telescopic sleeve, 19-5. Outer sleeve of the boom, 19-6. Middle boom fixing seat, 19-7. Lifting cylinder fixing seat, 19-8. Boom lifting cylinder, 19-9. Support main frame group, 19-10. Right telescopic frame, 19-11. Right front telescopic rod, 19-12. Front telescopic frame, 19-13. Right front protection frame, 19-14. Boom telescopic cylinder, 19-15. Front and rear swing cylinders, 19-16. Left front protection frame, 19-17. Front protection cylinder, 19-18. Side telescopic cylinder, 19-19. Left telescopic frame, 19-20. Front telescopic cylinder, 19-21. Left front telescopic rod, 19-22. Main frame. DETAILED DESCRIPTION

[0073] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application.

[0074] It should be noted that, unless otherwise specified, all technical and scientific terms used in this application have the same meanings as commonly understood by ordinary technicians in the technical field to which this application belongs.

[0075] In the present invention, unless otherwise specified, the directional words used, such as "front, back, left, right, top, bottom", usually refer to the directions indicated in the drawings, or to the components themselves in the vertical, perpendicular or gravity directions; similarly, for ease of understanding and description, "inside and outside" refer to the inside and outside relative to the outline of each component itself, but the above directional words are not used to limit the present invention.

[0076] In order to shorten the time of the tunnel head-on empty top, maximize the safety of the head-on personnel and the efficiency of the anchor support, this embodiment provides a six-arm top anchor bolter.

[0077] Reference Figures 1 to 3As shown, the six-arm top anchor bolter excavator of this embodiment includes a cutting part 1, a right anchor drilling rig part 2, a right telescopic arm group 3, a right operating console assembly 4, an electrical system 5, a first conveyor 6, a second conveyor connecting frame assembly 7, a water system 8, a hydraulic system 9, a rear support part 10, a main body 11, a left anchor drilling rig part 12, a walking part 13, a flip platform assembly 14, a shovel board part 15, a lubrication system 16, a left operating console assembly 17, a left telescopic arm group 18, and an intermediate boom support group 19.

[0078] The arrangement relationship of the bolter mining machine structure is as follows: the cutting part 1 is installed above the front end of the main body 11, and is used for cutting coal and rock. The walking part 13 is installed on both sides below the main body 11. The left telescopic arm group 18 and the right telescopic arm group 3 are respectively installed on the left and right sides of the walking part 13. The left telescopic arm group 18 is installed with the left anchor drilling machine part 12, and the right telescopic arm group 3 is installed with the right anchor drilling machine part 2. The rear support part 10 is connected to the rear of the main body 11, and plays the role of supporting and stabilizing the fuselage and installing the main components of the electrical system 5 and the hydraulic system 9. The rear of the rear support part 10 is also connected to the second transport connecting frame assembly 7. The shovel board part 15 is hinged to the front end of the main body 11 through a pin shaft. The shovel board part 15 is connected to the main body 11 by a shovel board oil cylinder. The lifting and lying of the shovel board are realized by the extension and contraction of the shovel board oil cylinder, which plays the role of lifting and lowering the shovel board part 15, collecting materials, supporting and stabilizing the fuselage. The first conveyor 6 runs through the main body 11, the front semi-open waist-shaped hole of the conveyor front chute 6-1 cooperates with the pin installed at the connection between the shovel plate 15 and the main body 11 as a fulcrum, the rear end hole of the conveyor front chute 6-1 is connected with the rear end hole of the rear support 10 through a pin as a fulcrum, and the conveyor front chute 6-1 is a fixed section of the first conveyor 6 through the front and rear fulcrums, and the conveyor middle part 6-2 is connected with the rear support 10 through the oil cylinder support, and the conveyor middle part 6-2 and the conveyor swing part 6-4 of the first conveyor 6 can realize the function of up and down lifting and lowering through the up and down extension of the supporting oil cylinder, so as to meet the matching use of different rear supporting equipment. The intermediate boom support group 19 is installed in the middle position above the rear support 10 to play a supporting role. The left control panel assembly 17 is installed on the left side of the main body to control the cutting, walking and transportation functions during excavation; the right control panel assembly 4 is installed on the right side of the main body 11 to control the functions during anchor support. The flip platform assembly 14 is installed on the cutting part 1. During anchor support, the flip platform assembly 14 flips to become a full-section large platform to support the anchor support for human operation. Except for the cutting part, the power of the remaining functions of the anchor miner basically relies on the conversion of electrical energy into hydraulic energy, and the conversion of hydraulic energy into kinetic energy. The main pump station assembly of the hydraulic system 9 is installed at the upper right side of the rear support part 10, and the oil tank assembly of the hydraulic system 9 is installed in the middle position of the rear support part 10 across the first conveyor 6. The main component of the electrical system 5, the electric control box, is installed on the left side of the rear support part 10, and the intelligent system is installed above the oil tank assembly of the whole machine. The remote visualization operation underground and the remote control operation on the ground are realized through the intelligent system of the whole machine.

[0079] Specifically, the main body 11 serves as the base of the bolter miner, and all basic components are installed around the main body 11. Figure 4 As shown, the main body 11 includes: a main body frame 11-1, a rotary oil cylinder 11-2, a rotary bearing 11-3, a rotary table 11-4 and other main parts. The main body frame 11-1 is connected to the bottom of the outer ring of the rotary bearing 11-3, the inner ring of the rotary bearing 11-3 is connected to the rotary table 11-4, the rotary oil cylinder 11-2 is connected between the main body frame 11-1 and the rotary table 11-4 by a pin shaft, and the rotary table 11-4 is rotated by the left and right extension of the rotary oil cylinder 11-2. The rotary table 11-4 is connected to the cutting part 1, thereby driving the cutting part 1 to cut coal and rock left and right.

[0080] See attached Figure 5 As shown, the cutting part 1 mainly includes: a cutting motor 1-1, a speed reducer 1-2, a telescopic part 1-3, a cutting head 1-4, and a telescopic cylinder 1-5. The speed reducer 1-2 is installed at the front end of the cutting motor 1-1, the rear end of the cutting motor 1-1 is connected to the turntable 11-4, the front end of the speed reducer 1-2 is connected to the telescopic part 1-3, the cutting head 1-4 is installed at the front end of the telescopic part 1-3, and the telescopic cylinder 1-5 is installed between the speed reducer 1-2 and the telescopic part 1-3. The rotation of the cutting motor 1-1 drives the rotation of the speed reducer 1-2, the speed reducer 1-2 transmits torque to the telescopic part 1-3, the telescopic part 1-3 transmits torque to the cutting head 1-4, and the cutting head 1-4 rotates to break coal and rock.

[0081] The walking part 13 is installed on both sides of the main body 11 to provide the equipment with functions such as moving forward, moving backward, and turning. Figure 6 As shown, the walking part 13 mainly includes: a walking frame 13-1, a crawler chain 13-2, a driving wheel 13-6, a guide wheel 13-4, a supporting roller 13-5, a tensioning cylinder 13-3 and other components. The driving wheel 13-6 is installed at the rear end of the walking frame 13-1, the guide wheel 13-4 is installed at the front end of the walking frame 13-1, the supporting roller 13-5 is installed at the bottom of the walking frame 13-1, the tensioning cylinder 13-3 is installed at the rear end of the guide wheel 13-4, and the crawler chain 13-2 wraps the walking frame 13-1 to form the entire left and right walking mechanism. The left and right walking mechanisms constitute the walking part 13, which provides the walking power for the whole machine to move forward, backward, climb and turn.

[0082] See attached Figure 7As shown, the shovel board part 15 includes: a main shovel board 15-1, a left star wheel 15-2, a left shovel board 15-3, a right star wheel 15-4, a right shovel board 15-5, a driven wheel 15-6 and other main parts. The left side of the main shovel board 15-1 is connected to the left shovel board 15-3, and the right side of the main shovel board 15-1 is connected to the right shovel board 15-5. The driven wheel 15-6 is installed on the front middle section of the main shovel board 15-1, and plays the role of rolling friction turning of the scraper chain 6-7. The left star wheel 15-2 is installed on the left shovel board 15-3, and the right star wheel 15-4 is installed on the right shovel board 15-5. The centrifugal force generated by the rotation of the left star wheel 15-2 and the right star wheel 15-4 causes the material to be thrown into the scraper chain 6-7 of the first conveyor part 6, so that the loading of the material is completed.

[0083] See attached Figures 8 to 10 As shown, the first conveyor part 6 includes: a conveyor front chute 6-1, a conveyor middle part 6-2, a conveyor swing cylinder 6-3, a conveyor swing part 6-4, a driving device 6-5, a spray block 6-6, a scraper chain 6-7, a chain pressure plate 6-8, a tensioning cylinder 6-9, a support seat 6-10 and other main components. The conveyor front chute 6-1 is connected to the conveyor middle part 6-2 by a pin shaft, and the conveyor middle part 6-2 is connected to the conveyor swing part 6-4 by two upper and lower pin shafts, which can realize the left and right swing of the conveyor swing part 6-4, as shown in the attached figure. Fig.11 As shown. The driving device 6-5 is inserted at the rear end of the conveyor swing part 6-4 to provide power for transporting materials. The spray block 6-6 is installed above the conveyor swing part 6-4 to spray and reduce dust. The scraper chain 6-7 of this equipment adopts a middle single chain transportation. The scraper chain 6-7 is laid in the chute of the first conveyor 6 and enters the chain return cavity of the first conveyor 6 through the driving device 6-5 and then bypasses the driven wheel to form a closed loop to transport materials. The chain pressure plate 6-8 is installed on the inner side of the chute to keep a certain distance from the scraper chain 6-7 to prevent the scraper chain from jumping or falling off. One end of the tensioning cylinder 6-9 is installed on the support seat 6-10, and the other end is supported by the driving device 6-5. The driving device 6-5 is moved backward by the movement of the tensioning cylinder to achieve the tensioning of the scraper chain 6-7.

[0084] The semi-open waist-shaped hole at the front end of the conveyor front chute 6-1 cooperates with the pin installed at the connection between the shovel plate part 15 and the main body part 11 as a fulcrum, and the rear end hole of the conveyor front chute 6-1 is connected to the rear end hole of the rear support part 10 through a pin as a fulcrum. The conveyor front chute 6-1 is a fixed section of the first conveyor 6 through the front and rear fulcrums. The conveyor middle part 6-2 is connected to the rear support part 10 through an oil cylinder support. The conveyor middle part 6-2 and the conveyor swing part 6-4 of the first conveyor 6 can realize the function of up and down lifting and lowering activities through the upward and downward extension of the supporting oil cylinder, as shown in the attached figure. Fig.12As shown, it can meet the matching use of different supporting equipment.

[0085] See attached Fig.13 As shown, the rear support part 11 is composed of the main parts such as the rear support frame 10-1, the support leg cylinder 10-2, and the support leg 10-3. The front end of the rear support frame 10-1 is fixedly connected to the main body 11, and the lower rear end of the rear support frame 10-1 is hinged to the support leg 10-3. The support leg cylinder 10-2 is connected between the rear support frame 10-1 and the support leg 10-3. The support leg 10-3 is supported downward and retracted upward by the extension and contraction of the support leg cylinder 10-2, so as to meet the functions of equipment excavation, track replacement and stable support, etc. The second transport connecting frame assembly 7 is installed at the rear end of the rear support part 10, and plays the role of connecting with the second transporter.

[0086] Please refer to the attached Figure 2 As shown, the upper part of the walking part 13 is also provided with a right anchor drill part 2 and a left anchor drill part 12. The right anchor drill part 2 is arranged on the upper right side of the main body 11 through the right telescopic arm group 3, and can be moved to the right side of the front of the anchor miner under the telescopic effect of the right telescopic arm group 3. The left anchor drill part 12 is arranged on the upper left side of the main body 11 through the left telescopic arm group 18, and can be moved to the left side of the front of the anchor miner under the telescopic effect of the left telescopic arm group 18.

[0087] For details, please refer to the attached Fig.14 , 15As shown in Figures 1 and 2, the right anchor drilling rig 2 includes: a right rotary sliding seat group 2-18, a right sliding frame group 2-10, a right lifting frame group 2-11, a right lifting slide group 2-12, a first right anchor drilling rig 2-19, a second right anchor drilling rig 2-5, and a third right anchor drilling rig 2-20. The right rotary sliding seat group 2-18 is installed on the extended end of the right telescopic arm group 3 through a right hydraulic swing cylinder 2-17 arranged at the lower part thereof. The right sliding frame group 2-10 is arranged on the right rotary sliding seat group 2-18 through a right speed-multiplying mechanism 2-16, the right lifting frame group 2-11 is fixed on the right sliding frame group 2-10, and the right lifting slide group 2-12 is arranged on the right lifting frame group 2-11 to be lifted and lowered by a right lifting speed-multiplying mechanism 2-6. The first right anchor drilling machine 2-19 and the second right anchor drilling machine 2-5 are respectively rotatably arranged at the left and right ends of the right lifting slide group 2-12 through the first right swing seat group 2-8 and the second right swing seat group 2-14, and the third right anchor drilling machine 2-20 is rotatably arranged at the middle position of the right lifting slide group 2-12. The first right anchor drilling machine 2-19, the second right anchor drilling machine 2-5 and the third right anchor drilling machine 2-20 are all adjusted in front and back, left and right angles through the left and right swing cylinders and the front and back swing cylinders. When the right rotary sliding seat group 2-18 moves to the head position of the anchor drill under the extension action of the right telescopic arm group 3, it rotates under the swing action of the right hydraulic swing cylinder 2-17, so that the first right anchor drill 2-19, the second right anchor drill 2-5 and the third right anchor drill 2-20 are flush with the head working surface, and are lifted under the action of the right lifting speed mechanism 2-6, and under the action of the left and right swing cylinders and the front and rear swing cylinders, the synchronous top anchor operation is quickly realized in the hole.

[0088] In this embodiment, the first right anchor drilling rig 2-19, the second right anchor drilling rig 2-5 and the third right anchor drilling rig 2-20 are each provided with a vertically arranged top anchor operating table 2-1, which is used to control the precise hole-finding operation of the corresponding drilling rig. The top anchor operating tables 2-1 arranged on the first right anchor drilling rig 2-19 and the second right anchor drilling rig 2-5 are symmetrically arranged in structure and are both arranged on the inner side of the corresponding drilling rig. An emergency stop button 2-2 is arranged on the upper part of the top anchor operating table 2-1, and an emergency stop cover 2-3 is arranged on the outer periphery of the emergency stop button 2-2.

[0089] See attached Fig.17 , 18As shown, the right telescopic arm group 3 includes: a right telescopic cylinder fixing seat 3-1, a right first-level telescopic cylinder 3-2, a right boom cylinder fixing seat 3-3, a right slide group 3-4, a right second-level telescopic cylinder 3-5, a right outer sleeve 3-6, a right inner sleeve 3-7, a right adjustment pressure plate group 3-8, a right fixing plate 3-9, etc. The right side slideway group 3-4 is installed on the upper right side of the walking part 13, and a slidable right fixed plate 3-9 is installed on the right side slideway group 3-4, and a right outer sleeve 3-6 is installed above the right fixed plate 3-9. A right inner sleeve 3-7 is installed inside the right outer sleeve 3-6, and a right secondary telescopic cylinder 3-5 is installed inside the right inner sleeve 3-7. One end of the right secondary telescopic cylinder 3-5 is installed on the right outer sleeve 3-6, and the other end is installed on the right inner sleeve 3-7. The right inner sleeve 3-7 can perform secondary telescopic movement, and a right adjusting plate group 3-8 is installed on the outside of the right outer sleeve 3-6. The gap between the right outer sleeve 3-6 and the right inner sleeve 3-7 is adjusted by the right adjusting plate group 3-8. One end of the right primary telescopic cylinder 3-2 is fixed to the right telescopic cylinder fixing seat 3-1, and the other end is fixed to the right boom cylinder fixing seat 3-3 to achieve primary sliding.

[0090] See attached Fig.19 , 20As shown in Figures 21, the left anchor drilling rig 12 includes: a left rotary sliding seat group 12-18, a left sliding frame group 12-10, a left lifting frame group 12-11, a left lifting slide group 12-12, a first left anchor drilling rig 12-19, a second left anchor drilling rig 12-5, and a third left anchor drilling rig 12-20. The left rotary sliding seat group 12-18 is installed on the extended end of the left telescopic arm group 18 through a left hydraulic swing cylinder 12-17 arranged at the lower part thereof. The left sliding frame group 12-10 is arranged on the left rotary sliding seat group 12-18 through a left speed-multiplying mechanism 12-16, the left lifting frame group 12-11 is fixed on the left sliding frame group 12-10, and the left lifting slide group 12-12 is arranged on the left lifting frame group 12-11 to be lifted and lowered by a left lifting speed-multiplying mechanism 12-6. The first left anchor drilling machine 12-19 and the second left anchor drilling machine 12-5 are respectively rotatably arranged at the left and right ends of the left lifting slide group 12-12 through the first left swing seat group 12-8 and the second left swing seat group 12-14, and the third left anchor drilling machine 12-20 is arranged at the middle position of the left lifting slide group 12-12. The first left anchor drilling machine 12-19, the second left anchor drilling machine 12-5 and the third left anchor drilling machine 12-20 are all adjusted in front and back, left and right angles through the left-left swing oil cylinder and the front-back swing oil cylinder. When the left rotary sliding seat group 12-18 moves to the front position of the anchor miner under the extension of the left telescopic arm group 18, it rotates under the swinging action of the left hydraulic swing cylinder 12-17, so that the first left anchor drilling rig 12-19, the second left anchor drilling rig 12-5 and the third left anchor drilling rig 12-20 are flush with the front working surface, and are lifted under the action of the left lifting speed increasing mechanism 12-6, as shown in the attached figure. Fig. 22 As shown, under the action of the left and right swing cylinders and the front and rear swing cylinders, the synchronous top anchor rod operation is quickly achieved on the hole.

[0091] Similarly, in this embodiment, the first left anchor drilling rig 12-19, the second left anchor drilling rig 12-5 and the third left anchor drilling rig 12-20 are respectively provided with a vertically arranged top anchor operating platform 2-1 for controlling the precise hole finding operation of the corresponding drilling rig. The top anchor operating platforms 2-1 arranged on the first left anchor drilling rig 12-19 and the second left anchor drilling rig 12-5 are symmetrically arranged in structure and are both arranged on the inner side of the corresponding drilling rig.

[0092] See attached Fig.23 , 24As shown, the left telescopic arm group 18 includes: a left telescopic cylinder fixing seat 18-1, a left first-stage telescopic cylinder 18-2, a left boom cylinder fixing seat 18-3, a left slide group 18-4, a left second-stage telescopic cylinder 18-5, a left outer sleeve 18-6, a left inner sleeve 18-7, a left adjustment pressure plate group 18-8, a left fixed plate 18-9, etc. The left slideway group 18-4 is installed on the upper left side of the walking part 13, and a slidable left fixed plate 18-9 is installed on the left slideway group 18-4. The left outer sleeve 18-6 is installed above the left fixed plate 18-9. The left outer sleeve 18-6 is installed with a left inner sleeve 18-7 inside the left outer sleeve 18-6. The left secondary telescopic cylinder 18-5 is installed inside the left inner sleeve 18-7. One end of the left secondary telescopic cylinder 18-5 is installed on the left outer sleeve 18-6, and the other end is installed on the left inner sleeve 18-7. The left inner sleeve 18-7 can perform secondary telescopic movement. A left adjustment plate group 18-8 is installed on the outside of the left outer sleeve 18-6. The gap between the left outer sleeve 18-6 and the left inner sleeve 18-7 is adjusted by the left adjustment plate group 18-8. One end of the left primary telescopic cylinder 18-2 is fixed to the left telescopic cylinder fixing seat 18-1, and the other end is fixed to the left boom cylinder fixing seat 18-3 to achieve primary sliding.

[0093] In this embodiment, during top anchor support, the first right anchor drill 2-19, the second right anchor drill 2-5, the third right anchor drill 2-20, the first left anchor drill 12-19, the second left anchor drill 12-5 and the third left anchor drill 12-20 are arranged side by side, and the distance between them is equal, and the spacing distance is 800-1000mm (about 90% of the roadway anchor spacing is 800mm, 900mm, 1000mm). If the spacing of the six top anchor drills is set to be consistent with the spacing of the coal mine support process regulations, during construction, the anchor drills can be synchronized and put in place in one step, and the synchronous automatic drilling operation of the six drills can be realized. And one person in each of the left and right anchor drills can operate independently without affecting each other. The reciprocating work during the excavation process greatly improves the support efficiency of the head anchor and anchor cable, greatly shortens the empty top time, and effectively improves the safety of the workers in the underground comprehensive excavation face.

[0094] Please refer to the attached Figure 2 As shown, the upper part of the walking part 13 is also provided with an intermediate arm support group 19, which is used to realize the telescopic distance of the long arm exceeding 1m of the cutting head, to lift the mesh, and to protect the top and the front. The upper part of the cutting part 1 is also provided with a flip platform assembly 14, which provides a large-section operating platform for the anchor miner.

[0095] For details, please refer to the attached Fig.25 , 26As shown, the intermediate boom support group 19 includes: left and right swing cylinders 19-1, swing cylinder connecting frame 19-2, three-stage telescopic sleeve 19-3, two-stage telescopic sleeve 19-4, boom outer sleeve 19-5, intermediate boom fixing seat 19-6, lifting cylinder fixing seat 19-7, boom lifting cylinder 19-8, support main frame group 19-9, right telescopic frame 19-10, right front telescopic rod 19-11, front telescopic frame 19-12, right front face protection frame 19-13, boom telescopic cylinder 19-14, front and rear swing cylinders 19-15, left front face protection frame 19-16, front protection cylinder 19-17, side telescopic cylinder 19-18, left telescopic frame 19-19, front telescopic cylinder 19-20, left front telescopic rod 19-21, main frame 19-22 and other major components. The intermediate boom fixing seat 19-6 is connected to the rear support part 10, and the intermediate boom fixing seat 19-6 is connected to the boom outer sleeve 19-5 through a pin shaft. The secondary telescopic sleeve 19-4 is installed inside the boom outer sleeve 19-5, and the tertiary telescopic sleeve 19-3 is installed inside the secondary telescopic sleeve 19-4. The boom telescopic cylinder 19-14 is installed between the boom outer sleeve 19-5 and the tertiary telescopic sleeve 19-3, and the two ends are connected by a pin shaft. The boom telescopic cylinder 19-14 is extended and retracted to realize the extension and retraction of the secondary telescopic sleeve 19-4 and the tertiary telescopic sleeve 19-3. The lifting cylinder fixing seat 19-7 is installed on the main body 11, and the boom lifting cylinder 19-8 is connected between the lifting cylinder fixing seat 19-7 and the boom outer sleeve 19-5. The boom lifting cylinder 19-8 is extended and retracted to lift the intermediate boom support group 19 to a certain angle to adapt to the height of the roadway.

[0096] The front and rear swing cylinder 19-15 described in this embodiment is installed on the front end base of the three-stage telescopic sleeve 19-3, and can rotate at a certain front and rear angle. The two ends of the front and rear swing cylinder 19-15 are straddled and installed in the swing cylinder connecting frame 19-2. The left and right swing cylinders 19-1 are installed on the swing cylinder connecting frame 19-2, and the support main frame group 19-9 is installed on the left and right swing cylinders 19-1. Then the left and right swing cylinders 19-1 and the support main frame group 19-9 can rotate at a certain left and right angle.

[0097] The supporting main frame group 19-9 includes a main frame 19-22 and a front telescopic frame 19-12, a right telescopic frame 19-10, and a left telescopic frame 19-19 arranged thereon. The front telescopic frame 19-12 is extended forward relative to the main frame 19-22 by a front telescopic cylinder 19-20, and a right front face protection frame 19-13 and a left front face protection frame 19-16 are also provided below the front end of the front telescopic frame 19-12. The right front face protection frame 19-13 and the left front face protection frame 19-16 are extended forward by a front face protection cylinder 19-17 to protect the front face. The right telescopic frame 19-10 and the left telescopic frame 19-19 are extended to the right and left relative to the main frame 19-22 respectively by side telescopic cylinders 19-18. A right front telescopic rod 19-11 is provided at the outer rod of the right telescopic frame 19-10, and a left front telescopic rod 19-21 is provided at the outer rod of the left telescopic frame 19-19. Both the right front telescopic rod 19-11 and the left front telescopic rod 19-21 can achieve the same front and rear telescopic movement as the front telescopic frame 19-12 under the action of the front telescopic cylinder 19-20.

[0098] See attached Fig. 27 , 28 As shown, the flip platform assembly 14 includes: a right platform 14-1, a rotating cylinder 14-2, a flip cylinder 14-3, a sliding platform 14-4, a main platform 14-5, a left platform 14-6, a guardrail column 14-7, a left connecting rod plate 14-8, a circular chain 14-9, and a right connecting rod plate 14-10. The bottom surface of the sliding platform 14-4 is fixedly connected to the upper cover plate of the cutting part 1, and the top of the sliding platform 14-4 is fixedly connected to the rotating cylinder 14-2, and the rotating cylinder 14-2 is connected to the main platform 14-5. The left and right sides of the main platform 14-5 are respectively connected to the left platform 14-6 and the right platform 14-1 through a pin shaft. The rotating cylinder 14-2 can make the entire platform rotate 180 degrees forward and backward. The left connecting rod plate 14-8 is respectively connected to the main platform 14-5 and the left platform 14-6 by a pin shaft, and the right connecting rod plate 14-10 is respectively connected to the main platform 14-5 and the right platform 14-6 by a pin shaft. The flipping cylinder 14-3 is connected between the left connecting rod plate 14-8 of the left platform 14-6 and the main platform, which plays a role in flipping the left platform 14-6 by 180 degrees. The flipping cylinder 14-3 is connected between the right platform 14-1 and 14-8 and the main platform, which plays a role in flipping the right platform 14-1 by 180 degrees. The guardrail column 14-7 is connected with the round chain 14-9 and inserted around the unfolding platform to play a role of safety protection. The unfolding area of ​​the flip platform is 2.6 times the folding area.

[0099] Attached Fig.29 , 30 The front view and top view of the six-arm top anchor bolter in this embodiment are shown in the unfolded anchoring and protection state.

[0100] From the attached Figure 2 and 30 It can be seen that the main body 11 is also provided with two symmetrically arranged operating consoles, such as the right operating console assembly 4 and the left operating console assembly 17. The right operating console assembly 4 is installed on the right side of the overlapped connection between the main body 11 and the rear support 10, and the left operating console assembly 17 is installed on the left side of the overlapped connection between the main body 11 and the rear support 10. The symmetrical arrangement structure of the double operating consoles improves the stability of the left and right sliding of the anchor miner. The right operating console assembly 4 is used to control anchor protection work and has the functions of "one-key expansion" and "one-key retraction". The left operating console assembly 17 is used to control the cutting, walking and transportation work of the anchor miner, and the two operating platforms are hydraulically interlocked and do not interfere with each other. They are operated by one driver, which is safe and reliable.

[0101] The water system 8 in this embodiment includes: a water inlet valve group, a switch valve group, a backwash filter, a pressure reducing valve, a cooler, a high-pressure water pump, a spray pump, a pressure gauge, etc., to ensure a water source with sufficient flow and pressure, to prevent the abnormal rise of the system oil temperature, to spray dust for cutting, to reduce the temperature of the cutting teeth, to reduce the temperature inside the telescopic part, to take away the heat generated by the operation of the motor, to perform wet dust removal for drilling, to remove debris from drilling holes, etc.

[0102] The lubrication system 16 includes: a centralized lubrication pump for mining, a progressive distributor, a rotary joint, a left lubrication joint, a right lubrication joint, a pressure gauge, etc.; a stable and reliable automatic lubrication system that can automatically lubricate the rotating pins, bearings and other mechanisms of the equipment.

[0103] The hydraulic system 9 includes: an oil pump motor, a double variable piston pump, a refueling pump, an oil tank group, a star wheel motor, a first conveyor motor, a travel motor, a multi-way electromagnetic hydraulic reversing valve group, a cutting head telescopic cylinder, a cutting head lifting cylinder, a shovel lifting cylinder, a cooler group, a cutting head rotary cylinder, a rear support cylinder, a first conveyor lifting cylinder, a first conveyor swing cylinder, a left top anchor operating table, a right top anchor operating table, etc. The hydraulic pipeline includes an oil tank connected to a double variable piston pump pipeline, a double variable piston pump connected to a multi-way electromagnetic hydraulic reversing valve pipeline, and an electromagnetic hydraulic reversing valve connected to a left top anchor operating table, a right top anchor operating table, and a pipeline of an actuator such as an oil cylinder; the anchor digger obtains power from the hydraulic oil pump, and then transmits the power to each actuator through a hydraulic pipeline, and the control valve corresponding to each actuator cooperates to complete drilling, support, travel, transportation, etc.

[0104] The electrical system 5 includes: an electric control box, an intrinsically safe operation box, an emergency stop button, a lighting lamp, a gas sensor, a voice alarm, a pressure sensor, a junction box, a receiver, a remote controller, an intelligent system, a mine intrinsically safe laser pointer, a mine flameproof liquid level temperature sensor, a mine flameproof turbine flow sensor, etc.; it can realize local operation, line-of-sight wireless remote control operation, underground remote visualization operation, and ground remote control operation. The electrical system 5 has an explosion-proof function, and the components that make up the electrical system 5 have explosion-proof certificates and coal safety certificates to ensure the safety of operators when the anchor digger is in operation.

[0105] The six-arm top anchor bolter of the present invention is controlled by hydraulic and electric, and has a high degree of mechanization. Six anchor drills are supported at the same time, which will become the most common arrangement structure of conventional large-scale tunnel anchor drills, which can greatly improve the support efficiency and reduce the labor intensity of operators. In addition, the long-stroke anchor drill is combined with a seven-way valve, an automatic drilling valve block, an emergency stop button, a flow speed regulating button, a waterway operation valve block, a pressure indicator, an operation handrail to prevent accidental touch protection structure, an operation indicator sign, a hydraulic joint and a hose direction and a reserved space for the hose direction. It has complete functions and a compact structure, and the semi-enclosed structure shield structure is easy to disassemble and maintain, which saves a lot of space, makes the key components reasonably arranged, and can be put into use. It also adopts a large-section flip platform assembly and an intermediate large arm support group to improve the working environment, have good construction safety, and adapt to work in harsh environments. It is an ideal coal mine underground mining and safe anchoring equipment, which can achieve the goal of safe, efficient and mechanized operation in my country's coal mining industry, and enrich the types of anchor bolters suitable for my country's coal mine tunnels.

[0106] When the six-arm top anchor bolter excavator is in a retracted state, its overall dimensions are 15100 mm in length, 3300 mm in width and 3000 mm in height, and it is suitable for excavation and support operations inside a tunnel with a width of 5.2-6.3 m and a height of 3.6 m-5.1 m.

[0107] The excavation function and the support function of the anchor excavator of the present invention are mutually locked, and the remote control and local operation can be switched freely and mutually locked, and can realize one-key emergency stop, remote control "one-key expansion" support function operation in place, remote control "one-key recovery" excavation function operation in place, automatic cutting one-key start function, and automatic return to the initial position function after cutting is completed. The "one-key expansion" function is performed in the following order: the left and right telescopic arm groups extend → the left and right top anchor drilling rigs are expanded (rotated inward 90°) → the working platform flips forward → the working platform is expanded → the working platform moves forward and enters the drilling state; the "one-key retraction" function is performed in the following order: the working platform moves backward → the working platform is retracted → the working platform flips backward → the left and right top anchor drilling rigs are retracted (rotated outward 90°) → the left and right telescopic arm groups are retracted and enter the cutting state.

[0108] The six-arm top bolt bolter of the present invention has complete functions, high strength of parts, good rigidity, compact structure, bilateral symmetry, reasonable layout, reliable operation and high stability of the whole machine, and can adapt to the use of most large coal mine tunnels. It integrates conventional operation, remote control operation and intelligent control, and is an industry-leading equipment with comprehensive functions. The bolter has a large moving space under the feet of the workers when anchoring, the equipment is easy to operate, and the escape is faster, which further shortens the empty top time of the head-on support, maximizes the safety of the head-on support, and supports six top bolts synchronously at the same time to make tunnel excavation safer and more efficient.

[0109] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Those skilled in the art may make some simple modifications, equivalent changes or modifications using the technical contents disclosed above, which all fall within the protection scope of the present invention.

Claims

1. A six-arm top bolter, comprising a main body (11), a walking part (13) arranged at the bottom of the main body (11), and a cutting part (1) arranged at the front end of the main body (11), characterized in that: It also includes a right anchor drilling machine part (2) and a left anchor drilling machine part (12); The right anchor drilling rig part (2) is arranged on the upper right side of the main body part (11) through a right telescopic arm group (3), and can be moved to the right side of the front of the anchor mining machine under the telescopic action of the right telescopic arm group (3); the right anchor drilling rig part (2) comprises a right rotary sliding seat group (2-18), a right sliding frame group (2-10), a right lifting frame group (2-11), a right lifting slide group (2-12), a first right anchor drilling rig (2-19), a second right anchor drilling rig (2-5) and a third right anchor drilling rig (2-20), the ... The shift seat group (2-18) is installed on the extended end of the right telescopic arm group (3) through a right hydraulic swing cylinder (2-17) arranged at the lower part thereof; the right sliding frame group (2-10) is arranged on the right rotary sliding seat group (2-18) through a right speed-multiplying mechanism (2-16); the right lifting frame group (2-11) is fixed on the right sliding frame group (2-10); the right lifting slide group (2-12) is arranged on the right lifting frame group (2-11) to be lifted up and down through a right lifting speed-multiplying mechanism (2-6); the first right The anchor drill (2-19) and the second right anchor drill (2-5) are respectively rotatably arranged at the left and right ends of the right lifting slide group (2-12) through the first right swing seat group (2-8) and the second right swing seat group (2-14), and the third right anchor drill (2-20) is rotatably arranged at the middle position of the right lifting slide group (2-12), and the first right anchor drill (2-19), the second right anchor drill (2-5) and the third right anchor drill (2-20) are all rotatably arranged at the middle position of the right lifting slide group (2-12) through the left and right swing cylinders and the front and rear swing cylinders to realize the front and rear left and right angles. When the right rotary sliding seat group (2-18) moves to the front position of the anchor drill under the extension of the right telescopic arm group (3), it rotates under the swinging action of the right hydraulic swing cylinder (2-17), so that the first right anchor drill (2-19), the second right anchor drill (2-5) and the third right anchor drill (2-20) are flush with the front working surface, and are lifted up under the action of the right lifting speed mechanism (2-6), and the synchronous top anchor operation of the hole is quickly realized under the action of the left and right swing cylinders and the front and rear swing cylinders; The left anchor drill section (12) is arranged on the upper left side of the main body (11) through the left telescopic arm group (18), and can be moved to the left side of the front of the anchor drill under the extension of the left telescopic arm group (18). The structure of the left anchor drill section (12) is symmetrical with that of the right anchor drill section (2), realizing synchronous telescopic and synchronous symmetrical rotation, thereby achieving synchronous operation of the six-arm top anchor.

2. The six-arm top bolter according to claim 1, characterized in that: The first right anchor drilling rig (2-19), the second right anchor drilling rig (2-5) and the third right anchor drilling rig (2-20) are each provided with a vertically arranged top anchor operating platform (2-1) for controlling the precise hole finding operation of the corresponding drilling rig, and the top anchor operating platforms (2-1) arranged on the first right anchor drilling rig (2-19) and the second right anchor drilling rig (2-5) are symmetrically arranged in structure and are both arranged on the inner side of the corresponding drilling rig; An emergency stop button (2-2) is provided on the upper part of the top anchor rod operating platform (2-1), and an emergency stop cover (2-3) is provided on the outer periphery of the emergency stop button (2-2).

3. The six-arm top bolter according to claim 2, characterized in that: The first right anchor drilling rig (2-19), the second right anchor drilling rig (2-5) and the third right anchor drilling rig (2-20) are spaced equidistantly from each other, with the spacing being 800-1000 mm.

4. The six-arm top bolter according to claim 1, characterized in that: The right telescopic arm assembly (3) comprises a right slideway assembly (3-4), a right fixed plate (3-9), a right outer sleeve (3-6), a right inner sleeve (3-7), a right primary telescopic oil cylinder (3-2), and a right secondary telescopic oil cylinder (3-5); the right slideway assembly (3-4) is mounted on the upper right side of the walking part (13); the right outer sleeve (3-6) is slidably mounted on the right slideway assembly (3-4) through the right fixed plate (3-9); and the right outer sleeve (3-6) is movable when the right primary telescopic oil cylinder (3-2) is in motion. The right side slideway group (3-4) slides forward and backward along the lower edge, the right inner sleeve (3-7) is arranged inside the right outer sleeve (3-6), and realizes two-stage sliding forward and backward under the action of the right two-stage telescopic oil cylinder (3-5), the right hydraulic swing oil cylinder (2-17) is fixed to the protruding end of the right inner sleeve (3-7), and a right adjustment plate group (3-8) is installed between the right outer sleeve (3-6) and the right inner sleeve (3-7) for adjusting the gap between the right outer sleeve (3-6) and the right inner sleeve (3-7); The structure of the left telescopic arm group (18) is symmetrical to the structure of the right telescopic arm group (3).

5. The six-arm top bolter according to claim 1, characterized in that: It also includes an intermediate boom support group (19), the intermediate boom support group (19) including an outer boom sleeve (19-5), a secondary telescopic sleeve (19-4), a tertiary telescopic sleeve (19-3) which are sleeved together, a boom telescopic oil cylinder (19-14) arranged between the outer boom sleeve (19-5) and the tertiary telescopic sleeve (19-3), a boom lifting oil cylinder (19-8), and a support main frame group (19-9); The rear end of the boom outer sleeve (19-5) is used for articulating with the rear support part (10) of the anchor mining machine. The front end bottom of the boom outer sleeve (19-5) is articulated with one end of the boom lifting cylinder (19-8). The other end of the boom lifting cylinder (19-8) is articulated in the middle of the upper part of the main body (11). A front and rear swing cylinder (19-15) is installed on the front end base of the three-stage telescopic sleeve (19-3). Swing cylinder connecting frames (19-2) are straddled at both ends of the front and rear swing cylinders (19-15). Left and right swing cylinders (19-1) are installed on the swing cylinder connecting frame (19-2). The support main frame group (19-9) is installed on the swing cylinder (19-1). The support main frame group (19-9) can be lifted and extended to a head-on position 1m beyond the cutting head of the cutting part (1) under the action of the boom lifting cylinder (19-8) and the boom telescopic cylinder (19-14), corresponding to the six-arm drilling position of the right anchor drilling rig part (2) and the left anchor drilling rig part (12) in the extended operation, and the support main frame group (19-9) can realize left-right angular rotation under the action of the left-right swing cylinder (19-1), and realize front-back angular rotation under the action of the front-back swing cylinder (19-15).

6. The six-arm top bolter according to claim 5, characterized in that: The supporting main frame group (19-9) comprises a main frame (19-22) and a front telescopic frame (19-12), a right telescopic frame (19-10), and a left telescopic frame (19-19) arranged thereon, wherein the front telescopic frame (19-12) is extended forward relative to the main frame (19-22) by a front telescopic oil cylinder (19-20), and a right front face protection frame (19-13) and a left front face protection frame (19-16) are further arranged below the front end of the front telescopic frame (19-12). The right telescopic frame (19-10) and the left telescopic frame (19-19) are both extended forward by the head protection cylinder (19-17) to achieve the function of head protection; the right telescopic frame (19-10) and the left telescopic frame (19-19) are respectively extended to the right and left relative to the main frame (19-22) by the side telescopic cylinder (19-18), and the outer rods of the right telescopic frame (19-10) and the left telescopic frame (19-19) are both provided with front telescopic rods to achieve the same front and rear telescopic movement as the front telescopic frame (19-12).

7. The six-arm top bolter according to claim 6, characterized in that: It also includes a flip platform assembly (14) arranged on the upper part of the cutting part (1), the flip platform assembly (14) including a sliding platform (14-4) and a main platform (14-5), the bottom surface of the sliding platform (14-4) is fixedly connected to the upper cover plate of the cutting part (1), and the top surface of the sliding platform (14-4) is connected to the main platform (14-5) through a rotating cylinder (14-2), so that the main platform (14-5) can be flipped forward under the action of the rotating cylinder (14-2), and under the action of the sliding platform (14-4), it can be close to the six-arm drilling rigs of the right anchor drilling rig part (2) and the left anchor drilling rig part (12) in extended operation; A left platform (14-6) and a right platform (14-1) that can be flipped 180 degrees are respectively arranged on the left and right sides of the main platform (14-5); the total platform area of ​​the left platform (14-6) and the right platform (14-1) after unfolding is 2.6 times the area of ​​the folded platform; It also includes guardrail posts (14-7) inserted on the edges of the unfolding platform. The guardrail posts (14-7) are multiple and are connected to each other by a circular chain (14-9) to provide safety protection.

8. The six-arm top bolter according to claim 1, characterized in that: The main body (11) comprises a main body frame (11-1), a rotary oil cylinder (11-2), a rotary bearing (11-3), and a rotary table (11-4); the main body frame (11-1) is connected to the bottom of the outer ring of the rotary bearing (11-3); the inner ring of the rotary bearing (11-3) is connected to the rotary table (11-4); the rotary oil cylinder (11-2) is connected between the main body frame (11-1) and the rotary table (11-4) by a pin shaft; The cutting part (1) comprises a cutting motor (1-1), a speed reducer (1-2), a telescopic part (1-3) and a cutting head (1-4) which are connected in sequence. The rear end of the cutting motor (1-1) is hinged to the rotary table (11-4) of the main body (11). A telescopic oil cylinder (1-5) is installed between the speed reducer (1-2) and the telescopic part (1-3). Under the action of the rotary oil cylinder (11-2) and the telescopic oil cylinder (1-5), the cutting head (1-4) can move forward, backward, left and right to complete the coal and rock cutting operation.

9. The six-arm top bolter according to claim 8, characterized in that: It also includes a shovel plate part (15), a first conveyor part (6), a rear support part (10) and a second conveyor connecting frame assembly (7), The shovel plate part (15) is hinged to the front lower part of the main body part (11), and a shovel plate oil cylinder is provided between the shovel plate part (15) and the main body part (11), which is used to realize the lifting and lying of the shovel plate through the extension and contraction of the shovel plate oil cylinder; The first conveyor part (6) runs through the inside of the main body (11), and comprises a conveyor front chute (6-1), a conveyor middle part (6-2), a conveyor swing cylinder (6-3), a conveyor swing part (6-4), a driving device (6-5), a spray block (6-6), a scraper chain (6-7), a chain pressure plate (6-8), and a tensioning cylinder (6-9). The conveyor front chute (6-1) is connected to the conveyor middle part (6-2) via a pin shaft, and the conveyor swing part (6-4) is connected to the conveyor middle part (6-2) via two upper and lower pin shafts, and swings left and right under the action of the conveyor swing cylinder (6-3). The driving device (6 -5) is inserted at the rear end of the conveyor swing part (6-4), the spray block (6-6) is installed above the conveyor swing part (6-4) to spray and reduce dust, the scraper chain (6-7) is laid in the chute of the first conveyor (6) and enters the chain return cavity of the first conveyor (6) through the driving device (6-5) and then bypasses the driven wheel to form a closed loop for transporting materials, the chain pressure plate (6-8) is installed on the inner side of the chute to keep a certain distance from the scraper chain (6-7) to prevent the scraper chain from jumping or falling off, and the tensioning cylinder (6-9) is installed on the conveyor swing part (6-4) and the conveyor middle part (6-2) so that the conveyor swing part (6-4) can swing left and right to adapt to various working conditions; The front half-open waist-shaped hole of the front chute (6-1) of the conveyor cooperates with the pin shaft installed on the shovel plate part (15) and the main body part (11) as a fulcrum, and the rear end hole of the front chute (6-1) of the conveyor is connected with the rear end hole of the rear support part (10) through the pin shaft as a fulcrum, so that the front chute (6-1) of the conveyor is fixed by the front and rear fulcrums, and the middle part (6-2) of the conveyor is connected with the rear support part (10) through the oil cylinder support, and the up and down lifting and lowering activities of the middle part (6-2) of the conveyor and the swing part (6-4) of the conveyor are realized by the up and down extension and retraction of the supporting oil cylinder; The rear support part (11) comprises a rear support frame (10-1), a support leg oil cylinder (10-2) and a support leg (10-3); the rear support frame (10-1) is mounted at the rear end of the main body (11); the bottom of the rear support frame (10-1) is hinged to the support leg (10-3); the support leg oil cylinder (10-2) is connected between the rear support frame (10-1) and the support leg (10-3) to realize downward support and upward retraction of the support leg (10-3); The second transport connecting frame assembly (7) is installed at the rear end of the rear support portion (10) and is used to achieve connection with the second transport machine.

10. The six-arm top bolter according to claim 9, characterized in that: The invention also comprises a right operating console assembly (4) and a left operating console assembly (17), wherein the right operating console assembly (4) is mounted on the right side of the overlapped connection between the main body (11) and the rear support (10), and the left operating console assembly (17) is mounted on the left side of the overlapped connection between the main body (11) and the rear support (10), wherein the right operating console assembly (4) is used to control anchoring operations and has "one-key deployment" and "one-key retraction" functions, and the left operating console assembly (17) is used to control the cutting, walking and transportation operations of the anchor mining machine, and the two operating platforms are hydraulically interlocked and do not interfere with each other.