Unhandled work ticket operation violation identification method and device, computer equipment and storage medium

By identifying the work tickets that have not been processed, the low safety problem caused by the work tickets that have not been processed in the power operation is solved, and the safety and violation identification efficiency of the power operation are improved.

CN119273125AInactive Publication Date: 2025-01-07ELECTRIC POWER RES INST CHINA SOUTHERN POWER GRID CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411185202.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-27
Publication Date
2025-01-07
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the power operation management system, due to management negligence and insufficient safety awareness, power operations that do not apply for work tickets increase the risk of accidents and injuries, and there are problems with low safety.

Method used

Provide a method for identifying violations of unprocessed work tickets. By obtaining the work plan sheets of the power grid management platform, filtering the work plan sheets to be verified, and obtaining the results of the work violations of unprocessed work tickets based on the matching work tickets, including time and place Match and other conditions to identify jobs that have not processed work tickets.

Benefits of technology

It improves the efficiency and simplicity of identifying violations of power operations, thereby improving the safety of power operations and reducing safety risks caused by not applying for work tickets.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119273125A_ABST
    Figure CN119273125A_ABST
Patent Text Reader

Abstract

The embodiment of the invention provides an unhandled work ticket operation violation identification method and device, computer equipment, a storage medium and a computer program product, and relates to the technical field of power monitoring. The method comprises the following steps: acquiring a plurality of operation plan lists of a power grid management platform; screening out a to-be-verified operation plan list from the plurality of operation plan lists according to the business state information of each operation plan list; obtaining a matching work ticket of the to-be-verified operation plan list; and according to the matched work ticket, obtaining an unhandled work ticket work violation identification result of the work plan list to be verified. According to the method, the efficiency and convenience of power operation violation identification are improved, and then the safety of power operation can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of electric power monitoring technology, and in particular to a method, device, computer equipment, storage medium and computer program product for identifying violations of work without a work permit. Background Art

[0002] In the power operation management system, some power operations usually require work tickets, which are one of the important measures to ensure safety in power work. It stipulates the specific content of the operation, safety measures, operators and their responsibilities, as well as safety requirements and precautions during the operation. Through the standardized work ticket process, the safety risks in power operations can be effectively reduced, the safety of personnel and equipment can be guaranteed, the safety of the operation process can be ensured, and it is conducive to avoiding human errors and accidents. However, due to management negligence and the shallow safety awareness of the work team members, power operations are carried out without applying for work tickets as required, which increases the risk of accidents and injuries, and there is a problem of low safety. Summary of the invention

[0003] Based on this, it is necessary to provide a method, device, computer equipment, storage medium and computer program product for identifying violations of work without a work permit in order to address the above technical problems.

[0004] In a first aspect, the present application provides a method for identifying violations of work procedures for which a work permit has not been processed. The method comprises:

[0005] Obtain multiple operation plans from the power grid management platform;

[0006] According to the business status information of each of the operation plans, the operation plans to be verified are screened out from the plurality of operation plans;

[0007] Obtaining a matching work ticket for the work plan to be verified;

[0008] According to the matching work ticket, the identification result of the work violation of the unprocessed work ticket of the work plan to be verified is obtained.

[0009] In one embodiment, the step of obtaining the result of identifying the violation of the work order for which the work ticket has not been processed in the work plan to be verified based on the matching work ticket includes: obtaining the power work plan information of the work plan to be verified; obtaining the work ticket information of the matching work ticket; and obtaining the result of identifying the violation of the work order for which the work ticket has not been processed in the work plan to be verified based on the power work plan information and the work ticket information.

[0010] In one of the embodiments, the power operation plan information includes power operation time information; the work ticket information includes work ticket time information; the obtaining of the violation identification result of the unprocessed work ticket operation of the work plan to be verified based on the power operation plan information and the work ticket information includes: obtaining the time matching result corresponding to the work plan to be verified based on the power operation time information and the work ticket time information; if the time matching result indicates that the work plan to be verified does not meet the time matching condition, then the violation identification result of the unprocessed work ticket operation of the work plan to be verified is determined as the unprocessed work ticket operation.

[0011] In one of the embodiments, the power operation time information includes a confirmed work start date and a confirmed work end date; the work ticket time information includes a planned start time and a planned end time; the time matching result corresponding to the work plan to be verified is obtained based on the power operation time information and the work ticket time information, including: determining the working time interval of the power operation corresponding to the work plan to be verified based on the planned start time and the planned end time; if both the confirmed work start date and the confirmed work end date do not exist within the working time interval, the time matching result corresponding to the work plan to be verified is determined to not meet the time matching condition; if at least one of the confirmed work start date and the confirmed work end date exists within the working time interval, the time matching result corresponding to the work plan to be verified is determined to meet the time matching condition.

[0012] In one embodiment, the power operation plan information includes power operation location information; the work ticket information includes work ticket location information; the obtaining of the violation identification result of the unprocessed work ticket operation of the work plan to be verified based on the power operation plan information and the work ticket information includes: obtaining the location matching result corresponding to the work plan to be verified based on the power operation location information and the work ticket location information; if the location matching result indicates that the work plan to be verified does not meet the location matching condition, then the violation identification result of the unprocessed work ticket operation of the work plan to be verified is determined as the unprocessed work ticket operation.

[0013] In one of the embodiments, the method further includes: obtaining multiple target work tickets from the power grid management platform within a preset time period; obtaining current task content information of the target work tasks contained in each of the target work tickets; determining the associated work tasks of the target work tasks based on the current task content information; if the associated work tasks do not have associated work tickets, determining the violation identification result of the unprocessed work ticket operation of the associated work tasks as an unprocessed work ticket operation.

[0014] In a second aspect, the present application provides a device for identifying violations of work procedures without a work permit. The device comprises:

[0015] A query module is used to obtain multiple operation schedules from the power grid management platform;

[0016] A screening module, used for screening out the work plan sheets to be verified from the plurality of work plan sheets according to the business status information of each work plan sheet;

[0017] An acquisition module, used to acquire a matching work ticket of the work plan to be verified;

[0018] The identification module is used to obtain the identification result of the work violation of the unprocessed work ticket of the work plan to be verified based on the matched work ticket.

[0019] In a third aspect, the present application further provides a computer device. The computer device includes a memory and a processor, the memory stores a computer program, and the processor implements the following steps when executing the computer program:

[0020] Obtain multiple operation plans from the power grid management platform;

[0021] According to the business status information of each of the operation plans, the operation plans to be verified are screened out from the plurality of operation plans;

[0022] Obtaining a matching work ticket for the work plan to be verified;

[0023] According to the matching work ticket, the identification result of the work violation of the unprocessed work ticket of the work plan to be verified is obtained.

[0024] In a fourth aspect, the present application further provides a computer-readable storage medium. The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the following steps are implemented:

[0025] Obtain multiple operation plans from the power grid management platform;

[0026] According to the business status information of each of the operation plans, the operation plans to be verified are screened out from the plurality of operation plans;

[0027] Obtaining a matching work ticket for the work plan to be verified;

[0028] According to the matching work ticket, the identification result of the work violation of the unprocessed work ticket of the work plan to be verified is obtained.

[0029] In a fifth aspect, the present application further provides a computer program product. The computer program product includes a computer program, and when the computer program is executed by a processor, the following steps are implemented:

[0030] Obtain multiple operation plans from the power grid management platform;

[0031] According to the business status information of each of the operation plans, the operation plans to be verified are screened out from the plurality of operation plans;

[0032] Obtaining a matching work ticket for the work plan to be verified;

[0033] According to the matching work ticket, the identification result of the work violation of the unprocessed work ticket of the work plan to be verified is obtained.

[0034] In the above-mentioned method, device, computer equipment, storage medium and computer program product for identifying violations of operations for which work tickets have not been processed, first, multiple operation plan sheets of the power grid management platform can be obtained; next, the operation plan sheets to be verified can be screened out from the multiple operation plan sheets based on the business status information of each operation plan sheet; further, the matching work ticket of the operation plan sheet to be verified can be obtained; finally, the violation identification result of the operation for which the work ticket has not been processed for the operation plan sheet to be verified can be obtained based on the matching work ticket. In the method provided in the embodiment of the present application, violations of the power operation corresponding to the operation plan sheet can be identified based on the operation plan sheet and the matching work ticket, thereby improving the efficiency and simplicity of the identification of violations of the power operation, and further, the safety of the power operation can be improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] In order to more clearly illustrate the technical solutions in the embodiments of the present application or related technologies, the drawings required for use in the embodiments of the present application or related technical descriptions will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0036] FIG1 is a flow chart of a method for identifying violations of work without a work permit provided in an embodiment of the present application;

[0037] FIG2 is a flow chart of obtaining the result of identifying the violation of the work of the unprocessed work ticket of the work plan sheet to be verified provided by an embodiment of the present application;

[0038] FIG3 is a flow chart of obtaining the result of identifying the violation of the work order for the unprocessed work order according to the work order provided by the embodiment of the present application;

[0039] FIG4 is a structural block diagram of a device for identifying violations of work without a work permit provided in an embodiment of the present application;

[0040] FIG5 is a diagram of the internal structure of a computer device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0041] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0042] In an exemplary embodiment, as shown in FIG1 , a method for identifying violations of work without a work ticket is provided. This embodiment uses the method applied to a server as an example for illustration. It is understandable that the method can also be applied to a terminal, and can also be applied to a system including a terminal and a server, and is implemented through the interaction between the terminal and the server. In this embodiment, the method includes the following steps:

[0043] Step 102, obtaining multiple operation plan sheets from the power grid management platform.

[0044] Among them, the business monitoring personnel can log in to the power grid management platform on the power operation terminal. The business monitoring personnel can trigger a login request on the power operation terminal, and the power operation terminal can display a login interface in response to the login request. The business monitoring personnel can enter a user name and password on the login interface to log in. In the case that the business monitoring personnel logs in successfully, a query request for a work plan sheet for multiple power operations within a preset time period can be triggered through the business handling interface of the power operation terminal. The power operation terminal responds to the query request for the work plan sheet and can send the query request for the work plan sheet to the system server of the power grid management platform. The system server can obtain multiple work plans of the power grid management platform within the preset time period according to the query request for the work plan sheet, or it can obtain a comprehensive power outage application sheet, which determines whether to apply for a power outage based on the planned work content. The method for identifying violations of work for the work plan sheet in the embodiment of the present application is also applicable to the comprehensive power outage application sheet. Among them, the introduction of the work ticket and the comprehensive power outage application sheet can be referred to as follows. The types of power grid work tickets are mainly divided into three types, namely the first type of work ticket, the second type of work ticket and the third type of work ticket. These work tickets are used in different power operation scenarios according to the nature of the work, aiming to ensure the safe conduct of power work. Types of work tickets and their usage scenarios The first type of work ticket: used for power outage work of high-voltage equipment, suitable for all or part of the power outage work on high-voltage equipment, such as maintenance and installation of high-voltage equipment. The second type of work ticket: used for live work of high-voltage equipment, including work on high-voltage equipment that does not require power outage, such as daily inspection and maintenance of equipment. The third type of work ticket: suitable for work far away from live parts, such as work on low-voltage equipment, work on secondary circuits, etc. These operations do not require power outage of high-voltage equipment. Issuance process and requirements of work tickets The safety level of the issuer and the work leader shall not be lower than level 4. The issuer and work leader of the same work ticket need to be two people respectively. The members of the work team specified in the work ticket should generally not be replaced. If they need to be replaced, they should be signed by the issuer. When the type, location, content and other elements of the work need to be changed, the original work ticket needs to be abolished and a new work ticket needs to be issued. The comprehensive power outage application form is a detailed written document used to apply for power outage service to the relevant management department in the event of maintenance, overhaul, modification or other special circumstances. This document needs to clearly state the reason for the power outage, the time, location, and scope of the required power outage, etc., to ensure that the relevant management departments can fully understand the rationality and necessity of the power outage application and make reasonable arrangements. The key points for writing a power outage application include: Introduction Overview: Explain that the purpose of the power outage application is to apply for power outage service under specific circumstances. Detailed description of the reason for the power outage: Describe the reason for the power outage in detail, including equipment maintenance, equipment overhaul, equipment modification, safety inspection, etc., and explain the urgency, importance, and possible impact of the power outage.Clear description of the time, location and scope of the power outage: Determine the start and end time of the power outage, including the date and specific time, describe the location of the power outage in detail, including the name of the building, area or specific equipment, and provide a floor plan or schematic diagram of the scope of the power outage. Preparation before the power outage: Notify relevant users or relevant units in advance, arrange maintenance personnel, staff or professional teams to conduct pre-power outage inspections, tests or cleanup work, and communicate with relevant management departments about the power outage process, safety measures and requirements. Safety measures and emergency plans during the power outage: List the safety measures that need to be taken during the power outage, such as equipment blockade, high-voltage equipment power off, sign setting, etc., and formulate emergency plans to deal with possible emergencies. Recovery work plan after the power outage: Set a work plan after the power outage, including equipment startup sequence, system testing and recovery sequence, etc., ensure testing, inspection and verification of the recovery process, promptly notify relevant users or relevant units that the power outage has ended, and remind them to carry out corresponding recovery work. In the embodiment of the present application, the operation plan sheet is taken as an example of a comprehensive power outage application sheet and an operation plan sheet. For the comprehensive power outage application sheet, it can be obtained through the following path: power grid management platform->safety production application->system operation plan->comprehensive power outage management->comprehensive power outage query path, and the power grid management platform can be a power grid management platform; for the operation plan sheet, it can be obtained through the following path: smart safety supervision system->plan management->operation plan query path.

[0045] Step 104, based on the business status information of each operation plan sheet, select the operation plan sheets to be verified from the multiple operation plan sheets.

[0046] Among them, the business status information can be used to indicate the planning status of each work plan, for example, it can include terminated and unterminated. For a comprehensive power outage application form, the business status information of the comprehensive power outage application form can be obtained. When the business status information indicates that the planning status of the comprehensive power outage application form is terminated, the corresponding comprehensive power outage application form can be determined as a work plan to be verified, and the work plan to be verified is a work plan that needs to be checked for illegal work without a ticket. For a work plan, the business status information may include the work status, work mode and work control of the work plan, and the work status, work mode and work control of the work plan can be obtained. The work status can be used to indicate the work stage of the work task of the work plan, for example, in progress, completed, interrupted and rescheduled, etc.; the work mode can describe whether the work task of the work plan has a power outage requirement, for example, power outage and live work, etc., and the work control can describe whether the work task of the work plan has a control requirement, for example, controlled work and non-controlled work, etc. When the work status of the work task in the work plan is in progress, completed, interrupted or rescheduled, the work mode is not power outage or live work, and the work control is control work, the work plan that needs to be verified is filtered out by keywords. If the work content of the work plan contains the following keywords, it will be queried for the next step of verification: 1. "on the *pole"; 2. "on the *tower"; 3. "in the *cable trench"; 4. "on the *cable"; Specially: these keywords need to exist in a coherent manner, such as "*on the *10kV* line*pole", and the pole; exclude the case containing "*P*cabinet" or "4*switch" or "4*knife switch". If these two steps of screening are met, the work plan can be determined as a work plan to be verified.

[0047] Step 106, obtaining the matching work ticket of the work plan to be verified.

[0048] In this step, the work plan to be verified can be matched with the corresponding work ticket to obtain the matching result of the work plan to be verified and the corresponding work ticket. When the matching result is that the work plan to be verified does not match the corresponding work ticket, it can be determined that the work task of the work plan to be verified has not been processed, and the result of the violation identification of the work ticket is determined as the work ticket has not been processed. For the comprehensive power outage application form, the acquisition path of its matching work ticket is to obtain the work ticket under the power grid management platform->safety production application->production operation management->work ticket management path. The power grid management platform can be the power grid management platform, and the matching work ticket of the comprehensive power outage application form can be obtained through this acquisition path. For the operation plan, the acquisition path of its matching work ticket is the power grid management platform->safety production application->production operation management->work ticket management path. The work ticket with the "work ticket type" of "power distribution second type work ticket" under this acquisition path can be used as the matching work ticket of the operation plan.

[0049] Step 108, based on the matched work ticket, obtain the identification result of the work violation of the unprocessed work ticket of the work plan to be verified.

[0050] In this step, the power operation plan information of the operation plan to be verified can be obtained; the work ticket information matching the work ticket can be obtained; and the violation identification result of the operation plan that has not handled the work ticket of the operation plan to be verified can be obtained according to the power operation plan information and the work ticket information. Taking the operation plan as a comprehensive power outage application form and an operation plan as an example, for the comprehensive power outage application form, the power operation plan information of the comprehensive power outage application form may include work unit information, work time information and work location information. The work ticket information may include work ticket unit information, work ticket time information and work ticket location information. On the one hand, the work unit information contained in the power operation plan information can be compared with the work ticket unit information contained in the work ticket information to obtain the unit matching result of the work unit information and the work ticket unit information. When the unit matching result indicates that the work unit information corresponding to the comprehensive power outage application form does not match the work ticket unit information of the matching work ticket, the violation identification result of the operation that has not handled the work ticket of the comprehensive power outage application form can be determined as the operation that has not handled the work ticket. When the unit matching result indicates that the work unit information corresponding to the comprehensive power outage application form matches the work ticket unit information of the matching work ticket, other matching items, such as the work ticket time information and the work ticket location information, can be further compared and judged. Specifically, the "application unit" attribute of the comprehensive power outage application form is extracted, and the "operation and maintenance unit" attribute, the "power supply station to which the operation and maintenance unit belongs" attribute, and the "unit and team" attribute of the work ticket are extracted. If the "application unit" of the comprehensive power outage application form is equal to the "operation and maintenance unit" of the work ticket, or the "application unit" of the comprehensive power outage application form is equal to the "power supply station to which the operation and maintenance unit belongs" of the work ticket, or the "application unit" of the comprehensive power outage application form is included in the "unit and team" of the work ticket, then it is considered that the unit match of the comprehensive power outage application form and the work ticket is consistent. On the other hand, the working time information included in the power operation plan information can be compared with the working ticket time information included in the operation ticket information to obtain the time matching result of the working time information and the working ticket time information. When the time matching result indicates that the working time information corresponding to the comprehensive power outage application form does not match the working ticket time information of the matching work ticket, the violation identification result of the unprocessed work ticket operation of the comprehensive power outage application form can be determined as the unprocessed work ticket operation. When the time matching result indicates that the working time information corresponding to the comprehensive power outage application form matches the working ticket time information of the matching work ticket, other comparison items, such as the work ticket unit information and the work ticket location information, can be further compared and judged. Specifically, the "confirmed work start date" and "confirmed work end date" of the comprehensive power outage application form are extracted, and the "planned start time" and "planned end time" of the work ticket are extracted.If the confirmed work start date of the comprehensive power outage application form is greater than or equal to the planned start time of the work ticket, and less than the planned end time of the work ticket, or the confirmed work end date of the comprehensive power outage application form is less than or equal to the planned end time of the work ticket, and greater than or equal to the planned start time of the work ticket, then it is considered that the time match between the comprehensive power outage application form and the work ticket is consistent. On the other hand, the work location information contained in the power operation plan information can be compared with the work ticket location information contained in the operation ticket information to obtain the location matching result of the work location information and the work ticket location information. In the case where the location matching result indicates that the work location information corresponding to the comprehensive power outage application form does not match the work ticket location information of the matching work ticket, the violation identification result of the unprocessed work ticket operation of the comprehensive power outage application form can be determined as the unprocessed work ticket operation. In the case where the location matching result indicates that the work location information corresponding to the comprehensive power outage application form matches the work ticket location information of the matching work ticket, other comparison items, such as the work ticket time information and the work ticket unit information, can be further compared and judged. Specifically, extract the "power outage scope" and "work content" attributes of the comprehensive power outage application form, and extract the "work tasks", "substation / line / equipment", and "work lines or plant and equipment names" attributes of the work ticket. Extract the stations and lines of these attributes respectively and compare them. If the stations and lines extracted from the "power outage scope" and "work content" attributes of the comprehensive power outage application form are consistent with the stations and lines extracted from the "work tasks", "substation / line / equipment", and "work lines or plant and equipment names" attributes of the work ticket, then it is considered that the location match of the comprehensive power outage application form and the work ticket is consistent. When the comprehensive power outage application form and the matching work ticket have consistent unit matches, consistent time matches, and consistent location matches, then the violation identification result of the comprehensive power outage application form for not handling the work ticket can be determined as a work ticket operation. Conversely, the violation identification result of the comprehensive power outage application form for not handling the work ticket can be determined as a work ticket operation. For the comprehensive power outage application form, there are situations where no ticketless violation identification is required. For example, if the power outage project is a "user project" and the work content contains the character "special" and does not contain the character "public", or contains the characters "user, factory, hospital", then this comprehensive power outage application form is excluded and no violation identification is required. If the power outage project is "main network maintenance" and the "work type" in the work content only has "main network maintenance" and no other types, then this comprehensive power outage application form is excluded and no violation identification is required. If the power outage project is "main network maintenance" and the "work type" in the work content includes "main network maintenance" and "user project", and the work content contains the character "special" and does not contain the character "public", or contains the characters "user, factory, hospital", then this comprehensive power outage application form is excluded and no violation identification is required.For the operation plan, the power operation plan information of the work plan may include work unit information, work time information, work location information and equipment information. The operation ticket information may include work ticket unit information, work ticket time information, work ticket location information and equipment or number information. On the one hand, the work unit information contained in the power operation plan information can be compared with the work ticket unit information contained in the operation ticket information to obtain the unit matching result of the work unit information and the work ticket unit information. When the unit matching result indicates that the work unit information corresponding to the work plan does not match the work ticket unit information of the matching work ticket, the violation identification result of the unprocessed work ticket operation of the work plan can be determined as the unprocessed work ticket operation. When the unit matching result indicates that the work unit information corresponding to the work plan matches the work ticket unit information of the matching work ticket, other comparison items, such as work ticket time information and work ticket location information, can be further compared and judged. Specifically, the "operation team list" attribute of the operation plan is extracted, and the "operation and maintenance unit" attribute, the "power supply station to which the operation and maintenance unit belongs" attribute, and the "unit and team" attribute of the work ticket are extracted. If the "operation team list" of the operation plan is equal to the "operation and maintenance unit" of the work ticket, or the "power supply station" of the operation plan is equal to the "power supply station to which the operation and maintenance unit belongs" of the work ticket, or the "power supply station" of the operation plan is included in the "unit and team" of the work ticket, then the units of the operation plan and the work ticket are considered to match. On the other hand, the working time information contained in the power operation plan information can be compared with the work ticket time information contained in the operation ticket information to obtain the time matching result of the working time information and the work ticket time information. In the case where the time matching result indicates that the working time information corresponding to the work plan does not match the work ticket time information of the matching work ticket, the violation identification result of the unprocessed work ticket operation of the work plan can be determined as the unprocessed work ticket operation. In the case where the time matching result indicates that the working time information corresponding to the work plan matches the work ticket time information of the matching work ticket, other comparison items, such as the work ticket unit information and the work ticket location information, can be further compared and judged. Specifically, the "actual start time" and "actual end time" of the operation plan are extracted, and the "planned start time" and "planned end time" of the work ticket are extracted. If the actual start time of the job plan is greater than or equal to the planned start time of the work ticket and less than the planned end time of the work ticket, or the actual end time of the job plan is less than or equal to the planned end time of the work ticket and greater than or equal to the planned start time of the work ticket, then the time match between the job plan and the work ticket is considered consistent.On the other hand, the work location information included in the power operation plan information can be compared with the work ticket location information included in the operation ticket information to obtain the location matching result of the work location information and the work ticket location information. When the location matching result indicates that the work location information corresponding to the work plan sheet does not match the work ticket location information of the matching work ticket, the violation identification result of the unprocessed work ticket operation of the work plan sheet can be determined as the unprocessed work ticket operation. When the location matching result indicates that the work location information corresponding to the work plan sheet matches the work ticket location information of the matching work ticket, other comparison items, such as the work ticket unit information and the work ticket location information, can be further compared and judged. Specifically, the "work location" and "work content" attributes of the operation plan sheet are extracted, and the "work task", "substation / line / equipment", and "work equipment or line name" attributes of the work ticket are extracted. The stations and lines of these attributes are extracted and compared respectively. If the "station" or "line" of the operation plan sheet is consistent with the work ticket, it is considered that the location matching of the operation plan sheet and the work ticket is consistent. The equipment or number information contained in the power operation plan information can also be compared with the equipment or number information contained in the operation ticket information. Specifically, on the premise that the unit, time and location match successfully, continue to judge whether the equipment or number is consistent. If the work content of the operation plan sheet includes "on the *pole" or "on the *tower", extract the number in front of the "pole" or "tower" to judge whether the number in front of the "pole" or "tower" matches successfully with the work ticket. If the work content of the operation plan sheet includes "in the *cable trench" or "on the *cable", judge whether the work task of the work ticket includes "cable trench" or "cable". If the unit match of the operation plan sheet and the matching work ticket is consistent, the time match is consistent, the location match is consistent, and the equipment or number match is consistent, then the violation identification result of the operation plan sheet that has not handled the work ticket can be determined as the operation with the work ticket. On the contrary, the violation identification result of the operation plan sheet that has not handled the work ticket can be determined as the operation without handling the work ticket.

[0051] In the method of this embodiment, first, multiple work plans can be obtained from the power grid management platform; next, the work plans to be verified can be screened out from the multiple work plans based on the business status information of each work plan; further, the matching work tickets of the work plans to be verified can be obtained; finally, the work violation identification results of the work plans to be verified that have not been processed can be obtained based on the matching work tickets. In the method provided by the embodiment of the present application, the power work corresponding to the work plan can be identified for violations based on the work plan and the matching work ticket, which improves the efficiency and simplicity of identifying violations of power work, and further, can improve the safety of power work.

[0052] In an exemplary embodiment, as shown in FIG2 , step 108 may include steps 202 to 206. Among them:

[0053] Step 202, obtaining the power operation plan information of the operation plan to be verified.

[0054] Step 204, obtaining work ticket information that matches the work ticket.

[0055] Step 206, based on the power operation plan information and the work ticket information, obtain the identification results of the work violation of the work plan sheet to be verified that has not processed the work ticket.

[0056] In an exemplary embodiment, the power operation plan information includes power operation time information; the work ticket information includes work ticket time information; step 206 may include: obtaining the time matching result corresponding to the work plan to be verified according to the power operation time information and the work ticket time information; if the time matching result indicates that the work plan to be verified does not meet the time matching condition, the violation identification result of the unprocessed work ticket operation of the work plan to be verified is determined as the unprocessed work ticket operation. In an exemplary embodiment, the power operation time information includes the confirmed work start date and the confirmed work end date; the work ticket time information includes the planned start time and the planned end time; obtaining the time matching result corresponding to the work plan to be verified may include: determining the work time interval of the power operation corresponding to the work plan to be verified according to the planned start time and the planned end time; if both the confirmed work start date and the confirmed work end date do not exist in the work time interval, determining the time matching result corresponding to the work plan to be verified as not meeting the time matching condition; if at least one of the confirmed work start date and the confirmed work end date exists in the work time interval, determining the time matching result corresponding to the work plan to be verified as meeting the time matching condition.

[0057] For a comprehensive power outage application form, the working time information included in the power operation plan information can be compared with the work ticket time information included in the work ticket information to obtain a time matching result between the working time information and the work ticket time information. When the time matching result indicates that the working time information corresponding to the comprehensive power outage application form does not match the work ticket time information of the matching work ticket, the violation identification result of the unprocessed work ticket operation of the comprehensive power outage application form can be determined as an unprocessed work ticket operation. When the time matching result indicates that the working time information corresponding to the comprehensive power outage application form matches the work ticket time information of the matching work ticket, other comparison items, such as the work ticket unit information and the work ticket location information, can be further compared and judged. Specifically, the "confirmed work start date" and "confirmed work end date" of the comprehensive power outage application form are extracted, and the "planned start time" and "planned end time" of the work ticket are extracted. If the confirmed work start date of the comprehensive power outage application form is greater than or equal to the planned start time of the work ticket, and less than the planned end time of the work ticket, or the confirmed work end date of the comprehensive power outage application form is less than or equal to the planned end time of the work ticket, and greater than or equal to the planned start time of the work ticket, then it is considered that the time matching of the comprehensive power outage application form and the work ticket is consistent. For the operation plan, the working time information contained in the power operation plan information can be compared with the work ticket time information contained in the operation ticket information to obtain the time matching result of the working time information and the work ticket time information. In the case where the time matching result indicates that the working time information corresponding to the work plan does not match the work ticket time information of the matching work ticket, the violation identification result of the unprocessed work ticket operation of the work plan can be determined as the unprocessed work ticket operation. In the case where the time matching result indicates that the working time information corresponding to the work plan matches the work ticket time information of the matching work ticket, other comparison items, such as the work ticket unit information and the work ticket location information, can be further compared and judged. Specifically, the "actual start time" and "actual end time" of the operation plan are extracted, and the "planned start time" and "planned end time" of the work ticket are extracted. If the actual start time of the job plan is greater than or equal to the planned start time of the work ticket and less than the planned end time of the work ticket, or the actual end time of the job plan is less than or equal to the planned end time of the work ticket and greater than or equal to the planned start time of the work ticket, then the time match between the job plan and the work ticket is considered consistent.

[0058] In the method of this embodiment, the working time information contained in the power operation plan information can be compared with the work ticket time information contained in the work ticket information. In the case of a time mismatch, the violation identification result of the unprocessed work ticket operation in the work plan to be verified can be determined as the unprocessed work ticket operation. In this case, other items do not need to be compared, which improves the convenience of identifying power operations without work tickets.

[0059] In an exemplary embodiment, the power operation plan information includes power operation location information; the work ticket information includes work ticket location information; step 206 may include:

[0060] According to the power operation location information and the work ticket location information, the location matching result corresponding to the work plan to be verified is obtained; if the location matching result indicates that the work plan to be verified does not meet the location matching conditions, the violation identification result of the unprocessed work ticket operation of the work plan to be verified is determined as the unprocessed work ticket operation.

[0061] Among them, for the comprehensive power outage application form, the work location information contained in the power operation plan information can be compared with the work ticket location information contained in the work ticket information to obtain the location matching result of the work location information and the work ticket location information. When the location matching result indicates that the work location information corresponding to the comprehensive power outage application form does not match the work ticket location information of the matching work ticket, the violation identification result of the unprocessed work ticket operation of the comprehensive power outage application form can be determined as the unprocessed work ticket operation. When the location matching result indicates that the work location information corresponding to the comprehensive power outage application form matches the work ticket location information of the matching work ticket, other comparison items, such as the work ticket time information and the work ticket unit information, can be further compared and judged. Specifically, the "power outage scope" and "work content" attributes of the comprehensive power outage application form are extracted, and the "work task", "substation / line / equipment", and "work line or plant and equipment name" attributes of the work ticket are extracted. The stations and lines of these attributes are extracted and compared respectively. If the stations and lines extracted from the "power outage scope" and "work content" attributes of the comprehensive power outage application form are consistent with the stations and lines extracted from the "work tasks", "substations / lines / equipment", and "work lines or plant and equipment names" attributes of the work ticket, then the location match of the comprehensive power outage application form and the work ticket is considered to be consistent. For the operation plan, the work location information contained in the power operation plan information can be compared with the work ticket location information contained in the operation ticket information to obtain the location matching result of the work location information and the work ticket location information. When the location matching result indicates that the work location information corresponding to the work plan does not match the work ticket location information of the matching work ticket, the violation identification result of the unprocessed work ticket operation of the work plan can be determined as the unprocessed work ticket operation. When the location matching result indicates that the work location information corresponding to the work plan matches the work ticket location information of the matching work ticket, other comparison items, such as the work ticket unit information and the work ticket location information, can be further compared and judged. Specifically, the "work location" and "work content" attributes of the work plan are extracted, and the "work task", "substation / line / equipment", and "work equipment or line name" attributes of the work ticket are extracted. The stations and lines of these attributes are extracted and compared respectively. If the "station" or "line" of the work plan is consistent with the work ticket, it is considered that the locations of the work plan and the work ticket match each other.

[0062] In the method of this embodiment, the work location information contained in the power operation plan information can be compared with the work ticket location information contained in the work ticket information. If the locations do not match, the violation identification result of the unprocessed work ticket operation in the work plan to be verified can be determined as the unprocessed work ticket operation. In this case, other items do not need to be compared, which improves the convenience of identifying power operations without work tickets.

[0063] In an exemplary embodiment, as shown in FIG3 , the embodiment of the present application further includes the following steps, which are used to illustrate the process of identifying violations without a ticket based on a work ticket, and the steps specifically include steps 302 to 308. Among them:

[0064] Step 302, obtaining multiple target work tickets from the power grid management platform within a preset time period.

[0065] Among them, the work ticket can be used to identify the violation of the work task without a ticket for the associated work task of the target work task of the work ticket. In this step, the acquisition path of the multiple work tickets can be the power grid management platform->safety production application->production operation management->work ticket management path. Furthermore, according to the operation status information of each work ticket in the multiple work tickets, the target work ticket can be screened out from the multiple work tickets. The target work ticket can be a work ticket that can be used to associate work tasks for the violation of the work task without a ticket. In a possible implementation method, the work ticket with the operation status information of being in execution, work termination or work ticket termination can be determined as the target work ticket.

[0066] Step 304, obtaining the current task content information of the target work tasks included in each target work ticket.

[0067] Step 306: Determine the associated work tasks of the target work task according to the current task content information.

[0068] Among them, the current task content information of the target work ticket can be determined through keyword query, and the related task content information of the current task content information can be determined based on the current task content information. The related task content information can be the previous and later work of the current task content information. Furthermore, the related work tasks of the target work tasks of the target work ticket can be determined based on the related task content information.

[0069] Step 308: If there is no associated work ticket for the associated work task, the violation identification result of the unprocessed work ticket operation of the associated work task is determined as the unprocessed work ticket operation.

[0070] Specifically, if the work task of the work ticket contains "live connection", check whether there is a work ticket containing "installation of *knife switches, switches, cable heads" in the work tasks within the range of 60 days before the planned start time of the work ticket to the planned end time; if the match is unsuccessful, the work ticket operation has not been processed. If the work task of the work ticket contains "dismantling the net", check whether there is a work ticket containing "weaving the net" in the work tasks within the range of 60 days before the planned start time of the work ticket to the planned end time. If the match is unsuccessful, the work ticket operation has not been processed. If the work task of the work ticket contains "dismantling the *crossing frame", check whether there is a work ticket containing "erecting the *crossing frame" in the work tasks within the range of 60 days before the planned start time of the work ticket to the planned end time. If the match is unsuccessful, the work ticket operation has not been processed. If the work task of the work ticket contains "weaving the net", check whether there is a work ticket containing "dismantling the net" in the work tasks within the range of 15 days after the planned start time of the work ticket to the planned end time. If the match is unsuccessful, the work ticket operation has not been processed. If the work task of a work ticket includes "erecting a *crossing frame", check whether there is a work ticket that includes "dismantling a *crossing frame" in the work task within 15 days from the planned start time to the planned end time of the work ticket. If the match fails, the work ticket operation has not been processed. In particular, because the subsequent work may not have started for the work ticket that has just ended, if the planned end time of the work ticket is less than 15 days from the current time, the current work ticket is excluded and does not participate in the violation identification. In addition, "dismantle the net" and "weave the net" need to be two consecutive characters. If there are other characters in the middle, no identification is required.

[0071] In the method of this embodiment, the work ticket can be used to identify the violations of the work before and after the target work task of the work ticket, thereby improving the simplicity and efficiency of the violation identification of the power work without a ticket.

[0072] It should be understood that, although the various steps in the flowcharts involved in the above-mentioned embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above-mentioned embodiments can include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily to be carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.

[0073] Based on the same inventive concept, the embodiment of the present application also provides a device for identifying violations of work for unprocessed work tickets for implementing the above-mentioned method for identifying violations of work for unprocessed work tickets. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme recorded in the above-mentioned method, so the specific limitations in one or more embodiments of the device for identifying violations of work for unprocessed work tickets provided below can refer to the limitations of the method for identifying violations of work for unprocessed work tickets above, and will not be repeated here.

[0074] In one embodiment, as shown in FIG. 4 , a device for identifying violations of work without a work ticket is provided, including: a query module 402, a screening module 404, an acquisition module 406 and an identification module 408, wherein:

[0075] A query module 402 is used to obtain multiple operation plan sheets from a power grid management platform;

[0076] A screening module 404 is used to screen out the work plan sheets to be verified from the plurality of work plan sheets according to the business status information of each work plan sheet;

[0077] The acquisition module 406 is used to acquire the matching work ticket of the work plan to be verified;

[0078] The identification module 408 is used to obtain the identification result of the work violation of the unprocessed work ticket of the work plan to be verified based on the matched work ticket.

[0079] In one embodiment, the identification module 408 is also used to: obtain the power operation plan information of the operation plan to be verified; obtain the work ticket information of the matching work ticket; and obtain the identification result of the operation violation of the unprocessed work ticket of the operation plan to be verified based on the power operation plan information and the work ticket information.

[0080] In one embodiment, the power operation plan information includes power operation time information; the work ticket information includes work ticket time information; the identification module 408 is also used to: obtain the time matching result corresponding to the work plan to be verified according to the power operation time information and the work ticket time information; if the time matching result indicates that the work plan to be verified does not meet the time matching condition, then the violation identification result of the unprocessed work ticket operation of the work plan to be verified is determined as the unprocessed work ticket operation.

[0081] In one embodiment, the power operation time information includes a confirmed work start date and a confirmed work end date; the work ticket time information includes a planned start time and a planned end time; the identification module 408 is also used to: determine the working time interval of the power operation corresponding to the work plan to be verified based on the planned start time and the planned end time; if the confirmed work start date and the confirmed work end date do not exist within the working time interval, the time matching result corresponding to the work plan to be verified is determined to not meet the time matching condition; if at least one of the confirmed work start date and the confirmed work end date exists within the working time interval, the time matching result corresponding to the work plan to be verified is determined to meet the time matching condition.

[0082] In one embodiment, the power operation plan information includes the power operation location information; the work ticket information includes the work ticket location information; the identification module 408 is also used to: obtain the location matching result corresponding to the work plan to be verified according to the power operation location information and the work ticket location information; if the location matching result indicates that the work plan to be verified does not meet the location matching condition, then the violation identification result of the unprocessed work ticket operation of the work plan to be verified is determined as the unprocessed work ticket operation.

[0083] In one embodiment, the identification module 408 is also used to: obtain multiple work tickets of the power grid management platform within a preset time period; obtain the current task content information of the target work task contained in each of the work tickets; determine the associated work task of the target work task based on the current task content information; if the associated work task does not have an associated work ticket, then determine the violation identification result of the unprocessed work ticket operation of the associated work task as an unprocessed work ticket operation.

[0084] Each module in the above-mentioned device for identifying violations of work without a work ticket can be implemented in whole or in part by software, hardware, or a combination thereof. Each module can be embedded in or independent of a processor in a computer device in the form of hardware, or can be stored in a memory in a computer device in the form of software, so that the processor can call and execute operations corresponding to each module.

[0085] In one embodiment, a computer device is provided, which may be a server, and its internal structure diagram may be shown in FIG5 . The computer device includes a processor, a memory, and a network interface connected via a system bus. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program, and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store data related to the identification of violations of work tickets that have not been processed. The network interface of the computer device is used to communicate with an external terminal via a network connection. When the computer program is executed by the processor, a method for identifying violations of work tickets that have not been processed is implemented.

[0086] Those skilled in the art will understand that the structure shown in FIG. 5 is merely a block diagram of a partial structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than shown in the figure, or combine certain components, or have a different arrangement of components.

[0087] In one embodiment, a computer device is further provided, including a memory and a processor, wherein a computer program is stored in the memory, and the processor implements the steps in the above method embodiments when executing the computer program.

[0088] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the steps in the above-mentioned method embodiments are implemented.

[0089] In one embodiment, a computer program product is provided, including a computer program, which implements the steps in the above method embodiments when executed by a processor.

[0090] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties.

[0091] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in this application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetoresistive random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but are not limited to this.

[0092] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0093] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.

Claims

1. A method for identifying violations of work procedures without a work permit, characterized in that: The method comprises: Obtain multiple operation plans from the power grid management platform; According to the business status information of each of the operation plans, the operation plans to be verified are screened out from the plurality of operation plans; Obtaining a matching work ticket for the work plan to be verified; According to the matching work ticket, the identification result of the work violation of the unprocessed work ticket of the work plan to be verified is obtained.

2. The method according to claim 1, characterized in that The step of obtaining the identification result of the operation violation of the unprocessed work ticket of the operation plan to be verified according to the matched work ticket includes: Obtaining the power operation plan information of the operation plan to be verified; Obtaining work ticket information of the matching work ticket; According to the power operation plan information and the work ticket information, the violation identification result of the operation without the work ticket of the operation plan to be verified is obtained.

3. The method according to claim 2, characterized in that The power operation plan information includes power operation time information; the work ticket information includes work ticket time information; The step of obtaining the violation identification result of the operation without a work ticket of the operation plan to be verified according to the power operation plan information and the work ticket information includes: According to the power operation time information and the work ticket time information, obtaining the time matching result corresponding to the work plan to be verified; If the time matching result indicates that the work plan to be verified does not meet the time matching condition, the violation identification result of the unprocessed work ticket operation of the work plan to be verified is determined as the unprocessed work ticket operation.

4. The method according to claim 3, characterized in that The power operation time information includes a confirmed work start date and a confirmed work end date; the work ticket time information includes a planned start time and a planned end time; The obtaining, according to the power operation time information and the work ticket time information, a time matching result corresponding to the to-be-verified operation plan, comprises: Determine the working time interval of the power operation corresponding to the operation plan to be verified according to the planned start time and the planned end time; If the confirmed work start date and the confirmed work end date are both not within the working time interval, the time matching result corresponding to the to-be-verified work plan is determined as not meeting the time matching condition; If at least one of the confirmed work start date and the confirmed work end date exists within the work time interval, the time matching result corresponding to the to-be-verified work plan is determined to satisfy the time matching condition.

5. The method according to claim 2, characterized in that: The power operation plan information includes power operation location information; the work ticket information includes work ticket location information; The step of obtaining the violation identification result of the operation without a work ticket of the operation plan to be verified according to the power operation plan information and the work ticket information includes: According to the power operation location information and the work ticket location information, obtaining a location matching result corresponding to the work plan to be verified; If the location matching result indicates that the work plan to be verified does not meet the location matching condition, the violation identification result of the unprocessed work ticket operation of the work plan to be verified is determined as the unprocessed work ticket operation.

6. The method according to any one of claims 1 to 5, characterized in that The method further comprises: Obtaining multiple target work tickets of the power grid management platform within a preset time period; Obtaining current task content information of the target work tasks included in each of the target work tickets; Determine the associated work tasks of the target work task according to the current task content information; If there is no associated work ticket for the associated work task, the violation identification result of the unprocessed work ticket operation of the associated work task is determined as an unprocessed work ticket operation.

7. A device for identifying violations of work without a work permit, characterized in that: The device comprises: A query module is used to obtain multiple operation schedules from the power grid management platform; A screening module, used for screening out the work plan sheets to be verified from the plurality of work plan sheets according to the business status information of each work plan sheet; An acquisition module, used to acquire a matching work ticket of the work plan to be verified; The identification module is used to obtain the identification result of the work violation of the unprocessed work ticket of the work plan to be verified based on the matched work ticket.

8. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 6 are implemented.

9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 6 are implemented.

10. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 6 are implemented.

Citation Information

Patent Citations

  • Work ticket-free operation safety inspection method, device and system for power system and storage device

    CN114462762A

  • Recognition and early warning method, device and equipment for illegal operation without work ticket

    CN114818995A

  • Setting method for planning power stoppage work of power system and device thereof

    JP2007244139A