Geotechnical cloth laying and pressing equipment for small mountain pile type engineering spoil
By designing the abandoned geotextile laying and compression equipment for small hill pile-type engineering, and using the gear chain system driven by tracks and motors, automated and mechanized geotextile laying and compression are realized, solving the inconvenience of manual laying and rolling problems, and improving the Efficiency and pressure protection effect.
Patent Information
- Application Number
- CN202411480114.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-23
- Publication Date
- 2025-01-10
- Estimated Expiration
- 2044-10-23
AI Technical Summary
The random stacking of abandoned soil in the project leads to environmental pollution, dust and soil erosion. It is inconvenient to lay geotextiles manually, labor intensity and low efficiency. After laying, the geotextiles are easy to roll over and lack effective compression equipment.
A small hill pile engineering abandoned geotextile laying and compression equipment is designed, using a crawler moving mechanism, a geotextile laying mechanism and a geotextile pressing mechanism, and using a crawler moving mechanism to automatically and mechanize the geotextile laying and compression through the motor The driving gear and chain system realize the movement of tracks and the laying and compression of geotextiles, and use the compression bricks and spacer feeding mechanism to improve the compression effect.
It greatly reduces the labor intensity of staff, improves laying efficiency, reduces the possibility of geotextile rolling down, improves the pressure protection effect of geotextiles, saves resources and time, and improves economic efficiency.
Smart Images

Figure CN119287901A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of geotextile laying of engineering waste soil, in particular to a hill pile type geotextile laying and compacting device for engineering waste soil. Background Art
[0002] The main source of engineering waste is the waste soil and silt excavated from new construction and reconstruction projects in cities. With the continuous advancement of urbanization in China, the direction of urban development has been continuously moving from the ground to the underground. Underground structures such as subway lines and municipal pipe networks have become an indispensable part of our lives. The resulting problem is that the amount of engineering waste is increasing. The large amount of random stacking of engineering waste will cause environmental pollution, dust and soil erosion. Therefore, it is necessary to lay geotextiles on the engineering waste, but when laying by hand, it is inconvenient to move up and down the hill-like engineering waste, and it is inconvenient to carry the geotextile. In addition, the laying personnel need to bend over or squat, which increases the labor intensity of the laying personnel and is not efficient. At the same time, after the geotextile is laid, if it is not compacted, the geotextile will roll up, resulting in improper protection. Therefore, it is necessary to design corresponding equipment for laying geotextiles to solve the above problems. Summary of the invention
[0003] The object of the present invention is to provide a device for laying and compacting geotextiles of small hill-type engineering waste soil, so as to solve the problems raised in the above-mentioned background technology.
[0004] To achieve the above object, the present invention provides the following technical solutions: The geotextile laying and compacting equipment for hill pile type engineering waste soil is composed of a crawler moving mechanism, a geotextile laying mechanism and a geotextile compacting mechanism. The crawler moving mechanism is equipped with a geotextile laying mechanism and a geotextile compacting mechanism. The front end of the geotextile laying mechanism is provided with a geotextile compacting mechanism.
[0005] In a preferred embodiment of the present invention, the crawler moving mechanism includes a fixed bracket, the fixed bracket is arranged in two groups, a first fixed shaft, a second fixed shaft and a third fixed shaft are fixedly installed between the two groups of fixed brackets, the third fixed shaft is arranged above the first fixed shaft and the second fixed shaft; a first motor is fixedly installed on the side wall of the fixed bracket, a driving gear is fixedly installed on the output end of the first motor, the driving gear is meshed and connected to a first chain, the first chain is meshed and connected to a driven gear, the driven gear is fixedly installed on a first transmission shaft, connecting plates are fixedly installed at both ends of the fixed bracket, the first transmission shaft is fixedly connected to the fixed bracket through the connecting plate at the left end, transmission gears are fixedly installed at both ends of the first transmission shaft, and the crawler is connected to the transmission gear.
[0006] In a preferred embodiment of the present invention, the first fixed shaft extends out of the fixed bracket and is rotatably connected to the first movable bracket, the second fixed shaft extends out of the fixed bracket and is rotatably connected to the second movable bracket, the first movable bracket and the second movable bracket are rotatably connected via a shaft sleeve, and the tops of the first movable bracket and the second movable bracket are connected via a buffer spring; the bottom of the second movable bracket is rotatably connected to wheel frame one, the left end of the wheel frame one is rotatably connected to the third movable wheel, the right end of the wheel frame one is rotatably connected to the fourth movable wheel, and the bottoms of the third movable wheel and the fourth movable wheel are connected to the track; the bottom of the first movable bracket is rotatably connected to wheel frame two, the left end of the wheel frame two is rotatably connected to the first movable wheel, and the right end of the wheel frame two is rotatably connected to the second movable wheel; the third fixed shaft extends out of the fixed bracket and is rotatably connected to the third rotating wheel, and the third rotating wheel is rotatably connected to the track.
[0007] In a preferred embodiment of the present invention, the connecting plate at the right end is rotatably connected to the movable bracket, the top of the movable bracket is rotatably connected to the second rotating wheel, the bottom of the movable bracket is rotatably connected to the first rotating wheel, and the first rotating wheel and the second rotating wheel are connected to the crawler track.
[0008] In a preferred embodiment of the present invention, the geotextile laying mechanism includes a second motor, the second motor is fixedly mounted on a fixed bracket of the crawler moving mechanism, a gear is mounted on the output end of the second motor, the gear is meshed and connected to a second chain, the second chain is meshed and connected to a rotating gear, the rotating gear is fixedly mounted on a rotating shaft, a first auxiliary rotating wheel is provided on the right side of the rotating shaft, a geotextile is provided between the rotating shaft and the first auxiliary rotating wheel, the right end of the geotextile is connected to a second auxiliary rotating wheel, a roller is provided on the right side of the second auxiliary rotating wheel, a geotextile is wrapped around the roller, and a third auxiliary rotating wheel and a fourth auxiliary rotating wheel are provided at the bottom of the roller.
[0009] In a preferred embodiment of the present invention, sliders are installed at both ends of the third auxiliary rotating wheel and the fourth auxiliary rotating wheel, a spring 1 is installed on the side of the slider away from the roller, the spring 1 is fixedly installed in a slide groove, the slide groove is slidably connected to the slider, the rotating shaft, the first auxiliary rotating wheel, the second auxiliary rotating wheel and both ends of the roller are rotatably connected to the fixed bracket; the slide groove is fixedly installed on the fixed bracket.
[0010] In a preferred embodiment of the present invention, the geotextile pressing mechanism includes a fixed frame, which is fixedly mounted on a fixed bracket of a crawler moving mechanism, and slide grooves are fixedly mounted on both ends of the inner wall of the fixed frame, and pressing bricks are placed in the slide grooves.
[0011] In a preferred embodiment of the present invention, a spacing material shifting mechanism is installed on the fixed frame, and the spacing material shifting mechanism extends into the slide slot.
[0012] In a preferred embodiment of the present invention, the interval material discharging mechanism includes a third motor, the third motor is fixedly mounted on a fixed frame, a raised disc is fixedly mounted on the output end of the third motor, a stabilizing plate is fixedly mounted on the top of the raised disc, and the fixed frame is rotatably connected to the clamping pressure rod and the material discharging rod.
[0013] In a preferred embodiment of the present invention, a spring is installed on the stabilizing plate, one end of the spring is connected to a clamping pressure rod, a clamping rotation slot is provided at the bottom of the material removing rod, the end of the clamping pressure rod is connected to the clamping rotation slot, and a protrusion is provided on the side wall of the clamping pressure rod, corresponding to the protrusion on the raised disc.
[0014] Additional aspects and advantages of the present invention will be given in part in the following description, and in part will become obvious from the following description, or will be learned through practice of the present invention; 1. This equipment uses automated machinery for laying. The geotextile relies on a crawler walking mechanism to move up and down the hill-type engineering spoil, which greatly reduces the labor intensity of the staff and improves the laying efficiency; 2. This equipment adopts a geotextile laying mechanism, which can freely control the laying length of the geotextile, reducing the rolling of the geotextile roll caused by accidents during the laying process of the geotextile, saving resources and the time wasted in recycling the geotextile; at the same time, the geotextile pressing mechanism is adopted, the pressing effect of the engineering waste soil is improved, and the possibility of the geotextile rolling is reduced. The pressed specimens used can be bricks that can be found everywhere, which are light and efficient, and improve economic efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which: Figure 1 A three-dimensional diagram of the equipment for laying and compacting geotextiles for small hill-type engineering waste; Figure 2 A three-dimensional diagram of the crawler moving mechanism in the laying and compacting equipment of the geotextile for the hill pile type engineering waste; Figure 3 This is the front view of the crawler moving mechanism in the equipment for laying and compacting the geotextile for the hill pile type engineering waste soil; Figure 4 A three-dimensional diagram of the geotextile laying mechanism in the geotextile laying and compacting equipment for small hill-type engineering waste soil; Figure 5 A three-dimensional diagram of the geotextile pressing mechanism in the equipment for laying and pressing geotextiles for small hill-type engineering waste soil; Figure 6 This is a schematic diagram of the structure of the intermediate material transfer mechanism in the laying and compacting equipment of geotextile for waste soil in hill pile projects.
[0016] In the figure: 1, crawler moving mechanism; 101, fixed bracket; 102, first motor; 103, driving gear; 104, first chain; 105, connecting plate; 106, driven gear; 107, first transmission shaft; 108, crawler; 109, first fixed shaft; 110, second fixed shaft; 111, third fixed shaft; 112, transmission gear; 113, first moving bracket; 114, first moving wheel; 115, second moving wheel; 116, second moving bracket; 117, third moving wheel; 118, fourth moving wheel; 119, bushing; 120, buffer spring; 121, moving bracket; 122, first rotating wheel; 123, second rotating wheel; 124, third rotating wheel; 2. Geotextile laying mechanism; 201. Second motor; 202. Second chain; 203. Rotating gear; 204. Rotating shaft; 205. First auxiliary rotating wheel; 206. Geotextile; 207. Second auxiliary rotating wheel; 208. Roller; 209. Third auxiliary rotating wheel; 210. Fourth auxiliary rotating wheel; 3. Geotextile pressing mechanism; 301. Fixed frame; 302. Slide; 303. Interval material-dispensing mechanism; 304. Pressing bricks; 306. Third motor; 307. Raised disc; 308. Stabilizing plate; 309. Spring; 310. Clamping pressure rod; 311. Clamping rotating slot; 312. Material-dispensing rod. DETAILED DESCRIPTION
[0017] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.
[0018] Please refer to Figure 1-6 The geotextile laying and compacting equipment for hill pile type engineering waste soil is composed of a crawler moving mechanism 1, a geotextile laying mechanism 2 and a geotextile compacting mechanism 3. The geotextile laying mechanism 2 and the geotextile compacting mechanism 3 are installed on the crawler moving mechanism 1, and the geotextile laying mechanism 2 is provided with a geotextile compacting mechanism 3 at the front end.
[0019] The crawler moving mechanism 1 includes a fixed bracket 101, which is arranged in two groups. A first fixed shaft 109, a second fixed shaft 110 and a third fixed shaft 111 are fixedly installed between the two groups of fixed brackets 101, and the third fixed shaft 111 is arranged above the first fixed shaft 109 and the second fixed shaft 110; the first fixed shaft 109, the second fixed shaft 110 and the third fixed shaft 111 are connected with the two groups of fixed brackets 101 to form a fixed frame, thereby fixing the geotextile laying mechanism 2 and the geotextile pressing mechanism 3; The first motor 102 is fixedly installed on the side wall of the fixed bracket 101, and a driving gear 103 is fixedly installed on the output end of the first motor 102. The driving gear 103 is meshed and connected to the first chain 104, and the first chain 104 is meshed and connected to the driven gear 106. The driven gear 106 is fixedly installed on the first transmission shaft 107. Connecting plates 105 are fixedly installed on both ends of the fixed bracket 101. The first transmission shaft 107 is fixedly connected to the fixed bracket 101 through the left end connecting plate 105. Transmission gears 112 are fixedly installed on both ends of the first transmission shaft 107, and the transmission gear 112 is connected to the crawler track 108. Specifically, the first motor 102 drives the driving gear 103 to rotate, the driving gear 103 drives the first chain 104 to rotate, the first chain 104 drives the driven gear 106 to rotate, the driven gear 106 drives the first transmission shaft 107 to rotate, the first transmission shaft 107 drives the transmission gear 112 to rotate, and the transmission gear 112 drives the crawler track 108 to rotate.
[0020] The first fixed shaft 109 extends out of the fixed bracket 101 and is rotatably connected to the first mobile bracket 113. The second fixed shaft 110 extends out of the fixed bracket 101 and is rotatably connected to the second mobile bracket 116. The first mobile bracket 113 and the second mobile bracket 116 are rotatably connected through the shaft sleeve 119. The tops of the first mobile bracket 113 and the second mobile bracket 116 are connected through a buffer spring 120. The bottom of the second mobile bracket 116 is rotatably connected to a wheel frame 1 (not marked in the figure). The left end of the wheel frame 1 is rotatably connected to the third mobile wheel 117, and the right end of the wheel frame 1 is rotatably connected to the fourth mobile wheel 118. The bottoms of the third mobile wheel 117 and the fourth mobile wheel 118 are connected to the track 108. The bottom of the first mobile bracket 113 is rotatably connected to the third mobile wheel 117. It is rotatably connected to wheel frame 2 (not marked in the figure), the left end of wheel frame 2 is rotatably connected to the first moving wheel 114, and the right end of wheel frame 2 is rotatably connected to the second moving wheel 115; the third fixed shaft 111 extends out of the fixed bracket 101 and is rotatably connected to the third rotating wheel 124, and the third rotating wheel 124 is rotatably connected to the track 108. Specifically, the first moving bracket 113 and the second moving bracket 116 are rotatably connected in a cross manner, and the top is elastically connected by a buffer spring 120, and the elastic force is applied to the first moving wheel 114, the second moving wheel 115, the third moving wheel 117 and the fourth moving wheel 118, so as to support the track 108, and the third rotating wheel 124 has a supporting effect on the top of the track 108.
[0021] The right end connecting plate 105 is rotatably connected to the movable bracket 121 , the top of the movable bracket 121 is rotatably connected to the second rotating wheel 123 , the bottom of the movable bracket 121 is rotatably connected to the first rotating wheel 122 , and the first rotating wheel 122 and the second rotating wheel 123 are connected to the crawler 108 .
[0022] The geotextile laying mechanism 2 includes a second motor 201, which is fixedly mounted on the fixed bracket 101 of the crawler moving mechanism 1. A gear (not marked in the figure) is installed at the output end of the second motor 201, which is meshed with a second chain 202, which is meshed with a rotating gear 203, which is fixedly mounted on a rotating shaft 204, a first auxiliary rotating wheel 205 is arranged on the right side of the rotating shaft 204, a geotextile 206 is arranged between the rotating shaft 204 and the first auxiliary rotating wheel 205, and the right end of the geotextile 206 is connected to a second auxiliary rotating wheel 207, and the second auxiliary rotating wheel 208 is arranged on the right side of the rotating shaft 204. A roller 208 is provided on the right side of the auxiliary rotating wheel 207, and a geotextile 206 is wound on the roller 208. A third auxiliary rotating wheel 209 and a fourth auxiliary rotating wheel 210 are provided at the bottom of the roller 208. Specifically, the second motor 201 rotates the gear, the gear rotates the second chain 202, the second chain 202 rotates the rotating gear 203, the rotating gear 203 rotates the rotating shaft 204, and the rotating shaft 204 rotates in coordination with the first auxiliary rotating wheel 205 to pull the geotextile 206 out of the roller 208 and then transmit it to the bottom of the geotextile laying mechanism 2. The second auxiliary rotating wheel 207 has a positioning effect on the geotextile 206.
[0023] Slide blocks (not marked in the figure) are installed at both ends of the third auxiliary rotating wheel 209 and the fourth auxiliary rotating wheel 210. A spring 1 (not marked in the figure) is installed on the side of the slider away from the roller 208. The spring 1 is fixedly installed in a slide groove (not marked in the figure). The slide groove is slidably connected to the slider. The rotating shaft 204, the first auxiliary rotating wheel 205, the second auxiliary rotating wheel 207 and both ends of the roller 208 are rotatably connected to the fixed bracket 101; the slide groove is fixedly installed on the fixed bracket 101. Specifically, the third auxiliary rotating wheel 209 and the fourth auxiliary rotating wheel 210 are subjected to the elastic force of the spring 1, so as to fit the geotextile 206 outside the roller 208 to prevent the geotextile 206 from becoming loose.
[0024] The geotextile pressing mechanism 3 includes a fixed frame 301, which is fixedly mounted on the fixed bracket 101 of the crawler moving mechanism 1. Slide grooves 302 are fixedly mounted on both ends of the inner wall of the fixed frame 301. Pressing bricks 304 are placed in the slide grooves 302. The pressing bricks 304 slide downward from the slide grooves 302 and fall on the laid geotextile 206, thereby pressing the geotextile 206 to prevent the geotextile 206 from being blown away by the wind. The fixed frame 301 is provided with an interval material shifting mechanism 303 , and the interval material shifting mechanism 303 extends into the slide slot 302 .
[0025] The interval material-dispensing mechanism 303 includes a third motor 306, which is fixedly mounted on the fixed frame 301. A raised disc 307 is fixedly mounted on the output end of the third motor 306. A stabilizing plate 308 is fixedly mounted on the top of the raised disc 307. A clamping pressure rod 310 and a material-dispensing rod 312 are rotatably connected on the fixed frame 301. A spring 309 is mounted on the stabilizing plate 308. One end of the spring 309 is connected to the clamping pressure rod 310. A clamping rotation slot 311 is provided at the bottom of the material-dispensing rod 312. The end of the clamping pressure rod 310 is connected to the clamping rotation slot 311. The side wall of the clamping pressure rod 310 is provided with The protrusion corresponds to the protrusion of the protruding disc 307. Specifically, the third motor 306 rotates the protruding disc 307 and the stabilizing plate 308, and the protruding top column of the stabilizing plate 308 clamps the protrusion of the side wall of the clamping rod 310, so that the top end of the clamping rod 310 is disengaged from the clamping rotating slot 311. After the clamping rotating slot 311 is released, the compression brick 304 pushes the material pushing rod 312 and moves downward. After the third motor 306 resets the protruding disc 307, the clamping rod 310 is reconnected to the clamping rotating slot 311 by the force of the spring 309, and the material pushing rod 312 pushes the next group of compression bricks 304.
[0026] The working principle of the present invention is: the first motor, the second motor and the third motor are connected to an external power supply and a controller, the first motor 102 drives the driving gear 103 to rotate, the driving gear 103 drives the first chain 104 to rotate, the first chain 104 drives the driven gear 106 to rotate, the driven gear 106 drives the first transmission shaft 107 to rotate, the first transmission shaft 107 drives the transmission gear 112 to rotate, and the transmission gear 112 drives the crawler 108 to rotate; the first moving bracket 113 is cross-rotatingly connected with the second moving bracket 116, and the top is elastically connected by a buffer spring 120, and the elastic force is applied to the first moving wheel 114, the second moving wheel 115, the third moving wheel 117 and the fourth moving wheel 118, so as to support the crawler 108, the second motor 201 rotates the gear, the gear rotates the second chain 202, the second chain 202 rotates the rotating gear 203, and the rotating gear 20 The rotating shaft 204 is rotated, and the rotating shaft 204 rotates in coordination with the first auxiliary rotating wheel 205, so that the geotextile 206 is pulled out from the roller 208 and then transferred to the bottom of the geotextile laying mechanism 2; the third motor 306 rotates the raised disc 307 and the stabilizing plate 308, and the raised top column of the stabilizing plate 308 clamps the protrusion of the side wall of the clamping rod 310, so that the top end of the clamping rod 310 is disengaged from the clamping rotating slot 311, and the clamping rotating slot 311 is released. After that, the compression brick 304 pushes the material-moving rod 312 and moves downward. After the third motor 306 resets the raised disc 307, the clamping pressure rod 310 is reconnected to the clamping rotating slot 311 by the force of the spring 309. The material-moving rod 312 pushes the next group of compression bricks 304, and the compression bricks 304 slide downward from the slide slot 302 and fall on the laid geotextile 206, thereby pressing the geotextile 206 to prevent the geotextile 206 from being blown away by the wind.
[0027] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.
Claims
1. Equipment for laying and compacting geotextiles for small hill type engineering waste soil, characterized by: The invention comprises a crawler moving mechanism (1), a geotextile laying mechanism (2) and a geotextile pressing mechanism (3); the crawler moving mechanism (1) is provided with a geotextile laying mechanism (2) and a geotextile pressing mechanism (3); the front end of the geotextile laying mechanism (2) is provided with a geotextile pressing mechanism (3).
2. The equipment for laying and compacting geotextiles for hill pile engineering waste soil according to claim 1 is characterized in that: The crawler moving mechanism (1) comprises a fixed bracket (101), wherein the fixed bracket (101) is arranged in two groups, wherein a first fixed shaft (109), a second fixed shaft (110) and a third fixed shaft (111) are fixedly mounted between the two groups of the fixed brackets (101), wherein the third fixed shaft (111) is arranged above the first fixed shaft (109) and the second fixed shaft (110); a first motor (102) is fixedly mounted on a side wall of the fixed bracket (101), a driving gear (103) is fixedly mounted on an output end of the first motor (102), and the driving gear (103) is fixedly mounted on an output end of the first motor (102). The gear (103) is meshedly connected to the first chain (104), the first chain (104) is meshedly connected to the driven gear (106), the driven gear (106) is fixedly mounted on the first transmission shaft (107), connecting plates (105) are fixedly mounted at both ends of the fixed bracket (101), the first transmission shaft (107) is fixedly connected to the fixed bracket (101) via the connecting plate (105) at the left end, transmission gears (112) are fixedly mounted at both ends of the first transmission shaft (107), and the transmission gear (112) is connected to a crawler track (108).
3. The equipment for laying and compacting geotextiles for hill pile engineering waste soil according to claim 2 is characterized in that: The first fixed shaft (109) extends out of the fixed bracket (101) and is rotatably connected to the first movable bracket (113); the second fixed shaft (110) extends out of the fixed bracket (101) and is rotatably connected to the second movable bracket (116); the first movable bracket (113) and the second movable bracket (116) are rotatably connected via a shaft sleeve (119); the tops of the first movable bracket (113) and the second movable bracket (116) are connected via a buffer spring (120); the bottom of the second movable bracket (116) is rotatably connected to a wheel frame 1; the left end of the wheel frame 1 is rotatably connected to the second movable bracket (116); Three moving wheels (117), the right end of the first wheel frame is rotatably connected to the fourth moving wheel (118), and the bottoms of the third moving wheel (117) and the fourth moving wheel (118) are connected to the track (108); the bottom of the first moving bracket (113) is rotatably connected to the second wheel frame, the left end of the second wheel frame is rotatably connected to the first moving wheel (114), and the right end of the second wheel frame is rotatably connected to the second moving wheel (115); the third fixed shaft (111) extends out of the fixed bracket (101) and is rotatably connected to the third rotating wheel (124), and the third rotating wheel (124) is rotatably connected to the track (108).
4. The equipment for laying and compacting geotextiles for hill pile engineering waste soil according to claim 3 is characterized in that: The connecting plate (105) at the right end is rotatably connected to the movable bracket (121), the top of the movable bracket (121) is rotatably connected to the second rotating wheel (123), the bottom of the movable bracket (121) is rotatably connected to the first rotating wheel (122), and the first rotating wheel (122) and the second rotating wheel (123) are connected to the crawler (108).
5. The equipment for laying and compacting geotextiles for hill pile engineering waste soil according to claim 1 is characterized in that: The geotextile laying mechanism (2) comprises a second motor (201), the second motor (201) being fixedly mounted on a fixed bracket (101) of the crawler moving mechanism (1), a gear being mounted on the output end of the second motor (201), the gear being meshedly connected to a second chain (202), the second chain (202) being meshedly connected to a rotating gear (203), the rotating gear (203) being fixedly mounted on a rotating shaft (204), a first auxiliary rotating wheel (205) being arranged on the right side of the rotating shaft (204), a geotextile (206) being arranged between the rotating shaft (204) and the first auxiliary rotating wheel (205), the right end of the geotextile (206) being connected to a second auxiliary rotating wheel (207), a roller (208) being arranged on the right side of the second auxiliary rotating wheel (207), the geotextile (206) being wound around the roller (208), and a third auxiliary rotating wheel (209) and a fourth auxiliary rotating wheel (210) being arranged at the bottom of the roller (208).
6. The equipment for laying and compacting geotextiles for hill pile engineering waste soil according to claim 5 is characterized in that: Slide blocks are installed at both ends of the third auxiliary rotating wheel (209) and the fourth auxiliary rotating wheel (210); a spring 1 is installed on the side of the slide block away from the roller (208); the spring 1 is fixedly installed in a slide groove; the slide groove is slidably connected to the slide block; the rotating shaft (204), the first auxiliary rotating wheel (205), the second auxiliary rotating wheel (207) and the roller (208) are rotatably connected to the fixed bracket (101); the slide groove is fixedly installed on the fixed bracket (101).
7. The equipment for laying and compacting geotextiles for hill pile engineering waste soil according to claim 1 is characterized in that: The geotextile pressing mechanism (3) comprises a fixed frame (301), wherein the fixed frame (301) is fixedly mounted on a fixed bracket (101) of the crawler moving mechanism (1), and slide grooves (302) are fixedly mounted on both ends of the inner wall of the fixed frame (301), and pressing bricks (304) are placed in the slide grooves (302).
8. The equipment for laying and compacting geotextiles for hill pile engineering waste soil according to claim 7, characterized in that: The fixed frame (301) is provided with an interval material shifting mechanism (303), and the interval material shifting mechanism (303) extends into the slide groove (302).
9. The equipment for laying and compacting geotextiles for hill pile engineering waste soil according to claim 8, characterized in that: The interval material-discharging mechanism (303) comprises a third motor (306), the third motor (306) is fixedly mounted on the fixed frame (301), a raised disc (307) is fixedly mounted on the output end of the third motor (306), a stabilizing plate (308) is fixedly mounted on the top of the raised disc (307), and a clamping pressure rod (310) and a material-discharging rod (312) are rotatably connected on the fixed frame (301).
10. The equipment for laying and compacting geotextiles for hill pile engineering waste soil according to claim 9, characterized in that: A spring (309) is installed on the stabilizing plate (308), one end of the spring (309) is connected to a clamping pressure rod (310), a clamping rotation slot (311) is provided at the bottom of the material moving rod (312), an end of the clamping pressure rod (310) is connected to the clamping rotation slot (311), and a protrusion is provided on the side wall of the clamping pressure rod (310) and corresponds to the protrusion of the protruding disc (307).
Citation Information
Patent Citations
Grass grid desertification control robot
CN113774916A
Pavement construction method
CN115717353A
Auxiliary device for laying geotextile of isolating layer of terrestrial ground engineering in permafrost region
CN116463911A
Polylactic acid sand barrier laying device
CN215441843U
Automatic geogrid paving device
CN217997754U