Heat furnace real-time sampling mechanism and method

By designing the filtering and sealing mechanism in the real-time sampling equipment of the hot furnace, the problems of blocked sampling head and poor sealing are solved, and efficient material filtration and sealing are achieved, ensuring the stable and safe operation of the equipment.

CN119290492AInactive Publication Date: 2025-01-10GUANGDE JIUXING MOIECULAR SIEVE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411444168.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-15
Publication Date
2025-01-10
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the existing real-time sampling equipment of hot furnaces, the filter screen installed on the sampling head is prone to clogging and the sealing performance is poor, resulting in water inlet problems.

Method used

A real-time sampling mechanism for the hot furnace including a filter mechanism and a sealing mechanism is designed. The filter mechanism is passed through a combination of a filter can, a filter mesh and a connecting cover, and the sealing mechanism is passed through a combination of a sealing groove, a clamp, a sealing gasket, a connecting ring and a fixing block. , ensure material filtration and sealing effect, and monitor the equipment status and sealing in real time through the monitor.

Benefits of technology

Effectively remove impurities in the material, prevent equipment damage, improve sampling accuracy and reliability, enhance sealing, extend the service life of the equipment, simplify the maintenance process, and improve installation and use efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119290492A_ABST
    Figure CN119290492A_ABST
Patent Text Reader

Abstract

The invention relates to the relevant technical field of heat furnace real-time sampling, in particular to a heat furnace real-time sampling mechanism and method.The heat furnace real-time sampling mechanism comprises a material taking tank, a material taking pipe, a material taking pump and a discharging pipe and is characterized in that the material taking pipe is connected to the upper surface of the material taking tank, and the material taking pump is fixedly connected to the surface of one side of the material taking pipe; a discharging pipe is connected to one side of the surface of the material taking pump, the outer side surface of the material taking pipe is sleeved with a filtering mechanism, a sealing mechanism is arranged on the upper surface of the material taking tank, and a fixing mechanism is arranged on the inner side surface of the material taking tank. According to the real-time sampling mechanism and method for the heating furnace, materials in the heating furnace can be rapidly extracted to the filtering tank, impurities are effectively filtered through the filtering net, the filtering net can be cleaned for continuous use after being full, the sealing structure ensures no leakage in the process, connection is firm and reliable, the sampling accuracy and reliability are improved through the mechanism, operation and maintenance are convenient, and the practicability is high. Powerful support is provided for quality control and process optimization of heat furnace production, and the production efficiency and the product quality are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field related to hot furnace real-time sampling, and in particular to a hot furnace real-time sampling mechanism and method. Background Art

[0002] The hot furnace real-time sampling equipment is a professional device used for material sampling in a high-temperature hot furnace environment. It is mainly composed of a material pump, a material pipe, a filter tank, a discharge pipe and other components. A filter device is required during the hot furnace sampling process because the material in the hot furnace may contain impurities. The filter can effectively remove these impurities and prevent impurities from entering the subsequent equipment such as the material pump to avoid damage to the equipment. At the same time, it ensures that the sampled material is pure and provides accurate and reliable samples for subsequent analysis and testing. Detector monitoring is also crucial in the real-time sampling equipment of hot furnaces. It can monitor the working status of the material pump, the filtering condition of the filter tank and the overall sealing in real time, ensure the stable and efficient sampling process, protect the safety of operators, and provide strong data support for the quality control and process optimization of hot furnace production. The real-time sampling mechanism of the hot furnace plus the filtering mechanism can effectively remove impurities in the hot furnace materials, ensure the purity of the materials entering the subsequent process, prevent impurities from damaging the material pump and other equipment, and extend the service life of the equipment. At the same time, it improves the accuracy and reliability of sampling, and provides high-quality samples for subsequent analysis and testing. It enables the real-time sampling mechanism of the hot furnace to better adapt to various complex hot furnace environments and ensure the stable sampling process.

[0003] In the current real-time sampling process of hot furnaces, a filter is basically installed on the sampling head. This may cause the sampling head to be blocked during the sampling process, and the sealing performance is poor, which makes it easy for water to enter during use. Summary of the invention

[0004] The purpose of the present invention is to provide a hot furnace real-time sampling mechanism and method, in order to overcome the existing technical background in the current hot furnace real-time sampling process, basically a sampling head is installed with a filter net, which may cause the sampling head to be blocked during the sampling process, and the sealing performance is poor, and water is easy to enter during use.

[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a hot furnace real-time sampling mechanism and method, a hot furnace real-time sampling mechanism, comprising a material taking tank, a material taking pipe, a material taking pump and a material discharging pipe, characterized in that the upper surface of the material taking tank is connected with the material taking pipe, the one side surface of the material taking pipe is fixedly connected with the material taking pump, the one side surface of the material taking pump is connected with the material discharging pipe, the outer surface of the material taking pipe is sleeved with a filtering mechanism, the upper surface of the material taking tank is provided with a sealing mechanism, and the inner surface of the material taking tank is provided with a fixing mechanism;

[0006] The filtering mechanism includes a filter tank, a filter screen, a connecting cover and a handle. The filter tank is connected through one side surface of the material taking pipe, the filter screen is provided on the inner side surface of the filter tank, the connecting cover is threadedly connected to the outer side surface of the filter tank, and a handle is installed on one side surface of the connecting cover.

[0007] Preferably, the discharge pipe passes through the material taking tank for connection.

[0008] Preferably, the sealing mechanism includes a sealing groove, a clamping block, a sealing gasket, a connecting ring, a fixed block and a limiting groove. A sealing groove is provided on the upper surface of the material taking tank, a clamping block is installed on the upper surface of the sealing groove, a sealing gasket is attached to the inner surface of the sealing groove, a connecting ring is provided on the upper surface of the sealing groove, a fixing block is installed on one side surface of the connecting ring, and a limiting groove is provided on one side surface of the fixing block.

[0009] Preferably, the inner wall size of the limiting groove matches the outer wall size of the block.

[0010] Preferably, the connecting ring is threadedly connected and fixed to the clamping block and the fixing block.

[0011] Preferably, the fixing mechanism includes a fixing frame, a placement groove, an installation groove, a spring, a mounting block, a monitor and a card slot. The fixing frame is fixedly installed on the inner side of the material taking tank, the upper surface of the fixing frame is provided with a placement groove, the one side surface of the fixing frame is provided with a mounting groove, the inner surface of the mounting groove is fixedly connected with a spring, one end surface of the spring is fixedly connected with a mounting block, the upper surface of the mounting block is provided with a monitor, and card slots are provided on both side surfaces of the monitor.

[0012] Preferably, the inner spring of the mounting groove is connected to the mounting block to form a telescopic structure.

[0013] A method for a hot furnace real-time sampling mechanism, the specific steps are as follows:

[0014] S1. First, check whether all parts of the hot furnace sampling equipment are intact. The material of the sampling tube is made of high-temperature resistant alloy steel, with a length of 1.5 meters and a diameter of 3 centimeters. It can withstand a high temperature of at least 1200 degrees Celsius. The sampling container must be made of high-temperature resistant ceramic material with a capacity of 0.5 liters and good sealing to ensure that the equipment is not damaged or leaking and can work normally;

[0015] S2. Then put on high-temperature resistant heat-insulating clothing. The heat-insulating performance of the heat-insulating clothing should be able to ensure human safety in a high-temperature environment of 1000 degrees Celsius for 30 minutes. Wear high-temperature resistant gloves with a thickness of 2 cm. The goggles should be able to effectively block heat radiation and splashes to ensure the safety of operators when approaching the hot furnace;

[0016] S3. Then determine the location of the hot furnace where sampling is required. The temperature of the hot furnace is usually between 800 degrees Celsius and 1500 degrees Celsius. Ensure that the sampling equipment can accurately reach the sampling point. The optimal operating distance from the hot furnace is 1 meter.

[0017] S4. Use the feeding tube to quickly insert it into the hot furnace. The feeding tube should have good high temperature resistance and heat insulation effect. The thickness of the heat insulation material of the feeding tube is 1 cm, which can effectively block heat conduction. The insertion speed should be controlled at 5 cm per second to prevent the operator from being scalded;

[0018] S5. After the material taking tube is inserted into the appropriate position, turn on the material taking pump to allow the sample in the furnace to flow into the material taking tank. The operation should be quick and accurate to avoid external contamination of the sample.

[0019] S6. After sampling is completed, quickly pull the sampling tube out of the hot furnace;

[0020] S7. Place the removed samples in a safe place for subsequent processing. At the same time, clean and maintain the sampling equipment to prepare for the next use.

[0021] Compared with the prior art, the present invention has the following beneficial effects:

[0022] 1. After starting the material pump, place the material pipe in the hot furnace, which can quickly and efficiently extract materials from the hot furnace for testing and analysis, so as to adjust the process parameters in time and improve production efficiency and product quality. Secondly, the material is filtered through the filter before entering the material pump, which effectively removes impurities and large particles in the material, prevents these impurities from damaging the material pump and subsequent equipment, and extends the service life of the equipment. At the same time, it also ensures that the material taken out of the hot furnace has a high purity, providing a reliable sample for subsequent analysis and testing. When the filter is full, the connection cover can be opened by the handle, the filter can be easily cleaned, and then reinstalled for continued use. This design makes the maintenance of the sampling mechanism simple and convenient, without the need for complicated disassembly process, which greatly improves the maintainability and use efficiency of the equipment;

[0023] 2. Place the sealing gasket in the sealing groove and fix it, which can effectively enhance the sealing of the connection and prevent the high-temperature material in the hot furnace from leaking during the sampling process, avoiding the potential safety hazards caused by the leakage of high-temperature materials, and also ensuring the accuracy and reliability of sampling. Then, the connecting ring drives the fixing block to be placed in the sealing groove and rotate. When the limit groove is stuck with the block, it is fixed by bolts. This connection method is simple and convenient to operate, and can quickly realize the installation and fixation of the sealed connection. In actual use, it not only improves the installation efficiency, but also has a firm and reliable connection, which can withstand the high temperature and pressure environment in the hot furnace and ensure the stability of the sampling process.

[0024] 3. The design of pressing the mounting block to squeeze the spring into the mounting slot is simple and quick to operate. When installing the monitor, no complicated tools and cumbersome steps are required, which greatly improves the installation efficiency. When the mounting block is completely inserted into the mounting slot, the monitor is placed in the placement slot. This method makes the installation position of the monitor more accurate and stable. Once the position of the card slot and the mounting slot coincide, the spring will push the mounting block into the card slot to complete the fixation of the fixing frame and the monitor. This fixing method is firm and reliable, and can ensure that the monitor will not loosen or fall off due to vibration or other factors during the real-time sampling of the hot furnace. The monitor plays a vital role in the hot furnace sampling process. It plays an important role. On the one hand, it can monitor the working status of the material pump in real time, such as pressure, flow and other parameters, to ensure the normal operation of the material pump and avoid affecting the sampling work due to failure of the material pump. On the other hand, the monitor can monitor the filtering condition of the filter tank. When the filter is blocked or the filtering effect is reduced, it will issue an alarm in time to remind the operator to clean or replace the filter to ensure the quality and efficiency of sampling. The monitor can also monitor the overall sealing of the real-time sampling mechanism of the hot furnace. Once a problem with the sealing is found, timely measures can be taken to prevent the leakage of high-temperature materials in the hot furnace, thereby ensuring the safety of the operator and the smooth progress of the sampling work. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 This is a schematic diagram of the overall appearance structure of the hot furnace real-time sampling device of the present invention;

[0026] Figure 2 It is a schematic cross-sectional view of the sampling device of the present invention;

[0027] Figure 3 It is a schematic diagram of the structure of the filtering mechanism of the present invention;

[0028] Figure 4 It is a schematic diagram of the sealing mechanism structure of the present invention;

[0029] Figure 5 It is a schematic diagram of the fixing mechanism structure of the present invention;

[0030] Figure 6 For the present invention Figure 3 Enlarged structural diagram at A in the middle.

[0031] In the figure: 1. material taking tank; 2. material taking pipe; 3. material taking pump; 4. material discharge pipe; 5. filtering mechanism; 501. filtering tank; 502. filtering net; 503. connecting cover; 504. handle; 6. sealing mechanism; 601. sealing groove; 602. clamping block; 603. sealing gasket; 604. connecting ring; 605. fixing block; 606. limiting groove; 7. fixing mechanism; 701. fixing frame; 702. placing groove; 703. mounting groove; 704. spring; 705. mounting block; 706. monitor; 707. clamping slot. DETAILED DESCRIPTION

[0032] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0033] The present embodiment discloses a hot furnace real-time sampling mechanism, comprising a material taking tank 1, a material taking pipe 2, a material taking pump 3 and a material discharging pipe 4, characterized in that the upper surface of the material taking tank 1 is connected with the material taking pipe 2, the one side surface of the material taking pipe 2 is fixedly connected with the material taking pump 3, the one side surface of the material taking pump 3 is connected with the material discharging pipe 4, the outer surface of the material taking pipe 2 is sleeved with a filtering mechanism 5, the upper surface of the material taking tank 1 is provided with a sealing mechanism 6, and the inner surface of the material taking tank 1 is provided with a fixing mechanism 7;

[0034] The filtering mechanism 5 includes a filter tank 501, a filter screen 502, a connecting cover 503 and a handle 504. The filter tank 501 is connected to one side surface of the feeding pipe 2, the filter screen 502 is arranged on the inner side surface of the filter tank 501, the connecting cover 503 is threadedly connected to the outer side surface of the filter tank 501, and the handle 504 is installed on one side surface of the connecting cover 503. The filtering effect is better through the arrangement of the filter tank 501, the filter screen 502, the connecting cover 503 and the handle 504. First, the feeding pump 3 is started, and then the feeding pipe 2 is placed in the hot furnace, and then the material is pumped into the filter tank 501, and then the material passes through the filter screen 502 for filtering and enters the feeding pump 3, and then is discharged from the discharge pipe 4 to the storage tank for use. When the filter screen 502 is full, the connecting cover 503 can be opened through the handle 504, and the filter screen 502 can be cleaned and then installed back for continued use.

[0035] Furthermore, the discharge pipe 4 penetrates through the material taking tank 1 and is connected, and the material can be discharged through the arrangement of the discharge pipe 4.

[0036] Further, the sealing mechanism 6 includes a sealing groove 601, a clamping block 602, a sealing gasket 603, a connecting ring 604, a fixing block 605 and a limiting groove 606. The upper surface of the material taking tank 1 is provided with a sealing groove 601, the upper surface of the sealing groove 601 is provided with a clamping block 602, the inner surface of the sealing groove 601 is fitted with a sealing gasket 603, the upper surface of the sealing groove 601 is provided with a connecting ring 604, one side surface of the connecting ring 604 is provided with a fixing block 605, one side surface of the fixing block 605 is provided with a limiting groove 606, and the material taking tank 1 is provided with a sealing groove 601. By setting the sealing groove 601, the clamping block 602, the sealing gasket 603, the connecting ring 604, the fixed block 605 and the limiting groove 606, the sealing effect is improved, and then the sealing gasket 603 is placed in the sealing groove 601 and fixed, and then the connecting ring 604 drives the fixed block 605 to be placed in the sealing groove 601, and then the connecting ring 604 is rotated, and then the connecting ring 604 drives the fixed block 605 to rotate, and then when the limiting groove 606 clamps the clamping block 602, the connecting ring 604 is bolted to fix it.

[0037] Furthermore, the inner wall size of the limiting groove 606 is consistent with the outer wall size of the clamping block 602 , and the clamping block 602 can be fixed by the setting of the limiting groove 606 .

[0038] Furthermore, the connecting ring 604 is threadedly connected and fixed to the clamping block 602 and the fixing block 605 . The setting of the fixing block 605 provides a better fixing effect.

[0039] Further, the fixing mechanism 7 includes a fixing frame 701, a placement groove 702, a mounting groove 703, a spring 704, a mounting block 705, a monitor 706 and a card slot 707. The fixing frame 701 is fixedly installed on the inner side of the material taking tank 1, and the upper surface of the fixing frame 701 is provided with a placement groove 702, and a side surface of the fixing frame 701 is provided with a mounting groove 703. The inner surface of the mounting groove 703 is fixedly connected with a spring 704, and one end surface of the spring 704 is fixedly connected with a mounting block 705. The upper surface of the mounting block 705 is provided with a monitor 706, and the two side surfaces of the monitor 706 are provided with card slots 707. The arrangement of slot 702, mounting slot 703, spring 704, mounting block 705, monitor 706 and card slot 707 makes the fixing effect better. Then install the fixing frame 701, then press the mounting block 705, and then the mounting block 705 squeezes the spring 704 into the mounting slot 703. When the mounting block 705 completely enters the mounting slot 703, then place the monitor 706 into the placement slot 702. Then when the position of the card slot 707 matches the position of the mounting slot 703, the spring 704 pushes the mounting block 705 into the card slot 707 to complete the fixation of the fixing frame 701 and the monitor 706.

[0040] Furthermore, the inner spring 704 of the mounting groove 703 is connected to the mounting block 705 to form a telescopic structure. The spring 704 can be installed through the setting of the mounting groove 703.

[0041] A method for a hot furnace real-time sampling mechanism, the specific steps are as follows:

[0042] S1. First, check whether all parts of the hot furnace sampling equipment are intact. The material taking pipe (2) is made of high-temperature resistant alloy steel, with a length of 1.5 meters and a diameter of 3 centimeters, and can withstand a high temperature of at least 1200 degrees Celsius. The sampling container must be made of high-temperature resistant ceramic material, with a capacity of 0.5 liters and good sealing, to ensure that the equipment is not damaged, leak-free, and can work normally;

[0043] S2. Then put on high-temperature resistant heat-insulating clothing. The heat-insulating performance of the heat-insulating clothing should be able to ensure human safety in a high-temperature environment of 1000 degrees Celsius for 30 minutes. Wear high-temperature resistant gloves with a thickness of 2 cm. The goggles should be able to effectively block heat radiation and splashes to ensure the safety of operators when approaching the hot furnace;

[0044] S3. Then determine the location of the hot furnace where sampling is required. The temperature of the hot furnace is usually between 800 degrees Celsius and 1500 degrees Celsius. Ensure that the sampling equipment can accurately reach the sampling point. The optimal operating distance from the hot furnace is 1 meter.

[0045] S4, use the feeding tube 2 to quickly insert it into the hot furnace. The feeding tube 2 should have good high temperature resistance and heat insulation effect. The thickness of the heat insulation material of the feeding tube 2 is 1 cm, which can effectively block heat conduction. The insertion speed should be controlled at 5 cm per second to prevent the operator from being scalded;

[0046] S5. After the material taking tube 2 is inserted into the appropriate position, turn on the material taking pump 3 to allow the sample in the furnace to flow into the material taking tank 1. The operation should be quick and accurate to avoid external contamination of the sample.

[0047] S6. After the sampling is completed, the material taking tube 2 is quickly pulled out from the hot furnace;

[0048] S7. Place the removed samples in a safe place for subsequent processing. At the same time, clean and maintain the sampling equipment to prepare for the next use.

[0049] Working principle: first start the material taking pump 3, then place the material taking pipe 2 into the hot furnace, then pump the material into the filter tank 501, then the material is filtered through the filter screen 502 and enters the material taking pump 3, and then is discharged from the discharge pipe 4 to the storage tank for use. When the filter screen 502 is full, the connecting cover 503 can be opened through the handle 504, the filter screen 502 can be cleaned and then installed back for continued use, and then the sealing gasket 603 is placed in the sealing groove 601 and fixed, and then the connecting ring 604 drives the fixing block 605 to be placed in the sealing groove 601, and then the connecting ring 604 is rotated, and then the connecting ring 604 drives the fixing block 605 to rotate, and then when the limiting groove 606 is stuck with the blocking block 602, then the connecting ring 604 is bolted to fix it, and then the sealing gasket 603 is placed in the sealing groove 601 and fixed, and then the connecting ring 604 drives the fixing block 605 to be placed in the sealing groove 706 is fixed to the filter housing 501. When the filter housing 501 is in the sealing groove 601, the connecting ring 604 is rotated, and then the connecting ring 604 drives the fixing block 605 to rotate. When the limiting groove 606 is stuck to the blocking block 602, the connecting ring 604 is bolted to fix it. Then the fixing frame 701 is installed, and then the mounting block 705 is pressed. Then the mounting block 705 squeezes the spring 704 to enter the mounting groove 703. When the mounting block 705 is completely inserted into the mounting groove 703, the monitor 706 is placed in the placement groove 702. Then, when the position of the blocking groove 707 coincides with the position of the mounting groove 703, the spring 704 pushes the mounting block 705 into the blocking groove 707 to complete the fixing of the fixing frame 701 and the monitor 706. After the monitor 706 is fixed, the filtering condition in the filter tank 501 can be monitored during the sampling process, and the flow rate when the material taking pipe 2 is taking materials can also be monitored.

[0050] Obviously, the above embodiments are only examples for clear explanation, and are not intended to limit the implementation methods. For ordinary technicians in the relevant field, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived from them are still within the protection scope of the invention.

Claims

1. A hot furnace real-time sampling mechanism, comprising a material taking tank (1), a material taking pipe (2), a material taking pump (3) and a material discharge pipe (4), characterized in that: The upper surface of the material taking tank (1) is connected to a material taking pipe (2), a side surface of the material taking pipe (2) is fixedly connected to a material taking pump (3), a side surface of the material taking pump (3) is connected to a discharge pipe (4), a filtering mechanism (5) is sleeved on the outer surface of the material taking pipe (2), a sealing mechanism (6) is provided on the upper surface of the material taking tank (1), and a fixing mechanism (7) is provided on the inner surface of the material taking tank (1); The filtering mechanism (5) comprises a filtering tank (501), a filtering net (502), a connecting cover (503), and a handle (504); the filtering tank (501) is connected through one side surface of the material taking pipe (2); the filtering net (502) is arranged on the inner side surface of the filtering tank (501); the connecting cover (503) is threadedly connected to the outer side surface of the filtering tank (501); and the handle (504) is installed on one side surface of the connecting cover (503).

2. A hot furnace real-time sampling mechanism according to claim 1, characterized in that: The discharge pipe (4) passes through and is connected to the material taking tank (1).

3. A hot furnace real-time sampling mechanism according to claim 1, characterized in that: The sealing mechanism (6) comprises a sealing groove (601), a clamping block (602), a sealing gasket (603), a connecting ring (604), a fixing block (605) and a limiting groove (606); the upper surface of the material taking tank (1) is provided with a sealing groove (601); the upper surface of the sealing groove (601) is provided with a clamping block (602); the inner surface of the sealing groove (601) is fitted with a sealing gasket (603); the upper surface of the sealing groove (601) is provided with a connecting ring (604); a fixing block (605) is installed on one side surface of the connecting ring (604); and a limiting groove (606) is provided on one side surface of the fixing block (605).

4. A hot furnace real-time sampling mechanism according to claim 3, characterized in that: The inner wall size of the limiting groove (606) matches the outer wall size of the clamping block (602).

5. A hot furnace real-time sampling mechanism according to claim 3, characterized in that: The connecting ring (604) is threadedly connected and fixed to the clamping block (602) and the fixing block (605).

6. A hot furnace real-time sampling mechanism according to claim 1, characterized in that: The fixing mechanism (7) comprises a fixing frame (701), a placement groove (702), a mounting groove (703), a spring (704), a mounting block (705), a monitor (706) and a clamping groove (707); the fixing frame (701) is fixedly mounted on the inner side of the material taking tank (1); the upper surface of the fixing frame (701) is provided with a placement groove (702); a side surface of the fixing frame (701) is provided with a mounting groove (703); the inner surface of the mounting groove (703) is fixedly connected with a spring (704); one end surface of the spring (704) is fixedly connected with a mounting block (705); the upper surface of the mounting block (705) is provided with a monitor (706); and clamping grooves (707) are provided on both side surfaces of the monitor (706).

7. A hot furnace real-time sampling mechanism according to claim 6, characterized in that: The inner spring (704) of the mounting groove (703) is connected to the mounting block (705) to form a telescopic structure.

8. A method for a hot furnace real-time sampling mechanism. A hot furnace real-time sampling mechanism as described in claims 1 to 7, characterized in that: The specific steps are as follows: S1. First, check whether all parts of the hot furnace sampling equipment are intact. The material taking pipe (2) is made of high-temperature resistant alloy steel, with a length of 1.5 meters and a diameter of 3 centimeters, and can withstand a high temperature of at least 1200 degrees Celsius. The sampling container must be made of high-temperature resistant ceramic material, with a capacity of 0.5 liters and good sealing, to ensure that the equipment is not damaged, leak-free, and can work normally; S2. Then put on high-temperature resistant heat-insulating clothing. The heat-insulating performance of the heat-insulating clothing should be able to ensure human safety in a high-temperature environment of 1000 degrees Celsius for 30 minutes. Wear high-temperature resistant gloves with a thickness of 2 cm. The goggles should be able to effectively block heat radiation and splashes to ensure the safety of operators when approaching the hot furnace; S3. Then determine the location of the hot furnace where sampling is required. The temperature of the hot furnace is usually between 800 degrees Celsius and 1500 degrees Celsius. Ensure that the sampling equipment can accurately reach the sampling point. The optimal operating distance from the hot furnace is 1 meter. S4. Use the feeding tube (2) to quickly insert it into the hot furnace. The feeding tube (2) should have good high temperature resistance and heat insulation effect. The thickness of the heat insulation material of the feeding tube (2) is 1 cm, which can effectively block heat conduction. The insertion speed should be controlled at 5 cm per second to prevent the operator from being scalded. S5. After the material taking tube (2) is inserted into the appropriate position, turn on the material taking pump (3) to allow the sample in the furnace to flow into the material taking tank (1). The operation should be quick and accurate to avoid external contamination of the sample. S6. After the sampling is completed, the material taking tube (2) is quickly pulled out from the hot furnace; S7. Place the removed samples in a safe place for subsequent processing. At the same time, clean and maintain the sampling equipment to prepare for the next use.