Large-scale staggered-span continuous-row steel-making plant structure and construction method

By using components such as beams and columns, top beams, cross plates and limit blocks in large staggered steelmaking plants, combined with the clamping positioning mechanism, the problem of bolts loose in vibrating environments is solved, and the stability of the factory structure is improved and construction efficiency.

CN119308425AActive Publication Date: 2025-01-14CHINA MCC17 GRP CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411699918.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-26
Publication Date
2025-01-14
Estimated Expiration
2044-11-26

Smart Images

  • Figure CN119308425A_ABST
    Figure CN119308425A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of steel-making plants, and discloses a large staggered-span continuous-row steel-making plant structure and a construction method.The large staggered-span continuous-row steel-making plant structure comprises a plurality of sets of supporting assemblies arranged front and back, each supporting assembly comprises a plurality of beam columns arranged at intervals, and a top cross beam is jointly arranged at the tops of every two adjacent beam columns; reinforcing frames are fixedly arranged at the upper ends of the outer walls of the multiple beam columns, reinforcing beams are jointly and fixedly arranged between the front reinforcing frames and the rear reinforcing frames, transverse plates are fixedly arranged at the tops of the multiple beam columns, mounting bolts are arranged between the top transverse beams and the transverse plates in a threaded and penetrating mode, and limiting nuts are arranged on the lower sides of the threaded ends of the mounting bolts in a threaded and sleeving mode. According to the large staggered-span continuous-row steel-making plant structure and the construction method, when the steel beams and the beam columns are connected, the tops of the bolts used for connection can be limited, the situation that the bolts are loosened in a vibration environment is avoided as much as possible, meanwhile, it can be guaranteed that the bolts are convenient to disassemble, and adjustment can be conducted in time when the steel beams have installation deviation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of steelmaking plants, and in particular to a large-scale staggered-span steelmaking plant structure and a construction method. Background Art

[0002] Large-scale staggered-span steelmaking plants are a specially designed industrial building, mainly used for steelmaking production. The design of the plant structure takes into account the special conditions such as high temperature and heavy load in the steelmaking production process, while pursuing efficient space utilization and flexibility. The staggered span refers to the asymmetric or staggered arrangement of the span design of the plant. This design enables the plant structure to adapt to different process flows and equipment requirements, thereby improving the utilization efficiency of space.

[0003] CN211619768U discloses a stable combined steel beam structure for a steel plant. The steel plant structure cooperates with the steel beam through the support plates, support columns, double-headed screws, etc. to support the steel beam, improve the stability of the steel beam, and facilitate the movement of the overhead crane. The support rods, connecting rods, and fixed screws are arranged to cooperate with the steel beam to further support and reinforce the steel beam, avoid shaking of the steel beam, and enhance the stability of the steel beam.

[0004] However, when connecting the steel beams in the above-mentioned factory building structure, bolts and nuts are used. Since the equipment inside the steelmaking plant will generate large vibrations when in use, the factory building is in a vibration environment for a long time, which can easily cause the bolts and nuts to loosen, causing the bolts to fall off from the steel beams, reducing the connection stability between the steel beams and the overall structural stability of the factory building. Summary of the invention

[0005] 1. Technical issues to be resolved

[0006] In view of the deficiencies in the prior art, the present invention provides a large-scale staggered-span steelmaking plant structure and a construction method, which has the advantages of being able to limit the tops of the bolts used for connection when the steel beams and beam columns are connected, so as to avoid loosening in a vibrating environment as much as possible, and also ensuring that the bolts are easy to disassemble, so as to facilitate timely adjustment when the steel beams have installation deviations. This solves the problem that when the plant structure is used to connect the steel beams, bolts and nuts are used for cooperation, and since the internal equipment of the steelmaking plant will generate large vibrations when in use, the plant is in a vibrating environment for a long time, which makes it easy for the bolts and nuts to loosen.

[0007] (II) Technical solution

[0008] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a large-scale staggered-span steelmaking plant structure and construction method, comprising a plurality of groups of support assemblies arranged in a front-to-back arrangement, each of the support assemblies comprising a plurality of beams and columns arranged at intervals, a top crossbeam being placed on the tops of two adjacent beams and columns, a reinforcement frame being fixed on the upper ends of the outer walls of the plurality of beams and columns, and a reinforcement beam being fixed between the plurality of reinforcement frames in front and behind;

[0009] A transverse plate is fixedly arranged on the top of the plurality of beams, a mounting bolt is threadedly passed through the top transverse beam and the transverse plate, a limiting nut is threadedly sleeved on the lower side of the threaded end of the mounting bolt, the limiting nut contacts and cooperates with the bottom of the transverse plate, and a mounting hole for matching with the mounting bolt is opened inside the top transverse beam;

[0010] A vertical plate is fixedly provided on the top of the horizontal plate, connecting grooves are provided on both sides of the vertical plate, a vertical rod is fixedly provided on the inner wall of the connecting groove, a limit block is sleeved on the outer side of the vertical rod, a limit pressure plate is fixedly provided on the outer wall of the limit block, and the limit pressure plate is provided on the top of the mounting bolt;

[0011] The limit block is arranged in a U shape, and a clamping positioning mechanism is arranged between the limit block and the vertical rod.

[0012] Preferably, the card-jointed positioning mechanism comprises two symmetrically arranged card blocks, the interior of the limit block is hollow, the two card blocks are respectively slidably arranged on both sides of the inner wall of the limit block, and a spring is fixed between one side of the card block located inside the limit block and the inner wall of the limit block.

[0013] Preferably, the two blocking blocks are wedge-shaped blocks.

[0014] Preferably, two symmetrically arranged sliding grooves are provided at both ends of the inner wall of the limit block, a slide plate is fixedly provided through the inner wall of the clamping block, and both ends of the slide plate are respectively slidably arranged in two adjacent sliding grooves.

[0015] Preferably, a rotating rod is rotatably provided on the inner wall of the limit block, and a push plate is provided on the rod wall fixing sleeve of the rotating rod. Connecting plates are provided on both sides of the push plate for contact and cooperation. The two connecting plates are respectively fixedly connected to the two clamping blocks. The push plate is arranged in a cam shape, and the two connecting plates are arranged in a centrally symmetrical manner, and the sides close to each other are arranged in an inclined surface.

[0016] Preferably, the cross section of the vertical rod is rectangular.

[0017] Preferably, the rod wall fixing sleeve of the rotating rod is provided with a rotating wheel, and the rod wall sleeve of the rotating rod is provided with a torsion spring, the two ends of the torsion spring are respectively fixedly connected to the rotating rod and the inner wall of the limit block, the outer wall of the limit block is provided with a rotating hole that cooperates with the rotation of the rotating wheel, and the side wall of the rotating wheel passes through the rotating hole and extends to the outside.

[0018] Preferably, both sides of the inner wall of the limit block are provided with through holes for matching with the clamping block.

[0019] The construction method of large staggered span steelmaking plant structure has the following specific steps:

[0020] S1: First, multiple sets of support components are set on the ground at the construction location of the plant, and the positions of multiple beams and columns are determined. Then, the top beam is placed on the top of two adjacent beams and columns, and the installation bolts and limit nuts are inserted into the beams and columns and the top beam;

[0021] S2: After the position of the mounting bolt is determined, the open end of the limit block is inserted into the connecting groove so that the vertical rod is located inside the opening of the limit block. At this time, the two clamping blocks are arranged on the outside of the vertical rod. The positions of the limit block and the limit pressure plate are determined so that the limit pressure plate is arranged on the top of the mounting bolt.

[0022] S3: When the installation of the top crossbeam deviates, the rotating wheel can be rotated to drive the push plate to rotate, so that the push plate pushes the two connecting plates, so that the card block enters the limit block. At this time, the limit block can be pulled out of the connecting groove, the installation bolts can be plugged in, and the position of the top crossbeam can be adjusted;

[0023] S4: After the multiple supporting components are determined, the ceiling can be set on the top of the multiple supporting components to complete the construction of the factory building.

[0024] (III) Beneficial effects

[0025] Compared with the prior art, the present invention provides a large-scale staggered-span steelmaking plant structure and construction method, which has the following beneficial effects:

[0026] 1. The large-scale staggered-span steelmaking plant structure and construction method can limit the top of the bolt after the beams and beams of the plant are connected, and try to avoid the bolts from detaching from the steel structure due to vibration, thereby improving the stability of the plant structure.

[0027] 2. The large-scale staggered-span steelmaking plant structure and construction method can conveniently remove and reinstall the mounting bolts when deviation occurs in the installation of the top cross beam through the vertical plates, connecting grooves, vertical rods, limit blocks, clamping blocks, rotating rods, push plates, connecting plates and rotating wheels, thereby improving the convenience of connecting the steel structure of the plant. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 This is a schematic diagram of the structure and construction method of a large-scale staggered-span steelmaking plant proposed by the present invention;

[0029] Figure 2 for Figure 1 The structure enlarged diagram of the local A part;

[0030] Figure 3 for Figure 1 Schematic diagram of the internal structure of the middle limit block;

[0031] Figure 4 for Figure 3 A schematic diagram of the side structure of the middle push plate and the connecting plate;

[0032] Figure 5 for Figure 3 Schematic diagram of the three-dimensional structure of the middle limit block.

[0033] In the figure: 1 beam, 2 top cross beam, 3 reinforcement frame, 4 reinforcement beam, 5 cross plate, 6 mounting bolts, 7 limit nuts, 8 vertical plates, 9 vertical rods, 10 limit blocks, 11 limit pressure plates, 12 clamping blocks, 13 springs, 14 slide plates, 15 rotating rods, 16 push plates, 17 connecting plates, 18 rotating wheels, 19 torsion springs, 20 rotating holes, and 21 through holes. DETAILED DESCRIPTION

[0034] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0035] Example 1

[0036] See also Figure 1-5 , a large staggered span steelmaking plant structure and construction method, comprising a plurality of support components arranged front and back, each support component comprising a plurality of beams and columns 1 arranged at intervals, a top crossbeam 2 being placed on the tops of two adjacent beams and columns 1, a reinforcement frame 3 being fixed on the upper ends of the outer walls of the plurality of beams and columns 1, and a reinforcement beam 4 being fixed between the plurality of reinforcement frames 3 in front and back;

[0037] A transverse plate 5 is fixed on the top of the plurality of beams 1, a mounting bolt 6 is threadedly passed through the top transverse beam 2 and the transverse plate 5, a limiting nut 7 is threadedly sleeved on the lower side of the threaded end of the mounting bolt 6, the limiting nut 7 is in contact with the bottom of the transverse plate 5, and a mounting hole is opened inside the top transverse beam 2 to match the mounting bolt 6;

[0038] A vertical plate 8 is fixed on the top of the horizontal plate 5, and connecting grooves are opened on both sides of the vertical plate 8. A vertical rod 9 is fixed on the inner wall of the connecting groove. The cross-section of the vertical rod 9 is rectangular. A limit block 10 is sleeved on the outer side of the vertical rod 9. A limit pressure plate 11 is fixed on the outer wall of the limit block 10, and the limit pressure plate 11 is arranged on the top of the mounting bolt 6.

[0039] When constructing the factory building structure, firstly, multiple beams 1 are spaced apart at the factory building installation position, and the top cross beam 2 is laid. At this time, the beams 1 and the top cross beam 2 can be connected by installing bolts 6 and limit nuts 7. Then, the limit block 10 can be inserted into the connection groove, and the position of the limit block 10 can be determined under the setting of the vertical rod 9. At this time, the limit block 10 can drive the limit pressure plate 11 to be set on the top of the installation bolt 6, and try to avoid the bolts from falling off from the top cross beam 2 in a vibration environment, so as to ensure the connection stability between the steel structures of the factory building. After multiple supporting components are set, the reinforcing beam 4 can be reinforced, and the ceiling can be set on the top of multiple top cross beams 2 to complete the setting of the factory building structure.

[0040] Example 2

[0041] Embodiment 2 is based on Embodiment 1 in order to make the setting position of the limiting pressure plate 11 fixed, as shown in FIG. Figure 2-3 As shown, the limit block 10 is set in a U shape, and a card-connecting positioning mechanism is provided between the limit block 10 and the vertical rod 9. The card-connecting positioning mechanism includes two symmetrically arranged card blocks 12, and the two card blocks 12 are wedge-shaped blocks. The interior of the limit block 10 is hollow, and the two card blocks 12 are respectively slidably arranged on both sides of the inner wall of the limit block 10. Both sides of the inner wall of the limit block 10 are provided with through holes 21 for matching the card blocks 12. A spring 13 is fixedly provided between one side of the card block 12 located inside the limit block 10 and the inner wall of the limit block 10. Two symmetrically arranged sliding grooves are provided at both ends of the inner wall of the limit block 10. A slide plate 14 is fixedly penetrated through the inner wall of the card block 12, and the two ends of the slide plate 14 are respectively slidably arranged in two adjacent sliding grooves.

[0042] When the limit block 10 is inserted into the connecting groove, since the block 12 is a wedge-shaped block and one side is arranged with an inclined surface, when the inclined surface of the block 12 contacts the vertical rod 9, the block 12 is pushed and squeezes the spring 13. In this process, the cooperation of the slide plate 14 and the slide groove can provide stable limiting support for the movement of the block 12. When the limit block 10 contacts the inner wall of the connecting groove, the block 12 rebounds and is arranged on the outside of the vertical rod 9 under the elastic force recovery of the spring 13. At this time, the position of the limit block 10 and the limit pressure plate 11 can be determined by cooperating with the connecting groove, thereby completing the top limit of the mounting bolt 6.

[0043] Example 3

[0044] Embodiment 3 is based on Embodiment 1-2, in order to be able to promptly remove the limit block 10 and reset the mounting bolt 6 when the top crossbeam 2 has an installation deviation, as shown in FIG. Figure 3-5 As shown, a rotating rod 15 is rotatably provided on the inner wall of the limit block 10, and a push plate 16 is provided on the rod wall fixing sleeve of the rotating rod 15. Connecting plates 17 are provided on both sides of the push plate 16 in contact and cooperation. The two connecting plates 17 are respectively fixedly connected with the two clamping blocks 12, and the push plate 16 is arranged in a cam shape. The two connecting plates 17 are arranged symmetrically with the center, and the sides close to each other are arranged in an inclined surface. A rotating wheel 18 is provided on the rod wall fixing sleeve of the rotating rod 15, and a torsion spring 19 is provided on the rod wall sleeve of the rotating rod 15. The two ends of the torsion spring 19 are respectively fixedly connected with the rotating rod 15 and the inner wall of the limit block 10, and a rotating hole 20 is opened on the outer wall of the limit block 10 to cooperate with the rotation of the rotating wheel 18. The side wall of the rotating wheel 18 passes through the rotating hole 20 and extends to the outside.

[0045] When the installation position of the top crossbeam 2 deviates, the rotating wheel 18 can be pushed, so that the rotating wheel 18 drives the rotating rod 15 to rotate, and the rotating rod 15 drives the push plate 17 to rotate, and the two ends of the push plate 17 cooperate with the inclined surfaces of the two connecting plates 16, so that the connecting plates 16 are pushed and drive the clamping block 12 to move. At this time, the clamping block 12 can retract into the limit block 10. At this time, the limit block 10 can be pulled out of the connecting groove and separated from the mounting bolts 6, and the mounting bolts 6 can be quickly disassembled, ensuring the convenience of connection and disassembly between the steel structures of the factory building and improving the construction efficiency of the steelmaking plant.

Claims

1. A large-scale staggered-span steelmaking plant structure, comprising a plurality of supporting components arranged in a front-to-back arrangement, characterized in that: Each of the support components comprises a plurality of beams (1) arranged at intervals, a top crossbeam (2) being placed on the tops of two adjacent beams (1), a reinforcing frame (3) being fixedly provided on the upper ends of the outer walls of the plurality of beams (1), and a reinforcing beam (4) being fixedly provided between the front and rear plurality of reinforcing frames (3); A transverse plate (5) is fixedly provided on the top of each of the plurality of beam columns (1); a mounting bolt (6) is threadedly passed through the top transverse beam (2) and the transverse plate (5); a limiting nut (7) is threadedly sleeved on the lower side of the threaded end of the mounting bolt (6); the limiting nut (7) is in contact with and fits the bottom of the transverse plate (5); and a mounting hole for matching the mounting bolt (6) is provided inside the top transverse beam (2); A vertical plate (8) is fixedly provided on the top of the horizontal plate (5), and connecting grooves are provided on both sides of the vertical plate (8). A vertical rod (9) is fixedly provided on the inner wall of the connecting groove, and a limit block (10) is sleeved on the outer side of the vertical rod (9). A limit pressing plate (11) is fixedly provided on the outer wall of the limit block (10), and the limit pressing plate (11) is arranged on the top of the mounting bolt (6); The limit block (10) is arranged in a U shape, and a clamping positioning mechanism is provided between the limit block (10) and the vertical rod (9).

2. The large-scale staggered-span steelmaking plant structure according to claim 1 is characterized by: The clamping and positioning mechanism comprises two symmetrically arranged clamping blocks (12); the interior of the limit block (10) is hollow; the two clamping blocks (12) are respectively slidably arranged on both sides of the inner wall of the limit block (10); a spring (13) is fixedly arranged between one side of the clamping block (12) located inside the limit block (10) and the inner wall of the limit block (10).

3. The large-scale staggered-span steelmaking plant structure according to claim 2 is characterized in that: The two clamping blocks (12) are both wedge-shaped blocks.

4. The large-scale staggered-span steelmaking plant structure according to claim 2 is characterized in that: Two symmetrically arranged sliding grooves are provided at both ends of the inner wall of the limit block (10); a slide plate (14) is fixedly provided on the inner wall of the clamping block (12); and the two ends of the slide plate (14) are respectively slidably arranged in two adjacent sliding grooves.

5. The large-scale staggered-span steelmaking plant structure according to claim 2 is characterized by: The inner wall of the limit block (10) is rotatably provided with a rotating rod (15), and the rod wall fixed sleeve of the rotating rod (15) is provided with a push plate (16), and both sides of the push plate (16) are contact-matched with connecting plates (17), and the two connecting plates (17) are respectively fixedly connected to the two clamping blocks (12), and the push plate (16) is arranged in a cam shape, and the two connecting plates (17) are arranged in a central symmetrical manner, and the sides close to each other are both arranged in an inclined surface.

6. The large-scale staggered-span steelmaking plant structure according to claim 1 is characterized by: The cross section of the vertical rod (9) is arranged in a rectangular shape.

7. The large-scale staggered-span steelmaking plant structure according to claim 5 is characterized by: The rod wall fixed sleeve of the rotating rod (15) is provided with a rotating wheel (18), the rod wall sleeve of the rotating rod (15) is provided with a torsion spring (19), the two ends of the torsion spring (19) are respectively fixedly connected to the rotating rod (15) and the inner wall of the limit block (10), the outer wall of the limit block (10) is provided with a rotating hole (20) for cooperating with the rotating wheel (18) to rotate, and the side wall of the rotating wheel (18) passes through the rotating hole (20) and extends to the outside.

8. The large-scale staggered-span steelmaking plant structure according to claim 1 is characterized by: Both sides of the inner wall of the limit block (10) are provided with through holes (21) for matching with the clamping block (12).

9. The method for constructing a large-scale staggered-span steelmaking plant structure according to claim 1, wherein the specific steps are as follows: S1: First, multiple groups of support components are set on the ground at the construction location of the factory building, and the positions of multiple beams (1) are determined. Then, the top crossbeam (2) is placed on the top of two adjacent beams (1), and the installation bolts (6) and limit nuts (7) are inserted into the beams (1) and the top crossbeam (2); S2: After the position of the mounting bolt (6) is determined, the open end of the limit block (10) is inserted into the connecting groove so that the vertical rod (9) is located inside the opening of the limit block (10). At this time, the two clamping blocks (12) are arranged on the outside of the vertical rod (9), and the positions of the limit block (10) and the limit pressure plate (11) are determined so that the limit pressure plate (11) is arranged on the top of the mounting bolt (6); S3: When the installation of the top cross beam (2) deviates, the rotating wheel (18) can be rotated to drive the push plate (16) to rotate, so that the push plate (16) pushes the two connecting plates (17) so that the block enters the limit block (12). At this time, the limit block (10) can be pulled out of the connecting groove, the installation bolt (6) can be plugged in, and the position of the top cross beam (2) can be adjusted; S4: After the multiple supporting components are determined, the ceiling can be set on the top of the multiple supporting components to complete the construction of the factory building.

Citation Information

Patent Citations

  • Anti-seismic plant and construction method

    CN117306918A

  • Beam column structure of steel structure factory building

    CN218148876U

  • Pavilion

    CN219241471U

  • Beam column connecting structure of house building

    CN219931240U

  • Column-beam joint structure, frame structure, and method of joining column and beam

    JP2015078575A