Automatic production line of new energy automobile connector
By setting up conveying tracks, pin stations and unloading stations on the connector production line, combined with the automated operation of pin modules and injection molding machines, the problems of low production efficiency and high cost in the existing technology are solved, and high efficiency is achieved automated production.
Patent Information
- Application Number
- CN202310865150.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-07-14
- Publication Date
- 2025-01-14
AI Technical Summary
The existing connector production model is not automated, resulting in low production efficiency and high production costs.
An automated production line for connectors of new energy vehicles was designed, including conveying tracks, pin stations and unloading stations set on the workbench. Pin module 1 and pin module 2 are used for automatic pin insertion and injection molding. The machine is used for injection molding, and the handling robot is used for material handling, and an automated production process is realized through the controller.
Automatic pin insertion, injection molding and unloading of connectors is realized, which greatly improves production efficiency, reduces manual usage and production costs, and is suitable for large-scale production.
Smart Images

Figure CN119315354A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of connector production, and in particular relates to an automated production line for connectors of new energy vehicles. Background Art
[0002] Connectors are widely used in electronic devices, whether they are industrial equipment or commonly used electrical components such as computers or cars. Connectors are used to connect the power supply to the internal electrical components. The finished connector includes a clip and its internally inserted pins. The pins are divided into flat pins and square pins according to their functions. During production, the pins are first inserted into the clip using a pin insertion device, and then the injection molding machine is used to complete the injection molding.
[0003] At present, with the continuous development of electronic technology, the application scope of connectors is becoming more and more extensive, and the market demand is also increasing. However, the existing connector production model is not fully automated, and requires distributed and separate equipment to carry out each step of production, resulting in reduced production efficiency; at the same time, the large amount of labor in the production process also leads to increased production costs. Summary of the invention
[0004] The purpose of the present invention is to provide an automated production line for new energy vehicle connectors, aiming to solve the technical problems of the prior art that connector production is distributed, production efficiency is low, and the high production cost caused by the large amount of labor required.
[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is:
[0006] An automated production line for new energy vehicle connectors comprises a conveying track, a pin insertion station and a discharge station arranged on a workbench, an injection molding station is also arranged on one side of the workbench, the conveying track is arranged between the pin insertion station, the injection molding station and the discharge station, and a carrier for accommodating a magazine is arranged on the conveying track; the pin insertion station is provided with a pin module 1 and a pin module 2, the pin module 1 is used to insert a flat pin into the magazine, and the pin module 2 is used to insert a square pin into the magazine, and the magazine after pin insertion is moved to an injection molding machine at the injection molding station by a handling robot for injection molding, and the finished connector after injection molding is moved to the carrier on the conveying track by the handling robot, and moved to the discharge station along the conveying track; the pin module 1, the pin module 2, the injection molding machine, the conveying track and the handling robot are all connected to a controller.
[0007] Preferably, there are two conveying tracks and they are arranged in parallel, there are several pin modules one and two, and the pin module one and the pin module two are arranged on the outside of the conveying track opposite to each other; the conveying track includes a first track and a second track, there are two first tracks and they are respectively arranged on one side of the pin module one and the pin module two, and the second track is arranged between the discharge end of the pin module two and the unloading station; a flipping module is arranged between the first track and the second track, which is used to clamp the carrier carrying the magazine with completed pin insertion on the first track, flip it from a horizontal state to a vertical state, and then put it on the second track; the handling robot is arranged between the injection molding station and the second track; a handling module is arranged between the two first tracks at the ends of the pin module one and the pin module two, and a flipping module and a handling module are arranged between the end of the second track and the first track on the side of the first pin module one, which are used to move the empty carrier from the second track to the first track.
[0008] Preferably, the pin module 1 includes a tray rack, a first material shifting mechanism, a cutting mechanism and a pin insertion mechanism, the tray rack is provided with a round tray for winding a first pin strip, the first pin strip is wound on a main shaft between two material stop plates of the round tray, and the round tray is driven by a first motor; the first material shifting mechanism, the cutting mechanism and the pin insertion mechanism are sequentially arranged on the first working frame, a carrier for accommodating a clip is provided on the opposite side of the pin insertion mechanism, and the carrier is arranged on a conveying track; a material guide trough for guiding the first pin strip is provided between the tray rack and the first material shifting mechanism, the first material shifting mechanism can shift the first pin strip output from the material guide trough to the cutting mechanism one by one, the cutting mechanism is used to cut the flat pins on the first pin strip, and the cut flat pins are inserted into the clip on the conveying track through the pin insertion mechanism.
[0009] Preferably, the first material shifting mechanism includes a second motor and a gear arranged above the first workbench, the output shaft of the second motor is coaxially fixed with the gear, and the second motor is a stepping motor; the teeth of the gear can be stuck in the through hole at one end of the first pin strip, and the feed side of the gear is provided with a sensor for detecting the through hole on the material bridge at the end of the first pin strip, and the discharge side of the gear is provided with a positioning column that can be raised and lowered, and the lower end of the positioning column can be placed in the through hole at the end of the first pin strip.
[0010] Preferably, the cutting mechanism includes a pressing block and a cutter, the pressing block is connected to a lifting cylinder and is used to press the flat pins on the first pin strip, the cutters are two and are respectively arranged between the flat pins and the material bridge, and between the flat pins and the material bridge of the first pin strip, the cutter is connected to a cutting cylinder and is used to cut and separate the flat pins from the material bridge and the material bridge.
[0011] Preferably, the pin insertion mechanism includes a left and right translation cylinder and a front and rear pushing cylinder, a push plate is provided at the end of the piston rod of the front and rear pushing cylinder, and the pressure block is connected to the left and right translation cylinder, and is used to move the flat pin to the push plate position of the front and rear pushing cylinder, and the front and rear pushing cylinder pushes the flat pin into the magazine through the push plate.
[0012] Preferably, the second pin module includes a second working frame, a second material shifting mechanism, a second cutting mechanism and a second pin insertion mechanism. The second pin material strip is wound on a material tray on a side bracket of the second working frame. A guide plate for guiding the second pin material strip is provided under the material tray. The second material shifting mechanism is used to shift the second pin material strip to the second cutting mechanism. The second cutting mechanism is used to cut the square pins on the second pin material strip. The cut square pins are inserted into the clip on the conveying track through the second pin insertion mechanism.
[0013] Preferably, the second material-moving mechanism includes a material-moving gear arranged below the second workbench, the teeth of the material-moving gear can be stuck in the through hole on one side of the second pin material strip; the material-moving gear is connected to the second motor, the axle of the material-moving gear is rotatably matched with the upper end of the connecting rod, the lower end of the connecting rod is rotatably connected to the end of the handle hinged on the lower part of the second workbench, and pulling the handle downward can drive the material-moving gear to descend; the feed side and the discharge side above the material-moving gear are both provided with sensors for detecting the through hole on one side of the second pin material strip.
[0014] Preferably, the transport module includes a support frame, a horizontal moving mechanism and a claw, the claw moves along the crossbeam of the support frame through the horizontal moving mechanism, and the claw is connected to the horizontal moving mechanism through a lifting mechanism, and is used to move the carrier equipped with a clip on the first track on one side of the pin module to the first track on the second side of the pin module, or to move the empty carrier after unloading from the flipping module to the first track for the next batch of connector pin operations; a visual image detector is provided on the second track, which is used to detect whether the flat pins and square pins in the connector are missing or bent before injection molding; the flipping module includes a portal frame, a lifting assembly, a rotating mechanism and a claw, the clamping arm of the claw is connected to the turntable of the rotating mechanism, the rotating mechanism is arranged at the movable end of the lifting assembly, and the lifting assembly and the rotating mechanism are both arranged on the top of the portal frame.
[0015] Preferably, the unloading station is provided with an unloading module, and the unloading module includes an unloading robot and a receiving rack, one side of the receiving rack is provided with an unloading table for placing the unloading robot and the receiving tray, and the other side of the receiving rack is a material bin for accommodating the material tray rack; the unloading robot is used to absorb the finished connectors on the conveying track and move them to the receiving tray; the unloading table is provided with a telescopic mechanism for pushing the receiving tray with the finished connectors into the material bin; the material tray rack in the material bin is provided with multiple layers of material trays, and the material tray rack is lifted and lowered by a belt; a motor and a transmission shaft are provided at the bottom of the material bin, and the belts symmetrically arranged on both sides of the material bin are connected to the transmission shaft through pulleys, and the belts are connected to the material tray rack through belt clamps.
[0016] The beneficial effects of adopting the above technical solution are as follows: Compared with the prior art, the present invention arranges a pin insertion station and a discharge station on the workbench, and sets an injection molding station on one side of the workbench, and arranges a conveying track between the pin insertion station, the injection molding station and the discharge station, so that the carrier containing the clip can move between the various stations under the drive of the conveying track; the pin module 1 and the pin module 2 of the pin insertion station are used to respectively insert the flat pins and the square pins into the clip in the carrier, and the clip after pin insertion is moved to the injection molding machine for injection molding by a handling robot, and the finished connector after injection molding is moved to the carrier on the conveying track by a handling robot, and moved to the discharge station along the conveying track for unloading. Under the control of the controller, the present invention can realize the automatic pin insertion, injection molding, discharge and other operations of the connector, which greatly improves the production efficiency, reduces the amount of labor, and thus reduces the production cost. The present invention is particularly suitable for large-scale connector production. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0018] Figure 1 This is a schematic diagram of the structure of an automated production line for new energy vehicle connectors provided by an embodiment of the present invention;
[0019] Figure 2 yes Figure 1 A partial enlarged view of the middle A;
[0020] Figure 3 is a structural schematic diagram of a pin module 1 in an embodiment of the present invention;
[0021] Figure 4 yes Figure 3 A partial enlarged view of point B in the middle;
[0022] Figure 5 is a structural schematic diagram of the pin module 2 in an embodiment of the present invention;
[0023] Figure 6 yes Figure 5A partial enlarged view of point C in the middle;
[0024] Figure 7 yes Figure 5 A schematic diagram of the structure of the second material-shifting mechanism;
[0025] Figure 8 is a structural schematic diagram of a transport module in an embodiment of the present invention;
[0026] Fig. 9 is a structural schematic diagram of a flip module in an embodiment of the present invention;
[0027] Fig.10 It is a structural schematic diagram of a discharging module in an embodiment of the present invention;
[0028] Fig.11 is a state diagram of a magazine installed in a vehicle in an embodiment of the present invention;
[0029] Fig.12 is a schematic structural diagram of a first pin strip used in an embodiment of the present invention;
[0030] Fig.13 It is a structural schematic diagram of a material shifting component in a material turning module in an embodiment of the present invention;
[0031] Fig.14 It is a structural schematic diagram of a flipping component in a material flipping module in an embodiment of the present invention;
[0032] In the figure: 00-finished connector, 01-flat pin, 02-clip, 03-square pin, 04-first pin strip, 05-strip, 06-second pin strip, 07-bridge; 1-workbench, 2-conveyor track, 21-first track, 22-second track; 3-pin insertion station, 4-unloading station, 5-injection station, 6-handling robot, 7-carrier, 8-claw, 9-sensor, 10-positioning column, 11-visual image detector, 12-3D laser detector;
[0033] 100-pin module 1, 110-disc rack, 111-round disc, 1110-blocking disc; 112-first motor, 113-paper reel; 120-first material shifting mechanism, 121-second motor, 122-gear, 123-panel;
[0034] 130-first cutting mechanism, 131-pressing block, 132-cutter, 133-lifting cylinder;
[0035] 140-first pin insertion mechanism, 141-left and right translation cylinder, 142-front and rear push cylinder, 143-push plate;
[0036] 150-first working frame, 160-material guide chute;
[0037] 200-pin module 2, 210-second working frame, 220-second material dispensing mechanism, 221-material dispensing gear, 222-second motor, 223-handle; 230-second cutting mechanism, 240-second pin mechanism, 250-dispensing tray, 260-guide plate, 270-paper tape recovery tray;
[0038] 300-handling module, 301-support frame, 302-horizontal moving mechanism, 303-lifting mechanism;
[0039] 400-unloading module, 401-unloading robot, 402-receiving rack, 403-receiving tray, 404-tray rack, 405-telescopic mechanism, 406-belt, 407-motor, 408-drive shaft, 409-pulley, 410-belt clamp, 412-unloading platform, 422-bin;
[0040] 500-injection molding machine; 600-flip module, 601-door frame, 602-lifting component, 603-rotating mechanism;
[0041] 700- material turning module; 710- material shifting assembly, 711- guide rail, 712- telescopic cylinder, 713- connecting assembly, 714- material shifting plate; 720- flipping assembly, 721- clamping cylinder, 722- flipping cylinder, 723- lifting cylinder, 724- lifting plate, 725- air claw, 726- mounting plate, 727- guide groove, 728- support, 729- guide column. DETAILED DESCRIPTION
[0042] The following is a clear and complete description of the technical solutions in the embodiments of the present invention in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0043] See also Figure 1The present invention provides an automatic production line for new energy vehicle connectors, comprising a conveying track 2, a pin insertion station 3 and a discharge station 4 arranged on a workbench 1, an injection molding station 5 is also arranged on one side of the workbench 1, the conveying track 2 is arranged between the pin insertion station 3, the injection molding station 5 and the discharge station 4, and a carrier 7 for accommodating a clip 02 is arranged on the conveying track 2; the pin insertion station 3 is arranged with a pin module 1 100 and a pin module 2 200, the pin module 1 100 is used to insert a flat pin 01 into the clip 02 The pin module 2 200 is used to insert the square pin 03 into the clip 02. The clip 02 after pin insertion is moved to the injection molding machine 500 of the injection molding station 5 by the handling robot 6 for injection molding. The finished connector 00 after injection molding is moved to the carrier 7 on the conveying track 2 by the handling robot 6, and moved to the unloading station 4 along the conveying track 2; the pin module 1 100, the pin module 2 200, the injection molding machine 500, the conveying track 2 and the handling robot 6 are all connected to the controller, and the controller can be installed in the cabinet under the workbench. The driving component of the conveying track can drive the carrier to move between different stations. Under the control of the controller, the automatic pin insertion, injection molding, unloading and other operations of the connector can be realized, which greatly improves the production efficiency and reduces the auxiliary labor time of the staff.
[0044] In a specific embodiment of the present invention, Figure 1 , 8 As shown, the conveying track 2 is two and arranged in parallel, the pin module 1 100 and the pin module 2 200 are both multiple, the pin module 1 100 and the pin module 2 200 are relatively arranged on the outside of the conveying track 2, and the number of the pin module 2 200 is less than the number of the pin module 1 100; the conveying track 2 includes a first track 21 and a second track 22, the first track 21 is two and is respectively arranged on one side of the pin module 1 100 and the pin module 2 200, the second track 22 is arranged between the discharge end of the pin module 2 200 and the unloading station 4, and a flip module is provided between the first track 21 and the second track 22. Group 600, used to clamp the carrier 7 carrying the clip with completed pin insertion on the first track 21, flip it from a horizontal state to a vertical state, and then put it on the second track 22; the handling robot 6 is arranged between the injection molding station 5 and the second track 22; a handling module 300 is provided between the two first tracks 21 at the ends of the pin module 100 and the pin module 200, and a flipping module 700 and a handling module 300 are provided between the unloading station 4 at the end of the second track 22 and the first track 21 on the side of the first pin module 100, which are used to move the empty carrier 7 from the second track 22 to the first track 21, so as to facilitate the pin insertion operation of the next batch of connectors.
[0045] As a preferred structure, Figure 3As shown, the pin module 100 includes a tray rack 110, a first material shifting mechanism 120, a first cutting mechanism 130 and a first pin insertion mechanism 140. The tray rack 110 is provided with a round tray 111 for winding the first pin strip 04. The first pin strip 04 is wound on the main shaft between two stopper plates 1110 of the round tray 111. The round tray 111 is driven by a first motor 112. The first material shifting mechanism 120, the first cutting mechanism 130 and the first pin insertion mechanism 140 are sequentially arranged on the first working frame 150. The first pin insertion mechanism 1 A carrier 7 for accommodating the clip 02 is provided on the opposite side of 40, and the carrier 7 is arranged on the conveying track 2; a material guide groove 160 for guiding the first pin strip 04 is provided between the material tray rack 110 and the first material shifting mechanism 120, and the first material shifting mechanism 120 can shift the first pin strip 04 output by the material guide groove 160 to the first cutting mechanism 130 one by one, and the first cutting mechanism 130 is used to cut the flat pins 01 on the first pin strip 04, and the cut flat pins 01 are inserted into the clip 02 on the conveying track 2 through the first pin insertion mechanism 140.
[0046] To further optimize the above structure, a paper reel 113 is provided at the edge of the round material disc 111, and the paper reel 113 is pressed against the edge of the round material disc 111. The round material disc rotates under the drive of the first motor, thereby driving the paper reel to rotate. This structure can realize that the bottom paper tape of the round material disc is separated and wound around the paper reel while the first pin material tape is unloaded, so as to realize the recycling of the paper tape. At the same time, the first motor is a high-torque stepper motor and is connected to the controller, which can realize the linkage cooperation between the first motor and the first material shifting mechanism, the first cutting mechanism and the first pin insertion mechanism, and complete the cutting and pin insertion operations of the flat pins in sequence.
[0047] In a specific embodiment of the present invention, Figure 2 , 4As shown, the first material shifting mechanism 120 includes a second motor 121 and a gear 122 arranged above the first workbench 150. The output shaft of the second motor 121 is coaxially fixed with the gear 122. The second motor 121 is a stepping motor. The teeth of the gear 122 can be stuck in the through hole at one end of the first pin strip 04. The feeding side of the gear 122 is provided with a sensor 9 for detecting the through hole on the end strip 05 of the first pin strip 04. The discharging side of the gear 122 is provided with a positioning column 10 that can be raised and lowered. The lower end of the positioning column 10 can be placed in the through hole at the end of the first pin strip 04. A panel 123 is provided on the first workbench table below the gear 122. The panel 123 is provided with an opening that cooperates with the sensor, the positioning column and the gear. Among them, the sensor adopts a corresponding optical fiber sensor, which is used to detect whether the through hole on the strip corresponds to the opening on the panel. The positioning column is fixed in the through hole of the material strip by manual pin insertion, and then the cutting and pin insertion operations are carried out respectively. After the operation is completed, the positioning column is pulled out, and then the first motor 112 is started to discharge the first pin material strip, and the cutting and pin insertion operations of the next group of flat pins are carried out.
[0048] When designing specifically, Figure 3 , 11 As shown, the first cutting mechanism 130 includes a pressing block 131 and a cutter 132. The pressing block 131 is connected to a lifting cylinder 133 and is used to press the flat pin 01 on the first pin strip 04. There are two cutters 132, which are respectively arranged between the flat pin 01 and the strip 05, and between the flat pin 01 and the material bridge 07 of the first pin strip 04. The cutter 132 is connected to a cutting cylinder 134 and is used to cut and separate the flat pin 01 from the strip 05 and the material bridge. The cylinder body of the lifting cylinder 133 is fixed on a pedestal, the end of the piston rod of the lifting cylinder 133 is rotatably connected to one end of the connecting rod, the other end of the connecting rod is rotatably connected to the top of the pressing block, and the top of the vertical rod between the lifting cylinder and the pressing block is rotatably connected to the middle of the connecting rod. The lifting action of the lifting cylinder 133 drives the connecting rod to rotate around the top of the vertical rod, and the lifting action of the pressing block is realized by the lever principle.
[0049] When in use, the first pin strip 04 is placed below the pressure block 131 on the base. The rising piston rod of the lifting cylinder 133 can drive the pressure block 131 to descend, thereby pressing and fixing the first pin strip 04. At the same time, a gap is provided on the base to cooperate with the cutter, and the cutter can cut the first pin strip 04 under the drive of the lifting mechanism.
[0050] As a preferred structure, Figure 3As shown, the first pin insertion mechanism 140 includes a left-right translation cylinder 141 and a front-back pushing cylinder 142. The piston rod end of the front-back pushing cylinder 142 is provided with a push plate 143. The base on which the pressure block 131 and the lifting cylinder 133 are installed is connected to the left-right translation cylinder 141, and is used to move the flat pin 01 to the position of the push plate 143 of the front-back pushing cylinder 142. The front-back pushing cylinder 142 pushes the flat pin 01 into the magazine 02 through the push plate 143. In specific production, the front-back pushing cylinders 142 can be designed as two upper and lower arrangements. One front-back pushing cylinder 142 can push the flat pin 01 on the base into the magazine 02 to achieve preliminary insertion; the other front-back pushing cylinder 142 can completely insert the flat pin 01 into the magazine 02 through the push plate to ensure that the exposed end of the flat pin 01 remains flush.
[0051] In a specific embodiment of the present invention, Figure 5 As shown, the pin module 200 includes a second working frame 210, a second material shifting mechanism 220, a second cutting mechanism 230 and a second pin insertion mechanism 240. The second pin strip 06 is wound on a material discharge tray 250 on a side bracket of the second working frame 210. The material discharge tray 250 is driven to rotate by a third motor. A guide plate 260 for guiding the second pin strip 06 is provided under the material discharge tray 250. The second material shifting mechanism 220 is used to shift the second pin strip 06 to the second cutting mechanism 230. The second cutting mechanism 230 is used to cut the square pins 03 on the second pin strip 06. The cut square pins 03 are inserted into the clip 02 in the carrier 7 on the conveying track 2 through the second pin insertion mechanism 240.
[0052] The above structure is further optimized, and a paper tape recovery disk 270 is installed on one side of the material discharge tray 250, and the disc-shaped second pin material strip 06 is mounted on the central axis of the material discharge tray 250, and the paper tape at the bottom of the end of the second pin material strip 06 is wound on the central axis of the paper tape recovery disk 270, and the paper tape recovery disk 270 is driven to rotate by the third motor; the material discharge tray 250 is arranged parallel to the central axis of the paper tape recovery disk 270. After starting the third motor, the paper tape recovery disk 270 can recover the paper tape while allowing the separated second pin material strip 06 to slide down along the inclined guide plate 260 and enter the table of the second workbench 210 for cutting and pin insertion operations. The third motor is a stepping motor and is connected to the controller, which can realize the linkage cooperation between the third motor and the second material shifting mechanism 220, the second cutting mechanism 230 and the second pin insertion mechanism 240, and complete the cutting and pin insertion operations of the square pins in sequence.
[0053] As a preferred structure, Figure 6 , 7As shown, the second material-moving mechanism 220 includes a material-moving gear 221 disposed below the second workbench 210, the teeth of which can be stuck in the through hole on one side of the second pin material strip 06; the material-moving gear 221 is connected to the second motor 222, the wheel axle of the material-moving gear 221 is rotatably matched with the upper end of the connecting rod, the lower end of the connecting rod is rotatably connected to the end of the handle 223 hinged at the lower part of the second workbench 210, and the handle can be pulled downward to drive the material-moving gear 221 to descend; the feed side and the discharge side above the material-moving gear 221 are both provided with sensors 9 for detecting the through holes on one side of the second pin material strip 06, and the feed side above the material-moving gear 221 is also provided with a positioning column 10, which is arranged between the two sensors 9. Among them, the sensor adopts a counter-beam optical fiber sensor, which is used to detect whether the through hole on the material strip corresponds to the opening on the top panel of the second workbench. The positioning column is fixed in the through hole of the material strip by manual pin insertion, and then the cutting and pin insertion operations are carried out respectively. After the operation is completed, the positioning column is pulled out, and then the second motor is started to discharge the second pin material strip, and the cutting and pin insertion operations of the next group of square pins are carried out.
[0054] In addition, the second cutting mechanism 230 and the second pin insertion mechanism 240 of the second pin module 200 have the same working principle and substantially the same structure as the first cutting mechanism 130 and the first pin insertion mechanism 140 of the first pin module 100 .
[0055] As a preferred solution, Figure 1 As shown, the transport module 300 includes a support frame 301, a horizontal moving mechanism 302 and a claw 8. The claw 8 moves along the crossbeam of the support frame 301 through the horizontal moving mechanism 302. The claw 8 is connected to the horizontal moving mechanism 302 through a lifting mechanism 303, and is used to move the carrier 7 equipped with the clip 02 on the first track 21 on the side of the pin module 100 to the first track 21 on the side of the pin module 200, or to move the empty carrier 7 after unloading from the turning module 700 to the first track 21 for the next batch of connector pin operations.
[0056] When making specific Fig. 9As shown, the flip module 600 includes a door frame 601, a lifting assembly 602, a rotating mechanism 603 and a claw 8. The clamping arm of the claw 8 is connected to the turntable of the rotating mechanism 603. The rotating mechanism 603 is arranged at the movable end of the lifting assembly 602. The lifting assembly 602 and the rotating mechanism 603 are both arranged on the top of the door frame 601. In specific application, a visual image detector 11 is provided on the second track 22 to detect whether the flat pins 01 and the square pins 03 in the clip 02 are missing or bent before injection molding. After the injection molding station is completed, a 3D laser detector 12 for observing the appearance of the finished connector 00 is also provided on the second track 22. If the visual image detector and the 3D laser detector detect that the product is defective, an alarm will be issued to prompt the staff to take it out in time, further improving the qualified rate of the product.
[0057] In a specific embodiment of the present invention, Fig.13 , 14 As shown, the material turning module 700 includes a material shifting assembly 710 and a flipping assembly 720. The material shifting assembly 710 includes a guide rail 711 and a telescopic cylinder 712 arranged in parallel. The piston rod end of the telescopic cylinder 712 is connected to a material shifting plate 714 through a connecting assembly 713. The material shifting plate 714 is perpendicular to the length direction of the telescopic cylinder 712. One end of the material shifting plate 714 extends to the top of the second track 22, and is used to shift the empty carrier 7 on the second track 22 from a vertical state to a horizontal state. The flip assembly 720 includes a clamping cylinder 721, a flip cylinder 722, a lifting cylinder 723 and a lifting plate 724. The end of the clamping cylinder 721 is provided with a pair of pneumatic claws 725 for clamping the empty carrier 7. The clamping cylinder 721 is arranged at the movable end of the flip cylinder 722. The flip cylinder 722 is arranged on one side of the mounting plate 726 at the top of the cylinder body of the lifting cylinder 723. The piston rod of the lifting cylinder 723 passes through the mounting plate, and its end is the lifting plate 724. A support 728 for placing the empty carrier 7 is provided in the middle of the upper surface of the lifting plate 724. A plurality of upright guide columns 729 are provided around the support 728. The side of the support 729 is provided with an inclined guide groove 727. The guide column 729 and the guide groove 727 are used to guide the carrier during the descent process. The specific application process is as follows:
[0058] When the finished connectors in the carrier on the second track are unloaded at the unloading station, the empty carrier is shifted from a vertical state to a horizontal state by the shifting plate of the shifting assembly, and the movable end of the flipping cylinder of the flipping assembly is turned downward, and the empty carrier is clamped and fixed with the help of the clamping cylinder, and then the flipping cylinder flips it to the top of the lifting cylinder. As the lifting cylinder descends, the empty carrier drops to a position that is compatible with the height of the claws of the handling module. Finally, the handling module is started to move the empty carrier to the first track on one side of the pin module.
[0059] In a specific embodiment of the present invention, Fig.10 As shown, the unloading station 4 is provided with an unloading module 400, and the unloading module 400 includes an unloading robot 401 and a receiving rack 402, one side of the receiving rack 402 is provided with an unloading platform 412 for placing the unloading robot 401 and the receiving tray 403, and the other side of the receiving rack 402 is a silo 422 for accommodating the tray rack 404; the unloading robot 101 is used to absorb the finished connector product 00 on the conveying track 2 and move it to the receiving tray 403; the unloading platform 412 is provided with a telescopic mechanism 405, which is used to push the receiving tray 403 with the finished connector into the silo 422; the tray rack 404 in the silo 422 is provided with multiple layers of trays for placing the receiving tray 404; the tray rack 404 is lifted and lowered by a belt 406. Among them, a motor 407 and a transmission shaft 408 are provided at the bottom of the silo 422, and the belts 406 symmetrically arranged on both sides of the silo 422 are connected to the transmission shaft 408 through pulleys 409, and the belts 406 are connected to the tray frame 404 through belt clips 410. The motor 407 drives the belt 406 to run through the transmission shaft 408, and the belt 406 drives the belt clip 410 to rise and fall, thereby driving the tray frame 404 to rise and fall.
[0060] In the specific production, the telescopic mechanism 405 adopts a cylinder, and a suction cup is provided at the end of the piston rod of the cylinder for adsorbing the receiving tray. The suction nozzle at the end of the mechanical arm of the unloading robot moves the finished connector to the receiving tray, and the cylinder is started to push the receiving tray carrying the finished connector into the silo; then the tray rack in the floor silo descends, and the empty receiving tray on the tray rack is sucked out with the help of the suction cup at the end of the cylinder to receive the next finished connector. Among them, walking wheels can also be installed at the bottom of the silo to facilitate the easy movement of the silo to any location.
[0061] Since the carrier 7 with the clip 02 before injection molding has been turned from a horizontal state to a vertical state by the turning module 600, and moved from the first track 21 to the second track 22 at the same time, the finished connector 00 after injection molding is collected in the bin 422 at the unloading station 4, and the empty carrier 7 is left on the second track 22. A turning module 700 is set at the end of the second track 22 to turn the vertically placed empty carrier 7 to a horizontal state, and move the horizontal empty carrier 7 to the first track 21 through the transport module 300 to perform the pin insertion operation of the next batch of connectors.
[0062] The specific application process of the present invention is as follows:
[0063] The clip before the pin 02 Fig.11As shown, the carrier 7 is installed in the carrier 7. Driven by the driving component on the first track 21, the carrier 7 passes through the pin module 100 one by one to complete the pin insertion operation of the flat pin 01. Then, the carrier 7 equipped with the clip 02 is moved from one first track 21 to another first track 21 through the end handling module 300, and then the pin insertion operation of the square pin 03 is completed through the pin module 2 200; then, the horizontal carrier 7 is turned to the vertical state through the flip module 600, and the visual image detector 11 is used to detect whether there is a missing or bent pin in the clip. The qualified products are clamped by the handling robot 6 to the injection molding machine 500 by the clip 02 in the carrier 7. After the injection molding, the finished connector 00 is clamped to the second track 22 by the handling robot 6; the appearance is first inspected by the 3D laser detector 12, and the finished connector 00 that meets the requirements is moved to the unloading station 4 via the second track 22, and the finished connector 00 is placed one by one in the bin 422 by the unloading module 400. The empty carrier 7 on the second track 22 is then moved to the first track 21 by the turning module 700 and the transport module 300 , and the next batch of connectors is produced by the pin module 100 .
[0064] In summary, the present invention has the advantages of reasonable design, compact structure, high degree of automation and high production efficiency. In the production process of the connector, the controller controls the actions of the pin module, the handling module, the flip module, the unloading module, the turning module and the handling robot to achieve automatic coordination of the production process. Fully automatic production greatly increases production volume and reduces production costs. The present invention is particularly suitable for mass production and can meet market demand.
[0065] In the above description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed above.
Claims
1. An automated production line for new energy vehicle connectors, characterized in that: It includes a conveying track, a pin insertion station and an unloading station arranged on a workbench. An injection molding station is also arranged on one side of the workbench. The conveying track is arranged between the pin insertion station, the injection molding station and the unloading station. A carrier for accommodating a magazine is arranged on the conveying track. The pin insertion station is provided with a pin module 1 and a pin module 2. The pin module 1 is used to insert a first pin into the magazine, and the pin module 2 is used to insert a square pin into the magazine. After the pin is inserted, the magazine is moved to an injection molding machine at the injection molding station by a handling robot for injection molding. After injection molding, the finished connector is moved to the carrier on the conveying track by the handling robot and moved to the unloading station along the conveying track. The pin module 1, the pin module 2, the injection molding machine, the conveying track and the handling robot are all connected to a controller.
2. The automatic production line of new energy vehicle connectors according to claim 1 is characterized in that: There are two conveying tracks, which are arranged in parallel. There are several pin modules one and two, and the pin modules one and two are arranged on the outside of the conveying track opposite to each other. The conveying track includes a first track and a second track. There are two first tracks, which are respectively arranged on one side of the pin module one and the pin module two, and the second track is arranged between the discharge end of the pin module two and the unloading station. A flipping module is arranged between the first track and the second track, which is used to clamp the carrier carrying the magazine with completed pin insertion on the first track, flip it from a horizontal state to a vertical state, and then put it on the second track. The handling robot is arranged between the injection molding station and the second track. A handling module is arranged between the two first tracks at the ends of the pin modules one and two, and a flipping module and a handling module are arranged between the end of the second track and the first track on the side of the first pin module one, which are used to move the empty carrier from the second track to the first track.
3. The automatic production line of new energy vehicle connectors according to claim 1 is characterized in that: The pin module 1 includes a tray rack, a first material shifting mechanism, a cutting mechanism and a pin insertion mechanism. The tray rack is provided with a round tray for winding a first pin strip, the first pin strip is wound on a main shaft between two material stop plates of the round tray, and the round tray is driven by a first motor; the first material shifting mechanism, the cutting mechanism and the pin insertion mechanism are sequentially arranged on the first working frame, a carrier for accommodating a clip is provided on the opposite side of the pin insertion mechanism, and the carrier is arranged on a conveying track; a material guide trough for guiding the first pin strip is provided between the tray rack and the first material shifting mechanism, the first material shifting mechanism can shift the first pin strip output from the material guide trough to the cutting mechanism one by one, the cutting mechanism is used to cut the flat pins on the first pin strip, and the cut flat pins are inserted into the clip on the conveying track through the pin insertion mechanism.
4. The automatic production line of new energy vehicle connectors according to claim 3 is characterized in that: The first material shifting mechanism includes a second motor and a gear arranged above the first workbench, the output shaft of the second motor is coaxially fixed with the gear, and the second motor is a stepping motor; the teeth of the gear can be stuck in the through hole at one end of the first pin strip, and the feed side of the gear is provided with a sensor for detecting the through hole on the material bridge at the end of the first pin strip, and the discharge side of the gear is provided with a positioning column that can be raised and lowered, and the lower end of the positioning column can be placed in the through hole at the end of the first pin strip.
5. The automatic production line of new energy vehicle connectors according to claim 3 is characterized in that: The cutting mechanism includes a pressing block and a cutter. The pressing block is connected to a lifting cylinder and is used to press the flat pins on the first pin strip. There are two cutters, which are respectively arranged between the flat pins and the material bridge, and between the flat pins and the material bridge of the first pin strip. The cutter is connected to a cutting cylinder and is used to cut and separate the flat pins from the material bridge and the material bridge.
6. The automatic production line of new energy vehicle connectors according to claim 5 is characterized in that: The pin insertion mechanism includes a left and right translation cylinder and a front and rear pushing cylinder. A push plate is provided at the end of the piston rod of the front and rear pushing cylinder. The pressure block is connected to the left and right translation cylinder and is used to move the flat pin to the push plate position of the front and rear pushing cylinder. The front and rear pushing cylinder pushes the flat pin into the magazine through the push plate.
7. The automatic production line of new energy vehicle connectors according to claim 6 is characterized in that: The second pin module includes a second working frame, a second material shifting mechanism, a second cutting mechanism and a second pin insertion mechanism. The second pin material strip is wound on a material tray on a side bracket of the second working frame. A guide plate for guiding the second pin material strip is provided under the material tray. The second material shifting mechanism is used to shift the second pin material strip to the second cutting mechanism. The second cutting mechanism is used to cut the square pins on the second pin material strip. The cut square pins are inserted into the clip on the conveying track through the second pin insertion mechanism.
8. The automatic production line of new energy vehicle connectors according to claim 7 is characterized in that: The second material-moving mechanism includes a material-moving gear arranged below the second workbench, and the teeth of the material-moving gear can be stuck in the through hole on one side of the second pin material strip; the material-moving gear is connected to the second motor, and the wheel axle of the material-moving gear is rotatably matched with the upper end of the connecting rod, and the lower end of the connecting rod is rotatably connected to the end of the handle hinged on the lower part of the second workbench, and pulling the handle downward can drive the material-moving gear to descend; the feed side and the discharge side above the material-moving gear are both provided with sensors for detecting the through hole on one side of the second pin material strip.
9. The automatic production line of new energy vehicle connectors according to claim 2 is characterized in that: The transport module includes a support frame, a horizontal moving mechanism and a clamping claw. The clamping claw moves along the crossbeam of the support frame through the horizontal moving mechanism. The clamping claw is connected to the horizontal moving mechanism through a lifting mechanism, and is used to move the carrier equipped with a clip on the first track on one side of the pin module to the first track on the second side of the pin module, or to move the empty carrier after unloading from the flipping module to the first track for the next batch of connector pin operations; a visual image detector is provided on the second track, which is used to detect whether the flat pins and square pins in the connector are missing or bent before injection molding; the flipping module includes a portal frame, a lifting assembly, a rotating mechanism and a clamping claw. The clamping arm of the clamping claw is connected to the turntable of the rotating mechanism. The rotating mechanism is arranged at the movable end of the lifting assembly, and the lifting assembly and the rotating mechanism are both arranged on the top of the portal frame.
10. The automatic production line for new energy vehicle connectors according to any one of claims 1 to 9, characterized in that: The unloading station is provided with an unloading module, and the unloading module includes an unloading robot and a receiving rack. One side of the receiving rack is provided with an unloading platform for placing the unloading robot and the receiving tray, and the other side of the receiving rack is a material bin for accommodating the material tray rack; the unloading robot is used to absorb the finished connectors on the conveying track and move them to the receiving tray; the unloading platform is provided with a telescopic mechanism for pushing the receiving tray with the finished connectors into the material bin; the material tray rack in the material bin is provided with multiple layers of material trays, and the material tray rack is lifted and lowered by a belt; a motor and a transmission shaft are provided at the bottom of the material bin, and the belts symmetrically arranged on both sides of the material bin are connected to the transmission shaft through pulleys, and the belts are connected to the material tray rack through belt clamps.