Fault information determination method and device of transformer substation, equipment, medium and product

Through information collection robots and automated data processing technology, the incomplete and inaccurate information caused by the collection of substation fault information is solved, and the rapid and accurate collection and diagnosis of fault information is achieved, the fault analysis and maintenance efficiency is improved, and the substation is ensured. stable operation.

CN119315483APending Publication Date: 2025-01-14GUANGDONG POWER GRID CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411353366.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-26
Publication Date
2025-01-14

AI Technical Summary

Technical Problem

In the prior art, the collection of substation fault information relies on manual labor, resulting in limited comprehensiveness and accuracy of information. Especially when unattended, the fault analysis and maintenance progress is extended, affecting the operation of substations and social production activities.

Method used

The information collection robot and automated data processing technology are used to determine the secondary information collection task based on the initial fault information, and the robot collects detailed abnormal information, and combines the data analysis model to perform fault diagnosis, reducing human resource consumption and improving information collection efficiency and accuracy.

Benefits of technology

It realizes the rapid and accurate acquisition of secondary information on substation faults, improves the accuracy of the analysis of fault causes, reduces the difficulty of fault repair, accelerates the maintenance progress, and ensures the safe and stable operation of the substation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119315483A_ABST
    Figure CN119315483A_ABST
Patent Text Reader

Abstract

The invention discloses a fault information determination method, device and equipment of a transformer substation, a medium and a product, and relates to the technical field of electric power, the method comprises the steps that a secondary information acquisition task of the transformer substation is determined based on initial fault information of the transformer substation, and the secondary information acquisition task comprises at least one piece of to-be-acquired equipment; determining a to-be-operated information collector and first control information of the to-be-operated information collector based on the position information of the at least one to-be-collected device, wherein the to-be-operated information collector comprises at least one information collection robot; controlling the to-be-operated information collector to operate based on the first control information, and collecting fault secondary information of at least one to-be-collected device; and determining a fault diagnosis result of the transformer substation based on the initial fault information and the fault secondary information of the at least one piece of to-be-collected equipment. Accurate transformer substation fault secondary information can be obtained rapidly and safely with low resource consumption, and the accuracy of a fault reason analysis result is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of electric power technology, and in particular to a method, device, equipment, medium and product for determining fault information of a substation. Background Art

[0002] The safe and stable operation of substations is one of the prerequisites for ensuring the order of social production activities. Therefore, the efficiency and accuracy of the confirmation of substation fault information are crucial. For example, when an accident or abnormality occurs in a substation, it is necessary to quickly and accurately collect secondary fault information in order to analyze the cause of the accident and restore power supply in time.

[0003] At present, the secondary information is collected manually. For example, when an accident or abnormality occurs in a substation, the power workers stationed at the substation collect the secondary fault information. However, there are many types of power equipment and the operation is highly professional. If the skill level of the power workers is not high, the comprehensiveness and accuracy of the collected secondary fault information will be limited, which will affect the fault cause analysis results and fault repair work of the substation. Secondly, if the substation is unattended, the effectiveness of the secondary fault information cannot be guaranteed, which will delay the progress of the fault cause analysis and repair progress of the substation, and even affect the operation of the substation and social production activities. Summary of the invention

[0004] The present invention provides a method, device, equipment, medium and product for determining fault information of a substation, aiming to obtain accurate secondary fault information of the substation quickly, safely and with low resource consumption, improve the accuracy of fault cause analysis results, so as to reduce the difficulty of fault repair work and speed up the progress of fault repair work.

[0005] According to one aspect of the present invention, a method for determining fault information of a substation is provided, the method comprising:

[0006] Based on the initial fault information of the substation, determining a secondary information collection task of the substation, wherein the secondary information collection task includes at least one device to be collected;

[0007] Based on the location information of at least one device to be collected, determine the information collector to be operated and the first control information of the information collector to be operated, wherein the information collector to be operated includes at least one information collection robot, the first control information includes at least one sub-control information, and the information collection robot corresponds to the sub-control information one by one;

[0008] Controlling the to-be-run information collector to run based on the first control information to collect secondary fault information of at least one device to be collected;

[0009] Based on the initial fault information and the secondary fault information of at least one device to be collected, a fault diagnosis result of the substation is determined.

[0010] According to another aspect of the present invention, a device for determining fault information of a substation is provided. The device for determining fault information of a substation is used to implement the method for determining fault information of a substation in any embodiment of the present invention. The device includes:

[0011] An acquisition module, used to determine a secondary information collection task of the substation based on the initial fault information of the substation, wherein the secondary information collection task includes at least one device to be collected;

[0012] A determination module, configured to determine, based on the location information of at least one device to be collected, an information collector to be operated and first control information of the information collector to be operated, wherein the information collector to be operated includes at least one information collection robot, the first control information includes at least one sub-control information, and the information collection robot corresponds to the sub-control information one by one;

[0013] A control module, used for controlling the to-be-run information collector to run based on the first control information, and to collect secondary fault information of at least one device to be collected;

[0014] The diagnosis module is used to determine the fault diagnosis result of the substation based on the initial fault information and the secondary fault information of at least one device to be collected.

[0015] According to another aspect of the present invention, there is provided an electronic device, the electronic device comprising:

[0016] at least one processor; and a memory communicatively coupled to the at least one processor;

[0017] The memory stores a computer program executable by at least one processor, and the computer program is executed by at least one processor so that the at least one processor can execute the method for determining fault information of a substation in any embodiment of the present invention.

[0018] According to another aspect of the present invention, a computer-readable storage medium is provided, which stores computer instructions for enabling a processor to implement the method for determining fault information of a substation in any embodiment of the present invention when the computer instructions are executed.

[0019] According to another aspect of the present invention, a computer program product is provided. The computer program product includes a computer program. When the computer program is executed by a processor, the method for determining fault information of a substation according to any embodiment of the present invention is implemented.

[0020] The method for determining fault information of a substation of the present invention includes: determining a secondary information collection task of the substation based on the initial fault information of the substation, wherein the secondary information collection task includes at least one device to be collected; determining an information collector to be operated and first control information of the information collector to be operated based on the location information of at least one device to be collected, wherein the information collector to be operated includes at least one information collection robot, the first control information includes at least one sub-control information, and the information collection robot corresponds to the sub-control information one-to-one; controlling the information collector to be operated to operate based on the first control information to collect secondary fault information of at least one device to be collected; and determining a fault diagnosis result of the substation based on the initial fault information and the secondary fault information of at least one device to be collected. The technical solution of the present invention determines the faulty equipment that needs to be monitored again after analyzing the initial fault information of the substation, controls the information collection robot to collect detailed abnormal information of the faulty equipment (equivalent to the secondary fault information), and determines the fault information of the substation based on the initial fault information and the detailed abnormal information of the faulty equipment. The information collection and fault assessment process does not require the participation of power workers, which reduces the consumption of human resources. The automated information collection and data processing method can effectively improve the efficiency, comprehensiveness and accuracy of information collection, thereby improving the accuracy of the fault cause analysis results, reducing the difficulty of fault maintenance work, and speeding up the progress of fault maintenance work. The problem that there are many types of power equipment and the operation is highly professional is solved. If the skill level of power workers is not high, the comprehensiveness and accuracy of the collected secondary fault information are limited, which will affect the fault cause analysis results and fault maintenance work of the substation. If the substation is unattended, the effectiveness of the secondary fault information cannot be guaranteed, which will prolong the progress of the fault cause analysis and maintenance progress of the substation, and even affect the operation of the substation and social production activities.

[0021] It should be understood that the contents described in this section are not intended to identify the key or important features of the embodiments of the present invention, nor are they intended to limit the scope of the present invention. Other features of the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to more clearly illustrate the technical solutions in the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings in the following description are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0023] Figure 1 It is a flow chart of a method for determining fault information of a substation provided by the present invention;

[0024] Figure 2 It is a schematic diagram of a secondary information collection system provided by the present invention;

[0025] Figure 3 It is a structural schematic diagram of a fault information determination device for a substation provided by the present invention;

[0026] Figure 4 It is a structural schematic diagram of an electronic device provided by the present invention. DETAILED DESCRIPTION

[0027] In order to enable those skilled in the art to better understand the solution of the present invention, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0028] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0029] Figure 1 This is a flow chart of a method for determining fault information of a substation provided by the present invention. This embodiment can be applied to the situation of determining secondary distributed information of faults of a substation quickly, efficiently, safely and with low resource consumption. The method can be executed by the device for determining fault information of a substation provided by the present invention. The device can be implemented in the form of hardware and / or software. In a specific embodiment, the device can be integrated in an electronic device. The following embodiments will be described by taking the device integrated in an electronic device as an example. Figure 1 , the method specifically comprises the following steps:

[0030] S101. Determine a secondary information collection task of the substation based on initial fault information of the substation.

[0031] The central processing unit can be linked to a variety of information acquisition equipment such as the Supervisory Control And Data Acquisition (SCADA), the power grid management platform information system, and the substation surrounding environment monitoring system to regularly obtain the operating data of each substation in its management area, including but not limited to the current, voltage, temperature, alarm information of the monitoring equipment, the secondary protection setting information in the CADA system, and the equipment ledger information such as the name, model, installation location, and operating status. If there is an abnormality in the substation, the operating data of the substation will contain abnormal operating data, and the initial fault information of the substation can be understood as the abnormal operating data in the information obtained by the above central processing unit, for example, data that does not conform to the preset operating rules, abnormal alarm information, device abnormal information, etc. In order to ensure the accuracy of the substation abnormal monitoring, the present invention will perform secondary detection on the equipment with abnormal operating data, that is, it will obtain the operating data of the equipment corresponding to the initial fault information for a second time. The advantage of such a setting is that more detailed and more real-time abnormal information can be obtained, reducing the probability of information omission, thereby ensuring the comprehensiveness and accuracy of the substation fault information. The secondary information collection task can be understood as the equipment and collection requirements for secondary information collection. The secondary information collection task includes at least one device to be collected, and the equipment to be collected includes but is not limited to the protection screen, fault recording screen, pressure plate, circuit breaker and handle in the substation.

[0032] The advantage of this setting is that the equipment that needs to be inspected a second time can be quickly determined based on the initial fault information in the substation operation information, that is, the secondary information collection location, which greatly improves the efficiency of obtaining secondary information.

[0033] The present invention uses machine learning and pattern recognition technology to train a data analysis model in advance. The data analysis model is loaded on the central processing unit. On the one hand, it is used to analyze the fault interval information, fault time information and protection action information of the substation according to the initial fault information, and then determine the equipment that needs to be secondary detected, that is, the equipment corresponding to the secondary scattered information (fault secondary information that needs to be collected again). On the other hand, it is used to process the initial fault information and the secondary scattered information, analyze the causes and influencing factors of the fault, and make a judgment and evaluation of the fault situation. At this time, the work of the data analysis model is to integrate and unify the collected secondary scattered information including device status, alarm information and action records, and then combine external data, initial fault information and secondary scattered information for correlation analysis to determine the relevant parameters and conditions when the fault occurs. The advantage of such a setting is that it can comprehensively consider the external data and secondary scattered information, comprehensively analyze the causes and influencing factors of the fault, and make accurate fault judgments and evaluations. External data can be understood as non-relay protection secondary accident-related factors obtained by other platforms, such as work ticket construction work information (construction causes equipment failure), weather factors (bad weather causes equipment failure), other accident event information (failures in other areas cause local failures), etc. This embodiment does not limit this.

[0034] In one embodiment, S101 may specifically include: determining the fault interval information, fault time information, fault type and protection action information of the substation based on the initial fault information; determining at least one device to be collected based on the fault interval information, fault time information and protection action information.

[0035] Among them, the fault interval information can be understood as the interval length of each abnormal operation data in the initial fault information, the fault time information can be understood as the generation time of each abnormal operation data, and the protection action information can be understood as the alarm information of each device in the substation. The fault interval information, fault time information, fault type and protection action information can be used as data support for parsing the equipment that needs secondary detection. The equipment to be collected can be understood as the equipment that needs secondary detection, that is, the equipment where the secondary dispersed information is located.

[0036] Specifically, based on the abnormal data (initial fault information) in the data information stored by the background monitoring machine, the interval, time and protection action of the accident can be known. Basic rules are set in the data analysis model. For example, the corresponding protection screen that needs to be further searched for the interval A fault is A+B, and the corresponding protection screen that needs to be searched for the interval B fault is C+D. Additional rules can also be set. For example, if a DC grounding occurs during the fault, it is necessary to find the protection screen E, and if a thunderstorm occurs during the fault, it is necessary to find the protection screen F, etc. By superimposing special situations on different intervals, the screen cabinets (devices to be collected) for which data need to be collected can be obtained.

[0037] It is worth noting that before determining the fault interval information, fault time information and protection action information of the substation based on the initial fault information, the initial fault information will be cleaned and preprocessed, including but not limited to data denoising, outlier processing and data normalization. The advantage of this setting is to ensure the data quality and accuracy of the initial fault information and improve the accuracy of the fault interval information, fault time information and protection action information.

[0038] S102: Determine an information collector to be operated and first control information of the information collector to be operated based on location information of at least one device to be collected.

[0039] The location information of the device to be collected can be understood as the location of the device to be collected in the substation, the information collector to be operated can be understood as a robot or information collection device that needs to perform a secondary decentralized information collection task, and the first control information can be understood as the operation instruction information of the information collector to be operated in the process of performing the information collection task, including but not limited to the collection target, operation route, driving speed information and stop information. The information collector to be operated includes at least one information collection robot, and the first control information includes at least one sub-control information, and the information collection robot corresponds to the sub-control information one by one.

[0040] Specifically, there may be multiple devices to be collected. If the distance between multiple devices to be collected is close, only one robot needs to be started to quickly complete the information collection task. If the distance between the devices to be collected is far, the devices to be collected need to collect a lot of secondary information, or the operation of the devices to be collected is more complicated, in order to ensure the efficiency of information collection, multiple robots need to be started to perform the information collection tasks separately. The sub-control information is the operation instruction information of each robot.

[0041] The advantage of this setting is that it can combine the location information of the equipment to be collected in the substation and the attribute information of the information collector, and specifically determine the information collector to be operated, thereby ensuring the quality and efficiency of information collection while reducing resource consumption.

[0042] Furthermore, the present invention determines the priority of tasks according to the type and severity of the fault to ensure that critical tasks can be responded to and processed in a timely manner, that is, a task allocation strategy is designed to allocate high-priority tasks to the robots or devices that respond first and have higher functional levels, so as to achieve effective execution and collaborative work of tasks.

[0043] In one embodiment, S102 may specifically include: determining an initial operation information collector, location information and type information of the initial operation information collector, wherein the initial operation information collector includes at least one information collection robot; based on the location information of at least one device to be collected and the location information and type information of each information collection robot in the initial operation information collector, determining the information collector to be operated and the first control information, wherein the first control information includes the collection target, operation route, driving speed information and stop information of the information collector to be operated.

[0044] The robots in the substation include information collection robots, fault report printing robots, etc. Different robots perform different types of tasks, and only information collection robots can perform information collection tasks. Therefore, when obtaining secondary fault information, it is necessary to determine the information collector to be operated and its first control information based on the position of each information collection robot and the position information of the equipment to be collected. The advantage of this setting is that a better, lower resource consumption, and more efficient information collection strategy can be formulated based on the position of each information collection robot.

[0045] Specifically, the information collection device and the device to be collected can also be associated, and the information collector to be operated and its first control information can be determined according to the association relationship. In one embodiment, it is assumed that the devices for storing key accident event information in the substation are A, B, C, D, E, F, etc., and different protection screen cabinets are in different spaces. Different robots are arranged in different spaces, for example, relay room robots, communication room robots, outdoor robots, outdoor robots, etc. The default configuration has a way to obtain associated key information. For example, devices A and B need to be obtained by robot 1 (communication room robot), devices C and D need to be obtained by robot 2 (outdoor robot), and devices E and F need to be obtained by robot 3 (indoor robot). If the data analysis model determines that the protection screen cabinets for the key information to be found are A, B, and C, a task is sent to robots 1+2 to obtain secondary fault information.

[0046] S103: Control the to-be-run information collector to run based on the first control information to collect secondary fault information of at least one device to be collected.

[0047] Specifically, controlling the information collector to be operated to collect the secondary fault information of at least one device to be collected based on the first control information can be understood as controlling each information collection robot to operate based on its corresponding sub-control information to collect the secondary fault information of its corresponding device.

[0048] In one embodiment, the robot can reach the designated protection screen cabinet (device to be collected) according to the preset path and action rules, monitor the action of the device to be collected in real time through the visual recognition system or sensor, and record the collected status information and alarm information. The robot can also monitor the status of the alarm indicator light, and determine whether there is an alarm according to the preset rules. If there is an alarm, the alarm type, location and other information are uploaded to the central processor. In another embodiment, the robot can go to the accident-related protection screen, fault recording screen and other secondary cabinet locations according to the preset path and action rules, use a high-definition camera to collect information on the physical status of the pressure plate, circuit breaker, and handle in the on-site protection, and analyze the actual position of the corresponding pressure plate, circuit breaker, and operating handle through the built-in edge computing artificial intelligence recognition algorithm, and then determine whether its position is correct. If not, the error information is uploaded to the central processor so that the central processor can analyze the fault information of the substation.

[0049] Furthermore, the method of the present invention also includes: when receiving a supplementary monitoring instruction, determining a supplementary monitoring robot and a supplementary monitoring device based on the monitoring requirements in the supplementary monitoring instruction; determining second control information of the supplementary monitoring robot based on position information of the supplementary monitoring robot and position information of the supplementary monitoring device; controlling the supplementary monitoring robot to operate based on the second control information, and collecting secondary fault information of the supplementary monitoring device.

[0050] The substation is operated in real time, and there may be new secondary fault information that needs to be collected during the secondary information collection process. Among them, the supplementary monitoring instruction is used to indicate that the substation has generated new secondary fault information that needs to be collected. The monitoring requirements can be understood as the attribute information of the equipment that needs to be supplemented with monitoring, including but not limited to the number, location and name, which is used to determine the supplementary monitoring equipment. The supplementary monitoring robot can be understood as a robot that collects the secondary fault information of the supplementary monitoring equipment. The second control information can be understood as the collection target, operation route, driving speed information and stop information of the supplementary monitoring robot, etc., which is used to instruct the supplementary monitoring robot to collect the secondary fault information of the supplementary monitoring equipment. The advantage of this setting is that comprehensive and highly real-time substation fault data can be obtained, so as to obtain comprehensive, accurate and authoritative substation fault analysis results.

[0051] On the one hand, the present invention also includes an action collaborative communication function, which ensures the synchronization and coordination of actions between multiple robots through precise time synchronization and communication protocols, thereby improving work efficiency and accuracy. On the other hand, it is also possible to plan fault collection actions, that is, to perform path planning and task allocation for multiple robots to ensure that they work together in the working area to avoid conflicts and repeated operations. Safety protection devices will also be considered, such as collision detection, emergency stop buttons, etc., to ensure that the robot operation is stopped in time in an emergency to ensure the safety of personnel and equipment. In addition, the robot of the present invention carries a camera when performing tasks, and the central processing unit can monitor the operating status and working conditions of the robot in real time, and remotely control and adjust it in order to adjust the robot's operating information.

[0052] Optionally, after controlling the information collector to be run to run based on the first control information and collecting secondary fault information of at least one device to be collected, it also includes: when receiving a reset request instruction of the information collector to be run, displaying the operating environment of the information collector to be run; determining whether the information collector to be run meets a preset reset condition based on the operating environment of the information collector to be run; if the information collector to be run meets the preset reset condition, controlling the information collector to be run to perform a reset operation.

[0053] Among them, the reset request instruction of the information collector to be run is used to indicate that there is a reset request for the device corresponding to the information collector to be run. The operating environment of the information collector to be run is displayed to facilitate the staff of the central processor to understand the environmental information of the device applying for reset. The information collector to be run meets the preset reset conditions, which can be understood as the device corresponding to the information collector to be run meets the reset conditions. For example, the central processor has issued a reset consent instruction. The advantage of this setting is to verify the device applying for reset to ensure the accuracy of the reset work.

[0054] In one embodiment, the reset work is performed by a humanoid robot with precise positioning and mechanical arm operation functions. The robot is equipped with a visual recognition system, a force sensor and other equipment for real-time monitoring and precise control of the reset action. The robot monitors the status of the alarm signal indicator light on the protective screen through the visual recognition system, obtains the position information of the alarm signal to be reset in real time, and sends the position information of the alarm signal to be reset to the operator (central processing unit) so that the operator can confirm the position and type of the signal to be reset through the remote monitoring system or on-site observation. After the operator confirms, the robot can accurately locate and use the mechanical arm to press the corresponding reset button according to the confirmed alarm signal position information to perform the reset action. In addition, the robot can also monitor the pressing of the reset button, and feed back the execution results to the central processing system to confirm the execution of the reset action.

[0055] S104: Determine a fault diagnosis result of the substation based on the initial fault information and secondary fault information of at least one device to be collected.

[0056] Among them, the fault diagnosis result can be understood as the fault parameters of the substation, for example, whether the fault range is inside or outside the station, and whether the fault is a permanent fault or a transient fault. Specifically, determining the fault diagnosis result of the substation based on the initial fault information and the secondary fault information of at least one device to be collected can be understood as integrating and integrating the initial fault information and the secondary fault information collected by the information collection robot to determine the fault range, fault type, fault cause, accident development prediction, fault handling suggestions, fault solutions and emergency measures of the substation.

[0057] The advantage of this setting is that it can monitor and analyze the substation operating parameters in real time, propose an optimized scheduling plan based on the diagnosis results, realize intelligent control and scheduling of substation operation, and improve the operating efficiency and stability of the power grid.

[0058] It is worth noting that the present invention will perform data fieldization and standardized storage according to the template preset by the user. On the one hand, it is convenient for operators to call and view, and on the other hand, it is used for substation equipment status assessment. For example, if the related equipment in the same substation fails again in the future, the fault analysis can be combined with the stored historical fault information.

[0059] Optionally, after determining the fault diagnosis result of the substation, it also includes: determining a fault information printing device based on the fault diagnosis result; determining a target fault printing robot based on the location information of the fault information printing device, and controlling the target fault printing robot to perform the fault result printing task of the fault information printing device, wherein the target fault printing robot is an idle fault printing robot closest to the fault information printing device or a fault printing robot corresponding to a device to be collected for which a fault report needs to be printed.

[0060] Among them, the fault information printing device can be understood as a robot that prints fault information. Through the cooperation of the humanoid robot and the robotic arm, the protection screen cabinet door is opened and the touch device panel is clicked to print the protection action report. Specifically, the robot has a built-in portable protection device printer, which can automatically connect to the printing data cable to complete the report printing task. The robot will monitor the report printing situation. After printing, it will close the corresponding protection cabinet door and scan, organize and save the protection report. The advantage of this setting is that the fault report can be printed in time for the debugging personnel to view.

[0061] Figure 2It is a schematic diagram of a secondary information collection system provided by the present invention. The arrows in the figure indicate the direction of information transmission, and the dotted lines indicate the monitoring relationship. It is mainly that the substation secondary information collection robot detects abnormal data of the panel cabinet where the secondary information is located.

[0062] The data analysis model of the present invention is trained and updated regularly. The data analysis model mainly includes data collection and preparation stage, model selection and design stage, model training and tuning stage, model deployment and real-time monitoring stage and continuous improvement and optimization stage.

[0063] The data collection and preparation stage mainly includes: 1) Collecting substation historical data, that is, obtaining substation historical data including equipment operation data, fault data, and alarm information from existing power grid management systems, SCADA systems and other equipment; 2) Data cleaning and preprocessing, that is, performing preprocessing operations such as cleaning, denoising, and outlier processing on the collected data to ensure data quality and availability; 3) Feature engineering, that is, performing feature extraction and feature selection on the processed data to convert the data into feature vectors that can be used for model training.

[0064] The model selection and design stage mainly includes: 1) model selection, that is, selecting a suitable machine learning algorithm or deep learning model, such as decision tree, support vector machine, neural network, etc., according to the nature of the problem and data characteristics; 2) model design, that is, designing the model structure and parameter settings, including network hierarchy, activation function, loss function, etc., to maximize the performance and generalization ability of the model.

[0065] The model training and tuning stage mainly includes: 1) model training, that is, using historical data to train the selected model, and updating the model parameters through the back propagation algorithm and optimizer to minimize the loss function; 2) model evaluation and tuning, that is, using methods such as cross-validation to evaluate and tune the trained model, and adjust hyperparameters to improve the performance and generalization ability of the model.

[0066] The model deployment and real-time monitoring stage mainly includes: 1) model deployment, that is, deploying the trained model to the actual system to process and analyze the substation data in real time; 2) real-time monitoring and feedback, that is, monitoring the performance and effect of the model in actual operation, and adjusting the model based on the monitoring results to ensure the stability and accuracy of the model.

[0067] The continuous improvement and optimization stage mainly includes: 1) data update and retraining, that is, regularly updating the model's training data and retraining the model to adapt to the changes and development of the substation system; 2) model improvement and optimization, that is, improving and optimizing the model according to feedback and needs in actual applications to improve its performance and applicability.

[0068] The technical solution of this embodiment determines the faulty equipment that needs to be monitored again after analyzing the initial fault information of the substation, controls the information collection robot to collect detailed abnormal information of the faulty equipment (equivalent to the secondary fault information), and determines the fault information of the substation based on the initial fault information and the detailed abnormal information of the faulty equipment. The information collection and fault assessment process does not require the participation of power workers, which reduces the consumption of human resources. The automated information collection and data processing method can effectively improve the efficiency, comprehensiveness and accuracy of information collection, thereby improving the accuracy of the fault cause analysis results, reducing the difficulty of fault maintenance work, and speeding up the progress of fault maintenance work. The problem that there are many types of power equipment and the operation is highly professional is solved. If the skill level of power workers is not high, the comprehensiveness and accuracy of the collected secondary fault information are limited, which will affect the fault cause analysis results and fault maintenance work of the substation. If the substation is unattended, the effectiveness of the secondary fault information cannot be guaranteed, which will prolong the progress of the fault cause analysis and maintenance of the substation, and even affect the operation of the substation and social production activities.

[0069] Figure 3 FIG. 1 is a schematic diagram of the structure of a fault information determination device for a substation provided by the present invention. Figure 3 As shown, the device includes: an acquisition module 201 , a determination module 202 , a control module 203 and a diagnosis module 204 .

[0070] The acquisition module 201 is used to determine the secondary information collection task of the substation based on the initial fault information of the substation, wherein the secondary information collection task includes at least one device to be collected.

[0071] Determination module 202 is used to determine the information collector to be operated and the first control information of the information collector to be operated based on the location information of at least one device to be collected, wherein the information collector to be operated includes at least one information collection robot, the first control information includes at least one sub-control information, and the information collection robot corresponds to the sub-control information one by one.

[0072] The control module 203 is used to control the to-be-run information collector to run based on the first control information to collect secondary fault information of at least one to-be-collected device.

[0073] The diagnosis module 204 is used to determine the fault diagnosis result of the substation based on the initial fault information and the secondary fault information of at least one device to be collected.

[0074] Optionally, the acquisition module 201 is specifically used to determine the fault interval information, fault time information and protection action information of the substation based on the initial fault information; and determine at least one device to be collected based on the fault interval information, fault time information and protection action information.

[0075] Optionally, the determination module 202 is specifically used to determine the initial operation information collector, the location information and type information of the initial operation information collector, wherein the initial operation information collector includes at least one information collection robot; based on the location information of at least one device to be collected and the location information and type information of each information collection robot in the initial operation information collector, determine the information collector to be operated and the first control information, wherein the first control information includes the collection target, operation route, driving speed information and stop information of the information collector to be operated.

[0076] Optionally, the device also includes a processing module, which is used to determine the supplementary monitoring robot and the supplementary monitoring equipment based on the monitoring requirements in the supplementary monitoring instruction when the supplementary monitoring instruction is received; determine the second control information of the supplementary monitoring robot based on the position information of the supplementary monitoring robot and the position information of the supplementary monitoring equipment; control the supplementary monitoring robot to operate based on the second control information, and collect secondary fault information of the supplementary monitoring equipment.

[0077] Optionally, the control module 203 is also used to control the operation of the information collector to be run based on the first control information, and after collecting the secondary fault information of at least one device to be collected, upon receiving a reset request instruction of the information collector to be run, display the operating environment of the information collector to be run; determine whether the information collector to be run meets the preset reset condition based on the operating environment of the information collector to be run; if the information collector to be run meets the preset reset condition, control the information collector to be run to perform the reset work.

[0078] Optionally, the diagnostic module 204 is also used to determine the fault diagnosis result of the substation, and then determine the fault information printing device based on the fault diagnosis result; determine the target fault printing robot based on the location information of the fault information printing device, and control the target fault printing robot to perform the fault result printing task of the fault information printing device, wherein the target fault printing robot is an idle fault printing robot that is closest to the fault information printing device.

[0079] The substation fault information determination device provided in this embodiment can execute the substation fault information determination method provided in any embodiment of the present invention, and has the corresponding functional modules and beneficial effects of the execution method.

[0080] Figure 4: is a schematic diagram of the structure of an electronic device provided by the present invention. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workbenches, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device may also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices (such as helmets, glasses, watches, etc.) and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present invention described and / or required herein.

[0081] like Figure 4 As shown, the electronic device 10 includes at least one processor 11, and a memory connected to the at least one processor 11, such as a read-only memory (ROM) 12, a random access memory (also called random access memory, RAM) 13, etc., wherein the memory stores a computer program that can be executed by at least one processor, and the processor 11 can perform various appropriate actions and processes according to the computer program stored in the read-only memory (ROM) 12 or the computer program loaded from the storage unit 18 to the random access memory (RAM) 13. In the RAM 13, various programs and data required for the operation of the electronic device 10 can also be stored. The processor 11, ROM 12 and RAM 13 are connected to each other through a bus 14. An input / output (I / O) interface 15 is also connected to the bus 14.

[0082] A number of components in the electronic device 10 are connected to the I / O interface 15, including: an input unit 16, such as a keyboard, a mouse, etc.; an output unit 17, such as various types of displays, speakers, etc.; a storage unit 18, such as a disk, an optical disk, etc.; and a communication unit 19, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 19 allows the electronic device 10 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.

[0083] The processor 11 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the processor 11 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various special artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, a digital signal processor (DSP), and any appropriate processor, controller, microcontroller, etc. The processor 11 executes the various methods and processes described above, such as a fault information determination method for a substation.

[0084] In some embodiments, the fault information determination method of the substation may be implemented as a computer program, which is tangibly contained in a computer-readable storage medium, such as a storage unit 18. In some embodiments, part or all of the computer program may be loaded and / or installed on the electronic device 10 via the ROM 12 and / or the communication unit 19. When the computer program is loaded into the RAM 13 and executed by the processor 11, one or more steps of the fault information determination method of the substation described above may be performed. Alternatively, in other embodiments, the processor 11 may be configured to execute the fault information determination method of the substation in any other appropriate manner (e.g., by means of firmware).

[0085] Various embodiments of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various embodiments may include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.

[0086] Computer programs for implementing the methods of the present invention may be written in any combination of one or more programming languages. These computer programs may be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that when the computer program is executed by the processor, the functions / operations specified in the flow chart and / or block diagram are implemented. The computer program may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.

[0087] In the context of the present invention, a computer-readable storage medium may be a tangible medium that may contain or store a computer program for use by or in conjunction with an instruction execution system, device, or equipment. A computer-readable storage medium may include, but is not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, device, or equipment, or any suitable combination of the foregoing. Alternatively, a computer-readable storage medium may be a machine-readable signal medium. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.

[0088] To provide interaction with a user, the systems and techniques described herein may be implemented on an electronic device having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and a pointing device (e.g., a mouse or trackball) through which the user can provide input to the electronic device. Other types of devices may also be used to provide interaction with the user; for example, the feedback provided to the user may be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user may be received in any form (including acoustic input, voice input, or tactile input).

[0089] The systems and techniques described herein can be implemented in a computing system that includes backend components (e.g., as a data server) or a computing system that includes middleware components (e.g., an application server) or a computing system that includes frontend components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein) or a computing system that includes any combination of such backend components, middleware components, or frontend components. The components of the system can be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), a blockchain network, and the Internet.

[0090] A computing system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The client and server relationship is generated by computer programs running on the corresponding computers and having a client-server relationship with each other. The server may be a cloud server, also known as a cloud computing server or cloud host, which is a host product in the cloud computing service system to solve the defects of difficult management and weak business scalability in traditional physical hosts and VPS services.

[0091] In one embodiment, the present invention further includes a computer program product, the computer program product includes a computer program, and when the computer program is executed by a processor, the method for determining fault information of a substation of any embodiment of the present invention is implemented.

[0092] In the process of implementation, the computer program product can be written in one or more programming languages ​​or a combination thereof to perform the computer program code of the present invention, including object-oriented programming languages, such as Java, Smalltalk, C++, and conventional procedural programming languages, such as "C" language or similar programming languages. The program code can be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer can be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or can be connected to an external computer (for example, using an Internet service provider to connect through the Internet).

[0093] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps described in the present invention can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solution of the present invention can be achieved, and this document does not limit this.

[0094] The above specific implementations do not constitute a limitation on the protection scope of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for determining fault information of a substation, characterized in that: include: Based on the initial fault information of the substation, determining a secondary information collection task of the substation, wherein the secondary information collection task includes at least one device to be collected; Based on the location information of the at least one device to be collected, determine the information collector to be operated and the first control information of the information collector to be operated, wherein the information collector to be operated includes at least one information collection robot, the first control information includes at least one sub-control information, and the information collection robot corresponds to the sub-control information one by one; Controlling the to-be-run information collector to run based on the first control information to collect secondary fault information of the at least one to-be-collected device; Based on the initial fault information and the secondary fault information of the at least one device to be collected, a fault diagnosis result of the substation is determined.

2. The method according to claim 1, characterized in that The determining of the secondary information collection task of the substation based on the initial fault information of the substation includes: Based on the initial fault information, determining fault interval information, fault time information and protection action information of the substation; Based on the fault interval information, the fault time information and the protection action information, the at least one device to be collected is determined.

3. The method according to claim 1, characterized in that The determining, based on the location information of the at least one device to be collected, an information collector to be operated and first control information of the information collector to be operated includes: Determine an initial operation information collector, location information and type information of the initial operation information collector, wherein the initial operation information collector includes at least one information collection robot; Based on the location information of at least one device to be collected and the location information and type information of each of the information collection robots in the initial operation information collector, the information collector to be operated and the first control information are determined, wherein the first control information includes the collection target, operation route, driving speed information and stop information of the information collector to be operated.

4. The method according to claim 1, characterized in that Also includes: When receiving a supplementary monitoring instruction, determining a supplementary monitoring robot and a supplementary monitoring device based on the monitoring requirements in the supplementary monitoring instruction; determining second control information of the supplementary monitoring robot based on the position information of the supplementary monitoring robot and the position information of the supplementary monitoring device; The supplementary monitoring robot is controlled to operate based on the second control information to collect secondary fault information of the supplementary monitoring device.

5. The method according to claim 1, characterized in that After controlling the to-be-run information collector to run based on the first control information and collecting the secondary fault information of the at least one to-be-collected device, the method further includes: When receiving a reset request instruction of the information collector to be run, displaying the running environment of the information collector to be run; Determining whether the information collector to be run meets a preset reset condition based on the running environment of the information collector to be run; If the information collector to be operated meets the preset reset condition, the information collector to be operated is controlled to perform a reset operation.

6. The method according to claim 1, characterized in that After determining the fault diagnosis result of the substation, the method further includes: Based on the fault diagnosis result, determining a fault information printing device; Based on the position information of the fault information printing device, a target fault printing robot is determined, and the target fault printing robot is controlled to perform the fault result printing task of the fault information printing device, wherein the target fault printing robot is an idle fault printing robot closest to the fault information printing device.

7. A fault information determination device for a substation, characterized in that: The method for determining fault information of a substation according to any one of claims 1 to 6 is used to implement the fault information determination device of the substation, comprising: An acquisition module, configured to determine a secondary information collection task of the substation based on initial fault information of the substation, wherein the secondary information collection task includes at least one device to be collected; A determination module, configured to determine, based on the location information of the at least one device to be collected, an information collector to be operated and first control information of the information collector to be operated, wherein the information collector to be operated includes at least one information collection robot, the first control information includes at least one sub-control information, and the information collection robot corresponds to the sub-control information in a one-to-one manner; A control module, used for controlling the to-be-run information collector to run based on the first control information, and to collect the secondary fault information of the at least one to-be-collected device; The diagnosis module is used to determine the fault diagnosis result of the substation based on the initial fault information and the secondary fault information of the at least one device to be collected.

8. An electronic device, characterized in that: The electronic device comprises: at least one processor; and a memory communicatively coupled to the at least one processor; The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the fault information determination method for a substation as described in any one of claims 1 to 6.

9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the method for determining fault information of a substation as described in any one of claims 1 to 6 when executed.

10. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the computer program implements the fault information determination method for a substation according to any one of claims 1 to 6.