Virtual visual space safety management and control system for power transmission and transformation construction
Through the virtual visual space safety control system, the construction environment and the physical condition of construction personnel is monitored in real time, and the problems in the existing technology that cannot reasonably analyze the impact of the construction environment and the inability to supervise construction personnel in real time are solved, and the normal progress of construction projects and construction personnel are realized. Safety.
Patent Information
- Application Number
- CN202411405019.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-10
- Publication Date
- 2025-02-07
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing technology cannot reasonably analyze the impact of the construction environment during power transmission and transformation construction, and cannot adjust the work arrangements in a timely manner, resulting in difficulty in carrying out the construction project normally. At the same time, it is impossible to supervise the physical condition of the construction personnel in real time, making it difficult to ensure construction safety.
The virtual visual space safety control system is adopted, including a control platform, construction environment analysis module, construction personnel supervision module, equipment operation analysis module, early warning module, data visualization module and virtual reality equipment. By monitoring the construction environment and the physical condition of construction personnel in real time, Issuing early warnings and management suggestions in a timely manner.
Effectively ensure the normal progress of power transmission and transformation construction projects, reduce the impact of the construction environment on the construction projects, ensure the safety of construction personnel, and achieve efficient and safe management of power transmission and transformation construction.
Smart Images

Figure CN119398382A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power transmission and transformation construction, and more specifically, to a virtual visualization space safety management and control system for power transmission and transformation construction. Background Art
[0002] The virtual visualization space safety management and control system for power transmission and transformation construction is an innovative management system that combines modern information technology with virtual reality technology. The system builds a virtual power transmission and transformation construction environment to achieve all-round, multi-angle monitoring and safety management of the construction process, thereby improving construction efficiency and reducing safety risks.
[0003] The patent application with reference publication number CN114494630A discloses a method and system for intelligent safety management and control of substation infrastructure based on precise positioning technology, which belongs to the field of power monitoring. The method includes the following steps: forming a visualized three-dimensional model based on a three-dimensional basic model and an information database; dividing corresponding dangerous areas on the three-dimensional model according to the live equipment in the information database, and generating a first electronic fence and a boundary warning area around the dangerous area; obtaining the first position information of the operator and the second position information of the construction equipment; mapping the first position information and the second position information to the three-dimensional model for display; judging whether the first position information and the second position information are in the first electronic fence or the boundary warning area, and if so, outputting corresponding alarm information; the present application uses Beidou positioning, three-dimensional visualization modeling and 5G communication technology to effectively improve the informationization and intelligentization level of substation infrastructure safety management and control;
[0004] However, when the existing technology is used to supervise the power transmission and transformation construction process, it is impossible to reasonably analyze the impact that the construction environment may have during the power transmission and transformation construction process, and it is impossible to adjust the work arrangement in time according to the analysis results, and it is impossible to ensure the normal progress of the power transmission and transformation construction project. In addition, it is impossible to monitor the physical condition of the construction workers in real time to determine whether the construction workers are in danger. It is difficult to ensure the safety of the construction workers during construction, and it is impossible to ensure the safe progress of the power transmission and transformation project.
[0005] To this end, we propose a virtual visualization space safety management and control system for power transmission and transformation construction to address the above issues. Summary of the invention
[0006] The purpose of the present invention is to provide a virtual visualization space safety management and control system for power transmission and transformation construction, which solves the problems that the prior art is unable to reasonably analyze the impact that the construction environment may cause during the power transmission and transformation construction process, cannot adjust the work arrangement in time according to the analysis results, cannot ensure the normal progress of the power transmission and transformation construction project, and cannot monitor the physical condition of the construction personnel in real time to determine whether the construction personnel are in danger, making it difficult to ensure the safety of the construction personnel during construction and unable to ensure the safe progress of the power transmission and transformation project.
[0007] The purpose of the present invention can be achieved through the following technical solutions:
[0008] A virtual visualization space safety management and control system for power transmission and transformation construction, including a management and control platform, a construction environment analysis module, a construction personnel supervision module, an equipment operation analysis module, an early warning module, a data visualization module, and virtual reality equipment;
[0009] The construction environment analysis module collects statistics on the construction environment information at the construction site and evaluates and analyzes the construction environment based on the construction environment information;
[0010] The construction worker supervision module supervises, evaluates and analyzes the physical condition information of construction workers;
[0011] Equipment operation analysis module, which processes and analyzes the data collected from the equipment on the construction site to determine the operating status of the equipment on the construction site;
[0012] The early warning module receives the construction humidity unqualified signal, the construction temperature unqualified signal, the construction wind speed unqualified signal, the warning signal and the abnormal information, and issues the corresponding early warning information respectively;
[0013] The data visualization module constructs a three-dimensional basic model of the power transmission and transformation construction site according to the construction drawings and design plans, establishes an information database of the power transmission and transformation construction site, generates a visualized three-dimensional model of the power transmission and transformation construction site based on the three-dimensional basic model and the information database, and sends the visualized three-dimensional model of the power transmission and transformation construction site to the management and control platform;
[0014] Virtual reality equipment is used to obtain a visualized three-dimensional model of the power transmission and transformation construction site and corresponding early warning information.
[0015] As a preferred implementation mode of the present invention, the construction environment information includes humidity, temperature and wind speed of the construction site, and the physical condition information includes heart rate, sweat secretion and body temperature of the construction workers.
[0016] As a preferred embodiment of the present invention, the process of the construction environment analysis module for collecting statistics on the construction environment information of the construction site is as follows:
[0017] The construction environment analysis module collects construction environment information through the sensor matrix at fixed intervals, and compares the collected construction environment information with the preset standard environment information. If the real-time construction humidity is within the preset standard construction humidity, it is recorded as a qualified construction humidity data point; if the real-time construction humidity is outside the preset standard construction humidity, it is recorded as an unqualified construction humidity data point; if the real-time construction temperature is within the preset standard construction temperature, it is recorded as a qualified construction temperature data point; if the real-time construction temperature is outside the preset standard construction temperature, it is recorded as an unqualified construction temperature data point; if the real-time construction wind speed is within the preset standard construction wind speed, it is recorded as a qualified construction wind speed data point; if the real-time construction wind speed is outside the preset standard construction wind speed, it is recorded as an unqualified construction wind speed data point.
[0018] As a preferred embodiment of the present invention, the method in which the construction environment analysis module evaluates and analyzes the construction environment according to the construction environment information is as follows:
[0019] The construction environment analysis module calculates qualified data points and unqualified data points of the construction humidity, obtains the proportion of qualified data points in the total data points, and records them as the construction humidity qualified rate, wherein the total data points are the sum of qualified data points and unqualified data points. The construction environment analysis module compares and analyzes the construction humidity qualified rate with the preset construction humidity qualified rate threshold value entered and stored internally. If the construction humidity qualified rate is greater than or equal to the preset construction humidity qualified rate threshold value, a construction humidity qualified signal is generated; if the construction humidity qualified rate is less than the preset construction humidity qualified rate threshold value, a construction humidity unqualified signal is generated;
[0020] The construction environment analysis module obtains the proportion of qualified data points in the construction temperature in the total data points, and records it as the construction temperature qualified rate, where the total data points are the sum of qualified data points and unqualified data points. The construction environment analysis module compares and analyzes the construction temperature qualified rate with the preset construction temperature qualified rate threshold value entered and stored internally. If the construction temperature qualified rate is greater than or equal to the preset construction temperature qualified rate threshold value, a construction temperature qualified signal is generated; if the construction temperature qualified rate is less than the preset construction temperature qualified rate threshold value, a construction temperature unqualified signal is generated.
[0021] As a preferred implementation mode of the present invention, the construction environment analysis module obtains the proportion of qualified construction wind speed data points in the total data points, and records it as the construction wind speed qualified rate, wherein the total data points are the sum of qualified data points and unqualified data points. The construction environment analysis module compares and analyzes the construction wind speed qualified rate with the preset construction wind speed qualified rate threshold value recorded and stored internally. If the construction wind speed qualified rate is greater than or equal to the preset construction wind speed qualified rate threshold value, a construction wind speed qualified signal is generated; if the construction wind speed qualified rate is less than the preset construction wind speed qualified rate threshold value, a construction wind speed unqualified signal is generated;
[0022] The construction environment analysis module sends the construction humidity unqualified signal, the construction temperature unqualified signal and the construction wind speed unqualified signal to the early warning module via the management and control platform.
[0023] As a preferred embodiment of the present invention, the supervision, evaluation and analysis process of the construction personnel supervision module on the real-time physical condition of the construction personnel is as follows:
[0024] The heart rate multiplier values of the construction workers in multiple time periods are obtained. The abnormal heart rate multiplier value represents the ratio of the area enclosed by the line segment of the heart rate value characteristic curve above the preset heart rate value characteristic curve and the preset heart rate value characteristic curve, and then to the area enclosed by the heart rate value characteristic curve and the X-axis. In this way, a set A of heart rate multiplier values is constructed, and the maximum subset and the minimum subset in set A are obtained, and the mean of the difference between the maximum subset and the minimum subset in set A is recorded as the abnormal heart rate risk value XYF.
[0025] As a preferred embodiment of the present invention, the sweat secretion of the construction workers detected in multiple time periods is obtained to construct a set B of sweat secretion, the mean in set B is obtained, and the mean in set B is marked as the mean sweat secretion, a rectangular coordinate system is established with time as the X-axis and the mean sweat secretion as the Y-axis, a sweat secretion mean curve is drawn by drawing points, and a preset sweat secretion mean threshold curve is drawn in the coordinate system at the same time, and the product value of the time length corresponding to the line segment above the preset sweat secretion mean threshold curve and the area enclosed by the upper line segment and the preset sweat secretion mean threshold curve is obtained from the coordinate system after data normalization, and it is marked as the abnormal sweating risk value CYF.
[0026] As a preferred embodiment of the present invention, the body temperatures of construction workers detected in multiple time periods are obtained, the difference between the body temperatures of two consecutive time periods is obtained, the average of the difference between the body temperatures of the two consecutive time periods is marked as the body temperature change value, a rectangular coordinate system is established with time as the X-axis and the body temperature change value as the Y-axis, the body temperature change value curve is drawn by drawing points, and a preset body temperature change value threshold curve is drawn in the coordinate system, the acute angle value formed when the body temperature change value curve intersects with the preset body temperature change value threshold curve for the first time is obtained from the coordinate system, and it is marked as the abnormal body temperature risk angle TYF.
[0027] As a preferred embodiment of the present invention, the abnormal heart rate risk value XYF, the abnormal sweating risk value CYF and the abnormal body temperature risk angle TYF are obtained;
[0028] By formula The physical condition assessment coefficient is obtained, where b1, b2 and b3 are respectively the preset proportional factor coefficients of the abnormal heart rate risk value, abnormal sweating risk value and abnormal body temperature risk angle, and e is a natural constant. The physical condition assessment coefficient SSZ is compared and analyzed with the preset physical condition assessment coefficient threshold value stored in the internal input:
[0029] If the physical condition assessment coefficient SSZ is greater than or equal to the preset physical condition assessment coefficient threshold, a warning signal is generated and sent to the early warning module;
[0030] If the physical condition assessment coefficient SSZ is less than the preset physical condition assessment coefficient threshold, no signal is generated.
[0031] As a preferred embodiment of the present invention, the specific process of the equipment operation analysis module processing and analyzing the data collected from the construction site equipment is as follows:
[0032] Data preprocessing: preprocess the data collected from the equipment on the construction site;
[0033] Feature extraction: Extract features related to the operating status of equipment at the construction site from the preprocessed data;
[0034] Abnormal identification and detection: Based on the extracted features and using classification algorithms or machine learning algorithms, the operating status of the equipment on the construction site is identified, and the actual operating parameters are compared with the corresponding normal range or threshold one by one to determine whether the equipment on the construction site is operating abnormally;
[0035] Information extraction: Extract abnormal information of construction site equipment based on the results of abnormal identification and detection;
[0036] Result output: The extracted abnormal information is sent to the early warning module through the management and control platform.
[0037] Compared with the prior art, the advantages of the present invention are:
[0038] (1) In the present invention, the construction environment analysis module is used to monitor the environment of the construction site in real time and analyze whether it affects the normal progress of the power transmission and transformation construction project. The work arrangement of the power transmission and transformation construction project is adjusted in time according to the analysis results, effectively ensuring the normal progress of the power transmission and transformation construction project, and significantly reducing the impact of the construction environment on the power transmission and transformation construction project;
[0039] (2) In the present invention, the physical condition of the construction workers is monitored and analyzed in real time through the construction worker monitoring module to determine whether the construction workers are in danger during construction. If there is danger, an alarm is issued in time to remind the management personnel, and the construction workers are immediately arranged to stop work and send to the doctor for examination, so as to effectively ensure the safety of the construction workers during construction, avoid personnel safety accidents in the power transmission and transformation project, and ensure the safe progress of the power transmission and transformation project;
[0040] (3) In the present invention, a visualized three-dimensional model of the power transmission and transformation construction site is generated by a data visualization module and displayed in a virtual reality device, so that management personnel can fully understand the real-time construction status of the power transmission and transformation construction site without having to visit the site in person, thereby reducing the time and cost of on-site inspections. When an abnormal situation is found, the early warning module will send the corresponding early warning information to the virtual reality device, and can provide scientific management suggestions to the management personnel through remote guidance or data retrieval, so as to efficiently and safely manage the power transmission and transformation construction project. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] Figure 1 is a system block diagram of the present invention;
[0042] Figure 2 This is a system block diagram of Embodiment 1 of the present invention;
[0043] Figure 3 It is a logical flow diagram of the present invention. DETAILED DESCRIPTION
[0044] The following will combine the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all the embodiments. All other embodiments obtained by ordinary technicians in this field without creative work based on the embodiments of the present invention belong to the scope of protection of the present invention.
[0045] Embodiment 1:
[0046] like Figure 1 As shown, the virtual visualization space safety management and control system for power transmission and transformation construction proposed by the present invention includes a management and control platform, a construction environment analysis module, a construction personnel supervision module, an equipment operation analysis module, an early warning module, a data visualization module and a virtual reality device;
[0047] The control platform is connected to the data visualization module, the construction environment analysis module and the equipment operation analysis module in two-way communication. The control platform is connected to the construction personnel supervision module, the virtual reality equipment and the early warning module in one-way communication. The construction personnel supervision module is connected to the early warning module in one-way communication, and the early warning module is connected to the virtual reality equipment in one-way communication.
[0048] The construction environment analysis module collects statistics on the construction environment information of the construction site and evaluates and analyzes the construction environment based on the construction environment information. The construction environment information includes the humidity, temperature and wind speed of the construction site;
[0049] The construction environment analysis module is used to collect statistics on the construction environment information of the construction site:
[0050] The construction environment analysis module collects construction environment information through the sensor matrix at fixed intervals, and compares the collected construction environment information with the preset standard environment information. If the real-time construction humidity is within the preset standard construction humidity, it is recorded as a qualified construction humidity data point; if the real-time construction humidity is outside the preset standard construction humidity, it is recorded as an unqualified construction humidity data point; if the real-time construction temperature is within the preset standard construction temperature, it is recorded as a qualified construction temperature data point; if the real-time construction temperature is outside the preset standard construction temperature, it is recorded as an unqualified construction temperature data point; if the real-time construction wind speed is within the preset standard construction wind speed, it is recorded as a qualified construction wind speed data point; if the real-time construction wind speed is outside the preset standard construction wind speed, it is recorded as an unqualified construction wind speed data point;
[0051] The method by which the construction environment analysis module evaluates and analyzes the construction environment based on the construction environment information is as follows:
[0052] The construction environment analysis module calculates the qualified data points and unqualified data points of the construction humidity, obtains the proportion of qualified data points in the total data points, and records them as the construction humidity qualified rate, where the total data points are the sum of qualified data points and unqualified data points. The construction environment analysis module compares and analyzes the construction humidity qualified rate with the preset construction humidity qualified rate threshold value stored in its internal input. If the construction humidity qualified rate is greater than or equal to the preset construction humidity qualified rate threshold value, a construction humidity qualified signal is generated. If the construction humidity qualified rate is less than the preset construction humidity qualified rate threshold value, a construction humidity unqualified signal is generated. The humidity unqualified signal indicates that the humidity at the construction site is not conducive to the normal progress of the construction work, and the humidity at the construction site will affect the insulation performance of the equipment, the safe operation of the equipment, the construction efficiency and the quality.
[0053] The construction environment analysis module obtains the proportion of qualified data points in the total data points in the construction temperature, and records it as the construction temperature qualified rate, where the total data points are the sum of qualified data points and unqualified data points. The construction environment analysis module compares and analyzes the construction temperature qualified rate with the preset construction temperature qualified rate threshold value stored in its internal input. If the construction temperature qualified rate is greater than or equal to the preset construction temperature qualified rate threshold value, a construction temperature qualified signal is generated. If the construction temperature qualified rate is less than the preset construction temperature qualified rate threshold value, a construction temperature unqualified signal is generated. The construction temperature unqualified signal indicates that the temperature at the construction site is not conducive to the normal progress of the construction work, and the temperature at the construction site will affect the safety of construction personnel, equipment performance and construction quality.
[0054] The construction environment analysis module obtains the proportion of qualified construction wind speed data points in the total data points and records it as the construction wind speed qualified rate, where the total data points are the sum of qualified data points and unqualified data points. The construction environment analysis module compares and analyzes the construction wind speed qualified rate with the preset construction wind speed qualified rate threshold value stored in its internal input. If the construction wind speed qualified rate is greater than or equal to the preset construction wind speed qualified rate threshold value, a construction wind speed qualified signal is generated. If the construction wind speed qualified rate is less than the preset construction wind speed qualified rate threshold value, a construction wind speed unqualified signal is generated. The construction wind speed unqualified signal indicates that the wind speed at the construction site is not conducive to the normal progress of the construction work, and the wind speed at the construction site will affect the construction safety, construction quality and construction progress.
[0055] The construction environment analysis module sends the unqualified construction humidity signal, unqualified construction temperature signal and unqualified construction wind speed signal to the early warning module through the management and control platform;
[0056] After receiving the warning signal of unqualified construction humidity, unqualified construction temperature and unqualified construction wind speed, the management personnel will promptly make reasonable adjustments to the construction time, strengthen the safety protection measures for the construction personnel and strengthen the maintenance and repair of the equipment on the construction site, effectively ensuring the normal progress of the power transmission and transformation construction project and significantly reducing the impact of the construction environment on the power transmission and transformation construction project;
[0057] The construction worker supervision module supervises, evaluates and analyzes the physical condition information of construction workers, including their heart rate, sweat secretion and body temperature;
[0058] The supervision, evaluation and analysis process of the construction personnel supervision module on the real-time physical condition of the construction personnel is as follows:
[0059] The heart rate multiplier values of the construction workers in multiple time periods are obtained. The abnormal heart rate multiplier value represents the ratio of the area enclosed by the line segment of the heart rate characteristic curve located above the preset heart rate characteristic curve and the preset heart rate characteristic curve to the area enclosed by the heart rate characteristic curve and the X-axis. In this way, a set A of heart rate multiplier values is constructed, and then the maximum subset and the minimum subset in the set A are obtained. The mean of the difference between the maximum subset and the minimum subset in the set A is recorded as the abnormal heart rate risk value XYF. The larger the value of the abnormal heart rate risk value XYF is, the more abnormal the heart rate of the construction workers is, and the greater the safety risk of the construction workers is.
[0060] The sweat secretion of the construction workers detected in multiple time periods is obtained to construct a set B of sweat secretion, the mean in the set B is obtained, and the mean in the set B is marked as the sweat secretion mean, a rectangular coordinate system is established with time as the X-axis and the sweat secretion mean as the Y-axis, a sweat secretion mean curve is drawn by plotting points, and a preset sweat secretion mean threshold curve is drawn in the coordinate system at the same time, and the product value obtained by normalizing the data of the time corresponding to the line segment above the preset sweat secretion mean threshold curve and the area enclosed by the upper line segment and the preset sweat secretion mean threshold curve is obtained from the coordinate system, and it is marked as the abnormal sweating risk value CYF. The larger the value of the abnormal sweating risk value CYF, the more abnormal the sweat secretion of the construction workers is, and the greater the safety risk of the construction workers is;
[0061] The body temperatures of construction workers detected in multiple time periods are obtained, and the difference between the body temperatures of two consecutive time periods is obtained. The average of the difference between the body temperatures of the two consecutive time periods is marked as the body temperature change value. A rectangular coordinate system is established with time as the X-axis and the body temperature change value as the Y-axis. The body temperature change value curve is drawn by plotting points. At the same time, a preset body temperature change value threshold curve is drawn in the coordinate system. The acute angle value formed when the body temperature change value curve intersects with the preset body temperature change value threshold curve for the first time is obtained from the coordinate system, and it is marked as the abnormal body temperature risk angle TYF. The larger the value of the abnormal body temperature risk angle TYF, the more abnormal the body temperature change of the construction worker is, and the greater the safety risk of the construction worker is.
[0062] By formula The physical condition assessment coefficient is obtained, where b1, b2 and b3 are respectively the preset proportional factor coefficients of the abnormal heart rate risk value, abnormal sweating risk value and abnormal body temperature risk angle, and e is a natural constant. The physical condition assessment coefficient SSZ is compared and analyzed with the preset physical condition assessment coefficient threshold value stored in the internal input:
[0063] If the physical condition assessment coefficient SSZ is greater than or equal to the preset physical condition assessment coefficient threshold, a warning signal is generated and sent to the early warning module;
[0064] If the physical condition assessment coefficient SSZ is less than the preset physical condition assessment coefficient threshold, no signal is generated;
[0065] After receiving the alarm signal, the management personnel immediately arranged for the construction workers to stop work and send them to the hospital for examination, effectively ensuring the safety of the construction workers during construction, avoiding personnel safety accidents in the power transmission and transformation project, and ensuring the safe progress of the power transmission and transformation project.
[0066] Embodiment 2: The technical solution of the embodiment of the present invention is different from that of embodiment 1 in that:
[0067] Equipment operation analysis module, which processes and analyzes the data collected from the equipment on the construction site to determine the operating status of the equipment on the construction site;
[0068] The specific process of the equipment operation analysis module processing and analyzing the data collected from the construction site equipment is as follows:
[0069] Data preprocessing: preprocess the data collected from the equipment on the construction site, including data cleaning, filtering and denoising, to eliminate outliers, noise and errors in the original data and improve the accuracy and reliability of the data;
[0070] Feature extraction: Extract features related to the operating status of the equipment at the construction site from the preprocessed data, such as voltage, current, temperature, and abnormal sound value. These features can reflect the operating status and performance of the equipment at the construction site.
[0071] Abnormal identification and detection: Based on the extracted features, the operating status of the construction site equipment is identified using classification algorithms or machine learning algorithms. Common classification algorithms include support vector machines and neural networks. The actual operating parameters are compared with the corresponding normal ranges or thresholds one by one to determine whether the construction site equipment is operating abnormally. For example, if the actual operating parameters exceed the normal range or threshold, it is considered that the construction site equipment has an abnormal operation.
[0072] Information extraction: Extract abnormal information of equipment on the construction site based on the results of abnormality identification and detection, where the abnormal information includes abnormality type and occurrence time, etc.;
[0073] Result output: The extracted abnormal information is sent to the early warning module through the management and control platform. When the early warning module receives the abnormal information, it will issue a corresponding early warning, so that the management personnel can grasp the operating status of the equipment on the construction site in detail, and the corresponding personnel can perform timely maintenance on the equipment on the construction site to ensure the normal operation of the equipment on the construction site;
[0074] The equipment operation analysis module collects data from construction site equipment in real time and processes and analyzes it to determine whether there are any operational abnormalities. If there are any operational abnormalities, corresponding control operations are performed on the construction site equipment to achieve operation and maintenance supervision and intelligent control of the construction site equipment during operation, ensuring the normal operation of the construction site equipment;
[0075] The early warning module receives the construction humidity unqualified signal, the construction temperature unqualified signal, the construction wind speed unqualified signal, the warning signal and the abnormal information, and issues the corresponding early warning information respectively;
[0076] After receiving the construction humidity unqualified signal, construction temperature unqualified signal, construction wind speed unqualified signal, warning signal and abnormal information, the early warning module will issue corresponding early warning information respectively, and remind the management personnel in time, so that the management personnel can take corresponding measures to deal with it according to the early warning information in time, ensure the safe and normal operation of the power transmission and transformation project, and realize the efficient and safe management of the power transmission and transformation project;
[0077] The data visualization module constructs a three-dimensional basic model of the power transmission and transformation construction site according to the construction drawings and design plans, establishes an information database of the power transmission and transformation construction site, generates a visualized three-dimensional model of the power transmission and transformation construction site based on the three-dimensional basic model and the information database, and sends the visualized three-dimensional model of the power transmission and transformation construction site to the management and control platform;
[0078] The data visualization module generates a visualized 3D model of the power transmission and transformation construction site and displays it in a virtual reality device, so that managers can fully understand the real-time construction status of the power transmission and transformation construction site without having to visit the site in person, thus reducing the time and cost of on-site inspections;
[0079] Virtual reality equipment to obtain a visualized 3D model of the power transmission and transformation construction site and corresponding warning information;
[0080] When an abnormal situation is found, the early warning module will send the corresponding early warning information to the virtual reality device, and can provide scientific management suggestions to managers through remote guidance or data retrieval, so as to manage the power transmission and transformation construction project efficiently and safely.
[0081] The working principle of the present invention is as follows: when in use, the environment of the construction site is monitored in real time through the construction environment analysis module to analyze whether it affects the normal progress of the power transmission and transformation construction project, and the work arrangement of the power transmission and transformation construction project is adjusted in time according to the analysis result, so as to effectively ensure the normal progress of the power transmission and transformation construction project, and significantly reduce the impact of the construction environment on the power transmission and transformation construction project, and the physical condition of the construction personnel supervision module is supervised and analyzed in real time to determine whether the construction personnel are in danger during the construction. If there is danger, the management personnel are warned in time, and the construction personnel are immediately arranged to stop work and send to the doctor for examination, so as to effectively ensure the safety of the construction personnel during construction, avoid personnel safety accidents in the power transmission and transformation project, and ensure the safe progress of the power transmission and transformation project.
[0082] The above is only a preferred specific implementation manner of the present invention; but the protection scope of the present invention is not limited thereto; any technician familiar with the technical field within the technical scope disclosed by the present invention; any equivalent replacement or change based on the technical solution and improved concept of the present invention shall be covered by the protection scope of the present invention.
Claims
1. A virtual visualization space safety management and control system for power transmission and transformation construction, characterized in that: It includes a management and control platform, a construction environment analysis module, a construction personnel supervision module, an equipment operation analysis module, an early warning module, a data visualization module and virtual reality equipment; The construction environment analysis module collects statistics on the construction environment information at the construction site and evaluates and analyzes the construction environment based on the construction environment information; The construction worker supervision module supervises, evaluates and analyzes the physical condition information of construction workers; Equipment operation analysis module, which processes and analyzes the data collected from the equipment on the construction site to determine the operating status of the equipment on the construction site; The early warning module receives the unqualified construction humidity signal, unqualified construction temperature signal, unqualified construction wind speed signal, warning signal and abnormal information, and issues corresponding early warning information respectively; The data visualization module constructs a three-dimensional basic model of the power transmission and transformation construction site according to the construction drawings and design plans, establishes an information database of the power transmission and transformation construction site, generates a visualized three-dimensional model of the power transmission and transformation construction site based on the three-dimensional basic model and the information database, and sends the visualized three-dimensional model of the power transmission and transformation construction site to the management and control platform; Virtual reality equipment is used to obtain a visualized three-dimensional model of the power transmission and transformation construction site and corresponding early warning information.
2. The virtual visualization space safety management and control system for power transmission and transformation construction according to claim 1 is characterized in that: The construction environment information includes humidity, temperature and wind speed at the construction site, and the physical condition information includes heart rate, sweat secretion and body temperature of the construction workers.
3. The virtual visualization space safety management and control system for power transmission and transformation construction according to claim 1 is characterized in that: The process of the construction environment analysis module for collecting statistics on the construction environment information of the construction site is as follows: The construction environment analysis module collects construction environment information through the sensor matrix at fixed intervals, and compares the collected construction environment information with the preset standard environment information. If the real-time construction humidity is within the preset standard construction humidity, it is recorded as a qualified construction humidity data point; if the real-time construction humidity is outside the preset standard construction humidity, it is recorded as an unqualified construction humidity data point; if the real-time construction temperature is within the preset standard construction temperature, it is recorded as a qualified construction temperature data point; if the real-time construction temperature is outside the preset standard construction temperature, it is recorded as an unqualified construction temperature data point; if the real-time construction wind speed is within the preset standard construction wind speed, it is recorded as a qualified construction wind speed data point; if the real-time construction wind speed is outside the preset standard construction wind speed, it is recorded as an unqualified construction wind speed data point.
4. The virtual visualization space safety management and control system for power transmission and transformation construction according to claim 3 is characterized in that: The method for the construction environment analysis module to evaluate and analyze the construction environment according to the construction environment information is as follows: The construction environment analysis module calculates qualified data points and unqualified data points of the construction humidity, obtains the proportion of qualified data points in the total data points, and records them as the construction humidity qualified rate, wherein the total data points are the sum of qualified data points and unqualified data points. The construction environment analysis module compares and analyzes the construction humidity qualified rate with the preset construction humidity qualified rate threshold value entered and stored internally. If the construction humidity qualified rate is greater than or equal to the preset construction humidity qualified rate threshold value, a construction humidity qualified signal is generated; if the construction humidity qualified rate is less than the preset construction humidity qualified rate threshold value, a construction humidity unqualified signal is generated; The construction environment analysis module obtains the proportion of qualified data points in the construction temperature in the total data points, and records it as the construction temperature qualified rate, where the total data points are the sum of qualified data points and unqualified data points. The construction environment analysis module compares and analyzes the construction temperature qualified rate with the preset construction temperature qualified rate threshold value entered and stored internally. If the construction temperature qualified rate is greater than or equal to the preset construction temperature qualified rate threshold value, a construction temperature qualified signal is generated; if the construction temperature qualified rate is less than the preset construction temperature qualified rate threshold value, a construction temperature unqualified signal is generated.
5. The virtual visualization space safety management and control system for power transmission and transformation construction according to claim 4 is characterized in that: The construction environment analysis module obtains the proportion of qualified construction wind speed data points in the total data points, and records it as the construction wind speed qualified rate, where the total data points are the sum of qualified data points and unqualified data points. The construction environment analysis module compares and analyzes the construction wind speed qualified rate with the preset construction wind speed qualified rate threshold value stored in the module. If the construction wind speed qualified rate is greater than or equal to the preset construction wind speed qualified rate threshold value, a construction wind speed qualified signal is generated; if the construction wind speed qualified rate is less than the preset construction wind speed qualified rate threshold value, a construction wind speed unqualified signal is generated; The construction environment analysis module sends the construction humidity unqualified signal, the construction temperature unqualified signal and the construction wind speed unqualified signal to the early warning module via the management and control platform.
6. The virtual visualization space safety management and control system for power transmission and transformation construction according to claim 1 is characterized in that: The supervision, evaluation and analysis process of the construction personnel supervision module on the real-time physical condition of the construction personnel is as follows: The heart rate multiplier values of the construction workers in multiple time periods are obtained. The abnormal heart rate multiplier value represents the ratio of the area enclosed by the line segment of the heart rate value characteristic curve above the preset heart rate value characteristic curve and the preset heart rate value characteristic curve, and then to the area enclosed by the heart rate value characteristic curve and the X-axis. In this way, a set A of heart rate multiplier values is constructed, and the maximum subset and the minimum subset in set A are obtained, and the mean of the difference between the maximum subset and the minimum subset in set A is recorded as the abnormal heart rate risk value XYF.
7. The virtual visualization space safety management and control system for power transmission and transformation construction according to claim 6 is characterized in that: The sweat secretion of the construction workers detected in multiple time periods is obtained to construct a set B of sweat secretion, the mean in set B is obtained, and the mean in set B is marked as the mean sweat secretion, a rectangular coordinate system is established with time as the X-axis and the mean sweat secretion as the Y-axis, and a sweat secretion mean curve is drawn by drawing points. At the same time, a preset sweat secretion mean threshold curve is drawn in the coordinate system, and the product value of the time corresponding to the line segment above the preset sweat secretion mean threshold curve and the area enclosed by the upper line segment and the preset sweat secretion mean threshold curve is obtained from the coordinate system after data normalization, and marked as the abnormal sweating risk value CYF.
8. The virtual visualization space safety management and control system for power transmission and transformation construction according to claim 7 is characterized in that: The body temperatures of construction workers detected in multiple time periods are obtained, and the difference between the body temperatures of two consecutive time periods is obtained. The average of the difference between the body temperatures of the two consecutive time periods is marked as the body temperature change value. A rectangular coordinate system is established with time as the X-axis and the body temperature change value as the Y-axis. The body temperature change value curve is drawn by drawing points. At the same time, a preset body temperature change value threshold curve is drawn in the coordinate system. The acute angle value formed when the body temperature change value curve intersects with the preset body temperature change value threshold curve for the first time is obtained from the coordinate system, and it is marked as the abnormal temperature risk angle TYF.
9. The virtual visualization space safety management and control system for power transmission and transformation construction according to claim 8 is characterized in that: Obtain the abnormal heart rate risk value XYF, the abnormal sweating risk value CYF, and the abnormal body temperature risk angle TYF; By formula The physical condition assessment coefficient is obtained, where b1, b2 and b3 are respectively the preset proportional factor coefficients of the abnormal heart rate risk value, abnormal sweating risk value and abnormal body temperature risk angle, and e is a natural constant. The physical condition assessment coefficient SSZ is compared and analyzed with the preset physical condition assessment coefficient threshold value stored in the internal input: If the physical condition assessment coefficient SSZ is greater than or equal to the preset physical condition assessment coefficient threshold, a warning signal is generated and sent to the early warning module; If the physical condition assessment coefficient SSZ is less than the preset physical condition assessment coefficient threshold, no signal is generated.
10. The virtual visualization space safety management and control system for power transmission and transformation construction according to claim 1 is characterized in that: The specific process of the equipment operation analysis module processing and analyzing the data collected from the construction site equipment is as follows: Data preprocessing: preprocess the data collected from the equipment on the construction site; Feature extraction: Extract features related to the operating status of equipment at the construction site from the preprocessed data; Abnormal identification and detection: Based on the extracted features and using classification algorithms or machine learning algorithms, the operating status of the equipment on the construction site is identified, and the actual operating parameters are compared with the corresponding normal range or threshold one by one to determine whether the equipment on the construction site is operating abnormally; Information extraction: Extract abnormal information of construction site equipment based on the results of abnormal identification and detection; Result output: Send the extracted abnormal information to the early warning module via the management and control platform.
Citation Information
Patent Citations
Intelligent safety management and control method and system for substation infrastructure based on precise positioning technology
CN114494630A
Cited By
A land surveying and mapping data intelligent analysis and management system
CN119783984A