Shear wall structure and construction method thereof

By using prefabricated steel pipe columns and connecting components in the shear wall structure to assemble the frame body and combine it with concrete, the problem of shortage of labor during the existing shear wall construction is solved, and faster construction speed and higher Compression and earthquake resistance.

CN119411719APending Publication Date: 2025-02-11ZHEJIANG LONGMA CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411298732.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-18
Publication Date
2025-02-11

AI Technical Summary

Technical Problem

During the construction of existing poured concrete shear walls, more workers are required to tie the steel cages, and the construction industry has a shortage of labor resources, making it difficult to meet the needs of construction industrialization.

Method used

The frame is assembled from steel pipe columns and connecting components. The frame is buried in the concrete wall. The steel pipe columns and concrete form steel pipe concrete columns to improve the compressive resistance of concrete, and quickly install it on site to reduce labor input. .

Benefits of technology

It improves the construction speed of shear walls, reduces labor investment, enhances the compressive performance of concrete and the seismic performance of structures, and meets the needs of construction industrialization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119411719A_ABST
    Figure CN119411719A_ABST
Patent Text Reader

Abstract

The invention relates to a shear wall structure and a construction method thereof, the shear wall structure comprises a concrete wall body and a frame body, and the frame body is embedded in the concrete wall body; the frame body comprises a plurality of steel pipe columns and a plurality of connecting assemblies. The multiple steel pipe columns are arranged at intervals, cavities for containing concrete are formed in the steel pipe columns, and the steel pipe columns and the concrete jointly form steel pipe concrete columns. The plurality of connecting assemblies are arranged at intervals; the connecting assemblies are fixedly connected with the steel pipe columns, the connecting assemblies are used for connecting the adjacent steel pipe columns, and the connecting assemblies and the steel pipe columns form a frame body of a net-shaped structure. In the shear wall, the frame body in the shear wall is formed by assembling the steel pipe columns and the connecting assemblies, the steel pipe columns and the connecting assemblies can be prefabricated in a factory, and the obvious industrialization characteristic is achieved. And in the on-site construction process, the frame body has certain rigidity and bearing capacity, so that on-site installation of workers is facilitated, labor input is reduced, and the construction speed of the shear wall is increased.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of building construction, and in particular to a shear wall structure and a construction method thereof. Background Art

[0002] In high-rise buildings, shear walls are mainly used to withstand wind loads and horizontal loads caused by horizontal earthquakes to reduce structural damage.

[0003] During the construction of cast-in-place concrete shear walls, workers tied up the vertical steel cages; then, they installed shear wall formwork on both sides of the steel cages; finally, they poured concrete between the two shear wall formworks.

[0004] During the above-mentioned concrete wall construction process, a large number of workers are needed on the construction site to tie the vertical steel cages; and the contradiction between the demand for labor in the construction industry and the shortage of labor resources is becoming increasingly severe; therefore, the existing shear wall structure is difficult to meet the needs of building industrialization. Summary of the invention

[0005] In order to increase the construction speed of the shear wall structure to meet the needs of building industrialization, the present application provides a shear wall structure and a construction method thereof.

[0006] The present application provides a shear wall structure and a construction method thereof, which adopts the following technical solutions: A shear wall structure comprises a concrete wall and a frame body, wherein the frame body is buried in the concrete wall body; the frame body comprises a plurality of steel pipe columns and a plurality of connection assemblies; along the length direction of the concrete wall body, a plurality of steel pipe columns are arranged at intervals, each of the steel pipe columns is provided with a chamber for accommodating concrete, and the steel pipe columns and the concrete together form a steel pipe concrete column; along the height direction of the concrete wall body, a plurality of connection assemblies are arranged at intervals; the connection assemblies are fixedly connected to the steel pipe columns, and the connection assemblies are used to connect adjacent steel pipe columns, and the connection assemblies and the steel pipe columns form a frame body with a mesh structure.

[0007] By adopting the above technical solution, the frame body inside the shear wall is assembled from steel pipe columns and connection components, which can be prefabricated in the factory and have obvious industrial characteristics. In addition, during the on-site construction process, the frame body has a certain rigidity and bearing capacity, which is convenient for on-site installation by the staff, reduces labor input, and improves the construction speed of the shear wall.

[0008] At the same time, the steel tube column and concrete form a steel tube concrete column, which has a strong restraining effect on the internal concrete to improve the compressive performance of the concrete in the shear wall structure; at the same time, the steel tube concrete column has good ductility and energy absorption capacity under the action of compression, bending and shear cyclic loads, thereby improving the shear wall structure's ability to resist horizontal loads.

[0009] Optionally, the steel pipe column includes at least two single pipe columns, the single pipe column is a hollow steel pipe structure, and the single pipe column and the concrete form a steel pipe concrete structure; a plurality of the single pipe columns are arranged at intervals along the width direction of the concrete wall, and a protective gap is provided between the single pipe column and the outer peripheral surface of the concrete wall.

[0010] By adopting the above technical solution, the steel pipe column includes a plurality of single pipe columns arranged at intervals, so that a plurality of steel pipe concrete structures are provided on both sides of the shear wall, thereby improving the compressive strength of the concrete on both sides of the shear wall body.

[0011] Optionally, the connecting assembly includes a connecting rod and a fastener; the fastener includes two symmetrically arranged fastening plates and a fastening bolt, the two fastening plates are arranged on both sides of the single pipe column, the fastening plates are provided with a fixing groove, the fixing groove is used to accommodate the single pipe column, the fastening plates are provided with mounting holes, the fastening bolts are sequentially passed through the mounting holes, and the fastening bolts are used to tie the fastening plates together; the connecting rod is a hollow steel pipe, and the connecting rod is fixedly connected to the single pipe column.

[0012] By adopting the above technical solution, the position of the single pipe column is fixed by fasteners, thereby facilitating installation by workers and improving the construction speed of the shear wall.

[0013] Optionally, along the length direction of the concrete wall, a plurality of first connecting holes are opened on both sides of the single pipe column; the connecting holes are arranged at intervals along the height direction of the concrete wall, and the first connecting holes are used for concrete to pass through.

[0014] By adopting the above technical solution, by opening a plurality of first communicating holes on the single pipe column, the concrete inside the single pipe column and the concrete of the concrete wall can flow mutually, thereby facilitating on-site construction of the staff.

[0015] Optionally, the first connecting holes on both sides of the single pipe column are arranged in a staggered manner.

[0016] By adopting the above technical solution, the first connecting holes on both sides of the single pipe column are staggered, which can improve the restraining effect of the single pipe column on the internal concrete, so as to further improve the ability of the shear wall body to resist horizontal loads.

[0017] Optionally, along the length direction of the connecting rod, the connecting rod is provided with a plurality of second connecting holes at intervals, and the second connecting holes are used for concrete to pass through.

[0018] By adopting the above technical solution, by opening a plurality of second connecting holes on the connecting rod, the concrete in the concrete wall can enter the connecting rod through the second connecting holes, thereby further improving the integrity between the concrete wall and the frame body.

[0019] Optionally, along the length direction of the connecting rod, the connecting rod is provided with a plurality of third connecting holes at intervals; the shear wall structure also includes an inserted steel bar, the inserted steel bar includes an inserted portion and an abutting portion, the inserted portion and the abutting portion are integrally formed, the inserted portion is passed through the third connecting hole, the inserted portion is buried in the concrete wall, and the abutting portion abuts against the connecting rod, and the abutting portion and the connecting rod are fixed by binding with thin iron wire.

[0020] By adopting the above technical solution, by inserting the splicing steel bars into the connecting rod, the splicing steel bars and the concrete wall are engaged with each other, thereby improving the restraining effect on the connecting rod and reducing the slippage between the connecting rod and the concrete wall.

[0021] Optionally, the shear wall structure also includes a mild steel damper and a rubber gasket; a plurality of mild steel dampers are provided, and the plurality of mild steel dampers are spaced apart along the length direction of the connecting rod; the mild steel damper includes a first straight portion, an arc-shaped portion, and a second straight portion connected in sequence; the first straight portion and the second straight portion are relatively parallelly arranged; the first straight portion is fixed to the connecting rod with bolts; the rubber gasket is bonded to the inner and outer sides of the mild steel damper, and the rubber gasket provides deformation space for the deformation of the mild steel damper.

[0022] By adopting the above technical solution, one side of the soft steel damper is connected to the connecting rod bolt, and the other side of the soft steel damper is embedded in the concrete wall; therefore, when relative sliding occurs between the connecting rod and the concrete wall, the arc-shaped portion of the soft steel damper is forced to undergo elastic-plastic bending deformation, thereby dissipating seismic energy and further improving the seismic performance of the shear wall.

[0023] Optionally, it also includes a secondary steel mesh, which is fixedly connected to the frame body; the secondary steel mesh includes a plurality of transverse secondary steel bars and a plurality of longitudinal secondary steel bars, the transverse secondary steel bars are parallel to the ground, and the plurality of transverse secondary steel bars are arranged at intervals, and the longitudinal secondary steel bars are perpendicular to the ground, and the plurality of transverse secondary steel bars are arranged at intervals.

[0024] By adopting the above technical solution, a secondary steel mesh is added outside the frame body, thereby reducing the uneven stress distribution inside the shear wall concrete caused by the interaction between the steel bars and the concrete, thereby achieving the purpose of improving the shear wall's destructive strength.

[0025] A construction method of a shear wall structure comprises the following steps: Install the frame: fix the steel pipe column to the ground, and fix the connection assembly to the steel pipe column; Install shear wall formwork: Install shear wall formwork on both sides of the frame; Pouring concrete: insert the air guide tube into the steel pipe column, pour concrete into the steel pipe column while removing the air guide tube; pour concrete between the two shear wall formworks to form a concrete wall; Demoulding and curing: remove the shear wall formwork and water and cure to the concrete design strength.

[0026] In summary, the present application includes at least one of the following beneficial technical effects: 1. The frame inside the shear wall is assembled from steel pipe columns and connection components, which can be prefabricated in the factory and have obvious industrial characteristics. In addition, during the on-site construction process, the frame has a certain rigidity and bearing capacity, which is convenient for on-site installation by the staff, reduces labor input, and increases the construction speed of the shear wall; 2. The steel tube column includes a plurality of single tube columns arranged at intervals, so that a plurality of steel tube concrete structures are arranged on both sides of the shear wall, thereby improving the compressive strength of the concrete on both sides of the shear wall body; 3. One side of the soft steel damper is connected to the connecting rod bolt, and the other side of the soft steel damper is embedded in the concrete wall; therefore, when relative sliding occurs between the connecting rod and the concrete wall, the arc-shaped part of the soft steel damper is forced to undergo elastic-plastic bending deformation, thereby dissipating seismic energy and further improving the seismic performance of the shear wall. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a structural schematic diagram of the shear wall in Example 1.

[0028] Figure 2 It is a structural schematic diagram of the frame body in Example 1.

[0029] Figure 3 yes Figure 2 Enlarged view of point A in the middle.

[0030] Figure 4 It is a cross-sectional view of a single column in Example 1.

[0031] Figure 5 It is a structural schematic diagram of the frame body in Example 3.

[0032] Figure 6 yes Figure 5 Enlarged view of point B in the middle.

[0033] Figure 7 It is a cross-sectional view of the shear wall structure in Example 3.

[0034] Figure 8 It is a schematic diagram of the structure of the frame body in Example 4.

[0035] Fig. 9 yes Figure 8 Enlarged view of point C in the middle.

[0036] Fig.10 It is a cross-sectional view of the shear wall structure in Example 4.

[0037] Fig.11 It is a schematic diagram of the structure of the mild steel damper in Example 4.

[0038] Fig.12 It is a structural schematic diagram of the frame body in Example 5.

[0039] Fig.13 yes Fig.12 Enlarged view of point D in the middle.

[0040] Explanation of the reference numerals: 1. Concrete wall; 2. Frame body; 21. Steel pipe column; 211. Single pipe column; 2111. First connecting hole; 22. Connecting assembly; 221. Connecting rod; 2211. Second connecting hole; 2212. Third connecting hole; 222. Fastener; 2221. Fastening plate; 22211. Fixing groove; 2222. Fastening bolt; 3. Inserted steel bars; 31. Inserting portion; 32. Abutting portion; 4. Mild steel damper; 41. First straight portion; 42. Arc-shaped portion; 43. Second straight portion; 5. Rubber gasket; 6. Secondary steel mesh; 61. Transverse secondary steel bars; 62. Longitudinal secondary steel bars. DETAILED DESCRIPTION

[0041] The following is combined with Figure 1-13 This application is described in further detail.

[0042] Example 1 The present application embodiment discloses a shear wall structure and a construction method thereof. Figure 1 The shear wall structure includes a concrete wall body 1 and a frame body 2, and the frame body 2 is buried in the concrete wall body 1.

[0043] Reference Figure 1 and Figure 2After the workers install the frame body 2 on the floor slab, shear wall formworks are installed on both sides of the frame body 2; a receiving cavity is enclosed between the two oppositely arranged shear wall formworks to receive the concrete of the shear wall; after the concrete solidifies, a concrete wall body 1 is formed.

[0044] In this embodiment, the concrete uses EPS (polystyrene particles) concrete with good thermal and sound insulation properties to wrap the frame 2, so that the concrete wall 1 and the frame 2 work together, which greatly improves the integrity and fire resistance of the structure. In other embodiments, the concrete can also use high-strength concrete and lightweight concrete such as foam concrete; this application does not limit the specific type of concrete.

[0045] Reference Figure 1 and Figure 2 The frame body 2 includes a plurality of steel pipe columns 21 and a plurality of connection components 22, wherein the connection components 22 are used to connect adjacent steel pipe columns 21. Along the length direction of the concrete wall 1, a plurality of steel pipe columns 21 are arranged at intervals, and a chamber for containing concrete is provided in the steel pipe columns 21, and the steel pipe columns 21 and the concrete together form a steel pipe concrete column. Along the height direction of the concrete wall 1, a plurality of connection components 22 are arranged at intervals; the connection components 22 are fixedly connected to the steel pipe columns 21, and the connection components 22 and the steel pipe columns 21 form a frame body 2 with a mesh structure.

[0046] Reference Figure 2 and Figure 3 The steel pipe column 21 includes at least two single pipe columns 211. The single pipe columns 211 are hollow steel pipe structures. Several single pipe columns 211 are arranged at intervals along the width direction of the concrete wall 1, and a protective gap is provided between the single pipe columns 211 and the outer peripheral surface of the concrete wall 1. In the present application, along the width direction of the concrete wall 1, the steel pipe column 21 includes two relatively arranged single pipe columns 211; the two single pipe columns 211 are fixedly connected by a connecting assembly 22. The single pipe column 211 and the concrete form a steel pipe concrete structure, and along both sides of the thickness direction of the shear wall, a plurality of steel pipe concrete structures are provided on both sides of the shear wall, thereby improving the compressive strength of the concrete on both sides of the shear wall body, improving the ability of the shear wall to resist out-of-plane bending deformation, and improving the seismic performance of the shear wall. While the workers are installing the frame body 2, the seismic performance of the shear wall is also improved simultaneously.

[0047] The boundary conditions of the area where the concrete wall 1 contacts the single pipe column 211 change, which makes it easy for cracks to appear on the periphery of the concrete wall 1 and the single pipe column 211, thereby affecting the seismic performance and appearance of the shear wall.

[0048] Reference Figure 3 and Figure 4Along the length direction of the concrete wall 1, a plurality of first connecting holes 2111 are provided on both sides of the single pipe column 211; the connecting holes are arranged at intervals along the height direction of the concrete wall 1, and the first connecting holes 2111 are used for concrete to pass through. And the first connecting holes 2111 on both sides of the single pipe column 211 are arranged alternately. On the one hand, by providing a plurality of first connecting holes 2111 on the single pipe column 211, the concrete inside the single pipe column 211 and the concrete of the concrete wall can flow with each other, thereby facilitating on-site construction by the staff. On the other hand, the concrete in the single pipe column 211 and the concrete in the concrete wall 1 are condensed into one, thereby improving the integrity between the concrete wall 1 and the frame body 2; thereby reducing the cracking of the concrete wall 1 in the single pipe body area.

[0049] Reference Figure 3 and Figure 4 The first connecting holes 2111 on both sides of the single pipe column 211 are staggered, which is convenient for construction workers and improves the integrity of the concrete wall 1 and the frame body 2; it can also improve the restraining effect of the single pipe column 211 on the internal concrete, so as to further improve the ability of the shear wall body to resist horizontal loads.

[0050] Reference Figure 2 and Figure 3 The connection assembly 22 includes a connection rod 221 and a fastener 222 . The fastener 222 is used to fix the single pipe columns 211 arranged in pairs, and the connection member is used to fix a plurality of steel pipe columns 21 .

[0051] Reference Figure 2 and Figure 3 Specifically, the fastener 222 includes two symmetrically arranged fastening plates 2221 and fastening bolts 2222. The fastening plates 2221 are provided with fixing grooves 22211, and the fixing grooves 22211 are used to accommodate the single pipe column 211. The fastening plates 2221 are provided with mounting holes, and the fastening bolts 2222 are sequentially inserted into the mounting holes. The fastening bolts 2222 are used to tie the two oppositely arranged fastening plates 2221 together, so that the two fastening plates 2221 clamp and fix the two single pipe columns 211. On the one hand, the position of the single pipe column 211 is fixed by the fastener 222, which is convenient for the installation of the staff and improves the construction speed of the shear wall. On the other hand, the fastener 222 has a tying effect on the single pipe columns 211 on both sides, which can limit the single pipe columns 211 and concrete on both sides of the width of the shear wall from bulging outward, thereby further improving the performance of the shear wall in resisting bending and shearing deformation and improving the seismic performance of the shear wall.

[0052] Reference Figure 2 and Figure 3The connecting rod 221 is a hollow steel pipe, which is horizontally arranged. There are a plurality of connecting rods 221, which are arranged at intervals along the vertical direction. In this embodiment, connecting rods 221 are arranged on both sides of the shear wall. The connecting rod 221 is fixedly connected to the single pipe column 211 by bolts, so that the staff can quickly install the frame body 2 and improve the construction speed of the shear wall.

[0053] Reference Figure 2 and Figure 3 Along the length direction of the connecting rod 221, the connecting rod 221 is provided with a plurality of second connecting holes 2211 at intervals, and the second connecting holes 2211 are used for concrete to pass through. By providing a plurality of second connecting holes 2211 on the connecting rod 221, the concrete in the concrete wall 1 can enter the connecting rod 221 through the second connecting holes 2211, thereby improving the connection strength between the concrete wall 1 and the connecting rod 221, further improving the integrity between the concrete wall 1 and the frame body 2, and improving the ability of the shear wall body to resist horizontal loads.

[0054] During the construction of the shear wall structure, the staff can embed the steel connectors in the floor slab, and the staff can use the fasteners 222 to assemble the two single pipe columns 211 into the steel pipe column 21. Then, the staff welds and fixes the single pipe column 211 in the steel pipe column 21 with the embedded steel connectors; then, the staff bolts and fixes the connecting rod 221 with the single pipe column 211. Thus, through the assembly of the steel pipe column 21 connection assembly 22, it is convenient for the staff to quickly install the frame body 2, reduce the manpower input, and improve the construction efficiency of the shear wall.

[0055] The implementation principle of a shear wall structure and its construction method in the embodiment of the present application is: The frame body 2 inside the shear wall is assembled from steel pipe columns 21 and connection components 22. The steel pipe columns 21 and the connection components 22 can be prefabricated in a factory, which has obvious industrial characteristics. In addition, during the on-site construction process, the frame body 2 has a certain rigidity and bearing capacity, which is convenient for on-site installation by the staff, reduces labor input, and improves the construction speed of the shear wall.

[0056] At the same time, the steel tube column 21 and the concrete form a steel tube concrete column, and the steel tube column 21 has a strong restraining effect on the concrete inside to improve the compressive performance of the concrete in the shear wall structure; at the same time, the steel tube concrete column has good ductility and energy absorption capacity under the action of compression, bending and shear cyclic loads, thereby improving the ability of the shear wall structure to resist horizontal loads.

[0057] Example 2 This embodiment 2 discloses a construction method of a shear wall structure in embodiment 1, comprising the following steps: Install the frame body 2: embed steel connectors on the floor slab, use fasteners 222 to assemble two single pipe columns 211 into a steel pipe column 21, weld and fix the single pipe column 211 to the embedded steel connectors; and bolt and fix the connecting rod 221 to the single pipe column 211.

[0058] Install shear wall formwork: Install shear wall formwork on both sides of frame body 2.

[0059] Pouring concrete: insert an air guide tube into the steel pipe column 21, pour concrete into the single pipe column 211 while removing the air guide tube; pour concrete between the two shear wall templates to form a concrete wall 1. When the staff pours concrete into the single pipe column 211, the air guide tube can be used to timely discharge the air at the bottom of the single pipe column 211, thereby improving the density of the concrete in the single pipe column 211. The air guide tube can be a tubular structure such as a small steel pipe or a plastic hose.

[0060] Demoulding and curing: remove the shear wall formwork and water and cure to the concrete design strength.

[0061] Example 3 The difference between this embodiment 2 and embodiment 1 is that: When the shear wall is subjected to a large earthquake, the connecting rod 221 and the concrete wall 1 will produce a bonding and sliding effect, so that the connecting rod 221 and the concrete wall 1 will move relative to each other. Therefore, this embodiment further improves the shear wall structure.

[0062] Reference Figures 5 to 7 Along the length direction of the connecting rod 221, the connecting rod 221 is provided with a plurality of third connecting holes 2212 at intervals. The shear wall structure also includes a plug-in steel bar 3, the plug-in steel bar 3 includes a plug-in portion 31 and abutting portion 32, the plug-in portion 31 and the abutting portion 32 are integrally formed, the plug-in portion 31 is inserted into the third connecting hole 2212, the plug-in portion 31 is buried in the concrete wall 1, and the abutting portion 32 abuts against the connecting rod 221. That is, by inserting the plug-in steel bar 3 into the connecting rod 221, and partially burying the plug-in steel bar 3 in the concrete wall 1, the restraining effect on the connecting rod 221 is improved through the coordinated cooperation between the plug-in steel bar 3 and the concrete wall 1; the slippage between the connecting rod 221 and the concrete wall 1 can be reduced, the integrity of the concrete wall 1 and the frame body 2 can be improved, and the overall seismic performance of the shear wall can be improved.

[0063] In this embodiment, the abutment portion 32 and the connecting rod 221 are fixed by binding with thin iron wire; in other embodiments, after the worker inserts the inserted steel bar 3 into the connecting rod 221, the worker can also change the shape of the inserted steel bar 3 by bending the inserted steel bar 3 to prevent the inserted steel bar 3 from being separated from the connecting rod 221 when pouring concrete.

[0064] Example 4 The difference between this embodiment 3 and embodiment 1 is that: Reference Figures 8 to 10 The shear wall structure further includes a mild steel damper 4, and a plurality of mild steel dampers 4 are provided, and the plurality of mild steel dampers 4 are arranged at intervals along the length direction of the connecting rod 221. In this embodiment, two mild steel dampers 4 are arranged horizontally at intervals, and two groups of mild steel dampers 4 are arranged vertically; the opening directions of the two mild steel dampers 4 on the same horizontal plane are arranged oppositely to improve the self-reset performance of the mild steel damper 4.

[0065] Reference Figures 9 to 11 The mild steel damper 4 includes a first straight portion 41 , an arc portion 42 and a second straight portion 43 connected in sequence; the first straight portion 41 and the second straight portion 43 are arranged relatively parallel to each other; the first straight portion 41 is fixed to the connecting rod 221 with bolts.

[0066] Reference Figures 9 to 11 In addition, the shear wall structure further includes a rubber gasket 5, which is bonded to both inner and outer sides of the mild steel damper 4, and provides a deformation space for the mild steel damper 4 to deform.

[0067] The implementation principle of a shear wall structure and its construction method in the embodiment of the present application is: When the shear wall is subjected to a large earthquake, the connecting rod 221 and the concrete wall 1 will produce a bonding and sliding effect, so that the connecting rod 221 and the concrete wall 1 will move relative to each other.

[0068] Since one side of the mild steel damper 4 is bolted to the connecting rod 221, and the other side of the mild steel damper 4 is embedded in the concrete wall 1, when relative sliding occurs between the connecting rod 221 and the concrete wall 1, the connecting rod 221 will pull the first straight portion 41 of the mild steel damper 4 to slide, so that the first straight portion 41 and the second straight portion 43 pull the middle arc portion 42 to undergo elastic-plastic bending deformation, thereby dissipating seismic energy and further improving the seismic performance of the shear wall.

[0069] Example 5 The difference between this embodiment 5 and embodiment 3 is that: Reference Fig.12 and Fig.13 The shear wall structure also includes two secondary steel meshes 6. Along the width direction of the shear wall, the two secondary steel meshes 6 are arranged on both sides of the frame body 2, and the secondary steel meshes 6 are fixedly connected to the frame body 2.

[0070] Reference Fig.13The secondary steel mesh 6 includes a plurality of transverse secondary steel bars 61 and a plurality of longitudinal secondary steel bars 62. The transverse secondary steel bars 61 are parallel to the ground, and the plurality of transverse secondary steel bars 61 are arranged at intervals. The longitudinal secondary steel bars 62 are perpendicular to the ground, and the plurality of transverse secondary steel bars 61 are arranged at intervals.

[0071] The frame body 2 structure has great rigidity, so after the workers assemble the frame body 2, they can use small iron wires to tie and fix the transverse secondary steel bars 61 and the longitudinal secondary steel bars 62 to the frame body 2, which is convenient for the workers to operate.

[0072] By adding a secondary steel mesh 6 to the outer periphery of the frame body 2, the degree of uneven stress distribution inside the shear wall concrete caused by the interaction between the steel bars and the concrete is reduced, thereby reducing the influence of the interaction between the main steel bars and the concrete on the maximum average compressive stress of the concrete in the shear wall, alleviating the concrete softening phenomenon, and achieving the purpose of improving the shear wall's destructive strength.

[0073] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A shear wall structure, characterized in that: The invention comprises a concrete wall (1) and a frame (2), wherein the frame (2) is buried in the concrete wall (1); the frame (2) comprises a plurality of steel pipe columns (21) and a plurality of connection components (22); along the length direction of the concrete wall (1), the plurality of steel pipe columns (21) are arranged at intervals, the steel pipe columns (21) are provided with chambers for accommodating concrete, and the steel pipe columns (21) and the concrete together form steel pipe concrete columns; along the height direction of the concrete wall (1), the plurality of connection components (22) are arranged at intervals; the connection components (22) are fixedly connected to the steel pipe columns (21), and the connection components (22) are used to connect adjacent steel pipe columns (21), and the connection components (22) and the steel pipe columns (21) form a frame (2) with a mesh structure.

2. The shear wall structure according to claim 1, characterized in that: The steel tube column (21) comprises at least two single tube columns (211), and the single tube columns (211) and the concrete form a steel tube concrete structure; the single tube columns (211) are hollow steel tube structures, and a plurality of the single tube columns (211) are arranged at intervals along the width direction of the concrete wall (1), and a protective gap is provided between the single tube columns (211) and the outer peripheral surface of the concrete wall (1).

3. The shear wall structure according to claim 2, characterized in that: The connection assembly (22) comprises a connection rod (221) and a fastener (222); the fastener (222) comprises two symmetrically arranged fastening plates (2221) and a fastening bolt (2222); the two fastening plates (2221) are arranged on both sides of the single pipe column (211); the fastening plates (2221) are provided with a fixing groove (22211); the fixing groove (22211) is used to accommodate the single pipe column (211); the fastening plates (2221) are provided with a mounting hole; the fastening bolts (2222) are sequentially passed through the mounting holes; the fastening bolts (2222) are used to tie the fastening plates (2221); the connection rod (221) is a hollow steel pipe; the connection rod (221) is fixedly connected to the single pipe column (211).

4. The shear wall structure according to claim 2, characterized in that: Along the length direction of the concrete wall (1), a plurality of first communication holes (2111) are provided on both sides of the single pipe column (211); the communication holes are arranged at intervals along the height direction of the concrete wall (1), and the first communication holes (2111) are used for concrete to pass through.

5. The shear wall structure according to claim 4, characterized in that: The first communication holes (2111) on both sides of the single pipe column (211) are arranged in a staggered manner.

6. The shear wall structure according to claim 3, characterized in that: Along the length direction of the connecting rod (221), the connecting rod (221) is provided with a plurality of second communication holes (2211) at intervals, and the second communication holes (2211) are used for concrete to pass through.

7. The shear wall structure according to claim 3, characterized in that: Along the length direction of the connecting rod (221), the connecting rod (221) is provided with a plurality of third connecting holes (2212) at intervals; the shear wall structure further comprises an inserting steel bar (3), the inserting steel bar (3) comprising an inserting portion (31) and an abutting portion (32), the inserting portion (31) and the abutting portion (32) being integrally formed, the inserting portion (31) being passed through the third connecting hole (2212), the inserting portion (31) being buried in the concrete wall (1), and the abutting portion (32) abutting against the connecting rod (221), and the abutting portion (32) and the connecting rod (221) being fixed by binding with thin iron wire.

8. The shear wall structure according to claim 3, characterized in that: The shear wall structure further comprises a mild steel damper (4) and a rubber gasket (5); a plurality of the mild steel dampers (4) are provided, and the plurality of the mild steel dampers (4) are arranged at intervals along the length direction of the connecting rod (221); the mild steel damper (4) comprises a first straight portion (41), an arcuate portion (42) and a second straight portion (43) which are connected in sequence; the first straight portion (41) and the second straight portion (43) are arranged relatively parallel; the first straight portion (41) is bolted to the connecting rod (221); the rubber gasket (5) is bonded to the inner and outer sides of the mild steel damper (4), and the rubber gasket (5) provides a deformation space for the mild steel damper (4) to deform.

9. The shear wall structure according to claim 1, characterized in that: It also comprises a secondary steel mesh (6), the secondary steel mesh (6) being fixedly connected to the frame body (2); the secondary steel mesh (6) comprising a plurality of transverse secondary steel bars (61) and a plurality of longitudinal secondary steel bars (62), the transverse secondary steel bars (61) being parallel to the ground, and the plurality of transverse secondary steel bars (61) being arranged at intervals, and the longitudinal secondary steel bars (62) being perpendicular to the ground, and the plurality of transverse secondary steel bars (61) being arranged at intervals.

10. A construction method of a shear wall structure according to any one of claims 1 to 9, characterized in that: Installing the frame body (2): fixing the steel pipe column (21) to the ground, and fixing the connecting assembly (22) to the steel pipe column (21); Install shear wall formwork: install shear wall formwork on both sides of the frame body (2); Pouring concrete: inserting an air guide tube into the steel pipe column (21), pouring concrete into the steel pipe column (21) while removing the air guide tube; pouring concrete between two shear wall formworks to form a concrete wall (1); Demoulding and curing: remove the shear wall formwork and water and cure to the concrete design strength.