Underground hot spring pipeline structure and construction method thereof
By setting up protective structures and maintenance structures inside the foundation pit, the problems of unstable installation, inconvenient maintenance and easy damage of hot spring pipelines are solved, and the service life and stability of the pipelines are improved, and the maintenance is facilitated.
Patent Information
- Application Number
- CN202510019980.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-07
- Publication Date
- 2025-02-11
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing hot spring pipelines are unstable in installation, inconvenient maintenance and easy damage.
An underground hot spring pipeline structure was designed, including a protective structure set inside the foundation pit. The protective structure consists of a box, a reservoir, a support frame and an inspection structure. The box is equipped with an insulation layer and a waterproof layer, and the reservoir prevents the pipe from soaking. The support frame realizes stable installation and adjustment of the pipe through buffer components and power components, so that the maintenance structure facilitates internal maintenance of the pipe.
Through the protection of the box and the buffering of the support frame, the service life and stability of the pipeline are improved; the maintenance structure facilitates the maintenance of the pipeline and reduces the risk of damage.
Smart Images

Figure CN119412574A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of underground pipeline construction, and in particular to an underground hot spring pipeline structure and a construction method thereof. Background Art
[0002] Hot spring pipes are used to introduce hot spring water to the required places. Hot spring pipes are laid in an overhead or underground manner. The overhead hot spring pipes are exposed to the outside, and the heat loss in the pipes is relatively serious. In addition, they are affected by the external environment, resulting in a short service life of the hot spring pipes. In the underground laying method, the hot spring pipes are laid in the foundation pit and buried. The hot spring pipes are protected by the soil layer, which reduces the impact of the hot spring pipes on the external environment. However, in the underground laying method, the hot spring pipes are directly placed in the foundation pit. On the one hand, the hot spring pipes are unstable. On the other hand, the pipes are greatly affected by the soil environment. The water in the soil can easily soak the pipes, causing corrosion to the pipes and affecting the service life of the pipes. In addition, the maintenance of the pipes is also very inconvenient, requiring excavation of the soil layer, which can easily cause damage to the pipes during the excavation process. The maintenance of hot spring pipes is inconvenient. Summary of the invention
[0003] The purpose of the present invention is to provide an underground hot spring pipeline structure and a construction method thereof, so as to solve the problems of unstable installation, inconvenient maintenance and easy damage of the existing hot spring pipeline.
[0004] To achieve the above-mentioned purpose, the present invention provides an underground hot spring pipeline structure, including a protective structure, which is arranged inside a foundation pit. The protective structure includes a box body, water reservoirs are arranged on both sides of the bottom of the box body, a cover is arranged on the top of the box body to seal the opening on the top of the box body, a support frame is arranged inside the box body to support the pipeline, and an inspection structure is arranged inside the box body to facilitate pipeline inspection, and the pipeline is connected through the inspection structure.
[0005] Preferably, a heat-insulating layer is provided on the inner wall of the box, and a waterproof layer is provided on the outer surface of the heat-insulating layer; and the two water reservoirs at the bottom of the box are connected by a connecting pipe.
[0006] Preferably, a limiting groove is provided on the lower surface of the cover, and the top of the box body is clamped in the limiting groove.
[0007] Preferably, the support frame includes a base, the base is fixed to the bottom of the box body, a mounting seat is provided above the base, a buffer assembly is provided between the mounting seat and the base, a slide plate is provided above the mounting seat, and a power assembly that drives the slide plate to slide on the mounting seat is provided on the mounting seat, a fixing cylinder is provided above the slide plate, a screw is inserted into the interior of the fixing cylinder, the screw and the fixing cylinder are connected by threaded transmission, a lower clamping plate is rotatably provided at the top end of the screw, an upper clamping plate for fixing the pipe is provided above the lower clamping plate, and the lower clamping plate and the upper clamping plate are fixedly connected by bolts; a second connecting seat is provided on the side wall of the fixing cylinder, a vertical guide rod is provided on the outer surface of the lower clamping plate, a guide hole for allowing the guide rod to pass through is provided on the second connecting seat, the guide rod is slidably connected to the second connecting seat, and the guide rod is located on both sides of the screw.
[0008] Preferably, the buffer assembly includes a buffer pad and a spring, the buffer pad is located between the mounting seat and the base, the spring is located between the base and the first connecting seat, the first connecting seat is fixed at both ends of the mounting seat, a fixing rod is fixedly provided on the base, a through hole for the fixing rod to pass through is provided on the first connecting seat, the fixing rod is slidably connected to the first connecting seat, a limiting plate is provided at the top end of the fixing rod, and the spring is sleeved on the outside of the fixing rod.
[0009] Preferably, the power assembly includes an adjusting screw, one end of which is rotatably connected to the slide, a fixing plate is fixedly provided on the base, a threaded hole is provided on the fixing plate for the adjusting screw to pass through and is adapted to the adjusting screw, a first sliding groove which has a guiding effect on the sliding of the slide is provided on the base, a first sliding block adapted to the first sliding groove is provided on the slide, the first sliding block is located in the first sliding groove and is slidably connected to the first sliding groove.
[0010] Preferably, the maintenance structure includes a lifting seat, a lifting assembly for driving the lifting seat to lift is arranged below the lifting seat, an inspection cylinder is arranged above the lifting seat, connecting pipes connected to the pipeline are arranged on both sides of the inspection cylinder, the connecting pipes are connected to the inspection cylinder, a cover plate is arranged at the top of the inspection cylinder, a limit seat inserted into the interior of the inspection cylinder is arranged at the bottom end of the cover plate, the cover plate and the inspection cylinder are sealed and fixedly connected, a clamping assembly for clamping the connecting pipe and the pipeline is arranged on the lifting seat, and the two clamping assemblies are respectively arranged on both sides of the inspection cylinder.
[0011] Preferably, the lifting assembly includes a fixed seat, which is fixed in the box body, a bidirectional screw is arranged above the fixed seat, the bidirectional screw is rotatably connected to the support plate, the support plate is fixedly arranged on the fixed seat, one end of the bidirectional screw is provided with a turning handle for driving the bidirectional screw to rotate, both ends of the bidirectional screw are respectively threadedly engaged with a transmission seat, fixed shafts are arranged on both sides of the transmission seat, and the fixed shaft is hinged to the lifting seat through a connecting rod; a sleeve is fixedly arranged at the corner of the fixed seat, and a vertical limit rod is arranged on the lifting seat, and the limit rod is located in the sleeve and is slidably connected to the sleeve.
[0012] Preferably, the clamping assembly includes two clamping plates arranged opposite to each other, both ends of the clamping plates are fixedly connected by bolts, the clamping plates are arranged on a slide seat, the slide seat is slidably arranged on a lifting seat, the lifting seat is provided with a second slide groove which has a guiding effect on the sliding of the slide seat, the slide seat is provided with a second slider adapted to the second slide groove, the second slider is located in the second slide groove and is slidably connected to the second slide groove, and the slide seat is provided with a top screw for locking the slide seat and the lifting seat.
[0013] The construction method based on the above-mentioned underground hot spring pipeline structure includes the following steps: S1. Excavate a foundation pit, compact and level it, and form a box in the foundation pit by casting concrete or laying prefabricated parts; S2. Fix the base between the two water reservoirs at the bottom of the box, place the pipe on the lower clamping plate, turn the screw, adjust the height of the lower clamping plate by the screw, turn the adjusting screw, adjust the position of the lower clamping plate by the adjusting screw, and perform hot-melt connection on the pipe. After the connection is completed, place the upper clamping plate cover above the pipe, fix the upper clamping plate on the lower clamping plate, and clamp the pipe; S3. Place the fixing seat at the bottom of the box, rotate the bidirectional screw rod, the bidirectional screw rod drives the transmission seat to slide along the bidirectional screw rod, the transmission seat drives the lifting seat to rise and fall through the fixed shaft and the connecting rod, adjust the height of the connecting pipe, move the fixing seat to adjust the position of the connecting pipe, fix the fixing seat at the bottom of the box, perform hot-melt docking on the pipe and the connecting pipe, slide the sliding seat, the sliding seat drives the clamping plate to clamp at the connection between the pipe and the connecting pipe, and fix the clamping plate with bolts; place a cover plate on the top of the inspection tube, and fix the cover plate and the inspection tube with bolts; S4. Place the cover on top of the box, and insert the top of the box into the limit groove; backfill the foundation pit to complete the construction.
[0014] The advantages and positive effects of the underground hot spring pipeline structure and construction method described in the present invention are: 1. Set up a box outside the pipeline. The reinforced concrete box protects the pipeline, prevents the pipeline from direct contact with the soil, and increases the service life of the pipeline. Set up an insulation layer inside the pipeline to reduce the heat loss of the pipeline. The setting of a water reservoir can prevent the pipeline from being soaked and protect the pipeline. The setting of the box also facilitates the inspection and maintenance of the outside of the pipeline.
[0015] 2. The buffer pads and springs on the support frame inside the box provide buffer protection for the pipeline and reduce the impact of external vibration on the pipeline. The height of the lower clamping plate can be adjusted by the slide plate and screw rod to facilitate the installation of the pipeline and improve adaptability.
[0016] 3. An inspection structure is set inside the box to facilitate inspection of the inside of the pipeline.
[0017] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic diagram of the three-dimensional structure of an embodiment of the present invention; Figure 2 A top view of an embodiment of the present invention; Figure 3 This is a schematic diagram of the box structure of an embodiment of the present invention; Figure 4 A schematic diagram of a cover structure according to an embodiment of the present invention; Figure 5 A schematic diagram of the support frame installation structure according to an embodiment of the present invention; Figure 6 This is a schematic diagram of the three-dimensional structure of a support frame according to an embodiment of the present invention; Figure 7 It is a schematic diagram of the front view structure of the three-dimensional support frame according to an embodiment of the present invention; Figure 8 A schematic diagram of the installation structure of the maintenance structure of an embodiment of the present invention; Fig. 9 A schematic diagram of the three-dimensional structure of the maintenance structure of an embodiment of the present invention; Fig.10 It is a schematic diagram of the front view of the maintenance structure of an embodiment of the present invention.
[0019] Reference numerals 1. Protective structure; 11. Box; 12. Water reservoir; 13. Connecting pipe; 14. Insulation layer; 15. Cover; 16. Limiting groove; 2. Support frame; 21. Base; 22. Mounting seat; 23. Slide plate; 24. Fixing tube; 25. Screw rod; 26. Lower clamping plate; 27. Upper clamping plate; 28. Buffer pad; 29. First connecting seat; 210. Fixing rod; 211. Spring; 212. Fixing plate; 213. Adjusting screw rod; 214. First slide groove; 215. Second connecting seat; 216. Guide rod; 3. Maintenance structure; 31. Lifting seat; 32. Maintenance cylinder; 33. Cover plate; 34. Limit seat; 35. Connecting pipe; 36. Sliding seat; 37. Clamping plate; 38. Fixed seat; 39. Bidirectional screw; 310. Transmission seat; 311. Connecting rod; 312. Fixed shaft; 313. Support plate; 314. Turning handle; 315. Sleeve; 316. Limit rod. DETAILED DESCRIPTION
[0020] The technical solution of the present invention is further described below through the accompanying drawings and embodiments.
[0021] Unless otherwise defined, the technical terms or scientific terms used in the present invention should be understood by people with ordinary skills in the field to which the present invention belongs. The words "first", "second" and similar words used in the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. "Include" or "comprise" and similar words mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.
[0022] Example like Figure 1 , Figure 2 As shown. An underground hot spring pipeline structure includes a protective structure 1, which is arranged inside a foundation pit. The protective structure 1 is used to protect the pipeline and provide a space for installing the pipeline. The protective structure 1 includes a box 11, which is a cast-in-place reinforced concrete structure or a reinforced concrete structure assembled with prefabricated parts. The box 11 is used to support the protective structure 1 to improve the protective effect. An insulation layer 14 is arranged on the inner wall of the box 11. The insulation layer 14 adopts an existing structure. The insulation layer 14 insulates the pipeline inside the box 11 to reduce the heat loss of the hot spring water in the pipeline. A waterproof layer is arranged on the outer surface of the insulation layer 14. The waterproof layer is arranged on the two surfaces of the insulation layer 14, that is, the insulation layer 14 is connected to the inner wall of the box 11 through the insulation layer 14, and the exposed surface of the insulation layer 14 is also provided with the insulation layer 14. On the one hand, it prevents water in the foundation pit from entering the box 11, and on the other hand, it protects the insulation layer 14.
[0023] like Figure 3 As shown. Water reservoirs 12 are provided on both sides of the bottom of the box 11, and the two water reservoirs 12 at the bottom of the box 11 are connected by a connecting pipe 13. Once the waterproof layer on the inner wall of the box 11 is damaged or the pipeline leaks, the water that penetrates into the box 11 or the leaked water can be temporarily stored in the water reservoir 12 to prevent the pipeline from being soaked. A humidity sensor can be provided in the water reservoir 12 to monitor the humidity in the water reservoir 12, so as to facilitate timely maintenance of the box 11 or the pipeline.
[0024] like Figure 4As shown. A cover 15 for sealing the top opening of the box body 11 is provided on the top of the box body 11, and a limiting groove 16 is fixedly provided on the lower surface of the cover 15, and the top of the box body 11 is clamped in the limiting groove 16. An insulation layer 14 is also provided on the inner surface of the cover 15 to improve the insulation effect. A sealing gasket is provided in the limiting groove 16 of the cover 15 to improve the sealing effect between the box body 11 and the cover 15. The cover 15 can be made of stainless steel metal material or a prefabricated reinforced concrete slab. In order to improve the stability of the connection between the cover 15 and the box body 11, the cover 15 can be detachably fixed to the box body 11 by bolts, and the box body 11 can be inspected by opening the cover 15.
[0025] like Figure 5 , Figure 6 , Figure 7 As shown. A support frame 2 for supporting the pipeline is arranged inside the box 11, and the support frame 2 can be a metal frame. The support frame 2 includes a base 21, and the base 21 is fixed to the bottom of the box 11 by bolts. A mounting seat 22 is arranged above the base 21, and a buffer assembly is arranged between the mounting seat 22 and the base 21. The buffer assembly includes a buffer pad 28 and a spring 211, and the rubber buffer pad 28 is located between the mounting seat 22 and the base 21. The buffer pad 28 is fixedly connected to the mounting seat 22 and the base 21. The spring 211 is located between the base 21 and the first connecting seat 29, and the two ends of the spring 211 are respectively fixed to the base 21 and the first connecting seat 29. The first connecting seat 29 is fixed to the two ends of the mounting seat 22. A vertical fixing rod 210 is fixedly arranged on the base 21, and a through hole is arranged on the first connecting seat 29 for the fixing rod 210 to pass through, and the fixing rod 210 is slidably connected to the first connecting seat 29. A limit plate is fixedly arranged at the top of the fixing rod 210 to prevent the first connecting seat 29 from slipping off the fixing rod 210. The spring 211 is sleeved on the outside of the fixing rod 210. The spring 211 and the buffer pad 28 are buffered with the mounting seat 22 to reduce the influence of external vibration on the pipeline.
[0026] A slide plate 23 is arranged above the mounting seat 22, and a power assembly is arranged on the mounting seat 22 to drive the slide plate 23 to slide on the mounting seat 22. The power assembly includes an adjusting screw rod 213, and one end of the adjusting screw rod 213 is rotatably connected to the slide plate 23 through a bearing. A fixing plate 212 is fixedly arranged on the base 21, and a threaded hole is arranged on the fixing plate 212 for the adjusting screw rod 213 to pass through and to match the adjusting screw rod 213. A first slide groove 214 having a guiding effect on the sliding of the slide plate 23 is arranged on the base 21, and a first slider matched with the first slide groove 214 is arranged on the slide plate 23, and the first slider is located in the first slide groove 214 and is slidably connected with the first slide groove 214.
[0027] A fixed cylinder 24 is fixedly arranged above the slide plate 23, and a screw 25 is inserted inside the fixed cylinder 24. The screw 25 is connected to the fixed cylinder 24 through a threaded transmission. A lower clamping plate 26 is rotatably arranged at the top of the screw 25 through a bearing, and an upper clamping plate 27 for fixing the pipeline is arranged above the lower clamping plate 26. The lower clamping plate 26 and the upper clamping plate 27 are fixedly connected by bolts. Both the upper clamping plate 27 and the lower clamping plate 26 are arc-shaped plates. A second connecting seat 215 is fixedly arranged on the side wall of the fixed cylinder 24, and a vertical guide rod 216 is fixedly arranged on the outer surface of the lower clamping plate 26. A guide hole for the guide rod 216 to pass through is arranged on the second connecting seat 215, and the guide rod 216 is slidably connected to the second connecting seat 215. The guide rod 216 is located on both sides of the screw 25. The guide rod 216 has a guiding effect on the lifting and lowering of the lower clamping plate 26.
[0028] like Figure 8 , Fig. 9 , Fig.10 As shown. An inspection structure 3 is provided inside the housing 11 for facilitating the inspection of the pipeline, and the pipeline is connected through the inspection structure 3. The inspection structure 3 facilitates the inspection of the pipeline. The inspection structure 3 includes a lifting seat 31, and a lifting assembly for driving the lifting seat 31 to lift is provided below the lifting seat 31. The lifting assembly includes a fixed seat 38, and the fixed seat 38 is fixed in the housing 11. A bidirectional screw rod 39 is provided above the fixed seat 38, and the bidirectional screw rod 39 is rotatably connected to the support plate 313 through a bearing. The support plate 313 is fixedly set on the fixed seat 38. A turning handle 314 for driving the bidirectional screw rod 39 to rotate is fixedly set at one end of the bidirectional screw rod 39. The two ends of the bidirectional screw rod 39 are respectively threadedly engaged with a transmission seat 310. Fixed shafts 312 are fixedly provided on both sides of the transmission seat 310, and the fixed shaft 312 is hinged to the lifting seat 31 through a connecting rod 311. A sleeve 315 is fixedly arranged at the corner of the fixed seat 38, and a vertical limiting rod 316 is arranged on the lifting seat 31, and the limiting rod 316 is located in the sleeve 315 and is slidably connected with the sleeve 315. The sleeve 315 and the limiting rod 316 have the function of guiding and limiting the lifting of the lifting seat 31.
[0029] An inspection cylinder 32 is fixedly arranged above the lifting seat 31, and connecting pipes 35 connected to the pipeline are arranged on both sides of the inspection cylinder 32, and the connecting pipes 35 are connected to the inspection cylinder 32. A cover plate 33 is arranged at the top of the inspection cylinder 32, and a limit seat 34 inserted into the inside of the inspection cylinder 32 is fixedly arranged at the bottom of the cover plate 33. A rubber sealing gasket is arranged on the cover plate 33, and the cover plate 33 and the inspection cylinder 32 are sealed and connected by the sealing gasket. The cover plate 33 and the inspection cylinder 32 are fixedly connected by bolts. In order to improve the thermal insulation effect, a thermal insulation layer 14 is arranged outside the inspection cylinder 32.
[0030] The lifting seat 31 is provided with a clamping assembly for clamping the connecting pipe 35 and the pipeline, and the two clamping assemblies are respectively arranged on both sides of the inspection tube 32. The clamping assembly includes two arc-shaped clamping plates 37 arranged opposite to each other, and the two ends of the clamping plates 37 are fixedly connected by bolts. The clamping plate 37 is fixedly arranged on the slide seat 36, and the slide seat 36 is slidably arranged on the lifting seat 31. The lifting seat 31 is provided with a second slide groove that has a guiding effect on the sliding of the slide seat 36, and the slide seat 36 is fixedly provided with a second slider adapted to the second slide groove, and the second slider is located in the second slide groove and slidably connected to the second slide groove. The slide seat 36 is provided with a top screw for locking the slide seat 36 and the lifting seat 31. The clamping plate 37 is driven to slide by the slide seat 36, so as to facilitate the connection between the connecting pipe 35 and the pipeline. The clamping plate 37 clamps and supports the connecting pipe 35 and the pipeline, thereby improving the stability of the connection.
[0031] Support frames 2 are respectively arranged on both sides of the inspection structure 3, and the pipeline is supported by the support frames 2 to improve the stability of the pipeline.
[0032] The construction method of the underground hot spring pipeline structure comprises the following steps: S1, excavating a foundation pit, compacting and leveling the foundation pit, forming a box body 11 in the foundation pit by using cast-in-place concrete or laying prefabricated parts, and laying a thermal insulation layer 14 in the box body 11.
[0033] S2. Fix the base 21 between the two water reservoirs 12 at the bottom of the box 11 by bolts. Place the pipe on the lower clamping plate 26, rotate the screw 25, and adjust the height of the lower clamping plate 26 by the screw 25; rotate the adjusting screw rod 213, and adjust the position of the lower clamping plate 26 by adjusting the screw rod 213; perform hot-melt connection on the pipe ends, and after the connection is completed, cover the upper clamping plate 27 above the pipe, and fix the upper clamping plate 27 on the lower clamping plate 26 by bolts to clamp and fix the pipe.
[0034] S3. Place the fixed seat 38 at the bottom of the box 11, rotate the bidirectional screw 39, the bidirectional screw 39 drives the transmission seat 310 to slide along the bidirectional screw 39, and the transmission seat 310 drives the lifting seat 31 to rise and fall through the fixed shaft 312 and the connecting rod 311 to adjust the height of the connecting pipe 35. Move the fixed seat 38 to adjust the position of the connecting pipe 35, and fix the fixed seat 38 to the bottom of the box 11 with bolts. Butt-melt the pipe and the connecting pipe 35, slide the slide 36, and drive the clamping plate 37 to clamp at the connection between the pipe and the connecting pipe 35, and fix the clamping plate 37 with bolts. Place the cover plate 33 above the inspection tube 32, and fix the cover plate 33 and the inspection tube 32 with bolts.
[0035] S4, the cover 15 is placed on the top of the box 11, and the top of the box 11 is inserted into the limit groove 16. The foundation pit is backfilled, and the construction is completed. During the pipeline construction, the pipeline is laid along a specific direction.
[0036] Therefore, the underground hot spring pipeline structure and the construction method thereof described in the present invention can solve the problems of unstable installation, inconvenient maintenance and easy damage of existing hot spring pipelines.
[0037] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that they can still modify or replace the technical solution of the present invention with equivalents, and these modifications or equivalent replacements cannot cause the modified technical solution to deviate from the spirit and scope of the technical solution of the present invention.
Claims
1. An underground hot spring pipeline structure, characterized in that: The protective structure includes a protective structure, which is arranged inside the foundation pit. The protective structure includes a box body, water reservoirs are arranged on both sides of the bottom of the box body, a cover for sealing the top opening of the box body is arranged on the top of the box body, a support frame for supporting the pipeline is arranged inside the box body, and an inspection structure for facilitating pipeline inspection is arranged inside the box body, and the pipelines are connected through the inspection structure; The support frame includes a base, the base is fixed to the bottom of the box body, a mounting seat is arranged above the base, a buffer assembly is arranged between the mounting seat and the base, a slide plate is arranged above the mounting seat, and a power assembly that drives the slide plate to slide on the mounting seat is arranged on the mounting seat, a fixing cylinder is arranged above the slide plate, a screw is inserted into the interior of the fixing cylinder, the screw and the fixing cylinder are connected by threaded transmission, a lower clamping plate is rotatably arranged at the top end of the screw, an upper clamping plate for fixing the pipe is arranged above the lower clamping plate, and the lower clamping plate and the upper clamping plate are fixedly connected by bolts; a second connecting seat is arranged on the side wall of the fixing cylinder, a vertical guide rod is arranged on the outer surface of the lower clamping plate, a guide hole for allowing the guide rod to pass through is arranged on the second connecting seat, the guide rod is slidably connected to the second connecting seat, and the guide rod is located on both sides of the screw.
2. An underground hot spring pipeline structure according to claim 1, characterized in that: A heat-insulating layer is arranged on the inner wall of the box body, and a waterproof layer is arranged on the outer surface of the heat-insulating layer; and two water storage tanks at the bottom of the box body are connected through a connecting pipe.
3. An underground hot spring pipeline structure according to claim 2, characterized in that: A limiting groove is arranged on the lower surface of the cover, and the top of the box body is clamped in the limiting groove.
4. An underground hot spring pipeline structure according to claim 3, characterized in that: The buffer assembly includes a buffer pad and a spring, the buffer pad is located between the mounting seat and the base, the spring is located between the base and the first connecting seat, the first connecting seat is fixed at both ends of the mounting seat, a fixing rod is fixedly provided on the base, a through hole for the fixing rod to pass through is provided on the first connecting seat, the fixing rod is slidably connected to the first connecting seat, a limiting plate is provided on the top end of the fixing rod, and the spring is sleeved on the outside of the fixing rod.
5. An underground hot spring pipeline structure according to claim 4, characterized in that: The power assembly includes an adjusting screw, one end of which is rotatably connected to the slide, a fixing plate is fixedly arranged on the base, a threaded hole is arranged on the fixing plate for the adjusting screw to pass through and is adapted to the adjusting screw, a first sliding groove which has a guiding effect on the sliding of the slide is arranged on the base, a first sliding block adapted to the first sliding groove is arranged on the slide, and the first sliding block is located in the first sliding groove and is slidably connected to the first sliding groove.
6. An underground hot spring pipeline structure according to claim 5, characterized in that: The maintenance structure includes a lifting seat, a lifting assembly for driving the lifting seat to lift is arranged below the lifting seat, an maintenance cylinder is arranged above the lifting seat, connecting pipes connected to the pipeline are arranged on both sides of the maintenance cylinder, the connecting pipes are connected to the maintenance cylinder, a cover plate is arranged at the top of the maintenance cylinder, a limiting seat inserted into the interior of the maintenance cylinder is arranged at the bottom of the cover plate, the cover plate and the maintenance cylinder are sealed and fixedly connected, a clamping assembly for clamping the connecting pipe and the pipeline is arranged on the lifting seat, and the two clamping assemblies are respectively arranged on both sides of the maintenance cylinder.
7. An underground hot spring pipeline structure according to claim 6, characterized in that: The lifting assembly includes a fixed seat, which is fixed in the box body. A bidirectional screw is arranged above the fixed seat, which is rotatably connected to the support plate. The support plate is fixedly arranged on the fixed seat. A turning handle for driving the bidirectional screw to rotate is arranged at one end of the bidirectional screw. Transmission seats are respectively threadedly engaged at both ends of the bidirectional screw. Fixed shafts are arranged on both sides of the transmission seat, and the fixed shafts are hinged to the lifting seat through connecting rods. Sleeves are fixedly arranged at the corners of the fixed seat, and a vertical limit rod is arranged on the lifting seat. The limit rod is located in the sleeve and is slidably connected to the sleeve.
8. An underground hot spring pipeline structure according to claim 7, characterized in that: The clamping assembly includes two clamping plates arranged opposite to each other, both ends of the clamping plates are fixedly connected by bolts, the clamping plates are arranged on a slide seat, the slide seat is slidably arranged on a lifting seat, a second slide groove having a guiding effect on the sliding of the slide seat is arranged on the lifting seat, a second slider matched with the second slide groove is arranged on the slide seat, the second slider is located in the second slide groove and is slidably connected to the second slide groove, and a top screw for locking the slide seat and the lifting seat is arranged on the slide seat.
9. A construction method for an underground hot spring pipeline structure according to claim 8, characterized in that: The following steps are involved: S1. Excavate a foundation pit, compact and level it, and form a box in the foundation pit by casting concrete or laying prefabricated parts; S2. Fix the base between the two water reservoirs at the bottom of the box, place the pipe on the lower clamping plate, turn the screw, adjust the height of the lower clamping plate by the screw, turn the adjusting screw, adjust the position of the lower clamping plate by the adjusting screw, and perform hot-melt connection on the pipe. After the connection is completed, place the upper clamping plate cover above the pipe, fix the upper clamping plate on the lower clamping plate, and clamp the pipe; S3. Place the fixing seat at the bottom of the box, rotate the bidirectional screw rod, the bidirectional screw rod drives the transmission seat to slide along the bidirectional screw rod, the transmission seat drives the lifting seat to rise and fall through the fixed shaft and the connecting rod, adjust the height of the connecting pipe, move the fixing seat to adjust the position of the connecting pipe, fix the fixing seat at the bottom of the box, perform hot-melt docking on the pipe and the connecting pipe, slide the sliding seat, the sliding seat drives the clamping plate to clamp at the connection between the pipe and the connecting pipe, and fix the clamping plate with bolts; place a cover plate on the top of the inspection tube, and fix the cover plate and the inspection tube with bolts; S4. Place the cover on top of the box, and insert the top of the box into the limit groove; backfill the foundation pit to complete the construction.
Citation Information
Patent Citations
Shock absorption type protection supporting mechanism for road construction pre-buried pipeline protection
CN112459107A
Urban pipeline drinking water quality monitoring device
CN212568737U
Anti-collapse protection device for municipal underground pipeline
CN218564564U
Butt joint equipment for pipeline maintenance
CN221270221U
Water conservancy construction pipeline protection device
CN221922538U